Water purifier and cooling method of water purifier comprising same
The water purifier's innovative design uses a shell and temperature-controlled wastewater circulation to efficiently cool booster pumps, addressing inefficiencies and costs in existing methods by reusing wastewater for effective heat dissipation.
Patent Information
- Application Number
- CN202310638112.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-01
- Publication Date
- 2024-12-03
AI Technical Summary
The cooling of booster pumps in water purifiers is inefficient and costly, with existing methods wasting energy and reducing the pump's lifespan due to high temperatures and inadequate heat dissipation.
A water purifier design that includes a shell around the booster pump with a passage for wastewater circulation, equipped with a temperature detection unit and control system to adjust wastewater flow based on pump temperature, utilizing wastewater for effective cooling without additional cooling mechanisms.
Enhances booster pump cooling efficiency, extends its lifespan, and reduces costs by reusing wastewater for cooling, while optimizing cooling based on actual temperature conditions.
Smart Images

Figure CN119062567A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water purifier manufacturing, and in particular to a water purifier and a water purifier cooling method comprising the same. Background Art
[0002] With the development of water purification products, users have higher and higher requirements for flow rate, filter element service life, etc. In order to meet users' demand for flow rate, the flow rate of the booster pump used in the water purifier is getting larger and larger. Correspondingly, the working pressure of the booster pump is getting higher and higher. This makes the heating problem of the booster pump more obvious when it is working. In particular, in order to reduce noise, the outside of the booster pump will be designed with a soundproof shell and some sound-absorbing materials, which makes it more difficult for the booster pump to dissipate heat and the temperature is too high, which reduces the life of the booster pump or causes some safety problems.
[0003] In the prior art, for the high temperature of the booster pump and the difficulty in heat dissipation, a condensing plate or air-conditioning mechanism for cooling is generally arranged on the outer peripheral side of the booster pump, and the condensing plate or air-conditioning mechanism is brought into contact with the surface of the booster pump to achieve heat exchange on the surface of the booster pump. However, this cooling method not only increases the manufacturing cost of the water purifier and increases the use cost, but also starts the condensing plate or air-conditioning mechanism when the booster pump is working but not yet in a high temperature state, that is, the booster pump cannot be effectively cooled according to the actual situation, thereby causing part of the energy consumption of the water purifier to be wasted. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the defects in the prior art that the cooling cost of the booster pump is high and the booster pump cannot be effectively cooled according to actual conditions, and to provide a water purifier and a water purifier cooling method including the same.
[0005] The present invention solves the above technical problems through the following technical solutions:
[0006] A water purifier, comprising a booster pump and a wastewater pipe, wherein a shell is provided on the outer peripheral side cover of the booster pump, a passage is formed between the shell and the outer surface of the booster pump, and the wastewater pipe is connected to the passage, and the water purifier also comprises a temperature detection unit, a valve body and a control unit, wherein the valve body is mounted on the wastewater pipe, the temperature detection unit is arranged on the shell, the valve body, the temperature detection unit and the control unit are electrically connected, the temperature detection unit is used to measure the surface temperature of the booster pump, and the control unit adjusts the opening of the valve body according to the temperature value of the temperature detection unit.
[0007] In the present solution, the shell cover is arranged on the outer surface of the booster pump so that a passage is formed between the booster pump and the shell. The wastewater pipe is used to supply water to the passage to improve the utilization rate of the wastewater generated by the water purifier, and the surface temperature of the booster pump is taken away by the wastewater, thereby achieving effective cooling of the booster pump. There is no need to additionally set up a cooling mechanism to cool the booster pump to reduce the use cost of the water purifier, while increasing the service life of the booster pump.
[0008] In addition, by providing a temperature detection unit, a valve body and a control unit and adjusting the valve body accordingly according to the temperature value of the booster pump actually measured by the temperature detection unit, the wastewater flow entering the passage can be controlled to achieve the most effective cooling of the booster pump under different temperature conditions, thereby avoiding the wastewater flow being wasted or the inability to effectively cool down due to the mismatch between the wastewater flow and the temperature state corresponding to the booster pump, and further improving the cooling efficiency of the booster pump.
[0009] Preferably, the water purifier includes an ejector, the water inlet of the ejector is connected to the wastewater pipe, the water outlet of the ejector is connected to the passage, a mixing chamber is formed between the water inlet and the water outlet, and the ejector is also provided with an air inlet, which is connected to the mixing chamber.
[0010] In this solution, the ejector is used to mix the wastewater and air in the mixing chamber to form bubble water. The bubble water not only has the function of cooling the wastewater, but the air released when the small bubbles burst will also mix with the water to take away the surface temperature of the booster pump. Compared with simply injecting wastewater into the passage for cooling, its cooling efficiency is improved, the surface temperature of the booster pump drops faster, and it takes less time to cool the booster pump from a high temperature state to a normal temperature, thereby ensuring the service life of the booster pump.
[0011] Preferably, the calculation formula for the water inlet of the ejector is: Wherein, μ is the flow coefficient, A is the cross-sectional area of the water inlet, ΔP is the pressure difference between the water inlet and the water outlet, ρ is the density of the wastewater, and the density of the wastewater is 1*10 3 kg / m 3 .
[0012] In this scheme, the water inlet of the ejector is calculated by the formula to obtain the ideal flow value Q. When the actual water inlet entering the ejector is Q, the air introduced by the ejector is mixed with the wastewater to form bubble water, and the units of the bubbles in the bubble water are all in micron level. In addition, the ideal flow value Q is instructive for the actual flow entering the ejector, that is, the valve body opening changes after adjustment by the control unit, and the changed valve body opening determines whether the actual flow entering the ejector has a proportional relationship with Q or is equal to Q. Only when the actual flow entering the ejector is equal to Q, the bubble water has the best cooling effect on the booster pump and the highest cooling efficiency for the booster pump.
[0013] Preferably, the water purifier further comprises a flow meter, the flow meter is electrically connected to the control unit, and the flow meter is installed on the waste water pipe and located between the valve body and the ejector.
[0014] In this solution, the actual wastewater flow rate entering the ejector is detected by a flow meter, and then it is determined whether the wastewater flow rate entering the passage within different temperature ranges is appropriate, thereby improving the cooling efficiency of the booster pump.
[0015] Preferably, the control unit includes a controller and a main control board, the controller is arranged on the valve body, the controller includes a drive motor and a gear transmission assembly, the drive motor drives the valve stem of the valve body to rotate through the gear transmission assembly, the main control board is electrically connected to the drive motor, and the main control board is used to receive the temperature value of the temperature detection unit and control the rotation of the drive motor according to the temperature value to adjust the opening of the valve body.
[0016] In this solution, the drive motor drives the valve stem of the valve body through the gear transmission assembly, and the main control board is electrically connected to the drive motor to receive signals and drive the drive motor to rotate in time, thereby adjusting the opening of the valve body in time.
[0017] Preferably, the gear transmission assembly includes a complete gear, an intermittent gear, a first limit switch and a second limit switch. The complete gear shaft is connected to the output shaft of the drive motor, the intermittent gear shaft is connected to the valve stem, and the intermittent gear is meshed with the complete gear. The first limit switch and the second limit switch are arranged on both sides of the intermittent gear. When the first side of the intermittent gear contacts the first limit switch, the valve body is closed, and when the second side of the intermittent gear contacts the second limit switch, the valve body is fully opened.
[0018] In this solution, a full gear and an intermittent gear are set to improve the accuracy of opening or closing the valve body, so that the flow rate of wastewater entering the passage can meet the cooling requirement of the booster pump. A first limit switch and a second limit switch are set to correspond to different states of the valve body. When the intermittent gear contacts the first limit switch, the valve body always remains in a closed state, and wastewater cannot flow into the passage. This is suitable for the situation when the water purifier has just started and the booster pump has not yet entered a high temperature state. When the intermittent gear contacts the second limit switch, the valve body always remains in a fully open state, and the flow rate of wastewater entering the passage can meet the cooling requirement of the booster pump.
[0019] Preferably, the inner wall of the housing is streamlined corresponding to the booster pump;
[0020] And / or, the shell is provided with a vacuum interlayer.
[0021] In this solution, the inner wall of the shell is set to a streamlined structure so that the bubble water entering the passage can quickly flow out of the passage, and the resistance of the wastewater is minimal, allowing the bubble water to pass at an optimal flow rate and take away the heat of the booster pump more quickly; the vacuum interlayer is used to reduce the noise of the booster pump, so that the noise transmitted to the outside of the booster pump is reduced when the booster pump is working.
[0022] A method for cooling a water purifier is implemented by using the above-mentioned water purifier, and the method for cooling a water purifier comprises the following steps:
[0023] S1. Start the water purifier, and the control unit controls the valve body to open;
[0024] S2, the control unit controls the valve body to open and controls the opening of the valve body according to the temperature value of the temperature detection unit, and keeps the opening of the valve body for 5 minutes after adjustment, and repeatedly measures the temperature value and repeatedly adjusts the opening of the valve body until the water purifier is turned off;
[0025] S3. When the water purifier is turned off, the control unit closes the valve body.
[0026] In this solution, the water purifier is started to transmit a signal to the control unit, and the main control board of the control unit is connected to the drive motor to drive the valve stem of the valve body to rotate and open the valve body, and the opening of the valve body is adjusted according to the surface temperature of the booster pump actually measured by the temperature detection unit. The flow entering the passage within the corresponding temperature range is guaranteed to achieve the highest cooling efficiency, that is, the effective cooling of the booster pump is achieved in a shorter time. As the use time of the water purifier increases, the surface temperature of the booster pump is repeatedly detected every 5 minutes to adapt to the actual situation that the surface temperature of the booster pump changes under different use times, so as to reasonably utilize the wastewater flow.
[0027] Preferably, in step S2, the maximum temperature value is set to T, and the flow rate of the valve body is set to Q. b , and determine whether the temperature value is greater than or equal to 55%T. If so, further determine whether the temperature value is greater than or equal to 80%T. When the temperature value is greater than or equal to 80%T, adjust the opening of the valve body, and measure the actual flow of the valve body through the flow meter to see whether it meets 85%Q b If yes, keep the valve opening, if no, continue to adjust the valve opening until the actual flow of the valve is 85%Q b .
[0028] In this solution, the valve opening is adjusted accordingly according to the temperature range of the temperature actually measured by the temperature detection unit. According to multiple experiments, the valve opening is 85% Q b It can meet the cooling demand of this temperature range, and the cooling efficiency takes less time than other valve body openings.
[0029] Preferably, in step S2, the maximum temperature value is set to T, and the flow rate of the valve body is set to Q. b , and determine whether the temperature value is greater than or equal to 55%T. If so, further determine whether the temperature value is greater than or equal to 100%T. When the temperature value reaches T, adjust the opening of the valve body, and measure the actual flow of the valve body through the flow meter to see whether it meets Q b If yes, then keep the valve opening, otherwise continue to adjust the valve opening until the actual flow rate of the valve body is Q b .
[0030] In this scheme, the valve opening is adjusted accordingly according to the temperature range of the temperature actually measured by the temperature detection unit. According to multiple experiments, the valve opening is Q b It can meet the cooling demand of this temperature range, and the cooling efficiency takes less time than other valve body openings.
[0031] Preferably, in step S2, the maximum temperature value is set to T, and the flow rate of the valve body is set to Q. b , and determine whether the temperature value is greater than or equal to 55%T. If so, further determine whether the temperature value is less than 80%T. When the temperature value is less than 80%T, adjust the opening of the valve body, and measure the actual flow of the valve body by the flow meter to see whether it meets 70%Q b If yes, keep the valve opening, if no, continue to adjust the valve opening until the actual flow of the valve is 70%Q b .
[0032] In this solution, the valve opening is adjusted accordingly according to the temperature range of the temperature actually measured by the temperature detection unit. According to multiple experiments, the valve opening is 70% Q b It can meet the cooling demand of this temperature range, and the cooling efficiency takes less time than other valve body openings.
[0033] Preferably, before step S1, the method further includes the following steps:
[0034] When the water purifier is not started, the control unit always closes the valve body.
[0035] In this solution, the valve body is always kept closed before the water purifier is started so that the pressure of the water purification pipe part inside the water purifier is guaranteed, thereby avoiding the situation where the flow of the water purification pipe part becomes smaller due to the internal pressure of the water purifier being released from the waste water pipe when the valve body is just started, thus affecting the user experience.
[0036] The positive progressive effect of the present invention is that: the present invention sets a shell on the outer peripheral side of the booster pump, and the shell and the surface of the booster pump form a passage for fluid circulation, and the wastewater pipe of the water purifier is connected to the passage, so that the wastewater generated by the water purifier during operation enters the passage through the wastewater pipe and takes away the surface heat of the booster pump, thereby achieving effective cooling of the booster pump. At the same time, the wastewater that should have been discharged into the sewer is reused, and there is no need to additionally set up a cooling mechanism to cool the booster pump. The structure is simple and the cost is reduced, which effectively guarantees the service life of the booster pump and the water purifier. In addition, by setting a temperature detection unit, a valve body and a control unit and adjusting the valve body accordingly according to the temperature value of the booster pump actually measured by the temperature detection unit, the wastewater flow entering the passage is controlled, so as to perform the most effective cooling for the booster pump under different temperature states, avoid the wastewater flow or the inability to effectively cool down due to the mismatch between the wastewater flow and the temperature state corresponding to the booster pump, and further improve the cooling efficiency of the booster pump. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 The figure is a schematic diagram of the connection between the waste water pipe and the shell according to an embodiment of the present invention.
[0038] Figure 2 It is a schematic structural diagram of a valve body and a flow meter according to an embodiment of the present invention.
[0039] Figure 3 This is a positional relationship diagram of a complete gear and an intermittent gear according to an embodiment of the present invention.
[0040] Figure 4 Schematic diagram of the structure of an ejector according to an embodiment of the present invention.
[0041] Figure 5 for Figure 4AA section view.
[0042] Figure 6 FIG. 1 is a schematic diagram of a vacuum interlayer of a shell according to an embodiment of the present invention.
[0043] Figure 7 This is a flow chart of cooling the booster pump according to an embodiment of the present invention.
[0044] Description of reference numerals:
[0045] Booster pump 1
[0046] Housing 11
[0047] Vacuum interlayer 111
[0048] Path 12
[0049] Wastewater pipe 2
[0050] Control unit 3
[0051] Controller 31
[0052] Drive motor 311
[0053] Gear transmission assembly 312
[0054] Complete gear 3121
[0055] Intermittent gear 3122
[0056] First limit switch 32
[0057] Second limit switch 33
[0058] The first side portion 34
[0059] Second side portion 35
[0060] Valve body 4
[0061] Ejector 5
[0062] Mixing chamber 51
[0063] Air Inlet 52
[0064] Flow meter 6 DETAILED DESCRIPTION
[0065] The present invention is further described below by way of examples, but the present invention is not limited to the scope of the examples.
[0066] This embodiment provides a water purifier, the specific structure is as follows Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, the water purifier includes a booster pump 1 and a wastewater pipe 2. The booster pump 1 is a booster pump structure in the prior art. This embodiment is not a structural improvement of the booster pump 1, and no further details are given herein. The outer peripheral side cover of the booster pump 1 is provided with a shell 11. The shell 11 is an elliptical structure and has an accommodating cavity formed therein. The inner wall of the shell 11 is spaced apart from the outer surface of the booster pump 1 to form a passage 12. The booster pump 1 is arranged in the accommodating cavity of the shell 11 and the shell 11 has an inlet and an outlet. The wastewater pipe 2 is connected to the inlet of the shell 11, so that the wastewater can enter the passage 12 through the wastewater pipe 2 and contact the outer surface of the booster pump 1, thereby taking away the heat of the outer surface of the booster pump 1 to achieve effective cooling of the booster pump 1. In addition, wastewater is supplied to passage 12 by wastewater pipe 2, which greatly improves the utilization rate of wastewater compared to the method of directly discharging purified wastewater into the sewer. Compared with the method of setting a cooling mechanism on the outer surface of booster pump 1, such as air conditioning or fan to cool the surface of booster pump 1, it has lower cost and more convenient wastewater acquisition, reduces the use cost of water purifier, and improves the service life of booster pump 1 and water purifier.
[0067] like Figure 2 and Figure 3 As shown, in this embodiment, the water purifier also includes a control unit 3 and a valve body 4. The valve body 4 is a valve body structure in the prior art and has a rotatable valve stem. The valve body 4 is opened or closed by rotating the valve stem, wherein the valve body 4 is installed on the wastewater pipe 2 and the wastewater pipe 2 is opened or closed through the valve body 4. By keeping the valve body 4 closed when the water purifier is not started, the pressure balance inside the water purifier is ensured to avoid the insufficient pressure of the water purification pipe of the water purifier affecting the flow of the water purification pipe. This is the prior art and will not be described in detail here. The control unit 3 is arranged on the valve body 4 and the valve body 4 is electrically connected to the control unit 3. The control unit 3 includes a controller 31, which is rotatably connected to the valve stem of the valve body 4, so as to replace the manual adjustment of the valve body 4 opening or closing by automatically adjusting the valve body 4 to open or close, thereby improving the automation of the water purifier.
[0068] Specifically, the controller 31 is used to receive a start or shut down signal from the water purifier. When the water purifier is started, the signal is transmitted to the controller 31, so that the controller 31 drives the valve stem to rotate and correspondingly opens the valve body 4. By opening the valve body 4, the waste water generated by the filtration of the water purifier when it is started flows into the passage 12 through the waste water pipe 2, thereby achieving effective cooling of the booster pump 1. The controller 31 can select a motor structure for receiving signals and rotating in the prior art. The drive shaft of the motor structure can be coaxially arranged with the valve stem or driven by gears. This is a prior art and will not be described in detail here.
[0069] Further, the control unit 3 also includes a main control board (not shown in the figure), the controller 31 is arranged on the valve body 4 and the controller 31 includes a drive motor 311 and a gear transmission assembly 312, the drive motor 311 has a drive shaft, the gear transmission assembly 312 is arranged between the valve stem and the drive shaft and the gear transmission assembly 312 is driven by the drive shaft to rotate so that the valve stem rotates accordingly and finally the valve body 4 is opened or closed. Compared with other rotating connection methods, the gear transmission assembly 312 is not only provided with high transmission accuracy, but also with low cost and can be reused many times, so as to timely adjust the opening of the valve body 4 when the water purifier is started and the booster pump 1 is working, so as to meet the cooling demand of the booster pump 1. The main control board is electrically connected to the water purifier for receiving signals from the water purifier, and the main control board is also electrically connected to the drive motor 311 to start the drive motor 311 in time. Among them, the drive motor 311 and the main control board select the structure for receiving signals in the prior art and the motor structure for starting or closing according to the signals.
[0070] Among them, Figure 3As shown, in this embodiment, the controller 31 has a bottom plate, the bottom plate is a rectangular plate and a shell is covered on the bottom plate, a space for accommodating a gear transmission assembly 312, a part of the drive shaft and a part of the valve stem is formed in the shell, through holes are provided on the bottom plate corresponding to the valve stem and the drive shaft, the valve stem and the drive shaft extend from the through holes and extend into the space formed by the shell, the valve stem and the drive shaft are spaced apart and the valve stem and the drive shaft are rotationally connected through the gear transmission assembly 312, the gear transmission assembly 312 includes a full gear 3121, an intermittent gear 3122, The first limit switch 32 and the second limit switch 33, the full gear 3121 is a circular ring gear and is axially connected to the output shaft of the driving motor 311, the intermittent gear 3122 is a sector gear and is axially connected to the valve stem, the intermittent gear 3122 is meshed with the full gear 3121 and the first limit switch 32 and the second limit switch 33 are arranged on both sides of the intermittent gear 3122, and the first side portion 34 and the second side portion 35 are respectively protruded on both sides of the intermittent gear 3122 corresponding to the first limit switch 32 and the second limit switch 33, and are started by the main control board The driving motor 311 rotates the driving shaft and drives the full gear 3121 to rotate, and the corresponding intermittent gear 3122 rotates and drives the valve stem to rotate. When the first side portion 34 of the intermittent gear 3122 contacts the first limit switch 32, the valve body 4 is closed, and when the second side portion 35 of the intermittent gear 3122 contacts the second limit switch 33, the valve body 4 is fully opened. By setting the full gear 3121 and the intermittent gear 3122 to improve the accuracy of opening or closing the valve body 4, the flow rate of the wastewater entering the passage 12 can meet the requirements under different temperature conditions. In order to cool down the booster pump 1, the first limit switch 32 and the second limit switch 33 are set to correspond to different states of the valve body 4. When the intermittent gear 3122 contacts the first limit switch 32, the valve body 4 always remains in a closed state, and waste water cannot flow into the passage 12. This is suitable for the situation when the water purifier has just been started and the booster pump 1 has not yet entered a high temperature state. When the intermittent gear 3122 contacts the second limit switch 33, the valve body 4 always remains in a fully open state, and the waste water flow entering the passage 12 can meet the cooling demand of the booster pump 1 under a high temperature state.
[0071] In this embodiment, a temperature detection unit (not shown in the figure) is also provided on the shell 11. The temperature detection unit is electrically connected to the main control board. One end of the temperature detection unit extends into the shell 11 and is arranged close to the pump head of the boost pump 1. The temperature detection unit detects the temperature value of the boost pump 1 at different times and transmits the temperature value to the main control board, so that the main control board controls the drive motor 311 to adjust the opening of the valve body 4 accordingly, so that the wastewater flow entering the passage 12 corresponds to the temperature of the boost pump 1 at the current moment, effectively meeting the cooling demand of the boost pump 1 while improving the cooling efficiency, avoiding the situation where the wastewater flow is too large, resulting in a small flow out of the water purification pipe of the water purifier, affecting the user experience.
[0072] In addition, if Figure 1 , Figure 4 and Figure 5 As shown, the water purifier also includes an ejector 5, the water inlet of the ejector 5 is connected to the wastewater pipe 2, the water outlet of the ejector 5 is connected to the passage 12, a mixing chamber 51 is formed between the water inlet and the water outlet, and the ejector 5 is also provided with an air inlet 52, which is connected to the mixing chamber 51.
[0073] Specifically, the air inlet 52 is arranged side by side with the water inlet, and the wastewater enters the mixing chamber 51 through the water inlet and mixes with the air entering the mixing chamber 51 from the air inlet 52. The cross section of the pipeline from the water inlet to the mixing chamber 51 is set to a tapered structure from large to small along the flow direction of the wastewater, and the cross section from the mixing chamber 51 to the water outlet is set to a tapered structure from small to large along the flow direction of the wastewater, so as to form a pressure difference between the water inlet and the water outlet by using the Venturi tube principle. The pressure difference is the negative pressure generated by the change in the diameter of the ejector tube. The air at the air inlet 52 is sucked into the mixing chamber through the negative pressure for mixing. After mixing, the wastewater contains air and the air incorporated is compressed into microns. The mixed liquid is injected into the passage 12 through the ejector 5 and has a certain flow rate due to the Venturi tube principle. At the flow rate, the mixed liquid enters the passage 12 and is dispersed to every corner of the passage 12 in a jet shape. The flowing wastewater will take away the heat of the outer surface of the booster pump 1. The air released when the small bubbles burst will also mix with the wastewater and take away the heat of the outer surface of the booster pump 1, that is, the heat dissipation of the booster pump 1 can be achieved faster and more efficiently. Compared with simply injecting wastewater into the passage 12, the cooling effect is more obvious and the cooling time is less. It is suitable for the cooling method of the fluid with a shorter contact time with the booster pump 1.
[0074] In this embodiment, the wastewater flow rate entering the ejector 5 is calculated by the formula: When the valve body 4 is fully opened, the ejector inhales the best amount of air. After entering the mixing chamber 51, the air is fully mixed with the wastewater and the bubbles in the mixed liquid are all micrometers. Q is the wastewater flow rate entering the ejector 5, in m 3 / s, μ is the flow coefficient, and its value range is related to the cross-sectional area of the outlet of the ejector 5, and needs to be derived based on multiple experiments. A is the cross-sectional area of the inlet of the ejector 5, and the unit is m 2 , ΔP is the pressure difference between the water inlet and the water outlet, which needs to be measured by a pressure gauge, and the unit is Pa. ρ is the density of the wastewater, and its value is 1*10 3 kg / m 3. By setting a formula for the wastewater flow rate entering the ejector 5, the formula is used to infer the water intake under ideal conditions. At this water intake, the wastewater and air are more fully mixed, and the cooling efficiency of the booster pump 1 is the highest. The above formula is calculated based on the actual size of the ejector 5. This is a prior art and will not be elaborated on here. In addition, the ideal flow value Q is instructive for the actual flow entering the ejector 5, that is, the opening of the valve body 4 changes after adjustment by the control unit 3, and the changed opening of the valve body 4 determines whether the actual flow entering the ejector 5 is proportional to Q or is equal to Q. Only when the actual flow entering the ejector 5 is equal to Q, the cooling effect of the bubble water on the booster pump 1 is optimal, and the cooling efficiency of the booster pump 1 is the highest.
[0075] In other embodiments of the present invention, the ejector 5 also includes a one-way flow structure, which is arranged between the air inlet 52 and the mixing chamber 51. The one-way flow structure is arranged to prevent the wastewater entering the mixing chamber 51 from seeping out through the air inlet 52, thereby preventing the wastewater from soaking the internal structure of the water purifier, thereby improving the safety of the water purifier. The one-way flow structure adopts the structure used for one-way flow in the prior art, which can be a one-way valve or a one-way flip flap structure. This is the prior art and will not be elaborated on here.
[0076] Furthermore, the pump head of the booster pump 1 is arranged close to the wastewater pipe 2. The booster pump 1 includes a pump head and a pump tail. Due to the structure of the booster pump 1 itself, the components that generate pressure are mainly located in the pump head part, that is, the temperature of the pump head is higher than that of the pump tail when the booster pump 1 is working. Therefore, the pump head is arranged close to the wastewater pipe 2 so that the wastewater flowing into the passage 12 of the wastewater pipe 2 first contacts the pump head and takes away its surface heat. Compared with the wastewater first contacting the outer surface of the pump tail, the cooling effect is better.
[0077] like Figure 1 , Figure 2 As shown, the water purifier also includes a flow meter 6, which is electrically connected to the main control board. The ejector 5 is arranged between the valve body 4 and the booster pump 1. The flow meter 6 is arranged between the valve body 4 and the ejector 5. The flow meter 6 is used to measure the actual wastewater flow entering the ejector 5. The flow meter 6 uses a flow monitoring structure in the prior art. This is the prior art and will not be described in detail here. The actual wastewater flow entering the ejector 5 is detected by the flow meter 6, and then it is determined whether the wastewater flow entering the passage 12 within different temperature ranges is appropriate, thereby improving the cooling efficiency of the booster pump 1.
[0078] like Figure 6 As shown, in this embodiment, the inner wall of the housing 11 is streamlined corresponding to the booster pump 1 .
[0079] Specifically, the inner wall of the shell 11 extends in a streamlined shape from the part connected to the wastewater pipe 2. The inner wall of the shell 11 is set to a streamlined structure to minimize the resistance when the wastewater passes through, allowing the bubble water to pass through at an optimal flow rate, so that the bubble water entering the passage 12 can quickly flow out of the passage 12 and take away the heat from the outer surface of the booster pump 1 more quickly.
[0080] Of course, in other embodiments, the inner wall of the housing 11 may also be in other shapes, such as an arc structure, the purpose of which is also to reduce the flow resistance of the bubble water to improve the cooling efficiency of the booster pump 1. This is a prior art and will not be elaborated on here.
[0081] like Figure 6 As shown, in this embodiment, the housing 11 is provided with a vacuum interlayer 111 .
[0082] Specifically, the shell 11 is a double-layer structure, in which a layer close to the outer surface of the boost pump 1 extends in a streamlined shape, and a layer away from the outer surface of the boost pump 1 is spaced apart from a layer close to the outer surface of the boost pump 1. The shape of the layer away from the outer surface of the boost pump 1 may be the same as or different from the layer close to the outer surface of the boost pump 1. This embodiment is described by taking the shape of the layer away from the outer surface of the boost pump 1 as the same as the layer close to the outer surface of the boost pump 1 as an example. The spaced double-layer structure is sealed and a vacuum interlayer 111 is formed inside. The vacuum interlayer 111 is provided to reduce the noise of the boost pump 1 during operation from being transmitted to the outside of the shell 11, thereby achieving noise reduction of the boost pump 1.
[0083] This embodiment also provides a water purifier cooling method, which is implemented by the above-mentioned water purifier. The water purifier cooling method includes the following steps:
[0084] S1, start the water purifier, and the control unit 3 controls the valve body 4 to open;
[0085] S2, the control unit 3 controls the valve body 4 to open and controls the opening of the valve body 4 according to the temperature value of the temperature detection unit, and keeps the opening of the valve body 4 for 5 minutes after adjustment, and repeatedly measures the temperature value and repeatedly adjusts the opening of the valve body 4 until the water purifier is turned off;
[0086] S3. When the water purifier is turned off, the valve body 4 is closed by the control unit 3.
[0087] Specifically, Figure 7 As shown, in this embodiment, Q b That is, the flow rate Q entering the ejector 5 is Q, and the ideal flow rate Q is used as the reference. bTo make a distinction, when the water purifier is started, a signal is transmitted to the main control board, and the main control board correspondingly turns on the drive motor 311 so that the drive motor 311 drives the second side portion 35 of the intermittent gear 3122 to contact the second limit switch 33 and fully open the valve body 4. At the same time, the outer surface temperature of the booster pump 1 is detected according to the temperature detection unit, and the maximum outer surface temperature of the booster pump 1 is preset to be T, and the temperature value detected by the temperature detection unit is judged. When the temperature value is greater than or equal to 55%T, it is further judged whether the temperature value is greater than or equal to 80%T. If the temperature value is within this range, the drive motor 311 drives the intermittent gear 3122 to rotate toward the first limit switch 32. At the same time, the wastewater flow entering the ejector 5 is detected by the flow meter 6, and the ideal wastewater flow rate is preset to be Q b , and determine whether the flow value detected by flow meter 6 satisfies less than 85% Q b or greater than 120%Q b According to multiple experimental data, when Q b 120%Q b When the temperature of the booster pump is reduced, the cooling effect is the same as 85% Q b Similarly, the following Q b The range is the same, and no further details are given. If not, the intermittent gear 3122 continues to be driven to rotate toward the first limit switch 32. If yes, the position of the intermittent gear 3122 is maintained. Similarly, when the temperature value is greater than or equal to 100%T, the drive motor 311 drives the intermittent gear 3122 to rotate toward the first limit switch 32, and at the same time, the flow rate of wastewater entering the ejector 5 is detected by the flow meter 6, and it is determined whether the flow value detected by the flow meter 6 satisfies less than 100%Q b or greater than 110%Q b , if not, continue to drive the intermittent gear 3122 to rotate toward the first limit switch 32, if yes, maintain the position of the intermittent gear 3122; when the temperature value is greater than or equal to 55%T and less than 80%T, the drive motor 311 drives the intermittent gear 3122 to rotate toward the first limit switch 32, and at the same time, the flow meter 6 detects the wastewater flow entering the ejector 5, and determines whether the flow value detected by the flow meter 6 satisfies less than 70%Q b or greater than 130%Q b, if not, continue to drive the intermittent gear 3122 to rotate toward the first limit switch 32, if yes, then maintain the position of the intermittent gear 3122, when the temperature value is outside the above range, the drive motor 311 drives the intermittent gear 3122 and makes the second side portion 35 always contact the second limit switch 33. By repeatedly detecting the surface temperature of the booster pump 1 every 5 minutes by the temperature detection unit, and adjusting the opening of the valve body 4 according to the range of the measured temperature value, the position of the intermittent gear 3122 is maintained so that the cooling rate of the booster pump 1 is always maintained in the optimal state. When the water purifier is turned off, the main control board receives the signal accordingly and turns on the drive motor 311, so that the drive motor 311 drives the full gear 3121 to rotate and drives the first side portion 34 of the intermittent gear 3122 to contact the first limit switch 32, so as to achieve the closure of the valve body 4.
[0088] In this embodiment, the following steps are also included before step S1:
[0089] When the water purifier is not started, the control unit 3 always closes the valve body 4.
[0090] Specifically, when the water purifier is not started, the first side portion 34 of the intermittent gear 3122 is always in contact with the first limit switch 32, and the valve body 4 remains in a closed state accordingly. At this time, there is no need to cool down the boost pump 1. By always keeping the valve body 4 closed before the water purifier is started, the passage 12 is closed accordingly, and the pressure of the filter element of the water purifier is guaranteed to prevent the pressure from being released. This prevents the flow of the water purifier pipe from becoming smaller due to the valve body 4 opening when the water purifier is just started and the internal pressure of the water purifier being released from the waste water pipe 2, thereby affecting the user experience.
[0091] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that this is only for illustration and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. A water purifier, comprising a booster pump and a wastewater pipe, characterized in that: The outer peripheral side cover of the boost pump is provided with a shell, a passage is formed between the shell and the outer surface of the boost pump, the waste water pipe is connected to the passage, the water purifier also includes a temperature detection unit, a valve body and a control unit, the valve body is installed on the waste water pipe, the temperature detection unit is arranged on the shell, the valve body, the temperature detection unit and the control unit are electrically connected, the temperature detection unit is used to measure the surface temperature of the boost pump, and the control unit adjusts the opening of the valve body according to the temperature value of the temperature detection unit.
2. The water purifier according to claim 1, characterized in that: The water purifier includes an ejector, the water inlet of the ejector is connected to the wastewater pipe, the water outlet of the ejector is connected to the passage, a mixing chamber is formed between the water inlet and the water outlet, and the ejector is also provided with an air inlet, which is connected to the mixing chamber.
3. The water purifier according to claim 2, characterized in that: The calculation formula of the water inlet of the ejector is: Wherein, μ is the flow coefficient, A is the cross-sectional area of the water inlet, ΔP is the pressure difference between the water inlet and the water outlet, ρ is the density of the wastewater, and the density of the wastewater is 1*10 3 kg / m 3 .
4. The water purifier according to claim 2, characterized in that: The water purifier also includes a flow meter, which is electrically connected to the control unit. The flow meter is installed on the waste water pipe and is located between the valve body and the ejector.
5. The water purifier according to claim 1, characterized in that: The control unit includes a controller and a main control board. The controller is arranged on the valve body. The controller includes a drive motor and a gear transmission assembly. The drive motor drives the valve stem of the valve body to rotate through the gear transmission assembly. The main control board is electrically connected to the drive motor. The main control board is used to receive the temperature value of the temperature detection unit and control the rotation of the drive motor according to the temperature value to adjust the opening of the valve body.
6. The water purifier according to claim 5, characterized in that: The gear transmission assembly includes a complete gear, an intermittent gear, a first limit switch and a second limit switch. The complete gear shaft is connected to the output shaft of the drive motor, the intermittent gear shaft is connected to the valve stem, and the intermittent gear is meshed with the complete gear. The first limit switch and the second limit switch are arranged on both sides of the intermittent gear. When the first side portion of the intermittent gear contacts the first limit switch, the valve body is closed, and when the second side portion of the intermittent gear contacts the second limit switch, the valve body is fully opened.
7. The water purifier according to claim 1, characterized in that: The inner wall of the housing is arranged in a streamlined shape corresponding to the booster pump; And / or, the shell is provided with a vacuum interlayer.
8. A method for cooling a water purifier, implemented by using the water purifier as described in any one of claims 1 to 7, characterized in that: The water purifier cooling method comprises the following steps: S1. Start the water purifier, and the control unit controls the valve body to open; S2, the control unit controls the valve body to open and controls the opening of the valve body according to the temperature value of the temperature detection unit, and keeps the opening of the valve body for 5 minutes after adjustment, and repeatedly measures the temperature value and repeatedly adjusts the opening of the valve body until the water purifier is turned off; S3. When the water purifier is turned off, the control unit closes the valve body.
9. The water purifier cooling method according to claim 8, characterized in that: In step S2, the maximum temperature value is set to T, and the flow rate of the valve body is set to Q b , and determine whether the temperature value is greater than or equal to 55%T. If so, further determine whether the temperature value is greater than or equal to 80%T. When the temperature value is greater than or equal to 80%T, adjust the opening of the valve body, and measure the actual flow of the valve body through the flow meter to see whether it meets 85%Q b If yes, keep the valve opening, if no, continue to adjust the valve opening until the actual flow of the valve is 85%Q b .
10. The water purifier cooling method according to claim 9, characterized in that: In step S2, the maximum temperature value is set to T, and the flow rate of the valve body is set to Q b , and determine whether the temperature value is greater than or equal to 55%T. If so, further determine whether the temperature value is greater than or equal to 100%T. When the temperature value reaches T, adjust the opening of the valve body, and measure the actual flow of the valve body through the flow meter to see whether it meets Q b If yes, then keep the valve opening, otherwise continue to adjust the valve opening until the actual flow rate of the valve body is Q b .
11. The water purifier cooling method according to claim 9, characterized in that: In step S2, the maximum temperature value is set to T, and the flow rate of the valve body is set to Q b , and determine whether the temperature value is greater than or equal to 55%T. If so, further determine whether the temperature value is less than 80%T. When the temperature value is less than 80%T, adjust the opening of the valve body, and measure the actual flow of the valve body by the flow meter to see whether it meets 70%Q b If yes, keep the valve opening, if no, continue to adjust the valve opening until the actual flow of the valve is 70%Q b .
12. The water purifier cooling method according to claim 8, characterized in that: Before step S1, the method further includes the following steps: When the water purifier is not started, the control unit always closes the valve body.