Transformer monitoring method and system based on molecular simulation and bubble initial temperature

Through molecular simulation and dynamic simulation, the bubble start temperature of the transformer is calculated, which solves the problem of low bubble start temperature monitoring accuracy in the prior art and improves the reliability of the transformer operation.

CN119064734AActive Publication Date: 2024-12-03ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +2

Patent Information

Application Number
CN202411350600.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-03
Estimated Expiration
2044-09-26

AI Technical Summary

Technical Problem

The existing internal bubble starting temperature monitoring method of transformers relies on high-voltage tests for insulated cardboards with different moisture contents. The process is complex and the accuracy is low. It is greatly affected by equipment, environment and human factors, which reduces the operation reliability of the transformer.

Method used

Using a molecular simulation method, by obtaining the operating state parameters of the transformer, establishing a molecular model, conducting dynamic simulation tests, determining the bubble moisture parameters, and combining the preset bubble start temperature model, calculate the bubble start temperature and judge the breakdown risk.

Benefits of technology

It improves the accuracy of the bubble starting temperature, reduces errors during monitoring, enhances the reliability of the transformer operation, and avoids interference due to equipment, environment and human factors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064734A_ABST
    Figure CN119064734A_ABST
Patent Text Reader

Abstract

The invention discloses a transformer monitoring method and system based on molecular simulation and bubble initial temperature, and relates to the technical field of transformer monitoring, and the method comprises the steps: obtaining the operation state parameters of a to-be-monitored transformer in a preset monitoring time, carrying out the molecular simulation processing of the operation state parameters, obtaining a molecular model corresponding to the to-be-monitored transformer, and carrying out the calculation of the molecular model; performing a dynamic simulation test by adopting a molecular model to obtain a bubble moisture parameter corresponding to the to-be-monitored transformer, determining a bubble initial temperature corresponding to the to-be-monitored transformer according to the bubble moisture parameter and a preset bubble initial temperature model, and determining the to-be-monitored transformer according to a comparison result of the bubble initial temperature and the operation state parameters. And judging whether the to-be-monitored transformer has a breakdown risk. The technical problems that the accuracy is low and the operation reliability of the transformer is reduced due to the fact that insulating paperboards with different water contents are used for carrying out high-voltage tests to obtain the initial temperature of bubbles, but the manufacturing process of the insulating paperboards with different water contents is complex and the high-voltage test result is influenced by many factors are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of transformer monitoring, and in particular to a transformer monitoring method and system based on molecular simulation and bubble initiation temperature. Background Art

[0002] Power transformers are the core equipment of the power transmission and distribution system of the power grid. With the long-term operation of power transformers, the inside of power transformers gradually ages and bubbles appear locally. Among them, the increase of moisture with the increase of temperature is the main reason for the bubbles in the transformer oil-paper insulation system. Due to the lower dielectric constant of gas, the electric field distortion inside the gas often induces local discharge. The aggregation of these bubbles inevitably leads to the breakdown of the transformer oil-paper insulation system, and finally causes serious damage to the power transformer. Therefore, it is very important to monitor the bubble starting temperature inside the transformer in real time.

[0003] At present, the existing bubble initiation temperature monitoring inside the transformer is mainly carried out by high-voltage testing of insulating paperboards with different moisture contents, so as to obtain the bubble initiation temperature inside the transformer. However, the production process of insulating paperboards with different moisture contents is complicated, and the high-voltage test results are often affected by many factors such as equipment, environment, and human factors, which greatly reduces the accuracy and error and reduces the reliability of transformer operation. Summary of the invention

[0004] The present invention provides a transformer monitoring method and system based on molecular simulation and bubble initiation temperature, which solves the problem that the existing bubble initiation temperature monitoring inside the transformer is mainly carried out by high-voltage testing of insulating paperboards with different moisture contents, so as to obtain the bubble initiation temperature inside the transformer. However, the production process of insulating paperboards with different moisture contents is complicated, and the high-voltage test results are often affected by many factors such as equipment, environment, and human factors, which greatly reduces the accuracy and error and reduces the technical problem of reducing the reliability of transformer operation.

[0005] A first aspect of the present invention provides a transformer monitoring method based on molecular simulation and bubble initiation temperature, comprising:

[0006] Acquire the operating state parameters of the transformer to be monitored within a preset monitoring time, and perform molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored;

[0007] The molecular model is used to perform a dynamic simulation test to obtain the bubble moisture parameter corresponding to the transformer to be monitored;

[0008] Determine the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and a preset bubble starting temperature model;

[0009] According to the comparison result of the bubble starting temperature and the operating status parameter, it is judged whether the transformer to be monitored has a breakdown risk.

[0010] Optionally, the operating status parameters include water content in oil and operating time, and the step of performing molecular simulation processing on the operating status parameters to obtain a molecular model corresponding to the transformer to be monitored includes:

[0011] Inputting the water content in the oil into a preset insulating oil model library to obtain a target insulating oil model;

[0012] Inputting the operating time and the water content in the oil into a preset insulating paper model library to obtain a target insulating paper model;

[0013] Performing geometric optimization processing on the target insulating oil model and the target insulating paper model to generate a combined optimization model;

[0014] According to the preset annealing temperature range, the combined optimization model is subjected to energy cycle annealing processing to obtain a molecular model corresponding to the transformer to be monitored.

[0015] Optionally, the step of using the molecular model to perform a dynamics simulation test to obtain the bubble moisture parameter corresponding to the transformer to be monitored includes:

[0016] The molecular model is used to perform a constant temperature and constant volume simulation test and a constant temperature and constant pressure simulation test under a preset multi-coupled physical field to obtain data on the number of water molecules and oxygen-hydrogen bond distribution;

[0017] The number of water molecules is ratioed to a preset Avogaro constant to obtain a molar amount of water;

[0018] Using a radial distribution algorithm to perform probability density analysis on the oxygen-hydrogen bond distribution data to obtain a bubble radius;

[0019] The water molar quantity and the bubble radius are used as bubble moisture parameters corresponding to the transformer to be monitored.

[0020] Optionally, the step of determining the bubble initiation temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and a preset bubble initiation temperature model includes:

[0021] Inputting the bubble moisture parameter into a preset bubble initiation temperature model to obtain an initial bubble initiation temperature;

[0022] The initial bubble starting temperature and a preset experimental correction value are added together to obtain the bubble starting temperature corresponding to the transformer to be monitored.

[0023] Optionally, the step of judging whether the transformer to be monitored has a breakdown risk according to a comparison result of the bubble starting temperature and the operating status parameter includes:

[0024] Determining whether the oil temperature of the operating state parameter is less than the bubble starting temperature;

[0025] If the oil temperature is greater than or equal to the bubble starting temperature, it is determined that the transformer to be monitored has a breakdown risk;

[0026] If the oil temperature is lower than the bubble starting temperature, it is determined that there is no breakdown risk for the transformer to be monitored.

[0027] Optionally, the bubble starting temperature model is specifically:

[0028]

[0029] in, is the initial bubble starting temperature, is the viscosity of the insulating oil, is the number of moles of water, is the molar gas constant, is the bubble radius, For time, is the surface tension of the insulating oil, is the density of insulating oil.

[0030] A second aspect of the present invention provides a transformer monitoring system based on molecular simulation and bubble initiation temperature, comprising:

[0031] An operating state parameter extraction module is used to obtain the operating state parameters of the transformer to be monitored within a preset monitoring time, and perform molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored;

[0032] A molecular simulation module, used to perform a dynamic simulation test using the molecular model to obtain bubble moisture parameters corresponding to the transformer to be monitored;

[0033] A model calculation module, used to determine the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and a preset bubble starting temperature model;

[0034] The output parameter execution module is used to determine whether the transformer to be monitored has a breakdown risk according to the comparison result of the bubble starting temperature and the operating status parameter.

[0035] A third aspect of the present invention provides an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any one of the above items.

[0036] A fourth aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed, implements the transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any one of the above items.

[0037] A fifth aspect of the present invention provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions, wherein when the program instructions are executed by a computer, the computer executes the transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any one of the above items.

[0038] It can be seen from the above technical solutions that the present invention has the following advantages:

[0039] The present invention obtains the operating state parameters of the transformer to be monitored within a preset monitoring time, and uses the operating state parameters to perform molecular simulation to obtain a molecular model, and then uses the molecular model to simulate the process of bubble generation in the transformer to be monitored, thereby obtaining the bubble moisture parameters corresponding to the transformer to be monitored, and combined with the preset bubble starting temperature model, the bubble starting temperature of the transformer to be tested can be quickly obtained. The defect of low accuracy in obtaining the bubble starting temperature of the transformer by performing high-voltage tests on insulating paperboards with different moisture contents is overcome. Compared with the traditional bubble starting temperature method, the present invention obtains the bubble moisture parameters of the transformer by performing molecular simulation on the operating state parameters, avoiding the monitoring process being affected by many factors such as equipment, environment, and human factors, thereby improving the accuracy of the transformer bubble starting temperature. At the same time, the operation of the transformer is guided by the transformer bubble starting temperature, thereby improving the reliability of the transformer operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0041] Figure 1 A flowchart of a transformer monitoring method based on molecular simulation and bubble initiation temperature provided in Embodiment 1 of the present invention;

[0042] Figure 2 A flowchart of a transformer monitoring method based on molecular simulation and bubble initiation temperature provided in Embodiment 2 of the present invention;

[0043] Figure 3 A structural block diagram of a transformer monitoring system based on molecular simulation and bubble initiation temperature provided in Embodiment 3 of the present invention;

[0044] Figure 4 This is a structural block diagram of a computer device provided in Embodiment 4 of the present invention. DETAILED DESCRIPTION

[0045] The embodiment of the present invention provides a transformer monitoring method and system based on molecular simulation and bubble initiation temperature, which is used to solve the problem that the existing bubble initiation temperature monitoring inside the transformer is mainly carried out by performing high-voltage tests on insulating paperboards with different moisture contents, so as to obtain the bubble initiation temperature inside the transformer. However, the production process of insulating paperboards with different moisture contents is complicated, and the high-voltage test results are often affected by many factors such as equipment, environment, and human factors, which greatly reduces the accuracy and error and reduces the technical problem of reducing the reliability of transformer operation.

[0046] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] See also Figure 1 , Figure 1 A flowchart of a transformer monitoring method based on molecular simulation and bubble initiation temperature provided in Embodiment 1 of the present invention.

[0048] The present invention provides a transformer monitoring method based on molecular simulation and bubble initiation temperature, comprising:

[0049] Step 101, obtaining the operating state parameters of the transformer to be monitored within a preset monitoring time, and performing molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored;

[0050] In an embodiment of the present invention, the operating status parameters of the transformer to be monitored within a preset monitoring time are obtained through an operating status parameter extractor, wherein the operating status parameters include at least the water content in the oil, the oil temperature and the operating time, and the operating status parameters are molecularly simulated to obtain a molecular model corresponding to the transformer to be monitored.

[0051] It should be noted that the operating status parameter extractor is installed inside the transformer to be monitored, and is used to monitor the operating time and water content of the transformer to be monitored during operation.

[0052] Step 102: Perform a dynamic simulation test using a molecular model to obtain bubble moisture parameters corresponding to the transformer to be monitored;

[0053] In the embodiment of the present invention, a molecular model is used to perform dynamic simulation tests of NVT and NPT under the action of multi-coupled physical fields, and the water movement trajectory during the simulation process is collected to obtain the bubble moisture parameters corresponding to the transformer to be monitored.

[0054] Step 103, determining the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and the preset bubble starting temperature model;

[0055] In an embodiment of the present invention, the bubble moisture parameter is input into a preset bubble initiation temperature model to obtain an uncorrected bubble initiation temperature, and the uncorrected bubble initiation temperature is added to a pre-acquired experimental correction value to obtain the bubble initiation temperature corresponding to the transformer to be monitored.

[0056] Step 104: Determine whether the transformer to be monitored has a breakdown risk based on the comparison result between the bubble starting temperature and the operating status parameter.

[0057] In the embodiment of the present invention, it is determined whether the bubble starting temperature is less than the oil temperature of the operating state parameter. When the bubble starting temperature is less than the oil temperature of the operating state parameter, it is determined that the transformer to be monitored has no breakdown risk. When the bubble starting temperature is greater than or equal to the oil temperature, it is determined that the transformer to be monitored has a breakdown risk.

[0058] In an embodiment of the present invention, the present invention obtains the operating state parameters of the transformer to be monitored within a preset monitoring time, and uses the operating state parameters to perform molecular simulation to obtain a molecular model, and then uses the molecular model to simulate the process of bubble generation in the transformer to be monitored, thereby obtaining the bubble moisture parameters corresponding to the transformer to be monitored, and combined with the preset bubble starting temperature model, the bubble starting temperature of the transformer to be tested can be quickly obtained. The defect of low accuracy in obtaining the bubble starting temperature of the transformer by performing high-voltage tests on insulating paperboards with different moisture contents is overcome. Compared with the traditional bubble starting temperature method, the present invention obtains the bubble moisture parameters of the transformer by performing molecular simulation on the operating state parameters, avoiding the monitoring process being affected by many factors such as equipment, environment, and human factors, thereby improving the accuracy of the transformer bubble starting temperature. At the same time, the operation of the transformer is guided by the transformer bubble starting temperature, thereby improving the reliability of the transformer operation.

[0059] See also Figure 2 , Figure 2A flowchart of a transformer monitoring method based on molecular simulation and bubble initiation temperature provided in Embodiment 2 of the present invention.

[0060] The present invention provides a transformer monitoring method based on molecular simulation and bubble initiation temperature, comprising:

[0061] Step 201, obtaining the operating state parameters of the transformer to be monitored within a preset monitoring time, and performing molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored;

[0062] Furthermore, the operating state parameters include water content in oil and operating time, and step 201 includes the following sub-steps:

[0063] S11, inputting the water content in the oil into a preset insulating oil model library to obtain a target insulating oil model;

[0064] In the embodiment of the present invention, the water content in the oil is compared one by one with the insulating oil models in the preset insulating oil model library to match the corresponding target insulating oil model;

[0065] It should be noted that the insulating oil model library contains multiple insulating oil models with different water contents, and the insulating oil models are constructed by using Material Studio molecular simulation software.

[0066] S12, inputting the operating time and the water content in the oil into a preset insulation paper model library to obtain a target insulation paper model;

[0067] In the embodiment of the present invention, the operating time and the water content in the oil are compared one by one with the insulating paper models in the preset insulating paper model library to match the corresponding target insulating paper model.

[0068] It should be noted that the insulating paper model library contains multiple insulating paper models with different aging degrees, and the insulating paper models are constructed by using Material Studio molecular simulation software.

[0069] S13, performing geometric optimization processing on the target insulating oil model and the target insulating paper model to generate a combined optimization model;

[0070] In an embodiment of the present invention, a target insulating oil model and a target insulating paper model are spliced ​​to obtain a combined model, and a geometry optimization task of Material Studio molecular simulation software is called to perform geometry optimization on the combined model to obtain a combined optimized model.

[0071] S14. Perform energy cycle annealing processing on the combined optimization model according to a preset annealing temperature range to obtain a molecular model corresponding to the transformer to be monitored.

[0072] Annealing temperature range refers to the temperature range of energy cycle annealing treatment in the combined optimization model (the range is 300K-900K).

[0073] In the embodiment of the present invention, within the temperature range of 300K-900K, energy cycle annealing treatment is performed for no less than 50 times to keep the combined optimization model stable, thereby obtaining a molecular model corresponding to the transformer to be monitored.

[0074] Step 202: using a molecular model under a preset multi-coupled physical field to perform a constant temperature and constant volume simulation test and a constant temperature and constant pressure simulation test to obtain data on the number of water molecules and oxygen-hydrogen bond distribution;

[0075] In an embodiment of the present invention, a molecular model is used to perform a constant temperature and constant volume simulation test (ie, NVT) and a constant temperature and constant pressure simulation test (ie, NPT) under the action of a preset multi-coupled physical field to obtain the number of water molecules and oxygen-hydrogen bond distribution data (ie, OH bond distribution data).

[0076] Step 203, performing ratio processing on the number of water molecules and the preset Avogaro constant to obtain the number of water moles;

[0077] In the embodiment of the present invention, the ratio between the number of water molecules and the preset Avogaro constant is calculated to obtain the number of water moles

[0078] Step 204, using a radial distribution algorithm to perform probability density analysis on the oxygen-hydrogen bond distribution data to obtain the bubble radius;

[0079] In the embodiment of the present invention, the oxygen-hydrogen bond distribution data (ie, OH bond distribution data) is input into a preset radial distribution function (RDF) to obtain the bubble radius.

[0080] Step 205: Use the water molar quantity and the bubble radius as bubble moisture parameters corresponding to the transformer to be monitored.

[0081] In the embodiment of the present invention, the water molar quantity and the bubble radius are used as bubble moisture parameters corresponding to the transformer to be monitored.

[0082] Step 206, determining the bubble initiation temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and the preset bubble initiation temperature model;

[0083] Further, step 206 includes the following sub-steps:

[0084] S21, inputting the bubble moisture parameter into a preset bubble starting temperature model to obtain an initial bubble starting temperature;

[0085] In an embodiment of the present invention, the water molar quantity and the bubble radius are input into a preset bubble initiation temperature model to generate an initial bubble initiation temperature;

[0086] It should be noted that the bubble initiation temperature model is specifically:

[0087]

[0088] in, is the initial bubble starting temperature, is the viscosity of the insulating oil, is the number of moles of water, is the molar gas constant, is the bubble radius, For time, is the surface tension of the insulating oil, is the density of insulating oil.

[0089] It is worth mentioning that the driving force for bubble growth in transformer oil mainly comes from the internal pressure of the bubble, while the resistance comes from the viscosity of the insulating oil and the external atmospheric pressure. Combining the Navier-Stokes equation in spherical coordinates and surface tension, viscosity, etc., the motion equation of the bubble in the insulating oil can be obtained as follows:

[0090]

[0091] in, is the pressure inside the bubble, is the pressure outside the bubble.

[0092] The pressure inside the bubble is expressed as:

[0093]

[0094] in, is the internal volume of the bubble.

[0095] The pressure outside the bubble is expressed as:

[0096]

[0097] in, is the atmospheric pressure, is the pressure of insulating oil on the air bubble, is the acceleration due to gravity, is the height difference between the outer interface of the bubble and the top of the insulating oil. By coupling the above formula, the bubble starting temperature model can be obtained.

[0098] S22, summing the initial bubble starting temperature and the preset experimental correction value to obtain the bubble starting temperature corresponding to the transformer to be monitored.

[0099] In the embodiment of the present invention, the sum of the initial bubble starting temperature and the preset experimental correction value is calculated to obtain the bubble starting temperature corresponding to the transformer to be monitored.

[0100] It should be noted that the specific process of obtaining the experimental correction value is as follows: 1. Obtain laboratory gradient water content test data. 2. Input the laboratory gradient water content test data into the preset bubble starting temperature model to obtain the test bubble starting temperature data. 3. Calculate the difference between each test bubble starting temperature in the test bubble starting temperature data and the standard bubble starting temperature in the laboratory gradient water content test data. 4. Perform mean processing on all the differences to obtain the experimental correction value.

[0101] Step 207: Determine whether the transformer to be monitored has a breakdown risk based on the comparison result between the bubble starting temperature and the operating status parameter.

[0102] Further, step 207 includes the following sub-steps:

[0103] S31, determining whether the oil temperature of the operating state parameter is less than the bubble starting temperature;

[0104] S32, if the oil temperature is greater than or equal to the bubble starting temperature, it is determined that the transformer to be monitored has a breakdown risk;

[0105] In the embodiment of the present invention, it is determined whether the oil temperature of the operating state parameter is less than the bubble starting temperature. When the oil temperature is greater than or equal to the bubble starting temperature, it is determined that the transformer to be monitored has a breakdown risk, and the staff is prompted to reduce the operating power of the transformer to be monitored and increase the oil flow rate to reduce the temperature.

[0106] S33. If the oil temperature is lower than the bubble starting temperature, it is determined that there is no breakdown risk for the transformer to be monitored.

[0107] In an embodiment of the present invention, when the oil temperature is lower than the bubble starting temperature, it is determined that there is no breakdown risk for the transformer to be monitored, and the next monitoring time is waited for to reacquire the operating status parameters to monitor the transformer to be monitored.

[0108] In an embodiment of the present invention, the present invention obtains the operating state parameters of the transformer to be monitored within a preset monitoring time, and uses the operating state parameters to perform molecular simulation to obtain a molecular model, and then uses the molecular model to simulate the trend of bubble generation in the transformer to be monitored, thereby obtaining the bubble moisture parameters corresponding to the transformer to be monitored, and combined with the preset bubble starting temperature model, the bubble starting temperature of the transformer to be tested can be quickly obtained. The defect of low accuracy in obtaining the bubble starting temperature of the transformer by performing high-voltage tests on insulating paperboards with different moisture contents is overcome. Compared with the traditional bubble starting temperature method, the present invention obtains the bubble moisture parameters of the transformer by performing molecular simulation on the operating state parameters, avoiding the monitoring process being affected by many factors such as equipment, environment, and human factors, thereby improving the accuracy of the transformer bubble starting temperature. At the same time, the operation of the transformer is guided by the transformer bubble starting temperature, thereby improving the reliability of the transformer operation.

[0109] See also Figure 3 , Figure 3 This is a structural block diagram of a transformer monitoring system based on molecular simulation and bubble initiation temperature provided in Example 3 of the present invention.

[0110] The present invention provides a transformer monitoring system based on molecular simulation and bubble initiation temperature, comprising:

[0111] The operating state parameter extraction module 301 is used to obtain the operating state parameters of the transformer to be monitored within a preset monitoring time, and perform molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored;

[0112] The molecular simulation module 302 is used to perform a dynamic simulation test using a molecular model to obtain bubble moisture parameters corresponding to the transformer to be monitored;

[0113] The model calculation module 303 is used to determine the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and the preset bubble starting temperature model;

[0114] The output parameter execution module 304 is used to determine whether the transformer to be monitored has a breakdown risk according to the comparison result of the bubble starting temperature and the operating status parameter.

[0115] Furthermore, the operating state parameters include water content in oil and operating time. The operating state parameter extraction module 301 includes:

[0116] The first matching submodule is used to input the water content in the oil into a preset insulating oil model library to obtain a target insulating oil model;

[0117] The second matching submodule is used to input the operating time and the water content in the oil into a preset insulation paper model library to obtain a target insulation paper model;

[0118] The geometry optimization submodule is used to perform geometry optimization on the target insulating oil model and the target insulating paper model to generate a combined optimization model;

[0119] The annealing submodule is used to perform energy cycle annealing on the combined optimization model according to a preset annealing temperature range to obtain a molecular model corresponding to the transformer to be monitored.

[0120] Furthermore, the molecular simulation module 302 includes:

[0121] The simulation test submodule is used to perform constant temperature and constant volume simulation tests and constant temperature and constant pressure simulation tests using a molecular model under a preset multi-coupled physical field to obtain the number of water molecules and oxygen-hydrogen bond distribution data;

[0122] The ratio submodule is used to process the ratio of the number of water molecules to the preset Avogaro constant to obtain the number of water moles;

[0123] The bubble radius acquisition submodule is used to perform probability density analysis on oxygen-hydrogen bond distribution data using a radial distribution algorithm to obtain the bubble radius;

[0124] The bubble moisture parameter submodule is used to use the water molar number and bubble radius as the bubble moisture parameters corresponding to the transformer to be monitored.

[0125] Furthermore, the model calculation module 303 includes:

[0126] A parameter input submodule is used to input the bubble moisture parameter into a preset bubble starting temperature model to obtain an initial bubble starting temperature;

[0127] The summing submodule is used to sum the initial bubble starting temperature and the preset experimental correction value to obtain the bubble starting temperature corresponding to the transformer to be monitored.

[0128] Furthermore, the output parameter execution module 304 includes:

[0129] The first analysis submodule is used to determine whether the oil temperature of the operating state parameter is less than the bubble starting temperature;

[0130] The second analysis submodule is used to determine that the transformer to be monitored has a breakdown risk if the oil temperature is greater than or equal to the bubble starting temperature;

[0131] The third analysis submodule is used to determine that there is no breakdown risk in the transformer to be monitored if the oil temperature is lower than the bubble starting temperature.

[0132] Furthermore, the bubble initiation temperature model is specifically:

[0133]

[0134] in, is the initial bubble starting temperature, is the viscosity of the insulating oil, is the number of moles of water, is the molar gas constant, is the bubble radius, For time, is the surface tension of the insulating oil, is the density of insulating oil.

[0135] See also Figure 4 , Figure 4 This is a structural block diagram of a computer device provided in Embodiment 4 of the present invention.

[0136] An electronic device according to an embodiment of the present invention includes: a memory 401 and a processor 402, wherein the memory 402 stores a computer program; when the computer program is executed by the processor 402, the processor 402 executes a transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any of the above embodiments.

[0137] The memory 401 may be an electronic memory such as a flash memory, an EEPROM (electrically erasable programmable read-only memory), an EPROM, a hard disk or a ROM. The memory 401 has a storage space 403 for a program code 413 for executing any method step in the above method. For example, the storage space 403 for the program code may include individual program codes 413 for implementing the various steps in the above method, respectively. These program codes may be read from or written to one or more computer program products. These computer program products include program code carriers such as hard disks, compact disks (CDs), memory cards or floppy disks. The program code may be compressed, for example, in an appropriate form. When these codes are run by a computing and processing device, the computing and processing device performs the various steps in the method described above. These program codes may be read from or written to one or more computer program products. These computer program products include program code carriers such as hard disks, compact disks (CDs), memory cards or floppy disks. The program code may be compressed, for example, in an appropriate form. When these codes are executed by a computing and processing device, they cause the computing and processing device to perform the steps of the transformer monitoring method based on molecular simulation and bubble initiation temperature described above.

[0138] Embodiment 5 of the present invention further provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any of the above embodiments is implemented.

[0139] Embodiment 6 of the present invention further provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions, wherein when the program instructions are executed by a computer, the computer executes a transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any of the above embodiments.

[0140] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0141] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0142] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0143] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0144] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0145] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A transformer monitoring method based on molecular simulation and bubble initiation temperature, characterized in that: include: Acquire the operating state parameters of the transformer to be monitored within a preset monitoring time, and perform molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored; The molecular model is used to perform a dynamic simulation test to obtain the bubble moisture parameter corresponding to the transformer to be monitored; Determine the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and a preset bubble starting temperature model; According to the comparison result of the bubble starting temperature and the operating status parameter, it is judged whether the transformer to be monitored has a breakdown risk.

2. The transformer monitoring method based on molecular simulation and bubble initiation temperature according to claim 1 is characterized in that: The operating state parameters include water content in oil and operating time. The step of performing molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored includes: Inputting the water content in the oil into a preset insulating oil model library to obtain a target insulating oil model; Inputting the operating time and the water content in the oil into a preset insulating paper model library to obtain a target insulating paper model; Performing geometric optimization processing on the target insulating oil model and the target insulating paper model to generate a combined optimization model; According to the preset annealing temperature range, the combined optimization model is subjected to energy cycle annealing processing to obtain a molecular model corresponding to the transformer to be monitored.

3. The transformer monitoring method based on molecular simulation and bubble initiation temperature according to claim 1 is characterized in that: The step of using the molecular model to conduct a dynamic simulation test to obtain the bubble moisture parameter corresponding to the transformer to be monitored includes: The molecular model is used to perform a constant temperature and constant volume simulation test and a constant temperature and constant pressure simulation test under a preset multi-coupled physical field to obtain data on the number of water molecules and oxygen-hydrogen bond distribution; The number of water molecules is ratioed to a preset Avogaro constant to obtain a molar amount of water; Using a radial distribution algorithm to perform probability density analysis on the oxygen-hydrogen bond distribution data to obtain a bubble radius; The water molar quantity and the bubble radius are used as bubble moisture parameters corresponding to the transformer to be monitored.

4. The transformer monitoring method based on molecular simulation and bubble initiation temperature according to claim 1 is characterized in that: The step of determining the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and a preset bubble starting temperature model comprises: Inputting the bubble moisture parameter into a preset bubble initiation temperature model to obtain an initial bubble initiation temperature; The initial bubble starting temperature and a preset experimental correction value are added together to obtain the bubble starting temperature corresponding to the transformer to be monitored.

5. The transformer monitoring method based on molecular simulation and bubble initiation temperature according to claim 1 is characterized in that: The step of judging whether the transformer to be monitored has a breakdown risk according to the comparison result of the bubble starting temperature and the operating state parameter comprises: Determining whether the oil temperature of the operating state parameter is less than the bubble starting temperature; If the oil temperature is greater than or equal to the bubble starting temperature, it is determined that the transformer to be monitored has a breakdown risk; If the oil temperature is lower than the bubble starting temperature, it is determined that there is no breakdown risk for the transformer to be monitored.

6. The transformer monitoring method based on molecular simulation and bubble initiation temperature according to claim 1 is characterized in that: The bubble initiation temperature model is specifically: in, is the initial bubble starting temperature, is the viscosity of the insulating oil, is the number of moles of water, is the molar gas constant, is the bubble radius, For time, is the surface tension of the insulating oil, is the density of insulating oil.

7. A transformer monitoring system based on molecular simulation and bubble initiation temperature, characterized in that: include: An operating state parameter extraction module is used to obtain the operating state parameters of the transformer to be monitored within a preset monitoring time, and perform molecular simulation processing on the operating state parameters to obtain a molecular model corresponding to the transformer to be monitored; A molecular simulation module, used to perform a dynamic simulation test using the molecular model to obtain bubble moisture parameters corresponding to the transformer to be monitored; A model calculation module, used to determine the bubble starting temperature corresponding to the transformer to be monitored according to the bubble moisture parameter and a preset bubble starting temperature model; The output parameter execution module is used to determine whether the transformer to be monitored has a breakdown risk according to the comparison result of the bubble starting temperature and the operating status parameter.

8. An electronic device, characterized in that: The invention comprises a memory and a processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the processor executes the steps of the transformer monitoring method based on molecular simulation and bubble initiation temperature as claimed in any one of claims 1 to 6.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed, the transformer monitoring method based on molecular simulation and bubble initiation temperature as described in any one of claims 1 to 6 is implemented.

10. A computer program product, characterized in that The computer program product comprises a computer program stored on a non-transitory computer-readable storage medium, wherein the computer program comprises program instructions, wherein when the program instructions are executed by a computer, the computer is caused to execute the transformer monitoring method based on molecular simulation and bubble initiation temperature according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Method for detecting bubble effect in oil paper insulation based on initial temperature envelope

    CN114646850A

  • Device and method for oil paper insulation bubble generation simulation experiment under multiple physical fields

    CN114660423A

  • System and method for headspace monitoring in transformers

    US20200191763A1

Cited By

  • Virtual sensing method and system for gas migration in transformer oil

    CN119598909A