Electricity-hydrogen main body comprehensive energy demand response method and device, computer equipment and storage medium
Through the comprehensive energy demand response method of electric hydrogen main body, combined with the new energy storage system and the flexible load demand response system, the power, hydrogen, heat and energy storage are optimized, and the combination of electric hydrogen main body and comprehensive energy demand response is solved. It improves energy utilization efficiency and economy, reduces the cost of green hydrogen production, and provides guarantees for the sustainable development of new energy systems.
Patent Information
- Application Number
- CN202411200543.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-12-03
AI Technical Summary
The existing power scheduling technology is difficult to effectively combine the electric hydrogen main body with the response to comprehensive energy demand, resulting in low energy utilization efficiency and unable to fully utilize the flexible resource advantages of the electric hydrogen main body.
Using the comprehensive energy demand response method of electric hydrogen main body, through the new energy storage system and flexible load demand response system, the cost objective function and the benefit objective function are constructed through the new energy storage system and the flexible load demand response system, and the cost objective function is constructed by using electrolytic cells, hydrogen storage tanks, hydrogen fuel cells and new energy power generation modules to optimize the cost objective function. Power consumption, hydrogen consumption, heat consumption and energy storage, control the new energy storage system and flexible load demand response system, and participate in market bidding.
With the dual goals of minimizing costs and maximizing benefits, we have achieved fine control of the operation of new energy energy storage systems and flexible load demand response systems, which has improved the economy of the comprehensive energy system, reduced the green hydrogen production cost, and enhanced electricity. The flexible resource adjustment advantages of hydrogen main body provide guarantees for the sustainable development of new energy systems.
Smart Images

Figure CN119067397A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power dispatching technology, and in particular to a method, device, computer equipment and storage medium for responding to comprehensive energy demand of an electric and hydrogen entity. Background Art
[0002] The fossil energy crisis and environmental pollution problems are becoming increasingly serious. Vigorously developing renewable energy and improving the comprehensive energy utilization efficiency have become the inevitable choice for sustainable energy development. Energy Internet improves the comprehensive energy utilization efficiency through the coordinated optimization and integrated operation of multiple energy networks on both the supply and demand sides, which is the development trend of future energy networks. Integrated energy system (IES) is a typical energy Internet based on multi-energy coupling production and with the coordination of multiple energy networks as the dispatching core. As a flexible adjustment resource of the power system, the electric hydrogen subject can help the safe and economic operation of the new power system. Therefore, it is urgent to explore a solution that combines the electric hydrogen subject with the comprehensive energy demand response. Summary of the invention
[0003] The purpose of this application is to solve at least one of the above-mentioned technical deficiencies, and in particular to provide a solution that combines the electric hydrogen subject with comprehensive energy demand response.
[0004] In the first aspect, the present application provides a comprehensive energy demand response method for an electric hydrogen subject, wherein the electric hydrogen subject includes a new energy storage system and a flexible load demand response system, wherein the new energy storage system includes an electrolyzer, a hydrogen storage tank, a hydrogen fuel cell and a new energy power generation module, wherein the electrolyzer is used to obtain electric energy from the new energy power generation module and / or the power grid to generate hydrogen and output it to the hydrogen storage tank, and the hydrogen fuel cell is used to obtain hydrogen from the hydrogen storage tank and / or the gas grid and generate electric energy to supply the grid and generate heat to supply the heat grid, and the demand response method includes:
[0005] Construct a cost objective function based on the electricity price, hydrogen price, heat price, energy storage unit price, electricity consumption, gas consumption, heat consumption and storage capacity at each time node in the scheduling cycle;
[0006] Taking the minimization of the cost objective function as the goal, the target electricity consumption, target gas consumption, target heat consumption and target energy storage capacity at each time node are obtained according to the first constraint condition set to control the new energy storage system;
[0007] The revenue objective function is constructed based on the minimum value of the electricity sales price, hydrogen supply price, heating price, electricity sales volume, hydrogen supply volume, heating volume and cost objective function at each time node in the scheduling period;
[0008] With the goal of maximizing the revenue objective function, the target hydrogen supply, target heat supply, and target electricity sales at each time node are obtained according to the second set of constraints to control the flexible load demand response system, and the target electricity sales price, target hydrogen supply price, and target heating price at each time node are obtained to participate in market bidding.
[0009] In one embodiment, the cost objective function is:
[0010]
[0011] in, is the cost objective function of the ith electric hydrogen entity, is the electricity consumption of the ith hydrogen-electric entity in period t, is the electricity price of the ith electric hydrogen entity in period t, is the gas consumption of the ith electric hydrogen entity in period t, is the hydrogen price of the ith electric hydrogen entity in period t, is the heat consumption of the ith electric hydrogen subject in period t, is the heat price of the ith electric hydrogen entity in period t, is the energy storage of the ith electric hydrogen entity in period t, is the energy storage unit price of the i-th electric hydrogen entity in period t.
[0012] In one embodiment, the first constraint condition includes: equipment constraint of the new energy storage system, system electric energy balance constraint, system thermal energy balance constraint and system hydrogen energy balance constraint.
[0013] In one of the embodiments, the first constraint condition also includes: upper and lower limit constraints on grid interaction power, upper and lower limit constraints on gas grid interaction flow, upper and lower limit constraints on heat grid interaction heat, and equipment ramp rate constraints.
[0014] In one embodiment, the revenue objective function is:
[0015]
[0016] in, is the profit objective function of the i-th electric hydrogen entity, is the electricity selling price of the ith electric hydrogen entity in period t, is the electricity sales of the i-th electric hydrogen entity in period t, is the hydrogen supply price of the ith electric hydrogen entity in period t, is the hydrogen supply of the ith electric hydrogen subject in period t, is the heating price of the ith electric hydrogen entity in period t, is the heat supply of the ith electric hydrogen entity in period t, is the minimum value of the cost objective function of the i-th electric hydrogen entity.
[0017] In one embodiment, the second constraint condition includes: upper and lower limit constraints on the response capacity of the flexible load demand response system.
[0018] In one of the embodiments, the second constraint condition also includes: upper and lower limit constraints on electricity sales price, upper and lower limit constraints on hydrogen supply price, upper and lower limit constraints on heating price, and user comfort constraints.
[0019] In the second aspect, the present application provides an electric hydrogen main body comprehensive energy demand response device, the electric hydrogen main body includes a new energy storage system and a flexible load demand response system, the new energy storage system includes an electrolyzer, a hydrogen storage tank, a hydrogen fuel cell and a new energy power generation module, the electrolyzer is used to obtain electric energy from the new energy power generation module and / or the power grid to generate hydrogen and output it to the hydrogen storage tank, the hydrogen fuel cell is used to obtain hydrogen from the hydrogen storage tank and / or the gas network and generate electric energy to supply the power grid, generate heat to supply the heat network, and the demand response device includes:
[0020] The first construction module is used to construct a cost objective function according to the electricity price, hydrogen price, heat price, energy storage unit price, electricity consumption, gas consumption, heat consumption and storage capacity at each time node in the scheduling period;
[0021] A first optimization control module is used to obtain target power consumption, target gas consumption, target heat consumption and target energy storage capacity at each time node according to a first constraint condition set with the minimum cost objective function as the goal, so as to control the new energy storage system;
[0022] The second construction module is used to construct a revenue objective function according to the minimum value of the electricity sales price, hydrogen supply price, heating price, electricity sales volume, hydrogen supply volume, heating volume and cost objective function at each time node in the scheduling period;
[0023] The second optimization control module is used to maximize the revenue objective function and obtain the target hydrogen supply, target heat supply, and target electricity sales at each time node according to the second constraint condition set to control the flexible load demand response system, and obtain the target electricity sales price, target hydrogen supply price, and target heating price at each time node to participate in market bidding.
[0024] In a third aspect, the present application provides a computer device comprising one or more processors and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by one or more processors, the steps of the electric-hydrogen main body comprehensive energy demand response method in any of the above-mentioned embodiments are executed.
[0025] In a fourth aspect, the present application provides a storage medium storing computer-readable instructions. When the computer-readable instructions are executed by one or more processors, the one or more processors execute the steps of the electric-hydrogen main body comprehensive energy demand response method in any of the above embodiments.
[0026] It can be seen from the above technical solutions that the embodiments of the present application have the following advantages:
[0027] Based on the comprehensive energy demand response method of the electric hydrogen subject in this embodiment, demand response models are established for the new energy storage system and the flexible load demand response system respectively, and the response is replaced by the coupling relationship between electric energy and hydrogen energy, thereby ensuring reliable demand response resources. At the same time, according to the incentive demand response strategy, electric and hydrogen loads are encouraged to directly participate in the daily demand response, thereby improving the economy of the comprehensive energy system. Under the dual goals of minimizing costs and maximizing benefits, the operation of the new energy storage system and the flexible load demand response system is precisely controlled, and the quotation strategy of the electric hydrogen subject in the energy trading market is optimized. It explores the participation of the electric hydrogen subject in the power market for comprehensive energy demand response, reduces the production cost of green hydrogen, and gives play to its advantages in flexible resource adjustment, which provides important guarantees for the sustainable development of the new energy system. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0029] Figure 1 This is a schematic diagram of the structure of the electric hydrogen main body in one embodiment of the present application;
[0030] Figure 2 This is a flow chart of a method for responding to comprehensive energy demand of an electric hydrogen entity in one embodiment of the present application;
[0031] Figure 3 An internal structure diagram of a computer device provided for one embodiment of the present application. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0033] This application provides a method for responding to the comprehensive energy demand of electric hydrogen entities. Figure 1 The main body of electric hydrogen includes new energy storage system and flexible load demand response system. The new energy storage system includes electrolyzer, hydrogen storage tank, hydrogen fuel cell and new energy power generation module ( Figure 1 The new energy generation module can be connected to the electrolyzer, power grid, and owner user through the power electronic interface. The energy management system combined with the front-end controller can control whether the electric energy generated by the new energy generation module is directly supplied to the owner user, input into the electrolyzer, or sold to the power grid.
[0034] An electrolyzer is a device that converts electrical energy into hydrogen energy. An electrolyzer can generate hydrogen by electrolyzing water using electricity purchased from a renewable energy power generation module (such as wind power, solar power) or from the power grid. The gas production end of the electrolyzer is connected to a hydrogen storage tank and a gas grid, so that the hydrogen generated by electrolysis in the electrolyzer can be transported to a hydrogen storage tank for storage or sold directly to the gas grid. This technology can not only store excess renewable energy, but also produce hydrogen when electricity prices are low, thus achieving economic storage of energy and peak-shaving. A hydrogen fuel cell is a device that converts hydrogen energy back into electrical energy and thermal energy. Its gas transmission end is connected to a hydrogen storage tank and a gas grid, its heat exchange end is connected to the owner user and the heat grid, and its power supply end is connected to the owner user and the power grid. It can use hydrogen stored in a hydrogen storage tank or directly obtained from the gas grid to generate electrical energy and thermal energy through chemical reactions. The electrical energy generated can be directly supplied to the owner user or resold to the power grid. The thermal energy required for the chemical reaction of a hydrogen fuel cell can be purchased from the heat grid, and the excess thermal energy generated by the hydrogen fuel cell can also be resold to the heat grid or supplied to the owner user. This method not only supplies the stored hydrogen energy to the owner user when needed (for example, when the electricity purchase price is high), but also can supply power to the grid when needed (peak electricity demand period), and can also use the large amount of heat generated during its operation to provide thermal energy for the heating network, thereby realizing diversified energy utilization.
[0035] The flexible load demand response system corresponds to the load of the owner user corresponding to the electric hydrogen subject. It can actively participate in the grid operation control and can interact with the grid with energy. It has flexible characteristics. Flexible load is flexible and variable within a certain period of time. The flexible load demand response system can control the flexible part of all user loads to change the inherent habitual electricity consumption mode, reduce or shift the electricity load in a certain period of time and respond to the power supply, thereby ensuring the stability of the grid and suppressing the short-term behavior of rising electricity prices.
[0036] See also Figure 2 , the demand response method in the present disclosure includes steps S202 to S208.
[0037] S202, constructing a cost objective function according to the electricity price, hydrogen price, heat price, energy storage unit price, electricity consumption, gas consumption, heat consumption and storage capacity at each time node in the scheduling period.
[0038] It can be understood that the dispatching cycle refers to the dispatching operation cycle of systems such as power grids, gas grids, and heat grids, which is generally 24 hours. The time node refers to the time node within the dispatching cycle, and the intervals between each time node are the same. The electricity price represents the unit price of electricity purchased by the electric hydrogen entity from the power grid. For areas with fixed electricity prices, the electricity price is generally set by the manager of the power system according to the time-of-use pricing strategy, that is, the electricity price during peak electricity consumption will be higher than the price during low electricity consumption. The pricing of each time node can be obtained directly from relevant channels. For areas where real-time electricity prices are implemented, it is necessary to predict the electricity price at each time node on the next day based on the historical electricity price announced by the power trading center. The electricity consumption refers to the total amount of electricity purchased by the electric hydrogen entity from the power grid (not the total electricity consumption of the electric hydrogen entity). The electricity cost of each time node is obtained by multiplying the electricity consumption at each time node by the electricity price, and the total electricity cost item in the cost objective function is obtained by adding the electricity costs of each time node in the dispatching cycle. Among them, the electricity consumption is the variable that needs to be optimized.
[0039] The hydrogen price represents the unit price of hydrogen purchased by the electric hydrogen entity from the gas grid. In the case of a long-term supply contract with a supplier, the agreed price can be used directly. Energy exchanges in some regions will also publish hydrogen purchase guidance prices, which can also be obtained from relevant channels. For areas that implement real-time hydrogen prices, it is necessary to predict the hydrogen prices at various time points on the next day based on the published historical hydrogen prices. The amount of hydrogen used refers to the total amount of hydrogen energy purchased by the electric hydrogen entity from the gas grid (not the total hydrogen consumption of the electric hydrogen entity). The hydrogen cost at each time node is obtained by multiplying the hydrogen consumption at each time node by the hydrogen price, and the total hydrogen cost item in the cost objective function is obtained by adding the hydrogen costs at each time node in the scheduling cycle. Among them, the amount of hydrogen used is the variable that needs to be optimized.
[0040] The heat price represents the unit price of heat purchased by the electric hydrogen entity from the heat network. For areas with fixed heat prices, the heat price is generally set by the manager of the heating system, and the pricing of each time node can be obtained directly from relevant channels. For areas with real-time heat prices, it is necessary to predict the heat price at each time node on the next day based on the published historical heat prices. The heat consumption refers to the total amount of heat energy purchased by the electric hydrogen entity from the heat network (not the total heat energy consumption of the electric hydrogen entity). The heat cost at each time node is obtained by multiplying the heat consumption at each time node by the heat price. The heat cost at each time node in the scheduling cycle is added up to obtain the total heat cost item in the cost objective function. Among them, the heat consumption is the variable that needs to be optimized.
[0041] The energy storage unit price represents the unit price of the cost of storing hydrogen in the hydrogen storage tank in the electric hydrogen body. The unit cost price is mainly composed of equipment cost, operation and maintenance cost, hydrogen loss cost, etc. The energy storage cost at each time node is obtained by multiplying the energy storage unit price by the energy storage capacity at that time node. The energy storage cost at each time node in the scheduling cycle is added to obtain the total energy storage cost item in the cost objective function. Among them, the energy storage capacity is the variable that needs to be optimized.
[0042] S204, taking minimizing the cost objective function as the goal, obtaining the target electricity consumption, target gas consumption, target heat consumption and target energy storage capacity at each time node according to the first constraint condition set, so as to control the new energy storage system.
[0043] It can be understood that electricity consumption, gas consumption, heat consumption and energy storage are variables that need to be optimized in the cost objective function, and the first set of constraints are the constraints that need to be met when the new energy storage system is running. The value of the cost objective function reflects the total operating cost of the new energy storage system in a scheduling cycle. Obtaining the minimum value of the cost objective function is the optimization problem under the constraints of the first set of constraints. It can be solved by commonly used solvers such as CPLEX, Gurobi, IPOPT, etc. to obtain the target electricity consumption, target gas consumption, target heat consumption and target energy storage. The target electricity consumption, target gas consumption, target heat consumption and target energy storage are the optimal electricity consumption, gas consumption, heat consumption and energy storage at each time node to achieve the lowest total cost.
[0044] When the scheduling cycle arrives, the operation of the new energy storage system can be controlled according to the target power consumption, target gas consumption, target heat consumption and target energy storage at each time node. That is, at each time node, the power flow direction of the new energy power generation module, the electrolysis power of the electrolyzer, the power generation power of the hydrogen fuel cell, etc. are comprehensively controlled so that the actual power consumption, actual gas consumption, actual heat consumption and actual energy storage at each time point match the target power consumption, target gas consumption, target heat consumption and target energy storage. Specifically, it can be determined how much power from the new energy power generation module flows to the owner user, how much power is sold to the grid, and how much power needs to be converted to hydrogen storage through the electrolyzer. It can also be determined whether the electrolyzer needs to purchase electricity from the power grid and store it in the hydrogen storage tank when the electricity price is cheap. When the electricity price is high, the hydrogen fuel cell is reused to convert energy from the hydrogen storage tank, or hydrogen is purchased directly from the gas grid to convert energy, etc. In general, the demand response strategy for the new energy storage system mainly utilizes the hydrogen load substitution demand response constructed by the coupling relationship between electricity and hydrogen energy, and guides the charging and discharging strategy of the light storage aggregator through the price difference.
[0045] S206, constructing a revenue objective function according to the minimum value of the electricity sales price, hydrogen supply price, heating price, electricity sales amount, hydrogen supply amount, heating supply amount and cost objective function at each time node in the scheduling period.
[0046] It can be understood that in addition to purchasing energy from various energy supply systems, the electric hydrogen entity can also sell energy to various energy supply systems. Among them, the electricity selling price is the declared price at which the electric hydrogen entity sells electricity to the power grid. The electricity sales amount is the declared quantity of electricity sold by the electric hydrogen entity to the power grid. The electricity selling price at each time node is multiplied by the electricity sales amount, and the result is the electricity sales revenue at that time node. Adding up the electricity sales revenue at each time node, the total electricity sales revenue is obtained. The electricity selling price and the electricity sales amount are both variables that need to be optimized in the revenue objective function.
[0047] The hydrogen supply price is the price reported by the hydrogen power entity when selling hydrogen to the grid. The hydrogen supply volume is the amount reported by the hydrogen power entity when selling hydrogen to the gas grid. The hydrogen supply price at each time point is multiplied by the hydrogen supply volume to obtain the hydrogen supply revenue at that time point. The total hydrogen supply revenue is obtained by adding up the hydrogen supply revenue at each time point. Both the hydrogen supply price and the hydrogen supply volume are variables that need to be optimized in the revenue objective function.
[0048] The heating price is the price reported by the electric hydrogen entity for selling heat (such as steam) to the grid. The heat supply is the amount of hydrogen reported by the electric hydrogen entity for selling to the gas grid. The heating price at each time point is multiplied by the heat supply to obtain the heating revenue at that time point. The total heating revenue is obtained by adding up the heating revenue at each time point. Both the heating price and the heat supply are variables that need to be optimized in the revenue objective function.
[0049] The minimum value of the cost objective function is the lowest operating cost in the entire scheduling cycle obtained in step S202 and step S204. The total net benefit in the scheduling cycle is obtained by adding up all types of benefits and then subtracting the lowest operating cost.
[0050] S208, with the maximum benefit objective function as the goal, obtain the target hydrogen supply, target heat supply, and target electricity sales at each time node according to the second set of constraints to control the flexible load demand response system, and obtain the target electricity sales price, target hydrogen supply price, and target heating price at each time node to participate in market bidding.
[0051] It can be understood that the electricity sales price, hydrogen supply price, heating price, electricity sales price, hydrogen supply and heat supply are all variables that need to be optimized in the revenue objective function, and the second set of constraints are the constraints that need to be met when the flexible load demand response system is running. The revenue objective function reflects the total net revenue within a scheduling cycle. The larger the function value, the more revenue the electric hydrogen entity can obtain within the scheduling cycle. It can be solved by commonly used solvers such as CPLEX, Gurobi, IPOPT, etc. to obtain the target hydrogen supply, target heat supply, target electricity sales price, target hydrogen supply price, and target heating price. The target hydrogen supply, target heat supply, target electricity sales price, target electricity sales price, target hydrogen supply price, and target heating price are the optimal declared quantity and declared price at each time node to achieve the highest operating revenue.
[0052] The electric hydrogen subject in this application has two systems that need to be optimized. After the new energy storage system is optimized, the control mode of the new energy storage system has been determined. The load of the owner user can be shifted, replaced, cut off, etc. through the flexible load demand response system to meet the target hydrogen supply, target heat supply, and target electricity sales at each time node, thereby determining the control mode of the flexible load demand response system. In addition, the operating income is used as an incentive to stimulate the electric hydrogen subject to actively participate in the bidding, build a hydrogen load incentive demand response, and optimize the electricity sales price, hydrogen supply price, and heating price. Through the stable discharge of fuel cells, the impact of the uncertainty of wind and solar power forecasts and electric hydrogen load forecasts on system scheduling can be reduced. At the same time, the operation of fuel cells generates a large amount of heat, which can meet the heating demand, thereby improving the economy of the integrated energy system.
[0053] Based on the comprehensive energy demand response method of the electric hydrogen subject in this embodiment, demand response models are established for the new energy storage system and the flexible load demand response system respectively, and the response is replaced by the coupling relationship between electric energy and hydrogen energy, thereby ensuring reliable demand response resources. At the same time, according to the incentive demand response strategy, electric and hydrogen loads are encouraged to directly participate in the daily demand response, thereby improving the economy of the comprehensive energy system. Under the dual goals of minimizing costs and maximizing benefits, the operation of the new energy storage system and the flexible load demand response system is precisely controlled, and the quotation strategy of the electric hydrogen subject in the energy trading market is optimized. It explores the participation of the electric hydrogen subject in the power market for comprehensive energy demand response, reduces the production cost of green hydrogen, and gives play to its advantages in flexible resource adjustment, which provides important guarantees for the sustainable development of the new energy system.
[0054] In one embodiment, the cost objective function is:
[0055]
[0056] in, is the cost objective function of the ith electric hydrogen entity, is the electricity consumption of the ith hydrogen-electric entity in period t, is the electricity price of the ith electric hydrogen entity in period t, is the gas consumption of the ith electric hydrogen entity in period t, is the hydrogen price of the ith electric hydrogen entity in period t, is the heat consumption of the ith electric hydrogen subject in period t, is the heat price of the ith electric hydrogen entity in period t, is the energy storage of the ith electric hydrogen entity in period t, is the energy storage unit price of the i-th electric hydrogen entity in period t.
[0057] In one embodiment, the first constraint condition includes: equipment constraints of the new energy storage system, system power balance constraints, system thermal energy balance constraints and system hydrogen energy balance constraints. It can be understood that the equipment constraints of the new energy storage system are mainly aimed at the operating characteristics of each device in the new energy storage system, such as the upper and lower limits of the hydrogen production capacity of the electrolyzer, the upper and lower limits of the hydrogen storage capacity of the hydrogen storage tank, and the upper and lower limits of the power generation power of the hydrogen fuel cell. These restrictions ensure that each device operates under safe and reliable conditions. The system power balance constraint must ensure the balance of the supply and demand of electric hydrogen by the electric hydrogen subject. The demand is composed of the fixed load and flexible load of the owner user. The supply of electric energy includes the part of the power generation of new energy power generation modules, the power purchase of electricity from the power grid, and the power generation of hydrogen fuel cells that flows to the owner user. The system thermal energy balance constraint must ensure the balance of the supply and demand of electric hydrogen by the electric hydrogen subject. The demand includes the demand for thermal energy by the owner user and the hydrogen fuel cell, and the supply includes the heat purchased by the electric hydrogen subject from the heat network and the part of the heat emitted by the hydrogen fuel cell that flows to the owner user and the hydrogen fuel cell. The system hydrogen energy balance constraint must ensure the balance of the supply and demand of hydrogen energy by the electric hydrogen subject. Demand includes the demand for hydrogen by hydrogen fuel cells and its sales to the grid, while supply includes the hydrogen purchased by hydrogen electric entities from the gas grid and the hydrogen electrolyzed by electrolyzers.
[0058] In one of the embodiments, the first constraint condition also includes: upper and lower limit constraints on grid interaction power, upper and lower limit constraints on gas grid interaction flow, upper and lower limit constraints on heat network interaction heat, and equipment ramp rate constraints. It can be understood that the upper and lower limit constraints on grid interaction power, the upper and lower limit constraints on gas grid interaction flow, and the upper and lower limit constraints on heat network interaction heat reflect the limits of interaction between the electric hydrogen subject and the energy supply system, and only the interaction strategy within the restricted range is safe and reliable. The equipment ramp rate constraint ensures that the equipment in each new energy storage system will not cause a change rate exceeding the corresponding threshold during the power regulation process, thereby ensuring the stability of the system.
[0059] In one embodiment, the revenue objective function is:
[0060]
[0061] in, is the profit objective function of the i-th electric hydrogen entity, is the electricity selling price of the ith electric hydrogen entity in period t, is the electricity sales of the i-th electric hydrogen entity in period t, is the hydrogen supply price of the ith electric hydrogen entity in period t, is the hydrogen supply of the ith electric hydrogen subject in period t, is the heating price of the ith electric hydrogen entity in period t, is the heat supply of the ith electric hydrogen entity in period t, is the minimum value of the cost objective function of the i-th electric hydrogen entity.
[0062] In one embodiment, the second constraint condition includes: upper and lower limit constraints on the response capacity of the flexible load demand response system. This constraint ensures that the flexible load system does not exceed its actual adjustment capacity when participating in demand response. For example, the maximum amplitude and duration of the flexible load adjustment cannot exceed the tolerance of the equipment or the user.
[0063] In one of the embodiments, the second constraint condition also includes: upper and lower limits of electricity sales price, upper and lower limits of hydrogen supply price, upper and lower limits of heating price, and user comfort constraints. The upper and lower limits of electricity sales price, the upper and lower limits of hydrogen supply price, and the upper and lower limits of heating price mean that the electric hydrogen subject will not make malicious quotations when participating in energy market transactions, and ensure that the quotations are within a reasonable range. User comfort is to evaluate the impact of flexible load adjustment on the lives of owner users based on one or more preset comfort indicators. User comfort constraints are requirements for these comfort indicators, such as limiting the load adjustment range, adjustment duration, etc.
[0064] The present application provides an electric hydrogen main body comprehensive energy demand response device, the electric hydrogen main body includes a new energy storage system and a flexible load demand response system, the new energy storage system includes an electrolyzer, a hydrogen storage tank, a hydrogen fuel cell and a new energy power generation module, the electrolyzer is used to obtain electric energy from the new energy power generation module and / or the power grid to generate hydrogen and output it to the hydrogen storage tank, and the hydrogen fuel cell is used to obtain hydrogen from the hydrogen storage tank and / or the gas network and generate electric energy to supply the power grid and generate heat to supply the heat network. The demand response device includes a first building module, a first optimization control module, a second building module and a second optimization control module.
[0065] The first construction module is used to construct a cost objective function according to the electricity price, hydrogen price, heat price, energy storage unit price, electricity consumption, gas consumption, heat consumption and storage energy at each time node in the scheduling period.
[0066] The first optimization control module is used to minimize the cost objective function and obtain the target electricity consumption, target gas consumption, target heat consumption and target energy storage capacity at each time node according to the first constraint condition set to control the new energy storage system.
[0067] The second construction module is used to construct a revenue objective function according to the minimum value of the electricity sales price, hydrogen supply price, heating price, electricity sales volume, hydrogen supply, heating volume and cost objective function at each time node in the scheduling period.
[0068] The second optimization control module is used to maximize the revenue objective function and obtain the target hydrogen supply, target heat supply, and target electricity sales at each time node according to the second constraint condition set to control the flexible load demand response system and obtain the target electricity sales price, target hydrogen supply price, and target electricity sales price at each time node.
[0069] For the specific limitations of the electric hydrogen main body comprehensive energy demand response device, please refer to the limitations of the electric hydrogen main body comprehensive energy demand response method mentioned above. For the specific limitations of the electric hydrogen main body comprehensive energy demand response device, please refer to the limitations of the electric hydrogen main body comprehensive energy demand response method mentioned above, which will not be repeated here. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules. It should be noted that the division of modules in the embodiment of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation.
[0070] The present application provides a computer device, including one or more processors and a memory, wherein the memory stores computer-readable instructions. When the computer-readable instructions are executed by the one or more processors, the steps of the electric-hydrogen main body comprehensive energy demand response method in any of the above embodiments are executed.
[0071] Indicatively, Figure 3 As shown, Figure 3 This is a schematic diagram of the internal structure of a computer device provided in an embodiment of the present application. Figure 3 The computer device 300 includes a processing component 302, which further includes one or more processors, and a memory resource represented by a memory 301 for storing instructions executable by the processing component 302, such as an application. The application stored in the memory 301 may include one or more modules, each corresponding to a set of instructions. In addition, the processing component 302 is configured to execute instructions to perform the steps of the electric hydrogen subject integrated energy demand response method in any of the above embodiments.
[0072] The computer device 300 may further include a power supply component 303 configured to perform power management of the computer device 300 , a wired or wireless network interface 304 configured to connect the computer device 300 to a network, and an input / output (I / O) interface 305 .
[0073] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0074] The present application provides a storage medium storing computer-readable instructions. When the computer-readable instructions are executed by one or more processors, the one or more processors execute the steps of the electric-hydrogen main body comprehensive energy demand response method in any of the above-mentioned embodiments.
[0075] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can refer to each other.
[0076] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for responding to comprehensive energy demand of electric hydrogen entities, characterized in that: The electric hydrogen main body includes a new energy storage system and a flexible load demand response system. The new energy storage system includes an electrolyzer, a hydrogen storage tank, a hydrogen fuel cell and a new energy power generation module. The electrolyzer is used to obtain electric energy from the new energy power generation module and / or the power grid to generate hydrogen and output it to the hydrogen storage tank. The hydrogen fuel cell is used to obtain hydrogen from the hydrogen storage tank and / or the gas network and generate electric energy to supply the power grid and generate heat to supply the heat network. The demand response method includes: Construct a cost objective function based on the electricity price, hydrogen price, heat price, energy storage unit price, electricity consumption, gas consumption, heat consumption and storage capacity at each time node in the scheduling cycle; Taking the minimization of the cost objective function as the goal, obtaining the target electricity consumption, target gas consumption, target heat consumption and target energy storage capacity at each time node according to the first constraint condition set, so as to control the new energy storage system; Constructing a revenue objective function according to the electricity sales price, hydrogen supply price, heating price, electricity sales amount, hydrogen supply amount, heating amount and the minimum value of the cost objective function at each time node in the scheduling period; Taking the maximization of the profit objective function as the goal, the target hydrogen supply, target heat supply, and target electricity sales volume at each time node are obtained according to the second set of constraints to control the flexible load demand response system, and the target electricity sales price, target hydrogen supply price, and target heating price at each time node are obtained to participate in market bidding.
2. The method for responding to comprehensive energy demand of electric hydrogen entities according to claim 1 is characterized in that: The cost objective function is: in, is the cost objective function of the i-th electric hydrogen entity, is the power consumption of the ith electric hydrogen subject in period t, is the electricity price of the ith electric hydrogen entity in period t, is the gas consumption of the ith electric hydrogen subject in period t, is the hydrogen price of the ith electric hydrogen entity in period t, is the heat consumption of the ith electric hydrogen subject in period t, is the heat price of the ith electric hydrogen entity in period t, is the energy storage of the ith electric hydrogen subject in time period t, is the energy storage unit price of the i-th electric hydrogen entity in time period t.
3. The method for responding to comprehensive energy demand of electric hydrogen subject according to claim 2 is characterized in that: The first constraint condition includes: equipment constraint of the new energy storage system, system electric energy balance constraint, system thermal energy balance constraint and system hydrogen energy balance constraint.
4. The method for responding to comprehensive energy demand of electric hydrogen entities according to claim 2 is characterized in that: The first constraint condition also includes: upper and lower limit constraints on grid interaction power, upper and lower limit constraints on gas grid interaction flow, upper and lower limit constraints on heat grid interaction heat, and equipment climbing rate constraints.
5. The method for responding to comprehensive energy demand of electric hydrogen entities according to claim 1 is characterized in that: The profit objective function is: in, is the profit objective function of the i-th electric hydrogen entity, is the electricity selling price of the i-th electric hydrogen entity in period t, is the electricity sales amount of the i-th electric hydrogen entity in period t, is the hydrogen supply price of the ith electric hydrogen entity in period t, is the hydrogen supply of the ith electric hydrogen subject in time period t, is the heating price of the ith electric hydrogen entity in period t, is the heat supply of the ith electric hydrogen body in period t, is the minimum value of the cost objective function of the ith electric hydrogen entity.
6. The method for responding to comprehensive energy demand of electric hydrogen subject according to claim 4 is characterized in that: The second constraint condition includes: upper and lower limit constraints on the response capacity of the flexible load demand response system.
7. The method for responding to comprehensive energy demand of electric hydrogen subject according to claim 6 is characterized in that: The second constraint conditions also include: upper and lower limit constraints on electricity sales prices, upper and lower limit constraints on hydrogen supply prices, upper and lower limit constraints on heating prices, and user comfort constraints.
8. An electric hydrogen main body comprehensive energy demand response device, characterized in that: The electric hydrogen main body includes a new energy storage system and a flexible load demand response system. The new energy storage system includes an electrolyzer, a hydrogen storage tank, a hydrogen fuel cell and a new energy power generation module. The electrolyzer is used to obtain electric energy from the new energy power generation module and / or the power grid to generate hydrogen and output it to the hydrogen storage tank. The hydrogen fuel cell is used to obtain hydrogen from the hydrogen storage tank and / or the gas network and generate electric energy to supply the power grid and generate heat to supply the heat network. The demand response device includes: The first construction module is used to construct a cost objective function according to the electricity price, hydrogen price, heat price, energy storage unit price, electricity consumption, gas consumption, heat consumption and storage capacity at each time node in the scheduling period; A first optimization control module is used to obtain the target power consumption, target gas consumption, target heat consumption and target energy storage capacity at each time node according to the first constraint condition set, with the minimum cost objective function as the goal, so as to control the new energy storage system; The second construction module is used to construct a revenue objective function according to the electricity sales price, hydrogen supply price, heating price, electricity sales amount, hydrogen supply amount, heating amount and the minimum value of the cost objective function at each time node in the scheduling period; The second optimization control module is used to maximize the revenue objective function and obtain the target hydrogen supply, target heat supply, and target electricity sales at each time node according to the second constraint condition set to control the flexible load demand response system, and obtain the target electricity sales price, target hydrogen supply price, and target heating price at each time node to participate in market bidding.
9. A computer device, characterized in that: It includes one or more processors and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the one or more processors, the steps of the electric-hydrogen main body integrated energy demand response method as described in any one of claims 1-7 are executed.
10. A storage medium, characterized in that: The storage medium stores computer-readable instructions, and when the computer-readable instructions are executed by one or more processors, the one or more processors execute the steps of the electric-hydrogen main body comprehensive energy demand response method as described in any one of claims 1-7.
Citation Information
Patent Citations
Optimal scheduling method for comprehensive energy storage system
CN112163968A
Operation control method for integrated energy system containing hybrid energy storage
CN113437752A
Electro-hydrogen comprehensive energy system cost optimization method based on renewable energy power generation
CN115358806A
Electricity-hydrogen-carbon fused park comprehensive energy system optimization operation method and system
CN118211702A
Park comprehensive energy optimization decision-making method and system considering electricity-carbon coupling price
CN118278571A