Drawing transfer list and drawing storage verification method and system

The drawing transfer list and verification system automates the management of automobile product design drawings, addressing manual search and data interaction issues to enhance efficiency and accuracy in design progress monitoring.

CN119067570APending Publication Date: 2024-12-03SINO TRUK JINAN POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411221442.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing methods for managing and verifying automobile product design drawings during upgrades face challenges such as manual search and verification of large data volumes, cross-system data interaction issues, and inaccurate, time-consuming reporting, which hinder efficient data sharing and project progress monitoring.

Method used

A drawing transfer list and verification system that automates the process of identifying materials needing upgrades, checking drawing status, and constructing statistical reports, utilizing a library system to manage connections between materials and drawings, and generating timely reports.

Benefits of technology

Enhances efficiency and accuracy in data management, enabling rapid understanding of design progress and project status through automated verification and reporting, reducing manual workload and resource usage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067570A_ABST
    Figure CN119067570A_ABST
Patent Text Reader

Abstract

The invention provides a drawing transfer list and drawing warehousing verification method and system, and relates to the field of product data management in the automobile manufacturing industry. The method comprises the steps of obtaining all materials needing to be upgraded and a target state of an upgrading list through an upgrading list number; preparing a drawing transfer list of materials with drawings in all the materials needing to be upgraded; detecting whether the material-related drawings in the drawing transfer list reach the target state of the upgrade list or not, realizing drawing warehousing verification, and recording the drawings which are not warehoused and already warehoused; and constructing a statistical report according to the drawing transfer list and a verification result of drawing storage. Material statistics and drawing warehousing verification statistics are achieved, the execution efficiency is high, a statistical report is generated immediately, the problems of large data size, cross-system data interaction, complex processing process, high system resource occupation and the like are solved, a basis is provided for finished automobile designers and project managers to know product design technical files and drawing complete input conditions in time, and product design quality is improved. Project progress monitoring and timely decision coordination are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of product data management in the automobile manufacturing industry, and in particular to a drawing transfer list and a drawing storage verification method and system. Background Art

[0002] The technical documents of automobile product design are the basis of production and operation activities. Drawings, as the design blueprint and technical specifications of automobile products, are the core assets of the automobile manufacturing industry and the core competitiveness of enterprise product research and development design. The application of new technologies and new materials in the process of upgrading automobile models requires the corresponding upgrade of automobile product design technical documents. After the upgrade and archiving, the drawings should be put into storage synchronously, in order to facilitate designers to check the status of drawings in a timely and rapid manner to ensure the smooth development of subsequent process, procurement, production and other business activities. After the material upgrade, the transfer list is generated, and the statistical process of verifying the drawings into the warehouse has problems such as large data volume, cross-system data interaction, and high system resource occupation. In the process of drawing maintenance during the upgrade process, on the one hand, it is necessary to manually search for drawings one by one and verify the status of drawings, which is a heavy workload, takes a lot of time, and has low work efficiency; on the other hand, data is accessed across systems, cannot be directly interacted and shared instantly, which increases the time for information communication and transmission; finally, manual statistical reports cannot guarantee the accuracy and timeliness of data, which is not convenient for timely and rapid understanding and control of product design progress, and is not conducive to monitoring project progress. Summary of the invention

[0003] In order to solve the above technical problems or at least partially solve the above technical problems, the present invention provides a drawing transfer list and a drawing storage verification method and system.

[0004] In a first aspect, the present invention provides a drawing transfer list and a drawing storage verification method, comprising:

[0005] Obtain all materials to be upgraded and the target status of the upgrade order through the upgrade order number;

[0006] Prepare a transfer drawing list of all materials that need to be upgraded and that should have drawings;

[0007] Check whether the material-related drawings in the transfer list have reached the target status of the upgrade order, implement drawing entry verification, and record drawings that have not been entered into the warehouse and those that have been entered into the warehouse;

[0008] Construct statistical reports based on the verification results of the transfer list and drawings entering the warehouse.

[0009] Furthermore, obtaining all materials to be upgraded and the target status of the upgrade order through the upgrade order number includes: according to the upgrade order number, retrieving the materials to be upgraded this time from the material data, and temporarily storing the materials to be upgraded until all materials to be upgraded are found; and obtaining the target status of the upgrade order based on all materials to be upgraded.

[0010] Furthermore, the process of preparing a transfer drawing list of all materials to be upgraded that should have drawings includes:

[0011] Count the required drawings in advance and construct a list L of required drawings;

[0012] Build a material drawing inspection queue to store the material order numbers of all materials that need to be upgraded;

[0013] Loop through the material order numbers in the material drawing detection queue. For each traversed material order number, obtain the material attributes from the material data associated with the material number, obtain the drawing width value from the material attributes, and determine whether the obtained drawing width value is in the drawing width list L. If so, determine that the corresponding material should have a drawing, add the material to the transfer drawing list, and remove the material from the material drawing detection queue. Otherwise, determine that the corresponding material has no drawing, remove the material from the material drawing detection queue and record it.

[0014] Furthermore, the material-related drawings in the inspection transfer drawing list include drawings indicated by the reference drawing value and drawings associated with the material bill of material number.

[0015] Furthermore, a connection between the BOM number and the drawing, and a connection between the reference value and the drawing are established in the library system, so that the drawings can be matched by the reference value and the BOM number.

[0016] Furthermore, the drawing indicated by the reference value is checked to see whether it has reached the target state of the upgrade order, and the drawing entry verification is implemented, including:

[0017] Traverse the material order numbers of the materials in the transfer drawing list, and for each traversed material order number, obtain material attributes from the material data associated with the material order number, and obtain reference drawing values ​​indicating several reference drawings from the material attributes;

[0018] Check whether the reference drawing value is empty. If not, search the library system for the reference drawing based on the reference drawing value to see if there is a reference drawing. If so, obtain the drawing status of the reference drawing. Compare whether there is a drawing in the reference drawing whose status is not lower than the target status of the upgrade order. If so, it is determined that the material drawing has been put into the library, otherwise the material drawing has not been put into the library.

[0019] Furthermore, it is necessary to detect whether the drawings associated with the material order number of the material have reached the target status of the upgrade order, and realize the drawing entry verification including:

[0020] Traverse the BOM numbers of the materials in the transfer list, and for each BOM number traversed, obtain the material attributes from the material data associated with the BOM number, and obtain the reference values ​​indicating several reference drawings from the material attributes; when the reference value is empty, obtain the drawing status of the drawing matching the BOM number, and compare whether there is a drawing status not lower than the target status of the upgrade order. If so, it is determined that the material drawing has been put into storage, otherwise the material drawing has not been put into storage.

[0021] Furthermore, the importance of product design is established, and design decisions are coordinated based on the importance of product design and the entry of product design technical documents and drawings contained in the statistical report.

[0022] In a second aspect, the present invention provides a drawing transfer list and drawing storage verification device, comprising: at least one processing unit, the processing unit is connected to a storage unit via a bus unit, the storage unit stores a computer program, and the processing unit executes the computer program to implement the drawing transfer list and drawing storage verification method.

[0023] In a third aspect, the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for verifying the transfer list and drawing entry is implemented.

[0024] The above technical solution provided by the embodiment of the present invention has the following advantages compared with the prior art:

[0025] This method obtains all materials to be upgraded and the target status of the upgrade order through the upgrade order number; prepares a transfer list of materials that should have drawings among all materials to be upgraded; detects whether the material-related drawings in the transfer list have reached the target status of the upgrade order, implements drawing entry verification, and records drawings that have not been entered into the warehouse and drawings that have been entered into the warehouse; and constructs a statistical report based on the verification results of the transfer list and drawing entry. The statistics of material statistics and drawing entry verification are realized, with high execution efficiency, and statistical reports are generated immediately, solving problems such as large data volume, cross-system data interaction, complex processing process, and high system resource usage. It provides a basis for vehicle designers and project managers to timely understand the complete entry of product design technical documents and drawings, which is conducive to monitoring project progress and timely coordination and decision-making. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0028] Figure 1 A flowchart of a drawing transfer list and a drawing storage verification method provided in an embodiment of the present application;

[0029] Figure 2 A flow chart of a list of materials that should have drawings among all materials to be upgraded provided in an embodiment of the present application;

[0030] Figure 3 A flowchart for detecting whether the material-related drawings in the transfer drawing list provided in the embodiment of the present application have reached the target state of the upgrade order, and realizing the drawing warehousing verification;

[0031] Figure 4 A schematic diagram of a drawing transfer list and a drawing storage verification device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0034] Example 1

[0035] See also Figure 1 As shown, the present invention provides a drawing transfer list and a drawing storage verification method, comprising:

[0036] P1: Obtain all materials to be upgraded and the target status of the upgrade order from the upgrade order through the upgrade order number. Obtaining all materials to be upgraded and the target status of the upgrade order through the upgrade order number includes: retrieving the materials to be upgraded from the material data according to the upgrade order number, and temporarily storing the materials to be upgraded until all materials to be upgraded are found; obtaining the target status of the upgrade order based on all materials to be upgraded.

[0037] P2: Prepare a transfer list of materials that should have drawings among all materials to be upgraded and record the materials that do not have drawings among all materials to be upgraded. Figure 2 As shown, the process includes:

[0038] Count the required drawings in advance and construct a list L of required drawings;

[0039] Build a material drawing inspection queue to store the material order numbers of all materials that need to be upgraded;

[0040] Loop through the material order numbers in the material drawing detection queue. For each traversed material order number, obtain the material attributes from the material data associated with the material number, obtain the drawing width value from the material attributes, and determine whether the obtained drawing width value is in the drawing width list L. If so, determine that the corresponding material should have a drawing, add the material to the transfer drawing list, and remove the material from the material drawing detection queue. Otherwise, determine that the corresponding material has no drawing, remove the material from the material drawing detection queue and record it.

[0041] Use drawing attributes to quickly filter out materials without drawings from all materials that need to be upgraded.

[0042] P3: Check whether the material-related drawings in the transfer list have reached the target status of the upgrade order, and implement drawing entry verification; it should be noted that the library system manages nearly one million drawings, and a material may have multiple states and multiple versions of drawings; establish the connection between the material order number and the drawing in the library system, and establish the connection between the reference drawing value and the drawing. The principle for determining whether a drawing exists for a known material is: first determine whether the drawing corresponding to the reference drawing in the material attribute exists, and if not, determine whether the drawing consistent with the material number exists. Figure 3 As shown, the specific steps include:

[0043] Traverse the material order numbers of the materials in the transfer drawing list, and for each traversed material order number, obtain material attributes from the material data associated with the material order number, and obtain reference drawing values ​​indicating several reference drawings from the material attributes;

[0044] Whether the reference value is empty,

[0045] If it is not empty, search the library system for the reference drawing according to the reference drawing value to see if there is a reference drawing; if so, obtain the drawing status of the reference drawing; compare whether there is a drawing status not lower than the target status of the upgrade order in the reference drawing. If so, it is determined that the material drawing has been put into the library, otherwise the material drawing has not been put into the library;

[0046] If it is empty, obtain the drawing status of the drawing that matches the material order number, and compare whether there is a drawing status not lower than the target status of the upgrade order. If so, it is determined that the material drawing has been put into storage, otherwise the material drawing has not been put into storage.

[0047] P4: Construct statistical reports based on the verification results of the transfer list and drawings entering the warehouse.

[0048] The statistical report includes the list of materials whose drawings have been put into storage in the transfer list. The materials in the list have completed the transfer of technical documents. The statistical report includes the list of materials whose drawings have not been put into storage in the transfer list. The relevant product designers need to transfer the technical documents on the transfer list into storage as soon as possible.

[0049] Construct product design importance and coordinate design decisions based on the product design importance and the entry of product design technical documents and drawings contained in the statistical report.

[0050] Example 2

[0051] like Figure 4 As shown, an embodiment of the present invention provides a drawing transfer list and drawing storage verification device, including: at least one processing unit, the processing unit is connected to a storage unit through a bus unit, the storage unit stores a computer program, and the processing unit executes the computer program to implement the drawing transfer list and drawing storage verification method, including:

[0052] Obtain all materials to be upgraded and the target status of the upgrade order through the upgrade order number;

[0053] Prepare a transfer drawing list of all materials that need to be upgraded and that should have drawings;

[0054] Check whether the material-related drawings in the transfer list have reached the target status of the upgrade order, implement drawing entry verification, and record drawings that have not been entered into the warehouse and those that have been entered into the warehouse;

[0055] Construct statistical reports based on the verification results of the transfer list and drawings entering the warehouse.

[0056] Of course, the storage unit in the drawing transfer list and drawing storage verification device provided by an embodiment of the present invention stores a computer program that is not limited to the method operations described above, and can also execute related operations in the drawing transfer list and drawing storage verification method provided by any embodiment of the present invention.

[0057] Example 3

[0058] An embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a host computer and a hardware-in-the-loop simulation test platform, the method for verifying the drawing transfer list and drawing storage is implemented, including:

[0059] Obtain all materials to be upgraded and the target status of the upgrade order through the upgrade order number;

[0060] Prepare a transfer drawing list of all materials that need to be upgraded and that should have drawings;

[0061] Check whether the material-related drawings in the transfer list have reached the target status of the upgrade order, implement drawing entry verification, and record drawings that have not been entered into the warehouse and those that have been entered into the warehouse;

[0062] Construct statistical reports based on the verification results of the transfer list and drawings entering the warehouse.

[0063] A computer-readable storage medium provided in an embodiment of the present invention stores a computer program which is not limited to the method operations described above, but can also execute related operations in a drawing transfer list and drawing storage verification method provided in any embodiment of the present invention.

[0064] In the embodiments provided by the present invention, it should be understood that the disclosed devices and systems can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the description division of the circuit is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling shown or discussed can be indirect coupling through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0065] The foregoing is merely a specific embodiment of the present invention, which enables those skilled in the art to understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A drawing transfer list and drawing storage verification method, characterized in that: include: Obtain all materials to be upgraded and the target status of the upgrade order through the upgrade order number; Prepare a transfer drawing list of all materials that need to be upgraded and that should have drawings; Check whether the material-related drawings in the transfer list have reached the target status of the upgrade order, implement drawing entry verification, and record drawings that have not been entered into the warehouse and those that have been entered into the warehouse; Construct statistical reports based on the verification results of the transfer list and drawings entering the warehouse.

2. According to claim 1, the drawing transfer list and drawing storage verification method is characterized in that: Acquiring all materials to be upgraded and the target status of the upgrade order through the upgrade order number includes: retrieving the materials to be upgraded this time from the material data according to the upgrade order number, and temporarily storing the materials to be upgraded until all materials to be upgraded are found; and acquiring the target status of the upgrade order based on all materials to be upgraded.

3. According to claim 1, the drawing transfer list and drawing storage verification method is characterized in that: The process of preparing a transfer drawing list of all materials that need to be upgraded and that should have drawings includes: Count the required drawings in advance and construct a list L of required drawings; Build a material drawing inspection queue to store the material order numbers of all materials that need to be upgraded; Loop through the material order numbers in the material drawing detection queue. For each traversed material order number, obtain the material attributes from the material data associated with the material number, obtain the drawing width value from the material attributes, and determine whether the obtained drawing width value is in the drawing width list L. If so, determine that the corresponding material should have a drawing, add the material to the transfer drawing list, and remove the material from the material drawing detection queue. Otherwise, determine that the corresponding material has no drawing, remove the material from the material drawing detection queue and record it.

4. According to claim 1, the drawing transfer list and drawing storage verification method is characterized in that: The material-related drawings in the inspection transfer drawing list include drawings indicated by the reference drawing value and drawings associated with the material bill of material number.

5. According to claim 4, the drawing transfer list and drawing storage verification method is characterized in that: In the library system, establish the connection between the material list number and the drawing, and establish the connection between the reference value and the drawing, so that the drawings can be matched through the reference value and the material list number.

6. The drawing transfer list and drawing storage verification method according to claim 4 is characterized in that: Check whether the drawing indicated by the reference drawing value has reached the target state of the upgrade order, and realize the drawing storage verification including: Traverse the material order numbers of the materials in the transfer drawing list, and for each traversed material order number, obtain material attributes from the material data associated with the material order number, and obtain reference drawing values ​​indicating several reference drawings from the material attributes; Check whether the reference drawing value is empty. If not, search the library system for the reference drawing based on the reference drawing value to see if there is a reference drawing. If so, obtain the drawing status of the reference drawing. Compare whether there is a drawing in the reference drawing whose status is not lower than the target status of the upgrade order. If so, it is determined that the material drawing has been put into the library, otherwise the material drawing has not been put into the library.

7. The drawing transfer list and drawing storage verification method according to claim 4 is characterized in that: Check whether the drawings associated with the material order number have reached the target status of the upgrade order. The drawing entry verification includes: Traverse the BOM numbers of the materials in the transfer list, and for each BOM number traversed, obtain the material attributes from the material data associated with the BOM number, and obtain the reference values ​​indicating several reference drawings from the material attributes; when the reference value is empty, obtain the drawing status of the drawing matching the BOM number, and compare whether there is a drawing status not lower than the target status of the upgrade order. If so, it is determined that the material drawing has been put into storage, otherwise the material drawing has not been put into storage.

8. The drawing transfer list and drawing storage verification method according to claim 1 is characterized in that: Construct product design importance and coordinate design decisions based on the product design importance and the entry of product design technical documents and drawings contained in the statistical report.

9. A drawing transfer list and drawing storage verification device, characterized in that: include: At least one processing unit, the processing unit is connected to the storage unit via a bus unit, the storage unit stores a computer program, and the processing unit executes the computer program to implement the transfer drawing list and drawing storage verification method described in any one of claims 1-8.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the drawing transfer list and drawing storage verification method as described in any one of claims 1 to 8 are implemented.