Digital city management method, system and equipment capable of integrating data resources and medium

By collecting and organizing sponge cities data in the digital city management system, generating real-time charts, and combining with early warning modules, the problem of data scatteredness is solved, the integration and early warning functions of data resources are realized, and management efficiency and early warning capabilities are improved.

CN119067587APending Publication Date: 2024-12-03CHINA UNITED NORTHWEST INST FOR ENG DESIGN & RES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411034126.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing digital urban management system cannot effectively integrate data in sponge city management, resulting in scattered data and it is difficult to intuitively understand the data changes.

Method used

By detecting and collecting the water content, precipitation, water level, humidity and water flow data in different areas of sponge cities, the data sorting module is used to classify and organize the data, and generate real-time charts, combining with the early warning module to determine and display abnormal data to realize the data Resource integration and early warning functions.

Benefits of technology

The integration of data resources is realized, which facilitates users to intuitively and quickly understand the data changes in sponge cities, improves data management efficiency and early warning capabilities, and avoids data scatteredness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067587A_ABST
    Figure CN119067587A_ABST
Patent Text Reader

Abstract

The invention discloses a digital city management method, system, equipment and medium capable of integrating data resources, and relates to the technical field of digital city management systems, and the system comprises a main server, a data acquisition module, a main control module, a large-screen display module, a data monitoring module, a data arrangement module, a data transmission module and a data storage module. When the digital city management system capable of integrating the data resources is used, collected data are sorted through a data sorting module, the data are sorted according to different data types, different terrains, different meteorological data and different time, and after sorting is completed, the data are stored in a database; in this way, a real-time changing chart can be generated through the chart generation module, and all information is integrated into the chart, so that the function of data resource integration is achieved, and a user can conveniently, visually and rapidly know all data types of the sponge city.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of digital city management systems, and in particular to a digital city management method, system, equipment and medium capable of integrating data resources. Background Art

[0002] Sponge city is a new generation of urban stormwater management concept, which means that the city can adapt to environmental changes and deal with natural disasters caused by rainwater with good flexibility like seawater. In order to better manage sponge cities, it is necessary to collect the corresponding numerical changes of sponge cities.

[0003] Existing digital urban management systems usually need to collect a large amount of data when managing sponge cities. In order to facilitate data transmission, the data are displayed directly on the screen. Therefore, due to the large number of data types, the data is very scattered, which does not have the function of data resource integration and is not convenient for users to intuitively understand data changes. Summary of the invention

[0004] The purpose of the present invention is to provide a digital city management method, system, device and medium capable of integrating data resources, so as to solve the problem that the digital city management system proposed in the above background technology does not have the function of integrating data.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A digital city management method capable of integrating data resources comprises the following steps:

[0007] S1, detects and collects water content, precipitation, water level, humidity, and water flow data in different areas of the sponge city;

[0008] S2, sorting the data collected in S1 according to region, data type and time; and drawing relevant charts;

[0009] S3, analyze the sorted data, directly store and display normal data, and issue warning information based on warning judgment for abnormal data.

[0010] A digital city management system capable of integrating data resources comprises a main server, a data acquisition module, a main control module, a large-screen display module, a data monitoring module, a data sorting module, a data transmission module and a data storage module, wherein the data acquisition module is used to collect monitoring data of a test area, the data acquisition module is bidirectionally connected to the data transmission module, the data transmission module is bidirectionally connected to the data sorting module, the output end of the main control module and the output end of the data sorting module are both connected to the input end of the main server, the input end of the data storage module is connected to the output end of the main server, the data sorting module is bidirectionally connected to the data monitoring module, the output end of the data monitoring module is connected to the input end of the large-screen display module, and the large-screen display module is bidirectionally connected to the main server.

[0011] Preferably, the data sorting module includes a regional classification module, a numerical classification module and a time classification module, and the output end of the regional classification module is respectively connected to a terrain data recording end and a meteorological data recording end; the output end of the time classification module is respectively connected to a historical contemporaneous data end and a real-time recording data end.

[0012] Preferably, it also includes a data regularization module, and the output ends of the terrain data recording end, the meteorological data recording end, the numerical classification module, the historical data end and the real-time data recording end are all connected to the input end of the data regularization module, and the output end of the data regularization module is connected to the input end of the large-screen display module.

[0013] Preferably, a chart generation module is arranged between the output end of the data regularization module and the input end of the large-screen display module, the input end of the chart generation module is connected to the output end of the data regularization module, and the output end of the chart generation module is connected to the input end of the large-screen display module.

[0014] Preferably, a data management module is arranged between the data monitoring module and the large-screen display module; the data management module includes a normal data management module and an abnormal data management module, the output end of the normal data management module is connected to the input end of the large-screen display module, and the output end of the abnormal data management module is provided with a data comparison module and an early warning module which are connected to the input end of the large-screen display module.

[0015] Preferably, the early warning module includes a first-level early warning module, a second-level early warning module, a third-level early warning module and an early warning management module connected in parallel, the input ends of the first-level early warning module, the second-level early warning module and the third-level early warning module are all connected to the output end of the data comparison module, the output ends of the first-level early warning module, the second-level early warning module and the third-level early warning module are all connected to the early warning management module, and the output end of the early warning management module is connected to the input end of the large-screen display module.

[0016] Preferably, the data acquisition module includes a data aggregation module, the input end of the data aggregation module is connected to multiple groups of regional acquisition modules, the regional acquisition modules correspond one-to-one to the areas to be measured, and the input ends of the regional acquisition modules are respectively connected to a moisture content detection module, a precipitation detection module, a water level detection module, a humidity detection module and a water flow detection module, and each detection module is used to perform corresponding data detection.

[0017] A terminal device comprises a memory, a processor and a computer program stored in the memory and running on the processor, wherein the steps of the method are implemented when the processor executes the computer program.

[0018] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method are implemented.

[0019] Compared with the prior art, the beneficial effect of the present invention is that when the digital city management system capable of integrating data resources is used, the collected data is sorted through a data sorting module, and the data is classified and sorted according to different data types, different terrains, different meteorological data and different times. After the sorting is completed, a real-time changing chart can be generated through a chart generation module, and all information can be integrated into the chart, thereby having the function of data resource integration, making it convenient for users to intuitively and quickly understand all data types of the sponge city. This is the use feature of the digital city management system capable of integrating data resources.

[0020] 1. This digital city management system that can integrate data resources can classify different types of data collected by the sponge city when conducting digital management of the sponge city, and merge the classified data through the data regularization module according to different data types. The merged and regularized data can then generate real-time charts through the chart generation module. The charts can intuitively understand the data changes of the sponge city, which plays the role of sponge city data integration;

[0021] 2. The digital city management system that can integrate data resources can monitor the data in real time through the data monitoring module in order to better play the role of early warning when conducting digital management of sponge cities. When abnormal data is detected, the data can be compared through the data comparison module, so as to quickly determine the different levels of early warning. Then, different early warning level information can be displayed through the early warning management module according to different early warning levels, so as to distinguish different early warning levels and facilitate the management of sponge cities;

[0022] 3. This digital city management system that can integrate data resources can collect data information in different areas through regional collection modules in different areas when conducting digital management of sponge cities. After the collection is completed, the regional collection module will summarize the information of different areas, and finally transmit it to the data management module through the data transmission module, so that the overall data will not appear scattered, which is convenient for subsequent sorting and summarization of the data. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall framework structure of the city management system of the present invention;

[0024] Figure 2 It is a schematic diagram of the framework structure of the data acquisition module of the present invention;

[0025] Figure 3 This is a schematic diagram of the framework structure of the data sorting module of the present invention;

[0026] Figure 4 It is a schematic diagram of the framework structure of the data monitoring module of the present invention.

[0027] In the figure: 1. Main server; 2. Main control module; 3. Data sorting module; 4. Data storage module; 5. Large screen display module; 6. Data monitoring module; 7. Data transmission module; 8. Data acquisition module; 301. Regional classification module; 302. Numerical classification module; 303. Time classification module; 304. Topographic data recording; 305. Meteorological data recording; 306. Historical data of the same period; 307. Real-time recording data; 308. Data regularization module; 309. Chart generation module; 601. Normal data management module; 602. Abnormal data management module; 603. Data comparison module; 604. First-level warning module; 605. Second-level warning module; 606. Third-level warning module; 607. Warning management module; 801. Data summary module; 802. Regional acquisition module; 803. Water content detection module; 804. Precipitation detection module; 805. Water level detection module; 806. Humidity detection module; 807. Water flow detection module. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] The present invention discloses a digital city management method capable of integrating data resources, comprising the following steps:

[0030] S1, detects and collects water content, precipitation, water level, humidity, and water flow data in different areas of the sponge city;

[0031] S2, sorting the data collected in S1 according to region, data type and time; and drawing relevant charts;

[0032] S3, analyze the sorted data, directly store and display normal data, and issue warning information based on warning judgment for abnormal data.

[0033] See also Figure 1 The present invention discloses a digital city management system capable of integrating data resources, comprising a main server 1, a data acquisition module 8, a main control module 2, a large-screen display module 5, a data monitoring module 6, a data sorting module 3, a data transmission module 7, and a data storage module 4. The data acquisition module 8 is used to collect monitoring data of the area to be tested. The data acquisition module 8 is bidirectionally connected to the data transmission module 7, and the data transmission module 7 is bidirectionally connected to the data sorting module 3. The output end of the main control module 2 and the output end of the data sorting module 3 are both connected to the input end of the main server 1, the input end of the data storage module 4 is connected to the output end of the main server 1, the data sorting module 3 is bidirectionally connected to the data monitoring module 6, the output end of the data monitoring module 6 is connected to the input end of the large-screen display module 5, and the large-screen display module 5 is bidirectionally connected to the main server 1.

[0034] See also Figure 2 The data acquisition module 8 includes a data summary module 801. The input end of the data summary module 801 is connected to multiple groups of regional acquisition modules 802. The input end of the regional acquisition module 802 is respectively connected to a moisture detection module 803, a precipitation detection module 804, a water level detection module 805, a humidity detection module 806 and a water flow detection module 807. The moisture detection module 803, the precipitation detection module 804, the water level detection module 805, the humidity detection module 806 and the water flow detection module 807 are connected in parallel to each other at the input end of the regional acquisition module 802.

[0035] During specific implementation, the digital city management system capable of integrating data resources, when in use, collects data on the hydrological environment in the area through the moisture detection module 803, precipitation detection module 804, water level detection module 805, humidity detection module 806 and water flow detection module 807 within the same area. At the same time, moisture detection module 803, precipitation detection module 804, water level detection module 805, humidity detection module 806 and water flow detection module 807 are installed in different areas, and the collected data are synchronously transmitted to the corresponding area collection module, and then the different area collection modules 802 will also transmit the collected data to the data collection module 8 through the data aggregation module 801, and then the data collection module 8 will uniformly transmit the data to the data sorting module 3 through the data transmission module 7. The data can be sorted through the data sorting module 3, which is convenient for subsequent sorting and summarization of the data, and the data of different areas of the sponge city can be collected and monitored more comprehensively.

[0036] See also Figure 3 It can be seen that the data aggregation module 801 introduced in the data collection module 8 effectively aggregates the data from the different regional collection modules 802, thereby improving the efficiency and accuracy of data collection. Through the regional collection modules 802 in different regions, data from different regions can be collected, providing a rich data source for data analysis and decision-making, so that the data situation of the sponge city can be obtained more comprehensively.

[0037] See also Figure 3 The data sorting module 3 includes a regional classification module 301, a numerical classification module 302, a time classification module 303 and a data regularization module 308. The output end of the regional classification module 301 is respectively connected to the terrain data record 304 end and the meteorological data record 305 end, the output end of the time classification module 303 is respectively connected to the historical synchronous data 306 end and the real-time recording data 307 end, the output ends of the terrain data record 304 end, the meteorological data record 305 end, the numerical classification module 302, the historical synchronous data 306 end and the real-time recording data 307 end are connected to the data regularization module 308, the output end of the data regularization module 308 is connected to the chart generation module 309, and the output end of the chart generation module 309 is connected to the input end of the large-screen display module 5.

[0038] In specific implementation, the digital city management system capable of integrating data resources can statistically distinguish sponge city data through the regional classification module 301, the numerical classification module 302 and the time classification module 303 in the data sorting module 3. First, the regional classification module 301 can count similar terrain data and meteorological data in different regions through the terrain data record 304 and the meteorological data record 305, and simply classify the statistical data. The numerical classification module 302 is mainly used to count the water level data, water flow data, humidity data, water content data and precipitation data of the rivers in the region, and classify and display the data according to different data types, so as to facilitate The user observes different types of data results, and the time classification module 303 records and counts the above-mentioned statistical data in real time through the real-time data recording 307 terminal, and uses the historical data 306 terminal to compare with the real-time data recording 307 terminal, so as to facilitate the user to understand the changing trend, and then all the above-mentioned collected data are sorted through the data regularization module 308, the sorted data are integrated, and the corresponding chart information is quickly generated through the chart generation module 309, and the produced data chart information is transmitted to the large-screen display module 5 for real-time display, so that the user can understand the data change information of the sponge city more intuitively, which has the function of sorting and merging data resources.

[0039] The introduction of the regional classification module 301, the numerical classification module 302 and the time classification module 303 makes the data sorting work more systematic and organized. In particular, the terrain data recording 304 and the meteorological data recording 305 under the regional classification module 301 can record the data changes under different terrain and meteorological conditions in more detail, providing an important basis for subsequent data analysis. The time classification module 303 realizes the time series analysis of data through the setting of the historical data 306 and the real-time recording data 307, which helps to discover the trend and law of data changes.

[0040] See also Figure 4 It can be seen that when in use, the collected different data can be integrated into multiple groups of data through the data sorting module 3, and the integrated data can be used to generate corresponding chart information, thereby having the function of integrating multiple groups of data.

[0041] The output end of the data monitoring module 6 is respectively connected to the normal data management module 601 and the abnormal data management module 602, the output end of the abnormal data management module 602 is connected to the data comparison module 603, the output end of the data comparison module 603 is respectively connected to the first-level warning module 604, the second-level warning module 605 and the third-level warning module 606, the output ends of the first-level warning module 604, the second-level warning module 605 and the third-level warning module 606 are connected to the warning management module 607, the output ends of the warning management module 607 and the normal data management module 601 are both connected to the input end of the large-screen display module 5, and the first-level warning module 604, the second-level warning module 605 and the third-level warning module 606 are connected in parallel to the input end of the warning management module 607.

[0042] In specific implementation, the digital city management system that can integrate data resources can monitor the collected data in real time through the data monitoring module 6 when in use. When the abnormal data management module 602 detects the existence of data abnormalities, the abnormal data can be judged by the first-level warning module 604, the second-level warning module 605 and the third-level warning module 606 judgment values ​​pre-entered in the data comparison module 603. The abnormal data can be judged. After the judgment is completed, the corresponding warning information can be issued through the first-level warning module 604, the second-level warning module 605 and the third-level warning module 606. Then, according to the different warning information, the warning content is displayed in real time on the large-screen display module 5 through the warning management module 607, thereby having the function of distinguishing management with different warning levels. On the contrary, when there is no abnormality in the data, the data will be displayed normally on the large-screen display module 5 through the normal data management module 601, and the warning level will not be displayed.

[0043] See also Figure 4 It can be seen that during use, the data can be monitored according to the data monitoring module 6. When abnormal data is monitored, corresponding warning information can be issued according to different warning levels, so that users can pay attention to the data changes of the sponge city in real time and take corresponding warning measures.

[0044] The data management module realizes real-time monitoring and management of data status by dividing the normal data management module 601 and the abnormal data management module 602. The data comparison module 603 and the early warning module in the abnormal data management module 602 can timely detect data anomalies and trigger corresponding early warning mechanisms, effectively improving the emergency response capabilities of urban management. The hierarchical design of the early warning module and the introduction of the early warning management module 607 make the early warning work more orderly and efficient. Different levels of early warning can be flexibly adjusted according to actual conditions to ensure the accuracy and timeliness of early warning information.

[0045] The large screen display module 5, as the output end of the system, is not only used to display various data and charts, but also realizes real-time update and interaction of information through bidirectional connection with the main server 1 and other modules. This design enables managers to grasp the operation status of the city at any time and perform data analysis and decision-making as needed. The present invention realizes the comprehensive collection, sorting, storage, monitoring and display of monitoring data in various areas of the city through the collaborative work of multiple modules.

[0046] To sum up, when in use, the digital city management system capable of integrating data resources can ensure the normal operation of the entire system through the main server 1, and control the main server 1 through the main control module 2. After the data is collected by the data acquisition module 8, it can be transmitted to the data sorting module 3 through the data transmission module 7, and the data is sorted by the data sorting module 3. The sorted data is displayed on the screen in real time through the large-screen display module 5, which is convenient for users to intuitively understand the numerical change trend of the sponge city. At the same time, the data is transmitted to the main control module 2, and the data is stored through the data storage module 4 in the main control module 2, which is convenient for subsequent data reference. This is the use feature of the digital city management system capable of integrating data resources. The content not described in detail in this description belongs to the existing technology known to professional and technical personnel in this field.

[0047] The present invention also discloses a terminal device, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, and the steps of the method are implemented when the processor executes the computer program.

[0048] The present invention also discloses a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method are implemented.

[0049] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A digital city management method that can integrate data resources. It is characterized in that The following steps are involved: S1, detects and collects water content, precipitation, water level, humidity, and water flow data in different areas of the sponge city; S2, sorting the data collected in S1 according to region, data type and time; and draw relevant diagrams; S3, analyze the sorted data, directly store and display normal data, and issue warning information based on warning judgment for abnormal data.

2. A digital city management system that can integrate data resources. Features: The invention comprises a main server (1), a data acquisition module (8), a main control module (2), a large screen display module (5), a data monitoring module (6), a data sorting module (3), a data transmission module (7), and a data storage module (4); the data acquisition module is used to collect monitoring data of the area to be tested; the data acquisition module (8) and the data transmission module (7) are bidirectionally connected; the data transmission module (7) and the data sorting module (3) are bidirectionally connected; the output end of the main control module (2) and the output end of the data sorting module (3) are both connected to the input end of the main server (1); the input end of the data storage module (4) is connected to the output end of the main server (1); the data sorting module (3) and the data monitoring module (6) are bidirectionally connected; the output end of the data monitoring module (6) is connected to the input end of the large screen display module (5); and the large screen display module (5) is bidirectionally connected to the main server (1).

3. A digital city management system capable of integrating data resources according to claim 2, Features: The data sorting module (3) comprises a regional classification module (301), a numerical classification module (302) and a time classification module (303); the output end of the regional classification module (301) is respectively connected to a terrain data recording end (304) and a meteorological data recording end (305); the output end of the time classification module (303) is respectively connected to a historical data end (306) and a real-time data recording end (307).

4. A digital city management system capable of integrating data resources according to claim 3, Features: It also includes a data regularization module (308), wherein the output ends of the terrain data recording end (304), the meteorological data recording end (305), the numerical classification module (302), the historical data end (306) and the real-time data recording end (307) are all connected to the input end of the data regularization module (308), and the output end of the data regularization module (308) is connected to the input end of the large-screen display module (5).

5. According to claim 3, a digital city management system capable of integrating data resources, Features: A chart generation module (309) is provided between the output end of the data regularization module (308) and the input end of the large-screen display module (5); the input end of the chart generation module (309) is connected to the output end of the data regularization module (308); and the output end of the chart generation module (309) is connected to the input end of the large-screen display module (5).

6. A digital city management system capable of integrating data resources according to claim 1, Features: A data management module is arranged between the data monitoring module (6) and the large-screen display module (5); the data management module comprises a normal data management module (601) and an abnormal data management module (602); an output end of the normal data management module (601) is connected to an input end of the large-screen display module (5); a data comparison module (603) and an early warning module are arranged at the output end of the abnormal data management module (602) and are connected to an input end of the large-screen display module (5).

7. A digital city management system capable of integrating data resources according to claim 6, Features: The warning module comprises a first-level warning module (604), a second-level warning module (605), a third-level warning module (606) and a warning management module (607) connected in parallel; the input ends of the first-level warning module (604), the second-level warning module (605) and the third-level warning module (606) are all connected to the output end of the data comparison module (603); the output ends of the first-level warning module (604), the second-level warning module (605) and the third-level warning module (606) are all connected to the warning management module (607); and the output end of the warning management module (607) is connected to the input end of the large-screen display module (5).

8. According to claim 1, a digital city management system capable of integrating data resources, Features: The data acquisition module (8) comprises a data aggregation module (801), the input end of the data aggregation module (801) is connected to a plurality of groups of regional acquisition modules (802), the regional acquisition modules (802) correspond one to one with the regions to be measured, the input end of the regional acquisition module (802) is respectively connected to a water content detection module (803), a precipitation detection module (804), a water level detection module (805), a humidity detection module (806) and a water flow detection module (807), and each detection module is used to perform corresponding data detection.

9. A terminal device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, It is characterized in that When the processor executes the computer program, the steps of the method according to claim 1 are implemented.

10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the method according to claim 1 are implemented.