Structure information model adaptive efficient scheduling method based on LOD technology

By decomposing and reorganizing the structure model and combining with the model scheduling strategy, the problem of low scheduling efficiency of the structure information model in LOD technology in GIS+BIM is solved, and efficient rendering and fineness are achieved.

CN119068159APending Publication Date: 2024-12-03CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411056960.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In GIS+BIM fusion technology, when LOD technology is used to schedule the structure information model, the feature pyramid construction technology is prone to lose structural features, resulting in low model scheduling efficiency and unable to meet engineering needs.

Method used

By decomposing the traditional structure model, obtaining the model organizational hierarchical information, generating part-level structure information models, and reorganizing the information model based on the model organizational hierarchical information and part-level models to form an overall structure information model, and efficient rendering and scheduling are carried out in combination with the model scheduling strategy. .

Benefits of technology

The defect of missing structural features of the feature pyramid model LOD scheduling is overcome, and efficient rendering scheduling of the structure information model is realized, which improves the manageability, fineness and rendering efficiency of the model.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119068159A_ABST
    Figure CN119068159A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of structural engineering, and discloses a structure information model adaptive efficient scheduling method based on an LOD technology, and the method comprises the steps: carrying out the decomposition of a conventional structure model, and obtaining model organization level information; information model construction is carried out based on the traditional structure model, and a part-level structure information model is generated; information model recombination is carried out according to the model organization level information and the part level structure information model, and a structure overall information model is obtained; and scheduling and displaying the overall information model of the structure according to a model scheduling strategy. According to the invention, efficient rendering scheduling of the structure information model can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of structural engineering technology, and in particular to an adaptive and efficient scheduling method for a structure information model based on LOD technology. Background Art

[0002] In BIM technology, LOD refers to the level of development, which describes the level of detail of a BIM model during the design and construction process. The concept of LOD is usually used to guide the accuracy and level of detail that a model should have at different stages. For example, in the early stages of design, the model may only need to show basic shapes and sizes, and the LOD can be relatively low; in the construction stage, the model needs to contain more details, such as specific component connections and material properties, and the LOD needs to be relatively high. BIM's LOD standard helps ensure model accuracy and consistency between different teams and project stages.

[0003] In GIS technology, LOD usually refers to the level of detail of geographic information. It describes the accuracy and details of spatial data at a geographic scale. The LOD of GIS is related to the scale of the map. The larger the scale, the higher the LOD of the map, and the more detailed the displayed geographic information. The principle of LOD scheduling technology is to build a geographic information model pyramid based on a quadtree (two-dimensional plane) or an octree (three-dimensional entity), and call pyramid models of different levels as needed. Because the geographic information model is a continuous plane model, regular squares or triangles can be used to subdivide the model level by level to generate models with different levels of detail, and the geometric features of the model are not required to be high; in GIS+BIM fusion technology, when LOD technology is used to schedule the information model of the structure in the GIS scene, the structural model generated by the feature pyramid construction technology is prone to lose the characteristics of the structure, resulting in low model scheduling efficiency and failure to meet engineering needs.

[0004] Therefore, how to achieve efficient rendering scheduling of building information models is a problem that needs to be solved urgently.

[0005] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0006] The main purpose of this application is to provide an adaptive and efficient scheduling method for a structure information model based on LOD technology, aiming to solve the technical problem of how to achieve efficient rendering scheduling of the structure information model.

[0007] To achieve the above objectives, the present application proposes an adaptive and efficient scheduling method for a structure information model based on LOD technology, wherein the method comprises:

[0008] Decompose the traditional structure model to obtain the model organization level information;

[0009] Building an information model based on the traditional structure model to generate a part-level structure information model;

[0010] Reorganizing the information model according to the model organization level information and the part-level structure information model to obtain an overall structure information model;

[0011] The overall information model of the structure is scheduled and displayed according to the model scheduling strategy.

[0012] In one embodiment, the decomposing of the traditional structure model to obtain model organization level information includes:

[0013] Obtain the geometric features and characteristic parameters of the structure;

[0014] Constructing a traditional structure model according to the geometric features and the feature parameters;

[0015] Decomposing the traditional building model into a plurality of sub-models at different levels;

[0016] Model organization level information is determined according to the multiple sub-models at different levels.

[0017] In one embodiment, decomposing the traditional building model into a plurality of sub-models at different levels includes:

[0018] Dividing the traditional structure model into a plurality of models at different levels, wherein the plurality of models at different scheduling levels at least include a scheme level model, a component level model, a part level model and a part level model;

[0019] The scheme-level model, the component-level model, the part-level model and the part-level model are decomposed respectively to obtain a plurality of sub-models at different levels.

[0020] In one embodiment, the information model is reorganized according to the model organization level information and the part-level structure information model to obtain the overall structure information model, including:

[0021] Generate a model assembly file according to the model organization level information;

[0022] The information model is reorganized according to the model assembly file and the part-level structure information model to obtain the overall structure information model.

[0023] In one embodiment, the information model is reorganized according to the model assembly file and the part-level structure information model to obtain the overall structure information model, including:

[0024] Determining a part model center according to the part-level structure information model;

[0025] Determine the component model center according to the part model center;

[0026] Generate a component-level structure information model according to the component model center and the part-level structure information model;

[0027] Assembling the component-level structure information model according to the model assembly file to obtain a scheme-level structure information model;

[0028] Model reorganization is performed according to the part-level structure information model, the component-level structure information model, the component-level structure information model and the scheme-level structure information model to obtain an overall structure information model.

[0029] In one embodiment, assembling the component-level structure information model according to the model assembly file to obtain a scheme-level structure information model includes:

[0030] Assembling the component-level structure information model according to the model assembly file to generate a member-level structure information model;

[0031] Acquire the engineering coordinates of the structure information model, and perform coordinate system conversion according to the engineering coordinates to obtain longitude and latitude coordinate information;

[0032] The scheme-level structure information model is determined according to the latitude and longitude coordinate information and the component-level structure information model.

[0033] In one embodiment, the scheduling and displaying of the overall information model of the structure according to the model scheduling strategy includes:

[0034] Determining the viewport distances of different component-level structure information models according to the overall structure information model;

[0035] The model scheduling strategy is used to call the structure information models of different levels in the structure overall information model according to the viewport distance for rendering and display.

[0036] In addition, to achieve the above purpose, the present application also proposes a structure information model adaptive and efficient scheduling device based on LOD technology, and the structure information model adaptive and efficient scheduling device based on LOD technology includes:

[0037] Decomposition module, used to decompose the traditional structure model to obtain the model organization level information;

[0038] A construction module, used to construct an information model based on the traditional structure model to generate a part-level structure information model;

[0039] A reorganization module, used for reorganizing the information model according to the model organization level information and the part-level structure information model to obtain an overall structure information model;

[0040] The scheduling module is used to schedule and display the overall information model of the structure according to the model scheduling strategy.

[0041] In addition, to achieve the above-mentioned objectives, the present application also proposes a structure information model adaptive and efficient scheduling device based on LOD technology, the device comprising: a memory, a processor, and a computer program stored on the memory and executable on the processor, the computer program being configured to implement the steps of the structure information model adaptive and efficient scheduling method based on LOD technology as described above.

[0042] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by the processor, the steps of the adaptive and efficient scheduling method of the structure information model based on LOD technology as described above are implemented.

[0043] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the adaptive and efficient scheduling method of the structure information model based on LOD technology as described above.

[0044] The present application provides an adaptive and efficient scheduling method for a structure information model based on LOD technology. The present application first decomposes the traditional structure model to obtain the model organization hierarchy information, which can improve the manageability and readability of the model and facilitate subsequent modification, maintenance and information addition. At the same time, the clarification of the hierarchy information lays the foundation for building a highly organized information model; the information model is constructed based on the traditional structure model to generate a part-level structure information model, which improves the precision and accuracy of the model; the information model is reorganized according to the model organization hierarchy information and the part-level structure information model to obtain an overall structure information model, which can form a multi-level model structure; the overall structure information model is scheduled and displayed according to the model scheduling strategy, which can achieve efficient rendering scheduling of the structure information model.

[0045] In summary, the present application reorganizes the model by decomposing and modeling the model organization hierarchy information and the part-level structure information model obtained, obtains the overall information model of the structure and performs rendering scheduling, thereby overcoming the technical defect of losing structural features in the traditional LOD scheduling based on the feature pyramid model, and can realize efficient rendering scheduling of the structure information model. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0047] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0048] Figure 1 A flow chart of the first embodiment of the method for adaptive and efficient scheduling of structure information model based on LOD technology provided in this application;

[0049] Figure 2 This is the overall principle diagram of the adaptive and efficient scheduling method of the structure information model based on the LOD technology in the first embodiment of the present application;

[0050] Figure 3 This is a schematic diagram of assembling a traditional continuous beam BIM model of a structure information model adaptive and efficient scheduling method based on LOD technology in the first embodiment of the present application;

[0051] Figure 4 This is a schematic diagram of the feature pyramid and quadtree data organization of the adaptive and efficient scheduling method of the structure information model based on the LOD technology in the first embodiment of the present application;

[0052] Figure 5 This is a block-based quadripartition schematic diagram of the adaptive and efficient scheduling method of the structure information model based on LOD technology in the first embodiment of the present application;

[0053] Figure 6 This is a schematic diagram of a triangle-based binary partitioning of a structure information model adaptive and efficient scheduling method based on LOD technology in the first embodiment of the present application;

[0054] Figure 7 A schematic diagram of a quadtree LOD terrain expression model and texture segmentation and overlay method of a structure information model adaptive and efficient scheduling method based on LOD technology in the first embodiment of the present application;

[0055] Figure 8 This is a schematic diagram of the building LOD level display of the adaptive and efficient scheduling method of the structure information model based on the LOD technology in the first embodiment of the present application;

[0056] Fig. 9 This is a schematic diagram of the sight distance of the adaptive and efficient scheduling method of the structure information model based on the LOD technology in the first embodiment of the present application;

[0057] Fig.10 This is a diagram showing the LOD1.0 accuracy of a bridge model of the adaptive and efficient scheduling method of a structure information model based on LOD technology in the first embodiment of the present application;

[0058] Fig.11 This is a diagram showing the LOD2.0 accuracy of a bridge model of the adaptive and efficient scheduling method of a structure information model based on LOD technology in the first embodiment of the present application;

[0059] Fig.12 This is a diagram showing the LOD3.0 accuracy of a bridge model of the adaptive and efficient scheduling method of a structure information model based on LOD technology in the first embodiment of the present application;

[0060] Fig.13 This is a schematic diagram of a refined prestressed system model of a structure information model adaptive and efficient scheduling method based on LOD technology in the first embodiment of the present application;

[0061] Fig.14 This is a conceptual diagram of the LOD level of the beam structure of a simply supported beam in the structure information model adaptive and efficient scheduling method based on the LOD technology in the first embodiment of the present application;

[0062] Fig.15 A flow chart of Embodiment 2 of the method for adaptive and efficient scheduling of structure information model based on LOD technology provided in this application;

[0063] Fig.16 This is a schematic diagram of characteristic parameters of a typical box girder section in the second embodiment of the present application based on the LOD technology-based structure information model adaptive and efficient scheduling method;

[0064] Fig.17 This is a schematic diagram of characteristic parameters of a typical three-span continuous rigid frame of the structure information model adaptive and efficient scheduling method based on LOD technology in the second embodiment of the present application;

[0065] Fig.18 This is a schematic diagram of the classification of BIM models of bridge structures according to the second embodiment of the present application, based on the LOD technology-based adaptive and efficient scheduling method of the structure information model;

[0066] Fig.19A flow chart of Embodiment 3 of the method for adaptive and efficient scheduling of structure information model based on LOD technology provided in this application;

[0067] Fig. 20 This is a schematic diagram of a certain large bridge scheme model of the third embodiment of the present application based on the structure information model adaptive efficient scheduling method of the LOD technology;

[0068] Fig.21 This is a schematic diagram of the continuous beam structure composition of the structure information model adaptive and efficient scheduling method based on LOD technology in the third embodiment of the present application;

[0069] Fig. 22 This is a schematic diagram of a part-level model of a structure information model adaptive and efficient scheduling method based on LOD technology in the third embodiment of the present application;

[0070] Fig.23 A schematic diagram of a coordinate system conversion process of a method for adaptively scheduling a structure information model based on LOD technology in the third embodiment of the present application;

[0071] Fig.24 This is a schematic diagram of the module structure of the structure information model adaptive and efficient scheduling device based on LOD technology in an embodiment of the present application;

[0072] Fig.25 Schematic diagram of the equipment structure of the hardware operating environment involved in the adaptive and efficient scheduling method of the structure information model based on LOD technology in the embodiment of the present application.

[0073] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0074] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0075] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0076] The main solution of the embodiment of the present application is: decomposing the traditional structure model to obtain model organization hierarchy information; constructing an information model based on the traditional structure model to generate a part-level structure information model; reorganizing the information model according to the model organization hierarchy information and the part-level structure information model to obtain an overall structure information model; scheduling and displaying the overall structure information model according to the model scheduling strategy.

[0077] Because the geographic information model is a continuous plane model, it can be subdivided into regular squares or triangles to generate models of different levels of detail, and the geometric features of the model are not high. When the LOD technology is used to schedule the information model of the structure, the structural model generated by the feature pyramid construction technology is prone to lose the characteristics of the structure, resulting in low model scheduling efficiency and failure to meet engineering needs. Therefore, how to achieve efficient rendering scheduling of the structure information model is a problem that needs to be solved urgently.

[0078] The present application reorganizes the model by decomposing and modeling the model organization hierarchy information and the part-level structure information model obtained, obtains the overall information model of the structure and performs rendering scheduling, overcomes the technical defect of losing structural features in the traditional LOD scheduling based on the feature pyramid model, and can realize efficient rendering scheduling of the structure information model.

[0079] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a structure information model adaptive and efficient scheduling device based on LOD technology, etc. The following takes the structure information model adaptive and efficient scheduling device based on LOD technology as an example to illustrate this embodiment and the following embodiments.

[0080] Based on this, the embodiment of the present application provides an adaptive and efficient scheduling method for a structure information model based on LOD technology, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the adaptive and efficient scheduling method of the structure information model based on LOD technology in this application.

[0081] In this embodiment, the structure information model adaptive and efficient scheduling method based on LOD technology includes steps S10 to S40:

[0082] Step S10, decomposing the traditional building model to obtain model organization level information.

[0083] It should be noted that traditional structure models, that is, traditional digital expression models of structures, usually include information such as the geometric shape and structural properties of engineering facilities such as bridges, tunnels, roadbeds, and houses. Traditional digital expression models of structures refer to two-dimensional drawings and basic three-dimensional models created using computer-aided design (CAD) technology. This type of model focuses on the geometric shape of the structure, usually including two-dimensional views such as plan views, elevations, and sections, as well as the general three-dimensional form of the structure through simple three-dimensional modeling technology. In the early digitalization process, these models were mainly used to record and communicate the design intent and construction details of the structure.

[0084] It can be understood that the model organization level information is the model detail level (LOD) information. By decomposing the traditional structure model, it can be divided into different levels and components to obtain the model organization level information. These level information describe the composition structure, level relationship and the relationship between the levels of the structure model, providing a basis for the subsequent information model construction and reorganization.

[0085] It is worth noting that, in the present embodiment, the principle of the adaptive and efficient scheduling method of the structure information model based on LOD technology is to add scheduling level information and longitude and latitude coordinate information serving the efficient scheduling of the GIS system to the structure BIM model data structure. In the GIS system, according to the model accuracy that can be distinguished by the viewport, the line-of-sight scheduling algorithm is adopted to cooperate with the scheduling level of the structure BIM model for scheduling, and the attitude positioning and loading are performed based on the longitude and latitude coordinate information provided by the model, so as to form high-precision positioning and efficient rendering of the structure BIM model in the GIS system.

[0086] like Figure 2 As shown, Figure 2 This is the overall schematic diagram of the adaptive and efficient scheduling method of the structure information model based on LOD technology. When the structure is a bridge, the bridge structure characteristics are expressed, parametric component modeling is performed according to the bridge structure characteristics, and the model LOD (level of detail) is defined. The model data organization is determined according to the model LOD, that is, information models with different structural accuracies, including LOD1.0 accuracy model, LOD2.0 accuracy model, LOD3.0 accuracy model, LOD4.0 accuracy model or other higher accuracy models. The model data organization is converted into a pyramid model export, and the engineering rectangular coordinates → GIS spherical coordinates are converted according to the engineering coordinates of the pyramid model. After the model GIS coordinates are assigned, the GIS environment model is loaded, and the pyramid model is rendered and displayed according to the visual scheduling algorithm.

[0087] Step S20: constructing an information model based on the traditional structure model to generate a part-level structure information model.

[0088] It should be noted that the part-level structure information model is the smallest entity component group for model scheduling rendering expression. Each component is composed of basic geometric elements such as points, lines, surfaces, and bodies, and complex geometric elements after Boolean operations. Its grouping needs to be organized in combination with the professional characteristics of the structure, and it is required to reflect the structural characteristics of the structure when calling rendering. A grouping scheme that takes into account structural characteristics divides the component model into an outer contour part group, an inner contour part group, a support skeleton part group, and an auxiliary part group.

[0089] It can be understood that according to the traditional digital expression model of the structure, BIM modeling software (such as Revit software, Catia software, Glodon component generator, etc.) is selected to construct the BIM model of the structure and generate all part-level BIM models that make up the overall model of the structure.

[0090] like Figure 3 As shown, Figure 3 It is a schematic diagram of the assembly of the traditional continuous beam BIM model. The whole bridge splicing model is obtained by completing the unit components and component constraint binding. The unit components include block zero unit components, cantilever cast height-changing section unit components, pier unit components and foundation unit components. According to the block zero unit components, cantilever cast height-changing section unit components, pier unit components and foundation unit components, the plane coordinates, vertical elevation and other controls are used to realize the continuous beam section unit constraint binding and pier + foundation constraint binding, and then the span point and lower structure constraint binding are carried out to obtain the whole bridge splicing model.

[0091] Step S30, reorganizing the information model according to the model organization level information and the part-level structure information model to obtain the overall structure information model.

[0092] It should be noted that the overall information model of the structure refers to a pyramid model obtained by reorganizing the structure information models of different scheduling levels. The structure information models of different scheduling levels include at least the part-level structure information model, the component-level structure information model, the component-level structure information model and the scheme-level structure information model.

[0093] It can be understood that the model organization hierarchical information includes the direct association relationship between information models at different levels, such as the scheme model is composed of multiple component models assembled according to the logical relationship of the scheme, the component model is composed of multiple part models assembled according to the topological relationship of the structure, and the part model is composed of multiple part models assembled according to the topological relationship of the structure.

[0094] In the specific implementation, the component-level structure information model can be determined through the part-level structure information model according to the model organization hierarchy information, the component-level structure information model can be determined according to the component-level structure information model, and the scheme-level structure information model can be determined according to the component-level structure information model. Then, the model is reorganized to obtain the overall information model of the pyramid structure.

[0095] Step S40: scheduling and displaying the overall information model of the structure according to the model scheduling strategy.

[0096] It should be noted that the model scheduling strategy refers to a viewing distance scheduling strategy based on a viewing distance scheduling algorithm. The viewing distance scheduling strategy can be intelligently scheduled according to the user's viewing distance range to improve model rendering efficiency and user experience.

[0097] It is understandable that based on the line-of-sight scheduling algorithm and combined with the model accuracy that can be distinguished by the GIS system viewport, models at different levels are called for rendering and display, so as to call as little model data as possible while meeting the accuracy of the visual model and improve the rendering speed.

[0098] In the specific implementation, the model scheduling strategy can calculate the user's viewing range based on the position and orientation of the user's current viewpoint, and determine the level of the structure information model that needs to be loaded and rendered based on the viewing range. For the structure information model within the viewing range, it is loaded into the rendering pipeline for rendering; for the structure information model outside the viewing range, it is unloaded or the rendering quality is reduced to optimize the rendering performance and user experience. In this way, the model scheduling strategy can achieve efficient scheduling of the overall information model of the structure and improve the rendering efficiency and response speed of the model.

[0099] It is worth noting that the overall information model of the structure is scheduled according to the model scheduling strategy, that is, different levels of the overall information model of the structure with a pyramid structure are called according to the needs based on the LOD scheduling technology. The principle of LOD scheduling technology is to build a geographic information model pyramid based on a quadtree (two-dimensional plane) or an octree (three-dimensional entity), and call different levels of pyramid models according to the needs, such as Figure 4 As shown, Figure 4 It is a schematic diagram of the feature pyramid and quadtree data organization. According to the feature pyramid, multiple levels can be generated, which may include the first layer LOD: 0, the second layer LOD: 1, the third layer LOD: 2, etc. Among them, the first layer LOD: 0 can be decomposed to obtain the second layer LOD: 1, and the second level can be decomposed to obtain the third layer LOD: 2.

[0100] The geographic information model is a continuous plane model, which can be subdivided into regular squares or triangles to generate models with different levels of detail, such as Figure 5 and Figure 6 As shown, Figure 5 Schematic diagram of block-based quad segmentation. Figure 6 Schematic diagram of triangle-based binary partitioning.

[0101] like Figure 7 As shown, Figure 7 The figure is a schematic diagram of the quadtree LOD terrain expression model and the texture segmentation and overlay method. Each node in the quadtree LOD terrain expression model is regarded as a rectangular area of ​​the terrain, which can be further split into four child nodes, each of which represents a quarter of the original area, and then texture segmentation and stacking are performed.

[0102] like Figure 8 As shown, Figure 8This is a schematic diagram showing the LOD levels of a building, which includes building models at levels LOD0-LOD4. LOD0 is the lowest level and LOD4 is the highest. The higher the level, the higher the accuracy of the building model and the richer the structural information.

[0103] In a feasible implementation, step S40 may include: determining the viewport distances of different component-level structure information models according to the overall structure information model; and calling the structure information models of different levels in the overall structure information model according to the viewport distance for rendering and display through the model scheduling strategy.

[0104] It should be noted that the overall information model of the structure is a pyramid structure consisting of a part-level structure information model, a component-level structure information model, a member-level structure information model and a scheme-level structure information model.

[0105] It can be understood that the viewport distance of different component-level structure information models is the distance between different component models in the scheme model and the viewport. Through the viewport distance scheduling algorithm, component models of different parts and levels, component models of different parts and levels, and component models of different degrees of refinement are rendered and displayed.

[0106] In a feasible real-time manner, after rendering and displaying the structure information models at different levels, it also includes: carrying out business designs such as scheme optimization based on the generated scheme-level model, adjusting the viewport distance of the model, switching the macro model viewport and the micro model viewport, re-calling the viewport distance algorithm, updating the rendering level and precision of the model, realizing smooth rendering of the scheme, and then completing the scheme design.

[0107] It is worth noting that the sight distance scheduling algorithm can be a ROAM algorithm, a restrictive quadtree algorithm, a ChunkedLOD algorithm, etc., and this embodiment does not impose specific restrictions on this. According to the scheduling principle, it is subdivided into the sight distance law and the surface roughness method. The scheduling law is: the sight distance law is mainly used for the scheme model, the component model and the part model, and the surface roughness law is mainly used for the component model. Preferably, a combination of the two laws can be used.

[0108] The principle of the sight distance rule is to determine the resolution (refinement level) of drawing a terrain node based on the sight distance value, that is, nodes farther from the viewpoint are rendered using high-level models, and nodes closer to the viewpoint are rendered using low-level models. The evaluation function based on the sight distance is as follows:

[0109]

[0110] Among them, f is the evaluation function, l is the viewing distance, d represents the length of the information model block edge at the central node, and C represents the constant that controls the deepest level of the overall scene information model, which is used to adjust the constant threshold of the accuracy of the terrain layer detail model. The larger C is, the more model block nodes need to participate in the current scene drawing, and the deeper the display level of the model of the current scene is. Set an error control threshold τ, and calculate an f value through the above formula. If f<τ, then the terrain block node is subdivided, that is, the child node of the terrain block node is indexed until f≥τ.

[0111] The viewing distance l is the viewpoint (x 0 ,y 0 ,z 0 ) and the target node (x 1 ,y 1 ,z 1 ) is as follows:

[0112]

[0113] Where l is the line of sight, x 0 ,y 0 、z 0 is the coordinate value of the viewpoint, x 1 ,y 1 、z 1 is the coordinate value of the target node.

[0114] like Fig. 9 As shown, Fig. 9 is a schematic diagram of the viewing distance. The viewing distance l can be determined according to the distance between the central node of the information model block with a length of d and the viewpoint.

[0115] The principle of the surface roughness rule is to render the area blocks with large curvature of the surface data with a higher resolution, and the area blocks with small curvature with a lower resolution, so that a small number of triangle patches can be used to simulate the real contour shape.

[0116] It is worth noting that when the structure is a bridge, in order to achieve efficient rendering of the BIM model in the GIS system, the bridge components under different scene view distances are rendered on demand. It is necessary to cooperate with the view distance scheduling strategy in the GIS system, reorganize the BIM model data of the bridge, and make supplementary provisions for the model rendering level of the overall structure of the bridge at each stage under the premise of meeting the existing relevant specifications. As shown in Table 1, Table 1 is a supplementary information table for the rendering level requirements of the overall structural model of the bridge. The table includes the overall structure accuracy, structural parts, construction accuracy, information depth, whether to render, and application scenarios. For example, when the overall structure accuracy is LOD1.0, the structural parts include the bridge deck, beams, piers and foundations, the component accuracy of the beam is LOD1.0, and the information depth is the outer contour skin with structural characteristics, which needs to be rendered. The application scenario is applicable to the planning and pre-feasibility stages, which requires the intelligent line selection system to meet.

[0117] Table 1

[0118]

[0119]

[0120] It is worth noting that the "Railway Engineering Information Model Delivery Accuracy Standard" (CRBIM 1004-2017) has made specific requirements on the accuracy requirements, information depth requirements, and geometric accuracy requirements of railway engineering information models. In combination with engineering practice and LOD adaptive parametric modeling technical requirements, on the premise of meeting the existing relevant specifications, supplementary regulations are made for the minimum accuracy requirements of models at each stage of bridge engineering, as shown in Table 2. Table 2 is a supplementary information table for the minimum accuracy requirements of bridge construction models. The table includes model accuracy, structural parts, information depth, and overall requirements. Taking the simply supported box girder as an example, the LOD1.0 accuracy requirement has an outer contour size with structural characteristics, which meets the requirements of the comprehensive line selection bridge and tunnel scheme flagging and determines the scope of the bridge; the LOD2.0 accuracy requirement has an inner and outer contour size with structural characteristics, which can estimate the amount of concrete in the simply supported beam and meet the preliminary requirements. Design depth requirements; LOD3.0 accuracy requirements have structural characteristic internal and external contour dimensions, which can estimate the amount of concrete in a simply supported beam, and increase the information of prestressed steel strands, which can meet the preliminary design and force analysis of the structure, and increase the number of prestressed steel strands to meet the depth requirements of the construction drawings; LOD3.5 accuracy requirements further increase the information of ordinary steel bars on the basis of LOD3.0, and have technical design information for complex structures and local analysis, which can meet the requirements of deep construction drawings; LOD4.0 accuracy requirements increase the overall outline and detailed structural dimensions of all structures and the corresponding steel bar information, and keep them consistent with the construction information. Figures 10 to 12 As shown, Fig.10 This is the LOD1.0 accuracy display diagram of the bridge model. Fig.11This is the LOD2.0 accuracy display diagram of the bridge model. Fig.12 This is a diagram showing the accuracy of the bridge model LOD3.0. Fig.13 As shown, Fig.13 In order to refine the schematic diagram of the prestressed system model, the prestressed system model is refined by adding anchors, prestressed channels, prestressed steel strands and tooth blocks to obtain the prestressing of the entire bridge section.

[0121] Table 2

[0122]

[0123]

[0124] like Fig.14 As shown, Fig.14 This is a conceptual diagram of the LOD level of the beam structure of a simply supported beam, which includes simply supported beam information models of level LOD0, level LOD1.0, level LOD2.0, level LOD3.0, level LOD3.5, and level LOD4.0, with accuracy ranging from low to high. The higher the LOD level, the higher the accuracy of the simply supported beam information model and the more structural information it contains.

[0125] The present embodiment provides an adaptive and efficient scheduling method for a structure information model based on LOD technology. The present embodiment first decomposes the traditional structure model to obtain the model organization hierarchy information, thereby improving the manageability and readability of the model and facilitating subsequent modification, maintenance and information addition. At the same time, the clarification of the hierarchy information provides guidance constraints for building a highly organized information model; the information model is constructed based on the traditional structure model to generate a part-level structure information model, thereby improving the precision and accuracy of the model; the information model is reorganized according to the model organization hierarchy information and the part-level structure information model to obtain an overall structure information model, thereby forming a multi-level model structure; the overall structure information model is scheduled and displayed according to the model scheduling strategy, thereby realizing efficient rendering scheduling of the structure information model.

[0126] In summary, this embodiment reorganizes the model by decomposing and modeling the model organization hierarchy information and the part-level structure information model obtained, obtains the overall information model of the structure and performs rendering scheduling, overcomes the technical defect of losing structural features in the traditional LOD scheduling based on the feature pyramid model, and can realize efficient rendering scheduling of the structure information model.

[0127] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can refer to the above introduction, and will not be repeated later. Fig.15 , the step S10 further includes steps S101-S104:

[0128] Step 101, obtaining geometric features and feature parameters of a structure.

[0129] It should be noted that according to the profession to which the structure belongs, the relevant BIM standards and entity decomposition standards are studied, and the geometric characteristics of the structure are abstracted and refined according to the BIM standards and entity decomposition standards, and then the characteristic parameters of the structure are determined. The geometric characteristics and characteristic parameters of the structure form the traditional digital expression model of the structure.

[0130] In a specific implementation, the structures in this embodiment may be bridges, tunnels, etc., and this embodiment does not impose any specific restrictions on this. This embodiment uses a bridge as an example for illustration. The BIM standards and entity decomposition standards related to bridges are studied, the geometric features of the bridge structure are abstractly refined, and the characteristic parameters of the bridge are determined to form a traditional digital expression model of the bridge.

[0131] like Fig.16 As shown, Fig.16 It is a schematic diagram of the characteristic parameters of a typical box girder section. The characteristic parameters of the box girder section include top plate width, top plate parallel section width, top plate drainage slope 1 width, top plate drainage slope 2 width, top plate drainage slope 1 slope, top plate drainage slope 2 slope, beam height, wing plate 1 thickness, wing plate 2 thickness, chamfer radius between wing plate and web plate, web plate thickness, top plate thickness, upper stem axil height, upper stem axil width, wing plate 1 width, wing plate 2 width, wing plate thickness, lower stem axil height, lower stem axil width, bottom plate height, bottom plate width, chamfer radius between bottom plate and web plate, etc.

[0132] like Fig.17 As shown, Fig.17 It is a schematic diagram of the characteristic parameters of a typical three-span continuous rigid frame. The characteristic parameters of the three-span continuous rigid frame include beam height, upper beam width, lower beam width, span 1 length, span 2 length, span 3 length, total length of curved segment B1, total length of curved segment B2, total length of curved segment B3, length of support A1, length of support A2, length of support A3, height of pier 1, height of pier 2, height of cap 1, height of cap 2, length of column 1, length of column 2, width of cap 1, width of cap 2, length of cap 1, length of cap 2, etc.

[0133] Step S102: constructing a traditional building model according to the geometric features and the feature parameters.

[0134] It should be noted that according to the geometric features and characteristic parameters of the structure, professional modeling software or tools are used to generate a three-dimensional traditional structure model. This model is a digital expression of the form and structure of the structure, which provides a basis for subsequent analysis and scheduling.

[0135] Step S103, decomposing the traditional building model into a plurality of sub-models at different levels.

[0136] It should be noted that the traditional building model is decomposed and divided into multiple sub-models of different levels. These sub-models can be divided according to the structure, function or spatial location of the building, so as to better organize and manage the model data. Through decomposition, the refined management of model data and efficient rendering scheduling can be achieved.

[0137] In the specific implementation, professional BIM software or tools can be used to decompose the model. According to the characteristics and requirements of the structure, set the appropriate decomposition level and division method to decompose the traditional structure model into multiple sub-models. These sub-models can be associated through logical relationships or spatial positions to form a complete model organization system.

[0138] In a feasible implementation, step 103 may include: dividing the traditional structure model into multiple models of different levels, wherein the multiple models of different scheduling levels include at least a scheme-level model, a component-level model, a part-level model and a part-level model; and decomposing the scheme-level model, the component-level model, the part-level model and the part-level model respectively to obtain multiple sub-models of different levels.

[0139] It should be noted that the scheme-level model is the overall framework of the building design, which includes the main structure and functional layout of the building. The component-level model is the basic structural unit in the building. The part-level model is the component of the component. The part-level model is the smallest component unit in the building, and each component is composed of basic geometric elements such as points, lines, surfaces, and bodies, as well as complex geometric elements after Boolean operations.

[0140] It can be understood that the digital expression model of traditional structures is classified into four scheduling levels: scheme model, component model, component model and part model, and the model of each level is decomposed into multiple digital expression sub-models. The models of the four scheduling levels, scheme model, component model, component model and part model, are decomposed separately to determine that the scheme model is composed of multiple first-level component sub-models, each first-level component sub-model is composed of multiple second-level component sub-models, and each second-level component sub-model is composed of multiple third-level element sub-models.

[0141] like Fig.18 As shown, Fig.18This is a schematic diagram of the classification of BIM models for bridge structures. Traditional digital expression models of bridges can be classified into scheme-level models, component-level models, component-level models and part-level models. Scheme-level models include the BIM model of a certain super-large bridge, etc. Component-level models include the BIM model of a simply supported beam, the BIM model of a continuous beam, the BIM model of a cable-stayed bridge, etc. Component-level models include the BIM model of the beam structure, the BIM model of the pier structure, the BIM model of the foundation structure, etc. Part-level models include the BIM model of the external contour, the BIM model of the internal contour, the BIM model of the steel skeleton, the BIM model of the prestressed system, etc.

[0142] Step S104: determining model organization level information according to the multiple sub-models at different levels.

[0143] It should be noted that the scheduling level of the BIM model of a structure refers to the model delivery accuracy requirements based on the existing BIM standard requirements, which divides the BIM model of a structure from top to bottom into four scheduling levels: scheme model, component model, part model and part model. Therefore, the model organization level information is determined according to the scheduling level, that is, the scheme model is composed of multiple component models assembled according to the logical relationship of the scheme; the component model is composed of multiple part models assembled according to the topological relationship of the structure. The part model is composed of multiple part models assembled according to the topological relationship of the structure.

[0144] It can be understood that each level of sub-model has its own unique properties and functions, which together constitute the complete expression of the entire structure. For example, the scheme-level sub-model provides the overall layout and design ideas of the structure, while the part-level sub-model describes in detail the smallest component unit of the structure, including its geometric shape, material properties, etc. The sub-models at different levels are interrelated, forming a model organization system with clear hierarchy and complete structure.

[0145] In this embodiment, by constructing a traditional structure model based on geometric features and feature parameters, decomposing the traditional structure model and determining the model organization hierarchy information, the association relationship between structure information models at different scheduling levels can be quickly and accurately determined, thereby effectively improving the scheduling efficiency of the structure information model.

[0146] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the adaptive and efficient scheduling method of the structure information model based on LOD technology of the present application. More forms of simple transformations based on this technical concept are all within the scope of protection of the present application.

[0147] Based on the first embodiment of the present application, in the third embodiment of the present application, the same or similar contents as those in the first embodiment can be referred to the above description, and will not be described in detail later. Fig.19 , the step S30 further includes steps S301-S302:

[0148] Step S301, generating a model assembly file according to the model organization level information.

[0149] It should be noted that the model assembly file is used to describe how sub-models at different levels are assembled into a complete structure model. It contains the identification, location, direction and other information of each sub-model, as well as the connection relationship and constraints between sub-models. The process of generating a model assembly file is actually the process of encoding and storing the model organization level information so that the information can be easily read and parsed later.

[0150] It is understandable that when generating the model assembly file, a standard file format such as XML, JSON, etc. can be used to ensure the readability and portability of the file. At the same time, the file can also be optimized according to specific needs, such as compressing the file size, improving the parsing speed, etc.

[0151] In the specific implementation, a model assembly file is formed according to the model organization hierarchy. The file organizes and expresses the model information in JSON format. The component-level BIM model is expressed by model file reference, which describes the hierarchical attribute values ​​of the scheme model, component model, component model, and part model. At the same time, the engineering mileage coordinates of the theoretical center of the component model are set, and the local rectangular coordinates of the component model and part model center relative to the parent model are set. It is generally necessary to generate a unified identification code for the component-level BIM model in advance. The unified identification code can select a snowflake algorithm, etc. This embodiment does not make specific restrictions on this.

[0152] The scheme-level model can be a certain super-large bridge scheme model, such as Fig. 20 As shown, Fig. 20 This is a schematic diagram of a certain large bridge scheme model. An example of a scheme-level model JSON file is as follows:

[0153] {XXXX Bridge:{

[0154] Unified number: **************,

[0155] Model type: scenario-level model,

[0156] Display level: 1,

[0157] Project coordinates:

[0158] {Solution center mileage: DK***+5000},

[0159] {Starting mileage of the plan: DK***+5000},

[0160] {Project end mileage: DK***+5000}

[0161] ],

[0162] Contains: [

[0163] {Component name: simply supported beam structure},

[0164] {Component name: continuous beam structure},

[0165] {Component name: low tower cable-stayed bridge structure} ]

[0167] }

[0168] }

[0169] The component level model can be a continuous beam structure model, such as Fig.21 As shown, Fig.21 This is a schematic diagram of the continuous beam structure. The foundation center position parameters, pier center position parameters, and beam support center position parameters are combined into a three-in-one binding to obtain the continuous beam structure model. The component-level model JSON file example is as follows:

[0170] {Continuous beam structure:{

[0171] Unified number: *****************,

[0172] Model type: component-level model,

[0173] Display level: 2,

[0174] Center mileage: DK000+500,

[0175] Center elevation: 500,

[0176] Geographic coordinates: [longitude, latitude, elevation, yaw, pitch, roll], including objects: [

[0177] {Component name: beam structure},

[0178] {Component name: pier structure},

[0179] {Component name: pile foundation structure} ]

[0181] }

[0182] }

[0183] The component-level model can be a beam structure model. An example of a component-level model JSON file is as follows:

[0184] Unified number: **********,

[0185] Model type: component model,

[0186] Display level: 3,

[0187] Relative position: [X coordinate, Y coordinate, Z coordinate]},

[0188] Contains: [

[0189] {Part Name: External Contour},

[0190] {Part Name: Inner Profile},

[0191] {Part name: steel bar skeleton},

[0192] {Part name: detail size} ]

[0194] }

[0195] }

[0196] The part-level model can be an external contour model. The example of the part-level model JSON file is as follows: {External contour: {

[0197] Unified number: **********,

[0198] Model type: Part-level model,

[0199] Display level: 6,

[0200] Relative position: [X coordinate, Y coordinate, Z coordinate],

[0201] Fineness level: Coarse

[0202] }

[0203] }

[0204] like Fig. 22 As shown, Fig. 22 It is a schematic diagram of the part-level model. The features of block unit component No. 0 are extracted to obtain component set components. The component set components are split to obtain external beam segment components, internal beam segment component sets and hollow components. The internal beam segment component set includes internal beam segment component 1, internal beam segment component 2 and internal beam segment component 3.

[0205] It is worth noting that, taking the bridge scheme model as an example, the model rendering level assignment rules that take into account structural characteristics include: the scheme-level model has the lowest level; the level of the component-level model increases by one unit compared to the scheme-level model; the starting level of the component-level model is the same as the parent component-level model, and the corresponding level of the component model that needs to be rendered and displayed in sequence increases by one unit as the viewport distance is pulled closer. The starting level of the part-level model is the same as the parent component-level model, and the corresponding level of the part model that needs to be rendered and displayed in sequence increases by one unit as the viewport distance is pulled closer. The rendering levels of the coarse, medium, and fine models of the same part model increase by one unit in turn.

[0206] As shown in Table 3, Table 3 is a display level information table of the bridge structure BIM model, which includes scheme-level model, component-level model, component-level model, part-level model, model refinement and display level. The scheme-level model includes a certain super-large bridge model, the component-level model includes a simply supported beam model, a continuous beam model, a low-tower cable-stayed bridge model, etc., the component-level model includes a beam structure model, a pier structure model, etc., the part-level model includes an outer contour model, an inner contour model, etc., the model refinement includes a coarse model, a medium model, and a fine model, and the display levels include 0, 1, 2, 3, etc.

[0207] Table 3

[0208]

[0209]

[0210] Step S302: reorganize the information model according to the model assembly file and the part-level structure information model to obtain the overall structure information model.

[0211] It should be noted that in the process of reorganizing the information model, the accuracy and completeness of the model assembly file must be ensured. The model assembly file should record in detail the spatial relationship, connection method and necessary parameter information between each component and part. Then, based on this information, combined with the established part-level structure information model, one by one matching and assembly are carried out.

[0212] It can be understood that, by combining the characteristics of LOD technology in BIM system and GIS system, a structure information model assembly data file integrating BIM+GIS is redefined, and scheduling display level information and longitude and latitude information and attitude angle information used for GIS system posture positioning are added to the traditional BIM data file. The structure model is displayed in a hierarchical manner according to the viewport distance scheduling strategy while taking into account the structural characteristics, forming an efficient rendering scheduling of the structure information model in the GIS system, overcoming the defect of losing structural features in the traditional LOD scheduling based on the feature pyramid model.

[0213] In a feasible implementation, step 302 may include: determining the part model center according to the part-level structure information model; determining the component model center according to the part model center; generating a component-level structure information model according to the component model center and the part-level structure information model; assembling the component-level structure information model according to the model assembly file to obtain a scheme-level structure information model; and reorganizing the model according to the part-level structure information model, the component-level structure information model, the component-level structure information model, and the scheme-level structure information model to obtain an overall structure information model.

[0214] It should be noted that the local rectangular coordinates of the component model and the center of the part model relative to the upper model are pre-set, and the center point of each part model is determined according to the geometric information and spatial positioning information in each part-level structure information model. According to the center of the part model, the center point of the component model is determined using the pre-defined relative position and spatial relationship. The center point of the component model reflects the relative position of the component in the overall structure.

[0215] It is understandable that after determining the center of the component model, it can be assembled in combination with the part-level structure information model to generate a component-level structure information model. In this process, the spatial relationship, connection method and attribute information between the parts inside the component need to be considered to ensure the integrity and accuracy of the component-level model.

[0216] It is worth noting that the generated component-level structure information model is assembled according to the instructions in the model assembly file. This assembly process follows a certain hierarchy and logical relationship to ensure the correct connection between the components and the stability of the overall structure.

[0217] The part-level structure information model, the component-level structure information model and the assembled scheme-level structure information model are reorganized as a whole to form the final overall structure information model. This model not only contains the geometric information and spatial positioning information of the structure, but also contains the logical relationship, attribute information and hierarchical structure between the components and parts, which is convenient for subsequent calls to achieve hierarchical display.

[0218] In a feasible implementation manner, the component-level structure information model is assembled according to the model assembly file to obtain a scheme-level structure information model, including: assembling the component-level structure information model according to the model assembly file to generate a component-level structure information model; obtaining the engineering coordinates of the structure information model, and performing coordinate system conversion according to the engineering coordinates to obtain longitude and latitude coordinate information; and determining the scheme-level structure information model according to the longitude and latitude coordinate information and the component-level structure information model.

[0219] It should be noted that engineering coordinates refer to the rectangular coordinate system used in actual engineering projects, which are usually defined based on the geographical location of the project site and specific reference points, such as the project center mileage, project starting mileage, and project end mileage. The longitude and latitude coordinates are a global geographic coordinate system used to determine the position of any point on the earth, such as longitude, latitude, elevation, yaw angle, pitch angle, roll angle, etc. Therefore, when converting the coordinate system, it is necessary to take into account factors such as the geographical location of the project site, the reference point, and the curvature of the earth to ensure the accuracy and reliability of the conversion.

[0220] It is understandable that after the coordinate system conversion, the scheme-level structure information model can be determined based on the converted latitude and longitude coordinate information and the component-level structure information model. In this process, the spatial relationship, connection mode and attribute information between the components need to be considered to ensure that the scheme-level model can accurately reflect the overall structure and characteristics of the structure.

[0221] It is worth mentioning that when constructing the overall information model of a structure, the model's refinement and display level also need to be considered. According to different levels of refinement and display level, different levels of display and call of the structure can be realized. For example, at the coarse model level, the general outline and main structure of the structure can be displayed; at the medium model level, more details and features can be displayed; and at the fine model level, the fine structure and detailed information of the structure can be displayed. This hierarchical display method helps to improve the visualization effect and usage efficiency of the model.

[0222] In the specific implementation, the location of the BIM model and the corresponding model assembly file are selected, the BIM model is assembled to form a component-level BIM model, and the spherical coordinate conversion algorithm provided by the GIS system is used to generate the corresponding longitude and latitude coordinate information based on the engineering coordinates in the component model. Then, the component-level model is accurately positioned in the GIS system through the longitude and latitude coordinates to form a scheme-level model.

[0223] It is worth noting that the conversion model between coordinate systems based on different ellipsoids is generally converted using the Bursa model. Taking the commonly used "seven parameter method" as an example, the corresponding conversion principle is: convert the coordinates of two sets of coordinate systems based on different ellipsoids with no less than 3 known points into the coordinates of the geocentric (geocentric) space rectangular coordinate system based on various ellipsoids; substitute the seven parameters into the Bursa model formula; substitute the source coordinates of the source ellipsoid of the point to be determined into the Bursa model to calculate the target coordinates based on the target ellipsoid, as shown in the following formula:

[0224]

[0225] Among them, (X 1 ,Y 1 ,Z 1 )T is the source coordinate system coordinate, (X 2 ,Y 2 ,Z 2 ) T is the coordinate of the target coordinate system, (ΔX, ΔY, ΔZ) is the translation parameter of the origin of the two coordinate systems, ε X , ε Y , ε Z is the rotation parameter of the three coordinate axes, and k is the scale ratio between the two coordinate systems, that is, the scale parameter.

[0226] like Fig.23 As shown, Fig.23 It is a schematic diagram of the coordinate system conversion process. The two-dimensional three-parameter engineering coordinate system is converted to a custom coordinate system, such as Beijing 54 coordinate system, Xi'an 80 coordinate system, and northern city coordinate system, to obtain the target coordinates, such as WGS84 and CGCS2000.

[0227] In this embodiment, by generating a model assembly file according to the model organization hierarchical information, and then reorganizing the information model of the part-level structure information model, the overall information model of the structure is obtained, which can effectively improve the efficiency and accuracy of modeling. At the same time, the coordinate system conversion technology is used to convert the engineering coordinates into longitude and latitude coordinates, so that the structure information model can be better integrated into the GIS system to achieve spatial positioning and information sharing. In addition, through a hierarchical display method, the display and call of different levels of the structure can be realized to meet the needs of different users and scene applications.

[0228] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the adaptive and efficient scheduling method of the structure information model based on LOD technology of the present application. More forms of simple transformations based on this technical concept are all within the scope of protection of the present application.

[0229] This application also provides an adaptive and efficient scheduling device for structure information model based on LOD technology, please refer to Fig.24 The adaptive and efficient scheduling device of the structure information model based on LOD technology includes:

[0230] The decomposition module 10 is used to decompose the traditional building model to obtain model organization level information.

[0231] The construction module 20 is used to construct an information model based on the traditional structure model to generate a part-level structure information model.

[0232] The reorganization module 30 is used to reorganize the information model according to the model organization level information and the part-level structure information model to obtain the overall structure information model.

[0233] The scheduling module 40 is used to schedule and display the overall information model of the structure according to the model scheduling strategy.

[0234] The present embodiment provides an adaptive and efficient scheduling device for a structure information model based on LOD technology. The present embodiment first decomposes the traditional structure model to obtain the model organization hierarchy information, which can improve the manageability and readability of the model and facilitate subsequent modification, maintenance and information addition. At the same time, the clarification of the hierarchy information lays a foundation for building a highly organized information model; the information model is constructed based on the traditional structure model to generate a part-level structure information model, which improves the precision and accuracy of the model; the information model is reorganized according to the model organization hierarchy information and the part-level structure information model to obtain an overall structure information model, which can form a multi-level model structure; the overall structure information model is scheduled and displayed according to the model scheduling strategy, which can achieve efficient rendering scheduling of the structure information model.

[0235] In summary, this embodiment reorganizes the model by decomposing and modeling the model organization hierarchy information and the part-level structure information model obtained, obtains the overall information model of the structure and performs rendering scheduling, overcomes the technical defect of losing structural features in the traditional LOD scheduling based on the feature pyramid model, and can realize efficient rendering scheduling of the structure information model.

[0236] Optionally, the decomposition module 10 is also used to obtain the geometric features and characteristic parameters of the structure; construct a traditional structure model based on the geometric features and the characteristic parameters; decompose the traditional structure model into multiple sub-models of different levels; and determine the model organization level information based on the multiple sub-models of different levels.

[0237] Optionally, the decomposition module 10 is also used to divide the traditional structure model into multiple models of different levels, wherein the multiple models of different scheduling levels include at least a scheme-level model, a component-level model, a component-level model and a part-level model; the scheme-level model, the component-level model, the component-level model and the part-level model are decomposed respectively to obtain multiple sub-models of different levels.

[0238] Optionally, the reorganization module 30 is further used to generate a model assembly file according to the model organization hierarchy information; and to reorganize the information model according to the model assembly file and the part-level structure information model to obtain an overall structure information model.

[0239] Optionally, the reorganization module 30 is further used to determine the part model center according to the part-level structure information model; determine the component model center according to the part model center; generate the component-level structure information model according to the component model center and the part-level structure information model; assemble the component-level structure information model according to the model assembly file to obtain a scheme-level structure information model; reorganize the model according to the part-level structure information model, the component-level structure information model, the component-level structure information model and the scheme-level structure information model to obtain an overall structure information model.

[0240] Optionally, the reorganization module 30 is further used to assemble the component-level structure information model according to the model assembly file to generate a component-level structure information model; obtain the engineering coordinates of the structure information model, and perform coordinate system conversion according to the engineering coordinates to obtain longitude and latitude coordinate information; determine the scheme-level structure information model according to the longitude and latitude coordinate information and the component-level structure information model.

[0241] Optionally, the scheduling module 40 is further used to determine the viewport distances of different component-level structure information models according to the overall structure information model; and to call the structure information models of different levels in the overall structure information model according to the viewport distance for rendering and display through the model scheduling strategy.

[0242] The adaptive and efficient scheduling device for structure information model based on LOD technology provided by the present application adopts the adaptive and efficient scheduling method for structure information model based on LOD technology in the above embodiment, which can solve the technical problem of how to achieve efficient rendering scheduling of structure information model. Compared with the prior art, the beneficial effects of the adaptive and efficient scheduling device for structure information model based on LOD technology provided by the present application are the same as the beneficial effects of the adaptive and efficient scheduling method for structure information model based on LOD technology provided by the above embodiment, and the other technical features of the adaptive and efficient scheduling device for structure information model based on LOD technology are the same as the features disclosed in the above embodiment method, which will not be repeated here.

[0243] The present application provides an adaptive and efficient scheduling device for a structure information model based on LOD technology. The adaptive and efficient scheduling device for a structure information model based on LOD technology includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the adaptive and efficient scheduling method for a structure information model based on LOD technology in the above-mentioned embodiment one.

[0244] Reference below Fig.25, which shows a schematic diagram of the structure of the adaptive and efficient scheduling device of the structure information model based on LOD technology suitable for implementing the embodiment of the present application. The adaptive and efficient scheduling device of the structure information model based on LOD technology in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptops, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Fig.25 The structure information model adaptive and efficient scheduling device based on LOD technology shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0245] like Fig.25 As shown, the adaptive and efficient scheduling device for the structure information model based on the LOD technology may include a processing device 1001 (such as a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM: Read Only Memory) 1002 or the program loaded from the storage device 1003 to the random access memory (RAM: Random Access Memory) 1004. In the RAM 1004, various programs and data required for the operation of the adaptive and efficient scheduling device for the structure information model based on the LOD technology are also stored. The processing device 1001, the ROM 1002 and the RAM 1004 are connected to each other through a bus 1005. The input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the adaptive and efficient scheduling device of the structure information model based on the LOD technology to communicate wirelessly or wired with other devices to exchange data. Although the figure shows the adaptive and efficient scheduling device of the structure information model based on the LOD technology with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have instead.

[0246] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0247] The adaptive and efficient scheduling device for structure information model based on LOD technology provided by the present application adopts the adaptive and efficient scheduling method for structure information model based on LOD technology in the above embodiment, which can solve the technical problem of how to realize efficient rendering scheduling of structure information model. Compared with the prior art, the beneficial effects of the adaptive and efficient scheduling device for structure information model based on LOD technology provided by the present application are the same as the beneficial effects of the adaptive and efficient scheduling method for structure information model based on LOD technology provided by the above embodiment, and the other technical features in the adaptive and efficient scheduling device for structure information model based on LOD technology are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0248] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0249] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0250] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the adaptive and efficient scheduling method of the structure information model based on the LOD technology in the above-mentioned embodiment.

[0251] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0252] The above-mentioned computer-readable storage medium may be included in the adaptive and efficient scheduling device for structure information model based on LOD technology; or it may exist independently without being assembled into the adaptive and efficient scheduling device for structure information model based on LOD technology.

[0253] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the adaptive and efficient scheduling device of the structure information model based on the LOD technology, the adaptive and efficient scheduling device of the structure information model based on the LOD technology: decomposes the traditional structure model to obtain the model organization hierarchy information; constructs the information model based on the traditional structure model to generate a part-level structure information model; reorganizes the information model according to the model organization hierarchy information and the part-level structure information model to obtain the overall information model of the structure; and schedules and displays the overall information model of the structure according to the model scheduling strategy.

[0254] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, C#, python, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0255] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0256] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0257] The readable storage medium provided in the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned adaptive and efficient scheduling method for structure information models based on LOD technology, and can solve the technical problem of how to achieve efficient rendering scheduling of structure information models. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in the present application are the same as the beneficial effects of the adaptive and efficient scheduling method for structure information models based on LOD technology provided in the above-mentioned embodiments, and will not be elaborated here.

[0258] The present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the above-mentioned LOD-based adaptive and efficient scheduling method for structure information models.

[0259] The computer program product provided by the present application can solve the technical problem of how to achieve efficient rendering scheduling of the structure information model. Compared with the prior art, the beneficial effects of the computer program product provided by the present application are the same as the beneficial effects of the adaptive and efficient scheduling method of the structure information model based on LOD technology provided by the above embodiment, which will not be repeated here.

[0260] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. An adaptive and efficient scheduling method for structure information model based on LOD technology, It is characterized in that The method comprises: Decompose the traditional structure model to obtain the model organization level information; Building an information model based on the traditional structure model to generate a part-level structure information model; Reorganizing the information model according to the model organization level information and the part-level structure information model to obtain an overall structure information model; The overall information model of the structure is scheduled and displayed according to the model scheduling strategy.

2. The method according to claim 1, It is characterized in that The traditional structure model is decomposed to obtain model organization level information, including: Obtain the geometric features and characteristic parameters of the structure; Constructing a traditional structure model according to the geometric features and the feature parameters; Decomposing the traditional building model into a plurality of sub-models at different levels; Model organization level information is determined according to the multiple sub-models at different levels.

3. The method according to claim 2, It is characterized in that The traditional building model is decomposed into a plurality of sub-models at different levels, including: Dividing the traditional structure model into a plurality of models at different levels, wherein the plurality of models at different scheduling levels at least include a scheme level model, a component level model, a part level model and a part level model; The scheme-level model, the component-level model, the part-level model and the part-level model are respectively decomposed to obtain a plurality of sub-models at different levels.

4. The method according to claim 1, It is characterized in that The information model is reorganized according to the model organization level information and the part-level structure information model to obtain the overall structure information model, including: Generate a model assembly file according to the model organization level information; The information model is reorganized according to the model assembly file and the part-level structure information model to obtain the overall structure information model.

5. The method according to claim 4, It is characterized in that The information model is reorganized according to the model assembly file and the part-level structure information model to obtain the overall structure information model, including: Determining a part model center according to the part-level structure information model; Determine the component model center according to the part model center; Generate a component-level structure information model according to the component model center and the part-level structure information model; Assembling the component-level structure information model according to the model assembly file to obtain a scheme-level structure information model; Model reorganization is performed according to the part-level structure information model, the component-level structure information model, the component-level structure information model and the scheme-level structure information model to obtain an overall structure information model.

6. The method according to claim 5, It is characterized in that The step of assembling the component-level structure information model according to the model assembly file to obtain a scheme-level structure information model includes: Assembling the component-level structure information model according to the model assembly file to generate a member-level structure information model; Acquire the engineering coordinates of the structure information model, and perform coordinate system conversion according to the engineering coordinates to obtain longitude and latitude coordinate information; The scheme-level structure information model is determined according to the latitude and longitude coordinate information and the component-level structure information model.

7. The method according to claim 1, It is characterized in that The step of scheduling and displaying the overall information model of the structure according to the model scheduling strategy includes: Determining the viewport distances of different component-level structure information models according to the overall structure information model; The model scheduling strategy is used to call the structure information models of different levels in the structure overall information model according to the viewport distance for rendering and display.

8. An adaptive and efficient scheduling device for structure information model based on LOD technology, It is characterized in that The structure information model adaptive and efficient scheduling device based on LOD technology includes: Decomposition module, used to decompose the traditional structure model to obtain the model organization level information; A construction module, used to construct an information model based on the traditional structure model to generate a part-level structure information model; A reorganization module, used for reorganizing the information model according to the model organization level information and the part-level structure information model to obtain an overall structure information model; The scheduling module is used to schedule and display the overall information model of the structure according to the model scheduling strategy.

9. An adaptive and efficient scheduling device for structure information model based on LOD technology, It is characterized in that The LOD-based structure information model adaptive and efficient scheduling device comprises: a memory, a processor, and a LOD-based structure information model adaptive and efficient scheduling program stored in the memory and executable on the processor. The LOD-based structure information model adaptive and efficient scheduling program is configured to implement the LOD-based structure information model adaptive and efficient scheduling method as described in any one of claims 1 to 7.

10. A storage medium, It is characterized in that The storage medium stores an LOD-based structure information model adaptive and efficient scheduling program, which, when executed by a processor, implements the LOD-based structure information model adaptive and efficient scheduling method as described in any one of claims 1 to 7.