Geological disaster early warning method, device and equipment based on recurrence period and storage medium

By combining the historical rainfall and the frequency of geological disasters, calculating the probability of geological disasters and generating early warning information, the problem of poor reliability of geological disaster warnings in the existing technology is solved, the accuracy and reliability of early warnings are improved, and meteorological and natural resources are integrated. The technological advantages of the industry.

CN119068631APending Publication Date: 2024-12-03GUANGDONG GEOLOGICAL ENVIRONMENT MONITORING STATION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411024408.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

When considering rainfall factors, existing geological disaster warning technologies ignore historical geological disaster situations and rainfall disaster factors, resulting in poor early warning reliability in complex geological conditions and severe climate change areas.

Method used

Based on the historical surface rainfall of the early warning unit, the rainfall threshold for the recurrence period is determined, and the probability of geological disasters is calculated and early warning information is generated. Distribution methods such as Pearson III, Gengbeer distribution and The log-normal distribution fits the probability of precipitation occurrence and determines the rainfall threshold.

Benefits of technology

It improves the accuracy and reliability of geological disaster warning, breaks down the technical barriers between meteorological and natural resources industries, integrates the advantages of both, and broadens the research horizons for meteorological warning of geological disasters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119068631A_ABST
    Figure CN119068631A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of computers, and provides a geological disaster early warning method, device and equipment based on a recurrence period and a storage medium, and the method comprises the steps: determining a rainfall threshold value of at least one recurrence period of an early warning unit based on the historical area rainfall of the early warning unit; based on the rainfall threshold value of each recurrence period and the rainfall value of the early warning unit when the historical geological disaster occurs, determining the frequency of the historical geological disaster occurring in each recurrence period; based on the historical geological disaster occurrence frequency and the rainfall frequency of each recurrence period, determining the geological disaster occurrence probability of each recurrence period; and generating geological disaster early warning information of the early warning unit based on the probability of occurrence of the geological disaster in each recurrence period. According to the geological disaster meteorological risk early warning method, the rainstorm recurrence period and geological disaster meteorological risk early warning are combined, the technical barrier between different early warning is broken, the technical advantages of the meteorological industry and the natural resource industry are fused, the research view of geological disaster meteorological early warning is widened, and therefore the reliability of geological disaster meteorological early warning is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a geological disaster early warning method, device, equipment and storage medium based on a recurrence period. Background Art

[0002] Heavy rain return period warning technology is to analyze the return period of the hazard factor itself. In the heavy rain return period warning, heavy rain is both a hazard factor and a disaster itself. In the actual application of natural disaster prevention and control, heavy rain is usually used as a hazard factor for other secondary disasters. As another natural disaster that is also easily caused by heavy rain, the existing geological disaster meteorological risk warning model only considers the rainfall in the past week when considering the rainfall factor, ignoring the historical rainfall in the area. When considering the historical geological disaster situation, the rainfall disaster factor when the historical geological disaster occurred is ignored. Therefore, the existing geological disaster warning technology always has certain limitations, especially in areas with complex geological conditions and drastic climate changes, the warning reliability is poor. Summary of the invention

[0003] The present invention provides a geological disaster early warning method, device, equipment and storage medium based on the recurrence period, which are used to solve the problem of low geological disaster early warning in the prior art and improve the accuracy of geological disaster early warning.

[0004] The present invention provides a geological disaster early warning method based on recurrence period, comprising: Determining a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; Determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit experienced historical geological disasters; Based on the historical frequency of geological disasters and rainfall frequency in each return period, the probability of geological disasters occurring in each return period is determined; Based on the probability of geological disasters occurring in each recurrence period, geological disaster warning information of the warning unit is generated.

[0005] According to a geological disaster early warning method based on the return period provided by the present invention, the frequency of historical geological disasters in each return period is determined based on the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the early warning unit, including: Determine the comparison result of the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the early warning unit; Based on the comparison results, the number of geological disasters that are greater than or equal to the rainfall threshold of each recurrence period is determined as the frequency of historical geological disasters in each recurrence period.

[0006] According to a geological disaster early warning method based on the return period provided by the present invention, the probability of geological disasters occurring in each return period is determined based on the historical frequency of geological disasters occurring in each return period and the rainfall frequency, including: The ratio of the frequency of historical geological disasters in each recurrence period to the rainfall frequency is determined, and the ratio is determined as the probability of geological disasters occurring in each recurrence period.

[0007] According to a geological disaster early warning method based on a recurrence period provided by the present invention, determining the historical surface rainfall of the early warning unit includes: Obtain historical rainfall data from at least one rain gauge station; Determining the historical surface rainfall of the early warning unit based on the historical rainfall data and the number of the rain gauge stations; Alternatively, constructing at least one polygon based on the rainfall stations within the early warning unit; Determining the historical surface rainfall of the warning unit based on the area and historical rainfall of each polygon; Alternatively, based on the historical rainfall data of the early warning unit, drawing isoprecipitation lines; Based on the isohyet, the historical surface rainfall of the early warning unit is determined.

[0008] According to a geological disaster early warning method based on a return period provided by the present invention, the historical surface rainfall of the early warning unit is used to determine the rainfall threshold of at least one return period of the early warning unit, including: Using at least one distribution method, fitting the historical surface rainfall of the early warning unit to obtain a distribution curve of the probability of occurrence of precipitation and precipitation; wherein the distribution method includes Pearson III distribution, Gumbel distribution and lognormal distribution; Based on the distribution curve, a rainfall threshold of at least one recurrence period of the early warning unit is determined.

[0009] According to a geological disaster early warning method based on a return period provided by the present invention, the distribution mode includes at least two types, and the determination of the rainfall threshold of at least one return period of the early warning unit based on the distribution curve includes: Based on each distribution curve, obtain the theoretical frequency of geological disasters determined by each distribution method; Based on the theoretical frequency and the actual frequency of geological disasters, determine the degree of fit of each distribution mode; Based on the distribution curve with the minimum fitting degree, a rainfall threshold of at least one recurrence period of the early warning unit is determined.

[0010] According to a geological disaster early warning method based on recurrence period provided by the present invention, the geological disaster early warning information of the early warning unit is generated based on the probability of geological disasters occurring in each recurrence period, including: Determine the warning level corresponding to the probability of geological disasters occurring in each return period; Based on the warning level, geological disaster warning information of the warning unit is generated.

[0011] The present invention provides a geological disaster early warning device based on a recurrence period, comprising: A rainfall threshold determination module, used to determine a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; A frequency determination module, used to determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit had historical geological disasters; The probability determination module is used to determine the probability of geological disasters occurring in each return period based on the historical frequency of geological disasters and rainfall frequency in each return period; The early warning module is used to generate geological disaster early warning information of the early warning unit based on the probability of geological disasters occurring in each recurrence period.

[0012] The present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a geological disaster early warning method based on the recurrence period as described above is implemented.

[0013] The present invention also provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, it implements any of the geological disaster warning methods based on recurrence period as described above.

[0014] The geological disaster early warning method, device, equipment and storage medium based on the return period provided by the present invention determine the rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit has historical geological disasters; determine the probability of geological disasters in each return period based on the frequency of historical geological disasters in each return period and the rainfall frequency; generate geological disaster early warning information of the early warning unit based on the probability of geological disasters in each return period. The present invention combines the rainstorm return period with the geological disaster meteorological risk early warning, breaks the technical barriers between different early warnings, integrates the technical advantages of the meteorological industry and the natural resources industry, broadens the research field of geological disaster meteorological early warning, and thus improves the reliability of geological disaster meteorological early warning. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a flow chart of the geological disaster early warning method based on the recurrence period provided by the present invention.

[0017] Figure 2 It is a structural schematic diagram of a geological disaster early warning device based on recurrence period provided by the present invention.

[0018] Figure 3 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] It should be noted that in the description of the present invention, the terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "include one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements. The orientation or position relationship indicated by the terms "upper", "lower" and the like is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0021] The terms "first", "second", etc. in the present invention are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged under appropriate circumstances, so that the embodiments of the present invention can be implemented in an order other than those illustrated or described herein, and the objects distinguished by "first", "second", etc. are generally of the same type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" means at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0022] Combine the following Figure 1-Figure 3 The invention describes the geological disaster early warning method, device, equipment and storage medium based on the recurrence period.

[0023] Specifically, the present invention provides a geological disaster early warning method based on the return period, referring to Figure 1 , Figure 1 It is a flow chart of the geological disaster early warning method based on the recurrence period provided by the present invention.

[0024] The geological disaster early warning method based on the recurrence period provided by the embodiment of the present invention includes: Step 100, based on the historical surface rainfall of the early warning unit, determining a rainfall threshold value of at least one return period of the early warning unit; It should be noted that the division of early warning units varies according to the region and disaster type, and different early warning unit division methods may also differ. For example, the following two methods can be used to divide early warning units: The first division method: The early warning unit is the smallest early warning division obtained by dividing administrative regions based on comprehensive considerations such as geological disaster susceptibility, geographical environment and socio-economic factors, in order to better guide geological disaster prevention, rescue and emergency response work. This division method can combine the early warning unit with the existing administrative divisions, making it easier for relevant departments to implement management and coordination.

[0025] The second division method: Early warning units divide the region into several minimum assessment units based on specific geological disaster types and monitoring methods to conduct meteorological early warnings for geological disasters. This division method needs to consider factors such as topography, hydrogeology, and meteorological conditions in order to more accurately predict the time of occurrence and scope of impact of geological disasters. By analyzing and interpreting the monitoring data within the early warning unit, early warning information can be issued in a timely manner, providing a scientific basis for preventing and reducing losses caused by geological disasters.

[0026] Historical surface rainfall is a physical quantity that describes the historical average precipitation per unit area in the entire region, and can objectively reflect the historical precipitation conditions in the entire region.

[0027] For geological disasters (such as landslides, mudslides, floods, etc.), the return period rainfall threshold refers to the rainfall required to trigger the geological disaster within a specific return period. In the fields of geology, meteorology and hydrology, the unit of return period is often used to express the frequency of occurrence of specific events, generally including: Once in 10 years: refers to the probability of occurrence once every 10 years on average, which can also be expressed as a probability of 10% (1 / 10); Once in 20 years: refers to the probability of occurrence once every 20 years on average, which can also be expressed as a probability of 5% (1 / 20); Once in 50 years: refers to the probability of occurrence once every 50 years on average, which can also be expressed as a probability of 2% (1 / 50); Once in 100 years: refers to the probability of occurrence once every 100 years on average, which can also be expressed as a probability of 1% (1 / 100).

[0028] The historical surface rainfall of the early warning unit is fitted by distribution, and then the rainfall threshold of at least one return period of the early warning unit is determined based on the fitting results. For example, the rainfall thresholds of 10-year, 20-year, 50-year, and 100-year return periods of each early warning unit in the past 1 hour, 3 hours, 6 hours, and 24 hours are calculated and analyzed, as shown in Table 1.

[0029] Table 1 Rainfall thresholds for the return period of each warning unit

[0030] Step 200, determining the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit had historical geological disasters; The rainfall threshold of each recurrence period is compared with the rainfall value when the historical geological disaster occurred in the early warning unit, and then the number of geological disasters greater than or equal to the rainfall threshold of each recurrence period is determined based on the comparison result, and the number of occurrences is determined as the frequency of historical geological disasters in each recurrence period.

[0031] For example, suppose the annual return period rainfall threshold of the early warning unit is 100 mm, that is, the average annual rainfall is 100 mm; the 10-year return period rainfall threshold of the early warning unit is 200 mm. Historical records show that in the past 50 years, there have been 10 geological disasters. The rainfall when these geological disasters occurred is compared with the annual return period rainfall threshold and the 10-year return period rainfall threshold. By comparison, it is found that the rainfall exceeded 100 mm when 5 geological disasters occurred, and the rainfall exceeded 200 mm when 2 geological disasters occurred. That is, the frequency of historical geological disasters with an annual return period is 5 times, and the frequency of historical geological disasters with a 10-year return period is 2 times.

[0032] Optionally, based on the above example data, the frequency of historical geological disasters under a specific recurrence period (such as once a year) can be calculated. Since the number of geological disasters with rainfall exceeding 100 mm is 5 times, and the total number of geological disasters is 10 times, the frequency of historical geological disasters under a specific recurrence period (such as once a year) is 5 / 10=0.5, that is, 50%, indicating that in the annual rainfall event of the warning unit, there is a 50% probability of geological disasters in history.

[0033] Step 300, determining the probability of geological disasters occurring in each return period based on the historical frequency of geological disasters and rainfall frequency in each return period; Determine the ratio of the frequency of historical geological disasters to the rainfall frequency in each return period, and then determine the ratio as the probability of geological disasters occurring in each return period. Among them, the rainfall frequency refers to the number of rainfall events that occur in a specific time period.

[0034] For example, suppose that the geological disaster of a warning unit is being studied, and there are records of the past 100 years. During these 100 years, 20 geological disasters have occurred. At the same time, the 24-hour rainfall with a return period of 10 years for this warning unit is 200 mm. Now it is necessary to evaluate the probability of geological disasters occurring in the future when the 10-year rainfall occurs, including the following steps: 1. Historical records of the early warning unit: In the past 100 years, a total of 20 geological disaster events have occurred in this early warning unit.

[0035] 2. 10-year return period rainfall: The 10-year return period rainfall of this warning unit is 200 mm, which means that on average there will be an event with rainfall reaching or exceeding 200 mm once every 10 years.

[0036] 3. Statistical analysis of the relationship between geological disasters and rainfall: By counting the 24-hour rainfall when 100 geological disasters occurred, it was found that the rainfall during 5 geological disasters exceeded 200 mm, a return period of once in 10 years.

[0037] 4. Probability assessment of geological disasters: Divide the frequency of geological disasters under 10-year rainfall conditions by the frequency of 10-year rainfall to obtain the probability of geological disasters under 10-year rainfall conditions. For example, according to statistical results, there are an average of 10 10-year rainfalls every 100 years, and 5 of these 10 rainfalls will lead to geological disasters. Therefore, the probability of a geological disaster is 5 times / 10 times=0.5, or 50%.

[0038] Optionally, more data and variables need to be considered when conducting a geological hazard probability assessment, such as geological characteristics, slope, soil type, etc., to improve the accuracy and reliability of the assessment.

[0039] Step 400, based on the probability of geological disasters occurring in each recurrence period, the geological disaster warning information of the warning unit is generated.

[0040] Determine the warning level corresponding to the probability of geological disasters occurring in each recurrence period, and then generate geological disaster warning information for the warning unit based on the warning level.

[0041] For example, several warning levels can be divided according to different probability values ​​to guide the early warning and emergency response of geological disasters. Among them, corresponding warning levels can be formulated: Blue warning: Risk level: There is a certain risk; the probability of occurrence is 20%-40%.

[0042] Yellow warning: Risk level: high risk; probability of occurrence is 40%-60%.

[0043] Orange warning: Risk level: high risk; probability of occurrence is 60%-80%.

[0044] Red warning: Risk level: very high risk; probability of occurrence is greater than 80%.

[0045] Based on the determined warning level, corresponding geological disaster warning information can be generated, such as: Red alert: The probability of landslide in the current area is greater than 80%. Please take emergency action immediately, evacuate people and close relevant roads.

[0046] According to the different probabilities of geological disasters, combined with the corresponding warning levels and warning information, we can warn and respond to geological disasters in advance to reduce potential losses and risks.

[0047] The geological disaster early warning method based on the return period provided by the embodiment of the present invention determines the rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; determines the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the early warning unit; determines the probability of geological disasters in each return period based on the frequency of historical geological disasters in each return period and the rainfall frequency; generates geological disaster early warning information of the early warning unit based on the probability of geological disasters in each return period. The embodiment of the present invention combines the rainstorm return period with the geological disaster meteorological risk early warning, breaks the technical barriers between different early warnings, integrates the technical advantages of the meteorological industry and the natural resources industry, broadens the research field of geological disaster meteorological early warning, and thus improves the reliability of geological disaster meteorological early warning.

[0048] Based on the above embodiment, determining the historical surface rainfall of the early warning unit includes: Step 111, obtaining historical rainfall data of at least one rainfall station; Step 112, determining the historical surface rainfall of the early warning unit based on the historical rainfall data and the number of rain gauges.

[0049] It should be noted that rain gauges are facilities used to observe and record precipitation. By measuring and recording rainfall data, the temporal and spatial distribution characteristics of precipitation can be grasped.

[0050] The embodiment of the present invention adopts the arithmetic mean method to calculate the historical surface rainfall of the early warning unit, wherein the arithmetic mean method is applicable to the situation where the distribution of rain gauges in the grid rainfall or early warning unit area is relatively even, the rainfall distribution is uniform or changes evenly, and the location of the rain gauges is reasonable. The method calculates the average rainfall of the entire area by summing and averaging the observation data of each rain gauge, and specifically includes the following steps: 1. Collect historical rainfall data from various rain gauges in the region.

[0051] 2. Sum the rainfall at each rain gauge.

[0052] 3. Divide the total rainfall obtained by the sum by the number of rain gauges to obtain the average rainfall of the warning unit, that is, the historical surface rainfall. The calculation formula is as follows: ; in, Indicates The rainfall time series data of each rain gauge station, i.e. historical rainfall data, represents the number of stations involved in the calculation, It represents the average rainfall of the warning unit, that is, the historical surface rainfall.

[0053] For example, suppose there are observation data (in millimeters) from the following four rainfall stations in a warning unit: Station A: 50, Station B: 55, Station C: 60, and Station D: 58. According to the arithmetic mean method, first sum these four observation data to get 50+55+60+58=223, and then divide the sum by the number of stations, that is, 223 / 4=55.75. Therefore, the average rainfall in the warning unit is 55.75 mm.

[0054] The embodiment of the present invention adopts the arithmetic mean method to calculate the historical surface rainfall of the early warning unit, which can quickly obtain the average rainfall of the area and improve the accuracy of estimating the rainfall situation in the early warning unit.

[0055] Step 121, constructing at least one polygon based on the rainfall stations in the early warning unit; Step 122, based on the area of ​​each polygon and the historical rainfall, determine the historical surface rainfall of the warning unit.

[0056] The embodiment of the present invention uses the Thiessen polygon method to calculate the historical surface rainfall of the warning unit, wherein the Thiessen polygon method, also known as the perpendicular bisect method, is a method for converting the point rainfall of a rain gauge station into surface rainfall. The Thiessen polygon method is suitable for estimating the rainfall in the warning unit when the distribution of rain gauges is uneven or rain gauges are not set up in some areas. The following are the main steps for calculating the historical surface rainfall of the warning unit using the Thiessen polygon method: 1. Connect the rainfall stations associated with the warning units on the map with lines to form many acute triangles.

[0057] 2. For each triangle, draw the perpendicular bisectors of each side and connect these perpendicular bisectors to form a polygon with each rain gauge as the core.

[0058] 3. Calculate the area of ​​each polygon.

[0059] 4. Within each polygon, the area rainfall is calculated as the average of the point rainfalls at the rain gauges within the polygon.

[0060] For example, suppose there are three rain gauges located at points A, B, and C, and their point rainfalls are 20 mm, 30 mm, and 25 mm, respectively. The Thiessen polygon method is needed to calculate the surface rainfall of an early warning unit.

[0061] First, connect the three rain gauges with lines to obtain three acute triangles. Then, draw perpendicular bisectors of the sides inside each triangle to obtain a polygon with each rain gauge as the core.

[0062] Then, calculate the area of ​​each polygon. Take point A as an example, the area of ​​the polygon corresponding to it is 450 square meters. Similarly, the areas of the polygons corresponding to points B and C are 600 square meters and 525 square meters respectively.

[0063] Finally, the surface rainfall is calculated based on the average rainfall of the rain gauge stations within each polygon. For the polygon corresponding to point A, since there is only one rain gauge station, its surface rainfall is the rainfall of the station, that is, 20 mm. For the polygons corresponding to points B and C, since there are two rain gauge stations, their average point rainfall can be calculated, which are (30+25) / 2=27.5 mm and (20+25) / 2=22.5 mm, respectively. Therefore, the surface rainfall of the polygons corresponding to points B and C are 27.5 mm and 22.5 mm, respectively.

[0064] To sum up, the surface rainfall of the warning unit is 450 square meters * 20 mm + 600 square meters * 27.5 mm + 525 square meters * 22.5 mm = 25.875 mm.

[0065] The embodiment of the present invention converts the point rainfall of a rain gauge station into surface rainfall by adopting the Thiessen polygon method, so as to more accurately estimate the rainfall conditions in the early warning unit.

[0066] Step 131, drawing isoprecipitation lines based on the historical rainfall data of the early warning unit; Step 132: determine the historical surface rainfall of the warning unit based on the isohyet.

[0067] The embodiment of the present invention adopts the isohyetal method to calculate the historical surface rainfall of the early warning unit, wherein the isohyetal method is a method for calculating the precipitation in a specific area, by connecting points with equal precipitation to form isohyetals, and then calculating the average precipitation in the area according to the area and distance between the isohyetals. The isohyetal method is applicable to the case where there are enough rainfall station data in space. The following are the main steps for calculating the historical surface rainfall of the early warning unit using the isohyetal method: 1. Draw isohyet lines: Based on the data from sufficient rainfall stations, connect points with equal precipitation to form isohyet lines. Isohyet lines can represent areas with the same precipitation.

[0068] 2. Measure the area between every two adjacent isohyet lines: In the area formed between the isohyet lines, calculate the area between every two adjacent isohyet lines. The area can be calculated by geometric methods or numerical integration.

[0069] 3. Calculate the average rainfall depth between adjacent isohyetal lines and multiply it by the corresponding area weight to get the weighted rainfall: According to the area between each two adjacent isohyetal lines, calculate the average precipitation between the two isohyetal lines, and then multiply the average precipitation by the corresponding area weight to get the weighted rainfall. Among them, the area weight can be determined according to the distance between the isohyetal lines. The closer the distance, the greater the weight of the isohyetal lines.

[0070] 4. Add up all the weighted rainfall to get the average rainfall of the warning unit, that is, the surface rainfall: add up all the calculated weighted rainfall to get the average rainfall of the warning unit (specific area). The average rainfall can be used as the reference precipitation of the warning unit to predict and monitor the precipitation conditions in the area.

[0071] For example, suppose there are four rain gauges that record the following rainfall (unit: mm): Station A: 50mm, Station B: 60mm, Station C: 70mm, Station D: 80mm, and the isohyet method is used to calculate these data. First, based on the data from the four rain gauges, the corresponding isohyet lines are drawn to form an area. Then, in this area, the area between adjacent isohyet lines is calculated. Finally, the average precipitation between each adjacent isohyet line is calculated based on the area and multiplied by the corresponding area weight.

[0072] The embodiment of the present invention adopts the isohyet method to calculate the historical surface rainfall of the warning unit, thereby improving the accuracy of estimating the rainfall conditions in the warning unit.

[0073] Based on the above embodiment, the step of determining the rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit includes: Step 141, using at least one distribution method to fit the historical surface rainfall of the early warning unit to obtain a distribution curve of the probability of occurrence of precipitation and precipitation; Step 142: Determine a rainfall threshold of at least one recurrence period of the early warning unit based on the distribution curve.

[0074] The embodiment of the present invention adopts distribution methods such as Pearson III distribution, Gumbel distribution and log-normal distribution to fit the historical surface rainfall of the warning unit, obtains the distribution curve of precipitation occurrence probability and precipitation, and then determines the rainfall threshold of at least one recurrence period of the warning unit based on the distribution curve.

[0075] For example, the historical surface rainfall of daily warning units in the past 50 years is collected to obtain a data set containing 18,250 data points. Using statistical methods, the historical surface rainfall is fitted into a probability distribution model (such as normal distribution, exponential distribution, gamma distribution, etc.). Then, the rainfall thresholds under different probabilities are calculated through the fitted probability distribution. For example, the rainfall threshold for a return period of 10 years is calculated, that is, in any given year, the probability of rainfall exceeding this value is 10%. Among them, the calculation result can be a specific value, such as 100 mm, which means that in any given year, the probability of rainfall exceeding 100 mm is 10%.

[0076] Furthermore, if at least two distribution methods are used to calculate the rainfall threshold of at least one return period of the early warning unit when a geological disaster occurs, each distribution method needs to be verified to select the optimal distribution method. Specifically, based on each distribution curve, the theoretical frequency of geological disasters determined by each distribution method is obtained, and then based on the theoretical frequency and the actual frequency of geological disasters, the fit of each distribution method is determined, and finally based on the distribution curve with the smallest fit, the rainfall threshold of at least one return period of the early warning unit is determined.

[0077] For example, the geological disaster samples are compared with the calculated return period, and the chi-square goodness of fit test is used to calculate the actual frequency of geological disasters based on the geological disaster samples. and the theoretical frequencies calculated using three probability distributions , goodness of fit for: ; Comparing the three probability distributions, The smallest goodness of fit is better, at the 0.05 level The test value of 71.0 is the minimum standard for the calculation of the return period. <71.0, which means it is usable.

[0078] The embodiment of the present invention can more accurately describe the distribution characteristics of precipitation by fitting the historical surface rainfall of the early warning unit in different probability distribution methods; through the distribution curve, the probability of precipitation occurring at different intensities can be obtained, which helps to evaluate the possibility of precipitation events of different intensities, and then determine the rainfall threshold of the early warning unit.

[0079] In order to further analyze and illustrate the geological disaster early warning method based on recurrence period proposed by the present invention, refer to the following examples.

[0080] The embodiment of the present invention specifically proposes a geological disaster early warning method based on the return period big data, with reference to the concept of rainstorm return period, combined with the characteristics of geological disasters being easily affected by rainstorms, statistical analysis is performed on the effective rainfall one day, two days, three days, four days and five days before the occurrence of historical geological disasters, which can realize the calculation of the effective rainfall corresponding to the geological disasters that occur once in 10 years, once in 20 years, once in 50 years and once in 100 years in the study area, and provide the region with a geological disaster early warning based on the return period big data when the rainfall reaches the return period of geological disasters. At the same time, the embodiment of the present invention also combines the rainstorm return period with the meteorological risk early warning of geological disasters, breaks the technical barriers between different early warnings, and integrates the technical advantages of the meteorological industry and the natural resources industry; uses the rainstorm return period calculation methods such as P-Ⅲ distribution, Gumbel distribution and lognormal distribution, combined with the calculation method of geological disaster effective rainfall, and introduces big data technology to provide technical support for the early warning of geological disaster return period.

[0081] A geological disaster early warning analysis model based on the return period big data is constructed for the geological disaster early warning unit. The connected meteorological station monitors the rainfall data, and the real-time rainfall data is obtained through the early warning unit surface rainfall data calculation model. At the same time, based on the rainfall data of each early warning unit under the historical geological disaster risk situation, the early warning unit geological disaster return period rainfall threshold is calculated to form the early warning unit geological disaster return period rainfall analysis model, and the early warning unit geological disaster return period alarm results are output in real time.

[0082] 1. Calculation of surface rainfall data for early warning units.

[0083] The embodiment of the present invention uses the geological disaster warning unit as the minimum evaluation unit, and obtains the surface rainfall data of each geological disaster warning unit through the surface rainfall data calculation method. According to the characteristics of different data, different methods are used to calculate the surface rainfall in the warning unit area, including arithmetic mean method, Thiessen polygon method, isohyet method, etc.

[0084] 2. Rainfall analysis model for the recurrence period of geological disasters in the early warning unit.

[0085] Combined with the rainfall data under historical geological disaster risk conditions, the rainfall threshold of the geological disaster recurrence period of the warning unit is calculated, and a rainfall analysis model for the geological disaster recurrence period is established. The real-time surface rainfall information of each warning unit is calculated and recorded according to the real-time monitoring data of the meteorological rainfall station. The recurrence period analysis of the rainfall forecast of the warning unit is carried out according to the rainfall threshold information of the geological disaster risk condition recurrence period of the warning unit, and the geological disaster recurrence period warning results are output.

[0086] The calculation method of the return period is generally based on existing observation data. Mathematical statistics methods are used to fit the historical observed rainfall element values ​​in a certain distribution manner to form a distribution curve of the probability of occurrence P of meteorological elements and rainfall x. The corresponding rainfall value can be obtained based on a certain occurrence probability P. This method can be used to obtain the corresponding rainfall value that occurs once in many years.

[0087] The embodiment of the present invention will use three return period calculation methods, namely P-Ⅲ distribution, Gumbel distribution and lognormal distribution, to calculate the rainfall when geological disasters occurred in the early warning unit over the past 30 years, and obtain the 1-hour, 3-hour, 6-hour and 24-hour extreme rainfall values ​​corresponding to the geological disasters with a return period of 10 years, 20 years, 50 years and 100 years for each early warning unit, to provide model support for the analysis of the return period of geological disasters and the comprehensive early warning information of geological disasters and meteorological disasters.

[0088] (1) Analysis and processing of historical data on geological disasters.

[0089] In order to calculate the recurrence period of geological disasters in the early warning unit, it is necessary to preprocess the historical geological disasters and rainfall data of the early warning unit. The main work contents include: 1.1) Collect and compile historical geological disaster data of the early warning unit.

[0090] The geological disaster warning units were numbered, and the records of geological disaster risks that occurred in the past 30 years were collected based on the warning units. Key information on the disaster risks was extracted through structured processing, including the scale of the disaster risk, the type of disaster risk, economic losses, casualties, etc., as shown in Table 2.

[0091] Table 2 Compilation of historical geological disaster data

[0092] 1.2) Normalization of historical disaster quantitative data.

[0093] The casualty and economic loss data of all geological disasters that have occurred in the history of a single early warning unit are normalized to form a "casualty index" and an "economic loss index", and the damage caused by historical disasters is described by grading the normalized values.

[0094] Normalization is to transform dimensional values ​​into dimensionless values, thereby eliminating the dimensional differences of various indicators. The normalization calculation formula is: ; In the formula, is the normalized data, is the sample data, is the minimum value in the sample data, is the maximum value in the sample data.

[0095] 1.3) Compilation of historical rainfall data for early warning units.

[0096] We use the data missing, data errors, data consistency errors, observation data singular value disturbances, measurement system errors and other issues in the historical rainfall data of each basic meteorological station and regional automatic station to carry out analysis and process them, and form reasonable and unified station data for the time periods with missing data.

[0097] 1.4) Calculation of historical surface rainfall in the warning unit.

[0098] Using the compiled historical rainfall data of the site and based on the early warning unit surface rainfall data calculation model, the site is processed to form the early warning unit historical surface rainfall time series data (including 1 hour, 3 hours, 6 hours, and 24 hours accumulated rainfall time series data).

[0099] 1.5) Correlation between historical disasters and surface rainfall data.

[0100] The early warning unit surface rainfall data organized in chronological order are associated with the time of historical disasters to obtain the local rainfall data when the historical disasters occurred, as shown in Table 3.

[0101] Table 3 Correlation table between historical geological disasters and surface rainfall data

[0102] (2) Analysis of rainfall thresholds for the geological disaster recurrence period of early warning units.

[0103] The early warning unit return period rainfall value processing model uses the three return period calculation methods of P-Ⅲ distribution, Gumbel distribution and log-normal distribution to analyze the rainfall sample data of the early warning unit. According to the above three methods, the 10-year, 20-year, 50-year and 100-year rainfall thresholds of each early warning unit for 1 hour, 3 hours, 6 hours and 24 hours are calculated and analyzed respectively, and the chi-square goodness of fit test is used to finally confirm the return period rainfall threshold of each early warning unit.

[0104] 2.1) Slide statistics update.

[0105] As the geological environment changes and engineering governance capabilities improve, the probability of geological disasters caused by continuous rainfall will change accordingly, and it will also change with the occurrence of geological disasters caused by recent rainfall. The systematic geological disaster return period rainfall analysis model needs to regularly analyze the recent rainfall process and geological disaster risk data, and update the geological disaster return period analysis model parameters in a timely manner to ensure the reliability of the model output of geological disaster meteorological warnings.

[0106] 2.2) The rainfall in the return period of the warning unit is correlated with the historical disaster rainfall.

[0107] Compare the rainfall in the return period of the warning unit with the rainfall when the historical disaster occurred to obtain the frequency of geological disasters in history under a specific return period. By comparing the frequency of historical disasters with the rainfall frequency (the inverse of the return period), the proportion of geological disasters occurring under a specific return period, that is, the probability of geological disasters occurring, is obtained. Among them, the rainfall frequency refers to the probability of a specific rainfall intensity or rainfall within a certain period of time; the rainfall frequency is the inverse of the return period. For example, taking the rainfall once in 10 years as an example, the corresponding rainfall frequency is 1 / 10=0.1, which means that there is an average of 10% probability of an event with rainfall equal to or exceeding the specific value each year.

[0108] By comparing the classification standards of geological disaster meteorological warning, the geological disaster meteorological warning level corresponding to each recurrence period threshold can be determined, as shown in Table 4.

[0109] Table 4 Classification standards for meteorological warning of geological disasters

[0110] Table 5 Frequency of geological disasters under the rainfall threshold of each early warning unit return period

[0111] Combining Table 4 and Table 5, we can obtain the corresponding geological disaster meteorological warning level under the return period of 10 years, 20 years, 50 years and 100 years for each warning unit in the past 1 hour, past 3 hours, past 6 hours and past 24 hours, as shown in Table 6.

[0112] Table 6 Meteorological warning levels for geological disasters under the rainfall thresholds of each warning unit return period

[0113] Unlike rainstorms that have a wide impact range, geological disasters may present completely different risks within a very small range depending on different geological conditions. If the minimum unit for issuing early warnings is too large, it will lead to problems that cannot be solved. Therefore, research on geological disasters is usually based on hidden danger points or risk points or risk slopes.

[0114] The embodiment of the present invention has the advantage of precise research objects. Based on big data technology, it can determine the geological disaster risk points or early warning units within the statistical research scope and their historical disaster situations. Combined with the surface rainfall calculation model, it can obtain the equivalent rainfall at the precise location of the geological disaster risk point or early warning unit, thereby accurately outputting geological disaster recurrence period warnings.

[0115] Figure 2 is a schematic diagram of the structure of the geological disaster early warning device based on the return period provided by the present invention, referring to Figure 2An embodiment of the present invention provides a geological disaster early warning device based on recurrence period, including a rainfall threshold determination module 201, a frequency determination module 202, a probability determination module 203 and an early warning module 204.

[0116] A rainfall threshold determination module 201, configured to determine a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; The frequency determination module 202 is used to determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit had historical geological disasters; The probability determination module 203 is used to determine the probability of geological disasters occurring in each return period based on the historical frequency of geological disasters and rainfall frequency in each return period; The early warning module 204 is used to generate geological disaster early warning information of the early warning unit based on the probability of geological disasters occurring in each recurrence period.

[0117] The geological disaster early warning device based on the recurrence period provided by the embodiment of the present invention determines the rainfall threshold of at least one recurrence period of the early warning unit based on the historical surface rainfall of the early warning unit; determines the frequency of historical geological disasters in each recurrence period based on the rainfall threshold of each recurrence period and the rainfall value when the early warning unit has historical geological disasters; determines the probability of geological disasters in each recurrence period based on the frequency of historical geological disasters in each recurrence period and the rainfall frequency; generates geological disaster early warning information of the early warning unit based on the probability of geological disasters in each recurrence period. The embodiment of the present invention combines the rainstorm recurrence period with the geological disaster meteorological risk early warning, breaks the technical barriers between different early warnings, integrates the technical advantages of the meteorological industry and the natural resources industry, broadens the research field of geological disaster meteorological early warning, and thus improves the reliability of geological disaster meteorological early warning.

[0118] In one embodiment, the frequency determination module 202 is further configured to: Determine the comparison result of the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the early warning unit; Based on the comparison results, the number of geological disasters that are greater than or equal to the rainfall threshold of each recurrence period is determined as the frequency of historical geological disasters in each recurrence period.

[0119] In one embodiment, the probability determination module 203 is further configured to: The ratio of the frequency of historical geological disasters in each recurrence period to the rainfall frequency is determined, and the ratio is determined as the probability of geological disasters occurring in each recurrence period.

[0120] In one embodiment, the rainfall threshold determination module 201 is further configured to: Obtain historical rainfall data from at least one rain gauge station; Determining the historical surface rainfall of the early warning unit based on the historical rainfall data and the number of the rain gauge stations; Alternatively, constructing at least one polygon based on the rainfall stations within the early warning unit; Determining the historical surface rainfall of the warning unit based on the area and historical rainfall of each polygon; Alternatively, based on the historical rainfall data of the early warning unit, drawing isoprecipitation lines; Based on the isohyet, the historical surface rainfall of the early warning unit is determined.

[0121] In one embodiment, the rainfall threshold determination module 201 is further configured to: Using at least one distribution method, fitting the historical surface rainfall of the early warning unit to obtain a distribution curve of the probability of occurrence of precipitation and precipitation; wherein the distribution method includes Pearson III distribution, Gumbel distribution and lognormal distribution; Based on the distribution curve, a rainfall threshold of at least one recurrence period of the early warning unit is determined.

[0122] In one embodiment, the rainfall threshold determination module 201 is further configured to: Based on each distribution curve, obtain the theoretical frequency of geological disasters determined by each distribution method; Based on the theoretical frequency and the actual frequency of geological disasters, determine the degree of fit of each distribution mode; Based on the distribution curve with the minimum fitting degree, a rainfall threshold of at least one recurrence period of the early warning unit is determined.

[0123] In one embodiment, the early warning module 204 is further configured to: Determine the warning level corresponding to the probability of geological disasters occurring in each return period; Based on the warning level, geological disaster warning information of the warning unit is generated.

[0124] Figure 3 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 3 As shown, the electronic device may include: a processor 310, a communication interface 320, a memory 330 and a communication bus 340, wherein the processor 310, the communication interface 320 and the memory 330 communicate with each other through the communication bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the geological disaster early warning method based on the recurrence period, and the method includes: Determining a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; Determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the warning unit; Based on the historical frequency of geological disasters and rainfall frequency in each return period, the probability of geological disasters occurring in each return period is determined; Based on the probability of geological disasters occurring in each recurrence period, geological disaster warning information of the warning unit is generated.

[0125] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0126] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which is implemented when the computer program is executed by a processor to execute the geological disaster early warning method based on the recurrence period provided by the above methods, the method comprising: Determining a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; Determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the warning unit; Based on the historical frequency of geological disasters and rainfall frequency in each return period, the probability of geological disasters occurring in each return period is determined; Based on the probability of geological disasters occurring in each recurrence period, geological disaster warning information of the warning unit is generated.

[0127] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0128] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0129] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A geological disaster early warning method based on recurrence period, characterized in that: include: Determining a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; Determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit experienced historical geological disasters; Based on the historical frequency of geological disasters and rainfall frequency in each return period, the probability of geological disasters occurring in each return period is determined; Based on the probability of geological disasters occurring in each recurrence period, geological disaster warning information of the warning unit is generated.

2. The geological disaster early warning method based on the return period according to claim 1 is characterized in that: The method of determining the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit experienced historical geological disasters includes: Determine the comparison result of the rainfall threshold of each return period and the rainfall value when the historical geological disaster occurred in the early warning unit; Based on the comparison results, the number of geological disasters that are greater than or equal to the rainfall threshold of each recurrence period is determined as the frequency of historical geological disasters in each recurrence period.

3. The geological disaster early warning method based on the return period according to claim 1 is characterized in that: The probability of geological disasters occurring in each return period is determined based on the historical frequency of geological disasters and rainfall frequency in each return period, including: The ratio of the frequency of historical geological disasters in each recurrence period to the rainfall frequency is determined, and the ratio is determined as the probability of geological disasters occurring in each recurrence period.

4. The geological disaster early warning method based on the return period according to claim 1 is characterized in that: Determine the historical surface rainfall of the warning unit, including: Obtain historical rainfall data from at least one rain gauge station; Determining the historical surface rainfall of the early warning unit based on the historical rainfall data and the number of the rain gauge stations; Alternatively, constructing at least one polygon based on the rainfall stations within the early warning unit; Determining the historical surface rainfall of the warning unit based on the area and historical rainfall of each polygon; Alternatively, based on the historical rainfall data of the early warning unit, drawing isoprecipitation lines; Based on the isohyet, the historical surface rainfall of the early warning unit is determined.

5. The geological disaster early warning method based on the return period according to claim 1 is characterized in that: The step of determining a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit comprises: Using at least one distribution method, fitting the historical surface rainfall of the early warning unit to obtain a distribution curve of the probability of occurrence of precipitation and precipitation; wherein the distribution method includes Pearson III distribution, Gumbel distribution and lognormal distribution; Based on the distribution curve, a rainfall threshold of at least one recurrence period of the early warning unit is determined.

6. The geological disaster early warning method based on the return period according to claim 5 is characterized in that: The distribution mode includes at least two types, and the determining of the rainfall threshold of at least one return period of the early warning unit based on the distribution curve includes: Based on each distribution curve, obtain the theoretical frequency of geological disasters determined by each distribution method; Based on the theoretical frequency and the actual frequency of geological disasters, determine the degree of fit of each distribution mode; Based on the distribution curve with the minimum fitting degree, a rainfall threshold of at least one recurrence period of the early warning unit is determined.

7. The geological disaster early warning method based on the return period according to claim 1 is characterized in that: The generating of geological disaster warning information of the warning unit based on the probability of geological disasters occurring in each recurrence period includes: Determine the warning level corresponding to the probability of geological disasters occurring in each return period; Based on the warning level, geological disaster warning information of the warning unit is generated.

8. A geological disaster early warning device based on recurrence period, characterized in that: include: A rainfall threshold determination module, used to determine a rainfall threshold of at least one return period of the early warning unit based on the historical surface rainfall of the early warning unit; A frequency determination module, used to determine the frequency of historical geological disasters in each return period based on the rainfall threshold of each return period and the rainfall value when the early warning unit had historical geological disasters; The probability determination module is used to determine the probability of geological disasters occurring in each return period based on the historical frequency of geological disasters and rainfall frequency in each return period; The early warning module is used to generate geological disaster early warning information of the early warning unit based on the probability of geological disasters occurring in each recurrence period.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the geological disaster early warning method based on the recurrence period as described in any one of claims 1 to 7 is implemented.

10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the geological disaster early warning method based on the recurrence period as described in any one of claims 1 to 7 is implemented.