Real-time expressway traffic operation risk identification method and identification system under ice and snow conditions based on dynamic multilayer fuzzy logic

Through dynamic multi-layer fuzzy logic and intelligent rule generation module, various influencing factors in highway traffic operation under ice and snow conditions are solved, and the identification accuracy and robustness in the existing technology is solved, and higher traffic operation is achieved Risk prediction credibility and adaptability.

CN119068680AActive Publication Date: 2024-12-03HARBIN INST OF TECH

Patent Information

Application Number
CN202411248722.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-03
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The existing methods cannot effectively deal with the relationship between multiple influencing factors in highway traffic operation under ice and snow conditions, cannot provide accurate quantitative indicators of traffic operation risks, and lack robustness in the new environment, resulting in low identification accuracy and poor real-time performance. .

Method used

Using a method based on dynamic multi-layer fuzzy logic, data is obtained through detection devices, environment input variables and bridge variables are preprocessed and divided, fuzzy logic is used for risk identification, intelligent rule generation module is introduced to adapt to the changing traffic environment, and the rule library is dynamically updated , improve robustness and prediction accuracy.

Benefits of technology

In the absence of accident or conflict data, the model can more accurately reflect complex traffic environments, improve the credibility and accuracy of traffic operation risks, and enhance the system's robustness and adaptability in different environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119068680A_ABST
    Figure CN119068680A_ABST
Patent Text Reader

Abstract

The invention relates to a real-time identification method and an identification system for highway traffic operation risks under ice and snow conditions based on dynamic multilayer fuzzy logic, relates to the real-time identification method and the identification system for the highway traffic operation risks under the ice and snow conditions, and belongs to the field of traffic safety. The objective of the invention is to solve the problems of low accuracy and poor real-time performance of expressway traffic operation risk identification under ice and snow conditions caused by the fact that an existing method cannot process the relation of various influence factors, cannot provide quantitative indexes for traffic operation risks and cannot guarantee the robustness of a model in a new environment. According to the invention, the model prediction result has high credibility under the condition of lack of accident data and traffic conflict data. According to the method, the quantization problem of the operation risk indexes is solved by constructing the multi-layer fuzzy logic structure. According to the invention, the intelligent rule generation module is added to improve the prediction accuracy and robustness of the system in different environments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a real-time identification method and an identification system for highway traffic operation risks under ice and snow conditions, and belongs to the field of traffic safety. Background Art

[0002] As a common adverse weather, snowy weather has a significant impact on highway traffic safety. However, highways under snowy conditions have complex traffic operation influencing factors, involving various conditions such as meteorological conditions, road surface conditions, linear conditions and traffic flow conditions. In order to accurately predict the traffic operation risk under snowy conditions in the absence of accident and conflict data, it is urgent to propose a real-time identification system for highway traffic operation risk under snowy conditions that integrates multiple types of influencing conditions. At present, the most prominent problem of the comprehensive risk prediction model is how to deal with the relationship between various influencing factors, give quantitative indicators for traffic operation risks, and ensure the robustness of the model in the new environment. The real-time identification method of highway traffic operation risk under snowy conditions based on dynamic multi-layer fuzzy logic proposed in this paper can solve the above problems. Summary of the invention

[0003] The purpose of the present invention is to solve the problems that the existing methods are unable to deal with the relationship between various influencing factors, unable to give quantitative indicators for traffic operation risks, and unable to ensure the robustness of the model in the new environment, resulting in low accuracy and poor real-time performance in identifying highway traffic operation risks under icy and snowy conditions. A real-time identification method and identification system for highway traffic operation risks under icy and snowy conditions based on dynamic multi-layer fuzzy logic are proposed.

[0004] The specific process of the real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic is as follows:

[0005] Step 1: deploy testing equipment and obtain data based on the deployed testing equipment;

[0006] Step 2: preprocess the data obtained in step 1 to obtain preprocessed data;

[0007] Step 3: determining environmental input variables based on the data obtained in step 1 and step 2, and determining bridge variables based on the environmental input variables;

[0008] Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity;

[0009] The bridging variables include traffic operation stability index and visibility on icy and snowy roads;

[0010] Step 4: Divide the environmental input variables and bridge variables into fuzzy sets and determine the membership functions;

[0011] Step 5: After dividing the fuzzy set in step 4 and determining the membership function, the environment input variables and bridge variables are used to formulate the original state generation rules, and the formulated original state generation rules are screened to obtain a valid state generation rule base;

[0012] Step 6: Based on the bridging variables and “traffic operation risk under ice and snow conditions” after dividing the fuzzy sets and determining the membership functions in step 4, determine the risk discrimination rules;

[0013] Step 7:

[0014] Obtain new environment input variables, and preprocess the new environment input variables according to step 2 to obtain preprocessed environment input variable data;

[0015] The fuzzy matching method based on the minimum membership principle is used to process the preprocessed new input environment input variable combination and the valid state generation rule screened out in step 5 to determine whether the input variable combination is covered by the valid state generation rule screened out in step 5;

[0016] If the new input environment input variable combination is covered by the effective state generation rule screened in step 5, the effective state generation rule screened in step 5 is used to perform fuzzy reasoning on the new environment input variable data, and the predicted value of the bridge variable is output; the risk discrimination rule in step 6 is used to perform fuzzy reasoning, and the final traffic operation risk under ice and snow conditions is output;

[0017] If the new input environment input variable combination is not covered by the valid state generation rules screened in step five, a new state generation rule is generated through a data-driven method, and the new state generation rule is used to perform fuzzy reasoning on the new environment input variable data to output the bridge variable prediction value; the risk discrimination rule in step six is ​​used for fuzzy reasoning to output the final traffic operation risk under ice and snow conditions.

[0018] The real-time identification system for highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic is used to execute the real-time identification method for highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic.

[0019] The beneficial effects of the present invention are:

[0020] The present invention incorporates as many influencing factors of the complex traffic environment under ice and snow conditions into the prediction system as possible, so that the model prediction results have a high degree of credibility in the absence of accident data and traffic conflict data. Specifically: the present invention considers as many factors as possible that may affect traffic safety in the complex traffic environment under ice and snow conditions, such as the slip coefficient, snow thickness, ice thickness, wind speed, relative humidity and light intensity. This comprehensive incorporation of multiple influencing factors enables the model to more accurately reflect the complexity of the real traffic environment. Since traffic accident data and conflict data are often difficult to collect comprehensively, the present invention supplements the lack of missing data through model structure design and data fusion, thereby ensuring that in the absence of complete accident or conflict data, the prediction results still have a high degree of credibility and reliability.

[0021] The present invention uses fuzzy logic to fuzzy process variables to solve the problem of the relationship between various influencing factors in the comprehensive risk prediction model. Specifically: traditional methods and other models usually need to find the coupling relationship or quantitative relationship between variables, and have limitations when dealing with complex relationships among multiple factors. The present invention uses the advantages of fuzzy logic to fuzzify the various influencing factors in the traffic environment and solve the problem of complex and nonlinear relationships between these influencing factors. Fuzzy logic can describe different variables in a more natural way through fuzzy sets and membership functions, thereby better simulating complex cause-and-effect relationships. In this way, the model can more flexibly handle the complex interactions between influencing factors and improve the accuracy of prediction results.

[0022] The present invention proposes to add a "bridging variable" to the fuzzy logic structure, and solves the problem of quantifying operational risk indicators by constructing a multi-layer fuzzy logic structure. Specifically, in the process of traffic risk assessment, it is often difficult to directly quantify and calculate risk indicators, especially under complex environmental conditions; and using a single-layer fuzzy logic to directly predict risks from environmental input variables mainly relies on experience, which is also inaccurate. The present invention proposes to introduce the concept of "bridging variables" into the fuzzy logic structure, and connect and transform multiple interrelated risk factors by constructing a multi-level fuzzy logic structure. The bridging variable plays a mediating and regulating role, so that the multi-layer fuzzy logic structure can effectively integrate variables at different levels, and finally give a more accurate risk quantification result. This design can not only reflect the relative importance of variables at different levels, but also dynamically adjust the risk assessment method under different conditions.

[0023] Existing traffic risk assessment systems usually rely on predefined rule bases, which are difficult to adapt to the ever-changing traffic environment and real-time input data. The present invention adds an intelligent rule generation module to improve the prediction accuracy and robustness of the system in different environments. Specifically: the general traffic risk assessment system based on fuzzy logic is usually based on a predefined rule base, which is difficult to adapt to the ever-changing traffic environment and real-time input data. By adding an intelligent rule generation module, the present invention can dynamically update and generate new rules when the system is running, so that it can better adapt to the current traffic environment. For example, using cluster analysis and machine learning methods, the rule base is updated in real time, so that the system can respond quickly to changes in different weather conditions, traffic conditions, etc. The introduction of this intelligent module improves the prediction accuracy of the system in various environments and enhances its robustness, that is, when faced with data noise, outliers and emergencies, the system can still maintain good performance and stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a flow chart of the present invention;

[0025] Figure 2 This is a diagram of the system module structure of the present invention;

[0026] Figure 3 It is the fuzzy logic structure diagram of the real-time fuzzy evaluation module;

[0027] Figure 4a It is the membership function curve diagram of relative humidity in environmental input variables;

[0028] Figure 4b It is the membership function curve diagram of light intensity in environmental input variables;

[0029] Figure 4c It is the membership function curve of snow thickness growth rate in environmental input variables;

[0030] Figure 4d It is the membership function curve diagram of wind speed visibility in environmental input variables;

[0031] Figure 4e is the visibility membership function curve;

[0032] Figure 5a It is the membership function curve diagram of the slip coefficient in the environmental input variables;

[0033] Figure 5b It is the membership function curve diagram of snow thickness in environmental input variables;

[0034] Figure 5c It is the membership function curve diagram of ice thickness in environmental input variables;

[0035] Figure 5dThe graph of the membership function of downhill slope in the environmental input variable;

[0036] Figure 5e It is the membership function curve graph of the flat curve radius in the environmental input variable;

[0037] Figure 5f It is the membership function curve diagram of short-time flow rate in environmental input variables;

[0038] Figure 5g It is the membership function curve diagram of the cross-sectional velocity difference among the environmental input variables;

[0039] Figure 5h It is the membership function curve of the traffic operation stability index on ice and snow road;

[0040] Figure 6 It is a membership function curve diagram of traffic operation risk under ice and snow conditions;

[0041] Figure 7 Generate module graphs for smart rules;

[0042] Figure 8 It is a schematic diagram of the cumulative frequency distribution curve of the variable. DETAILED DESCRIPTION

[0043] Specific implementation method 1: The specific process of the real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic in this implementation method is as follows:

[0044] Step 1: deploy testing equipment and obtain data based on the deployed testing equipment;

[0045] Step 2: preprocess the data obtained in step 1 to obtain preprocessed data;

[0046] Step 3: determining environmental input variables based on the data obtained in step 1 and step 2, and determining bridge variables based on the environmental input variables;

[0047] Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope (can be obtained by knowing the road alignment), flat curve radius (can be obtained by knowing the road alignment), short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity;

[0048] The bridging variables include traffic operation stability index and visibility on icy and snowy roads;

[0049] Step 4: Divide the environmental input variables and bridge variables into fuzzy sets and determine the membership functions;

[0050] Step 5: After dividing the fuzzy set in step 4 and determining the membership function, the environment input variables and bridge variables are used to formulate the original state generation rules, and the formulated original state generation rules are screened to obtain a valid state generation rule base;

[0051] Step 6: Based on the bridging variables and “traffic operation risk under ice and snow conditions” after dividing the fuzzy sets and determining the membership functions in step 4, determine the risk discrimination rules;

[0052] Step 7:

[0053] Obtain new environment input variables, and preprocess the new environment input variables according to step 2 to obtain preprocessed environment input variable data;

[0054] The fuzzy matching method based on the minimum membership principle (the existing mature method) is used to process the preprocessed new input environment input variable combination and the valid state generation rule selected in step 5 to determine whether the input variable combination is covered by the valid state generation rule selected in step 5;

[0055] If the new input environment input variable combination is covered by the effective state generation rule screened in step 5, the effective state generation rule screened in step 5 is used to perform fuzzy reasoning (Mamdani method) on the new environment input variable data, and the predicted value of the bridge variable is output; the risk discrimination rule in step 6 is used to perform fuzzy reasoning (Mamdani method) and the final traffic operation risk under ice and snow conditions is output;

[0056] If the new input environment input variable combination is not covered by the valid state generation rules screened in step five, a new state generation rule is generated through a data-driven method, and the new state generation rule is used to perform fuzzy reasoning (Mamdani method) on the new environment input variable data to output the bridge variable prediction value; the risk discrimination rule in step six is ​​used to perform fuzzy reasoning (Mamdani method) to output the final traffic operation risk under ice and snow conditions.

[0057] Specific implementation method 2: This implementation method is different from specific implementation method 1 in that in step 1, detection equipment is deployed, and data is acquired based on the deployed detection equipment;

[0058] The specific process is:

[0059] Deploy detection equipment in bottleneck sections of highways (such as curved and sloped sections) where real-time monitoring of traffic operation risks under ice and snow conditions is required;

[0060] The testing equipment includes traffic operation monitoring equipment, small weather station and road surface condition testing equipment;

[0061] The types of data detected by the traffic operation monitoring equipment are: traffic flow per minute, single vehicle speed;

[0062] The types of data detected by the small weather station are: wind speed, relative humidity, and light intensity;

[0063] The data types detected by the road condition detection equipment are: slippery coefficient, snow thickness, and ice thickness.

[0064] The data types that the device is required to be able to detect are shown in Table 6-1.

[0065] Traffic operation monitoring equipment: Equipment model MPD-N2

[0066] There are two types of road condition detection equipment: Jinzhou Sunshine YGLM-Z2 and Shandong Tianhe TH-LM2;

[0067] There are two types of small weather stations: Tianhe Environmental TH-QC5 and Jinzhou Sunshine PC-8.

[0068] The other steps and parameters are the same as those in the first embodiment.

[0069] Specific implementation method three: This implementation method is different from specific implementation methods one or two in that in step two, the data obtained in step one is preprocessed to obtain preprocessed data;

[0070] The specific process is:

[0071] The detected raw data is processed into a data type that can be input into the real-time fuzzy evaluation module, that is, the data is processed into the data type of the specified environmental input variable. Short-term flow rate counts the number of vehicles passing through a specific road section in a short period of time (take 15 minutes), and converts this number into hourly flow; cross-sectional velocity difference is the speed difference between different vehicles at the same detection point; snow thickness growth rate is the rate of change of snow thickness within a certain period of time;

[0072] Step 21. Calculate the short-time flow rate; the expression is:

[0073]

[0074] Where Q is the short-term flow rate; Q 15 is the number of vehicles detected in each 15-minute observation window; T is the length of the observation window in minutes;

[0075] Step 22: Calculate the cross-sectional velocity difference; the expression is:

[0076]

[0077] In the formula, is the average speed of the detected vehicles; V iis the speed of the i-th vehicle detected; n is the total number of vehicles detected in the observation window; D i is the absolute value of the difference between the single vehicle speed and the average speed; D is the cross-sectional speed difference, in km / h;

[0078] Step 2: Calculate the snow thickness growth rate; the expression is:

[0079]

[0080] Where R is the snow thickness growth rate in cm / min; Δt is the time interval; S t is the snow thickness detected at time t; S t+Δt is the snow thickness detected at time t+Δt.

[0081] The other steps and parameters are the same as those in the first or second embodiment.

[0082] Specific implementation method 4: This implementation method is different from any one of specific implementation methods 1 to 3 in that in step 3, the environmental input variables are determined based on the data obtained in step 1 and step 2, and the bridge variables are determined based on the environmental input variables;

[0083] Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope (can be obtained by knowing the road alignment), flat curve radius (can be obtained by knowing the road alignment), short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity;

[0084] The bridging variables include traffic operation stability index and visibility on icy and snowy roads;

[0085] In order to solve the problem that the final prediction indicator "traffic operation risk under ice and snow conditions" cannot be quantified, the "bridge variable" is introduced as an intermediate layer indicator. The first layer of fuzzy logic is constructed based on the data type obtained by processing the actual historical data in the previous step, and the bridge variable is first predicted using the environmental input variable. Since there is currently no indicator that can comprehensively reflect the state of traffic operation, road conditions, road linear conditions, and traffic flow factors, the "ice and snow road traffic operation stability index" is defined to reflect the traffic operation state when the above conditions are combined.

[0086] The specific process is:

[0087] Step 31: Calculate the traffic operation stability index on icy and snowy roads based on the slip coefficient, snow thickness, ice thickness, short-term flow rate, cross-sectional velocity difference, downhill slope, and flat curve radius; the expression is:

[0088] TSI-ISR=∑w i × SI

[0089] =0.325×w SC +0.1621×w ST +0.1391×w IT +0.0742×w STF +0.0496×w SD +0.1×w DS +0.15×w HCR

[0090] Among them, TSI-ISR is the traffic operation stability index on icy and snowy roads;

[0091] w i is the weight (obtained by principal component analysis), with values ​​of 0.325, 0.1621, 0.1391, 0.0742, 0.0496, 0.1, and 0.15;

[0092] w SI The grading method is consistent with the fuzzy set division, and the grading score is assigned according to the principle that the higher the stability, the higher the score. For example, the slippery coefficient is divided into 5 levels, and the slippery coefficient is assigned 0.6, 1.2, 1.8, 2.4, and 3 points respectively from small to large (the larger the slippery coefficient, the higher the stability); the downhill slope is divided into 3 levels, and the downhill slope is assigned 3, 2, and 1 points respectively from small to large (the higher the downhill slope, the lower the stability).

[0093] SI = SC, ST, IT, STF, SD, DS, HCR, which are respectively the slip coefficient, snow thickness, ice thickness, short-term flow rate, cross-sectional velocity difference, downhill slope, and flat curve radius;

[0094] Step 32: Visibility: Use OpenCV to identify the surveillance video taken by the traffic operation detection equipment (OpenCV is an open source computer vision library that provides rich image processing and analysis functions. OpenCV can be used to process surveillance video frames and estimate visibility through image processing algorithms) to obtain visibility data.

[0095] With the rules in place, visibility is determined based on the increase in snow thickness, wind speed, relative humidity, and light intensity.

[0096] The other steps and parameters are the same as those in Specific Embodiments 1 to 3.

[0097] Specific implementation method 5: This implementation method is different from any one of specific implementation methods 1 to 4 in that in step 4, the environmental input variables and the bridge variables are divided into fuzzy sets and the membership functions are determined;

[0098] The specific process is:

[0099] Step 41: Divide the environmental input variables and bridge variables into fuzzy sets; the specific process is:

[0100] Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity;

[0101] The bridging variables include: traffic operation stability index and visibility on icy and snowy roads;

[0102] Draw the slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, light intensity, icy and snowy road traffic operation stability index and visibility cumulative frequency curve respectively;

[0103] For the variables divided into 5 fuzzy sets, the 15%, 30%, 50%, and 85% positions on the cumulative frequency curve are used as reference critical values, and combined with empirical adjustment and determination, the variables are divided into 5 fuzzy sets;

[0104] For the variables divided into three fuzzy sets, the 15% and 85% positions on the cumulative frequency curve are used as reference critical values, and combined with empirical adjustment and determination, the variables are divided into three fuzzy sets;

[0105] The variables divided into five fuzzy sets are: slip coefficient, snow thickness, ice thickness, flat curve radius, cross-sectional speed difference, snow thickness growth rate, wind speed, relative humidity, light intensity, icy and snowy road traffic operation stability index and visibility;

[0106] The five fuzzy sets are S, NS, M, PB, and B from smallest to largest;

[0107] The variables divided into three fuzzy sets are: downhill slope and short-term flow rate;

[0108] The three fuzzy sets are S, M, and B from small to large.

[0109] The cumulative frequency curve is as follows Figure 7 shown.

[0110] The range of fuzzy sets is determined by five or three sets divided by boundary values. The specific division of fuzzy sets is shown in Table 1 below.

[0111] The most important feature of the membership function of a variable is the division of fuzzy sets, which is one of the main factors affecting the prediction results.

[0112] The membership function levels and function types of environmental input variables are shown in Tables 2 and 3, and the membership function levels and function types of bridge variables are shown in Table 4.

[0113] Table 1 Fuzzy set partitioning of variables

[0114]

[0115]

[0116]

[0117] Step 42: Determine the membership function.

[0118] The other steps and parameters are the same as those in Specific Embodiments 1 to 4.

[0119] Specific implementation method 6: This implementation method is different from the specific implementation methods 1 to 5 in that the membership function is determined (the type of function is determined) in step 42; the specific process is:

[0120] The number of membership functions of each variable is the same as the number of fuzzy sets divided by the variable, such as Figure 8 There are five membership functions of the slippery coefficient. Since it is divided into five fuzzy sets, there are five membership functions in total.

[0121] The variables are environmental input variables and bridge variables;

[0122] If it is the first or last membership function of a variable, the membership function is trapmf or zmf;

[0123] The trapmf is a trapezoidal membership function, and the zmf is a Z-type membership function;

[0124] If the data boundaries are clear, resulting in fewer transition parts or the fuzzy set requires clear upper and lower bounds, then select trapmf (trapezoidal membership function); if the data shows a gradually changing trend and requires a more delicate gradient description, then select zmf (Z-type membership function);

[0125] If it is the middle membership function of the variable (the membership function between the first and last membership functions), the membership function is trimf or gaussmf. If the data boundary is clear, select trimf (triangular membership function); if a smooth transition is required, select gaussmf (Gaussian membership function);

[0126] The trimf is a triangular membership function; gaussmf is a Gaussian membership function;

[0127] Table 2 Membership function levels and function types of environmental input variables

[0128]

[0129]

[0130] Table 3 Membership function levels and function types of environmental input variables

[0131]

[0132] Table 4 Membership function levels and function types of bridge variables

[0133]

[0134]

[0135] The other steps and parameters are the same as those in Specific Implementation Methods 1 to 5.

[0136] Specific implementation method 7: This implementation method is different from any one of specific implementation methods 1 to 6 in that in step 5, the original state generation rules are formulated for the environmental input variables and bridge variables after the fuzzy sets are divided in step 4 and the membership functions are determined, and the formulated original state generation rules are screened to obtain a valid state generation rule library;

[0137] The specific process is:

[0138] The combination of the environmental input variables and the bridge variables at each moment after the fuzzy sets are divided and the membership functions are determined in step 4 (the variable combination generated by the data detected at the same moment after the calculation and processing in steps 2 and 3) is used as an original state generation rule;

[0139] Calculate the weight of the stability index rule of the original state generation rule; for the original rules with the same combination of environmental input variables but different levels of output bridge variables, retain the original state generation rule with the largest weight in the stability index rule as the effective state generation rule, and discard the remaining original state generation rules;

[0140] Calculate the weight of the visibility rule of the original state generation rule; for the original rules with the same combination of environment input variables but different levels of output bridge variables, retain the original state generation rule with the largest weight in the visibility rule as the effective state generation rule, and discard the other original state generation rules;

[0141] The weight expression of the stability index rule of the original state generation rule is:

[0142]

[0143] In the formula, is the weight of the stability index rule of the i-th original state generation rule; ∧ is the minimum operator, which means selecting the minimum value; The maximum membership value of the slippery coefficient of the original state generation rule for the i-th original state (the membership value can be known if the membership function type is known); The maximum membership value of the snow thickness for the i-th original state generation rule; The maximum membership value of the ice thickness for the i-th original state generation rule; The maximum membership of the downhill slope of the i-th original state generation rule; The maximum membership value of the flat curve radius of the i-th original state generation rule; The maximum membership value of the short-term flow rate of the i-th original state generation rule; The maximum membership value of the cross-sectional velocity difference of the i-th original state generation rule;

[0144] The weight expression of the visibility rule of the original state generation rule is:

[0145]

[0146] In the formula, is the weight of the visibility rule of the i-th original state generation rule; ∧ is the minimum operator, which means selecting the minimum value; The maximum membership value of the snow thickness growth rate of the ith original state generation rule; The maximum membership value of the wind speed of the i-th original state generation rule; The maximum membership degree of relative humidity of the i-th original state generation rule; The maximum membership degree of the illumination intensity of the i-th original state generation rule;

[0147] Using the data collected by the deployed traffic operation monitoring equipment, meteorological detection equipment and road condition detection equipment, in conjunction with video surveillance data, the data of the snowfall period from November to March are screened out. After cleaning the abnormal data, all data are processed into the data type of the environmental input variable; all data are divided into corresponding levels according to the fuzzy set division method of the membership function in step 4. The fuzzy sets correspond to S, NS, M, PB, and B levels from small to large (if divided into 3 fuzzy sets, they correspond to S, M, and B levels from small to large). The level combination at each corresponding moment is an original Fuzzy rules, such as "If the slip coefficient is large, the snow thickness is small, the ice thickness is medium, the downhill slope is medium, the flat curve radius is large, the short-term flow rate is medium, and the cross-sectional velocity difference is medium, then the traffic operation stability index of the icy and snowy road surface is large" and "If the snow thickness growth rate is large, the wind speed is large, the relative humidity is large, and the light intensity is small, then the visibility is small". For the original rules with the same input conditions but different output conditions, the weight of the rules is used as a reference and combined with experience for screening, and 244 state generation rules for predicting the traffic operation stability index of icy and snowy roads are obtained, and 253 state generation rules for predicting visibility are obtained;

[0148] After obtaining all the original state generation rules, the rules are screened by the rule weights. The screening objects are the rules with the same input variable conditions but different output variable levels. Among these rules, the one with the largest weight is retained and the rest are discarded.

[0149] The weight expression of the stability index rule of the original state generation rule is:

[0150]

[0151] In the formula, is the weight of the stability index rule of the i-th original state generation rule; ∧ is the minimum operator, which means selecting the minimum value; The maximum membership value of the slippery coefficient of the original state generation rule for the i-th original state (the membership value can be known if the membership function type is known); The maximum membership value of the snow thickness for the i-th original state generation rule; The maximum membership value of the ice thickness for the i-th original state generation rule; The maximum membership of the downhill slope of the i-th original state generation rule; The maximum membership value of the flat curve radius of the i-th original state generation rule; The maximum membership value of the short-term flow rate of the i-th original state generation rule; The maximum membership value of the cross-sectional velocity difference of the i-th original state generation rule;

[0152] After screening, there are 244 valid fuzzy rules, as shown in Table 5.

[0153] The weight expression of the visibility rule of the original state generation rule is:

[0154]

[0155] In the formula, is the weight of the visibility rule of the i-th original state generation rule; ∧ is the minimum operator, which means selecting the minimum value; The maximum membership value of the snow thickness growth rate of the ith original state generation rule; The maximum membership value of the wind speed of the i-th original state generation rule; The maximum membership degree of relative humidity of the i-th original state generation rule; The maximum membership degree of the illumination intensity of the i-th original state generation rule;

[0156] After screening, there are 253 valid fuzzy rules in total, as shown in Table 6.

[0157] Table 5 Rules for generating the state of traffic operation stability index on icy and snowy roads

[0158]

[0159]

[0160] Table 6 Visibility status generation rules

[0161]

[0162] The other steps and parameters are the same as those in Specific Embodiments 1 to 6.

[0163] Specific implementation eight: This implementation differs from any one of specific implementations one to seven in that in step six, the risk discrimination rule is determined based on the bridge variables and "traffic operation risk under ice and snow conditions" after dividing the fuzzy set and determining the membership function in step four;

[0164] The specific process is:

[0165] Step 6.1. Determine the “risk level of traffic operation under ice and snow conditions”; the specific process is as follows:

[0166] The value range of the risk level of traffic operation under ice and snow conditions is set to a real number of 0-5, and the fuzzy set of the risk level of traffic operation under ice and snow conditions is divided into 5, from small to large, 0-1, 1-2, 2-3, 3-4, and 4-5;

[0167] The membership function type corresponding to 0-1 is trapmf, and the corresponding level is S;

[0168] The membership function type corresponding to 1-2 is trimf, and the corresponding level is NS;

[0169] The membership function type corresponding to 2-3 is trimf, and the corresponding level is M;

[0170] 3-4 corresponds to the membership function type of trimf, and the corresponding level is PB;

[0171] The membership function type corresponding to 4-5 is trapmf, and the corresponding level is B;

[0172] Step 62: Using a matrix-based rule-making method, each level of the bridge variable after the fuzzy set is divided and the membership function is determined in step 4 is combined into a two-dimensional matrix (25 types), and the risk discrimination rule is obtained by mapping the two-dimensional matrix with the "traffic operation risk level under ice and snow conditions" determined in step 61; the specific process is as follows:

[0173] When the traffic operation stability index level on icy and snowy roads is S and the visibility level is S, the traffic operation risk level under icy and snowy conditions is B;

[0174] When the traffic operation stability index level on icy and snowy roads is S and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is B;

[0175] When the traffic operation stability index level on icy and snowy roads is S and the visibility level is M, the traffic operation risk level under icy and snowy conditions is PB;

[0176] When the traffic operation stability index level on icy and snowy roads is S and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is PB;

[0177] When the traffic operation stability index level on icy and snowy roads is S and the visibility level is B, the traffic operation risk level under icy and snowy conditions is M;

[0178] When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is S, the traffic operation risk level under icy and snowy conditions is B;

[0179] When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is B;

[0180] When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is M, the traffic operation risk level under icy and snowy conditions is PB;

[0181] When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is M;

[0182] When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is B, the traffic operation risk level under icy and snowy conditions is NS;

[0183] When the traffic operation stability index level on icy and snowy roads is M and the visibility level is S, the traffic operation risk level under icy and snowy conditions is PB;

[0184] When the traffic operation stability index level on icy and snowy roads is M and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is PB;

[0185] When the traffic operation stability index level on icy and snowy roads is M and the visibility level is M, the traffic operation risk level under icy and snowy conditions is M;

[0186] When the traffic operation stability index level on icy and snowy roads is M and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is NS;

[0187] When the traffic operation stability index level on icy and snowy roads is M and the visibility level is B, the traffic operation risk level under icy and snowy conditions is S;

[0188] When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is S, the traffic operation risk level under icy and snowy conditions is PB;

[0189] When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is M;

[0190] When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is M, the traffic operation risk level under icy and snowy conditions is NS;

[0191] When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is S;

[0192] When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is B, the traffic operation risk level under icy and snowy conditions is S;

[0193] When the traffic operation stability index level on icy and snowy roads is B and the visibility level is S, the traffic operation risk level under icy and snowy conditions is M;

[0194] When the traffic operation stability index level on icy and snowy roads is B and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is NS;

[0195] When the traffic operation stability index level on icy and snowy roads is B and the visibility level is M, the traffic operation risk level under icy and snowy conditions is S;

[0196] When the traffic operation stability index level on icy and snowy roads is B and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is S;

[0197] When the traffic operation stability index level on icy and snowy roads is B and the visibility level is B, the traffic operation risk level under icy and snowy conditions is S;

[0198] The fuzzy set division and membership function of the bridge variable in this layer of fuzzy logic are the same as those of the first layer of fuzzy logic. The final output variable "traffic operation risk under ice and snow conditions" cannot be quantified, so its fuzzy set range is set to a real number of 0-5, from 0 to 5 representing increasing risks. The membership function and parameters of the traffic operation risk under ice and snow conditions are shown in Table 7. The risk discrimination rules of this layer are determined by experience, such as "if visibility is low and the traffic operation stability index of ice and snow road surface is small, then the traffic operation risk under ice and snow conditions is high", and there are 25 risk discrimination rules in this layer.

[0199] How to determine parameters and rules, how to get predicted values

[0200] ① Determine the membership functions of input and output variables

[0201] Membership function type:

[0202] The input variables are the traffic operation stability index and visibility on icy and snowy roads, which are the output variables of the previous layer of fuzzy logic, and their membership function types are the same as before.

[0203] The output variable traffic operation risk is artificially given a real number with a numerical range of 0-5, and its fuzzy set is divided into 5, from small to large, 0-1, 1-2, 2-3, 3-4, and 4-5. The corresponding 5 membership function types are determined in the same way as in step 4, and the final selected function types are trapmf, trimf, trimf, trimf, and trapmf.

[0204] Table 7 Membership functions and parameters of traffic operation risk under ice and snow conditions

[0205]

[0206] ②Determine the rules

[0207] When predicting traffic operation risks, the input variables of fuzzy logic are divided into five fuzzy sets, forming 25 input combinations. Subsequently, as shown in Table 8, a matrix rule formulation method is used to intuitively map the combination of input variables and risk levels through a two-dimensional matrix, and the judgment of each risk level is also combined with experience assistance.

[0208] Table 8 Fuzzy rule mapping matrix for predicting traffic operation risks

[0209]

[0210] Table 9 Risk identification rules

[0211]

[0212]

[0213] ③Get the predicted value

[0214] In the matlab software, the type and parameters of the membership function are manually input, and the rules are input. The matlab software uses the mamdani method for fuzzy reasoning, uses the centroid method (CentroidMethod, which determines the exact output value by calculating the centroid of the area under the output membership function curve) to defuzzify and directly output the risk prediction value.

[0215] The above steps 1 to 6 are for establishing the main functional module of the system - "real-time fuzzy evaluation module based on bridging variables".

[0216] The other steps and parameters are the same as those in Specific Embodiments 1 to 7.

[0217] Specific implementation method 9: This implementation method is different from any one of specific implementation methods 1 to 8 in that, if there is no overwriting in step 7, a new state generation rule is generated by a data-driven method; the specific process is:

[0218] 1) Merge the new environment input variable with the environment input variable data in the original state generation rule base in step 5 to obtain the merged environment input variable data, and obtain the data set of the bridge variable based on the bridge variable of the original state generation rule in step 5 (the data set of the bridge variable of the merged environment input variable data is still the original data set of the bridge variable), and the environment input variable and the bridge variable of the original state generation rule in step 5 still correspond to each other as a complete rule;

[0219] The merged environmental input variable data and the original state generation rule bridge variables are converted into numerical variables (the input variable combination and the corresponding bridge variable are a rule, and each rule is still a group after the conversion), and different levels are mapped to different values, as shown in Table 10;

[0220] The conversion of the merged environment input variable data and the original state generation rule bridge variable into a numerical variable is specifically as follows:

[0221] When the level of the fuzzy set corresponding to the combined environmental input variable is S, the combined environmental input variable is converted to a value of 0;

[0222] When the level of the fuzzy set corresponding to the combined environmental input variable is NS, the combined environmental input variable is converted to a value of 1;

[0223] When the level of the fuzzy set corresponding to the combined environmental input variable is M, the combined environmental input variable is converted to a value of 2;

[0224] When the level of the fuzzy set corresponding to the combined environmental input variable is PB, the combined environmental input variable is converted to a value of 3;

[0225] When the level of the fuzzy set corresponding to the combined environmental input variable is B, the combined environmental input variable is converted to a value of 4;

[0226] When the level of the fuzzy set corresponding to the bridge variable is S, the bridge variable is converted to the value 0;

[0227] When the level of the fuzzy set corresponding to the bridge variable is NS, the bridge variable is converted to the value 1;

[0228] When the level of the fuzzy set corresponding to the bridge variable is M, the bridge variable is converted to the value 2;

[0229] When the level of the fuzzy set corresponding to the bridge variable is PB, the bridge variable is converted to the value 3;

[0230] When the level of the fuzzy set corresponding to the bridge variable is B, the bridge variable is converted to a value of 4;

[0231] Table 10 Label encoding of converting rules into numerical variables

[0232]

[0233] 2) Apply K-means clustering to the environmental input variable combinations converted into numerical values, and divide the data points into K clusters, each cluster corresponds to a centroid (each centroid is a combination of environmental input variables);

[0234] 3) Generate output conditions based on the centroids of each cluster containing the new input environment variable combination (each centroid is an input variable combination), and use the output conditions as the output conditions of the new fuzzy rules corresponding to the new input environment variable combination; the specific process is:

[0235] 31) Calculate the individual support Support(A); the expression is:

[0236]

[0237] Calculate the support of joint occurrence Support(A∪B); the expression is:

[0238]

[0239] Where A represents the environment input variable combination represented by the centroid of the cluster containing the new input environment variable combination, B represents the output condition corresponding to A in the original state generation rule of step 5; the total number of transactions represents the number of environment input variable combinations converted to numerical values ​​(i.e., the number of original unscreened state generation rules);

[0240] 32) Calculate the confidence (A→B); the expression is:

[0241]

[0242] Confidence indicates the probability that condition B will also occur when condition A occurs. The confidence of a certain output condition B is derived based on a specific input condition combination A. If the confidence is high, it means that the input combination is closely related to the output condition, thus determining the output condition under the combination.

[0243] 33) Keep the output condition B with the highest confidence as the output condition of the new fuzzy rule corresponding to the new input environment variable combination.

[0244] The other steps and parameters are the same as those in Specific Embodiments 1 to 8.

[0245] Specific implementation method ten: In this implementation method, the real-time identification system for highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic is used to execute the real-time identification method for highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic.

[0246] The present invention may also have many other embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art may make various corresponding changes and modifications based on the present invention, but these corresponding changes and modifications should all fall within the scope of protection of the claims attached to the present invention.

Claims

1. A real-time identification method for highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic, characterized by: The specific process of the method is: Step 1: deploy testing equipment and obtain data based on the deployed testing equipment; Step 2: preprocess the data obtained in step 1 to obtain preprocessed data; Step 3: determining environmental input variables based on the data obtained in step 1 and step 2, and determining bridge variables based on the environmental input variables; Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity; The bridging variables include traffic operation stability index and visibility on icy and snowy roads; Step 4: Divide the environmental input variables and bridge variables into fuzzy sets and determine the membership functions; Step 5: After dividing the fuzzy set in step 4 and determining the membership function, the environment input variables and bridge variables are used to formulate the original state generation rules, and the formulated original state generation rules are screened to obtain a valid state generation rule base; Step 6: Based on the bridging variables and "traffic operation risk under ice and snow conditions" after dividing the fuzzy set and determining the membership function in step 4, determine the risk discrimination rules; Step 7: Obtain new environment input variables, and preprocess the new environment input variables according to step 2 to obtain preprocessed environment input variable data; The fuzzy matching method based on the minimum membership principle is used to process the preprocessed new input environment input variable combination and the valid state generation rule screened out in step 5 to determine whether the input variable combination is covered by the valid state generation rule screened out in step 5; If the new input environment input variable combination is covered by the effective state generation rule screened in step 5, the effective state generation rule screened in step 5 is used to perform fuzzy reasoning on the new environment input variable data, and the predicted value of the bridge variable is output; the risk discrimination rule in step 6 is used to perform fuzzy reasoning, and the final traffic operation risk under ice and snow conditions is output; If the new input environment input variable combination is not covered by the valid state generation rules screened in step five, a new state generation rule is generated through a data-driven method, and the new state generation rule is used to perform fuzzy reasoning on the new environment input variable data to output the bridge variable prediction value; the risk discrimination rule in step six is ​​used for fuzzy reasoning to output the final traffic operation risk under ice and snow conditions.

2. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 1 is characterized by: In the step 1, detection equipment is deployed, and data is acquired based on the deployed detection equipment; the specific process is: Deploy detection equipment on highways where real-time monitoring of traffic operation risks under icy and snowy conditions is required; The testing equipment includes traffic operation monitoring equipment, weather station and road surface condition testing equipment; The types of data detected by the traffic operation monitoring equipment are: traffic flow per minute, single vehicle speed; The data types detected by the weather station are: wind speed, relative humidity, and light intensity; The data types detected by the road condition detection equipment are: slippery coefficient, snow thickness, and ice thickness.

3. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 2 is characterized by: In the step 2, the data obtained in the step 1 is preprocessed to obtain preprocessed data; the specific process is: Step 21. Calculate the short-time flow rate; the expression is: Where Q is the short-term flow rate; Q 15 is the number of vehicles detected in each 15-minute observation window; T is the length of the observation window in minutes; Step 22: Calculate the cross-sectional velocity difference; the expression is: In the formula, is the average speed of the detected vehicles; V i is the speed of the i-th vehicle detected; n is the total number of vehicles detected in the observation window; D i is the absolute value of the difference between the single vehicle speed and the average speed; D is the cross-sectional speed difference, in km / h; Step 2: Calculate the snow thickness growth rate; the expression is: Where R is the snow thickness growth rate in cm / min; Δt is the time interval; S t is the snow thickness detected at time t; S t+Δt is the snow thickness detected at time t+Δt.

4. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 3 is characterized by: In the step three, the environmental input variables are determined based on the data obtained in the steps one and two, and the bridge variables are determined based on the environmental input variables; Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity; The bridging variables include traffic operation stability index and visibility on icy and snowy roads; The specific process is: Step 31: Calculate the traffic operation stability index on icy and snowy roads based on the slip coefficient, snow thickness, ice thickness, short-term flow rate, cross-sectional velocity difference, downhill slope, and flat curve radius; the expression is: TSI-ISR=∑w i ×w SI =0.325×w SC +0.1621×w ST +0.1391×w IT +0.0742×w STF +0.0496×w SD +0.1×w DS +0.15×w HCR Among them, TSI-ISR is the traffic operation stability index on icy and snowy roads; w i is the weight, and its values ​​are 0.325, 0.1621, 0.1391, 0.0742, 0.0496, 0.1, and 0.15 respectively; w SI To rate the grading; SI = SC, ST, IT, STF, SD, DS, HCR, which are respectively the slip coefficient, snow thickness, ice thickness, short-term flow rate, cross-sectional velocity difference, downhill slope, and flat curve radius; Step 32: Visibility: Use OpenCV to identify the surveillance video taken by the traffic operation detection equipment to obtain visibility data.

5. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 4 is characterized by: In the step 4, the environmental input variables and the bridge variables are divided into fuzzy sets and the membership functions are determined; the specific process is: Step 41: Divide the environmental input variables and bridge variables into fuzzy sets; the specific process is: Environmental input variables include: slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, and light intensity; The bridging variables include: traffic operation stability index and visibility on icy and snowy roads; Draw the slip coefficient, snow thickness, ice thickness, downhill slope, flat curve radius, short-term flow rate, cross-sectional velocity difference, snow thickness growth rate, wind speed, relative humidity, light intensity, icy and snowy road traffic operation stability index and visibility cumulative frequency curve respectively; For variables divided into 5 fuzzy sets, the 15%, 30%, 50%, and 85% positions on the cumulative frequency curve are used as reference critical values ​​to divide the variables into 5 fuzzy sets; For variables divided into three fuzzy sets, the 15% and 85% positions on the cumulative frequency curve are used as reference critical values ​​to divide the variables into three fuzzy sets; The variables divided into five fuzzy sets are: slip coefficient, snow thickness, ice thickness, flat curve radius, cross-sectional speed difference, snow thickness growth rate, wind speed, relative humidity, light intensity, icy and snowy road traffic operation stability index and visibility; The five fuzzy sets are S, NS, M, PB, and B from smallest to largest; The variables divided into three fuzzy sets are: downhill slope and short-term flow rate; The three fuzzy sets are S, M, and B from small to large; Step 42: Determine the membership function.

6. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 5 is characterized by: The membership function is determined in step 42; the specific process is: The number of membership functions of each variable is the same as the number of fuzzy sets divided by the variable; The variables are environmental input variables and bridge variables; If it is the first or last membership function of a variable, the membership function is trapmf or zmf; The trapmf is a trapezoidal membership function, and the zmf is a Z-type membership function; If it is an intermediate membership function of a variable, the membership function is trimf or gaussmf; The trimf is a triangle membership function; gaussmf is a Gaussian membership function.

7. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 6 is characterized by: In the step 5, the original state generation rules are formulated for the environmental input variables and bridge variables after the fuzzy sets are divided in the step 4 and the membership functions are determined, and the formulated original state generation rules are screened to obtain a valid state generation rule library; The specific process is: The combination of the environmental input variables and the bridge variables at each moment after the fuzzy sets are divided and the membership functions are determined in step 4 is used as an original state generation rule; Calculate the weight of the stability index rule of the original state generation rule; for the original rules with the same combination of environmental input variables but different levels of output bridge variables, retain the original state generation rule with the largest weight in the stability index rule as the effective state generation rule, and discard the remaining original state generation rules; Calculate the weight of the visibility rule of the original state generation rule; for the original rules with the same combination of environment input variables but different levels of output bridge variables, retain the original state generation rule with the largest weight in the visibility rule as the effective state generation rule, and discard the other original state generation rules; The weight expression of the stability index rule of the original state generation rule is: In the formula, is the weight of the stability index rule of the i-th original state generation rule; ∧ is the minimum operator; The maximum membership value of the slip coefficient of the i-th original state generation rule; The maximum membership value of the snow thickness for the i-th original state generation rule; The maximum membership value of the ice thickness for the i-th original state generation rule; The maximum membership of the downhill slope of the i-th original state generation rule; The maximum membership value of the flat curve radius of the i-th original state generation rule; The maximum membership value of the short-term flow rate of the i-th original state generation rule; The maximum membership value of the cross-sectional velocity difference of the i-th original state generation rule; The weight expression of the visibility rule of the original state generation rule is: In the formula, is the weight of the visibility rule of the i-th original state generation rule; ∧ is the minimum operator; The maximum membership value of the snow thickness growth rate of the ith original state generation rule; The maximum membership value of the wind speed of the i-th original state generation rule; The maximum membership degree of relative humidity of the i-th original state generation rule; The maximum membership degree of the illumination intensity of the i-th original state generation rule.

8. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 7 is characterized by: In the step 6, the risk discrimination rule is determined based on the bridge variables and "traffic operation risk under ice and snow conditions" after the fuzzy sets are divided and the membership functions are determined in step 4; The specific process is: Step 6.1: Determine the "risk level of traffic operation under ice and snow conditions"; the specific process is as follows: The value range of the risk level of traffic operation under ice and snow conditions is set to a real number of 0-5, and the fuzzy set of the risk level of traffic operation under ice and snow conditions is divided into 5, from small to large, 0-1, 1-2, 2-3, 3-4, and 4-5; The membership function type corresponding to 0-1 is trapmf, and the corresponding level is S; The membership function type corresponding to 1-2 is trimf, and the corresponding level is NS; The membership function type corresponding to 2-3 is trimf, and the corresponding level is M; 3-4 corresponds to the membership function type of trimf, and the corresponding level is PB; The membership function type corresponding to 4-5 is trapmf, and the corresponding level is B; Step 62: Using a matrix-based rule-making method, each level of the bridge variable after the fuzzy set is divided and the membership function is determined in step 4 is combined into a two-dimensional matrix, and the risk discrimination rule is obtained by mapping the two-dimensional matrix with the "traffic operation risk level under ice and snow conditions" determined in step 61; the specific process is as follows: When the traffic operation stability index level on icy and snowy roads is S and the visibility level is S, the traffic operation risk level under icy and snowy conditions is B; When the traffic operation stability index level on icy and snowy roads is S and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is B; When the traffic operation stability index level on icy and snowy roads is S and the visibility level is M, the traffic operation risk level under icy and snowy conditions is PB; When the traffic operation stability index level on icy and snowy roads is S and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is PB; When the traffic operation stability index level on icy and snowy roads is S and the visibility level is B, the traffic operation risk level under icy and snowy conditions is M; When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is S, the traffic operation risk level under icy and snowy conditions is B; When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is B; When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is M, the traffic operation risk level under icy and snowy conditions is PB; When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is M; When the traffic operation stability index level on icy and snowy roads is NS and the visibility level is B, the traffic operation risk level under icy and snowy conditions is NS; When the traffic operation stability index level on icy and snowy roads is M and the visibility level is S, the traffic operation risk level under icy and snowy conditions is PB; When the traffic operation stability index level on icy and snowy roads is M and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is PB; When the traffic operation stability index level on icy and snowy roads is M and the visibility level is M, the traffic operation risk level under icy and snowy conditions is M; When the traffic operation stability index level on icy and snowy roads is M and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is NS; When the traffic operation stability index level on icy and snowy roads is M and the visibility level is B, the traffic operation risk level under icy and snowy conditions is S; When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is S, the traffic operation risk level under icy and snowy conditions is PB; When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is M; When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is M, the traffic operation risk level under icy and snowy conditions is NS; When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is S; When the traffic operation stability index level on icy and snowy roads is PB and the visibility level is B, the traffic operation risk level under icy and snowy conditions is S; When the traffic operation stability index level on icy and snowy roads is B and the visibility level is S, the traffic operation risk level under icy and snowy conditions is M; When the traffic operation stability index level on icy and snowy roads is B and the visibility level is NS, the traffic operation risk level under icy and snowy conditions is NS; When the traffic operation stability index level on icy and snowy roads is B and the visibility level is M, the traffic operation risk level under icy and snowy conditions is S; When the traffic operation stability index level on icy and snowy roads is B and the visibility level is PB, the traffic operation risk level under icy and snowy conditions is S; When the traffic operation stability index level on icy and snowy roads is B and the visibility level is B, the traffic operation risk level under icy and snowy conditions is S.

9. The real-time identification method of highway traffic operation risk under ice and snow conditions based on dynamic multi-layer fuzzy logic according to claim 8 is characterized by: If there is no overwriting in step 7, a new state generation rule is generated by a data-driven method; the specific process is: 1) Merging the new environment input variable with the environment input variable data in the original state generation rule base in step 5 to obtain merged environment input variable data, and obtaining a data set of bridge variables based on the bridge variables of the original state generation rule in step 5; Convert the merged environment input variable data and the original bridge variables of the state generation rule into numerical variables; The conversion of the merged environment input variable data and the original state generation rule bridge variable into a numerical variable is specifically as follows: When the level of the fuzzy set corresponding to the combined environmental input variable is S, the combined environmental input variable is converted to a value of 0; When the level of the fuzzy set corresponding to the combined environmental input variable is NS, the combined environmental input variable is converted to a value of 1; When the level of the fuzzy set corresponding to the combined environmental input variable is M, the combined environmental input variable is converted to a value of 2; When the level of the fuzzy set corresponding to the combined environmental input variable is PB, the combined environmental input variable is converted to a value of 3; When the level of the fuzzy set corresponding to the combined environmental input variable is B, the combined environmental input variable is converted to a value of 4; When the level of the fuzzy set corresponding to the bridge variable is S, the bridge variable is converted to the value 0; When the level of the fuzzy set corresponding to the bridge variable is NS, the bridge variable is converted to the value 1; When the level of the fuzzy set corresponding to the bridge variable is M, the bridge variable is converted to the value 2; When the level of the fuzzy set corresponding to the bridge variable is PB, the bridge variable is converted to the value 3; When the level of the fuzzy set corresponding to the bridge variable is B, the bridge variable is converted to a value of 4; 2) Apply K-means clustering to the combination of environmental input variables converted into numerical values, and divide the data points into K clusters, each cluster corresponding to a centroid; 3) Generate output conditions based on the centroids of each cluster containing the new input environment variable combination, and use the output conditions as the output conditions of the new fuzzy rules corresponding to the new input environment variable combination; the specific process is: 31) Calculate the individual support Support(A); the expression is: Calculate the support of joint occurrence Support(A∪B); the expression is: Where A represents the combination of environmental input variables represented by the centroid of the cluster containing the new combination of input environmental variables, B represents the output condition corresponding to A in the original state generation rule of step 5; the total number of transactions represents the number of combinations of environmental input variables converted into numerical values; 32) Calculate the confidence (A→B); the expression is: 33) Keep the output condition B with the highest confidence as the output condition of the new fuzzy rule corresponding to the new input environment variable combination.

10. A real-time identification system for highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic, characterized by: The system is used to execute the real-time identification method of highway traffic operation risks under ice and snow conditions based on dynamic multi-layer fuzzy logic as described in any one of claims 1 to 9.

Citation Information

Patent Citations

  • Variable speed-limiting control system of an expressway under ice and snow weather and method

    CN109993988A

  • Multi-modal data fusion unmanned aerial vehicle take-off and landing safety risk assessment system and method

    CN117829599A

  • Ore pulp water delivery system risk assessment modeling method based on fuzzy inference system

    CN117973875A

  • An intelligent homeostasis maintaining system and method for making a comfortable environment

    KR101799754B1

Cited By

  • Expressway area risk factor identification method and device

    CN119992819A