Dynamic temporary plugging acid fracturing method for carbonate open hole horizontal well

By combining the characteristics of reservoir engineering and the potential for increasing production, the cracking order and material usage of temporary blocking acid pressure are determined, and the dynamic temporary blocking acid pressure method is adopted to solve the problem of unsatisfactory effect of the temporary blocking acid pressure process, and achieve more efficient Temporary acid pressure effect.

CN119083939APending Publication Date: 2024-12-06PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310662342.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-06
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing temporary blocking acid pressure process is not designed in combination with the specific reservoir engineering characteristics and production increase potential, resulting in redundant or insufficient temporary blocking materials, resulting in unsatisfactory or failure of temporary blocking acid pressure.

Method used

Based on the reservoir rupture pressure distribution characteristics of the target well section, determine the cracking order and the number of cracks that may be formed after temporary blockage, establish a geological model of temporary blockage acid pressure, and numerical simulation to calculate the cumulative yield changes under different fracture numbers to determine the most The excellent number of cracks and temporary blocking stages, combined with the pressure bearing capacity of indoor temporary blocking materials, determine the combination method and dosage of temporary blocking materials, and adopt dynamic temporary blocking acid pressure construction and evaluation.

Benefits of technology

The integrated geological-engineering design is realized, ensuring the targeted and personalized acid pressure of temporary blockage, improving the effect of temporary blockage of acid pressure, avoiding material waste and insufficient construction, and ensuring the success of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083939A_ABST
    Figure CN119083939A_ABST
Patent Text Reader

Abstract

The invention discloses a dynamic temporary plugging acid fracturing method for a carbonate open hole horizontal well, and relates to the technical field of petroleum engineering.The method comprises the steps that firstly, the crack initiation sequence and position of cracks and the number of cracks possibly formed after temporary plugging are determined on the basis of reservoir fracture pressure distribution characteristics of a target temporary plugging well section; establishing a temporary plugging acid fracturing geologic model on the basis of reservoir characteristics of a target well section, performing numerical simulation calculation on cumulative yield changes in five years under different numbers of cracks on the basis of crack initiation positions and the range of the number of the cracks, and determining the number of the cracks with the optimal productivity and the number of temporary plugging stages of the target layer section according to the yield change degree; determining the combination mode and mass concentration of the temporary plugging material based on the temporary plugging crack initiation position, the fracture pressure difference value between different crack initiation positions and the experimental result of the pressure bearing capacity of the indoor temporary plugging material; estimating the use amount of a temporary plugging material and the use amount of a temporary plugging carrying fluid in combination with the physical dimension and the temporary plugging stage number of the acid etching crack of the plugging section; and finally, dynamic temporary plugging acid fracturing is carried out on the mine field based on the temporary plugging material dosage and the temporary plugging carrying fluid dosage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of petroleum engineering, and in particular to a method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells. Background Art

[0002] In recent years, carbonate rocks have become an important field for oil and gas exploration and development at home and abroad. 47.5% of the world's remaining recoverable oil and gas reserves come from carbonate rocks (Shen Anjiang, Chen Yana, Meng Shaoxing, et al. Research progress of China's marine carbonate reservoirs and their significance for oil and gas exploration [J]. Marine Oil and Gas Geology, 2019, 24(04): 1-14.). Horizontal well temporary plugging and acid fracturing technology has the characteristics of increasing the contact area between the well section and the oil and gas reservoir and improving the utilization rate of acid. Therefore, it has become one of the important completion methods for carbonate reservoirs (Li Xinyong, Li Chunyue, Shen Xin, et al. Design of three-layer temporary plugging and acid fracturing process for horizontal wells in Tahe Oilfield [J]. Drilling and Production Technology, 2021, 44(03): 52-55.).

[0003] Temporary plugging and acid fracturing technology mainly uses degradable temporary plugging materials to plug the initial acid fracturing fractures, forcing the acid flow direction to change and create new fractures, thereby improving the efficiency of acid use. Temporary plugging materials include fibers, temporary plugging particles, etc. The temporary plugging level and the selection and dosage of temporary plugging materials directly affect the construction effect of temporary plugging acid fracturing, thereby affecting the production. Therefore, it is a necessary condition for oil and gas wells to produce if temporary plugging construction parameters are reasonably determined according to reservoir characteristics.

[0004] At present, some scholars have optimized the temporary plugging and acid fracturing process indoors. However, because the temporary plugging and acid fracturing design is not combined with the specific reservoir engineering characteristics and production increase potential, temporary plugging materials are often redundant or insufficient in temporary plugging acid fracturing construction sites, resulting in unsatisfactory temporary plugging and acid fracturing effects or even failure. In combination with the specific reservoir engineering geological characteristics and reservoir production increase potential, determining the appropriate temporary plugging agent dosage and temporary plugging times is an important guarantee for temporary plugging safety, economic efficiency and efficiency, and is also a key technical problem to be solved by temporary plugging and acid fracturing. Summary of the invention

[0005] The technical problem to be solved by the present invention is that the current temporary plugging acid fracturing technology does not carry out temporary plugging acid fracturing design in combination with specific reservoir engineering characteristics and production increase potential, and temporary plugging materials are often redundant or insufficient in temporary plugging acid fracturing construction mines, resulting in unsatisfactory temporary plugging acid fracturing effects or even failure. The purpose is to provide a dynamic temporary plugging acid fracturing method for carbonate open-hole horizontal wells to solve the problem that the current temporary plugging acid fracturing technology does not carry out temporary plugging acid fracturing design in combination with specific reservoir engineering characteristics and production increase potential, and temporary plugging materials are often redundant or insufficient in temporary plugging acid fracturing construction mines, resulting in unsatisfactory temporary plugging acid fracturing effects or even failure.

[0006] The present invention is achieved through the following technical solutions:

[0007] A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells, comprising the following steps:

[0008] S1. Based on the reservoir fracture pressure distribution characteristics of the target temporary plugging section, determine the fracture initiation sequence, location and the number of fractures N that may be formed after temporary plugging;

[0009] S2. Based on the reservoir characteristics of the target well section, a temporary plugging acid fracturing geological model is established. Based on the fracture initiation position and the range of fracture numbers [1, N] determined in S1, a numerical simulation is performed to calculate the cumulative production changes over 5 years under different fracture numbers. The optimal fracture number n and temporary plugging level k for the target layer production capacity are determined according to the degree of production change.

[0010] S3, based on the temporary plugging cracking position determined in S1, the rupture pressure difference between different cracking positions, and the indoor temporary plugging material pressure bearing capacity test results, determine the combination mode and mass concentration w of the temporary plugging material;

[0011] S4, based on the temporary plugging material combination and mass concentration w determined in S3, combined with the geometric dimensions of the acid-etched cracks in the plugging section and the temporary plugging level k determined in S2, estimate the amount of temporary plugging material and temporary plugging carrying fluid;

[0012] S5. Based on the amount of temporary plugging material and temporary plugging carrying fluid determined in S4, the mine implements dynamic temporary plugging acid fracturing.

[0013] This method combines the specific engineering geological characteristics of the reservoir with the reservoir's production increase potential to design temporary plugging and acid fracturing, embodying the concept of geological-engineering integrated design, making the temporary plugging and acid fracturing design more targeted and personalized. At the same time, dynamic temporary plugging and acid fracturing construction and evaluation are used to ensure the maximum success of temporary plugging and improve the effect of temporary plugging.

[0014] The method is simple to operate and has a reliable principle. It fully considers the difference in reservoir fracture pressure to determine the cracking and sequence of temporary plugging and acid fracturing in open hole sections, quantitatively evaluates the influence of different stages on the temporary plugging and acid fracturing effect from the perspective of production capacity, and optimizes the combination and dosage of temporary plugging agents, providing a basis for effective temporary plugging and acid fracturing transformation of open hole horizontal wells and improving the effect of temporary plugging and acid fracturing.

[0015] Furthermore, the specific method of step S1 is: based on the relevant parameter data of the target well section, estimating the fracture pressure of the target well section, and determining the fracture initiation order according to the fracture pressure distribution characteristics of the target well section.

[0016] Furthermore, the cracking sequence and the corresponding cracking positions X1, X2, ..., X are determined in ascending order according to the cracking pressure. n The corresponding rupture pressure value is P1<P2…<P i …<P n , the corresponding maximum number of cracks obtained after temporary plugging is N.

[0017] Furthermore, relevant parameter data include data on Young's modulus, Poisson's ratio, maximum horizontal principal stress, minimum horizontal principal stress, vertical stress, rock tensile strength, and formation pressure.

[0018] Furthermore, the specific method of step S2 is:

[0019] S21. Based on the reservoir porosity distribution, permeability distribution and gas saturation distribution characteristics of the target well section, a temporary plugging acid fracturing geological model is established using reservoir numerical simulation software;

[0020] S22. Based on the fracture initiation position determined in S1, acid fracturing fractures are implanted at the corresponding position in the acid fracturing geological model. The cumulative production change of the target well section within 5 years is calculated by numerical simulation when the number of fractures changes within the range of [1, N]. When the production growth rate reaches an inflection point, the corresponding number of fractures at this time is the number of fractures n with the optimal production capacity, and the corresponding temporary plugging level k is:

[0021] k = n-1 (1);

[0022] Where k is the temporary plugging level, dimensionless; n is the number of cracks, dimensionless; n≤N.

[0023] Furthermore, the specific method of step S3 is:

[0024] S31, temporary plugging level k, crack initiation position and corresponding rupture pressure value P determined based on S1 and S2 i , the rupture pressure difference of adjacent cracking points is,

[0025] ΔP i =P i+1 -P i (2);

[0026] Where ΔP i is the rupture pressure difference of adjacent cracking points, MPa; P i is the rupture pressure of the i-th crack, MPa; P i+1 is the rupture pressure value of the i+1th crack, MPa;

[0027] S32. Determine the minimum plugging strength P of the temporary plugging agent that meets the temporary plugging requirements plug :

[0028] P plug ≥min(ΔP1, ΔP2…ΔP i …ΔP n-1 ) (3);

[0029] Where P plug is the plugging strength of temporary plugging agent, MPa; ΔP n-1is the rupture pressure difference between the last two cracks, MPa;

[0030] S33, based on the minimum temporary plugging agent plugging strength P determined in S32 plug , combined with the test results of the pressure bearing capacity P of temporary plugging materials with different concentrations indoors, screen the temporary plugging material combination and temporary plugging material mass concentration w that meet the requirements, and the screening criteria are:

[0031] P≥1.5P plug (4);

[0032] Where P is the pressure bearing capacity of temporary plugging agent, MPa.

[0033] Furthermore, the specific method of step S4 is:

[0034] S41, assuming that the temporary crack plugging body is a rectangular block (such as Figure 1 The temporary plugging agent plugging volume is calculated as follows:

[0035] V plug =2CL plug h f w f (5);

[0036] Where V plug is the volume of the plugged fracture, m 3 ; L plug 、w f 、h f are the length of the plugging section, the width of the seam, and the height of the seam, in m; C is the margin coefficient to ensure the plugging effect, which is dimensionless.

[0037] S42. Calculate the temporary plugging agent dosage m based on the combination and mass concentration of temporary plugging materials determined in S3, the temporary plugging level k determined in S2, and the volume of the plugging section cracks. plug , Carrying fluid dosage V c :

[0038] m plug = kρV (6);

[0039]

[0040] Where m is the dosage of temporary plugging agent, kg; ρ is the density of temporary plugging agent, kg / m 3 ; V, V c are the volumes of temporary plugging agent and carrying liquid, m 3 ; w is the temporary plugging agent concentration, %, ρ c is the density of the carrying liquid, kg / m 3 .

[0041] Furthermore, the specific method of step S5 is:

[0042] S51. After the first-stage acid fracturing construction is completed, the temporary plugging material carrying liquid is pumped into the wellbore;

[0043] S52. Observe the change of construction pressure after the temporary plugging fluid enters the formation, and compare the increase of construction pressure ΔP under the same displacement r The rupture pressure difference ΔP determined by S31 is r ≥ΔP indicates that temporary blocking is effective; when ΔP r <ΔP, indicating that effective temporary blocking is not achieved.

[0044] Furthermore, in step S51, the displacement of the temporary plugging material carrying fluid pumped into the wellbore is 1.0-2.0m 3 / min.

[0045] Further, in step S52, when ΔP r ≥ΔP indicates that temporary plugging is effective, and temporary plugging should be ended in advance, and subsequent acid fracturing should be continued; when ΔP r <ΔP, indicating that effective temporary plugging has not been achieved. Continue to pump temporary plugging materials until the construction pressure meets the conditions or all temporary plugging materials are pumped.

[0046] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0047] (1) The temporary plugging acid fracturing method of the present invention combines the specific engineering geological characteristics of the reservoir with the reservoir production increase potential to design the temporary plugging acid fracturing, embodying the concept of geological-engineering integrated design, making the temporary plugging acid fracturing design more targeted and personalized, and at the same time adopting dynamic temporary plugging acid fracturing construction and evaluation to ensure the maximum success of temporary plugging and improve the effect of temporary plugging;

[0048] (2) The temporary plugging acid fracturing method of the present invention is simple to operate and has a reliable principle. It fully considers the difference in reservoir fracture pressure to determine the cracking and sequence of temporary plugging acid fracturing in the open hole section, quantitatively evaluates the influence of different levels on the temporary plugging acid fracturing effect from the perspective of production capacity, and optimizes the combination and dosage of temporary plugging agents, providing a basis for effective temporary plugging acid fracturing transformation of open hole horizontal wells and improving the effect of temporary plugging acid fracturing. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0050] Figure 1Schematic diagram of temporary plugging of acid fracturing cracks in the embodiment, wherein (a) is temporary plugging of the entire acid fracturing crack, and (b) is temporary plugging of the acid fracturing crack plugging section;

[0051] Figure 2 This is a schematic diagram of the fracture pressure profile of the reformed section of Well M in the embodiment;

[0052] Figure 3 The graph of the cumulative gas production of the M well transformation section in the embodiment for 5 years with different temporary plugging levels;

[0053] Figure 4 It is a curve chart of the test results of the pressure bearing capacity and pressure bearing time of the indoor temporary plugging material in the embodiment. DETAILED DESCRIPTION

[0054] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.

[0055] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0056] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0057] Example

[0058] Reference Figures 1 to 4 This embodiment provides a method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells, and the specific process is as follows:

[0059] S1. Based on the reservoir fracture pressure distribution characteristics of the target temporary plugging section, determine the fracture initiation sequence, location and the number of fractures N that may be formed after temporary plugging. Take a horizontal well M in the Sichuan Basin as an example. Figure 2 It is known that there are three potential fracture initiation positions at 6842m, 6980m and 7042m in the target well section ①6736-7032m; there are three potential fracture initiation positions at 6490m, 6570m and 6700m in the target well section ②6452-6736m. The number of fractures formed after temporary plugging is 3 in each section, and the total number of fractures N in the two sections is 6.

[0060] S2. Based on the reservoir characteristics of the target well section, a temporary plugging acid fracturing geological model is established. Based on the possible fracture initiation positions and the number of fractures determined in S1, a numerical simulation is performed to calculate the cumulative production changes over 5 years under different numbers of fractures. The number of fractures n and the temporary plugging level k for the optimal production capacity of the target layer section are determined according to the degree of production change. Specifically, it includes:

[0061] S21. Enter reservoir physical parameters (permeability, porosity and gas saturation), block natural gas characteristics, gas-water relative permeability parameters and formation temperature and pressure parameters into the Eclipse oil and gas reservoir numerical simulation software to establish a reservoir acid fracturing geological model. The total number of grids is 58×58×3=10092, and each grid in the x, y and z directions is 10m. Based on the potential fracturing position determined by the fracturing pressure, according to the order of fracturing pressure from low to high, one fracture (0-level general acid fracturing), two fractures (1-level temporary plugging) and three fractures (2-level temporary plugging) are implanted in each section at the same time.

[0062] S22. After completing the crack implantation step in S21, a unified production system is set for each case: a fixed production of 400,000 cubic meters per day and a production period of 5 years. Finally, the cumulative gas production and change trend over 5 years are obtained, and the optimal temporary plugging level is selected. Figure 3 As shown in the figure, the cumulative gas production of general acid fracturing (level 0 temporary plugging) in 5 years is 197 million cubic meters. The cumulative gas production of level 1 temporary plugging is increased by 16% compared with general acid fracturing, while level 2 temporary plugging and level 3 temporary plugging are increased by 17% and 17.5% respectively. It can be seen that the production improvement effect of level 1 temporary plugging is significant, and the reservoir utilization effect is also optimal. Increasing the number of fractures has limited contribution to production. Therefore, from the perspective of maximum production and considering reducing production costs, the production effect of level 1 temporary plugging in the segment is the best, that is, the temporary plugging level k of each segment is 1.

[0063] S3, based on the temporary plugging cracking position determined in S1, the rupture pressure difference between different cracking positions, and the test results of the pressure bearing capacity of the temporary plugging materials in the room, determine the combination mode and mass concentration w of the temporary plugging materials. Specifically including:

[0064] S31. According to the single-stage temporary plugging level (k=1) and the number of cracks (n=2) determined in S2, the rupture pressure at the initiation position of each crack is determined in combination with the rupture pressure profile. The rupture pressure difference of the initiation point before and after each stage of temporary plugging is calculated in sequence according to the initiation order, as shown in Table 1:

[0065] Table 1 Differential burst pressure at each level

[0066] Construction well section Well depth(m) Minimum bursting pressure (MPa) Second lowest bursting pressure (MPa) Burst pressure difference (MPa) Paragraph 1 6736~7032 126.8 139.2 1.4 Paragraph 2 6452~6736 140.4 141.8 12.4

[0067] Therefore, the temporary plugging agent combination plugging strength P is determined plug Need to meet P plug ≥12.4MPa.

[0068] S32, according to the temporary plugging agent plugging strength requirements obtained in S31, combined with the indoor temporary plugging material pressure bearing capacity and pressure bearing time experiment, determine the temporary plugging material and concentration w. Figure 4 The experimental results show that: 1.0% 4mm fiber + 0.5% 10 / 40 mesh particles + 0.5% 100 mesh powder can withstand a pressure of 19.8MPa, satisfying the formula P≥1.5P plug (4) Requirements for the selection of temporary plugging material strength.

[0069] S4. Based on the combination of temporary plugging materials and mass concentration w determined in S3, combined with the geometric dimensions of the acid-etched cracks in the plugging section and the temporary plugging level k determined in S2, estimate the amount of temporary plugging materials and temporary plugging carrying fluid. Specifically including:

[0070] S41. From the acid fracturing simulation, it can be obtained that the crack height after the initial acid fracturing is 50m, the crack width is 5mm, and the plugging length is 7.7m. Therefore, the plugging volume V of a single crack is calculated. plug 3.85m 3 ;

[0071] S42, temporary plugging agent density 0.86g / cm 3 , the margin coefficient C to ensure the plugging effect is 1.1, according to the formula V plug =2CL plug h f w f (5) It is easy to obtain that the dosage of temporary plugging agent for a single stage is 364kg; the density of the carrying liquid is 1.1g / cm 3 From formula (8), it is easy to get the amount of carrying fluid: The amount of carrying fluid for temporary plugging agent is 165m 3 .

[0072] S5. Based on the amount of temporary plugging material and temporary plugging carrying fluid determined in S4, dynamic temporary plugging acid fracturing construction is carried out, including:

[0073] After the first-stage acid fracturing construction, the target well section ① of M well was 0.7-2.0m 3 / min displacement to pump temporary plugging material carrying fluid into the wellbore, pumping 92m of carrying fluid 3 After that, the construction pressure rises by 2.3MPa at the same displacement, satisfying ΔP r (=2.3MPa)≥ΔP(=1.4MPa), indicating that temporary plugging is effective and completed ahead of schedule; the target well section ② of well M is 1.6m 3 / min displacement to pump temporary plugging material carrying fluid into the wellbore. After the designed carrying fluid is pumped in, 165m 3 After that, the construction pressure rose by 2.4MPa under the same displacement, which did not meet the effective temporary plugging conditions. The remaining temporary plugging fluid of 73m was pumped into the target well section ①. 3When the total pumping volume reaches 210m 3 When the construction pressure rises by 13.1MPa under the same displacement, the ΔP r (=13.1MPa)≥ΔP(=12.4MPa). For high stress reservoirs, in order to ensure the temporary plugging effect, continue to pump all the remaining temporary plugging fluid in the target well section ①. The total pumping fluid volume in the target well section ② reaches 238m 3 .

[0074] The implementation case well adopted the dynamic temporary plugging acid fracturing method, which effectively avoided the waste of temporary plugging agent in target well section ①, and also timely and dynamically supplemented the insufficient temporary plugging agent in target well section ②, realizing the dynamic allocation of temporary plugging materials during temporary plugging acid fracturing, achieving the ideal temporary plugging acid fracturing effect, and the test production reached 630,000 cubic meters / day.

[0075] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells, characterized in that: The following steps are involved: S1. Based on the reservoir fracture pressure distribution characteristics of the target temporary plugging section, determine the fracture initiation sequence, location and the number of fractures N that may be formed after temporary plugging; S2. Based on the reservoir characteristics of the target well section, a temporary plugging acid fracturing geological model is established. Based on the fracture initiation position and the range of fracture numbers [1, N] determined in S1, a numerical simulation is performed to calculate the cumulative production changes over 5 years under different fracture numbers. The optimal fracture number n and temporary plugging level k for the target layer production capacity are determined according to the degree of production change. S3, based on the temporary plugging cracking position determined in S1, the rupture pressure difference between different cracking positions, and the indoor temporary plugging material pressure bearing capacity test results, determine the combination mode and mass concentration w of the temporary plugging material; S4, based on the temporary plugging material combination and mass concentration w determined in S3, combined with the geometric dimensions of the acid-etched cracks in the plugging section and the temporary plugging level k determined in S2, estimate the amount of temporary plugging material and temporary plugging carrying fluid; S5. Based on the amount of temporary plugging material and temporary plugging carrying fluid determined in S4, the mine implements dynamic temporary plugging acid fracturing.

2. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 1, characterized in that: The specific method of step S1 is: based on the relevant parameter data of the target well section, the target well section fracture pressure is estimated, and according to the fracture pressure distribution characteristics of the target well section, the fracture initiation order is determined.

3. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 2, characterized in that: Determine the cracking sequence and corresponding cracking positions X1, X2, ... X according to the increasing cracking pressure. n The corresponding rupture pressure value is P1<P2…<P i …<P n , the corresponding maximum number of cracks obtained after temporary plugging is N.

4. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 2, characterized in that: Relevant parameter data include Young's modulus, Poisson's ratio, maximum horizontal principal stress, minimum horizontal principal stress, vertical stress, rock tensile strength, and formation pressure.

5. The method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 1, characterized in that: The specific method of step S2 is: S21. Based on the reservoir porosity distribution, permeability distribution and gas saturation distribution characteristics of the target well section, a temporary plugging acid fracturing geological model is established using reservoir numerical simulation software; S22. Based on the fracture initiation position determined in S1, acid fracturing fractures are implanted at the corresponding position in the acid fracturing geological model. The cumulative production change of the target well section within 5 years is calculated by numerical simulation when the number of fractures changes within the range of [1, N]. When the production growth rate reaches an inflection point, the corresponding number of fractures at this time is the number of fractures n with the optimal production capacity, and the corresponding temporary plugging level k is: k = n-1 (1); Where k is the temporary plugging level, dimensionless; n is the number of cracks, dimensionless; n≤N.

6. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 1, characterized in that: The specific method of step S3 is: S31, temporary plugging level k, crack initiation position and corresponding rupture pressure value P determined based on S1 and S2 i , the rupture pressure difference of adjacent cracking points is, ΔP i =P i+1 -P i (2); Where ΔP i is the rupture pressure difference of adjacent cracking points, MPa; P i is the rupture pressure of the i-th crack, MPa; P i+1 is the rupture pressure value of the i+1th crack, MPa; S32. Determine the minimum plugging strength P of the temporary plugging agent that meets the temporary plugging requirements plug : P plug ≥min(ΔP1,ΔP2…ΔP i …ΔP n-1 ) (3); Where P plug is the plugging strength of temporary plugging agent, MPa; ΔP n-1 is the rupture pressure difference between the last two cracks, MPa; S33, based on the minimum temporary plugging agent plugging strength P determined in S32 plug , combined with the test results of the pressure bearing capacity P of temporary plugging materials with different concentrations indoors, screen the temporary plugging material combination and temporary plugging material mass concentration w that meet the requirements, and the screening criteria are: P≥1.5P plug (4); Where P is the pressure bearing capacity of temporary plugging agent, MPa.

7. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 1, characterized in that: The specific method of step S4 is: S41. Assuming that the temporary plugging fracture body plugging section is a rectangular parallelepiped (as shown in FIG1 ), the temporary plugging agent plugging volume is calculated as: V plug =2CL plug h f w f (5); Where V plug is the volume of the crack in the plugging section, m 3 ; L plug 、w f 、h f are the length of the plugging section, the width of the seam, and the height of the seam, in m; C is the margin coefficient to ensure the plugging effect, which is dimensionless. S42. Calculate the temporary plugging agent dosage m based on the combination and mass concentration of temporary plugging materials determined in S3, the temporary plugging level k determined in S2, and the volume of the plugging section cracks. plug , Carrying fluid dosage V c : m plug =kρV (6); Where m is the dosage of temporary plugging agent, kg; ρ is the density of temporary plugging agent, kg / m 3 ; V, V c are the volumes of temporary plugging agent and carrying liquid, m 3 ; w is the temporary plugging agent concentration, %, ρ c is the density of the carrying liquid, kg / m 3 .

8. The method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 1, characterized in that: The specific method of step S5 is: S51. After the first-stage acid fracturing construction is completed, the temporary plugging material carrying liquid is pumped into the wellbore; S52. Observe the change of construction pressure after the temporary plugging fluid enters the formation, and compare the increase of construction pressure ΔP under the same displacement r The rupture pressure difference ΔP determined by S31 is r ≥ΔP indicates that temporary blocking is effective; when ΔP r <ΔP, indicating that effective temporary blocking is not achieved.

9. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 8, characterized in that: In step S51, the displacement of the temporary plugging material carrying fluid pumped into the wellbore is 1.0-2.0m 3 / min.

10. A method for dynamic temporary plugging and acid fracturing of carbonate open hole horizontal wells according to claim 8, characterized in that: In step S52, when ΔP r ≥ΔP indicates that temporary plugging is effective, and temporary plugging should be ended in advance, and subsequent acid fracturing should be continued; when ΔP r <ΔP, indicating that effective temporary plugging has not been achieved. Continue to pump temporary plugging materials until the construction pressure meets the conditions or all temporary plugging materials are pumped.