Induced caving method for concealed goaf of strip mine

The induced caving method for hidden goafs in open-pit mines addresses safety hazards by using site survey, 3D modeling, and grouting with a specific material to induce roof collapse, achieving safe and economical roof caving.

CN119084001APending Publication Date: 2024-12-06GUANGDONG PROVINCE DABAOSHAN MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411046772.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing methods for treating hidden goafs in open-pit mines face challenges such as high construction difficulty, high cost, and unstable effectiveness, posing safety hazards due to roof collapse under mine pressure and groundwater influence.

Method used

An induced caving method involving site survey, 3D modeling, risk assessment, drilling and grouting with a specific grouting material composition, and laying waste rock or tailings to induce natural roof collapse.

Benefits of technology

The method safely and efficiently expands the exposed area around the goaf, inducing natural roof caving with economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084001A_ABST
    Figure CN119084001A_ABST
Patent Text Reader

Abstract

The invention discloses an induced caving method for a concealed goaf of a strip mine, and relates to the field of mining. Comprising the following steps: address investigation: acquiring the position, size and form of a goaf according to historical mining records and in combination with a geological radar; performing three-dimensional modeling, namely performing three-dimensional modeling on the goaf according to the survey data; carrying out risk assessment and positioning, carrying out stress analysis according to the modeling model, and determining a grouting position according to an analysis result; drilling and grouting are conducted, specifically, drilling is conducted according to the determined grouting position, then a grouting material is selected, and grouting is conducted in the hole after the grouting speed is determined; and a discrete cushion layer is laid, after grouting is finished, waste rocks or tailings are laid according to roof caving and the scale of the roof caving, and then tamping treatment is conducted. By expanding the effective exposed area of the periphery of the goaf, natural caving of the goaf roof is induced, and safe, economical and efficient caving treatment is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mining, in particular to an induced caving method for a concealed goaf area in an open-pit mine. Background Art

[0003] In the process of open-pit mining, due to complex geological conditions and historical problems left over from mining, hidden goafs often exist. These goafs are prone to roof collapse under the influence of mine pressure and groundwater, posing huge safety hazards to mine production.

[0004] However, in the prior art, treatment methods such as filling method and caving method have problems such as great construction difficulty, high cost, and unstable effect. Therefore, a new and efficient induced caving method is urgently needed.

[0005] To this end, the present invention proposes an induction caving method for concealed goaf in open-pit mines Summary of the invention

[0006] The purpose of the present invention is to solve the shortcomings existing in the prior art and to propose an induced caving method for concealed goaf areas in open-pit mines.

[0007] In order to achieve the above object, the present invention adopts the following technical solutions:

[0008] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0009] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0010] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0011] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0012] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0013] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0014] Preferably: in the step S4, the grouting material is composed of the following components in mass ratio:

[0015] Cement: 20-40 parts,

[0016] Fly ash: 60-80 parts,

[0017] Accelerator: 2-2.5 parts,

[0018] Stone powder: 5-15 parts,

[0019] Water: 1-1.5 times the volume of solids.

[0020] Preferably: in the step S4, the grouting material is composed of the following components in mass ratio:

[0021] Cement: 25-35 parts,

[0022] Fly ash: 65-75 parts,

[0023] Accelerator: 2.1-2.4 parts,

[0024] Stone powder: 7-13 parts,

[0025] Water: 1-1.5 times the volume of solids.

[0026] Preferably: in the step S4, the grouting material is composed of the following components in mass ratio:

[0027] Cement: 30 parts,

[0028] Fly ash: 70 parts,

[0029] Accelerator: 2.25 parts,

[0030] Stone powder: 10 parts,

[0031] Water: 1-1.5 times the volume of solids.

[0032] Preferably: the method for preparing the grouting material comprises the following steps:

[0033] A1: Material preparation, prepare various raw materials according to the required proportions;

[0034] A2: Mix and stir. Add cement, fly ash and stone powder into the mixer, then add some water and continue stirring.

[0035] A3: Mix the remaining water source and stone powder separately and stir evenly;

[0036] A4: adding the mixture in step S2 to the mixing system in step S3 or adding the mixture in step S3 to the mixing system in step S2, and then continuing to mix and stir;

[0037] A5: After mixing, start grouting operation immediately.

[0038] Preferably: in the step S4, the calculation formula for the grouting width is: Where L is the grouting width, D is the width of the roadbed surface, B is the width of the roadbed maintenance belt, h is the thickness of the overlying loose layer, H下 is the thickness of bedrock under the goaf, H 上 is the thickness of bedrock above the goaf, is the loose movement angle, β is the movement angle of the overlying bedrock in the goaf in the downhill direction, and γ is the movement angle of the overlying bedrock in the goaf in the uphill direction.

[0039] Preferably: in the grouting width calculation formula of step S4,

[0040] Preferably: in the grouting width calculation formula of step S4, β∈(20°, 50°).

[0041] Preferably: in the grouting width calculation formula of step S4, γ∈(50°, 70°).

[0042] The beneficial effects of the present invention are:

[0043] 1. The present invention expands the effective exposure area around the goaf, induces the natural fall of the goaf roof, and realizes safe, economical and efficient roof caving treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 The present invention is a flow chart of the method for inducing roof caving in concealed goaf areas of open-pit mines proposed by the present invention. DETAILED DESCRIPTION

[0045] The technical solution of the present invention is further described in detail below in conjunction with specific implementation methods.

[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected or set, or detachably connected or set, or integrally connected or set. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] Embodiment 1:

[0048] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0049] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0050] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0051] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0052] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0053] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0054] Embodiment 2:

[0055] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0056] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0057] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0058] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0059] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0060] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0061] In the step S4, the grouting material is composed of the following components in mass ratio:

[0062] Cement: 20-40 parts,

[0063] Fly ash: 60-80 parts,

[0064] Accelerator: 2-2.5 parts,

[0065] Stone powder: 5-15 parts,

[0066] Water: 1-1.5 times the volume of solids.

[0067] Embodiment 3:

[0068] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0069] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0070] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0071] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0072] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0073] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0074] In the above step S4, the grouting material is composed of the following components in mass ratio:

[0075] Cement: 25-35 parts,

[0076] Fly ash: 65-75 parts,

[0077] Accelerator: 2.1-2.4 parts,

[0078] Stone powder: 7-13 parts,

[0079] Water: 1-1.5 times the volume of solids.

[0080] Embodiment 4:

[0081] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0082] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0083] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0084] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0085] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0086] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0087] In the step S4, the grouting material is composed of the following components in mass ratio:

[0088] Cement: 30 parts,

[0089] Fly ash: 70 parts,

[0090] Accelerator: 2.25 parts,

[0091] Stone powder: 10 parts,

[0092] Water: 1-1.5 times the volume of solids.

[0093] Embodiment 5:

[0094] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0095] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0096] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0097] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0098] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0099] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0100] In the step S4, the grouting material is composed of the following components in mass ratio:

[0101] Cement: 20-40 parts,

[0102] Fly ash: 60-80 parts,

[0103] Accelerator: 2-2.5 parts,

[0104] Stone powder: 5-15 parts,

[0105] Water: 1-1.5 times the volume of solids.

[0106] The preparation method of the grouting material comprises the following steps:

[0107] A1: Material preparation, prepare various raw materials according to the required proportions;

[0108] A2: Mix and stir. Add cement, fly ash and stone powder into the mixer, then add some water and continue stirring.

[0109] A3: Mix the remaining water source and stone powder separately and stir evenly;

[0110] A4: adding the mixture in step S2 to the mixing system in step S3 or adding the mixture in step S3 to the mixing system in step S2, and then continuing to mix and stir;

[0111] A5: After mixing, start grouting operation immediately.

[0112] Embodiment 6:

[0113] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0114] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0115] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0116] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0117] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0118] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0119] In the step S4, the grouting material is composed of the following components in mass ratio:

[0120] Cement: 20-40 parts,

[0121] Fly ash: 60-80 parts,

[0122] Accelerator: 2-2.5 parts,

[0123] Stone powder: 5-15 parts,

[0124] Water: 1-1.5 times the volume of solids.

[0125] The preparation method of the grouting material comprises the following steps:

[0126] A1: Material preparation, prepare various raw materials according to the required proportions;

[0127] A2: Mix and stir. Add cement, fly ash and stone powder into the mixer, then add some water and continue stirring.

[0128] A3: Mix the remaining water source and stone powder separately and stir evenly;

[0129] A4: adding the mixture in step S2 to the mixing system in step S3 or adding the mixture in step S3 to the mixing system in step S2, and then continuing to mix and stir;

[0130] A5: After mixing, start grouting operation immediately.

[0131] In step S4, the calculation formula for the grouting width is: Where L is the grouting width, D is the width of the roadbed surface, B is the width of the roadbed maintenance belt, h is the thickness of the overlying loose layer, H 下 is the thickness of bedrock under the goaf, H 上 is the thickness of bedrock above the goaf, is the loose movement angle, β is the movement angle of the overlying bedrock in the goaf in the downhill direction, and γ is the movement angle of the overlying bedrock in the goaf in the uphill direction.

[0132] In the grouting width calculation formula of step S4,

[0133] In the grouting width calculation formula of step S4, β∈(20°, 50°)

[0134] In the grouting width calculation formula of step S4, γ∈(50°, 70°).

[0135] Embodiment 7:

[0136] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0137] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0138] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0139] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0140] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0141] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0142] In the step S4, the grouting material is composed of the following components in mass ratio:

[0143] Cement: 20-40 parts,

[0144] Fly ash: 60-80 parts,

[0145] Accelerator: 2-2.5 parts,

[0146] Stone powder: 5-15 parts,

[0147] Water: 1-1.5 times the volume of solids.

[0148] The preparation method of the grouting material comprises the following steps:

[0149] A1: Material preparation, prepare various raw materials according to the required proportions;

[0150] A2: Mix and stir. Add cement, fly ash and stone powder into the mixer, then add some water and continue stirring.

[0151] A3: Mix the remaining water source and stone powder separately and stir evenly;

[0152] A4: adding the mixture in step S2 to the mixing system in step S3 or adding the mixture in step S3 to the mixing system in step S2, and then continuing to mix and stir;

[0153] A5: After mixing, start grouting operation immediately.

[0154] In step S4, the calculation formula for the grouting width is: Where L is the grouting width, D is the width of the roadbed surface, B is the width of the roadbed maintenance belt, h is the thickness of the overlying loose layer, H 下 is the thickness of bedrock under the goaf, H 上 is the thickness of bedrock above the goaf, is the loose movement angle, β is the movement angle of the overlying bedrock in the goaf in the downhill direction, and γ is the movement angle of the overlying bedrock in the goaf in the uphill direction.

[0155] In the grouting width calculation formula of step S4,

[0156] In the grouting width calculation formula of step S4, β∈(30°, 40°)

[0157] In the grouting width calculation formula of step S4, γ∈(55°, 65°)

[0158] Embodiment 8:

[0159] The method for inducing caving of concealed goaf in open-pit mines comprises the following steps:

[0160] S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar;

[0161] S2: 3D modeling: 3D modeling of the goaf based on the survey data;

[0162] S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results;

[0163] S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole;

[0164] S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

[0165] In the step S4, the grouting material is composed of the following components in mass ratio:

[0166] Cement: 20-40 parts,

[0167] Fly ash: 60-80 parts,

[0168] Accelerator: 2-2.5 parts,

[0169] Stone powder: 5-15 parts,

[0170] Water: 1-1.5 times the volume of solids.

[0171] The preparation method of the grouting material comprises the following steps:

[0172] A1: Material preparation, prepare various raw materials according to the required proportions;

[0173] A2: Mix and stir. Add cement, fly ash and stone powder into the mixer, then add some water and continue stirring.

[0174] A3: Mix the remaining water source and stone powder separately and stir evenly;

[0175] A4: adding the mixture in step S2 to the mixing system in step S3 or adding the mixture in step S3 to the mixing system in step S2, and then continuing to mix and stir;

[0176] A5: After mixing, start grouting operation immediately.

[0177] In step S4, the calculation formula for the grouting width is: Where L is the grouting width, D is the width of the roadbed surface, B is the width of the roadbed maintenance belt, h is the thickness of the overlying loose layer, H 下 is the thickness of bedrock under the goaf, H 上 is the thickness of bedrock above the goaf, is the loose movement angle, β is the movement angle of the overlying bedrock in the goaf in the downhill direction, and γ is the movement angle of the overlying bedrock in the goaf in the uphill direction.

[0178] In the grouting width calculation formula of step S4,

[0179] In the calculation formula of the grouting width in step S4, β = 35°

[0180] In the calculation formula of the grouting width in step S4, γ = 60°

[0181] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for inducing caving in concealed goaf of open-pit mines, characterized in that: The following steps are involved: S1: Site survey, obtaining the location, size and shape of the mined-out area based on historical mining records and combined with geological radar; S2: 3D modeling: 3D modeling of the goaf based on the survey data; S3: Risk assessment and location, perform stress analysis based on the modeling model, and determine the grouting location based on the analysis results; S4: drilling and grouting, drilling according to the determined grouting position, then selecting the grouting material, determining the grouting speed, and then grouting into the hole; S5: After the grouting of the bulk cushion layer is completed, waste rock or tailings are laid according to the top plate fall and its scale, and then compacted.

2. The method for inducing caving of concealed goaf in an open-pit mine according to claim 1, characterized in that: In the step S4, the grouting material is composed of the following components in mass ratio: Cement: 20-40 parts, Fly ash: 60-80 parts, Accelerator: 2-2.5 parts, Stone powder: 5-15 parts, Water: 1-1.5 times the volume of solids.

3. The method for inducing caving in a hidden goaf area of ​​an open-pit mine according to claim 1, characterized in that: In the step S4, the grouting material is composed of the following components in mass ratio: Cement: 25-35 parts, Fly ash: 65-75 parts, Accelerator: 2.1-2.4 parts, Stone powder: 7-13 parts, Water: 1-1.5 times the volume of solids.

4. The method for inducing caving of concealed goaf in an open-pit mine according to claim 1, characterized in that: In the step S4, the grouting material is composed of the following components in mass ratio: Cement: 30 parts, Fly ash: 70 parts, Accelerator: 2.25 parts, Stone powder: 10 parts, Water: 1-1.5 times the volume of solids.

5. The method for inducing caving in a hidden goaf area of ​​an open-pit mine according to any one of claims 2 to 4, characterized in that: The preparation method of the grouting material comprises the following steps: A1: Material preparation, prepare various raw materials according to the required proportions; A2: Mix and stir. Add cement, fly ash and stone powder into the mixer, then add some water and continue stirring. A3: Mix the remaining water source and stone powder separately and stir evenly; A4: adding the mixture in step S2 to the mixing system in step S3 or adding the mixture in step S3 to the mixing system in step S2, and then continuing to mix and stir; A5: After mixing, start grouting operation immediately.

6. The method for inducing caving of concealed goaf in an open-pit mine according to claim 5, characterized in that: In step S4, the calculation formula for the grouting width is: Where L is the grouting width, D is the width of the roadbed surface, B is the width of the roadbed maintenance belt, h is the thickness of the overlying loose layer, H 下 is the thickness of bedrock under the goaf, H 上 is the thickness of bedrock above the goaf, is the loose movement angle, β is the movement angle of the overlying bedrock in the goaf in the downhill direction, and γ is the movement angle of the overlying bedrock in the goaf in the uphill direction.

7. The method for inducing caving of concealed goaf in an open-pit mine according to claim 6, characterized in that: In the grouting width calculation formula of step S4, 8. The method for inducing caving of concealed goaf in an open-pit mine according to claim 6, characterized in that: In the grouting width calculation formula of step S4, β∈(20°, 50°).

9. The method for inducing caving of concealed goaf in an open-pit mine according to claim 6, characterized in that: In the grouting width calculation formula of step S4, γ∈(50°, 70°).