Multi-load combined loading test device and test method for buried pipeline
By designing soil-covered boxes and related test equipment, the impact of multiple loads on buried PE gas pipelines was simulated, and the problem of pipeline deformation and failure in the prior art was solved, and the problem of buried PE pipelines was realized. Safe operation and risk assessment support.
Patent Information
- Application Number
- CN202411357449.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-12-06
AI Technical Summary
The prior art has failed to effectively simulate the deformation and failure characteristics of buried PE gas pipelines under multiple loads, resulting in difficulty in safe operation and risk assessment, and lack of test devices for multi-load joint loading.
A multi-load joint loading test device for buried pipelines including soil-covered boxes and testing equipment was designed. The ground occupation, soil settlement and internal pressure of pipelines were simulated through hydrostatic bending moment tester, air compressor and spiral transmission mechanism. Combined with KPC linear displacement sensor and strain gauge to measure pipeline strain and sinking displacement in real time.
The deformation damage simulation test of buried PE pipelines under the synergistic action of multi-load is realized, providing a method to analyze the characteristics of pipeline deformation and failure and safe operation risks, and supporting the test of pipelines of different sizes and defects.
Smart Images

Figure CN119086301A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of material engineering, and in particular relates to a buried pipeline multi-load combined loading test device and a test method. Background Art
[0002] Traditional pipeline transportation is mainly based on metal pipelines, but they are susceptible to corrosion. In severe cases, pipeline leakage may occur, and even explosion accidents may occur, causing huge casualties and property losses. Polyethylene (PE) pipelines have become the main pipelines for natural gas transportation due to their excellent corrosion resistance, reliable tightness, high flexibility and strength, and ultra-long service life.
[0003] However, with the acceleration of urbanization and the increase in pipeline laying density, the safe operation problems faced by urban gas pipelines are also increasing, and the synergistic effect of multiple loads seriously threatens the safe use of PE gas pipelines. At present, the main problems of pipeline damage and failure in cities are ground occupation and ground subsidence. The ground occupation of buildings on pipelines can easily lead to foundation subsidence and pipeline deformation, and may induce leakage of oil and gas media, and even cause explosions. Due to the unreasonable design of some urban infrastructure and natural factors, ground soil collapse, voids, and subsidence often occur. If it happens to happen at the laying location of the gas pipeline, it is very likely to cause the gas pipeline to bend and tilt. Severe subsidence may cause pipeline leakage and breakage, causing accidents. Therefore, by conducting experimental research on the deformation and damage of buried pipelines under multiple loads, analyzing the deformation and damage characteristics of pipelines, and studying the laws between various factors and pipeline damage, it provides a reference for the safe operation and risk assessment of buried gas PE pipelines, which is of great significance to protecting people's lives and property. At present, there is no test device that simulates the combined loading of buried PE pipelines with multiple loads. Summary of the invention
[0004] Purpose of the invention: The technical problem to be solved by the present invention is to provide a buried pipeline multi-load combined loading test device and test method in view of the shortcomings of the prior art. The device includes a soil covering box and a test device;
[0005] The soil covering box comprises a box plate, a box frame, box legs and a box cross bar;
[0006] The box panels include a box front panel, a box rear panel, a box left panel, a box right panel, and a box bottom panel;
[0007] The box panels are connected to the box frame by welding, the box legs are fixed under the box frame by M12 bolts, and the box crossbars are fixed between the box legs by M10 bolts;
[0008] A roller trolley is provided at the bottom of the soil covering box;
[0009] The roller trolley is used to receive the sunken soil;
[0010] The soil covering box is used for containing buried pipelines and soil covering them.
[0011] The roller trolley comprises a trolley plate, a trolley steel frame, a trolley roller, a trolley towing hook and a U-shaped groove;
[0012] The trolley panels include a trolley front panel, a trolley rear panel, a trolley right panel, a trolley left panel, and a trolley bottom panel;
[0013] The trolley plate is fixed on the trolley steel frame by welding, the trolley towing hook is welded to the center of the left side of the trolley steel frame, the four corners of the trolley steel frame are welded with U-shaped grooves, and the trolley rollers are connected to the U-shaped grooves by pins.
[0014] The two sides of the soil covering box are provided with a burial depth control screw transmission mechanism for adjusting the burial depth of the buried pipeline, and the burial depth control screw transmission mechanism includes a first hand wheel, a first screw rod, a guide shaft support, a detachable slider with a hole and a first slide rail;
[0015] The first hand wheel is connected to the first screw rod by a flat key, the first screw rod is connected to the guide shaft support by a cylindrical pin, the guide shaft support is fixed to the detachable slider with a hole by an M10 bolt, and the detachable slider with a hole is embedded in the first slide rail;
[0016] The detachable perforated slider is moved by rotating the first screw rod, thereby adjusting the buried depth of the PE pipe. Meanwhile, the detachable perforated sliders with different apertures are replaced to realize testing of PE pipes of different sizes.
[0017] A data measuring device is arranged at the bottom of the soil covering box, and the data measuring device includes a KPC linear displacement sensor, a large strain gauge, a resistance strain gauge, a static stress strain test and analysis system (existing technology), a detachable bracket and a bracket fixing screw hole;
[0018] The detachable bracket is fixed and disassembled by bolts and bracket fixing screw holes, and the detachable bracket is fixed at different heights to cooperate with measuring the sinking displacement of pipelines at different buried depths;
[0019] The KPC linear displacement sensor is arranged above the detachable bracket and is used to collect the sinking displacement of the pipeline; the KPC linear displacement sensor is fixed to the pipeline through a metal rolling belt, and converts the linear mechanical displacement generated by the pipeline into an electrical signal, which is input into the computer for collection;
[0020] The large strain gauge and the resistance strain gauge are used to collect the longitudinal strain and the circumferential strain of the pipeline respectively;
[0021] The static stress strain test and analysis system converts the electrical signal collected by the strain gauge and inputs it into a computer for analysis. The large strain gauge and the resistance strain gauge are connected to the static stress strain test and analysis system through cables, and the static stress strain test and analysis system is connected to the computer through a wireless network.
[0022] The large strain gauge and resistance strain gauge are equidistantly pasted on the pipe top, pipe side and pipe bottom to collect strain when stress changes at different parts of the pipeline.
[0023] The bottom of the soil covering box is opened and equipped with a settlement control spiral transmission mechanism for simulating soil settlement under the pipeline;
[0024] The settlement control spiral transmission mechanism includes a translation settlement plate, a second hand wheel, a second screw rod, a second slide rail and a T-shaped guide shaft support;
[0025] The second hand wheel is connected to the second screw rod through a flat key, the T-shaped guide shaft support is fixed to the box frame and the translation settlement plate through M10 bolts, the second screw rod is fixed to the T-shaped guide shaft support on the translation settlement plate through an oil-free bushing, and the translation settlement plate is embedded in the second slide rail; the opening of the translation settlement plate is controlled by rotating the second hand wheel, thereby changing the degree of soil settlement.
[0026] The test equipment includes a hydrostatic bending moment tester and an air compressor; the soil-covering box can be placed on the working platform of the hydrostatic bending moment tester (the hydrostatic bending moment tester is an existing technology and is a pressure pipeline testing equipment of the Jiangsu Special Inspection Institute);
[0027] The hydrostatic bending moment tester applies a vertical load to the earth-covering box to simulate the pressure of the buried pipeline on the building line, and the air compressor applies air pressure to the closed pipeline to simulate the working pressure of the buried pipeline in actual working conditions.
[0028] The present invention also provides an experimental method for a buried pipeline multi-load combined loading test device, comprising the following steps:
[0029] Step 1, preparation stage: by sticking strain gauges on the PE pipe to measure the strain of the pipe when it is loaded, evenly arrange X groups of measuring surfaces on the PE pipe, each group of measuring surfaces has a measuring point arranged on the top, side and bottom of the pipe, arrange large strain gauges longitudinally on the measuring points, arrange resistance strain gauges circumferentially, complete the commissioning and installation of large strain gauges and resistance strain gauges, connect the signals of large strain gauges, resistance strain gauges and KPC linear displacement sensors, lay the soil in the covering box, and seal and pressurize the buried pipe;
[0030] Before pasting large strain gauges and resistance strain gauges, conduct appearance inspection and resistance measurement: observe whether the sensitive grid has rust defects, whether it is neatly arranged, whether the base and cover layer are damaged, and whether the lead is intact; check whether the sensitive grid is short-circuited or open-circuited, and measure the resistance to ensure that the sensitivity coefficient is the same;
[0031] Use sandpaper to polish the measuring point, and wipe it repeatedly with alcohol until there is no dirt on the measuring point;
[0032] The large strain gauge and the resistance strain gauge are respectively pasted with H-716 glue and H-711 glue. When pasting, a layer of polyethylene film is covered on the strain gauge, and it is ensured that there are no bubbles in the pasting area; G-D04 glue is used to perform mechanical protection treatment on the large strain gauge and the resistance strain gauge. After pasting, it should be left to stand for 24 hours to allow the glue to naturally solidify to the maximum pasting strength; when arranging the large strain gauge and the resistance strain gauge, a temperature compensation sheet is set to prevent the data from being affected by additional deformation;
[0033] After the large strain gauge and the resistance strain gauge are pasted, the test soil is laid in layers in the soil cover box, and each buried layer is compacted until it is buried below the required depth;
[0034] The pipeline is placed in the buried depth control screw transmission mechanism and adjusted to the buried depth required for the test. The large strain gauge, resistance strain gauge and KPC linear displacement sensor signal lines are led out through the reserved holes in the pipeline and connected to the computer through the static stress strain test analysis system (existing technology);
[0035] After the pipeline and signal line are installed, seal both ends of the buried pipeline, connect one end to the air compressor, and compress the air to the pressure required for the test; fill the soil in the soil covering box, and tamp each layer until it is buried to the top of the soil covering box;
[0036] Step 2, simulation test phase: including simulation of ground pressure on the pipeline and simulation of ground soil settlement:
[0037] The hydrostatic bending moment test machine is controlled to pressurize the upper surface of the soil-covering box to the load required for the test to simulate the ground occupancy load on the buried pipeline. At the same time, the translation settlement plate is rotated and opened to the required size for the test to simulate the soil settlement load on the buried pipeline. The settled soil is collected by a roller trolley. During the simulation process, the strain and sinking displacement of the buried pipeline are monitored in real time.
[0038] By changing the load applied by the hydrostatic bending moment testing machine, the pressure applied by the air compressor and the size of the opening and closing of the translational settlement plate, the influence of different factors (ground occupancy, soil subsidence, pipeline internal pressure, and pipe-soil burial depth) on the deformation and damage of buried PE pipelines was quantitatively studied. By designing corresponding orthogonal tests for different factors and using strain size as a statistic, variance analysis was used to test the significance of different factors and interactions, and the weights of the influence of different factors on the damage of buried PE pipelines were studied.
[0039] In step 2, in order to prevent soil from overflowing from the hole of the first side slide rail 305 during the test, a number of baffles are customized and inserted during the test to prevent soil from overflowing.
[0040] The present invention also provides an electronic device, comprising a processor and a memory, wherein the memory stores program code, and when the program code is executed by the processor, the processor executes the steps in the above method.
[0041] The present invention has the following beneficial effects:
[0042] 1. The present invention can simulate different occupancy loads of buried pipelines through the hydrostatic bending moment tester, simulate different degrees of soil settlement of buried pipelines through the spiral transmission settlement plate 5, and simulate different working internal pressures of buried pipelines through the air compressor. The spiral lifting slider 304 can simulate different buried depths of pipelines.
[0043] 2. The present invention can realize the buried PE pipeline deformation damage simulation test under the synergistic effect of multiple loads by simulating the various loads on the buried pipeline.
[0044] 3. The present invention can realize simultaneous real-time measurement of pipeline strain and pipeline sinking distance when the pipeline is subjected to different loads by arranging KPC displacement sensors and resistance strain gauges.
[0045] 4. The present invention can realize the test of pipe fittings and pipe joints with different pipe diameters and different defects by replacing the slider 304 and changing the sensor arrangement.
[0046] In summary, the present invention can realize the simulation test of pipeline deformation and damage of buried PE pipeline under various load conditions through the soil covering settlement box combined with relevant test equipment and measuring instruments, so as to analyze the deformation and damage characteristics of pipeline, study the laws between various factors and pipeline damage, and provide analysis methods and experimental support for the safe operation and risk assessment of buried gas PE pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments, and the above and / or other advantages of the present invention will become more clear.
[0048] Figure 1 It is a schematic diagram of the overall structure of the test device provided in an embodiment of the present invention.
[0049] Figure 2 It is a schematic diagram of a roller cart in the test device provided in an embodiment of the present invention.
[0050] Figure 3 It is a schematic diagram of the side structure of the test device provided in an embodiment of the present invention.
[0051] Figure 4 It is a schematic diagram of the internal structure of the test device provided in an embodiment of the present invention.
[0052] Figure 5 This is a layout diagram of PE pipeline strain gauges provided in an embodiment of the present invention.
[0053] In the figure: 1-soil covering box, 101-box front plate, 102-box rear plate, 103-box left plate, 104-box right plate, 105-box bottom plate, 106-steel box frame, 107-box support feet, 108-box fixed cross bar; 2-roller trolley, 201-trolley front plate, 202-trolley rear plate, 203-trolley right plate, 204-trolley left plate, 205-trolley bottom plate, 206-trolley steel frame, 207-trolley roller, 208-trolley towing hook, 209-U-shaped groove ; 3- burial depth control spiral transmission mechanism, 301- first hand wheel, 302- first screw, 303- removable slider with hole, 304- PE pipe, 305- first slide rail, 306- guide shaft support; 4- displacement measuring device, 401- KPC linear displacement sensor, 402- removable bracket, 403- bracket fixing screw hole; 5- settlement control spiral transmission mechanism, 501- translation settlement plate, 502- second hand wheel, 503- second screw, 504- second slide rail, 505- T-type guide shaft support. DETAILED DESCRIPTION
[0054] The present invention provides a buried pipeline multi-load combined loading test device and test method. Figure 1 As shown, the device comprises a soil covering box and a test device;
[0055] The soil covering box includes a box plate, a box frame 106, box legs 107 and a box crossbar 108;
[0056] The box panels include a box front panel 101, a box rear panel 102, a box left side panel 103, a box right side panel 104, and a box bottom panel 105;
[0057] The box plate is connected to the box frame 106 by welding, the box legs 107 are fixed below the box frame 106 by M12 bolts, and the box crossbar 108 is fixed between the box legs 107 by M10 bolts;
[0058] A roller trolley 2 is provided at the bottom of the soil covering box;
[0059] The roller trolley 2 is used to receive the sunken soil;
[0060] The soil covering box 1 is used for containing buried pipelines and their covering soil.
[0061] The roller trolley 2 includes a trolley plate, a trolley steel frame 206, a trolley roller 207, a trolley towing hook 208 and a U-shaped groove 209;
[0062] The trolley panels include a trolley front panel 201, a trolley rear panel 202, a trolley right panel 203, a trolley left panel 204, and a trolley bottom panel 205;
[0063] The trolley plate is fixed on the trolley steel frame 206 by welding, the trolley towing hook 208 is welded to the center of the left side of the trolley steel frame 206, U-shaped grooves 209 are welded at the four corners of the trolley steel frame 206, and the trolley roller 207 is connected to the U-shaped groove by a pin.
[0064] The two sides of the soil covering box are provided with a burial depth control screw transmission mechanism 3 for adjusting the burial depth of the buried pipeline, and the burial depth control screw transmission mechanism 3 includes a first hand wheel 301, a first screw rod 302, a guide shaft support 306, a detachable slider with a hole 303 and a first slide rail 305;
[0065] The first hand wheel 301 is connected to the first screw rod 302 via a flat key, the first screw rod 302 is connected to the guide shaft support 306 via a cylindrical pin, the guide shaft support 306 is fixed to the detachable perforated slider 303 via an M10 bolt, and the detachable perforated slider 303 is embedded in the first slide rail 305;
[0066] The detachable perforated slider is moved by rotating the first screw rod 302 to adjust the buried depth of the PE pipe. Meanwhile, the detachable perforated slider with different apertures can be replaced to test PE pipes of different sizes.
[0067] The data measuring device 4 is arranged at the bottom of the soil covering box, and the data measuring device 4 includes a KPC linear displacement sensor 401, a large strain gauge, a resistance strain gauge, a static stress strain test and analysis system (existing technology), a detachable bracket 402 and a bracket fixing screw hole 403;
[0068] The detachable bracket 402 is fixed and disassembled by bolts and bracket fixing screw holes 403, and the detachable bracket is fixed at different heights to cooperate with measuring the sinking displacement of pipelines at different buried depths;
[0069] The KPC linear displacement sensor 401 is arranged above the detachable bracket and is used to collect the sinking displacement of the pipeline; the KPC linear displacement sensor 401 is fixed to the pipeline through a metal rolling belt, and converts the linear mechanical displacement generated by the pipeline into an electrical signal, which is input into the computer for collection;
[0070] The large strain gauge and the resistance strain gauge are used to collect the longitudinal strain and the circumferential strain of the pipeline respectively;
[0071] The static stress strain test and analysis system converts the electrical signal collected by the strain gauge and inputs it into a computer for analysis. The large strain gauge and the resistance strain gauge are connected to the static stress strain test and analysis system through cables, and the static stress strain test and analysis system is connected to the computer through a wireless network.
[0072] The large strain gauge and resistance strain gauge are equidistantly pasted on the pipe top, pipe side and pipe bottom to collect strain when stress changes at different parts of the pipeline.
[0073] The bottom of the soil covering box 1 is opened and a settlement control spiral transmission mechanism 5 is installed to simulate the soil settlement under the pipeline;
[0074] The settlement control screw transmission mechanism 5 includes a translation settlement plate 501, a second hand wheel 502, a second screw rod 503, a second slide rail 504 and a T-shaped guide shaft support 505;
[0075] The second hand wheel 502 is connected to the second screw rod 503 through a flat key, the T-shaped guide shaft support 505 is fixed to the box frame 106 and the translation settlement plate 501 through M10 bolts, the second screw rod 503 is fixed to the T-shaped guide shaft support on the translation settlement plate 501 through an oil-free bushing, and the translation settlement plate 501 is embedded in the second slide rail 504; the opening of the translation settlement plate is controlled by rotating the second hand wheel 502, thereby changing the degree of soil settlement.
[0076] The test equipment includes a hydrostatic bending moment tester and an air compressor; the soil-covering box can be placed on the working platform of the hydrostatic bending moment tester (the hydrostatic bending moment tester is an existing technology and is a pressure pipeline testing equipment of the Jiangsu Special Inspection Institute);
[0077] The hydrostatic bending moment tester applies a vertical load to the earth-covering box to simulate the pressure of the buried pipeline on the building line, and the air compressor applies air pressure to the closed pipeline to simulate the working pressure of the buried pipeline in actual working conditions.
[0078] The present invention also provides an experimental method for a buried pipeline multi-load combined loading test device, comprising the following steps:
[0079] Step 1, preparation stage: by sticking strain gauges on the PE pipe to measure the strain of the pipe when it is loaded, evenly arrange X groups of measuring surfaces on the PE pipe, each group of measuring surfaces has a measuring point arranged on the top, side and bottom of the pipe, arrange large strain gauges longitudinally on the measuring points, arrange resistance strain gauges circumferentially, complete the commissioning and installation of large strain gauges and resistance strain gauges, connect the signals of large strain gauges, resistance strain gauges and KPC linear displacement sensor 401, lay the soil in the covering box, and seal and pressurize the buried pipe;
[0080] Before pasting large strain gauges and resistance strain gauges, conduct appearance inspection and resistance measurement: observe whether the sensitive grid has rust defects, whether it is neatly arranged, whether the base and cover layer are damaged, and whether the lead is intact; check whether the sensitive grid is short-circuited or open-circuited, and measure the resistance to ensure that the sensitivity coefficient is the same;
[0081] Use sandpaper to polish the measuring point, and wipe it repeatedly with alcohol until there is no dirt on the measuring point;
[0082] The large strain gauge and the resistance strain gauge are respectively pasted with H-716 glue and H-711 glue. When pasting, a layer of polyethylene film is covered on the strain gauge, and it is ensured that there are no bubbles in the pasting area; G-D04 glue is used to perform mechanical protection treatment on the large strain gauge and the resistance strain gauge. After pasting, it should be left to stand for 24 hours to allow the glue to naturally solidify to the maximum pasting strength; when arranging the large strain gauge and the resistance strain gauge, a temperature compensation sheet is set to prevent the data from being affected by additional deformation;
[0083] After the large strain gauge and the resistance strain gauge are pasted, the test soil is laid in layers in the soil cover box, and each buried layer is compacted until it is buried below the required depth;
[0084] The pipeline is placed in the buried depth control screw transmission mechanism 5, adjusted to the buried depth required for the test, and the large strain gauge, resistance strain gauge and KPC linear displacement sensor 401 signal lines are led out through the reserved holes in the pipeline, and connected to the computer through the static stress strain test analysis system (existing technology);
[0085] After the pipeline and signal line are installed, seal both ends of the buried pipeline, connect one end to the air compressor, and compress the air to the pressure required for the test; fill the soil in the soil covering box 1, and tamp it after each layer until it is buried to the top of the soil covering box 1;
[0086] Step 2, simulation test phase: including simulation of ground pressure on the pipeline and simulation of ground soil settlement:
[0087] The hydrostatic bending moment test machine is controlled to pressurize the upper surface of the soil-covering box to the load required for the test to simulate the ground occupancy load on the buried pipeline. At the same time, the translation settlement plate 501 is rotated and opened to the required size for the test to simulate the soil settlement load on the buried pipeline. The settled soil is collected by the roller trolley 2. During the simulation process, the strain and sinking displacement of the buried pipeline are monitored in real time.
[0088] By changing the load applied by the hydrostatic bending moment testing machine, the pressure applied by the air compressor and the size of the opening and closing of the translational settlement plate, the influence of different factors (ground occupancy, soil subsidence, pipeline internal pressure, and pipe-soil burial depth) on the deformation and damage of buried PE pipelines was quantitatively studied. By designing corresponding orthogonal tests for different factors and using strain size as a statistic, variance analysis was used to test the significance of different factors and interactions, and the weights of the influence of different factors on the damage of buried PE pipelines were studied.
[0089] In step 2, in order to prevent soil from overflowing from the hole of the first side slide rail 305 during the test, a number of baffles are customized and inserted during the test to prevent soil from overflowing.
[0090] The present invention also provides an electronic device, comprising a processor and a memory, wherein the memory stores program code, and when the program code is executed by the processor, the processor executes the steps in the above method.
[0091] In a specific embodiment of the present invention, by simulating various loads on the buried PE pipeline and studying the deformation and damage of the pipeline under multi-factor loads, the deformation characteristics, failure forms, strain and sinking distance of the buried pipeline under multi-factor loads can be revealed. At present, there is no research on the mechanical properties and deformation and damage of the buried PE pipeline under various load conditions. This example can achieve the above objectives well, and is described in detail below with reference to the accompanying drawings.
[0092] In this embodiment, the soil-covering box 1 includes a box front plate 101, a box rear plate 102, a box left plate 103, a box right plate 104, a box bottom plate 105, a box frame 106, a box support leg 107 and a box fixed cross bar 108, all of which are made of steel structure and can ensure that the deformation and strength of the model box meet the requirements of the test model. The soil-covering box 1 can be placed on the working platform of the hydrostatic bending moment testing machine; in addition, a roller trolley 2 is provided at the bottom of the soil-covering box, and the roller trolley 2 includes a trolley front plate 201, a trolley rear plate 202, a trolley right plate 203, a trolley left plate 204, a trolley bottom plate 205, a trolley steel frame 206, a trolley roller 207, a trolley towing hook 208 and a U-shaped groove 209, all of which are made of steel structure, and its strength can ensure that it can bear enough sunken soil. The roller trolley 2 can be placed on the test machine platform track for reciprocating movement.
[0093] The two sides of the soil covering box are provided with a burial depth control screw transmission mechanism 3 for adjusting the buried depth of the buried pipeline, and the burial depth control screw transmission mechanism 3 includes a first hand wheel 301, a first screw rod 302, a detachable slider with holes 303, a first slide rail 305 and a guide shaft support 306. The burial depth of the PE pipeline is adjusted by rotating the first screw rod 302 to move the detachable slider with holes 303, and at the same time, the detachable slider with holes 303 with different apertures can be replaced to realize the test of PE pipelines of different sizes.
[0094] A displacement measuring device 4 is arranged at the bottom of the soil covering box, and the displacement measuring device 4 includes a KPC linear displacement sensor 401, a detachable bracket 402 and a bracket fixing screw hole 403; the detachable bracket 402 is fixed and disassembled by bolts and the bracket fixing screw hole 403, and the detachable bracket 402 is fixed at different heights to cooperate with measuring the sinking displacement of pipelines at different buried depths. The KPC linear displacement sensor 401 is fixed to the pipeline through a metal rolling strip, and the linear mechanical displacement generated by the pipeline is converted into an electrical signal, which is input into a computer for collection.
[0095] The bottom of the soil covering box 1 is opened and a settlement control spiral transmission mechanism 5 is installed to simulate the soil settlement under the pipeline. The settlement control spiral transmission mechanism 5 includes a translation settlement plate 501, a second hand wheel 502, a second screw 503, a second slide rail 504 and a T-shaped guide shaft support 505. The opening of the translation settlement plate 501 is controlled by rotating the second hand wheel 502, thereby changing the soil settlement degree.
[0096] The strain gauge is attached to the PE pipe to measure the strain of the pipe when it is loaded. The PE pipe strain gauge is arranged as follows: Figure 5 As shown in the figure, 7 groups of measuring surfaces are evenly arranged on the PE pipe, and each group of measuring surfaces has a measuring point arranged on the top, side and bottom of the pipe. Large strain gauges are arranged longitudinally on the measuring points, and resistance strain gauges are arranged circumferentially to measure the longitudinal and circumferential strains of the pipe.
[0097] In a specific implementation of the present invention, the process of simulating the damage and deformation of a buried polyethylene (PE) pipeline after being subjected to multiple loads by using the above-mentioned buried polyethylene (PE) pipeline multi-load combined loading device includes:
[0098] Preparation stage: The preparation stage requires the completion of strain gauge debugging and installation, strain gauge and displacement sensor signal connection, soil laying in the covering box, and buried pipeline sealing and pressurization.
[0099] Before pasting the strain gauge, it is necessary to inspect its appearance and measure its resistance. Observe whether the sensitive grid has rust defects, whether it is neatly arranged, whether the base and covering layer are damaged, and whether the leads are intact. Check whether the sensitive grid is short-circuited or open-circuited, and measure the resistance to ensure that the sensitivity coefficient is the same. Before pasting, the measuring point needs to be polished with sandpaper and wiped repeatedly with alcohol until there is no dirt on the measuring point. Large strain strain gauges and resistance strain gauges are pasted with H-716 glue and H-711 glue respectively. When pasting, a layer of polyethylene film should be covered on the strain gauge, and ensure that there are no bubbles in the pasting area. Use G-D04 glue to mechanically protect the strain gauge. After pasting, it should be left to stand for 24 hours to allow the glue to naturally cure to the maximum pasting strength. When arranging strain gauges, temperature compensation sheets should also be set to prevent data influence caused by additional deformation.
[0100] After the strain gauge is pasted, the test soil is laid in layers in the soil cover box 1, and each buried layer is manually compacted until it is buried below the required depth. The pipeline is placed in the buried depth control screw transmission mechanism 3, adjusted to the required buried depth for the test, and the signal lines of the strain gauge and KPC linear displacement sensor 401 are led out through the reserved holes in the pipeline and connected to the computer through the static stress strain test analysis system.
[0101] After the pipeline and signal line are installed, seal both ends of the buried pipeline, connect one section to the air compressor, and compress the air to the required pressure for the test. Then fill the soil in the soil cover box 1, and tamp it manually after each buried layer until it is buried to the top of the soil cover box 1.
[0102] Simulation test phase: including simulation of ground pressure on the pipeline and simulation of ground soil settlement:
[0103] The hydrostatic bending moment test machine is controlled to pressurize the upper surface of the soil cover box to the load required for the test to simulate the ground occupancy load on the buried pipeline. At the same time, the translation settlement plate 501 is rotated and opened to the required size for the test to simulate the soil settlement load on the buried pipeline. The settled soil is collected by the roller trolley 2. During the simulation process, the strain and sinking displacement of the buried pipeline are monitored in real time.
[0104] By changing the load applied by the hydrostatic bending moment tester, the pressure applied by the air compressor, and the size of the settlement plate opening and closing, the influence of different factors on the deformation and damage of buried PE pipelines can be quantitatively studied. The weight of the influence of different factors on the damage of buried PE pipelines can be studied by designing orthogonal experiments and using this test bench.
[0105] The present invention provides a buried pipeline multi-load combined loading test device and test method. There are many methods and ways to implement the technical solution. The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention. All components not specified in this embodiment can be implemented by existing technologies.
Claims
1. A multi-load combined loading test device for buried pipelines, It is characterized in that The device comprises a soil covering box (1) and test equipment; The soil covering box (1) comprises a box plate, a box frame (106), box legs (107) and a box cross bar (108); The box plate is connected to the box frame (106) by welding, the box legs (107) are fixed below the box frame (106) by M12 bolts, and the box crossbar (108) is fixed between the box legs (107) by M10 bolts; A roller trolley (2) is provided at the bottom of the soil covering box; The roller trolley (2) is used to receive the sunken soil; The soil covering box (1) is used for containing buried pipelines and soil covering them.
2. The device according to claim 1, It is characterized in that The roller trolley (2) comprises a trolley plate, a trolley steel frame (206), a trolley roller (207), a trolley towing hook (208) and a U-shaped groove (209); The trolley plate is fixed on the trolley steel frame (206) by welding, the trolley towing hook (208) is welded to the center of the left side of the trolley steel frame (206), the four corners of the trolley steel frame (206) are welded with U-shaped grooves (209), and the trolley roller 207 is connected to the U-shaped groove by a latch.
3. The device according to claim 2, It is characterized in that The two sides of the soil covering box are provided with a burial depth control screw transmission mechanism (3) for adjusting the burial depth of the buried pipeline, and the burial depth control screw transmission mechanism (3) comprises a first hand wheel (301), a first screw rod (302), a guide shaft support (306), a detachable slider with a hole (303) and a first slide rail (305); The first hand wheel (301) is connected to the first screw rod (302) via a flat key, the first screw rod (302) is connected to the guide shaft support (306) via a cylindrical pin, the guide shaft support (306) is fixed to the detachable perforated slider (303) via an M10 bolt, and the detachable perforated slider (303) is embedded in the first slide rail (305); The detachable perforated slider is moved by rotating the first screw rod (302) to adjust the buried depth of the PE pipeline, and the detachable perforated slider with different apertures is replaced to test PE pipelines of different sizes.
4. The device according to claim 3, It is characterized in that A data measuring device (4) is arranged at the bottom of the soil covering box, and the data measuring device (4) comprises a KPC linear displacement sensor (401), a large strain gauge, a resistance strain gauge, a static stress strain test and analysis system, a detachable bracket (402) and a bracket fixing screw hole (403); The detachable bracket (402) is fixed and disassembled by means of bolts and bracket fixing screw holes (403), and the detachable bracket is fixed at different heights to coordinate with measuring the sinking displacement of pipelines at different buried depths; The KPC linear displacement sensor (401) is arranged above the detachable bracket and is used to collect the sinking displacement of the pipeline; the KPC linear displacement sensor (401) is fixed to the pipeline through a metal rolling strip, and converts the linear mechanical displacement generated by the pipeline into an electrical signal, which is input into a computer for collection; The large strain gauge and the resistance strain gauge are used to collect the longitudinal strain and the circumferential strain of the pipeline respectively; The static stress strain test and analysis system converts the electrical signal collected by the strain gauge and inputs it into a computer for analysis. The large strain gauge and the resistance strain gauge are connected to the static stress strain test and analysis system through cables, and the static stress strain test and analysis system is connected to the computer through a wireless network.
5. The device according to claim 4, It is characterized in that The large strain gauge and resistance strain gauge are equidistantly pasted on the pipe top, pipe side and pipe bottom to collect strain when stress changes at different parts of the pipeline.
6. The device according to claim 5, It is characterized in that The bottom of the soil covering box 1 is opened and equipped with a settlement control spiral transmission mechanism (5) for simulating soil settlement under the pipeline; The sedimentation control screw transmission mechanism (5) comprises a translation sedimentation plate (501), a second hand wheel (502), a second screw rod (503), a second slide rail (504) and a T-shaped guide shaft support (505); The second hand wheel (502) is connected to the second screw rod (503) via a flat key; the T-shaped guide shaft support (505) is fixed to the box frame (106) and the translation settlement plate (501) via an M10 bolt; the second screw rod (503) is fixed to the T-shaped guide shaft support on the translation settlement plate (501) via an oil-free bushing; the translation settlement plate (501) is embedded in the second slide rail (504); the opening of the translation settlement plate is controlled by rotating the second hand wheel (502), thereby changing the degree of soil settlement.
7. The device according to claim 6, It is characterized in that The test equipment includes a hydrostatic bending moment test machine and an air compressor; the soil covering box can be placed on the working platform of the hydrostatic bending moment test machine; The hydrostatic bending moment tester applies a vertical load to the earth-covering box to simulate the pressure of the buried pipeline on the building line, and the air compressor applies air pressure to the closed pipeline to simulate the working pressure of the buried pipeline in actual working conditions.
8. An experimental method for a buried pipeline multi-load combined loading test device according to any one of claims 1 to 7, It is characterized in that The steps include: Step 1, preparation stage: by sticking a strain gauge on the PE pipe to measure the strain of the pipe when it is loaded, X groups of measuring surfaces are evenly arranged on the PE pipe, each group of measuring surfaces has a measuring point arranged on the pipe top, pipe side and pipe bottom, large strain gauges are arranged longitudinally on the measuring points, and resistance strain gauges are arranged circumferentially, and the large strain gauges and resistance strain gauges are debugged and installed, the large strain gauges, resistance strain gauges and KPC linear displacement sensors (401) are connected to the signals, the soil is laid in the covering box, and the buried pipe is closed and pressurized; Before pasting large strain gauges and resistance strain gauges, conduct appearance inspection and resistance measurement: observe whether the sensitive grid has rust defects, whether it is neatly arranged, whether the base and cover layer are damaged, and whether the lead is intact; check whether the sensitive grid is short-circuited or open-circuited, and measure the resistance to ensure that the sensitivity coefficient is the same; Use sandpaper to polish the measuring point, and wipe it repeatedly with alcohol until there is no dirt on the measuring point; The large strain gauge and the resistance strain gauge are respectively pasted with H-716 glue and H-711 glue. When pasting, a layer of polyethylene film is covered on the strain gauge, and it is ensured that there are no bubbles in the pasting area; G-D04 glue is used to perform mechanical protection treatment on the large strain gauge and the resistance strain gauge. After pasting, it should be left to stand for 24 hours to allow the glue to naturally solidify to the maximum pasting strength; when arranging the large strain gauge and the resistance strain gauge, a temperature compensation sheet is set to prevent the data from being affected by additional deformation; After the large strain gauge and the resistance strain gauge are pasted, the test soil is laid in layers in the soil cover box, and each buried layer is compacted until it is buried below the required depth; The pipeline is placed in the buried depth control screw transmission mechanism (5), adjusted to the buried depth required for the test, and the signal lines of the large strain gauge, the resistance strain gauge and the KPC linear displacement sensor (401) are led out through the reserved holes in the pipeline and connected to the computer through the static stress strain test analysis system; After the pipeline and signal line are installed, both ends of the buried pipeline are sealed, and one end is connected to an air compressor to compress the air to the pressure required for the test; the soil is filled into the soil covering box (1), and soil is compacted after each buried layer until it is buried to the top of the soil covering box (1); Step 2, simulation test phase: including simulation of ground pressure on the pipeline and simulation of ground soil settlement: The hydrostatic bending moment test machine is controlled to pressurize the upper surface of the soil-covering box to a load required for the test to simulate the ground pressure load on the buried pipeline, and the translational settlement plate (501) is rotated and opened to a size required for the test to simulate the soil settlement load on the buried pipeline. The settled soil is collected by a roller trolley (2); during the simulation process, the strain and settlement displacement of the buried pipeline are monitored in real time; By changing the load applied by the hydrostatic bending moment testing machine, the pressure applied by the air compressor and the size of the opening and closing of the translational settlement plate, the influence of different factors on the deformation and damage of the buried PE pipeline was quantitatively studied. By designing corresponding orthogonal experiments for different factors and using the strain size as the statistic, the significance of different factors and interactions was tested by variance analysis, and the weight of the influence of different factors on the damage of buried PE pipeline was studied.
9. The method according to claim 8, It is characterized in that In step 2, in order to prevent soil from overflowing from the hollow of the first side slide rail (305) during the test, a number of baffles are customized and inserted during the test to prevent soil from overflowing.
10. An electronic device comprising a processor and a memory, wherein the memory stores program codes, and when the program codes are executed by the processor, the processor executes the steps of the method according to any one of claims 8 to 9.