Unfavorable geology visual grouting model test system influenced by multiple factors
Through the experimental system of poor geological visual grouting model influenced by multiple factors, simulates high-temperature water-rich environment and gravel with different porosities, and collects grouting data in real time, solving the difficulty of reinforcement effect of grouting technology in the existing technology in poor geological management. The research issues provide scientific engineering practice guidance, improving the reliability of construction and the scientific nature of design.
Patent Information
- Application Number
- CN202411235825.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-06
AI Technical Summary
In the poor geological management, the existing grouting technology is difficult to study the reinforcement effect intuitively due to the complexity of the interaction between groundwater and rock and soil in poor geological management. The theory is far behind engineering practice, and the construction is difficult, and there is a lack of an effective simulation test system.
A test system for poor geological visual grouting model with multiple factors influences was designed, including a water storage tank, a heating box and a temperature control box, equipped with a servo-stable grouting unit, which can simulate high-temperature water-rich environment of 30-100℃ and different Porosity gravel collects grouting pressure, crack internal temperature and slurry diffusion data in real time.
This system realizes systematic research on poor geological grouting reinforcement, provides important engineering practice guidance, and improves the scientificity and reliability of grouting reinforcement design and implementation.
Smart Images

Figure CN119086875A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of grouting simulation experimental devices, in particular to a visual grouting model test system for unfavorable geology affected by multiple factors. Background Art
[0002] In recent years, with the improvement of the national economy, my country's urban construction has accelerated, the level of urbanization has continued to improve, and the number of urban population has increased sharply. In order to alleviate the shortage of urban land and traffic congestion, promote the development and utilization of urban underground space, and accelerate the construction of urban-rural integration. Urban subway construction can effectively alleviate traffic pressure, shorten the distance between urban and rural areas, accelerate the economic development of areas along the subway, and at the same time improve the convenience and happiness of urban residents. With the continuous network construction and speed-up of urban subways, a series of problems that are not conducive to subway construction will also be faced. The most prominent of these is that subway stations and tunnels are located in or pass through complex unfavorable geology, such as water-rich thick sand layers, water-rich broken faults, karst, etc., and the surrounding environment has increasingly stringent requirements for subway construction. The requirements for subway construction are getting higher and higher, and the construction difficulty is getting greater and greater.
[0003] Grouting technology has strong adaptability and has become the most important technical means for treating poor geology. Grouting equipment is used to inject slurry into poor geology to fill sand layers, broken zones or caves, improve the bonding strength between rock and soil bodies, improve the mechanical properties of rock and soil bodies, and improve overall stability; at the same time, slurry filling cracks and voids (pores) can block the hydraulic connection between rock and soil bodies, improve their anti-seepage properties, and reduce the risk of geological disasters during engineering construction. In actual engineering, because the grouting treatment of poor geology is affected by the interaction between groundwater and rock and soil bodies, the factors affecting the reinforcement effect are complex and changeable, and grouting treatment is a hidden project, it is impossible to intuitively study the mechanism of grouting reinforcement and anti-seepage, resulting in the implementation of grouting technology mainly relying on engineering experience, and the grouting reinforcement theory lags far behind engineering practice.
[0004] This application proposes a multi-factor influenced poor geological visualization grouting model test system, which can study the effect of poor geological grouting reinforcement and anti-seepage under different factors. At the same time, through simulation experiments, the mechanism of poor geological grouting reinforcement can be comprehensively and systematically studied, which has important engineering practical significance for guiding the design and implementation of poor geological grouting reinforcement. Summary of the invention
[0005] In view of the deficiencies of the prior art, the present invention provides a multi-factor influenced unfavorable geological visualization grouting model test system.
[0006] To achieve the above-mentioned purpose, the present invention provides a poor geological visualization grouting model test system affected by multiple factors, including a water storage tank, a heating box and a temperature control box, a model box is arranged in the temperature control box, and a servo voltage-stabilizing grouting unit is connected to the model box; the water storage tank and the heating box are connected through a first water pipe, the heating box and the temperature control box are connected through a second water pipe and a third water pipe, and the heating box and the model box are connected through a fourth water pipe.
[0007] Preferably, the water storage tank is connected to valve one, and one side of the valve one is connected to the high-pressure water pump; one side of the heating box is connected to valve two, and the other side of the heating box is connected to valve three, valve four and valve five, one side of the temperature control box is connected to valve six and valve seven, one side of the model box is connected to valve eight, the side of the model box is connected to valve nine, the other side of the model box is connected to valve ten, and valve ten is connected to a waste liquid pipe.
[0008] Preferably, the two ends of the first water pipe are respectively connected to the high-pressure water pump and the valve two, the two ends of the second water pipe are respectively connected to the valve three and the valve six, the two ends of the third water pipe are respectively connected to the valve five and the valve seven, the two ends of the fourth water pipe are respectively connected to the valve four and the valve eight, and the fourth water pipe is provided with a pressure gauge one and two digital flow meters.
[0009] Preferably, an insulation board is provided at the inner bottom end of the temperature control box, an infrared reflective film is provided on the insulation board, a circulation pipe is provided on the infrared reflective film, and both ends of the circulation pipe are respectively connected with the valve six and the valve seven; a placement rack is provided in the gap of the circulation pipe, and the model box is provided above the placement rack.
[0010] Preferably, the model box includes a box body and a glass top plate, one end of the glass top plate is connected to the model box by a hinge, and the other end of the glass top plate is provided with a fixed switch one; a rubber strip is fixedly provided below the glass top plate, two baffles are provided in the box body, and crushed sand and gravel are provided in the box body; a grouting hole is provided on the side of the box body, the grouting hole is communicated with the valve nine, and stress sensors are provided on both sides of the grouting hole.
[0011] Preferably, the servo pressure-stabilizing grouting unit includes an air pump, an air outlet of the air pump is connected to one end of a filter, the other end of the filter is connected to one end of a pressure reducing valve, the other end of the pressure reducing valve is connected to interface 1 on three-way valve 1 through a fifth water pipe, interface 2 and interface 3 of the three-way valve 1 are respectively connected to one end of pressure pipe 1 and pressure pipe 2, and the other ends of pressure pipe 2 and pressure pipe 1 are respectively connected to an external valve 1 of two slurry storage tanks.
[0012] Preferably, the external valve 2 of the two slurry storage tanks is respectively connected to one end of slurry pipe 1 and slurry pipe 2, the other ends of slurry pipe 2 and slurry pipe 1 are respectively connected to interface 1 and interface 2 of three-way valve 2, interface 3 of three-way valve 2 is connected to one end of slurry pipe 3, the other end of slurry pipe 3 is connected to valve 10, and pressure gauge 2 is provided on slurry pipe 3.
[0013] Preferably, the slurry storage tank comprises a tank body and a storage top plate, one end of the storage top plate is connected to the tank body via a hinge, and the other end of the storage top plate is provided with a fixed switch 2; a pressure gauge and a safety valve are provided on the storage top plate.
[0014] Preferably, the external valve 1 is arranged at a middle position of the storage top plate, and the external valve 2 is arranged below the tank body.
[0015] Preferably, a camera is provided on one side of the temperature control box.
[0016] Therefore, the present invention adopts the multi-factor influenced unfavorable geological visualization grouting model test system of the above structure, which can realize the real simulation of 30-100°C high temperature and water-rich environment, sand and gravel with different porosities, and the real-time collection and capture of grouting pressure, internal temperature data of cracks, and diffusion traces of quick-setting slurry, which has important engineering practical significance for guiding the design and implementation of unfavorable geological grouting reinforcement.
[0017] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of an embodiment of the unfavorable geological visualization grouting model test system under the influence of multiple factors of the present invention;
[0019] Figure 2 It is a schematic diagram of the connection structure of the water storage tank and the heating box of the unfavorable geological visualization grouting model test system under multiple factors of influence of the present invention;
[0020] Figure 3 It is a structural schematic diagram of a servo-pressure-stabilized grouting unit of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0021] Figure 4 It is a structural schematic diagram of a temperature control box of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0022] Figure 5 It is a structural schematic diagram of a circulation pipe of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0023] Figure 6It is a structural schematic diagram of a placement frame of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0024] Figure 7 It is a structural schematic diagram of a model box of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0025] Figure 8 A side view of a model box of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0026] Fig. 9 A top view of a model box of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0027] Fig.10 It is a structural schematic diagram of a slurry storage tank of a multi-factor-influenced unfavorable geological visualization grouting model test system of the present invention;
[0028] Figure numerals: 1, water storage tank; 2, heating box; 3, temperature control box; 4, model box; 5, first water pipe; 6, second water pipe; 7, third water pipe; 8, fourth water pipe; 9, valve one; 10, valve two; 11, valve three; 12, valve four; 13, valve five; 14, valve six; 15, valve seven; 16, valve eight; 17, valve nine; 18, valve ten; 19, waste liquid pipe; 20, insulation board; 21, infrared reflective film; 22, circulation pipe; 23, placement rack; 24, glass top plate; 25, hinge; 26, fixed switch one; 27, rubber strip; 28, baffle; 29, crushed sand Stone; 30, grouting hole; 31, air pump; 32, filter; 33, pressure reducing valve; 34, fifth water pipe; 35, three-way valve one; 36, pressure pipe one; 37, pressure pipe two; 38, slurry storage tank; 39, external valve one; 40, external valve two; 41, slurry pipe one; 42, slurry pipe two; 43, three-way valve two; 44, slurry pipe three; 45, pressure gauge one; 46, tank body; 47, storage top plate; 48, fixed switch two; 49, pressure gauge; 50, safety valve; 51, camera; 52, high-pressure water pump; 53, pressure gauge two; 54, digital flowmeter; 55, stress sensor. DETAILED DESCRIPTION
[0029] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.
[0030] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0031] Example
[0032] See also Figure 1-10 The present invention provides a multi-factor-influenced unfavorable geological visualization grouting model test system, including a water storage tank 1 providing an original water source, a heating box 2 with adjustable temperature, and a temperature control box 3, a model box 4 is arranged in the temperature control box 3, and a servo-stability grouting unit is connected to the model box 4; the water storage tank 1 and the heating box 2 are connected through a first water pipe 5, the heating box 2 and the temperature control box 3 are connected through a second water pipe 6 and a third water pipe 7, and the heating box 2 and the model box 4 are connected through a fourth water pipe 8. A camera 51 is arranged on one side of the temperature control box 3 for shooting the slurry diffusion process.
[0033] The water storage tank 1 is connected to a valve 9, and one side of the valve 9 is connected to a high-pressure water pump 52; one side of the heating box 2 is connected to a valve 2 10, and the other side of the heating box 2 is connected to valves 3 11, 4 12 and 5 13, one side of the temperature control box 3 is connected to valves 6 14 and 7 15, one side of the model box 4 is connected to valve 8 16, the side of the model box 4 is connected to valve 9 17, and the other side of the model box 4 is connected to valve 18, and the valve 18 is connected to a waste liquid pipe 19 for collecting and discharging waste water to verify the water blocking rate of the material.
[0034] The two ends of the first water pipe 5 are connected to the high-pressure water pump 52 and the second valve 10, respectively. The two ends of the second water pipe 6 are connected to the third valve 11 and the sixth valve 14, respectively. The two ends of the third water pipe 7 are connected to the fifth valve 13 and the seventh valve 15, respectively. The two ends of the fourth water pipe 8 are connected to the fourth valve 12 and the eighth valve 16, respectively. The eighth valve 16 provides a dynamic water environment with adjustable temperature, water volume and water pressure for the model box 4. The fourth water pipe 8 is provided with a second pressure gauge 53 and two digital flow meters 54.
[0035] The inner bottom of the temperature control box 3 is fixedly provided with a heat preservation board 20, an infrared reflection film 21 is provided on the heat preservation board 20, a circulation pipe 22 is provided on the infrared reflection film 21, and the circulation pipe 22 is fixed on the heat preservation board 20 by a plastic clip. The two ends of the circulation pipe 22 are respectively connected to the valve 6 14 and the valve 7 15. The structure of the circulation pipe 22 is as follows: Figure 5 A placement rack 23 is provided in the gap of the circulation pipe 22. The placement rack 23 is a steel frame. The structure is as shown in FIG. Figure 6 As shown, a model box 4 is arranged above the placement rack 23 .
[0036] The model box 4 includes a box body and a glass top plate 24, and the glass top plate 24 is made of organic glass. One end of the glass top plate 24 is connected to the model box 4 by a hinge 25, and the other end of the glass top plate 24 is provided with a fixed switch 26, and the fixed switch 26 is provided to facilitate the opening and closing of the glass top plate 24. A rubber strip 27 is fixedly provided below the glass top plate 24, and the rubber strip 27 is used to simulate the water-conducting cracks in the tunnel. Two baffles 28 are provided in the box body to ensure the integrity of the filled crushed sand and gravel 29 part and the state of the water flow, and the crack opening can be approximately adjusted by adjusting the size of the baffle 28. Crushed sand and gravel 29 is provided in the box body, and the crushed sand and gravel 29 is used to simulate the stratum.
[0037] A grouting hole 30 is provided on the side of the box body, and the grouting hole 30 is connected to the valve nine 17. Stress sensors 55 are provided on both sides of the grouting hole 30. There are multiple stress sensors 55, which are arranged at the bottom and top of the corresponding positions of the model box 4 to monitor the relevant data in the model box 4. According to the type of parameters collected by the sensor, the sensors in the present invention include but are not limited to flow sensors and pressure sensors, which are specifically determined according to the type of parameters of the fluid that needs to be collected. The measurement range of the flow sensor is 0-500μL / min, and the measurement accuracy of the flow is above 0.5μL / min. The measurement range of the pressure sensor is 0-500kPa, and the measurement accuracy of the pressure sensor is above 0.5kPa.
[0038] The servo pressure-stabilizing grouting unit includes an air pump 31, the air outlet of the air pump 31 is connected to one end of a filter 32, the filter 32 ensures that the gas is dry, and the other end of the filter 32 is connected to one end of a pressure reducing valve 33, and the pressure reducing valve 33 ensures that the pressure is stable. The other end of the pressure reducing valve 33 is connected to the interface 1 on the three-way valve 1 35 through the fifth water pipe 34, and the interface 2 and the interface 3 of the three-way valve 1 35 are respectively connected to one end of the pressure delivery pipe 1 36 and the pressure delivery pipe 2 37, and the other ends of the pressure delivery pipe 2 37 and the pressure delivery pipe 1 36 are respectively connected to the external valve 1 39 of the two slurry storage tanks 38.
[0039] The external valve 2 40 of the two slurry storage tanks 38 is connected to one end of the slurry pipe 1 41 and the slurry pipe 2 42 respectively, and the other ends of the slurry pipe 2 42 and the slurry pipe 1 41 are respectively connected to the interface 1 and the interface 2 of the three-way valve 2 43, and the interface 3 of the three-way valve 2 43 is connected to one end of the slurry pipe 3 44. The slurry pipe 3 44 is set in the hot water of the temperature control box 3, and the other end of the slurry pipe 3 44 is connected to the valve 18 to provide the model box 4 with slurry with adjustable grouting pressure. The slurry pipe 3 44 is provided with a pressure gauge 1 45. The slurry pipe 1 41, the slurry pipe 2 42 and the slurry pipe 3 44 are all provided with a digital flow meter 54.
[0040] The slurry storage tank 38 includes a tank body 46 and a storage top plate 47, and the bottom plate and the side plate of the tank body 46 are welded together. One end of the storage top plate 47 is connected to the tank body 46 by a hinge 25, and the other end of the storage top plate 47 is provided with a fixed switch 2 48, which is convenient for opening and closing the storage top plate 47. A silicone pad is provided at the contact point between the storage top plate 47 and the tank body 46 to ensure the airtightness of the structure. A pressure gauge 49 and a safety valve 50 are provided on the storage top plate 47.
[0041] The external valve 1 39 is arranged at the middle position of the storage top plate 47, and the external valve 1 39 is the pulp inlet. The external valve 2 40 is arranged below the tank body 46, and the external valve 2 40 is the pulp outlet.
[0042] The specific operation steps of the present invention are as follows:
[0043] The first step, such as Fig. 9 As shown, stress sensors 55 are arranged at corresponding positions. The internal porosity of the model box 4 is controlled by the particle size distribution of the gravel to simulate the geology. Before laying the gravel, a layer of transparent rubber soft board is arranged inside the model box 4, and a layer of waste oil is brushed to facilitate the replacement of the stratum and demolding. The diffusion of slurry in the stratum cracks is simulated by the arrangement of transparent rubber strips 27. After the interior of the model box 4 is completed, the glass top plate 24 is fixed, the placement rack 23 is placed between the circulation pipe gaps of the temperature control box 3, and the model box 4 is placed on the placement rack 23.
[0044] The second step is to add enough water to the water storage tank 1, open valve one 9, high-pressure water pump 52 and valve two 10, so that the water in the water storage tank 1 enters the heating box 2, and at the same time add enough water to the temperature control box 3 to make the water level exceed the top surface of the model box 4. After using a temperature gun to measure the water temperature to reach 90 degrees Celsius, open valve three 11, valve five 13, valve six 14 and valve seven 15 to circulate 90 degrees Celsius hot water in the circulation pipe 22. The circulation pipe 22 transfers heat to the hot water in the temperature control box 3, so that the water temperature in the temperature control box 3 reaches 90 degrees Celsius.
[0045] The third step is to configure the slurry according to the ratio, and add the cement-based slurry to two slurry storage tanks 38, which can play the role of a pressure stabilizing unit to ensure the continuity and stability of slurry injection. If the cement-based slurry contains a relatively high content of admixtures or the slurry has a requirement for rapid setting, for example, the cement slurry is placed in one slurry storage tank 38, and the admixtures such as accelerators, water reducers, etc. are placed in another slurry storage tank 38; for example, for acrylate slurry, A and B liquids are placed in two slurry storage tanks 38 respectively; for example, for cement-water glass slurry, the cement slurry and water glass slurry can be placed in two slurry storage tanks 38 respectively. The ratio is controlled by controlling the opening of the external valve 2 40 and the digital flowmeter 54. After the slurry is added to the slurry storage tank 38, the air pump 31 is turned on, and the pressure gas passes through the filter 32, the pressure reducing valve 33, and the pressure pipe 34. After passing through the three-way valve 1 35, it is diverted to the pressure pipe 1 36 and the pressure pipe 2 37 and then enters the two slurry storage tanks 38. After the pressurized gas enters the slurry storage tank 38, the slurry is pressed into the slurry pipe 1 41 and the slurry pipe 2 42. The slurry enters the three-way valve 2 43 through the slurry pipe 1 41 and the slurry pipe 2 42, and then enters the slurry pipe 3 44 after mixing. A part of the slurry pipe 3 44 is placed in the hot water of the temperature control box 3, which can approximately simulate the transportation of the actual grouting pipe under high ground temperature. The slurry enters the model box 4 through the slurry pipe 3 44, the valve 18, and the pressure gauge 1 45. The grouting pressure is controlled by the pressure reducing valve 33 and the valve 18. The grouting end standard is adjusted according to the specific experimental plan, and can be set to a fixed grouting amount. The grouting ends when the slurry is used up. It can also be used when the slurry retention surface is a certain fixed value (based on the specific test slurry performance), or a fixed water blocking rate is used as the standard.
[0046] The fourth step is to monitor the slurry diffusion pattern and pressure sensor data on the side of the model box 4 and the glass top plate 24 to obtain the maximum diffusion radius, pressure change curve, and the position of the slurry retention surface relative to the top cover plate (the retention rate of the slurry under sudden water conditions can be compared). After the slurry solidifies, drill holes to measure the strength and the strength of the samples maintained under actual hydrological conditions during on-site construction.
[0047] The fifth step is to turn off the air pump 31, turn off the switch and valve of the heating box 2, clean the slurry in the grouting module, release the water in the temperature control box 3 after the water temperature returns to room temperature, take out the model box 4, open the glass top plate 24 to take samples, and clean the model box 4.
[0048] Therefore, the present invention adopts the multi-factor influenced unfavorable geological visualization grouting model test system of the above structure, which can realize the real simulation of 30-100°C high temperature water-rich environment and gravel with different porosities, as well as the real-time collection and capture of grouting pressure, grouting flow, dynamic water flow, formation internal and water-conducting fracture pressure data, fracture internal temperature data, and rapid setting slurry diffusion trace, which has important engineering practical significance for guiding the design and implementation of unfavorable geological grouting reinforcement.
[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. The unfavorable geological visualization grouting model test system with multiple factors, characterized by: It includes a water storage tank, a heating box and a temperature control box. A model box is arranged in the temperature control box, and a servo pressure-stabilizing grouting unit is connected to the model box. The water storage tank and the heating box are connected through a first water pipe, the heating box and the temperature control box are connected through a second water pipe and a third water pipe, and the heating box and the model box are connected through a fourth water pipe.
2. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 1 is characterized by: The water storage tank is connected to valve one, and one side of the valve one is connected to a high-pressure water pump; one side of the heating box is connected to valve two, and the other side of the heating box is connected to valve three, valve four and valve five, one side of the temperature control box is connected to valve six and valve seven, one side of the model box is connected to valve eight, the side of the model box is connected to valve nine, the other side of the model box is connected to valve ten, and valve ten is connected to a waste liquid pipe.
3. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 2 is characterized by: The two ends of the first water pipe are respectively connected to the high-pressure water pump and the valve two, the two ends of the second water pipe are respectively connected to the valve three and the valve six, the two ends of the third water pipe are respectively connected to the valve five and the valve seven, the two ends of the fourth water pipe are respectively connected to the valve four and the valve eight, and the fourth water pipe is provided with a pressure gauge one and two digital flow meters.
4. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 3 is characterized by: An insulation board is arranged at the inner bottom end of the temperature control box, an infrared reflective film is arranged on the insulation board, a circulation pipe is arranged on the infrared reflective film, and both ends of the circulation pipe are respectively connected with the valve six and the valve seven; a placement rack is arranged in the gap of the circulation pipe, and the model box is arranged above the placement rack.
5. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 4 is characterized by: The model box includes a box body and a glass top plate, one end of the glass top plate is connected to the model box by a hinge, and the other end of the glass top plate is provided with a fixed switch; a rubber strip is fixedly provided below the glass top plate, two baffles are provided in the box body, and crushed sand and gravel are provided in the box body; a grouting hole is provided on the side of the box body, the grouting hole is communicated with the valve nine, and stress sensors are provided on both sides of the grouting hole.
6. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 5 is characterized by: The servo pressure-stabilizing grouting unit includes an air pump, the air outlet of the air pump is connected to one end of the filter, the other end of the filter is connected to one end of the pressure reducing valve, the other end of the pressure reducing valve is connected to interface 1 on three-way valve 1 through a fifth water pipe, interface 2 and interface 3 of the three-way valve 1 are respectively connected to one end of pressure pipe 1 and pressure pipe 2, and the other ends of pressure pipe 2 and pressure pipe 1 are respectively connected to an external valve 1 of two slurry storage tanks.
7. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 6 is characterized by: The external valve 2 of the two slurry storage tanks is respectively connected to one end of slurry pipe 1 and slurry pipe 2, and the other ends of slurry pipe 2 and slurry pipe 1 are respectively connected to interface 1 and interface 2 of three-way valve 2, interface 3 of three-way valve 2 is connected to one end of slurry pipe 3, and the other end of slurry pipe 3 is connected to valve 10, and pressure gauge 2 is arranged on slurry pipe 3.
8. The multi-factor-influenced unfavorable geological visualized grouting model test system according to claim 7 is characterized by: The slurry storage tank includes a tank body and a storage top plate, one end of the storage top plate is connected to the tank body via a hinge, and the other end of the storage top plate is provided with a fixed switch 2; a pressure gauge and a safety valve are provided on the storage top plate.
9. The multi-factor-influenced unfavorable geological visualized grouting model test system according to claim 8, characterized in that: The external valve 1 is arranged at the middle position of the storage top plate, and the external valve 2 is arranged below the tank body.
10. The multi-factor-influenced unfavorable geological visualization grouting model test system according to claim 9, characterized in that: A camera is arranged on one side of the temperature control box.
Citation Information
Patent Citations
Visualized crack grouting test device and method for simulating multiple main control variables
CN109342275A
High-temperature water-rich fractured rock mass grouting simulation test system and method
CN117825232A
High-temperature water-rich filling crack grouting simulation test system and method
CN117825233A
Rock grouting test device based on multi-field coupling
CN218297942U
Visual variable-opening constant-pressure mining overlying strata fracture simulation grouting experiment device
CN218546449U
