Method and device for constructing industrial internet platform in hydropower industry and storage medium

By building an industrial Internet platform in the hydropower industry, using data collection, storage and machine learning, the problems of difficult-to-discover data delays and failures in hydropower station operations are solved, real-time monitoring and rapid response are achieved, operation and maintenance efficiency and security are improved, and the An open ecosystem that adapts to modern needs.

CN119089131APending Publication Date: 2024-12-06CHINA YANGTZE POWER
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411033147.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Hydropower station operation and management rely on traditional technology and a large number of manual operations, resulting in problems such as data delays, difficulty in discovering faults, waste of resources and delayed safety responses, and it is difficult to adapt to modern operation and maintenance needs.

Method used

Build an industrial Internet platform in the hydropower industry, establish data sharing channels and knowledge bases through data collection, storage, integration, mining and machine learning, provide intelligent early warning, fault diagnosis and decision-making support, and form a device-centered information physical fusion system.

Benefits of technology

Real-time data monitoring and analysis are realized, and the fault response is quickly responded to, which improves equipment maintenance efficiency and safety, reduces resource waste, and forms an open ecosystem that meets the needs of modern operation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089131A_ABST
    Figure CN119089131A_ABST
Patent Text Reader

Abstract

The invention discloses a hydropower industry industrial internet platform construction method and device and a storage medium. The method comprises the steps of collecting, transmitting and storing data, integrating and cleaning the data, and constructing a database for different equipment objects; establishing an equipment data mart; carrying out hydropower data mining, and carrying out deep exploration and analysis on the data; extracting corresponding rules, cases, FTA configuration and FMEA configuration according to water and electricity knowledge, constructing various water and electricity knowledge bases, and summarizing the water and electricity knowledge bases into models to serve as learning samples of the platform; and visual development is carried out, so that multi-power-plant collaborative deployment and application are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent hydropower industrial Internet, and in particular to a method, device and storage medium for constructing an industrial Internet platform for the hydropower industry. Background Art

[0002] As an important component of renewable energy, the operation and management of hydropower stations involve a series of complex and sophisticated processes. However, they have long relied on traditional technologies and a large amount of manual operations, which makes it difficult to adapt to the needs of modern hydropower operation and maintenance.

[0003] In terms of daily inspection and monitoring, the current model is that personnel regularly inspect a large number of equipment such as generators, turbines, and speed regulators, and rely on limited automated monitoring in the central control room. This approach has problems such as data delays, difficulty in finding local faults, and fixed maintenance cycles, which may lead to excessive wear of equipment, missing of effective information, or sudden failures.

[0004] In terms of water resource management, traditional water resource management methods focus on experience-based judgment and lack data-driven prediction and optimization strategies, which can easily lead to waste of resources or impact on downstream ecology.

[0005] In the daily work of hydropower stations, the most important thing is to ensure safe production. However, in terms of safety and emergency response, the existing safety warning system is implemented by manual inspections and partial equipment automation, which is prone to response delays, inaccurate judgments, and missed faults, which may lead to serious production safety accidents.

[0006] Therefore, based on the needs of the hydropower business, it is necessary to build a platform that can effectively solve the above problems. Summary of the invention

[0007] The present invention provides a method, device and storage medium for constructing an industrial Internet platform for the hydropower industry.

[0008] In a first aspect, the present invention provides a method for constructing an industrial Internet platform for the hydropower industry, the method comprising: Collect, transmit and store data, integrate and clean data to form a data management directory; based on the directory, extract data and build a database for different equipment objects; combine different application scenarios to establish data sharing channels, build equipment data marts, and provide data panoramic services; Conduct hydropower data mining, conduct in-depth exploration and analysis of data; determine the configuration of hydropower indicators and build an indicator library; and use machine learning to predict early warning information and disposal plans to quickly respond to various situations; Based on hydropower knowledge, extract corresponding rules, cases, FTA configurations, and FMEA configurations, build various hydropower knowledge bases, and summarize them into models as learning samples for the platform; Conduct visual development to facilitate collaborative application deployment in multiple power plants.

[0009] Furthermore, the construction of various hydropower knowledge bases includes: Collect and organize expert experience, historical cases, and fault diagnosis experience and knowledge.

[0010] Furthermore, the method comprises: By implementing equipment object construction, indicator configuration, rule configuration, model development, model configuration, visualization configuration, visualization statements, and visualization reports, effective monitoring information viewing, comparative analysis, operating condition analysis, trend analysis, defect analysis, and status evaluation can be carried out in terms of status perception.

[0011] Furthermore, the method comprises: Through device object construction, rule configuration, health sample library, model development, model configuration, and visualization configuration, fixed threshold alarms, linkage alarms, multivariable alarms, dynamic threshold alarms, and correlation alarms are provided for intelligent early warning.

[0012] Furthermore, the method comprises: By setting fault case configuration, indicator configuration, rule configuration, FMEA configuration, FTA configuration, model development and model configuration, fault diagnosis provides fault case library reasoning, FTA reasoning, rule reasoning, diagnostic model reasoning and diagnostic fusion decision-making.

[0013] Furthermore, the method comprises: Through indicator configuration, rule configuration, model development, model configuration, visualization configuration, and visualization reports, real-time decision-making, accident decision-making, maintenance registration, and maintenance planning are provided in intelligent decision-making.

[0014] Furthermore, the method comprises: The platform is built by integrating cloud computing platform, data middle platform, business middle platform, data analysis development, visualization application development, application cloud management and control, and cloud portal.

[0015] In a second aspect, the present invention provides a device for constructing an industrial Internet platform for the hydropower industry, the device comprising: The data processing module is used to collect, transmit and store data, integrate and clean data, and form a data management directory; based on the directory, extract data and build a database for different equipment objects; combine different application scenarios to establish data sharing channels, build equipment data marts, and provide data panoramic services; The data mining module is used to: conduct hydropower data mining, conduct in-depth exploration and analysis of data; determine the configuration of hydropower indicators and build an indicator library; and use machine learning to predict early warning information and disposal plans, and respond quickly to various situations; The knowledge base construction module is used to: extract corresponding rules, cases, FTA configurations, and FMEA configurations based on hydropower knowledge, build various hydropower knowledge bases, and summarize them into models as learning samples for the platform; Visual development module, used for: visual development to facilitate collaborative deployment of applications in multiple power plants.

[0016] In a third aspect, the present invention provides a device for constructing an industrial Internet platform for the hydropower industry, the device comprising: Memory, used to store programs; The processor is used to execute the program stored in the memory. When the program stored in the memory is executed, the processor is used to execute the above method.

[0017] In a fourth aspect, the present invention provides a storage medium storing computer-readable instructions, which, when executed by one or more processors, causes the one or more processors to execute the above method.

[0018] Compared with the prior art, the present invention has the following advantages: The industrial Internet platform constructed for the hydropower industry starts from the hydropower operation and maintenance needs of "state perception, intelligent early warning, fault diagnosis, and intelligent decision-making", and is able to develop functional components that meet the needs, forming an open ecosystem that is equipment-centric, information-physical, integrated and shared, and real-time intelligent. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A schematic diagram of a method for constructing an industrial Internet platform for the hydropower industry provided by an embodiment of the present invention; Figure 2 A schematic diagram of the composition of a device for building an industrial Internet platform for the hydropower industry provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0021] Explanation of terms involved in the embodiments of the present invention: A data catalog, also called a data resource catalog, generally refers to a data catalog formed by collecting metadata from related data sources (business system databases, data warehouses, data lakes, etc.) through metadata management tools.

[0022] The Fault Tree Analysis (FTA) method originated from fault tree analysis and is one of the important analysis methods in safety system engineering.

[0023] Failure Modes Analysis (FMA) is a formal, structured process used to analyze failure mode data from current and past processes to prevent those failure modes from occurring in the future.

[0024] Figure 1 A schematic diagram of a method for constructing an industrial Internet platform for the hydropower industry provided by an embodiment of the present invention, the method comprising: Collect, transmit and store data, integrate and clean data to form a data management directory; based on the directory, extract data and build a database for different equipment objects; combine different application scenarios to establish data sharing channels, build equipment data marts, and provide data panoramic services; Conduct hydropower data mining, conduct in-depth exploration and analysis of data; determine the configuration of hydropower indicators and build an indicator library; and use machine learning to predict early warning information and disposal plans to quickly respond to various situations; Based on hydropower knowledge, extract corresponding rules, cases, FTA configurations, and FMEA configurations, build various hydropower knowledge bases, and summarize them into models as learning samples for the platform; Conduct visual development to facilitate collaborative application deployment in multiple power plants.

[0025] In one embodiment, the construction of various hydropower knowledge bases includes: Collect and organize expert experience, historical cases, and fault diagnosis experience and knowledge.

[0026] In one embodiment, the method comprises: By implementing equipment object construction, indicator configuration, rule configuration, model development, model configuration, visualization configuration, visualization statements, and visualization reports, effective monitoring information viewing, comparative analysis, operating condition analysis, trend analysis, defect analysis, and status evaluation can be carried out in terms of status perception.

[0027] In one embodiment, the method comprises: Through device object construction, rule configuration, health sample library, model development, model configuration, and visualization configuration, fixed threshold alarms, linkage alarms, multivariable alarms, dynamic threshold alarms, and correlation alarms are provided for intelligent early warning.

[0028] In one embodiment, the method comprises: By setting fault case configuration, indicator configuration, rule configuration, FMEA configuration, FTA configuration, model development and model configuration, fault diagnosis provides fault case library reasoning, FTA reasoning, rule reasoning, diagnostic model reasoning and diagnostic fusion decision-making.

[0029] In one embodiment, the method comprises: Through indicator configuration, rule configuration, model development, model configuration, visualization configuration, and visualization reports, real-time decision-making, accident decision-making, maintenance registration, and maintenance planning are provided in intelligent decision-making.

[0030] In one embodiment, the method comprises: The platform is built by integrating cloud computing platform, data middle platform, business middle platform, data analysis development, visualization application development, application cloud management and control, and cloud portal.

[0031] Figure 2 A schematic diagram of a device for constructing an industrial Internet platform for the hydropower industry provided in an embodiment of the present invention; the device comprises: The data processing module is used to collect, transmit and store data, integrate and clean data, and form a data management directory; based on the directory, extract data and build a database for different equipment objects; combine different application scenarios to establish data sharing channels, build equipment data marts, and provide data panoramic services; The data mining module is used to: conduct hydropower data mining, conduct in-depth exploration and analysis of data; determine the configuration of hydropower indicators and build an indicator library; and use machine learning to predict early warning information and disposal plans, and respond quickly to various situations; The knowledge base construction module is used to: extract corresponding rules, cases, FTA configurations, and FMEA configurations based on hydropower knowledge, build various hydropower knowledge bases, and summarize them into models as learning samples for the platform; Visual development module, used for: visual development to facilitate collaborative deployment of applications in multiple power plants.

[0032] An embodiment of the present invention provides a device for constructing an industrial Internet platform for the hydropower industry, the device comprising: Memory, used to store programs; The processor is used to execute the program stored in the memory. When the program stored in the memory is executed, the processor is used to execute the above method.

[0033] In addition, an embodiment of the present invention provides a storage medium storing computer-readable instructions, and when the computer-readable instructions are executed by one or more processors, the one or more processors execute the above method.

[0034] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for constructing an industrial Internet platform for the hydropower industry, characterized in that: The method comprises: Collect, transmit and store data, integrate and clean data to form a data management directory; based on the directory, extract data and build a database for different equipment objects; combine different application scenarios to establish data sharing channels, build equipment data marts, and provide data panoramic services; Conduct hydropower data mining, conduct in-depth exploration and analysis of data; determine the configuration of hydropower indicators and build an indicator library; and use machine learning to predict early warning information and disposal plans to quickly respond to various situations; Based on hydropower knowledge, extract corresponding rules, cases, FTA configurations, and FMEA configurations, build various hydropower knowledge bases, and summarize them into models as learning samples for the platform; Conduct visual development to facilitate collaborative application deployment in multiple power plants.

2. The method for constructing an industrial Internet platform for the hydropower industry according to claim 1, characterized in that: The construction of various hydropower knowledge bases includes: Collect and organize expert experience, historical cases, and fault diagnosis experience and knowledge.

3. The method for constructing an industrial Internet platform for the hydropower industry according to claim 1, characterized in that: The method comprises: By implementing equipment object construction, indicator configuration, rule configuration, model development, model configuration, visualization configuration, visualization statements, and visualization reports, effective monitoring information viewing, comparative analysis, operating condition analysis, trend analysis, defect analysis, and status evaluation can be carried out in terms of status perception.

4. The method for constructing an industrial Internet platform for the hydropower industry according to claim 1, characterized in that: The method comprises: Through device object construction, rule configuration, health sample library, model development, model configuration, and visualization configuration, fixed threshold alarms, linkage alarms, multivariable alarms, dynamic threshold alarms, and correlation alarms are provided for intelligent early warning.

5. The method for constructing an industrial Internet platform for the hydropower industry according to claim 1, characterized in that: The method comprises: By setting fault case configuration, indicator configuration, rule configuration, FMEA configuration, FTA configuration, model development and model configuration, fault diagnosis provides fault case library reasoning, FTA reasoning, rule reasoning, diagnostic model reasoning and diagnostic fusion decision-making.

6. The method for constructing an industrial Internet platform for the hydropower industry according to claim 1, characterized in that: The method comprises: Through indicator configuration, rule configuration, model development, model configuration, visualization configuration, and visualization reports, real-time decision-making, accident decision-making, maintenance registration, and maintenance planning are provided in intelligent decision-making.

7. The method for constructing an industrial Internet platform for the hydropower industry according to claim 1, characterized in that: The method comprises: The platform is built by integrating cloud computing platform, data middle platform, business middle platform, data analysis development, visualization application development, application cloud management and control, and cloud portal.

8. A device for constructing an industrial Internet platform for the hydropower industry, characterized in that: The device comprises: The data processing module is used to collect, transmit and store data, integrate and clean data, and form a data management directory; based on the directory, extract data and build a database for different equipment objects; combine different application scenarios to establish data sharing channels, build equipment data marts, and provide data panoramic services; The data mining module is used to: conduct hydropower data mining, conduct in-depth exploration and analysis of data; determine the configuration of hydropower indicators and build an indicator library; and use machine learning to predict early warning information and disposal plans, and respond quickly to various situations; The knowledge base construction module is used to: extract corresponding rules, cases, FTA configurations, and FMEA configurations based on hydropower knowledge, build various hydropower knowledge bases, and summarize them into models as learning samples for the platform; Visual development module, used for: visual development to facilitate collaborative deployment of applications in multiple power plants.

9. A device for constructing an industrial Internet platform for the hydropower industry, characterized in that: The device comprises: Memory, used to store programs; A processor, configured to execute the program stored in the memory; when the program stored in the memory is executed, the processor is configured to execute the steps of the method as claimed in any one of claims 1 to 7.

10. A storage medium storing computer-readable instructions, wherein when the computer-readable instructions are executed by one or more processors, the one or more processors are caused to perform the steps of the method according to any one of claims 1 to 7.

Citation Information

Cited By

  • Hydropower station GIL equipment insulation state detection and evaluation method based on industrial internet platform

    CN120370108A