Mine card scheduling method, device and equipment based on proportional ore blending and medium
Through the mine card scheduling method based on proportional distribution, the problems of uneven equipment use and low stability of ore-difference components in open-pit mine transportation activities are solved, and more efficient mine card scheduling and resource utilization are achieved.
Patent Information
- Application Number
- CN202411162424.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-12-06
AI Technical Summary
The transportation activities of open-pit mines rely on manual scheduling, and it is impossible to effectively predict the future status and location of mining and transportation equipment, resulting in uneven equipment use and reducing resource utilization and the stability of ore dressing components.
The mine card scheduling method based on proportional distribution is used to determine the proportion of ore collection and transportation of each ore pile by the crushing station, calculate the total value of the dispatch difference transportation, and schedule the idle mine card to the corresponding according to the demand. Ores are transported by ore, updated transportation volume, and judged whether to exit the scheduling process to ensure that the ore acquisition matches the proportion.
It improves the rationality and efficiency of mine card scheduling, ensures that the amount of ore obtained by the crushing station is consistent with the demand, and improves the utilization rate of equipment resources and the stability of ore dressing components.
Smart Images

Figure CN119090213A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mining technology, and more specifically, to a method, device, equipment and medium for dispatching mining trucks based on proportional ore allocation. Background Art
[0002] In the process of open-pit mining, the production is divided into four processes: blasting, shoveling, transportation, and crushing. Usually, each mine has multiple mining points, corresponding to multiple ore piles and multiple ore crushing stations. Since the ore composition of each ore pile is different, in order to ensure that the ore composition of the crushing station is relatively stable, the ore source of the crushing station must be from different ore piles in a specific proportion, and the corresponding transportation capacity must be arranged, thereby forming a suitable truck scheduling method.
[0003] However, the current transportation activities in open-pit mines rely on manual scheduling, which cannot effectively predict the status and location of mining and transportation equipment in the future. It has a strong short-sightedness and is prone to cause vehicle pressure and uneven use of mining and transportation equipment, thereby increasing the non-working time of mining and transportation equipment, thereby reducing the utilization rate of equipment resources and affecting the stability of mineral processing components.
[0004] In summary, how to reasonably dispatch mining trucks according to the needs of the crushing station is an urgent problem to be solved by technical personnel in this field. Summary of the invention
[0005] The purpose of this application is to provide a mining truck dispatching method based on proportional ore allocation, which can solve the technical problem of how to reasonably dispatch mining trucks according to the needs of crushing stations to a certain extent. This application also provides a mining truck dispatching device based on proportional ore allocation, an electronic device and a computer-readable storage medium.
[0006] In order to achieve the above objectives, this application provides the following technical solutions:
[0007] A mining truck scheduling method based on proportional ore allocation, comprising:
[0008] Determine the ore removal and transportation ratio of each ore pile by the crushing station;
[0009] Determine the dispatch differential transport volume of the crushing station for each ore pile, where the dispatch differential transport volume represents the amount of ore transported from the corresponding ore pile to the crushing station by the mining truck;
[0010] Calculate the total value of the dispatch difference transportation volume;
[0011] According to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio, scheduling the idle first ore truck to transport the ore to the first ore pile with the smallest demand;
[0012] updating the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck;
[0013] Determine whether to exit mining card scheduling;
[0014] If the mining truck scheduling is continued, the step of calculating the total value of the scheduling difference transportation volume is returned to execute.
[0015] Preferably, before calculating the total value of the scheduling difference transportation volume, the method further includes:
[0016] Determine the ore pile corresponding to the ore extraction and transportation ratio with the largest value as the second ore pile;
[0017] dispatching an idle second mining truck to transport ore to the second mining pile;
[0018] The scheduling difference transportation volume of the crushing station for the second ore pile is updated according to the transportation volume of the second ore truck.
[0019] Preferably, after calculating the total value of the scheduling difference transportation volume, and before scheduling the idle first ore truck to transport ore to the first ore pile with the highest demand according to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio, the method further includes:
[0020] Determining whether the total amount exceeds a preset threshold, wherein the preset threshold is determined according to the processing capacity of the crushing station;
[0021] In response to the total amount value exceeding the preset threshold, the scheduling difference transportation volume of the crushing station for each ore pile is adjusted according to the consumption of ore by the crushing station.
[0022] Preferably, adjusting the dispatching difference transportation volume of each ore pile by the crushing station according to the consumption of ore by the crushing station includes:
[0023] Determine the minimum value of the dispatch difference transportation volume;
[0024] Determine the transport ratio value corresponding to the minimum value as a reference ratio value;
[0025] For each ore pile, determine the ratio of the transportation ratio value corresponding to the ore pile to the reference ratio value, determine the reduction amount based on the first product value of the minimum value and the ratio, and determine the difference between the scheduling difference transportation volume and the reduction amount as the adjusted scheduling difference transportation volume.
[0026] Preferably, the step of dispatching an idle first ore truck to transport ore to a first ore pile with the smallest demand according to the dispatch difference transportation volume, the total value and the ore extraction and transportation ratio comprises:
[0027] For each ore pile, determining that the second product of the transportation ratio value and the total amount value corresponding to the ore pile is the scheduled amount, and determining the difference between the scheduled difference transportation amount of the ore pile and the scheduled amount as the demand degree of the ore pile;
[0028] Determine the ore pile corresponding to the minimum demand level as the first ore pile;
[0029] The idle first mining truck is dispatched to transport ore to the first mining pile.
[0030] Preferably, after determining whether the total amount exceeds a preset threshold, the method further includes:
[0031] In response to the total amount not exceeding the preset threshold, the step of dispatching the idle first mining truck to transport ore to the first mining pile with the highest demand according to the dispatch difference transportation volume, the total amount and the ore extraction and transportation ratio is executed.
[0032] Preferably, updating the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck includes:
[0033] In response to the first mining truck not transporting ore to the crushing station, determining the difference between the dispatch difference transportation volume of the first ore pile and the average transportation volume of the first mining truck as the adjusted dispatch difference transportation volume;
[0034] In response to the first mining truck transporting ore to the crushing station, the difference between the scheduling difference transportation volume of the first ore pile and the target value is determined as the adjusted scheduling difference transportation volume, and the target value includes the difference between the average transportation volume and the actual transportation volume of the first mining truck.
[0035] A mining truck dispatching device based on proportional ore allocation, comprising:
[0036] The first determination module is used to determine the ore extraction and transportation ratio of each ore pile by the crushing station;
[0037] The second determination module is used to determine the dispatch difference transportation volume of the crushing station for each ore pile, and the dispatch difference transportation volume represents the amount of ore transported by the mining truck from the corresponding ore pile to the crushing station;
[0038] The first calculation module is used to calculate the total value of the scheduling difference transportation volume;
[0039] A first scheduling module is used to schedule an idle first ore truck to transport ore to a first ore pile with the smallest demand according to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio;
[0040] A first updating module, configured to update the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck;
[0041] The first judgment module is used to judge whether to exit the mine truck scheduling; if the mine truck scheduling is to be continued, the step of calculating the total value of the scheduling difference transportation volume is returned to execute.
[0042] An electronic device, comprising:
[0043] Memory for storing computer programs;
[0044] A processor is used to implement the steps of any of the above-mentioned mining truck scheduling methods based on proportional ore allocation when executing the computer program.
[0045] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of any of the above-mentioned methods for dispatching mining trucks based on proportional ore allocation are implemented.
[0046] The present application provides a method for dispatching a mine truck based on proportional ore allocation, which comprises the following steps: determining the ore collection and transportation ratio of a crushing station to each ore pile; determining the dispatch differential transportation volume of the crushing station to each ore pile, wherein the dispatch differential transportation volume represents the amount of ore transported by the mine truck from the corresponding ore pile to the crushing station; calculating the total value of the dispatch differential transportation volume; dispatching an idle first mine truck to transport ore to a first ore pile with the smallest demand according to the dispatch differential transportation volume, the total value and the ore collection and transportation ratio; updating the dispatch differential transportation volume of the first ore pile according to the transportation volume of the first mine truck; judging whether to exit the mine truck dispatching; and returning to the step of calculating the total value of the dispatch differential transportation volume if the mine truck dispatching is to be continued. In the present application, according to the scheduling difference transportation volume of each ore pile by the crushing station, the total value of existing ore and the ore extraction and transportation ratio, the idle first ore truck is dispatched to transport ore to the first ore pile with the smallest demand, so that the ore volume of the first ore pile obtained by the crushing station is adapted to the existing ore volume and the ore extraction and transportation ratio, and then the scheduling difference transportation volume of the first ore pile will be updated according to the transportation volume of a ore truck, so as to ensure that the scheduling difference transportation volume of the first ore pile matches the actual ore volume, so that the subsequent return to perform the total value of the scheduling difference transportation volume calculation and the subsequent steps can be based on the latest ore volume of each ore pile existing in the crushing station, and the ore truck can be dispatched again according to the ore extraction and transportation ratio, so that the process of the crushing station obtaining ore from each ore pile can be adapted to the ore extraction and transportation ratio. Since the ore extraction and transportation ratio represents the demand of the crushing station for ore, the present application can reasonably dispatch the ore truck according to the demand of the crushing station. A ore truck scheduling device based on proportional ore allocation, an electronic device and a computer-readable storage medium provided by the present application also solve the corresponding technical problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0048] Figure 1 A flowchart of a mining truck scheduling method based on proportional ore allocation provided in an embodiment of the present application;
[0049] Figure 2 This is a schematic diagram of the relationship between the crushing station, ore pile and ore truck;
[0050] Figure 3 This is a schematic diagram of mining truck scheduling in actual application;
[0051] Figure 4 A schematic diagram of the structure of a mining truck dispatching device based on proportional ore allocation provided in an embodiment of the present application;
[0052] Figure 5 This is a schematic diagram of the connection mode of each device in the mine truck dispatching device based on proportional ore allocation in this application;
[0053] Figure 6 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application;
[0054] Figure 7 Another structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0055] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0056] See also Figure 1 , Figure 1 A flowchart of a mining truck scheduling method based on proportional ore allocation provided in an embodiment of the present application.
[0057] A mining truck scheduling method based on proportional ore allocation provided in an embodiment of the present application may include the following steps:
[0058] Step S101: Determine the ore removal and transportation ratio of each ore pile by the crushing station.
[0059] In practical applications, the ore extraction and transportation ratio of each ore pile can be determined first. This ore extraction and transportation ratio is determined based on the ore demand of each ore pile by the crushing station. For example, the ore extraction and transportation ratio of each working ore pile can be calculated based on the target composition control target and stability requirements of the mixed ore after crushing, as well as the actual sampling and analysis composition data of each working ore pile.
[0060] It should be noted that the relationship between the crushing station, ore pile and ore truck can be as follows: Figure 2 As shown, it only illustrates the process of six mining trucks transporting ore from five ore piles to two crushing stations. In specific application scenarios, the number of crushing stations, mining trucks and ore piles can be flexibly adjusted as needed.
[0061] Step S102: determining the dispatch difference transportation volume of the crushing station for each ore pile, where the dispatch difference transportation volume represents the amount of ore that the mining truck transports from the corresponding ore pile to the crushing station.
[0062] In practical applications, after knowing the ore transportation ratio of the crushing station to each ore pile, it is also necessary to determine the dispatching differential transportation volume of the crushing station to each ore pile, so as to use the dispatching differential transportation volume to characterize the amount of ore transported from the corresponding ore pile to the crushing station by the mining truck, that is, the dispatching differential transportation volume of the ore pile is used to count the dispatched transportation volume and the actual transportation volume. In other words, the dispatching differential transportation volume characterizes the amount of ore obtained by the crushing station from this ore pile. The amount of ore obtained here may include the amount of ore that has been obtained and not crushed, and the amount of ore to be obtained. It should be noted that in the process of dispatching the mining truck to transport ore to the ore pile and the mining truck not transporting ore to the crushing station, the amount of ore obtained by the crushing station is the amount of ore to be obtained.
[0063] Step S103: Calculate the total value of the scheduling difference transportation volume.
[0064] Step S104: according to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio, the idle first ore truck is scheduled to transport the ore to the first ore pile with the smallest demand.
[0065] Step S105: updating the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck.
[0066] In practical applications, after determining the dispatch differential transportation volume of each ore pile by the crushing station, the total value of the dispatch differential transportation volume can be calculated. According to the dispatch differential transportation volume, the total value and the ore transportation ratio, the idle first ore truck is dispatched to transport ore to the first ore pile with the smallest demand. And according to the transportation volume of the first ore truck, the dispatch differential transportation volume of the first ore pile is updated.
[0067] In practical applications, before calculating the total value of the scheduling difference transport volume, when the mine truck is scheduled for the first time, the initial scheduling of the mine truck can be carried out directly according to the ore-taking and transportation ratio, that is, the ore pile corresponding to the ore-taking and transportation ratio with the largest value can be determined as the second ore pile; the idle second mine truck is scheduled to transport ore to the second ore pile; the scheduling difference transport volume of the crushing station to the second ore pile is updated according to the transportation volume of the second mine truck, for example, the sum of the scheduling difference transport volume and the average transportation volume of the second mine truck can be determined as the updated scheduling difference transport volume, etc.
[0068] In actual applications, after calculating the total value of the scheduling difference transportation volume, before scheduling the idle first mining truck to transport the ore to the first ore pile with the highest demand according to the scheduling difference transportation volume, the total value and the ore-taking and transportation ratio, it is considered that the crushing station will crush the ore to consume the ore, which may make all the current ores in the crushing station fail to meet the ore-taking and transportation ratio. In order to avoid this situation, it is also possible to determine whether the total value exceeds the preset threshold value. The preset threshold value is determined according to the processing capacity of the crushing station. For example, the preset threshold value can be determined as 1,000 tons according to the hourly processing capacity of the crushing station; in response to the total value exceeding the preset threshold value, the scheduling difference transportation volume of the crushing station for each ore pile is adjusted according to the consumption of ore by the crushing station, so that the current scheduling difference transportation volume can represent the ore volume of all the current ore piles of the crushing station; then, the step of scheduling the idle first mining truck to transport the ore to the first ore pile with the highest demand according to the scheduling difference transportation volume, the total value and the ore-taking and transportation ratio is executed. Correspondingly, in response to the total value not exceeding the preset threshold, it indicates that the current amount of ore in the crushing station does not meet the processing capacity of the crushing station. At this time, the step of directly dispatching the idle first mining truck to transport ore to the first mining pile with the highest demand according to the scheduling difference transportation volume, the total value and the ore transportation ratio can be executed.
[0069] In specific application scenarios, according to the consumption of ore by the crushing station, the dispatching difference transportation volume of the crushing station for each ore pile is adjusted. Because the crushing station consumes ore in proportion, the minimum type of ore owned by the crushing station determines the consumption of each type of ore by the crushing station. Therefore, the dispatching difference transportation volume can be updated according to the minimum type of ore owned by the crushing station, that is, the minimum value in the dispatching difference transportation volume can be determined; the transportation ratio value corresponding to the minimum value can be determined as a reference ratio value; for each ore pile, the ratio of the transportation ratio value corresponding to the ore pile to the reference ratio value is determined, the reduction amount is determined according to the first product value of the minimum value and the ratio, and the difference between the dispatching difference transportation volume and the reduction amount is determined as the adjusted dispatching difference transportation volume. For ease of understanding, assume that the scheduling difference transportation volume WV of ore pile i is denoted by WVi, and the corresponding ore transportation ratio is denoted by Pi, and assume that the minimum value in the scheduling difference transportation volume is WVx, x represents the ore pile number corresponding to the minimum value in the scheduling difference transportation volume, and the reference ratio value is Px; subsequently, for each ore pile i, if the ratio of the ore extraction ratio value P corresponding to the ore pile to the reference ratio value is determined, the ratio is Pi / Px, and if the reduction amount is determined according to the first product value of the minimum value and the ratio, the reduction amount is WVx*Pi / Px, and if the difference between the scheduling difference transportation volume and the reduction amount is determined as the adjusted scheduling difference transportation volume, it is equivalent to updating Pi=Pi-WVx*Pi / Px.
[0070] In a specific application scenario, in the process of dispatching the idle first mining truck to transport ore to the first mining pile with the smallest demand level according to the dispatch difference transportation volume, the total value and the mining transportation ratio, for each mining pile, the second product value of the transportation ratio value corresponding to the mining pile and the total value can be determined as the dispatched volume, and the difference between the dispatch difference transportation volume and the dispatched volume of the mining pile is determined as the demand level of the mining pile; the mining pile corresponding to the smallest demand level is determined as the first mining pile; and the idle first mining truck is dispatched to transport ore to the first mining pile. For ease of understanding, assuming that the total value is Tot, the demand level Ni of mining pile i can be expressed as Ni=WVi-Pi*Tot.
[0071] In actual applications, in the process of updating the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first mining truck, in response to the first mining truck not transporting ore to the crushing station, the difference between the scheduling difference transportation volume of the first ore pile and the average transportation volume of the first mining truck can be determined as the adjusted scheduling difference transportation volume; in response to the first mining truck transporting ore to the crushing station, the difference between the scheduling difference transportation volume of the first ore pile and the target value can be determined as the adjusted scheduling difference transportation volume, and the target value includes the difference between the average transportation volume and the actual transportation volume of the first mining truck. For ease of understanding, assuming that the average transportation volume of the mining truck is w0 and the actual transportation volume is w1, after the mining truck is dispatched to transport ore to ore pile i, if the mining truck has not returned to the crushing station, the scheduling difference transportation volume of ore pile i can be updated to WVi=WVi+w0. After that, if the mining truck returns to the crushing station, the scheduling difference transportation volume of ore pile i can be updated to WVi=WVi-(w0-w1). In this way, there is no need to wait for the mining truck to return to the crushing station to adjust the scheduling difference transportation volume, which can avoid the time consumed by the mining truck to transport ore affecting the mining truck scheduling process.
[0072] Step S106: Determine whether to exit the mining card scheduling; if the mining card scheduling continues, return to step S103.
[0073] In actual applications, when multiple mine truck scheduling is required, after updating the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first mine truck, it can be determined whether to exit the mine truck scheduling; if the mine truck scheduling is to be continued, return to execute the total value of the scheduling difference transportation volume and subsequent steps, if the mine truck scheduling is to be exited, it can be ended.
[0074] The present application provides a method for dispatching a mine truck based on proportional ore allocation, which comprises the following steps: determining the ore collection and transportation ratio of a crushing station to each ore pile; determining the dispatch differential transportation volume of the crushing station to each ore pile, wherein the dispatch differential transportation volume represents the amount of ore transported by the mine truck from the corresponding ore pile to the crushing station; calculating the total value of the dispatch differential transportation volume; dispatching an idle first mine truck to transport ore to a first ore pile with the smallest demand according to the dispatch differential transportation volume, the total value and the ore collection and transportation ratio; updating the dispatch differential transportation volume of the first ore pile according to the transportation volume of the first mine truck; judging whether to exit the mine truck dispatching; and returning to the step of calculating the total value of the dispatch differential transportation volume if the mine truck dispatching is to be continued. In the present application, according to the dispatched differential transportation volume of each ore pile by the crushing station, the total value of existing ore and the ore extraction and transportation ratio, the idle first ore truck is dispatched to transport ore to the first ore pile with the smallest demand, so that the ore quantity of the first ore pile obtained by the crushing station is compatible with the existing ore quantity and the ore extraction and transportation ratio, and then the dispatched differential transportation volume of the first ore pile is updated according to the transportation volume of a ore truck, so as to ensure that the dispatched differential transportation volume of the first ore pile matches the actual ore quantity. In this way, if the subsequent steps of calculating the total value of the dispatched differential transportation volume and subsequent steps are returned, the ore truck can be dispatched again according to the ore extraction and transportation ratio based on the latest ore quantity of each ore pile existing in the crushing station, so that the process of the crushing station obtaining ore from each ore pile can be compatible with the ore extraction and transportation ratio. Since the ore extraction and transportation ratio represents the demand of the crushing station for ore, the present application can reasonably dispatch the ore truck according to the demand of the crushing station.
[0075] To facilitate understanding of the mining truck scheduling method based on proportional ore allocation in this application, it is assumed that the number of working ore piles required by a certain crushing station is 5, and their SID numbers are 1, 2, 3, 4, and 5; the ore transportation ratio of each working ore pile is: P1, P2, P3, P4, and P5; assuming that the number of transportation mining trucks is 6, and the CID numbers are 1, 2, 3, 4, 5, and 6, respectively, and the corresponding transportation ore piles are numbered C1, C2, C3, C4, C5, and C6, and the actual weight of each transportation is measured by weighing: WC1, WC2, WC3, WC4, WC5, and WC6, and the average total transportation volume of the mining truck is assumed to be w0=50 tons / time; the difference transportation volume of each ore pile scheduling is WV1, WV2, WV3, WV4, and WV5, respectively; the total difference transportation volume of each ore pile scheduling Tot=WV1+WV2+WV3+WV4+WV5, and the preset threshold Threshold=1000. The whole mining truck scheduling process can be as follows: Figure 3 As shown, the following steps are included:
[0076] Get the transportation ratio of each ore pile: P1, P2, P3, P4, P5; initialize the ore pile number of the ore truck transportation: C1, C2, C3, C4, C5, C6 are set to 0; initialize the average transportation volume of the ore truck each time w0=50, the total transportation difference threshold of each ore pile scheduling Threshold=1000, and the scheduling difference transportation volume of each ore pile: WV1, WV2, WV3, WV4, WV5 are set to 0; get the maximum value of the ore pile transportation ratio maxPi=Max(P1, P2, P3, P4, P5) and the label SID=i, and dispatch the ore truck C1 to the SID ore pile for transportation; C1=SID; WVi(i=SID)=WVi+w0;
[0077] Calculate the total transportation scheduling volume Tot=WV1+WV2+WV3+WV4+WV5;
[0078] Determine whether Tot is greater than Threshold;
[0079] If yes, then obtain the minimum value of the scheduling difference transportation volume of each ore pile minWVx (x=1, 2, 3, 4, 5)=Min (WV1, WV2, WV3, WV4, WV5) and its pile number SID=x; correct WV1, WV2, WV3, WV4, WV5: WV1=WV1-minWVx*P1 / Px, WV2=WV2-minWVx*P2 / Px, WV3=WV3-minWVx*P3 / Px, WV4=WV4-minWVx*P4 / Px, WV5=WV5-minWVx*P5 / Px, where x is the pile number corresponding to the minimum minWVx value; execute the subsequent step of calculating the urgency Ni of the crushing station for the ore of the i-th ore pile; if no, directly execute the subsequent step of calculating the urgency Ni of the crushing station for the ore of the i-th ore pile;
[0080] Calculate the urgent need of the crushing station for the ore in the i-th ore pile Ni (i=1, 2, 3, 4, 5) = WVi (i=1, 2, 3, 4, 5) - Pi (i=1, 2, 3, 4, 5) * Tot;
[0081] Find the minimum value minNi (i=1, 2, 3, 4, 5) and the number minNID=i from the urgent need Ni (i=1, 2, 3, 4, 5) of each ore pile at the crushing station;
[0082] Determine whether there is an idle mining card j, that is, determine whether Cj (j = 1, 2, 3, 4, 5) = is true;
[0083] If yes, dispatch the mining truck Cj to transport to the minNID ore pile, that is, dispatch the mining truck Cj (j=1, 2, 3, 4, 5, 6) = minNID, corresponding to WVi (i=minNID) = WVi (i=minNID) + w0, and execute the subsequent steps of judging whether there is a mining truck returning to the crushing station and weighing; if no, directly execute the subsequent steps of judging whether there is a mining truck returning to the crushing station and weighing;
[0084] Determine whether there are mining trucks returning to the crushing station and weighing them;
[0085] If the mining truck Ci (i=1, 2, 3, 4, 5, 6) returns, carrying ore weight WCi, WVj (j=Ci) = WVj (j=Ci) - (w0-WCi), mining truck Ci is set to idle Ci=0; execute the subsequent steps to determine whether there is an exit request; if not, directly execute the subsequent steps to determine whether there is an exit request;
[0086] Determine whether there is a request to exit;
[0087] If yes, exit; if no, return to the step of calculating the total amount of transportation scheduling.
[0088] See also Figure 4 , Figure 4 A schematic diagram of the structure of a mining truck dispatching device based on proportional ore allocation provided in an embodiment of the present application.
[0089] A mining truck dispatching device based on proportional ore allocation provided in an embodiment of the present application may include:
[0090] The first determination module 101 is used to determine the ore extraction and transportation ratio of each ore pile by the crushing station;
[0091] The second determination module 102 is used to determine the dispatch difference transportation volume of each ore pile of the crushing station, and the dispatch difference transportation volume represents the amount of ore transported from the corresponding ore pile to the crushing station by the mining truck;
[0092] The first calculation module 103 is used to calculate the total value of the scheduling difference transportation volume;
[0093] The first scheduling module 104 is used to schedule the idle first ore truck to transport ore to the first ore pile with the smallest demand according to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio;
[0094] The first updating module 105 is used to update the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck;
[0095] The first judgment module 106 is used to judge whether to exit the mine truck scheduling; if the mine truck scheduling is to be continued, the step of calculating the total value of the scheduling difference transportation volume is returned to execute.
[0096] The mining truck dispatching device based on proportional ore allocation provided in the embodiment of the present application may also include:
[0097] The third determination module is used to determine the ore pile corresponding to the largest ore extraction and transportation ratio as the second ore pile before the first calculation module calculates the total value of the scheduling difference transportation volume;
[0098] A second scheduling module is used to schedule an idle second mining truck to transport ore to a second mining pile;
[0099] The second updating module is used to update the scheduling difference transportation volume of the crushing station for the second ore pile according to the transportation volume of the second ore truck.
[0100] The mining truck dispatching device based on proportional ore allocation provided in the embodiment of the present application may also include:
[0101] The second judgment module is used to determine whether the total value of the scheduling difference transportation volume exceeds a preset threshold value after the first calculation module calculates the total value of the scheduling difference transportation volume. The preset threshold value is determined according to the processing capacity of the crushing station. In response to the total value exceeding the preset threshold value, the scheduling difference transportation volume of the crushing station for each ore pile is adjusted according to the consumption of ore by the crushing station.
[0102] In a mining truck dispatching device based on proportional ore allocation provided in an embodiment of the present application, the second judgment module may include:
[0103] A first determining unit is used to determine the minimum value of the scheduling difference transportation volume;
[0104] A second determining unit is used to determine that the transport ratio value corresponding to the minimum value is a reference ratio value;
[0105] The first adjustment unit is used to determine the ratio of the transportation ratio value corresponding to each ore pile to the reference ratio value, determine the reduction amount according to the first product value of the minimum value and the ratio, and determine the difference between the scheduling difference transportation volume and the reduction amount as the adjusted scheduling difference transportation volume.
[0106] In a mining truck scheduling device based on proportional ore allocation provided in an embodiment of the present application, a first scheduling module may include:
[0107] A third determining unit is used to determine, for each ore pile, a second product value of the transportation ratio value and the total value corresponding to the ore pile as the scheduled amount, and determine the difference between the scheduled difference transportation amount of the ore pile and the scheduled amount as the demand degree of the ore pile;
[0108] A fourth determining unit, configured to determine the ore pile corresponding to the minimum demand level as the first ore pile;
[0109] The first dispatching unit is used to dispatch an idle first mining truck to transport ore to the first mining pile.
[0110] An embodiment of the present application provides a mining truck scheduling device based on proportional ore allocation, and the second judgment module is also used to: after judging whether the total amount exceeds a preset threshold, in response to the total amount not exceeding the preset threshold, execute the step of scheduling the idle first mining truck to transport ore to the first ore pile with the highest demand based on the scheduling difference transportation volume, the total amount and the ore transportation ratio.
[0111] In a mining truck scheduling device based on proportional ore allocation provided in an embodiment of the present application, the first update module may include:
[0112] A first updating unit is used for determining the difference between the dispatch difference transportation volume of the first ore pile and the average transportation volume of the first ore truck as the adjusted dispatch difference transportation volume in response to the first ore truck failing to transport ore to the crushing station;
[0113] The second updating unit is used to determine the difference between the scheduling difference transportation volume and the target value of the first ore pile as the adjusted scheduling difference transportation volume in response to the first ore truck transporting ore to the crushing station, and the target value includes the difference between the average transportation volume and the actual transportation volume of the first ore truck.
[0114] It should be noted that the dispatching of mining trucks cannot be separated from the support of the network. In practical applications, the connection method of each device in the mining truck dispatching device based on proportional ore allocation in this application can be as follows: Figure 5 As shown, the computer system can be set up with various modules of the present application, the computer system can control the shoveling of ore piles and the scheduling and navigation of ore trucks through a wireless network, and the computer system can control the crushing station equipment and weighing of the scale through a wired network, etc.
[0115] The present application also provides an electronic device and a computer-readable storage medium, both of which have the corresponding effects of the mining truck scheduling method based on proportional ore allocation provided in the embodiments of the present application. Figure 6 , Figure 6 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.
[0116] A fan speed processing device provided in an embodiment of the present application includes a memory 201 and a processor 202. The memory 201 stores a computer program. When the processor 202 executes the computer program, the steps of the mine truck scheduling method based on proportional ore allocation described in any of the above embodiments are implemented.
[0117] See also Figure 7, another electronic device provided in the embodiment of the present application may also include: an input port 203 connected to the processor 202, for transmitting commands input from the outside to the processor 202; a display unit 204 connected to the processor 202, for displaying the processing results of the processor 202 to the outside; a communication module 205 connected to the processor 202, for realizing communication between the electronic device and the outside. The display unit 204 can be a display panel, a laser scanning display, etc.; the communication method adopted by the communication module 205 includes but is not limited to mobile high-definition link technology (Mobile High-Definition Link, MHL), Universal Serial Bus (Universal Serial Bus, USB), High-Definition Multimedia Interface (High-DefinitionMultimedia Interface, HDMI), wireless connection: wireless fidelity technology (WIreless Fidelity, WiFi), Bluetooth communication technology, low-power Bluetooth communication technology, and communication technology based on IEEE802.11s.
[0118] An embodiment of the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the mining truck scheduling method based on proportional ore allocation as described in any of the above embodiments are implemented.
[0119] The computer-readable storage medium involved in this application includes random access memory (RAM), memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disks, removable disks, CD-ROMs (Compact Disc Read-Only Memory), or any other form of storage medium known in the technical field.
[0120] For the description of the relevant parts of the mine truck dispatching device based on proportional ore allocation, electronic device and computer-readable storage medium provided in the embodiments of the present application, please refer to the detailed description of the corresponding parts in the mine truck dispatching method based on proportional ore allocation provided in the embodiments of the present application, which will not be repeated here. In addition, the parts of the above technical solutions provided in the embodiments of the present application that are consistent with the implementation principles of the corresponding technical solutions in the prior art are not described in detail to avoid excessive elaboration.
[0121] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0122] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A mining truck dispatching method based on proportional ore allocation, characterized in that: include: Determine the ore removal and transportation ratio of each ore pile by the crushing station; Determine the dispatch differential transport volume of the crushing station for each ore pile, where the dispatch differential transport volume represents the amount of ore transported from the corresponding ore pile to the crushing station by the mining truck; Calculate the total value of the dispatch difference transportation volume; According to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio, scheduling the idle first ore truck to transport the ore to the first ore pile with the smallest demand; updating the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck; Determine whether to exit mining card scheduling; If the mining truck scheduling is continued, the step of calculating the total value of the scheduling difference transportation volume is returned to execute.
2. The method according to claim 1, characterized in that Before calculating the total value of the scheduling difference transportation volume, the method further includes: Determine the ore pile corresponding to the ore extraction and transportation ratio with the largest value as the second ore pile; dispatching an idle second mining truck to transport ore to the second mining pile; The scheduling difference transportation volume of the crushing station for the second ore pile is updated according to the transportation volume of the second ore truck.
3. The method according to claim 1, characterized in that After calculating the total value of the scheduling difference transportation volume, and before scheduling the idle first ore truck to transport ore to the first ore pile with the highest demand according to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio, the method further includes: Determining whether the total amount exceeds a preset threshold, wherein the preset threshold is determined according to the processing capacity of the crushing station; In response to the total amount value exceeding the preset threshold, the scheduling difference transportation volume of the crushing station for each ore pile is adjusted according to the consumption of ore by the crushing station.
4. The method according to claim 3, characterized in that The method of adjusting the scheduling difference transportation volume of each ore pile by the crushing station according to the consumption of ore by the crushing station includes: Determine the minimum value of the dispatch difference transportation volume; Determine the transport ratio value corresponding to the minimum value as a reference ratio value; For each ore pile, determine the ratio of the transportation ratio value corresponding to the ore pile to the reference ratio value, determine the reduction amount based on the first product value of the minimum value and the ratio, and determine the difference between the scheduling difference transportation volume and the reduction amount as the adjusted scheduling difference transportation volume.
5. The method according to claim 4, characterized in that The method of dispatching the idle first ore truck to transport ore to the first ore pile with the smallest demand according to the dispatch difference transportation volume, the total value and the ore extraction and transportation ratio includes: For each ore pile, determining that the second product of the transportation ratio value and the total amount value corresponding to the ore pile is the scheduled amount, and determining the difference between the scheduled difference transportation amount of the ore pile and the scheduled amount as the demand degree of the ore pile; Determine the ore pile corresponding to the minimum demand level as the first ore pile; The idle first mining truck is dispatched to transport ore to the first mining pile.
6. The method according to claim 3, characterized in that After determining whether the total amount exceeds the preset threshold, the method further includes: In response to the total amount not exceeding the preset threshold, the step of dispatching the idle first mining truck to transport ore to the first mining pile with the highest demand according to the dispatch difference transportation volume, the total amount and the ore extraction and transportation ratio is executed.
7. The method according to claim 1, characterized in that The updating of the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck includes: In response to the first mining truck not transporting ore to the crushing station, determining the difference between the dispatch difference transportation volume of the first ore pile and the average transportation volume of the first mining truck as the adjusted dispatch difference transportation volume; In response to the first mining truck transporting ore to the crushing station, the difference between the scheduling difference transportation volume of the first ore pile and the target value is determined as the adjusted scheduling difference transportation volume, and the target value includes the difference between the average transportation volume and the actual transportation volume of the first mining truck.
8. A mining truck dispatching device based on proportional ore allocation, characterized in that: include: The first determination module is used to determine the ore extraction and transportation ratio of each ore pile by the crushing station; The second determination module is used to determine the dispatch difference transportation volume of the crushing station for each ore pile, and the dispatch difference transportation volume represents the amount of ore transported by the mining truck from the corresponding ore pile to the crushing station; The first calculation module is used to calculate the total value of the scheduling difference transportation volume; A first scheduling module is used to schedule an idle first ore truck to transport ore to a first ore pile with the smallest demand according to the scheduling difference transportation volume, the total value and the ore extraction and transportation ratio; A first updating module, configured to update the scheduling difference transportation volume of the first ore pile according to the transportation volume of the first ore truck; The first judgment module is used to judge whether to exit the mine truck scheduling; if the mine truck scheduling is to be continued, the step of calculating the total value of the scheduling difference transportation volume is returned to execute.
9. An electronic device, characterized in that: include: Memory for storing computer programs; A processor is used to implement the steps of the mining truck scheduling method based on proportional ore allocation as described in any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the mining truck scheduling method based on proportional ore allocation as claimed in any one of claims 1 to 7 are implemented.