Data asset cost collection method and device
The method and device for data asset cost collection address the lack of efficient aggregation by acquiring and calculating data asset costs, enabling rapid and automated cost aggregation for data assets.
Patent Information
- Application Number
- CN202410952235.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies lack a suitable method for efficiently, quickly, and automatically aggregating data asset costs.
A method and device for data asset cost collection that involves acquiring a target data file, calculating its cost using metadata, personnel and investment data, and aggregating the costs efficiently and automatically.
Enables efficient, quick, and automated aggregation of data asset costs, facilitating data circulation and transactions in the digital economy.
Smart Images

Figure CN119090659A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a method and device for data asset cost aggregation. Background Art
[0002] Data resources are important production factors in the digital economy era and are also key drivers for enterprises to maintain their competitiveness and create value. By identifying data resources as assets, data elements that create value for enterprises will be identified as data assets, further laying a solid foundation for data circulation and transactions, and effectively promoting the rapid development of the digital economy. In the existing technology, starting with data assets, technologies have emerged in the areas of data asset value estimation, data asset confirmation, data asset inventory, data asset management, and data asset disposal, but there is a lack of a suitable way to aggregate data asset costs.
[0003] In summary, how to efficiently, quickly and automatically aggregate data asset costs is an issue that technical personnel in this field urgently need to solve. Summary of the invention
[0004] In view of this, the present application provides a data asset cost collection method and device, aiming to efficiently, quickly and automatically realize the collection of data asset costs.
[0005] In a first aspect, the present application provides a data asset cost collection method, comprising:
[0006] Acquire a target data file, where the target data file is a data asset carrier;
[0007] Acquiring data for calculating the cost of the target data file;
[0008] Using the data used to calculate the cost of the target data file, the cost of the target data file is calculated to obtain a first calculation result;
[0009] The data asset costs are aggregated according to the first accounting result.
[0010] Optionally, the acquiring of a target data file, wherein the target data file is a data asset carrier, includes:
[0011] Obtain metadata of the data management platform or data management tool;
[0012] According to the ownership information in the metadata, a target data file serving as a data asset carrier is determined.
[0013] Optionally, the acquiring of data for calculating the cost of the target data file includes:
[0014] Obtaining personnel cost data and investment data of the data assets;
[0015] The using the data for calculating the cost of the target data file to calculate the cost of the target data file to obtain a first calculation result includes:
[0016] Calculate the personnel labor costs according to the personnel cost data of the data assets and the input data to obtain the personnel labor cost calculation results; the personnel labor costs include direct labor costs and indirect labor costs;
[0017] Calculate the direct input costs according to the input data to obtain the direct input cost calculation results;
[0018] Calculate the depreciation expense according to the input data to obtain the depreciation expense calculation result;
[0019] Calculate the amortization of intangible assets based on the input data to obtain the amortization calculation result of intangible assets;
[0020] Calculate the design cost according to the input data to obtain the design cost calculation result;
[0021] The personnel labor cost accounting result, the direct investment cost accounting result, the depreciation cost accounting result, the design cost accounting result and the intangible asset amortization accounting result are determined as the first accounting result.
[0022] Optionally, before calculating the cost of the target data file using the data used to calculate the cost of the target data file to obtain a first calculation result, the method further includes:
[0023] Determine the cycle for collecting data asset costs;
[0024] The using the data for calculating the cost of the target data file to calculate the cost of the target data file to obtain a first calculation result includes:
[0025] According to the cycle of data asset cost collection, the cost of the target data file is calculated using the data used to calculate the cost of the target data file to obtain a second calculation result.
[0026] In a second aspect, the present application provides a data asset collection device, including:
[0027] A first acquisition module is used to acquire a target data file, where the target data file is a data asset carrier;
[0028] A second acquisition module, used for acquiring data for calculating the cost of the target data file;
[0029] A calculation module, configured to calculate the cost of the target data file using the data used to calculate the cost of the target data file, and obtain a first calculation result;
[0030] A collection module is used to collect the data asset costs according to the first accounting result.
[0031] Optionally, the first acquisition module includes:
[0032] A first acquisition unit, used to acquire metadata of a data management platform or a data management tool;
[0033] The first determination unit is used to determine a target data file as a data asset carrier according to the ownership information in the metadata.
[0034] Optionally, the second acquisition module includes:
[0035] A second acquisition unit, used to acquire personnel cost data and investment data of the data asset;
[0036] The accounting module includes:
[0037] A first accounting unit is used to calculate the personnel labor costs according to the personnel cost data of the data asset and the input data to obtain the personnel labor cost accounting results; the personnel labor costs include direct labor costs and indirect labor costs;
[0038] A second accounting unit is used to calculate the direct input cost according to the input data to obtain a direct input cost accounting result;
[0039] A third accounting unit, used to calculate the depreciation expense according to the input data to obtain a depreciation expense accounting result;
[0040] A fourth accounting unit, used to calculate the amortization of intangible assets according to the input data to obtain an amortization accounting result of the intangible assets;
[0041] A fifth accounting unit, used to calculate the design fee according to the input data to obtain a design fee calculation result;
[0042] The second determining unit is used to determine the personnel labor cost accounting result, the direct investment cost accounting result, the depreciation cost accounting result, the design cost accounting result and the intangible asset amortization accounting result as the first accounting result.
[0043] Optionally, the device comprises:
[0044] A determination module is used to determine the cycle of data asset cost collection;
[0045] The accounting module includes:
[0046] The sixth accounting unit is used to calculate the cost of the target data file according to the cycle of data asset cost collection and use the data used to calculate the cost of the target data file to obtain a second accounting result.
[0047] In a third aspect, an embodiment of the present application provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the data asset cost aggregation method described in any one of the implementation methods in the first aspect of the embodiment of the present application.
[0048] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, in which instructions are stored. When the instructions are executed on a terminal device, the terminal device executes a data asset cost aggregation method as described in any one of the implementation methods in the first aspect of the embodiment of the present application.
[0049] The present application provides a data asset cost collection method. When executing the method, a target data file is first obtained, wherein the target data file is a data asset carrier, then data for calculating the cost of the target data file is obtained, and the cost of the target data file is calculated using the data for calculating the cost of the target data file to obtain a first calculation result, and finally, the data asset cost is collected according to the first calculation result. In this way, by determining the target data file as a data asset carrier and calculating the cost of the target data file, the collection of data asset costs can be realized efficiently, quickly and automatically. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] In order to more clearly illustrate the technical solutions in this embodiment or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0051] Figure 1 A flowchart of a data asset cost collection method provided in an embodiment of the present application;
[0052] Figure 2 A schematic diagram of the structure of a data asset cost collection device provided in an embodiment of the present application;
[0053] Figure 3A schematic diagram of the structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0054] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. The present application provides a data asset cost collection method and device for use in the field of data processing technology. The above is only an example and does not limit the application field of the method and device provided in the present application.
[0055] Data resources are important production factors in the digital economy era and are also key drivers for enterprises to maintain their competitiveness and create value. By identifying data resources as assets, data elements that create value for enterprises will be identified as data assets, further laying a solid foundation for data circulation and transactions, and effectively promoting the rapid development of the digital economy. In the existing technology, starting with data assets, technologies have emerged in the areas of data asset value estimation, data asset confirmation, data asset inventory, data asset management, and data asset disposal, but there is a lack of a suitable way to aggregate data asset costs.
[0056] After research, the inventor proposed the technical solution of this application. First, a target data file is obtained, wherein the target data file is a data asset carrier. Then, data for calculating the cost of the target data file is obtained, and the cost of the target data file is calculated using the data for calculating the cost of the target data file to obtain a first calculation result. Finally, the data asset cost is aggregated according to the first calculation result. In this way, by determining the target data file as a data asset carrier and calculating the cost of the target data file, the aggregation of data asset costs can be realized efficiently, quickly and automatically.
[0057] In order to enable those skilled in the art to better understand the present application, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application. It should be noted that, for ease of description, only the parts related to the relevant invention are shown in the accompanying drawings. In the absence of conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.
[0058] See also Figure 1 , Figure 1 A flowchart of a data asset cost collection method provided in an embodiment of the present application includes:
[0059] S101: Obtain target data file.
[0060] Data assets refer to data resources that are formed by past transactions or events of an enterprise, owned or controlled by the enterprise, and expected to bring economic benefits to the enterprise. Data files are the carriers of data assets and the objects of cost accounting, but not all data files are data assets of the enterprise.
[0061] Through the metadata information acquisition module, the metadata of the data management platform or data management tool is regularly acquired using the interface method, including data file name, file size, ownership information, field description information, file lineage relationship and other data. According to the data ownership information, the data assets belonging to the enterprise are distinguished and marked, and the data files with clear ownership of the enterprise are defined as the data assets of the enterprise. The data files belonging to the data assets are represented as F, where F = {F1, F2, ..., F n}.
[0062] S102: Acquire data for calculating the cost of the target data file.
[0063] In some implementations, the frequency and period of data asset cost collection can be determined first, such as monthly collection, quarterly collection, etc., and each relevant cost is calculated on the corresponding data asset in each period, where the period is T, where T = {T1, T2, ..., T m}.
[0064] Use the interface to regularly obtain project lists, project time information, project personnel data, project implementation work packages, activities, working hours, and results data. The results are data files that are used as data assets for accounting, and the names of the data files formed by the activity tasks are recorded in the project data. M represents working hours, M represents ijk Indicates that in period T i When person j forms data file F k of working hours invested.
[0065] Use the interface to regularly obtain the current enterprise's personnel expenses. Among them, all the personnel of the enterprise are represented by EA, EA = {EA1, EA2, ..., EA a The personnel involved in each project are represented as EP, where EP = {EP1, EP2, …, EP p The personnel who participate in the data asset formation project are represented as EC, where EC = {EC1,EC2,…,EC c}, and W is used to represent unit personnel costs.
[0066] Use the interface to regularly obtain the current depreciation expenses of the company's fixed assets, amortization expenses of intangible assets, and other expenses such as travel expenses and conference expenses related to data assets.
[0067] Use the interface to regularly obtain the company's direct input data, including the amount, purpose and consumption of direct inputs such as materials, fuel, and power, as well as the price of outsourced data, contract cycle time and other data.
[0068] S103: Calculate the cost of the target data file using the data used to calculate the cost of the target data file to obtain a first calculation result.
[0069] The project, work package, activity, working hours and result data obtained in step S102 are used to determine the working hours of the personnel involved in the data asset formation process in this accounting cycle. Among them, the relevant personnel whose work results can be directly mapped to data files are direct participants, and the relevant personnel whose work results cannot be directly mapped to data files are indirect participants. Indirect participants include personnel such as managers and architects who do not directly work on a single data file. Here, direct participants are represented as ED, and indirect participants are represented as EO.
[0070] In the embodiment of the present application, the calculation of the personnel cost of data assets includes the calculation of direct personnel labor costs and the calculation of indirect personnel labor costs. The calculation method of direct personnel labor costs is as follows:
[0071] T i represents the current cycle, j represents the person directly involved in the data file work, where j∈EC and j∈ED, M ijk Indicates that in time period T i When person j forms data file F k The working hours input, W j Indicates that person j is in T i Internal personnel costs.
[0072] Data File F k In T i The direct labor cost of the period is expressed as WD ik , through preliminary calculations:
[0073] WD ik =∑ j M ijk ×W j ;
[0074] Data File F k The direct labor cost during the development phase is expressed as WD k , through preliminary calculations:
[0075] WD k =∑ i WD ik =∑ i ∑ j Mijk ×W j ;
[0076] The direct labor cost of the data assets that aggregate all data files is expressed as WD. Through preliminary calculation:
[0077] WD=∑ k WD k =∑ k ∑ i WD ik =∑ k ∑ i ∑ j M ijk ×W j .
[0078] Among them, the calculation method of indirect personnel labor costs is as follows:
[0079] T i represents the current cycle, h represents the person indirectly involved in the data file work, where h∈EC and h∈EO, M ih Indicates that in time period T i The man-hours input by personnel in the development phase of data assets, where the development phase refers to the application of research results or other knowledge to a plan or design to produce new or substantially improved materials, devices, products, etc. before commercial production or use. h Indicates that person h is in T i Personnel costs during the cycle.
[0080] In T i The indirect labor cost input of the cycle is expressed as WO i , through preliminary calculations:
[0081] WO i =∑ h M ih ×W h ;
[0082] The indirect labor cost input during the entire development phase of data assets is expressed as WO. Through preliminary calculation:
[0083] WO=∑ i WO i =∑ i ∑ h M ih ×W h .
[0084] In some implementations, the indirect personnel labor costs can also be converted to the data file F k On the data file F k In Ti The indirect labor cost input of the cycle is expressed as WO ik , the following conversion methods can be used:
[0085] (1) Calculated based on the size of the data file. The specific method is as follows:
[0086] Data File F k The file size is S k1 , then the conversion factor is Data File F k In T i The indirect labor cost input of the cycle is expressed as WO ik , then through preliminary calculation:
[0087]
[0088] Data File F k Indirect labor cost input in the development phase is expressed as WO k , then through preliminary calculation:
[0089] WO k =∑ i WO ik .
[0090] (2) The conversion is based on the amount of data content. The specific method is as follows:
[0091] Data File F k The amount of content is represented by S k2 , where S k2 Can be data file F k The number of cells, S k2 Can be data file F k The number of non-empty cells, S k2 Can be data file F k The number of fields, S k2 Can be data file F k The number of records, then the conversion factor is
[0092] Data File F k In T i The indirect labor cost input of the cycle is expressed as WO ik , then through preliminary calculation:
[0093]
[0094] Data File F k Indirect labor cost input in the development phase is expressed as WO k , then through preliminary calculation:
[0095] WO k =∑ i WO ik .
[0096] (3) Calculated based on the number of citations. The specific method is as follows:
[0097] Get data file F k Blood relationship, statistical data file F k The number of citations by downstream data files S k3 , then the conversion factor is For the data file F k There are two types of situations, one is the intermediate files that will be referenced, and the other is the application files that will not be referenced. When directly counting, the reference count of the second type of data files is 0. But in fact, the importance of application files is also very high. Here, the reference count of application files is adjusted to the average of the reference counts of its upstream files. When the application file only references one upstream file, it is reset to the reference count of the upstream file.
[0098] Data File F k In T i The indirect labor cost input of the cycle is expressed as WO ik , then through preliminary calculation:
[0099]
[0100] Data File F k Indirect labor cost input in the development phase is expressed as WO k , then through preliminary calculation:
[0101] WO k =∑ i WO ik .
[0102] (4) Calculated based on the proportion of direct labor costs. The specific method is as follows:
[0103] Data File F k The direct labor cost input in the development phase is expressed as S k4 , where the S k4 =WD k , the corresponding conversion factor is
[0104] Data File F k In T i The indirect labor cost input of the cycle is expressed as WO ik , then through preliminary calculation:
[0105]
[0106] Data File F k Indirect labor cost input in the development phase is expressed as WO k , then through preliminary calculation:
[0107] WO k =∑ i WO ik .
[0108] (5) Calculated based on the percentage of code volume, the specific method is as follows:
[0109] The formation of data files generally relies on code implementation. k The number of code lines S of the dependent code files k5 , S k5 It can be the number of lines in the code file or the number of non-blank lines in the code file. The corresponding conversion factor is
[0110] Data File F k In T i The indirect labor cost input of the cycle is expressed as WO ik , then through preliminary calculation:
[0111]
[0112] Data File F k Indirect labor cost input in the development phase is expressed as WO k , then through preliminary calculation:
[0113] WO k =∑ i WO ik .
[0114] In summary, the labor cost input of the personnel EC involved in the data asset formation project is expressed as WC, then WC=WD+WO. Data file F k Personnel labor costs WC k =WD k +WO k If you need to confirm T i Periodic data file F k The personnel labor costs, direct labor costs, and indirect labor costs can be further broken down and confirmed for each period based on the proportion of personnel labor cost investment in each period to the overall labor cost investment in the development stage.
[0115] In the embodiment provided in this application, the direct investment cost of the data assets is calculated to obtain the direct investment cost calculation result, which is as follows:
[0116] Direct investment costs are expressed as DC. According to the actual amount of R&D activities of the enterprise and the specific investment items, they can be divided into two situations: those that cannot be clearly measured and those that can be clearly measured. To obtain direct investment costs, there are generally multiple sources and items for direct investment costs. The gth item of direct investment costs is expressed as DC g .
[0117] (1) Where it is not possible to clearly measure the direct input costs, the accounting method is as follows:
[0118] The direct investment cost of data assets cannot be clearly measured, such as when the enterprise has multiple R&D activities, data asset formation is only part of them, and the specific investment items cannot be directly mapped to the data asset project. Get the information of each project and represent the pth project as T p The g-th item of direct investment expenses can be aggregated to the p-th item using the following method:
[0119] The conversion is based on project working hours, as follows:
[0120] For the entire development phase, for the g-th investment, count the project T from the actual investment start date to the investment end date. p The effective working hours are expressed as R gp , then the conversion factor is The corresponding direct input is expressed as DC gp :
[0121]
[0122] On this basis, the direct investment in the entire data asset project development phase is accumulated according to each investment.
[0123] For a certain period T i For the g-th investment, count the investment from the start date of the actual investment in this cycle to the end date of the investment in this cycle. p The effective working hours are expressed as R igp , then the conversion factor is The corresponding input is expressed as DC igp :
[0124]
[0125] Among them, facing a certain period T i , for the g-th input, it is expressed as DC ig , D.C. ig This can be done by first calculating the proportion of the current cycle duration to all cycle durations, and then multiplying the proportion by DC g to be sure.
[0126] If you need to further confirm the direct investment costs to the data file F k The same conversion method as indirect labor costs can be used to convert DC igp and DC gp Multiply by the corresponding conversion factor.
[0127] The conversion is based on the labor costs of project personnel, as follows:
[0128] Adjust the effective working hours counted in the above-mentioned project working hours conversion method to the personnel labor costs corresponding to the effective working hours to form the conversion coefficient, and perform the corresponding conversion in the same way.
[0129] (2) Where measurement is possible, the direct input costs are calculated as follows:
[0130] In cases where the direct investment costs of data assets can be clearly measured, such as when the enterprise has only a single data asset project and the investment items are clearly provided for the use of the data asset project, the investment costs are directly recognized as the direct investment costs of the corresponding R&D activities, and the direct investment costs of each period are also included according to the actual situation of each period. If you need to further confirm the direct investment costs to the data file F k If the above is the case, the indirect personnel labor cost conversion method can be used for conversion.
[0131] In summary, the direct investment costs of the data asset formation project are the sum of the costs of the projects that cannot be clearly measured and the costs of the projects that can be clearly measured, that is, the direct investment costs DC are obtained. If the statistical values of each period are required, the sum of the various investments is calculated for each period; if the statistical values of each file are required, the sum of the various investments is calculated for each file.
[0132] In some implementations, depreciation expenses can also be calculated. The specific method of calculating depreciation expenses is as follows: fixed asset depreciation expenses are expressed as GC, and according to the usage of fixed assets, they are divided into fixed assets shared by the enterprise, fixed assets shared by R&D projects, and fixed assets for single project use.
[0133] (1) The specific method for calculating depreciation expenses of fixed assets shared by enterprises is as follows:
[0134] Obtain the company's personnel data and fixed asset depreciation expense data.
[0135] For the entire data asset development phase, for the hth shared fixed asset, the effective working hours of the personnel involved during the use of the fixed asset are counted, and the effective working hours are expressed as R h , where the effective working hours of personnel involved in the data asset project are represented by TR h , then the conversion factor is The total depreciation expense of the common fixed assets in the development phase is expressed as DEPR h , the fixed asset depreciation expense of the corresponding data asset project is expressed as GC h :
[0136]
[0137] On this basis, the depreciation expenses of all common fixed assets during the entire data asset project development phase are accumulated according to the depreciation expenses of each fixed asset ∑GC h .
[0138] For a certain period T i For the hth shared fixed asset, the effective working hours of the personnel involved in the enterprise during the use of the fixed asset are counted. The effective working hours of the enterprise personnel are expressed as R ih , where the effective working hours of personnel involved in the data asset project are represented by TR ih , then the conversion factor is The total depreciation expense of the fixed assets shared by item h during the period is expressed as DEPR ih , the fixed asset depreciation expense of the corresponding data asset project is expressed as GC ih :
[0139]
[0140] If you need to further confirm the fixed asset depreciation expenses to the data file F k The above method of converting indirect labor costs can be used to convert GC h and GC ih Multiply by the corresponding conversion factor.
[0141] (2) The specific method for calculating the depreciation of fixed assets shared by all projects is as follows:
[0142] In the conversion method of fixed assets shared by the above-mentioned enterprises, the "effective working hours of enterprise personnel" involved in the statistics of fixed assets are adjusted to "effective working hours of personnel in each project" as the denominator for calculating the conversion coefficient to form the conversion coefficient, and the corresponding conversion is performed in the same way.
[0143] In addition, it can also be split according to the budget amount of each project and converted based on the proportion of the data asset project budget to all project budgets.
[0144] (3) The depreciation of fixed assets used by the project is calculated as follows:
[0145] The fixed assets used by this project are aggregated into the cost of this data asset project according to the actual depreciation expenses. Each period is also aggregated according to the depreciation expenses of each period. k If the above method is used, the indirect labor cost conversion can be performed by multiplying the corresponding conversion factor.
[0146] In summary, the fixed asset depreciation expenses of the data asset formation project are obtained by summing up the above three expenses, that is, the fixed asset depreciation expenses GC. If the statistical value of each period is required, the various inputs are summed up according to each period; if the statistical value of each file is required, the various inputs are summed up according to each file.
[0147] In some implementations, the amortization of intangible assets can also be accounted for, where the amortization expense of intangible assets is represented by TC, and is divided into intangible assets shared by the enterprise, intangible assets shared by R&D projects, and intangible assets for self-use in a single project, based on the use of the intangible assets. The conversion method for intangible assets shared by the enterprise is the same as the conversion method for depreciation expenses of fixed assets shared by the enterprise, and amortization of intangible assets is performed to achieve cost aggregation; the conversion method for intangible assets shared by various projects is the same as the conversion method for depreciation expenses of fixed assets shared by the projects, and amortization of intangible assets is performed to achieve cost aggregation. The conversion method for intangible assets used by this project is as follows: the intangible assets used by this project are aggregated into the cost of this data asset project according to the actual amortization expenses, and each period is also aggregated according to the amortization expenses of each period. If you need to further confirm the amortization expenses of intangible assets to the data file F k If the above method is used, the indirect labor cost conversion can be performed by multiplying the corresponding conversion factor.
[0148] In some implementations, the design costs can also be calculated, where the design costs are expressed as SC, including two situations: internal personnel input and external service procurement. In the case of internal personnel input, the labor costs of internal design personnel have been accounted for in the personnel labor cost section, and no repeated accounting or accumulation is performed. The corresponding costs can also be separated from the personnel labor cost module, and the calculation method remains unchanged. In the case of external service procurement, the costs incurred in the procurement contract are aggregated into the data asset design cost cost. If the costs need to be aggregated for each period, the costs can be evenly divided into each period according to the contract period; if the fixed asset depreciation costs need to be further confirmed to the data file F k If the above method is used, the indirect labor cost conversion can be performed by multiplying the corresponding conversion factor.
[0149] In some implementations, other expenses can also be accounted for, where other expenses are expressed as QC. The accounting method of QC is the same as the accounting method of fixed asset depreciation expenses, distinguishing whether they are shared or used separately, and performing conversion and aggregation. In the case of shared use, such as technical book material expenses, the related items can be converted and split; in the case of separate use, they can be separately aggregated.
[0150] In addition, if the project involves commissioned R&D expenses, the commissioned R&D party's regular statistics will be used as the basis for aggregation and included in the costs within the period; further, the total cost of commissioned R&D expenses will also be included as part of the data asset cost; if further confirmation of related expenses is required, the data file F k If the above method is used, the indirect labor cost conversion can be performed by multiplying the corresponding conversion factor.
[0151] To summarize, the cost of data assets is expressed as C:
[0152] C=WC+DC+GC+TC+SC+QC;
[0153] If you need the statistical value of each cycle, add up the costs of each cycle; if you need the statistical value of each file, add up the costs of each file.
[0154] S104: According to the first accounting result, the data asset costs are aggregated.
[0155] The data asset costs are aggregated using the various calculation results in S103.
[0156] In the embodiment of the present application, the cost of data assets can also be adjusted: during the development stage of a data asset project, it is inevitable that various reasons will lead to the abandonment or damage of data files, resulting in the final confirmed data assets being less than the sum of all data files involved in the process. For reasonable data file losses, the data asset cost C does not need to be adjusted, and the aforementioned method and accumulation results are still used. However, for the specific accounting of a single data file or a single cycle, it is necessary to adjust the cost of the lost part to the last confirmed data file, which in turn leads to adjustments to the cost aggregation of a single data file or a single cycle. For the data file that is finally confirmed, the various costs are accumulated to obtain the total cost C′, and the adjustment coefficient is The confirmation cost of a single data file is calculated by multiplying the original accumulated cost of the file by the adjustment factor. The confirmation cost of a single cycle is obtained by multiplying the original accumulated cost in the cycle by the adjustment coefficient get.
[0157] In the embodiment of the present application, a target data file is first obtained, wherein the target data file is a data asset carrier, then data for calculating the cost of the target data file is obtained, and the cost of the target data file is calculated using the data for calculating the cost of the target data file to obtain a first calculation result, and finally the data asset cost is aggregated according to the first calculation result. In this way, by determining the target data file as a data asset carrier and calculating the cost of the target data file, the aggregation of data asset costs can be realized efficiently, quickly and automatically.
[0158] The above are some specific implementations of the data asset cost collection method provided in the embodiment of the present application. Based on this, the present application also provides a corresponding device. The device provided in the embodiment of the present application will be introduced from the perspective of functional modularization.
[0159] See also Figure 2 As shown, Figure 2 A schematic diagram of the structure of a data asset cost collection device provided in an embodiment of the present application, the data asset cost collection device 200 includes:
[0160] A first acquisition module 210 is used to acquire a target data file, where the target data file is a data asset carrier;
[0161] A second acquisition module 220, used to acquire data for calculating the cost of the target data file;
[0162] A calculation module 230, configured to calculate the cost of the target data file using the data used to calculate the cost of the target data file, and obtain a first calculation result;
[0163] The aggregation module 240 is used to aggregate the data asset costs according to the first accounting result.
[0164] Optionally, the first acquisition module 210 includes:
[0165] A first acquisition unit, used to acquire metadata of a data management platform or a data management tool;
[0166] The first determination unit is used to determine a target data file as a data asset carrier according to the ownership information in the metadata.
[0167] Optionally, the second acquisition module 220 includes:
[0168] A second acquisition unit, used to acquire personnel cost data and investment data of the data asset;
[0169] The accounting module 230 includes:
[0170] A first accounting unit is used to calculate the personnel labor costs according to the personnel cost data of the data asset and the input data to obtain the personnel labor cost accounting results; the personnel labor costs include direct labor costs and indirect labor costs;
[0171] A second accounting unit is used to calculate the direct input cost according to the input data to obtain a direct input cost accounting result;
[0172] A third accounting unit, used to calculate the depreciation expense according to the input data to obtain a depreciation expense accounting result;
[0173] A fourth accounting unit, used to calculate the amortization of intangible assets according to the input data to obtain an amortization accounting result of the intangible assets;
[0174] A fifth accounting unit, used to calculate the design fee according to the input data to obtain a design fee calculation result;
[0175] The second determining unit is used to determine the personnel labor cost accounting result, the direct investment cost accounting result, the depreciation cost accounting result, the design cost accounting result and the intangible asset amortization accounting result as the first accounting result.
[0176] Optionally, the device 200 includes:
[0177] A determination module is used to determine the cycle of data asset cost collection;
[0178] The accounting module 230 includes:
[0179] The sixth accounting unit is used to calculate the cost of the target data file according to the cycle of data asset cost collection and use the data used to calculate the cost of the target data file to obtain a second accounting result.
[0180] like Figure 3 As shown, the computer device 01 is in the form of a general computing device. The components of the computer device 01 may include but are not limited to: one or more processors or processing units 03, a system memory 08, and a bus 04 connecting different system components (including the system memory 08 and the processing unit 03).
[0181] Bus 04 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, a graphics acceleration port, a processor or a local bus using any of a variety of bus structures. For example, these architectures include but are not limited to Industry Standard Architecture (ISA) bus, Micro Channel Architecture (MAC) bus, Enhanced ISA bus, Video Electronics Standards Association (VESA) local bus and Peripheral Component Interconnect (PCI) bus.
[0182] The computer device 01 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the computer device 01, including volatile and non-volatile media, removable and non-removable media.
[0183] The system memory 08 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 09 and / or cache memory 10. The computer device 01 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage system 11 may be used to read and write non-removable, non-volatile magnetic media ( Figure 3 not shown, usually called a "hard drive"). Although Figure 3 Not shown in the figure, a disk drive for reading and writing a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing a removable non-volatile optical disk (e.g., a CD-ROM, a DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to the bus 04 via one or more data medium interfaces. The memory 08 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present invention.
[0184] A program / utility 12 having a set (at least one) of program modules 13 may be stored, for example, in the memory 08, such program modules 13 including but not limited to an operating system, one or more application programs, other program modules, and program data, each of which or some combination thereof may include an implementation of a network environment. The program modules 13 generally perform the functions and / or methods of the embodiments described herein.
[0185] The computer device 01 may also communicate with one or more external devices 02 (e.g., keyboard, pointing device, display 07, etc.), one or more devices that enable a user to interact with the computer device 01, and / or any device that enables the computer device 01 to communicate with one or more other computing devices (e.g., network card, modem, etc.). Such communication may be performed via input / output (I / O) interface 06. Furthermore, the computer device 01 may also communicate with one or more networks (e.g., local area network (LAN), wide area network (WAN) and / or public network, such as the Internet) via network adapter 05. Figure 3 As shown, the network adapter 05 communicates with other modules of the computer device 01 via the bus 04. It should be understood that although Figure 3 Not shown, other hardware and / or software modules may be used in conjunction with computer device 01, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0186] The processor unit 03 executes various functional applications and data processing by running programs stored in the system memory 08, such as implementing a data asset cost aggregation method provided in an embodiment of the present application.
[0187] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0188] Through the description of the above implementation methods, it can be known that those skilled in the art can clearly understand that all or part of the steps in the above-mentioned embodiment method can be implemented by means of software plus a general hardware platform. Based on such an understanding, the technical solution of the present application can be embodied in the form of a software product, which can be stored in a storage medium, such as a read-only memory (ROM) / RAM, a magnetic disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network communication device such as a router) to execute the methods described in each embodiment of the present application or some parts of the embodiments.
[0189] Each embodiment in this specification is described in a progressive manner, and the same and similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. Some or all of the modules can be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative work.
[0190] The above description is merely an exemplary embodiment of the present application and is not intended to limit the protection scope of the present application.
Claims
1. A data asset cost collection method, characterized in that: include: Acquire a target data file, where the target data file is a data asset carrier; Acquiring data for calculating the cost of the target data file; Using the data used to calculate the cost of the target data file, the cost of the target data file is calculated to obtain a first calculation result; The data asset costs are aggregated according to the first accounting result.
2. The method according to claim 1, characterized in that The acquiring target data file, which is a data asset carrier, includes: Obtain metadata of the data management platform or data management tool; According to the ownership information in the metadata, a target data file serving as a data asset carrier is determined.
3. The method according to claim 1, characterized in that The acquiring of data for calculating the cost of the target data file includes: Obtaining personnel cost data and investment data of the data assets; The using the data for calculating the cost of the target data file to calculate the cost of the target data file to obtain a first calculation result includes: Calculate the personnel labor costs according to the personnel cost data of the data assets and the input data to obtain the personnel labor cost calculation results; the personnel labor costs include direct labor costs and indirect labor costs; Calculate the direct input costs according to the input data to obtain the direct input cost calculation results; Calculate the depreciation expense according to the input data to obtain the depreciation expense calculation result; Calculate the amortization of intangible assets based on the input data to obtain the amortization calculation result of intangible assets; Calculate the design cost according to the input data to obtain the design cost calculation result; The personnel labor cost accounting result, the direct investment cost accounting result, the depreciation cost accounting result, the design cost accounting result and the intangible asset amortization accounting result are determined as the first accounting result.
4. The method according to claim 1, characterized in that: Before calculating the cost of the target data file using the data used to calculate the cost of the target data file to obtain a first calculation result, the method further includes: Determine the cycle for collecting data asset costs; The using the data for calculating the cost of the target data file to calculate the cost of the target data file to obtain a first calculation result includes: According to the cycle of data asset cost collection, the cost of the target data file is calculated using the data used to calculate the cost of the target data file to obtain a second calculation result.
5. A data asset cost collection device, characterized in that: include: A first acquisition module is used to acquire a target data file, where the target data file is a data asset carrier; A second acquisition module, used for acquiring data for calculating the cost of the target data file; A calculation module, configured to calculate the cost of the target data file using the data used to calculate the cost of the target data file, and obtain a first calculation result; A collection module is used to collect the data asset costs according to the first accounting result.
6. The device according to claim 5, characterized in that The first acquisition module includes: A first acquisition unit, used to acquire metadata of a data management platform or a data management tool; The first determination unit is used to determine a target data file as a data asset carrier according to the ownership information in the metadata.
7. The device according to claim 5, characterized in that The second acquisition module includes: A second acquisition unit, used to acquire personnel cost data and investment data of the data asset; The accounting module includes: A first accounting unit is used to calculate the personnel labor costs according to the personnel cost data of the data asset and the input data to obtain the personnel labor cost accounting results; the personnel labor costs include direct labor costs and indirect labor costs; A second accounting unit is used to calculate the direct input cost according to the input data to obtain a direct input cost accounting result; A third accounting unit, used to calculate the depreciation expense according to the input data to obtain a depreciation expense accounting result; A fourth accounting unit, used to calculate the amortization of intangible assets according to the input data to obtain an amortization accounting result of the intangible assets; A fifth accounting unit, used to calculate the design fee according to the input data to obtain a design fee calculation result; The second determining unit is used to determine the personnel labor cost accounting result, the direct investment cost accounting result, the depreciation cost accounting result, the design cost accounting result and the intangible asset amortization accounting result as the first accounting result.
8. The device according to claim 5, characterized in that The device also includes: A determination module is used to determine the cycle of data asset cost collection; The accounting module includes: The sixth accounting unit is used to calculate the cost of the target data file according to the cycle of data asset cost collection and use the data used to calculate the cost of the target data file to obtain a fourth accounting result.
9. A computer device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the data asset cost aggregation method according to any one of claims 1 to 4 is implemented.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed on a terminal device, the terminal device executes the data asset cost aggregation method according to any one of claims 1 to 4.
Citation Information
Patent Citations
Medical project cost accounting method and system, electronic equipment and storage medium
CN114240494A
Nuclear power plant work order cost accounting method and device, electronic equipment and storage medium
CN115471277A
Financial data-based cost collection and classification method and system
CN116416074A
Parameter allocation method for cost accounting of medical service items
CN117829879A
Cited By
Data asset total cost accounting method based on staged cost collection
CN121304220A