Electric power and electric quantity balance probabilistic analysis method and system for electric power system
The probabilistic power balance method addresses the challenges of high renewable energy and extreme weather by generating scenarios and risk assessment, enhancing power system analysis accuracy and decision-making.
Patent Information
- Application Number
- CN202411115409.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-12-06
AI Technical Summary
Existing power balance methods struggle to account for the randomness and volatility of high renewable energy penetration and extreme weather events, leading to inaccuracies in power system analysis.
A probabilistic analysis method that generates typical, edge, and extreme scenarios using dimensionality reduction and clustering, followed by power balance analysis and risk assessment to create a probabilistic power balance table, incorporating thermal power unit heuristics.
Provides a more accurate and reliable power balance analysis, enabling better decision-making by capturing random factors and extreme events, ensuring the power grid's orderly operation.
Smart Images

Figure CN119093335A_ABST
Abstract
Description
Background Art
[0002] Electricity and power balance analysis is an important means to rationally plan power layout and scientifically arrange operation mode, and it is forward-looking. In academic research, production simulation technology is mainly used; in the industrial sector, the electricity and power balance table with simple calculation is mainly used. The traditional electricity and power balance table is mainly aimed at the combined operation system of hydropower and thermal power, and is based on the year and considers the annual maximum load for power balance. At the same time, four representative hydrological years are considered, namely dry year, normal year, flood year, and extremely dry year. With the gradual connection of new energy units to the grid, considering the seasonality of new energy output and the monthly new installed capacity, the electricity and power balance table currently used in engineering projects adopts monthly balance, and the load considers three schemes of high, medium and low. New energy uses the method of installed capacity multiplied by output rate and installed capacity multiplied by monthly utilization hours to participate in power balance and power balance. This method is easy to calculate and has clear physical characteristics, and has been widely recognized and applied.
[0003] However, there are two problems with the existing balance sheet method:
[0004] On the one hand, my country's renewable energy is developing rapidly. The proportion of renewable energy in the power system continues to rise, and its randomness and volatility make the power balance problem of the new power system more prominent than that of the traditional power system. The existing balance sheet method can only consider a single or average scenario for renewable energy power generation, and is prone to large errors for systems with a high proportion of renewable energy;
[0005] On the other hand, in recent years, extreme weather has occurred frequently in different seasons, bringing huge challenges to the power supply of the power system. The traditional balance sheet method cannot take into account the impact of extreme weather on the power balance.
[0006] Therefore, in order to cope with the randomness and volatility brought about by the high proportion of new energy penetration and incorporate extreme scenarios into the power and electricity balance analysis, it is necessary to improve the existing method of calculating the power and electricity balance table so as to better conduct power and electricity balance analysis. Summary of the invention
[0007] The technical problem to be solved by the present invention is to provide a probabilistic analysis method and system for the electric power balance of an electric power system in view of the deficiencies in the above-mentioned prior art. On the basis of retaining the form of electric power balance meter that has been widely recognized in practice for many years, a probabilistic balance analysis scenario is constructed, and a method for determining the balance risk is proposed to solve the technical problem that traditional electric power balance meter cannot cope with the randomness brought about by the high proportion of new energy grid connection and extreme events.
[0008] The present invention adopts the following technical solutions:
[0009] A method for probabilistic analysis of power and quantity balance in a power system comprises the following steps:
[0010] S1, generate typical scenarios, edge scenarios and extreme scenarios;
[0011] S2. Perform power balance analysis on the typical scenario, edge scenario, and extreme scenario obtained in step S1, calculate the power balance results under the typical scenario, edge scenario, and extreme scenario, and obtain a probabilistic power balance table;
[0012] S3. Perform risk balance determination based on the probabilistic power balance table obtained in step S2.
[0013] Preferably, step S1 specifically includes:
[0014] Generates basic scenarios of load, water and coal supply;
[0015] The basic scenarios of load, water supply and coal supply are processed using dimensionality reduction technology and clustering methods to obtain the basic scenario of new energy output;
[0016] Select basic scenarios with physical significance from the basic scenarios of new energy output to form typical scenarios and edge scenarios;
[0017] Based on the scenario with load loss risk, the load output, water inflow, coal supply, wind power output and photovoltaic output are increased or reduced by a certain proportion in a direction that is not conducive to the balance of electricity and power to obtain an extreme scenario.
[0018] Preferably, the basic scenario of new energy output is obtained by using dimensionality reduction technology and clustering method as follows:
[0019] The data is reduced in dimension using dimensionality reduction technology, and then clustered using the k-means clustering algorithm to obtain the new energy output k N There are several options and their corresponding probabilities, k N The value is 3, corresponding to the three basic output scenarios of new energy: high, medium and low.
[0020] Preferably, in step S2, the probabilistic power and quantity balance result includes a probabilistic power balance table and a probabilistic power balance table; the table sequentially gives the power and quantity balance results of typical scenarios, edge scenarios, scenario expectations, and extreme scenarios for each month of the year;
[0021] The typical scenario shows the balance of the scenario with the highest probability of occurrence in that month;
[0022] The marginal scenario reflects the most unbalanced power flow that occurred during the month;
[0023] The scenario expectation value reflects the average level of power and electricity balance in each scenario;
[0024] The extreme scenario shows the power balance of the system under unpredictable low-probability extreme events;
[0025] Get an overall sense of the month's balance by looking at the Expected Value and Extreme Scenario columns.
[0026] Preferably, in step S2, a heuristic method is used to determine the start and stop status of the thermal power unit, and then the thermal power generation in the electricity balance table and the thermal power output in the power balance table are determined, the thermal power generation is equal to the start-up thermal power capacity multiplied by the number of thermal power utilization hours, and the thermal power output is equal to the start-up thermal power capacity.
[0027] Preferably, the maximum thermal power output P required within the evaluation period Th,max as follows:
[0028]
[0029] Among them, α is the system reserve rate; P t L is the system load power at time t; P t T is the power transmission and reception plan at time t; P t G ,ex-thermal It is the sum of the outputs of all other power sources in the system except thermal power at time t.
[0030] Preferably, in step S3, the power balance risk is divided into load loss risk and new energy abandonment risk;
[0031] Calculate the balance margin and absorption index based on the balance sheet, and determine whether there is a potential balance risk by judging whether the index is less than the threshold;
[0032] The load loss risk is determined based on the power balance margin, which is obtained by dividing the available power generation in the power balance table by the load power demand;
[0033] Determine the risk of abandoning new energy based on the new energy consumption index.
[0034] Preferably, the new energy consumption index is expressed by dividing the system's new energy consumption space by the new energy power generation. If the new energy consumption index is greater than 100%, it means that the system has excess new energy consumption space. The new energy consumption rate is expressed by dividing the actual new energy power generation by the new energy power generation, which is not greater than 100%.
[0035] Preferably, the expression of the new energy consumption index is as follows:
[0036]
[0037] Among them, E L is the load power in the cycle, E Th,minis the minimum thermal power generation in the cycle, E Hy is the hydropower generation in the period, E other E is the power generation of all power sources in the system except for water and fire new energy sources; N The amount of electricity generated by new energy.
[0038] In a second aspect, an embodiment of the present invention provides a power system power and quantity balance probabilistic analysis system, including:
[0039] Scenario module, generating typical scenarios, edge scenarios and extreme scenarios;
[0040] The analysis module performs power balance analysis on typical scenarios, edge scenarios, and extreme scenarios, calculates the power balance results under typical scenarios, edge scenarios, and extreme scenarios, and obtains a probabilistic power balance table;
[0041] The output module makes risk balance judgment based on the probabilistic power and electricity balance table.
[0042] In a third aspect, a computer device comprises a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for probabilistic analysis of power system power balance when executing the computer program.
[0043] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, including a computer program, which, when executed by a processor, implements the steps of the above-mentioned power system power and electricity balance probabilistic analysis method.
[0044] Compared with the prior art, the present invention has at least the following beneficial effects:
[0045] A probabilistic analysis method for power system power and electricity balance is proposed. Based on typical, marginal and extreme scenarios, a probabilistic power and electricity balance table is designed, and balance risk judgment is made according to the balance margin and new energy consumption index indicators. It can fully take into account the probabilistic risk and provide a reliable decision-making basis for power grid operation.
[0046] Furthermore, the scenarios generated in step S1 include typical scenarios as well as extreme scenarios and edge scenarios with lower probability of occurrence, thereby ensuring the scientific nature of the power and electricity balance analysis.
[0047] Furthermore, the probabilistic power and electricity balance table in step S2 is probability-oriented and captures the random factors of power and electricity balance, and the result is closer to reality.
[0048] Furthermore, by using a heuristic method to set the start and shutdown status of thermal power units, a better unit combination plan can be obtained within a limited time, taking into account both the plan quality and time cost.
[0049] Furthermore, the risk assessment decision made based on the probabilistic power balance table in step S3 will be more scientific and accurate, which is conducive to the orderly and coordinated operation and development of the power grid.
[0050] It can be understood that the beneficial effects of the second aspect mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here.
[0051] To sum up, the present invention can realize the detection and identification of potential power balance risks of the power system to the greatest extent through a complete set of methods from scenario generation to power balance analysis to risk assessment, which better meets the requirements of the operation of high-penetration new energy systems.
[0052] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a schematic diagram of the process of the present invention;
[0054] Figure 2 This is a schematic diagram of scene selection and scene classification of the present invention;
[0055] Figure 3 The annual electricity balance margin in the example analysis of the present invention;
[0056] Figure 4 The annual new energy consumption index in the example analysis of the present invention;
[0057] Figure 5 A schematic diagram of a computer device provided by an embodiment of the present invention;
[0058] Figure 6 The present invention is a block diagram of an electronic device provided according to an embodiment. DETAILED DESCRIPTION
[0059] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] In the description of the present invention, it should be understood that the terms “include” and “comprises” indicate the presence of described features, wholes, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or collections thereof.
[0061] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0062] It should be further understood that the term "and / or" used in the present specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes these combinations. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects are in an "or" relationship.
[0063] It should be understood that, although the terms first, second, third, etc. may be used to describe preset ranges, etc. in the embodiments of the present invention, these preset ranges should not be limited to these terms. These terms are only used to distinguish preset ranges from each other. For example, without departing from the scope of the embodiments of the present invention, the first preset range may also be referred to as the second preset range, and similarly, the second preset range may also be referred to as the first preset range.
[0064] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0065] Various structural schematic diagrams of the embodiments disclosed in the present invention are shown in the accompanying drawings. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0066] The present invention provides a probabilistic analysis method for electric power and quantity balance of an electric power system, which adopts.
[0067] When applying the method proposed in the present invention, it is necessary to obtain basic system data, such as the technical parameters of various types of power sources in a high-proportion renewable energy power system, load demand and historical power generation of renewable energy (if there are no actual system parameters, such as the verification example used in this article, you can set reasonable parameter values for example verification), and then construct typical scenarios, edge scenarios and extreme scenarios based on the system parameters, establish a probabilistic power and electricity balance table and perform risk analysis based on the results, so that the relevant management departments can make timely and accurate decisions.
[0068] The present invention provides a method for probabilistic analysis of power and quantity balance in an electric power system, comprising the following steps:
[0069] S1, generate typical scenarios, edge scenarios and extreme scenarios;
[0070] The generation method of typical scenes and edge scenes is:
[0071] 1) Generation of basic scenarios for load, water supply, and coal supply;
[0072] Based on historical data information, the probability prediction method is used to predict the load power, water flow, and coal supply for the whole year in the future, and the k L , k H , k C The output and probability of typical situations. In engineering applications, k L , k H , k C Reasonable choices can be made according to the actual conditions of different regions. L , k H , k C All are taken as 3, corresponding to high, medium and low load output, abundant, medium and scarce water inflow, and high, medium and low coal supply.
[0073] 2) Use dimensionality reduction technology and clustering methods to obtain the basic scenario of new energy output;
[0074] Due to the strong volatility and randomness of new energy (specifically wind and solar in this invention), the basic scenarios of new energy cannot be directly generated into three situations like load and water supply, but need to be obtained by first generating a large number of scenarios and then clustering them. New energy is based on the historical data of the past ten years, superimposed with the scale of new energy installed capacity, and then considering the three production progresses of early, normal and delayed, to generate the future annual output time series data. Use dimensionality reduction technology to reduce the dimension of the data, and then use the k-means clustering algorithm to cluster it to get the new energy output k N There are several schemes and their corresponding probabilities. N The value is 3, which corresponds to the three basic output scenarios of new energy: high, medium, and low. In engineering, the basic scenarios of new energy can also be generated based on actual scheduling experience.
[0075] 3) Select basic scenes with physical significance to form typical scenes and edge scenes.
[0076] The method for generating extreme scenarios is: on the basis of scenarios with load loss risk, the load output, water inflow, coal supply, wind power output, and photovoltaic output are increased or decreased by a certain proportion in a direction that is not conducive to the balance of power and electricity to obtain extreme scenarios.
[0077] The schematic diagram of scene selection and scene classification is as follows Figure 2 As shown:
[0078] First, select one typical scenario and two edge scenarios for power balance sheet analysis. Arrange and combine all basic scenarios of load, water supply, coal, and new energy, and there are N = k L ×k H ×k C ×k N Combined scenarios, from which one typical scenario and two edge scenarios are selected. The typical scenario is composed of the scenarios with the highest probability of load, water supply, coal supply, wind power, and photovoltaic. The edge scenario refers to the scenario combination whose power balance result is at the boundary value of the balance results of all combined scenarios, which is divided into scenario combinations with load loss risks (edge scenario 1) and scenario combinations with new energy abandonment risks (edge scenario 2). The scenario combination with load loss risk is composed of high load, low new energy, low water, and less coal. The scenario combination with new energy abandonment risk is composed of low load, high new energy, abundant water, and more coal.
[0079] Secondly, all combination scenarios are divided into three categories: typical scenario, edge scenario I and edge scenario II, and the probability of each category is determined. The lower bound of edge scenario I is the minimum value of the power balance results of all combination scenarios. This value plus the margin ΔP is used to obtain the upper bound of edge scenario I. Similarly, the upper bound of edge scenario II is the maximum value of the power balance results of all combination scenarios. This value minus the margin ΔP is used to obtain the lower bound of edge scenario II. In engineering practice, the value of margin ΔP can be determined according to the decision maker's attitude towards risk. The smaller ΔP is, the narrower the interval of the edge scenario class is, the smaller the probability of the edge scenario class is, and the more optimistic the expected value of the power balance result is; conversely, the larger ΔP is, the more pessimistic the expected value of the power balance result is. The proportion of the number of scenarios that fall into the three categories to the total number of combination scenarios N is counted to obtain the probability of each scenario.
[0080] The probabilities of typical scenes, edge scenes 1, and edge scenes 2 are approximated by the probabilities of typical scenes, edge scenes I, and edge scenes II, respectively.
[0081] Extreme scenario generation, specifically:
[0082] Extreme scenarios have:
[0083] 1) Small probability, big impact;
[0084] 2) Unpredictable;
[0085] 3) Characteristics of mutation and chain reaction.
[0086] Therefore, extreme scenarios need to be obtained through construction. Since supply guarantee is the primary task of the power grid company, the extreme scenarios of the present invention specifically refer to scenarios with extreme supply guarantee risks. On the basis of scenarios with load loss risk, the load output, water flow, coal supply, wind power output, and photovoltaic output are increased or decreased by a certain proportion in a direction that is not conducive to the balance of power and electricity to obtain extreme scenarios.
[0087] S2. Perform power and electricity balance analysis based on the scenario obtained in step S1, and construct a probabilistic power and electricity balance table;
[0088] The probabilistic power balance table still retains the simple, easy-to-obtain, and clear characteristics required for practical engineering applications. Based on the generated typical scenarios, edge scenarios, and extreme scenarios, the power balance results under each scenario are calculated to obtain the probabilistic power balance table.
[0089] The typical scenario is ω Ty , the edge scenario with load loss risk is Edge scenarios with the risk of abandoning new energy are The extreme scenario is Ex . The monthly electricity data of each scenario in typical scenarios, edge scenarios and extreme scenarios are counted separately to conduct monthly electricity balance analysis. The most power-scarce moment of each scenario in the month is selected for monthly power balance analysis.
[0090] The probabilistic power balance results are presented in two tables, namely the probabilistic power balance table and the probabilistic power balance table. The table gives the power balance results of typical scenarios, edge scenarios, scenario expectations, and extreme scenarios for each month of the year. The typical scenario shows the balance of the scenario with the highest probability of occurrence in the month; the edge scenario reflects the most unbalanced power situation that may occur in the month; the scenario expectation reflects the average power balance level of each scenario; the extreme scenario shows the power balance of the system under unpredictable low-probability extreme events. The dispatcher can fully understand the overall balance of the month by viewing the expected value and extreme scenario columns.
[0091] The heuristic method is used to determine the start and stop status of thermal power units. The core idea is to determine the estimated combination and start-up mode of thermal power units according to the maximum thermal power output required during the evaluation period, and give priority to starting the units with low operating costs.
[0092] The maximum thermal power output P required during the assessment period Th,max as follows:
[0093]
[0094] Among them, α is the system reserve rate; P t L is the system load power at time t; P t T is the power transmission and reception plan at time t, where power transmission is positive and power reception is negative; P t G,ex-thermal It is the sum of the outputs of all other power sources in the system except thermal power at time t.
[0095] After the start and stop status of thermal power is determined, the thermal power generation in the power balance table and the thermal power output in the power balance table can be determined accordingly. Thermal power generation is equal to the thermal power capacity at start-up multiplied by the number of thermal power utilization hours (which can be obtained based on the actual operation experience of dispatching), and thermal power output is equal to the thermal power capacity at start-up.
[0096] S3. Make risk balance judgments so that relevant power grid departments can make scientific and timely decisions based on them.
[0097] The power balance risk is divided into two categories, namely, load loss risk and new energy abandonment risk;
[0098] Calculate the balance margin and absorption index based on the balance sheet, and determine whether there is a potential balance risk by judging whether the index is less than the threshold;
[0099] The risk of load loss is determined based on the power balance margin, which is obtained by dividing the available power generation in the power balance table by the load power demand; the risk of abandoning new energy is determined based on the new energy consumption index. The expression of the new energy consumption index is as follows:
[0100]
[0101] Among them, E L is the load power in the cycle, E Th,min is the minimum thermal power generation in the cycle (estimated startup state), E Hy is the hydropower generation in the period, E other E is the power generation of all power sources in the system except for water and fire new energy sources; N The amount of electricity generated by new energy.
[0102] The new energy consumption index is different from the consumption rate. It is expressed by dividing the system's new energy consumption space by the new energy power generation. Since the system's new energy consumption space may be greater than the new energy power generation, the index may be greater than 100%, indicating that the system has excess new energy consumption space. The new energy consumption rate is expressed by dividing the actual new energy power generation by the new energy power generation, and it cannot be greater than 100%.
[0103] It will be appreciated by those skilled in the art that various aspects of the present invention may be implemented as systems, methods or program products. Therefore, various aspects of the present invention may be specifically implemented in the following forms, namely: complete hardware implementation, complete software implementation (including firmware, microcode, etc.), or a combination of hardware and software implementations, which may be collectively referred to herein as "circuits", "modules" or "platforms".
[0104] In another embodiment of the present invention, a power system power and electricity balance probabilistic analysis system is provided, which can be used to implement the above-mentioned power system power and electricity balance probabilistic analysis method. Specifically, the power system power and electricity balance probabilistic analysis system includes a scenario module, an analysis module and an output module.
[0105] Among them, the scenario module generates typical scenarios, edge scenarios and extreme scenarios;
[0106] The analysis module performs power balance analysis on typical scenarios, edge scenarios, and extreme scenarios, calculates the power balance results under typical scenarios, edge scenarios, and extreme scenarios, and obtains a probabilistic power balance table;
[0107] The output module makes risk balance judgment based on the probabilistic power and electricity balance table.
[0108] In another embodiment of the present invention, a terminal device is provided, the terminal device includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of the probabilistic analysis method of power and electricity balance in the power system, including:
[0109] Generate typical scenarios, edge scenarios and extreme scenarios; perform power and electricity balance analysis on typical scenarios, edge scenarios and extreme scenarios, calculate the power and electricity balance results under typical scenarios, edge scenarios and extreme scenarios respectively, and obtain a probabilistic power and electricity balance table; make risk balance judgments based on the probabilistic power and electricity balance table.
[0110] In another embodiment of the present invention, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It is understandable that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device, and can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that more specific examples (non-exhaustive list) of the computer-readable storage medium here include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0111] Computer readable storage media also include data signals propagated in baseband or as part of a carrier wave, which carry readable program codes. Such propagated data signals can take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The readable storage medium can also be any readable medium other than a readable storage medium, which can send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, device, or device. The program code contained on the readable storage medium can be transmitted using any appropriate medium, including but not limited to wireless, wired, optical cable, RF, etc., or any suitable combination of the above.
[0112] Program code for performing the operations of the present invention may be written in any combination of one or more programming languages, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In the case of a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., through the Internet using an Internet service provider).
[0113] One or more instructions stored in a computer-readable storage medium may be loaded and executed by a processor to implement the corresponding steps of the method for probabilistic analysis of power system power balance in the above embodiment; one or more instructions in the computer-readable storage medium are loaded and executed by the processor as follows:
[0114] Generate typical scenarios, edge scenarios and extreme scenarios; perform power and electricity balance analysis on typical scenarios, edge scenarios and extreme scenarios, calculate the power and electricity balance results under typical scenarios, edge scenarios and extreme scenarios respectively, and obtain a probabilistic power and electricity balance table; make risk balance judgments based on the probabilistic power and electricity balance table.
[0115] See also Figure 5 , the terminal device is a computer device, and the computer device 60 of this embodiment includes: a processor 61, a memory 62, and a computer program 63 stored in the memory 62 and executable on the processor 61. When the computer program 63 is executed by the processor 61, the method for calculating the composition of fluid in the reservoir transformation wellbore in the embodiment is realized. To avoid repetition, it is not described one by one here. Alternatively, when the computer program 63 is executed by the processor 61, the functions of each model / unit in the calculation system for the composition of fluid in the reservoir transformation wellbore in the embodiment are realized. To avoid repetition, it is not described one by one here.
[0116] The computer device 60 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The computer device 60 may include, but is not limited to, a processor 61 and a memory 62. Those skilled in the art will appreciate that Figure 5 This is only an example of the computer device 60 and does not constitute a limitation of the computer device 60. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the computer device may also include input and output devices, network access devices, buses, etc.
[0117] The processor 61 may be a central processing unit (CPU), or other general-purpose processors, central processing units, graphics processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, data processing logic based on quantum computing, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.
[0118] The memory 62 may be an internal storage unit of the computer device 60, such as a hard disk or memory of the computer device 60. The memory 62 may also be an external storage device of the computer device 60, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc., equipped on the computer device 60.
[0119] Furthermore, the memory 62 may include both an internal storage unit of the computer device 60 and an external storage device. The memory 62 is used to store computer programs and other programs and data required by the computer device. The memory 62 may also be used to temporarily store data that has been output or is to be output.
[0120] Any reference to memory, database or other media used in the embodiments provided in the present application may include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory may include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM), etc.
[0121] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0122] See also Figure 6 The terminal device 600 is an electronic device, and the electronic device is in the form of a general computing device. The components of the electronic device may include but are not limited to: at least one processing unit 610, at least one storage unit 620, a bus 630 connecting different platform components (including the storage unit 620 and the processing unit 610), a display unit 640, etc.
[0123] The storage unit stores program codes, which can be executed by the processing unit 610, so that the processing unit 610 performs the steps according to various exemplary embodiments of the present invention described in the above method section of this specification. For example, the processing unit 610 can perform the following steps: Figure 1 Follow the steps shown in .
[0124] The storage unit 620 may include a readable medium in the form of a volatile storage unit, such as a random access memory unit (RAM) 6201 and / or a cache memory unit 6202 , and may further include a read-only memory unit (ROM) 6203 .
[0125] The storage unit 620 may also include a program / utility 6204 having a set (at least one) of program modules 6205, such program modules 6205 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0126] Bus 630 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
[0127] The electronic device 600 may also communicate with one or more external devices 700 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 600, and / or communicate with any device that enables the electronic device 600 to communicate with one or more other computing devices (e.g., routers, modems, etc.). Such communication may be performed via an input / output (I / O) interface 650. Furthermore, the electronic device 600 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 660. The network adapter 660 may communicate with other modules of the electronic device 600 via a bus 630. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 600, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage platforms, etc.
[0128] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can usually be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0129] Example Analysis
[0130] In order to verify the effectiveness of the present invention, an improved ROTS system is selected for case analysis. The system includes 32 thermal power units, 3 hydropower units, 5 wind farms and 4 photovoltaic power stations. The installed capacity of thermal power / hydropower / wind power / photovoltaic power is 10400MW, 2000MW, 2100MW and 1550MW respectively, and the installed capacity of new energy accounts for 22.74%. The load is expanded to 1.1 times of the original system, and the maximum load of the expanded system is 11463MW.
[0131] Step 1: Scenario generation: This example generates basic scenarios and probabilities of load, water supply, new energy, and coal burning throughout the year based on engineering methods, as shown in Tables 1 and 2.
[0132] Select basic scenes with physical significance and combine them into typical scenes and edge scenes:
[0133] Typical scenarios Ty (Scenario with the highest probability of occurrence): Medium load - Medium renewable energy - Flat water - Medium coal-fired;
[0134] Edge scene 1 (Scenario with risk of load loss): high load - low renewable energy - low water - low coal consumption;
[0135] Edge Scene 2 (Scenario with risk of abandoning new energy): low load - high new energy - abundant water - more coal
[0136] Edge Scene 1 The load power is increased, while new energy, coal-fired, and hydropower are reduced, forming an extreme scenarioω Ex ,The output coefficients of extreme scenarios are shown in the last column of Table 2.
[0137] Table 1 Basic scenario probability of ROTS system
[0138]
[0139]
[0140] Table 2 Output coefficient settings for ROTS system basic scenarios
[0141]
[0142] Step 2: Construct a probabilistic power balance table: Taking November as an example, the power balance results and electricity balance results of this month are calculated as shown in Table 3 and Table 4. The following will mainly analyze the contents of these two tables.
[0143] Table 3 Probabilistic electricity balance of ROTS system in November (GWh)
[0144]
[0145] According to the data in the table, we can analyze:
[0146] 1) Typical scenarios Ty The balance results show that there is a large surplus of electricity in this month, but the electricity is tightly balanced;
[0147] 2) Load loss risk edge scenario The balance result analysis shows that both power and electricity are in short supply, and the power balance margin is less than 1, indicating that there is a small probability of power shortage in this month;
[0148] 3) Extreme scenarios Ex The power surplus and deficit were large, and the power deficit reached 4.44GW, indicating that under extreme circumstances, there would be a serious power shortage in that month;
[0149] 4) The power balance results of the expected value E calculated using the typical scenario and two edge scenarios and the expected value E of all combined scenarios all The balance results are very close, indicating that it is credible to use the selected highest probability scenario, the scenario with load loss risk, and the scenario with new energy abandonment risk as representatives of the three scenarios to calculate the balance situation; from the balance result of the scenario expected value E, it can be seen that there is a large surplus of electricity this month, but there is a small shortage of electricity.
[0150] Table 4 Probabilistic power balance of ROTS system in November (GW)
[0151]
[0152] The overall analysis shows that there is a 91.36% probability that the power can be balanced this month, but there may be power shortages at certain times. In addition, if there are low-probability events such as extreme weather this month, there will be a double imbalance in power.
[0153] The traditional power balance table only gives the balance results of the most likely scenario, corresponding to the typical scenario in Table 3 ω Ty The traditional power balance table only gives the balance results of the most power shortage scenario, corresponding to the marginal scenario with load loss risk in Table 4. The traditional electricity balance table has an electricity balance margin of 1.27 for this month, indicating that there is sufficient electricity for this month. From the results of the probabilistic electricity balance table proposed in this article, it can be obtained that the balance margin is 0.97 in the scenario with load loss risk, and the balance margin is 0.8 in the extreme scenario, indicating that the system has a potential risk of insufficient electricity. It can be seen that the method of the present invention is helpful to discover the potential power balance risk of the power system. At the same time, the method of the present invention also gives the balance results of extreme scenarios, which helps the dispatcher to plan risk response plans in advance.
[0154] Step 3: Conduct an overall balance risk analysis;
[0155] Based on edge scenarios with load loss risk Calculate the power balance margin for the 12 months of the year, such as Figure 3 As shown. The threshold of the power balance margin is set to 1.05. As can be seen from the figure, January, May, November and December have potential load loss risks. Among them, the power balance margin in November and December is less than 1, 0.97 and 0.94 respectively, and the load loss risk is serious. The average value of the power balance margin throughout the year is 1.11, which is higher than the threshold of 1.05, indicating that the average power supply of the year can meet the demand and leave a certain margin.
[0156] In order to study the new energy consumption of high-proportion new energy systems, the load is expanded to 1.25 times of the original ROTS system, and the new energy installed capacity is expanded to 3.27 times of the original ROTS system. At this time, the sum of wind and solar new energy installed capacity is 11935.5MW, accounting for about 50% of the total system installed capacity. The basic scenario is generated according to the data shown in Table 4. In the marginal scenario with the risk of abandoning new energy Under this condition, the maximum system load is 13026MW.
[0157] Based on edge scenarios with risk of abandoning new energy Calculate the new energy consumption index for the 12 months of the year, and the results are as follows Figure 4 As shown. The threshold of the consumption index is set to 1. As can be seen from the figure, the consumption index in April is 0.78, which is lower than the threshold, and there is a serious risk of abandoning new energy. The consumption index in October is 1.03, which is slightly higher than the threshold and also has a potential risk of abandoning new energy. The average value of the consumption index for the whole year is 1.33, indicating that the average consumption of new energy can be absorbed with a certain margin in this year.
[0158] In summary, the method and system for probabilistic analysis of power system power balance in the present invention can better detect the potential power balance risks of the system than the traditional power balance meter and take into account the balance analysis under extreme weather conditions. It is more suitable for new power systems with a high proportion of new energy.
[0159] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0160] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0161] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0162] In the embodiments provided by the present invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0163] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0164] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0165] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0166] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0167] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0168] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0169] The above contents are only for explaining the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.
Claims
1. A probabilistic analysis method for power system power and quantity balance, characterized in that: The following steps are involved: S1, generate typical scenarios, edge scenarios and extreme scenarios; S2. Perform power balance analysis on the typical scenario, edge scenario, and extreme scenario obtained in step S1, calculate the power balance results under the typical scenario, edge scenario, and extreme scenario, and obtain a probabilistic power balance table; S3. Perform risk balance determination based on the probabilistic power balance table obtained in step S2.
2. The method for probabilistic analysis of power system power and quantity balance according to claim 1, characterized in that: Step S1 is specifically as follows: Generates basic scenarios of load, water and coal supply; The basic scenarios of load, water supply and coal supply are processed using dimensionality reduction technology and clustering methods to obtain the basic scenario of new energy output; Select basic scenarios with physical significance from the basic scenarios of new energy output to form typical scenarios and edge scenarios; Based on the scenario with load loss risk, the load output, water inflow, coal supply, wind power output and photovoltaic output are increased or reduced by a certain proportion in a direction that is not conducive to the balance of electricity and power to obtain an extreme scenario.
3. The method for probabilistic analysis of power system power and quantity balance according to claim 2, characterized in that: Using dimensionality reduction technology and clustering methods, the basic scenarios of new energy output are as follows: The data is reduced in dimension using dimensionality reduction technology, and then clustered using the k-means clustering algorithm to obtain the new energy output k N There are several options and their corresponding probabilities, k N The value is 3, corresponding to the three basic output scenarios of new energy: high, medium and low.
4. The method for probabilistic analysis of power system power and quantity balance according to claim 1, characterized in that: In step S2, the probabilistic power and electricity balance result includes a probabilistic electricity balance table and a probabilistic power balance table; The table gives the power balance results of typical scenarios, edge scenarios, scenario expectations, and extreme scenarios for each month of the year; The typical scenario shows the balance of the scenario with the highest probability of occurrence in that month; The marginal scenario reflects the most unbalanced power flow that occurred during the month; The scenario expectation value reflects the average level of power and electricity balance in each scenario; The extreme scenario shows the power balance of the system under unpredictable low-probability extreme events; Get an overall sense of the month's balance by looking at the Expected Value and Extreme Scenario columns.
5. The method for probabilistic analysis of power system power and quantity balance according to claim 1, characterized in that: In step S2, a heuristic method is used to determine the start and stop status of the thermal power unit, and then the thermal power generation in the electricity balance table and the thermal power output in the power balance table are determined. The thermal power generation is equal to the start-up thermal power capacity multiplied by the number of thermal power utilization hours, and the thermal power output is equal to the start-up thermal power capacity.
6. The method for probabilistic analysis of power system power and quantity balance according to claim 5, characterized in that: The maximum thermal power output P required during the assessment period Th,max as follows: Among them, α is the system reserve rate; is the system load power at time t; is the power transmission and reception plan at time t; It is the sum of the outputs of all other power sources in the system except thermal power at time t.
7. The method for probabilistic analysis of power system power and quantity balance according to claim 1, characterized in that: In step S3, the power balance risk is divided into load loss risk and new energy abandonment risk; Calculate the balance margin and absorption index based on the balance sheet, and determine whether there is a potential balance risk by judging whether the index is less than the threshold; The load loss risk is determined based on the power balance margin, which is obtained by dividing the available power generation in the power balance table by the load power demand; Determine the risk of abandoning new energy based on the new energy consumption index.
8. The method for probabilistic analysis of power system power and quantity balance according to claim 7, characterized in that: The new energy consumption index is expressed by dividing the system's new energy consumption space by the new energy power generation. If the new energy consumption index is greater than 100%, it means that the system has excess new energy consumption space; the new energy consumption rate is expressed by dividing the actual new energy power generation by the new energy power generation, which is not greater than 100%.
9. The method for probabilistic analysis of power system power and quantity balance according to claim 8, characterized in that: The expression of new energy consumption index is as follows: Among them, E L is the load power in the cycle, E Th,min is the minimum thermal power generation in the cycle, E Hy is the hydropower generation in the period, E other E is the power generation of all power sources in the system except for water and fire new energy sources; N The amount of electricity generated by new energy.
10. A probabilistic analysis system for power system power and quantity balance, characterized in that: include: Scenario module, generating typical scenarios, edge scenarios and extreme scenarios; The analysis module performs power balance analysis on typical scenarios, edge scenarios, and extreme scenarios, calculates the power balance results under typical scenarios, edge scenarios, and extreme scenarios, and obtains a probabilistic power balance table; The output module makes risk balance judgment based on the probabilistic power and electricity balance table.
