Power distribution area new energy grid-connected and off-grid control method and system
By deploying main control equipment in the distribution room and configuring sub-control equipment in the new energy station, safe off-grid and automatic grid-connected control of distributed new energy are achieved, and safety hazards of distributed photovoltaic systems in distribution network failures and equipment maintenance are solved. The problem has improved the operational safety and reliability of distributed energy in the power grid and the management timeliness.
Patent Information
- Application Number
- CN202410570819.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-05-09
AI Technical Summary
At this stage, distributed photovoltaic systems often experience distribution network failures, equipment maintenance and no passive island protection during operation, resulting in the large number of distributed photovoltaics on the low-voltage side that cannot meet the needs of refined management when connected to the grid, and give the photovoltaic power generation system and the main The power grid brings safety risks.
Deploy main control equipment in the distribution room and configure sub-control equipment in the new energy station. Through communication connection, multiple regional control libraries are divided into segments with switches or circuit breakers to realize the safe off-grid and automatic combination of distributed new energy. Network control, using the main control equipment to detect current and voltage, collect distributed grid-connected port data, judge the fault type and trigger the corresponding off-grid or grid-connected action, and gradually adjust the output of the new energy station according to the principle of power balance.
Create channels through wireless/power carriers and feeders, and independently and orderly control distributed new energy for grid-connection and off-grid operations, reduce the impact of grid-connection and off-grid on distribution networks, ensure line maintenance safety, simplify operation and maintenance work, and improve grid distribution The safety and reliability of energy operation in this type meets the needs of refined management on the low-voltage side.
Smart Images

Figure CN119093486A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of distributed renewable energy in power systems, and in particular to a method and system for controlling renewable energy on-grid and off-grid in distribution station areas. Background Art
[0002] With the access of a large number of distributed renewable energy sources, the active nature of distribution networks is becoming increasingly obvious. Distribution substations are the direct aggregation end for the access of distributed renewable energy sources to the power grid. It is more timely and easier to maintain new energy management in distribution substations.
[0003] At present, distributed photovoltaic systems often encounter problems such as distribution network failures, equipment maintenance, and lack of passive island protection during actual operation. In addition, traditional low-voltage switches are simple in function and cannot meet the current refined management needs of large-scale grid-connected distributed photovoltaics on the low-voltage side, bringing many safety hazards to photovoltaic power generation systems and the main power grid.
[0004] The present invention provides a method and system for controlling on-grid and off-grid operation, which can realize safe off-grid operation and automatic on-grid operation of distributed new energy, and improve the safety and reliability of distributed energy operation in power grids. Summary of the invention
[0005] The technical problem to be solved by the present invention is how to improve the safety and reliability of distributed energy operation in a power grid.
[0006] The present invention solves the above technical problems through the following technical means:
[0007] A method for controlling the on-grid and off-grid distribution of renewable energy in a substation area, wherein a main control device is deployed in a power distribution room, and sub-control devices are configured for each renewable energy station under the power distribution room, wherein the main control device and the sub-control devices are connected in communication; the substation area is divided into a plurality of regional control libraries, wherein the regional control libraries are divided into sections based on switches or circuit breakers, and feeders are used as a control group;
[0008] On-grid and off-grid control methods include:
[0009] Step 1: The main control device detects the current and voltage in the power distribution room, and the sub-control device collects the current and voltage of the distributed grid-connected port to provide auxiliary judgment for the main station; when the current set value is greater than the set overcurrent set value and reaches the action delay, the main control device records and forms a fault memory. When the fault memory delay reaches the off-grid new energy time set value, and the voltage loss reaches the delay set value, the incoming line fault off-grid action is triggered, and the feeder new energy off-grid action process is started, and jump to step 2;
[0010] When the main control device detects the action of a specific feeder relay protection device and the switch quantity of the feeder relay protection device action meets the delayed action time, the feeder off-grid action is triggered, the feeder off-grid action process is started, and the process jumps to step 2;
[0011] When the main control device is under maintenance, the maintenance off-grid action is triggered, the maintenance off-grid action process is started, and the process jumps to step 2;
[0012] Step 2: After the master control device enters the off-grid action process, it determines the off-grid action type. If it is off-grid due to incoming line fault or maintenance, the master control device controls the new energy on the corresponding bus to go off-grid. If it is a feeder off-grid action, the new energy station on the corresponding line is controlled to go off-grid.
[0013] Step 3. When the main control device detects that the maintenance is completed or the fault is eliminated, the sequential grid-connected process is carried out; according to the type of the last off-grid action, the method for judging whether the fault has disappeared is carried out; if the incoming line is off-grid, the main control device will detect the incoming line voltage and current. When the voltage returns to normal, the current is greater than the set value, and the direction flows to the bus, it is judged that the fault has recovered and the automatic grid-connected process is carried out; if the last time was the feeder off-grid, the feeder circuit breaker status is detected. When it changes from open position to closed position and the delay time is satisfied, it is judged that the fault has disappeared and the automatic grid-connected process is started; when the maintenance status disappears, the automatic grid-connected process needs to be manually started.
[0014] Furthermore, the off-grid control strategy in step 2 is as follows:
[0015] After the master device determines the off-grid type, it selects the new energy station in the corresponding regional control library. The master device first sends a group adjustment command to reduce the output of distributed new energy to the minimum; the delay T0 time is used for the distributed new energy action to complete, and the master device sends a group control remote control command to the sub-control device to control the distributed energy off-grid.
[0016] Furthermore, the grid connection control strategy in step 3 is as follows:
[0017] The master control device automatically controls the stations to be connected to the grid in sequence according to the regional control library. The control strategy for each station is as follows:
[0018] The master control device sends a remote adjustment to the minimum output power of the distributed energy of the station; the master control device delays the time setting T1 and issues a grid-connected instruction to the sub-control device. The sub-control device controls the distributed energy according to the power balance principle and controls the power output of the station in case of reverse power, so as to reduce the impact and influence of the grid connection on the line; the master control device completes all distributed energy controls in turn. After all single new energy stations are connected to the grid, the master control device gradually increases the power generation power of the distributed new energy station according to the progressive principle until the maximum output power is reached.
[0019] Furthermore, the division principle of the regional control library is specifically as follows: the distributed new energy on the same feeder is a control group, multiple control groups on the same I bus form another control group, and all control groups are aggregated into the main control library.
[0020] The present invention also provides a distributed renewable energy on-grid and off-grid control system for a substation, which is applied to the above method, including:
[0021] The main control module includes a main control device arranged in the power distribution room, which is used to detect and determine the type of fault and provide a corresponding on-grid and off-grid control strategy according to the type;
[0022] The sub-control module includes sub-control devices arranged in each new energy station under the power distribution room, and the sub-control devices are connected to the main control device for communication and receive control instructions from the main control device;
[0023] A regional control library divides the substation area into multiple regional control libraries, wherein the regional control library is divided into sections by switches or circuit breakers and feeders are a control group for sequential control and off-grid disconnection;
[0024] The on-grid and off-grid control strategies include:
[0025] Step 1: The main control device detects the current and voltage in the power distribution room. When the current setting value is greater than the set overcurrent setting value and reaches the action delay, the main control device records the fault memory. When the fault memory delay reaches the off-grid new energy time setting value, and the voltage loss reaches the delay setting value, the incoming line fault off-grid action is triggered, the feeder new energy off-grid action process is started, and the process goes to step 2.
[0026] When the main control device detects the action of a specific feeder relay protection device and the switch quantity of the feeder relay protection device action meets the delayed action time, the feeder off-grid action is triggered, the feeder off-grid action process is started, and the process jumps to step 2;
[0027] When the main control device is under maintenance, the maintenance off-grid action is triggered, the maintenance off-grid action process is started, and the process jumps to step 2;
[0028] Step 2: After the master control device enters the off-grid action process, it determines the off-grid action type. If it is off-grid due to incoming line fault or maintenance, the master control device controls the new energy on the corresponding bus to go off-grid. If it is a feeder off-grid action, the new energy station on the corresponding line is controlled to go off-grid.
[0029] Step 3. When the main control device detects that the maintenance is completed or the fault is eliminated, the sequential grid-connected process is carried out; according to the type of the last off-grid action, the method for judging whether the fault has disappeared is carried out; if the incoming line is off-grid, the main control device will detect the incoming line voltage and current. When the voltage returns to normal, the current is greater than the set value, and the direction flows to the bus, it is judged that the fault has recovered and the automatic grid-connected process is carried out; if the last time was the feeder off-grid, the feeder circuit breaker status is detected. When it changes from open position to closed position and the delay time is satisfied, it is judged that the fault has disappeared and the automatic grid-connected process is started; when the maintenance status disappears, the automatic grid-connected process needs to be manually started.
[0030] Furthermore, the off-grid control strategy in step 2 is as follows:
[0031] After the master device determines the off-grid type, it selects the new energy station in the corresponding regional control library. The master device first sends a group adjustment command to reduce the output of distributed new energy to the minimum; the delay T0 time is used for the distributed new energy action to complete, and the master device sends a group control remote control command to the sub-control device to control the distributed energy off-grid.
[0032] Furthermore, the grid connection control strategy in step 3 is as follows:
[0033] The master control device automatically controls the stations to be connected to the grid in sequence according to the regional control library. The control strategy for each station is as follows:
[0034] The master control device sends a remote adjustment to the minimum output power of the distributed energy of the station; the master control device delays the time setting T1 and issues a grid-connected instruction to the sub-control device. The sub-control device controls the distributed energy according to the power balance principle and controls the power output of the station in case of reverse power, so as to reduce the impact and influence of the grid connection on the line; the master control device completes all distributed energy controls in turn. After all single new energy stations are connected to the grid, the master control device gradually increases the power generation power of the distributed new energy station according to the progressive principle until the maximum output power is reached.
[0035] Furthermore, the division principle of the regional control library is specifically as follows: the distributed new energy on the same feeder is a control group, multiple control groups on the same I bus form another control group, and all control groups are aggregated into the main control library.
[0036] The advantages of the present invention are:
[0037] The present invention uses the on-grid and off-grid master control equipment deployed in the distribution room and the distributed new energy slave equipment, establishes a channel through the wireless / power carrier and the distributed new energy on the feeder, and autonomously and orderly controls the distributed new energy to perform on-grid and off-grid operations according to the fault and maintenance information detected by the on-grid and off-grid master control equipment, reduces the impact of the new energy on the distribution network, ensures the safety of line maintenance, simplifies operation and maintenance, and improves the safety and reliability of distributed energy operation in the power grid.
[0038] The present invention utilizes resources such as distributed new energy to realize the orderly connection and disconnection of distributed new energy, and completes the new energy management in the distribution station area in a more timely and maintainable manner.
[0039] The present invention includes collecting and controlling the distributed new energy directly connected to the distribution room, and collecting and controlling the information of primary equipment such as distribution transformers and switches in the distribution room. It realizes orderly control of new energy under conditions such as distribution network failure, equipment maintenance, and passive island protection. It meets the refined management requirements of large-scale grid-connected distributed photovoltaics on the low-voltage side. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 Schematic diagram of control deployment and controller area of Example 1 of the present invention. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] Example 1
[0043] This embodiment arranges control equipment for distributed renewable energy in the power grid and builds a hardware environment for realizing automatic grid connection and off-grid connection of distributed renewable energy, including:
[0044] A set of on-grid and off-grid master control equipment is deployed in the power distribution room, and a set of on-grid and off-grid sub-control equipment is configured for each new energy station under this power distribution room. The master control equipment collects relevant information of the power distribution room to complete the overall control strategy, and the sub-control equipment receives the control instructions of the master control equipment and executes the action behavior.
[0045] Specifically, the main control device collects the information of the sub-control devices at regular intervals to form a regional control library. The regional control library is based on physical connections, with switches or circuit breakers as sections and feeders as a control group, such as Figure 1 , distributed renewable energy FG1 and FG2 are connected to the feeder 102, then FG1 and FG2 form a control group, power source FG3 is in 103, then FG3 forms a control group. FG1, FG2 and FG3 are on the same I bus, then FG1, FG2 and FG3 form a control group. All control groups are aggregated into a master control library.
[0046] Function of sub-control device:
[0047] 1: Collect the current and voltage of the distributed grid-connected ports to provide auxiliary judgment for the master station.
[0048] 2: The sub-control device controls the distributed new energy switch equipment to realize switch closing and opening.
[0049] 3: The sub-control device receives the instructions from the master station and directly controls the energy output of power electronic equipment such as inverters.
[0050] The sub-control device's behavior in the process is as follows:
[0051] 1: In off-grid operation, the sub-controller first reduces the power generation according to the control instructions issued by the master station, then trips the switch or directly trips quickly to disconnect, and then goes off-grid.
[0052] 2: During the grid-connected operation, the sub-controller first increases the power generation according to the control instructions issued by the master station, then closes the switch and connects to the grid.
[0053] The above-mentioned neutron control operation needs to establish communication with inverters and other equipment to achieve power control capabilities.
[0054] The main control equipment is used to detect the current and voltage in the distribution room and provide control strategies.
[0055] Example 2
[0056] This embodiment provides a control strategy based on the hardware environment of Embodiment 1, including the following arrangements:
[0057] Step 1: The main control device detects the current and voltage in the power distribution room. When the current value is greater than the set overcurrent value and reaches the action delay, the main control device records the fault memory. When the fault memory delay reaches the off-grid new energy time value, and the voltage loss reaches the delay value, the incoming line fault off-grid action is triggered, and the feeder new energy off-grid action process is started. Jump to step 4.
[0058] Step 2: When the main control device detects the action of a specific feeder relay device and the switch quantity of the feeder relay device action meets the delayed action time, the feeder off-grid action is triggered and the feeder off-grid action process is started. Jump to step 4.
[0059] Step 3: When the main control device is input for maintenance, the maintenance off-grid action is triggered and the maintenance off-grid action process is started. Jump to step 4.
[0060] Step 4: When the main control device enters the off-grid action process, it determines the off-grid action type. If it is off-grid due to incoming line fault or maintenance, the main control controls the new energy on the corresponding bus to go off-grid. If it is a feeder off-grid action, the new energy station on the corresponding line is controlled to go off-grid.
[0061] The off-grid command follows the following control strategy
[0062] 4-1. After the main control determines the off-grid type, it selects the new energy station corresponding to the control area, such as Figure 1 If the incoming line 101 fails, the FG1, FG2, and FG3 distributed renewable energy sources in the control area under the low-voltage bus I are selected. If the feeder 102 fails, the FG1 and FG2 distributed renewable energy sources in the control area under the 102 feeder are selected.
[0063] 4-2, the master control first sends a group adjustment command to reduce the output of distributed new energy to the minimum.
[0064] 4-3, the delay T0 time (1s is acceptable) is used to complete the distributed new energy action, and the master control sends the group control remote control command to the substation to control the distributed energy to go off the grid.
[0065] Step 5. When the main control device detects that the maintenance is completed or the fault is eliminated, the sequential grid-connected process is carried out. According to the type of off-grid action last time, the method for judging whether the fault has disappeared is carried out. When it is an incoming line off-grid action, the main control will detect the incoming line voltage and current. When the voltage returns to normal, the current is greater than the set value, and the direction flows to the bus, it is judged that the fault has recovered and the automatic grid-connected process is carried out. If the last time was a feeder off-grid, the state of the feeder circuit breaker is detected. When it changes from open position to closed position, and the delay time is met, it is judged that the fault has disappeared and the automatic grid-connected process is started. When the maintenance status disappears, the automatic grid-connected process needs to be manually started.
[0066] The automatic grid connection process is as follows
[0067] The main control equipment automatically controls the grid connection of the distributed new energy stations in the control area in sequence. The control strategy of each station is as follows
[0068] 5-1, the master control device sends the remote adjustment of the minimum output power of the distributed energy source of the station
[0069] 5-2, the main control device sets the delay time to T1 (can be 2s), and issues a grid-connected command to the sub-control device. The sub-control device controls the distributed energy, and controls the power output of the station according to the power balance principle and when there is no reverse power situation, so as to reduce the impact and influence of the grid connection on the line.
[0070] 5-3, the master control device completes all distributed energy control of the controller in turn.
[0071] 5-4. After the master control device completes the grid connection of all individual stations, it will gradually increase the power generation capacity of the distributed stations according to the progressive principle until the maximum output power is reached.
[0072] Step 6: The automatic grid connection process ends here.
[0073] The present invention uses the on-grid and off-grid master control equipment deployed in the distribution room and the distributed new energy slave equipment, establishes a channel through the wireless / power carrier and the distributed new energy on the feeder, and autonomously and orderly controls the distributed new energy to perform on-grid and off-grid operations according to the fault and maintenance information detected by the on-grid and off-grid master control equipment, reduces the impact of the new energy on the distribution network, ensures the safety of line maintenance, simplifies operation and maintenance, and improves the safety and reliability of distributed energy operation in the power grid.
[0074] The main control equipment for on-grid and off-grid detection and collection collects the incoming current and voltage of the distribution room, collects the protection action information of the relay protection equipment of each feeder in the distribution room, collects the switch quantity information of maintenance input, the switch quantity information of grid startup, and the switch quantity information of manual off-grid. The main control equipment determines the fault state or maintenance state based on the above information, thereby triggering the relevant new energy grid connection or off-grid operation.
[0075] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for controlling the grid connection and off-grid connection of distributed renewable energy in a substation area. It is characterized in that Deploy a main control device in the power distribution room, and configure sub-control devices in each new energy station under the power distribution room, and the main control device and the sub-control device are connected in communication; divide the substation area into multiple regional control libraries, and the regional control library is divided into sections based on switches or circuit breakers, and feeders are a control group; On-grid and off-grid control methods include: Step 1: The main control device detects the current and voltage in the power distribution room, and the sub-control device collects the current and voltage of the distributed grid-connected port to provide auxiliary judgment for the main station; when the current set value is greater than the set overcurrent set value and reaches the action delay, the main control device records and forms a fault memory. When the fault memory delay reaches the off-grid new energy time set value, and the voltage loss reaches the delay set value, the incoming line fault off-grid action is triggered, and the feeder new energy off-grid action process is started, and jump to step 2; When the main control device detects the action of a specific feeder relay protection device and the switch quantity of the feeder relay protection device action meets the delayed action time, the feeder off-grid action is triggered, the feeder off-grid action process is started, and the process jumps to step 2; When the main control device is under maintenance, the maintenance off-grid action is triggered, the maintenance off-grid action process is started, and the process jumps to step 2; Step 2: After the main control device enters the off-grid action process, it determines the off-grid action type. If it is off-grid due to incoming line fault or maintenance, the sub-control device receives the command of the main control device, and controls the new energy on the corresponding bus to go off-grid. If the feeder is off-grid, the new energy station on the corresponding line is controlled to go off-grid. Step 3. When the main control device detects that the maintenance is completed or the fault is eliminated, the sequential grid-connected process is carried out; according to the type of the last off-grid action, the method for judging whether the fault has disappeared is carried out; if the incoming line is off-grid, the main control device will detect the incoming line voltage and current. When the voltage returns to normal, the current is greater than the set value, and the direction flows to the bus, it is judged that the fault has recovered and the automatic grid-connected process is carried out; if the last time was the feeder off-grid, the feeder circuit breaker status is detected. When it changes from open position to closed position and the delay time is satisfied, it is judged that the fault has disappeared and the automatic grid-connected process is started; when the maintenance status disappears, the automatic grid-connected process needs to be manually started.
2. According to the method for controlling the on-grid and off-grid distribution of renewable energy in a substation area according to claim 1, It is characterized in that The off-grid control strategy in step 2 is as follows: After the master device determines the off-grid type, it selects the new energy station in the corresponding regional control library. The master device first sends a group adjustment command to reduce the output of distributed new energy to the minimum; the delay T0 time is used for the distributed new energy action to complete, and the master device sends a group control remote control command to the sub-control device to control the distributed energy off-grid.
3. According to claim 1, a method for controlling the on-grid and off-grid distribution of distributed renewable energy in a substation area, It is characterized in that The grid connection control strategy in step 3 is as follows: The master control device automatically controls the stations to be connected to the grid in sequence according to the regional control library. The control strategy for each station is as follows: The master control device sends a remote adjustment to the minimum output power of the distributed energy of the station; the master control device delays the time setting T1 and issues a grid-connected instruction to the sub-control device. The sub-control device controls the distributed energy according to the power balance principle and controls the power output of the station in case of reverse power, so as to reduce the impact and influence of the grid connection on the line; the master control device completes all distributed energy controls in turn. After all single new energy stations are connected to the grid, the master control device gradually increases the power generation power of the distributed new energy station according to the progressive principle until the maximum output power is reached.
4. A method for controlling the connection and disconnection of distributed renewable energy in a substation according to any one of claims 1 to 3, It is characterized in that The division principle of the regional control library is specifically as follows: the distributed new energy on the same feeder is a control group, multiple control groups on the same I bus form another control group, and all control groups are aggregated into the main control library.
5. A distributed renewable energy on-grid and off-grid control system for a substation, applied to the methods of claims 1 to 4, It is characterized in that include The main control module includes a main control device arranged in the power distribution room, which is used to detect and determine the type of fault and provide a corresponding on-grid and off-grid control strategy according to the type; The sub-control module includes sub-control devices arranged in each new energy station under the power distribution room, and the sub-control devices are connected to the main control device for communication and receive control instructions from the main control device; A regional control library divides the substation area into multiple regional control libraries, wherein the regional control library is divided into sections by switches or circuit breakers and feeders are a control group for sequential control and off-grid disconnection; The on-grid and off-grid control strategies include: Step 1: The main control device detects the current and voltage in the power distribution room. When the current setting value is greater than the set overcurrent setting value and reaches the action delay, the main control device records the fault memory. When the fault memory delay reaches the off-grid new energy time setting value, and the voltage loss reaches the delay setting value, the incoming line fault off-grid action is triggered, the feeder new energy off-grid action process is started, and the process goes to step 2. When the main control device detects the action of a specific feeder relay protection device and the switch quantity of the feeder relay protection device action meets the delayed action time, the feeder off-grid action is triggered, the feeder off-grid action process is started, and the process jumps to step 2; When the main control device is under maintenance, the maintenance off-grid action is triggered, the maintenance off-grid action process is started, and the process jumps to step 2; Step 2: After the master control device enters the off-grid action process, it determines the off-grid action type. If it is off-grid due to incoming line fault or maintenance, the master control device controls the new energy on the corresponding bus to go off-grid. If it is a feeder off-grid action, the new energy station on the corresponding line is controlled to go off-grid. Step 3. When the main control device detects that the maintenance is completed or the fault is eliminated, the sequential grid-connected process is carried out; according to the type of the last off-grid action, the method for judging whether the fault has disappeared is carried out; if the incoming line is off-grid, the main control device will detect the incoming line voltage and current. When the voltage returns to normal, the current is greater than the set value, and the direction flows to the bus, it is judged that the fault has recovered and the automatic grid-connected process is carried out; if the last time was the feeder off-grid, the feeder circuit breaker status is detected. When it changes from open position to closed position and the delay time is satisfied, it is judged that the fault has disappeared and the automatic grid-connected process is started; when the maintenance status disappears, the automatic grid-connected process needs to be manually started.
6. A distributed renewable energy on-grid and off-grid control system for a substation according to claim 5, It is characterized in that The off-grid control strategy in step 2 is as follows: After the master device determines the off-grid type, it selects the new energy station in the corresponding regional control library. The master device first sends a group adjustment command to reduce the output of distributed new energy to the minimum; the delay T0 time is used for the distributed new energy action to complete, and the master device sends a group control remote control command to the sub-control device to control the distributed energy off-grid.
7. A distributed renewable energy on-grid and off-grid control system for a substation according to claim 5, It is characterized in that The grid connection control strategy in step 3 is as follows: The master control device automatically controls the stations to be connected to the grid in sequence according to the regional control library. The control strategy for each station is as follows: The master control device sends a remote adjustment to the minimum output power of the distributed energy of the station; the master control device delays the time setting T1 and issues a grid-connected instruction to the sub-control device. The sub-control device controls the distributed energy according to the power balance principle and controls the power output of the station in case of reverse power, so as to reduce the impact and influence of the grid connection on the line; the master control device completes all distributed energy controls in turn. After all single new energy stations are connected to the grid, the master control device gradually increases the power generation power of the distributed new energy station according to the progressive principle until the maximum output power is reached.
8. A distributed renewable energy on-grid and off-grid control system for a substation according to any one of claims 5 to 7, It is characterized in that The division principle of the regional control library is specifically as follows: the distributed new energy on the same feeder is a control group, multiple control groups on the same I bus form another control group, and all control groups are aggregated into the main control library.
Citation Information
Patent Citations
Grid-connection micro grid control system and method
CN109768571A
Protection method of power distribution network under distributed energy condition
CN114123136A
Regional grid-connected and off-grid response control method and system
CN114221376A
Centralized self-healing solution for master station containing distributed power supply circuit
CN116054098A