Building management system with sustainability improvement
By integrating an intelligent sustainable development optimization system into the building management system, the problem of achieving sustainable building development goals in existing technologies has been solved. This enables intelligent management of building equipment and energy optimization, improving energy efficiency and reducing carbon emissions.
Patent Information
- Application Number
- CN202380037024.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-12-23
- Filing Date
- 2023-04-28
- Publication Date
- 2024-12-06
AI Technical Summary
Existing building management systems are inefficient and wasteful in achieving sustainable development goals, and are unable to effectively monitor and optimize building equipment to meet predetermined carbon emission and energy use targets.
By integrating an intelligent sustainable development optimization system into the building management system, building data can be collected and analyzed to generate energy-saving protocols, control building equipment, detect equipment replacement and malfunctions, and provide a user interface to update and monitor energy usage, thereby achieving intelligent management and optimization of building equipment.
It improves the energy efficiency of buildings, reduces carbon emissions, enables intelligent management and optimization of building equipment, and helps buildings achieve sustainable development goals.
Smart Images

Figure CN119096205A_ABST
Abstract
Description
[0001] Cross-references to related patent applications
[0002] This application claims the benefit of and priority to U.S. Provisional Patent Application No. 63 / 336,935, filed April 29, 2022, and this application claims the benefit of and priority to U.S. Provisional Patent Application No. 63 / 435,191, filed December 23, 2022, each of which is incorporated herein by reference in its entirety. The entire contents of the following applications are incorporated herein by reference: U.S. Patent Application No. 17 / 948,118, filed September 19, 2022, U.S. Patent Application No. 17 / 710,458, filed March 31, 2022, U.S. Patent Application No. 17 / 134,661, filed December 28, 2020, U.S. Provisional Patent Application No. 63 / 289,499, filed December 14, 2021, and U.S. Patent Application No. 17 / 537,046, filed November 29, 2021. Summary of the invention
[0003] At least one embodiment relates to a building management system (BMS). The BMS may include one or more memory devices storing instructions thereon, which, when executed by one or more processors, cause the one or more processors to obtain sustainability goals established for a building, the building may include multiple pieces of building equipment, and the sustainability goals may be related to the sustainability of the building. The instructions may also cause the one or more processors to use the baseline value and the sustainability goal for the sustainability performance of the building to determine a target sustainability level for the building. The instructions may also cause the one or more processors to use the baseline value and the target sustainability level for the sustainability performance of the building to generate multiple energy saving agreements, the first of which may include multiple actions that meet at least a portion of the sustainability goal or at least a portion of the target sustainability level for the building. The instructions may also cause the one or more processors to receive an indication of accepting a subset of the multiple actions included in the first energy saving agreement, and implement the subset of the multiple actions included in the first energy saving agreement in response to receiving an indication of accepting a subset of the multiple actions.
[0004] In some embodiments, implementing a subset of the plurality of actions included in the first energy conservation protocol includes controlling at least one piece of building equipment among a plurality of pieces of building equipment using a plurality of control actions associated with the subset of the plurality of actions included in the first energy conservation protocol, and detecting that the building has moved toward a target sustainability level in response to controlling at least one piece of building equipment among the plurality of pieces of building equipment.
[0005] In some embodiments, the instructions may cause the one or more processors to detect that a first piece of building equipment among the plurality of pieces of building equipment has been replaced by a second piece of building equipment that may perform a function similar to the function of the first piece of building equipment. The instructions may also cause the one or more processors to determine an effect of the second piece of building equipment on at least one of a sustainability goal or a target sustainability level in response to the second piece of building equipment replacing the first piece of building equipment, and to provide the effect of the second piece of building equipment on at least one of the sustainability goal or the target sustainability level to a user device.
[0006] In some embodiments, the instructions may cause the one or more processors to use operational data of the building to detect an equipment fault condition for at least one piece of building equipment among the plurality of pieces of equipment. The instructions may also cause the one or more processors to determine that the equipment fault condition impacts a sustainability goal. The instructions may also cause the one or more processors to update at least one of the plurality of energy conservation protocols to include a first action that addresses at least a portion of the equipment fault condition, and to execute at least one of the plurality of energy conservation protocols that addresses the equipment fault condition.
[0007] In some embodiments, the instructions may cause the one or more processors to cause the device to display an element that includes at least one of a sustainability goal, a current value for sustainability performance, or at least one of a plurality of energy conservation protocols. The instructions may also cause the one or more processors to receive an indication to update at least a portion of the element that includes a user-defined energy conservation protocol, and update the element to include the user-defined energy conservation protocol.
[0008] In some embodiments, the instructions may cause the one or more processors to execute at least one of a plurality of energy conservation protocols. The instructions may also cause the one or more processors to determine a current value of sustainability performance for the building using operational data for the building, the current value of sustainability performance for the building being determined in response to a predetermined amount of time. The instructions may also cause the one or more processors to determine a difference between the current value of sustainability performance for the building and a baseline value of sustainability performance for the building, and in response to the difference being greater than a predetermined threshold, determine that at least one of the plurality of energy conservation protocols has moved the sustainability performance of the building toward a target sustainability level.
[0009] In some embodiments, the instructions may cause the one or more processors to monitor the state of a specific action included in at least one of the plurality of energy saving protocols using the operational data for the building. The instructions may also cause the one or more processors to determine that the state of the specific action has remained the same in response to monitoring the state of the specific action. The instructions may also cause the one or more processors to cause the device to display an element including a notification to perform the specific action, and to determine that the specific action has been performed using the second operational data for the building.
[0010] In some embodiments, determining a target sustainability level for a building includes: determining a difference between a baseline value for the building's sustainability performance and a sustainability target; using the difference between the baseline value for the building's sustainability performance and the sustainability target to generate a sustainability value that meets the sustainability target; and determining an amount of time to reach the sustainability value, wherein the amount of time is established by the sustainability target.
[0011] In some embodiments, generating multiple energy-saving protocols includes: retrieving operational data related to at least one of multiple pieces of building equipment from a database; using the operational data related to at least one of the multiple pieces of building equipment to determine the role of at least one of the multiple pieces of building equipment in a baseline value for the sustainability performance of the building; retrieving predetermined operational metrics related to the at least one piece of building equipment from a database; using the predetermined operational metrics related to the at least one piece of building equipment and the operational data related to the at least one piece of building equipment to detect a difference between the predetermined operational metrics and the operational data; and generating a set of actions in response to detecting the difference between the predetermined operational metrics and the operational data, the set of actions adjusting the role of the at least one piece of building equipment in the baseline value for the sustainability performance of the building by reducing the difference between the predetermined operational metrics and the operational data.
[0012] At least one embodiment relates to a method for reducing carbon emissions for a building. The method may include obtaining, by one or more processors, a carbon reduction target established for a building, the building including multiple pieces of building equipment. The method may also include determining, by one or more processors, a target carbon emissions level for the building using a baseline carbon emissions level and a carbon reduction target for the building. The method may also include generating, by one or more processors, a plurality of energy conservation agreements using the baseline carbon emissions level and the target carbon emissions level, wherein a first energy conservation agreement among the plurality of energy conservation agreements includes a plurality of actions that meet at least a portion of the carbon reduction target for the building or at least a portion of the target carbon emissions level. The method may also include receiving, by one or more processors, an indication of accepting a subset of the plurality of actions included in the first energy conservation agreement. The method may also include implementing, by one or more processors, a subset of the plurality of actions included in the first energy conservation agreement in response to receiving an indication of accepting a subset of the plurality of actions, and detecting, by one or more processors, that the building has moved toward the target carbon emissions level in response to implementing a subset of the plurality of actions included in the first energy conservation agreement.
[0013] In some embodiments, the method may further include detecting, by the one or more processors, that a first piece of building equipment among the plurality of pieces of building equipment has been replaced by a second piece of building equipment, wherein the second piece of building equipment performs a function similar to the function of the first piece of building equipment. The method may also include determining, by the one or more processors, an effect of the second piece of building equipment on at least one of a carbon reduction target or a target carbon emissions level in response to the second piece of building equipment replacing the first piece of building equipment, and providing, by the one or more processors, the effect of the second piece of building equipment on at least one of the carbon reduction target or the target carbon emissions level to a user device.
[0014] In some embodiments, the method may further include using, by the one or more processors, operational data of the building to detect an equipment fault condition for at least one piece of building equipment among the plurality of pieces of equipment. The method may also include determining, by the one or more processors, that the equipment fault condition impacts the carbon reduction target. The method may also include updating, by the one or more processors, at least one of the plurality of energy conservation protocols to include a first action that addresses at least a portion of the equipment fault condition, and executing, by the one or more processors, at least one of the plurality of energy conservation protocols, wherein the at least one of the plurality of energy conservation protocols addresses the equipment fault condition.
[0015] In an embodiment, the method may further include causing, by the one or more processors, the device to display an element, wherein the element includes at least one of a carbon reduction target, a current carbon emissions level, or at least one of a plurality of energy conservation protocols. The method may also include receiving, by the one or more processors, an indication to update at least a portion of the element, wherein the indication includes a user-defined energy conservation protocol, and updating, by the one or more processors, the element to include the user-defined energy conservation protocol.
[0016] In some embodiments, the method may further include executing, by one or more processors, at least one of the plurality of energy conservation protocols. The method may also include determining, by the one or more processors, a current carbon emissions level using operational data for the building, wherein the current carbon emissions level is determined in response to a predetermined amount of time. The method may also include determining, by the one or more processors, a difference between the current carbon emissions level and a baseline carbon emissions level, and determining, by the one or more processors, in response to the difference being greater than a predetermined threshold, that at least one of the plurality of energy conservation protocols has moved the sustainability of the building toward a target carbon emissions level.
[0017] In some embodiments, the method may further include monitoring, by one or more processors, the state of a specific action included in at least one of the plurality of energy saving protocols using operational data for the building. The method may also include determining, by one or more processors, in response to monitoring the state of the specific action, that the state of the specific action has remained the same. The method may also include causing, by one or more processors, the device to display an element, wherein the element includes a notification that the specific action was performed, and determining, by one or more processors, that the specific action has been performed using second operational data for the building.
[0018] In some embodiments, determining a target carbon emissions level for a building includes: determining, by one or more processors, a difference between a baseline carbon emissions level and a carbon reduction target; using, by one or more processors, the difference between the baseline carbon emissions level and the carbon reduction target to generate a sustainability value that meets the carbon reduction target; and determining, by one or more processors, an amount of time to reach the sustainability value, wherein the amount of time is established by the carbon reduction target.
[0019] In some embodiments, generating multiple energy-saving protocols includes: retrieving, by one or more processors, operational data related to at least one piece of building equipment among multiple pieces of building equipment from a database; using, by one or more processors, the operational data related to at least one piece of building equipment among multiple pieces of building equipment to determine the role of at least one piece of building equipment among multiple pieces of building equipment in a baseline value for the sustainability performance of the building; retrieving, by one or more processors, predetermined operational metrics related to the at least one piece of building equipment from a database; using, by one or more processors, predetermined operational metrics related to the at least one piece of building equipment and operational data related to the at least one piece of building equipment to detect a difference between the predetermined operational metrics and the operational data; and generating, by one or more processors, a set of actions in response to detecting the difference between the predetermined operational metrics and the operational data, the set of actions adjusting the role of the at least one piece of building equipment in the baseline sustainability performance by reducing the difference between the predetermined operational metrics and the operational data.
[0020] At least one embodiment relates to one or more non-transitory storage media. The one or more non-transitory storage media may have instructions stored thereon. These instructions, when executed by one or more processors, may cause the one or more processors to implement operations including obtaining a sustainability goal established for a building, the building including multiple pieces of building equipment, and wherein the sustainability goal relates to the sustainability performance of the building. These operations may also include determining a target sustainability level for the building using a baseline value for the sustainability performance of the building and the sustainability goal. These operations may also include generating multiple energy saving protocols using a baseline value for the sustainability performance of the building and the target sustainability level, wherein a first energy saving protocol in the multiple energy saving protocols includes multiple actions that meet at least a portion of the sustainability goal for the building or at least a portion of the target sustainability level. These operations may also include receiving an indication of accepting a subset of the multiple actions included in the first energy saving protocol. These operations may also include controlling at least one of the multiple building equipment using multiple control actions related to the subset of the multiple actions included in the first energy saving protocol, and detecting that the building has moved toward the target sustainability level in response to controlling at least one of the multiple building equipment.
[0021] In some embodiments, the operations may further include detecting that a first piece of building equipment in the plurality of pieces of building equipment has been replaced by a second piece of building equipment, wherein the second piece of building equipment performs a function similar to the function of the first piece of building equipment. The operations may also include determining an effect of the second piece of building equipment on at least one of a sustainability goal or a target sustainability level in response to the second piece of building equipment replacing the first piece of building equipment, and providing the effect of the second piece of building equipment on at least one of the sustainability goal or the target sustainability level to a user device.
[0022] In some embodiments, the operations may further include using the operational data of the building to detect an equipment fault condition for at least one piece of building equipment in the plurality of pieces of equipment. The operations may also include determining that the equipment fault condition impacts the sustainability goal. The operations may also include updating at least one of the plurality of energy conservation protocols to include a first action that addresses at least a portion of the equipment fault condition, and executing at least one of the plurality of energy conservation protocols, wherein the at least one of the plurality of energy conservation protocols addresses the equipment fault condition. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Various objects, aspects, features and advantages of the present disclosure will become more apparent and better understood by reference to the detailed description taken in conjunction with the accompanying drawings, in which the same reference numerals identify corresponding elements throughout. In the drawings, the same reference numerals generally represent identical, functionally similar and / or structurally similar elements.
[0024] Figure 1 is a diagram of a building equipped with a heating, ventilation, and / or air conditioning (HVAC) system according to an exemplary embodiment.
[0025] Figure 2 According to an exemplary embodiment, it can be used to monitor and / or control Figure 1 Block diagram of the building automation system (BAS) of a building.
[0026] Figure 3 is a block diagram of a system for planning sustainability optimization of a building according to an exemplary embodiment.
[0027] Figure 4 According to an exemplary embodiment Figure 3 Block diagram of an energy bill retrieval system of a sustainability optimization system that retrieves a utility bill for the building.
[0028] Figure 5 According to an exemplary embodiment Figure 3 Block diagram of a building audit system of a system configured to collect building data for a building via an audit.
[0029] Figure 6 According to an exemplary embodiment Figure 3 Block diagram of a demand-side data system of a system configured to collect building systems and operational data from a building and calculate energy metrics, carbon metrics, operational metrics, and facility improvement measures (FIMs) for the building.
[0030] Figure 7 According to an exemplary embodiment Figure 3 Block diagram of a field supply data system of a system configured to collect data from a field energy supply system of a building.
[0031] Figure 8 According to an exemplary embodiment Figure 3 Block diagram of a sustainability advisor and an optimization system of a system, the sustainability advisor being configured to provide sustainability data to a user and receive input from the user, and the optimization system being configured to run sustainability optimization of a building.
[0032] Fig. 9 is a block diagram of a planning tool that may be used to determine the return on investing in a battery asset and calculate various financial metrics associated with the investment, according to an exemplary embodiment.
[0033] Fig.10 is a block diagram illustrating an asset size determination module according to an exemplary embodiment.
[0034] Fig.11 is a block diagram of a system for energy conservation according to an exemplary embodiment.
[0035] Fig.12 According to an exemplary embodiment Fig.11 Block diagram of the sustainability components of the system.
[0036] Fig.13 is a user interface that displays a setting window for facility improvement measures according to an exemplary embodiment.
[0037] Fig.14 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0038] Fig.15 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0039] Fig.16 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0040] Fig.17is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0041] Fig.18 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0042] Fig.19 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0043] Fig. 20 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0044] Fig.21 is a user interface displaying a description window related to energy saving measures according to an exemplary embodiment.
[0045] Fig. 22 is a user interface displaying a description window related to energy saving measures according to an exemplary embodiment.
[0046] Fig.23 is a user interface that displays a customization window related to improvement planning according to an exemplary embodiment.
[0047] Fig.24 is a user interface that displays a customization window related to improvement planning according to an exemplary embodiment.
[0048] Fig.25 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0049] Fig.26 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0050] Fig. 27 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0051] Fig.28 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0052] Fig.29 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0053] Fig.30 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0054] Fig.31 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0055] Fig.32is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0056] Fig.33 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0057] Fig.34A is a user interface that displays a graphical representation of energy conservation measure tracking according to an exemplary embodiment.
[0058] Fig.34B is a user interface that displays a graphical representation of energy conservation measure tracking according to an exemplary embodiment.
[0059] Fig.35 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0060] Fig.36 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0061] Fig.37 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0062] Fig.38 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0063] Fig.39 is a user interface displaying a power saving window according to an exemplary embodiment.
[0064] Fig.40 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0065] Fig.41 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0066] Fig.42 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0067] Fig.43 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0068] Fig.44 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0069] Fig.45 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0070] Fig.46is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0071] Fig.47 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0072] Fig.48A is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0073] Fig.48B is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0074] Fig.49 is a user interface displaying an energy saving measure window according to an exemplary embodiment.
[0075] Fig.50 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0076] Fig.51 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0077] Fig.52 is a user interface displaying an improvement action planning dashboard according to an exemplary embodiment.
[0078] Fig.53A is a user interface that displays a graphical representation of energy conservation measure tracking according to an exemplary embodiment.
[0079] Fig.53B is a user interface displaying a table including a plurality of energy saving measures according to an exemplary embodiment.
[0080] Fig.54 is a block diagram of a process for reducing carbon emissions according to an exemplary embodiment. DETAILED DESCRIPTION
[0081] Referring generally to the accompanying drawings, systems and methods for sustainability assessment and / or improvement of one or more buildings are provided according to various exemplary embodiments. The sustainability optimization system may be configured to collect various information about the building, such as energy supply data, on-site energy generation systems, demand data, indications of building equipment, etc. The sustainability optimization system may be configured to run optimizations on the collected data to identify improvements to the building to achieve sustainable operation of the building. For example, the optimization may be optimized for various metrics of the building, such as carbon footprint, energy usage, financial costs, etc. The result of the optimization may be to retrofit certain building equipment, install on-site solar panels, purchase renewable energy credits (RECs), generate building control plans, etc. In some embodiments, the system may additionally or alternatively provide an assessment of the historical, current and / or future sustainability performance of the building, the spaces of the building, the occupants of the building, the equipment of the building, etc., with or without recommendations for improved performance.
[0082] In some embodiments, the optimization may result in a building plan that enables the building to meet sustainability goals within a specific timeline. For example, a user may have a goal for their building to reach net zero carbon emissions (or a predefined and / or user defined carbon emissions level) within a certain time frame (e.g., the next thirty years). The optimization may be run periodically, such as annually, to optimize within the optimization period (e.g., the next five years) and achieve the goal within the entire planning period (e.g., the next thirty years). In some embodiments, the optimization may additionally or alternatively be run upon a user's request / demand, upon the occurrence of certain events / goals, etc.
[0083] Building Management Systems and HVAC Systems
[0084] Reference now Figure 1 , according to an exemplary embodiment, shows an exemplary building management system (BMS) and HVAC system in which the systems and methods of the present invention can be implemented. Specifically referring to Figure 1 , showing a perspective view of a building 10. The building 10 is served by a BMS. A BMS is generally a system of devices configured to control, monitor, and manage equipment in or around a building or building area. The BMS may include, for example, an HVAC system, a security system, a lighting system, a fire alarm system, and / or any other system capable of managing building functions or devices, or any combination thereof.
[0085] The BMS serving the building 10 includes an HVAC system 100. The HVAC system 100 may include HVAC devices (e.g., heaters, chillers, air handling units, pumps, fans, thermal energy storage devices, etc.) configured to provide heating, cooling, ventilation, or other services to the building 10. By way of example, the HVAC system 100 is illustrated as including a waterside system 120 and an airside system 130. The waterside system 120 may provide heated or cooled fluid to the air handling units of the airside system 130. The airside system 130 may use the heated or cooled fluid to heat or cool an airflow provided to the building 10. Exemplary waterside systems and airside systems that may be used in the HVAC system 100 are referenced below. Figures 2 to 3 Described in more detail.
[0086] HVAC system 100 is shown to include chiller 102, boiler 104, and rooftop air handling unit (AHU) 106. Waterside system 120 can use boiler 104 and chiller 102 to heat or cool a working fluid (e.g., water, glycol, etc.) and can circulate the working fluid to AHU 106. In various embodiments, HVAC devices of waterside system 120 can be located in or around building 10 (e.g., Figure 1 ), or located at an off-site location such as a central plant (e.g., a chiller plant, a steam plant, a heat generating plant, etc.). Depending on whether heating or cooling is required in the building 10, the working fluid can be heated in the boiler 104 or cooled in the chiller 102. The boiler 104 can add heat to the circulating fluid, for example, by burning a combustible material (e.g., natural gas) or using an electric heating element. The chiller 102 can place the circulating fluid in a heat exchange relationship with another fluid (e.g., a refrigerant) in a heat exchanger (e.g., an evaporator) to absorb heat from the circulating fluid. The working fluid from the chiller 102 and / or the boiler 104 can be delivered to the AHU 106 via a line 108.
[0087] The AHU 106 may place the working fluid in heat exchange relationship with an airflow passing through the AHU 106 (e.g., via one or more stages of cooling coils and / or heating coils). For example, the airflow may be outdoor air, return air from within the building 10, or a combination of both. The AHU 106 may transfer heat between the airflow and the working fluid to provide heating or cooling to the airflow. For example, the AHU 106 may include one or more fans or blowers configured to pass the airflow through or through a heat exchanger containing the working fluid. The working fluid may then be returned to the chiller 102 or the boiler 104 via the conduit 110.
[0088] The airside system 130 may deliver the airflow supplied by the AHU 106 (i.e., supply airflow) to the building 10 via the supply duct 112, and may provide return air from the building 10 to the AHU 106 via the return duct 114. In some embodiments, the airside system 130 includes a plurality of variable air volume (VAV) units 116. For example, the airside system 130 is shown as including a separate VAV unit 116 on each floor or zone of the building 10. The VAV units 116 may include dampers or other flow control elements that may operate to control the amount of supply airflow provided to the various zones of the building 10. In other embodiments, the airside system 130 delivers the supply airflow to one or more zones of the building 10 (e.g., via the supply duct 112) without using an intermediate VAV unit 116 or other flow control element. The AHU 106 may include various sensors (e.g., temperature sensors, pressure sensors, etc.) configured to measure properties of the supply airflow. The AHU 106 may receive input from sensors located within the AHU 106 and / or within the building zone and may adjust the flow rate, temperature, or other properties of the supply airflow through the AHU 106 to achieve set point conditions for the building zone.
[0089] Reference now Figure 2 , a block diagram of a building automation system (BAS) 200 is shown according to an exemplary embodiment. The BAS 200 can be implemented in a building 10 to automatically monitor and control various building functions. The BAS 200 is shown to include a BAS controller 202 and a building subsystem 228. The building subsystem 228 is shown to include a building electrical subsystem 234, an information and communication technology (ICT) subsystem 236, a security subsystem 238, an HVAC subsystem 240, a lighting subsystem 242, an elevator / escalator subsystem 232, and a fire safety subsystem 230. In various embodiments, the building subsystem 228 may include fewer, additional, or alternative subsystems. For example, the building subsystem 228 may also or alternatively include a refrigeration subsystem, an advertising or signage subsystem, a cooking subsystem, a vending subsystem, a printer or copy service subsystem, or any other type of building subsystem that uses controllable devices and / or sensors to monitor or control the building 10. In some embodiments, the building subsystem 228 includes a water side system and / or an air side system. Further reference is made to U.S. Patent Application No. 15 / 631,830 filed on June 23, 2017, which is incorporated herein by reference in its entirety, for describing the waterside system and the airside system.
[0090] Each of the building subsystems 228 may include any number of devices, controllers, and connections for performing its respective functions and control activities. The HVAC subsystem 240 may include many of the same components as the HVAC system 100, as described with reference to FIG. Figure 1 As described. For example, HVAC subsystem 240 may include chillers, boilers, any number of air handling units, economizers, field controllers, supervisory controllers, actuators, temperature sensors, and other devices for controlling temperature, humidity, airflow, or other variable conditions within building 10. Lighting subsystem 242 may include any number of lighting fixtures, ballasts, lighting sensors, dimmers, or other devices configured to controllably adjust the amount of light provided to a building space. Security subsystem 238 may include occupancy sensors, video surveillance cameras, digital video recorders, video processing servers, intrusion detection devices, access control devices and servers, or other security-related devices.
[0091] Still reference Figure 2 , the BAS controller 202 is shown to include a communication interface 207 and a BAS interface 209. The interface 207 may facilitate communication between the BAS controller 202 and external applications (e.g., monitoring and reporting applications 222, enterprise control applications 226, remote systems and applications 244, applications resident on client devices 248, etc.) for allowing user control, monitoring, and adjustment of the BAS controller 202 and / or subsystems 228. The interface 207 may also facilitate communication between the BAS controller 202 and client devices 248. The BAS interface 209 may facilitate communication between the BAS controller 202 and building subsystems 228 (e.g., HVAC, lighting security, elevators, power distribution, services, etc.).
[0092] Interfaces 207, 209 may be or include wired or wireless communication interfaces (e.g., sockets, antennas, transmitters, receivers, transceivers, wire connectors, etc.) for data communication with building subsystems 228 or other external systems or devices. In various embodiments, communication through interfaces 207, 209 may be direct communication (e.g., local wired or wireless communication) or through a communication network 246 (e.g., WAN, Internet, cellular network, etc.). For example, interfaces 207, 209 may include an Ethernet card and port for sending and receiving data through an Ethernet-based communication link or network. In another example, interfaces 207, 209 may include a Wi-Fi transceiver for communicating through a wireless communication network. In another example, one or both of interfaces 207, 209 may include a cellular or mobile phone communication transceiver. In one embodiment, communication interface 207 is a power line communication interface, and BAS interface 209 is an Ethernet interface. In other embodiments, both communication interface 207 and BAS interface 209 are Ethernet interfaces or the same Ethernet interface.
[0093] Still reference Figure 2 , the BAS controller 202 is shown to include a processing circuit 204, which includes a processor 206 and a memory 208. The processing circuit 204 can be communicatively connected to the BAS interface 209 and / or the communication interface 207, so that the processing circuit 204 and its various components can send and receive data through the interfaces 207, 209. The processor 206 can be implemented as a general-purpose processor, an application-specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGA), a group of processing components, or other suitable electronic processing components.
[0094] Memory 208 (e.g., memory, memory unit, storage device, etc.) may include one or more devices (e.g., RAM, ROM, flash memory, hard disk storage, etc.) for storing data and / or computer code for completing or facilitating the various processes, layers, and modules described in this application. Memory 208 may be or include volatile memory or non-volatile memory. Memory 208 may include a database component, object code component, script component, or any other type of information structure for supporting the various activities and information structures described in this application. According to an exemplary embodiment, memory 208 is communicatively connected to processor 206 via processing circuit 204 and includes computer code for executing (e.g., by processing circuit 204 and / or processor 206) one or more processes described herein.
[0095] In some embodiments, the BAS controller 202 is implemented in a single computer (e.g., a server, a house, etc.). In various other embodiments, the BAS controller 202 may be distributed across multiple servers or computers (e.g., may exist in dispersed locations). Figure 2 The applications 222 and 226 are shown as existing external to the BAS controller 202 , but in some embodiments, the applications 222 and 226 may be hosted within the BAS controller 202 (eg, within the memory 208 ).
[0096] Still reference Figure 2 , the memory 208 is shown to include an enterprise integration layer 210, an automated measurement and verification (AM&V) layer 212, a demand response (DR) layer 214, a fault detection and diagnostics (FDD) layer 216, an integrated control layer 218, and a building subsystem integration layer 220. The layers 210-220 are configured in some embodiments to receive inputs from the building subsystems 228 and other data sources, determine optimal control actions for the building subsystems 228 based on the inputs, generate control signals based on the optimal control actions, and provide the generated control signals to the building subsystems 228. The following paragraphs describe some of the common functions performed by each of the layers 210-220 in the BAS 200.
[0097] The enterprise integration layer 210 can be configured to provide information and services to client or local applications to support a variety of enterprise-level applications. For example, the enterprise control application 226 can be configured to provide subsystem cross-control to a graphical user interface (GUI) or to any number of enterprise-level business applications (e.g., billing system, user identification system, etc.). The enterprise control application 226 can also or alternatively be configured to provide a configuration GUI for configuring the BAS controller 202. In yet other embodiments, the enterprise control application 226 can work with the layers 210-220 to optimize building performance (e.g., efficiency, energy usage, comfort, or safety) based on input received at the interface 207 and / or the BAS interface 209.
[0098] The building subsystem integration layer 220 may be configured to manage communications between the BAS controller 202 and the building subsystems 228. For example, the building subsystem integration layer 220 may receive sensor data and input signals from the building subsystems 228 and provide output data and control signals to the building subsystems 228. The building subsystem integration layer 220 may also be configured to manage communications between the building subsystems 228. The building subsystem integration layer 220 translates communications (e.g., sensor data, input signals, output signals, etc.) across multi-vendor / multi-protocol systems.
[0099] The demand response layer 214 may be configured to optimize resource usage (e.g., electricity usage, natural gas usage, water usage, etc.) and / or the monetary cost of such resource usage in response to meeting the demand of the building 10. The optimization may be based on time-of-use prices, curtailment signals, energy availability, or other data received from a utility provider, a distributed energy generation system 224, from an energy storage device 227, or from other sources. The demand response layer 214 may receive inputs from other layers of the BAS controller 202 (e.g., a building subsystem integration layer 220, an integrated control layer 218, etc.). The inputs received from the other layers may include environmental or sensor inputs, such as temperature, carbon dioxide levels, relative humidity levels, air quality sensor outputs, occupancy sensor outputs, room schedules, etc. The inputs may also include inputs from the utility such as electricity usage (e.g., expressed in kWh), heat load measurements, pricing information, scheduled pricing, smoothed pricing, curtailment signals, etc.
[0100] According to an exemplary embodiment, the demand response layer 214 includes control logic for responding to the data and signals it receives. These responses may include communicating with the control algorithms in the integrated control layer 218 in a controlled manner, changing control strategies, changing set points, or activating / deactivating building equipment or subsystems. The demand response layer 214 may also include control logic configured to determine when to utilize stored energy. For example, the demand response layer 214 may determine to begin using energy from the energy storage device 227 just before the start of the peak usage hour.
[0101] In some embodiments, the demand response layer 214 includes control modules configured to proactively initiate control actions (e.g., automatically change set points) based on one or more demand-indicative or demand-based inputs (e.g., price, curtailment signal, demand level, etc.), which can minimize energy costs. In some embodiments, the demand response layer 214 uses equipment models to determine an optimal set of control actions. The equipment model can include, for example, a thermodynamic model that describes the inputs, outputs, and / or functions performed by various groups of building equipment. The equipment model can represent a collection of building equipment (e.g., sub-equipment, an array of chillers, etc.) or an individual device (e.g., an individual chiller, heater, pump, etc.).
[0102] The demand response layer 214 may further include or be mapped to one or more demand response strategy definitions (e.g., a database, XML file, etc.). The strategy definitions may be edited or adjusted by a user (e.g., via a graphical user interface) so that the control actions initiated in response to a demand input may be customized for the user's application, desired comfort level, specific building equipment, or based on other issues. For example, a demand response strategy definition may specify which devices may be turned on or off in response to a particular demand input, how long a system or piece of equipment should be off, which set points may be changed, what is the allowable set point adjustment range, how long to maintain a high demand set point before returning to a normally scheduled set point, how close to a capacity limit, which equipment modes to utilize, energy transfer rates to and from an energy storage device (e.g., a thermal storage tank, a battery bank, etc.) (e.g., maximum rate, alarm rate, other rate boundary information, etc.), and when to dispatch on-site energy generation (e.g., via a fuel cell, an electric generator set, etc.).
[0103] The integrated control layer 218 may be configured to use data inputs or outputs from the building subsystem integration layer 220 and / or the demand response layer 214 to make control decisions. Due to the subsystem integration provided by the building subsystem integration layer 220, the integrated control layer 218 may integrate the control activities of the subsystems 228 so that the subsystems 228 behave as a single integrated super-system. In an exemplary embodiment, the integrated control layer 218 includes control logic that uses inputs and outputs from the building subsystems to provide greater comfort and energy savings relative to the comfort and energy savings that the individual subsystems can provide alone. For example, the integrated control layer 218 may be configured to use inputs from a first subsystem to make energy-saving control decisions for a second subsystem. The results of these decisions may be transmitted back to the building subsystem integration layer 220.
[0104] The integrated control layer 218 is shown as being logically located below the demand response layer 214. The integrated control layer 218 can be configured to enhance the effectiveness of the demand response layer 214 by enabling the building subsystems 228 and their corresponding control loops to be controlled in coordination with the demand response layer 214. This configuration can reduce disruptive demand response behavior compared to conventional systems. For example, the integrated control layer 218 can be configured to ensure that a demand response-driven upward adjustment to the set point of the chilled water temperature (or another component that directly or indirectly affects the temperature) does not result in an increase in fan energy (or other energy used to cool the space) that would otherwise result in total building energy use greater than the energy saved at the chiller.
[0105] The integrated control layer 218 may be configured to provide feedback to the demand response layer 214 so that the demand response layer 214 checks whether constraints (e.g., temperature, lighting levels, etc.) are properly maintained even when required load shedding is in progress. Constraints may also include set points or sensed boundaries related to safety, equipment operating limits and performance, comfort, fire codes, electrical codes, energy codes, etc. The integrated control layer 218 is also logically located below the fault detection and diagnostics layer 216 and the automated measurement and verification layer 212. The integrated control layer 218 may be configured to provide calculated inputs (e.g., summaries) to these higher levels based on outputs from more than one building subsystem.
[0106] The automated measurement and verification (AM&V) layer 212 can be configured to verify that the control strategies commanded by the integrated control layer 218 or the demand response layer 214 are operating properly (e.g., using data aggregated by the AM&V layer 212, the integrated control layer 218, the building subsystem integration layer 220, the FDD layer 216, or other layers). The calculations performed by the AM&V layer 212 can be based on the building system energy model and / or equipment model for each BAS device or subsystem. For example, the AM&V layer 212 can compare the output predicted by the model with the actual output from the building subsystem 228 to determine the accuracy of the model.
[0107] The fault detection and diagnostics (FDD) layer 216 may be configured to provide continuous fault detection for the building subsystems 228, building subsystem devices (i.e., building equipment), and control algorithms used by the demand response layer 214 and the integrated control layer 218. The FDD layer 216 may receive data inputs from the integrated control layer 218, directly from one or more building subsystems or devices, or from another data source. The FDD layer 216 may automatically diagnose and respond to detected faults. The response to a detected or diagnosed fault may include providing a warning message to a user, a maintenance scheduling system, or a control algorithm configured to attempt to repair the fault or resolve the fault.
[0108] The FDD layer 216 may be configured to use the detailed subsystem inputs available at the building subsystem integration layer 220 to output a specific identification of a faulty component or a cause of a fault (e.g., a loose damper linkage). In other exemplary embodiments, the FDD layer 216 is configured to provide a "fault" event to the integrated control layer 218, which executes control strategies and policies in response to the received fault event. According to exemplary embodiments, the FDD layer 216 (or strategies executed by the integrated control engine or business rules engine) may shut down a system or direct control activities around a faulty device or system to reduce energy waste, extend equipment life, or ensure an appropriate control response.
[0109] The FDD layer 216 may be configured to store or access a variety of different system data repositories (or data points of live data). The FDD layer 216 may use some of the contents of the data store to identify faults at the equipment level (e.g., a specific chiller, a specific AHU, a specific terminal unit, etc.) and use other contents to identify faults at the component or subsystem level. For example, the building subsystem 228 may generate temporal (i.e., time series) data indicating the performance of the BAS 200 and its various components. The data generated by the building subsystem 228 may include measured or calculated values that exhibit statistical characteristics and provide information about how the corresponding system or process (e.g., a temperature control process, a flow control process, etc.) performs based on errors from its set points. These processes can be checked by the FDD layer 216 to expose when the performance of the system begins to degrade and alert the user to repair the fault before it becomes more serious.
[0110] Reference now Figure 3 , according to an exemplary embodiment, a system 300 for planning sustainability optimization of a building is shown. The system 300 includes a classification and planning system 302, which is configured to interact with a user via a user device 318. The system 300 further includes an energy bill retrieval system 304, which is configured to retrieve an energy bill for the building. The system 300 further includes a building audit system 306, which is configured to collect and aggregate audit data for the building. The system 300 further includes a demand-side data system 308, which is configured to collect demand-related data from various building subsystems of the building.
[0111] Furthermore, the system 300 includes a field supply data system 310 configured to collect data about a field supply system of a building. Furthermore, the system 300 includes a sustainability advisor 320 configured to present sustainability-related optimization results to a user via a user device 318. The system 300 includes an optimization system 322 configured to run optimizations that can identify optimal building renovation decisions, building improvements, and / or operational plans.
[0112] In some embodiments, the components of system 300 can be run on one or more processors as instructions. Instructions can be stored in various memory devices. The processor can be a processor 326-338 and the memory device can be a memory device 340-352. Processor 326-338 can be implemented as a general-purpose processor, an application-specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGA), a group of processing components or other suitable electronic processing components. Memory devices 340-352 (e.g., memory, memory unit, storage device, etc.) may include one or more devices (e.g., RAM, ROM, flash memory, hard disk storage, etc.) for storing data and / or computer codes for completing or facilitating the various processes, layers and modules described in this application. Memory devices 340-352 may be or include volatile memory and / or non-volatile memory.
[0113] The memory devices 340-352 may include object code components, script components, or any other type of information structure for supporting the various activities and information structures described in this application. According to some embodiments, the memory 406 is communicatively connected to the processors 326-338 and may include computer code for one or more processes for performing the functions described herein (e.g., by the processors 326-338).
[0114] System 300 includes a data storage device 324. The data storage device 324 can be a database, a data warehouse, a data lake, a data lake warehouse, etc. The data storage device 324 can store raw data, aggregated data, annotated data, formatted data, etc. The data storage device 324 can act as a repository for all data collected from the classification and planning system 302, the energy bill retrieval system 304, the building audit system 306, the demand side data system 308, the field supply data system 310, the sustainability advisor 320, the optimization system 322, and / or any other system. In some embodiments, the data storage device 324 can be a digital twin in some embodiments. In some embodiments, the digital twin can be a graph data structure. The digital twin can be a digital twin described with reference to U.S. Patent Application No. 17 / 134,664 filed on December 28, 2020.
[0115] The classification and planning system 302 may provide one or more user interfaces to a user via a user device 318. The user interface may allow a user to interact and provide various information describing a building while the building is in the design phase and / or during an introductory phase when a user first registers with the system 300 to begin sustainability planning for their building. The classification and planning system 302 may receive facility data 312, sustainability goals 314, and / or utility access data 316. The facility data 312 may describe a building facility, such as providing a name for the facility or campus, identifying the number of buildings in the facility or campus, identifying the purpose of each building, including a name for each building, indicating a campus layout, indicating a building size, indicating a building area, indicating a campus square footage, indicating a geographic location, and the like.
[0116] The classification and planning system 302 may receive sustainability goals 314 from a user device 318. The sustainability goals 314 may be customer goals for their buildings regarding energy reduction, carbon creation, carbon footprint, water reduction, switching to renewable energy, purchasing a certain number of renewable energy credits, and the like. These goals may include target levels for energy consumption, carbon production, net zero carbon emissions, renewable energy, and the like. These goals may further include timelines for each target level. For example, a timeline may be a period of time in the future, such as days, weeks, months, years, decades, and the like. The timeline may indicate a target date. For example, a timeline may be that a building achieves energy independence within the next forty years, or that a building reaches a net zero carbon emissions level within the next twenty-five years. In some embodiments, the timeline for the sustainability goals may be returned to the user via the user device 318, with suggestions for meeting certain goals, such as a suggestion that the suggestion may be extended by five years (e.g., to 25 years) to reach a certain carbon emissions level, which is more financially feasible than trying to reach the carbon emissions level within 20 years.
[0117] Reference now Figure 4, the energy bill retrieval system 304 of the sustainability optimization system 300, according to an exemplary embodiment, the energy bill retrieval system retrieves the utility bill of the building. The energy bill retrieval system 304 can be configured to retrieve utility access data 316 from the data storage device 324 via a data storage interface 404. The bill can be an electricity bill, a natural gas bill, a water bill, etc. The data storage interface 404 can be an interface that is integrated with the data storage device 324 via an application programming interface (API) or otherwise exposed and API to an external system. The utility interface 410 can receive the utility access data 316 and retrieve the utility bill from the utility system 402 based on the utility access data 316. The utility access data 316 may include a user name, login credentials, an email address, an access code, an account number, the name of an energy provider, etc.
[0118] In some embodiments, utility interface 410 may be integrated with utility system 402 via utility access data 316. Utility bills may include electricity consumption, water consumption, gas consumption, solar power consumption, wind turbine power consumption, and utility interface 410 may provide the energy bill to utility bill and sustainability analyzer 408. Analyzer 408 may run various analyses on the utility bill.
[0119] For example, the analyzer 408 can identify invoice data, perform an audit of utility bill data, and / or perform analysis on energy rates and / or energy billing (e.g., environmental penalties for various forms of energy). The analyzer 408 can identify a building's energy consumption baseline, identify a benchmark for the building (e.g., compare the building's baseline to other peer buildings or industries to determine a benchmark index), determine facility key performance indicators (KPIs), etc.
[0120] The analyzer 408 may identify sustainability data, such as a carbon emissions baseline for the building (e.g., carbon emissions generated by natural gas or carbon emissions from electricity consumption), sustainability benchmarks (e.g., comparison of the emissions baseline for the building with peers of other buildings), renewable energy usage tracking, etc. The analyzer 408 may generate a sustainability report (e.g., an indication between baseline emissions and current emissions to show sustainability tracking), a management and verification (M&V) report, etc. The results of the analysis performed by the analyzer 408 may be a utility data output 406, which may be stored in the data storage device 324 via the data storage interface 404. In some embodiments, the M&V report may illustrate the savings between the baseline and the improvement of the building. For example, the M&V report may indicate the reduction in carbon emissions (compared to the baseline) caused by a particular FIM.
[0121] Reference now Figure 5 , according to an exemplary embodiment, a building audit system 306 of the system 300 is shown, the facility audit system 306 being configured to collect building data for a building via an audit. The building audit system 306 includes a data storage interface 502 that can be the same as or similar to the data storage interface 404. The interface 504 can retrieve facility data 312 from the data storage device 324. The facility data 312 can be provided to the facility audit system 508. In addition, a user can provide facility access information 510 (e.g., key codes, registration details, access directions, etc.) to the facility audit system 508 via a user device 318. The facility audit system 508 can receive audit details from an auditor who visits the physical building and record information about the building.
[0122] Based on the audit data collected by the auditor and provided to the facility audit system 508, the facility audit system 508 can compile a facility asset report 506. The facility asset report can include information such as a detailed facility description. The facility description can identify each room, area, and / or floor of the building and indicate the square footage and / or ceiling height of each area of the building. The report 506 can include an equipment list. The equipment list can indicate the number, brand, model, etc. of each piece of equipment in the building. For example, the number and type of chillers in the building can be indicated in the report 506. In addition, a maintenance log of all maintenance operations of the equipment list can be included in the report 506. In addition, the report 506 can include photos of all pieces of equipment in the building. The report 506 can further include building envelope information. The results of all audit outputs of the system 508, including the facility asset report 506, can be stored in the data storage device 324 via the data storage interface 502.
[0123] Reference now Figure 6, a demand-side data system 308 of system 300, according to an exemplary embodiment, is configured to collect building system and operational data from a building and calculate energy metrics, carbon metrics, operational metrics, and facility improvement measures (FIMs) for the building. System 308 can retrieve facility audit data 604, sustainability goals 606, and / or utility data 608 from data storage device 324 via data storage interface 602. Data storage interface 602 can be the same or similar to data storage interface 404. Demand-side analyzer 610 can receive data 602-608. In addition, demand-side analyzer 610 can receive building system and / or operational data 616 from building system 618. Building system and / or operational data 616 can be metadata for building systems, operational settings for building systems, runtime data for building systems, energy usage for building systems 618, and the like. Building system 618 can be a fire safety system, an ambient cooling system, an ambient heating system, a ventilation system, a lighting system, and the like. Building system 618 can be a reference Figure 1 and Figure 2 Describe the system.
[0124] The demand-side analyzer 610 may run an analysis based on the demand-related data 602-608 and the building systems and / or operational data 616. The analyzer 610 may generate a report 612. The report 612 may indicate an energy breakdown and / or a carbon breakdown of the building's demand-related systems (e.g., systems that consume energy). The report 612 may indicate energy consumption levels and / or carbon emission levels for the building's cooling system, the building's heating system, the building's lighting system, and the like. The energy consumption levels and / or carbon emission levels may attribute a portion (e.g., a percentage) of the total building energy consumption and / or carbon emission to a particular piece of equipment, equipment subsystem, subsystem type, building operation mode (heating or cooling), and the like.
[0125] The analyzer 610 can further identify facility improvement measures (FIMs) for improving and / or reducing the energy use and / or carbon emissions of the building. The FIM can replace the boiler with a newer energy-efficient boiler, which will cause a specific reduction in energy consumption and / or carbon emissions. In addition, the analyzer 610 can identify operational improvements, such as reducing the temperature set point by one degree Fahrenheit during heating within a specific time period to cause a specific energy reduction and / or carbon emissions generation. The report 612 can include a savings report. The report 612 can be provided to the interface 602 as a demand-side data output 614. The interface 602 can store the output 614 in the data storage device 324. In some embodiments, if the demand-side data system 308 is unable to pull data from the building system 618, the building audit system 306 retrieves the data (e.g., via a manual report such as from a building manager, or via other methods).
[0126] Reference now Figure 7 , shows a field supply data system 310, which is configured to collect data about a field energy supply system of a building according to an exemplary embodiment. The field supply data system 310 may include a data storage interface 702 configured to retrieve data from a data storage device 324, such as a sustainability goal 314 determined by the system 304 and / or utility data 704. The interface 702 may be used with reference to Figure 4 The described interface 404 is similar or identical.
[0127] The field supply analyzer 706 can analyze the utility data 704 and / or the sustainability goals 314 to determine a field supply report 708, which can be stored in the data storage device 324 as a field-generated data output 710 via the interface 702. The analyzer 706 can analyze the utility data 704 and / or the sustainability goals 314 to identify opportunities to reduce energy use and / or carbon emissions through a field energy supply system (e.g., solar panels, wind power, hydroelectric dams, rechargeable batteries, etc.). The analyzer 706 can identify opportunities to shift electricity consumption from the energy grid to the field energy supply system.
[0128] Report 708 may include analysis results for solar photovoltaic (PV) cells, fuel cells, energy storage devices, etc. Report 708 may further indicate renewable energy reports, such as reports on opportunities to shift the building's energy consumption to on-site renewable energy sources. Report 708 may further indicate energy cost savings, such as how much energy cost savings would be obtained if solar PV cells were installed in the building. In addition, report 708 may indicate sustainability data, such as how much carbon savings or carbon generation would be obtained by consuming different amounts of energy from on-site PV cells, on-site wind turbines, etc.
[0129] Reference now Figure 8 , shows a sustainability advisor 320 and an optimization system 322 according to an exemplary embodiment, the sustainability advisor 320 being configured to provide sustainability data to a user and receive input from the user, and the optimization system 322 being configured to run a sustainability optimization for a building. The sustainability advisor 320 is configured to retrieve data from a data storage device 324 (e.g., reference Figures 3 to 7 The sustainability adviser 320 may be configured to manage a user portal 802 that may provide various information to a user and receive input from a user.
[0130] The user portal 802 may interact with the user by causing the user device 318 to display various user interfaces with information about cost improvements, energy reduction improvements, and / or carbon emission reduction improvements for the building. The information displayed in the user portal 802 may be based on the results of the optimizations run by the optimization system 322. The portal 802 may provide the user with various reports and / or recommendations (e.g., recommended FIMs, recommendations for purchasing renewable energy credits (RECs), recommendations for adopting updated control strategies, etc.) for planning the construction, renovation, and / or operation of the building to meet one or more sustainability goals.
[0131] The project adviser 804 may allow a user to review, define and / or update a project. A project may be for a particular building and / or planned sustainability of a building. The adviser 804 may allow a user to set and / or update their sustainability goals. Additionally, the adviser 804 may allow a user to review their progress in meeting the sustainability goals of their project.
[0132] The sustainability planner 806 can provide a plan for meeting the sustainability goals of a particular project. The plan generated by the sustainability planner 806 can be based on the optimization run by the optimization system 322. In some embodiments, the plan generated by the sustainability planner 806 can be a plan for a time frame, such as a thirty-year plan, a twenty-year plan, etc. The plan can provide steps for meeting the user's sustainability goals. These steps can indicate which equipment modifications should be performed at the current time or at a specific time in the future, how many RECs should be purchased each year or every ten years, which control schemes should be adopted, etc. Over time, the sustainability planner 806 can update the sustainability plan based on new optimizations run by the optimization system 322. This can keep the plan on track to meet the goals as the environment or technology changes, and allow users to meet their goals in a more cost-effective manner. The planner 806 can generate a plan based on the sustainability planning data 814.
[0133] The sustainability tracker 808 can track the progress of the building in meeting various sustainability goals. In some embodiments, the sustainability tracker 808 can retrieve operational building data from the data storage device 324, retrieve energy bills from the data storage device 324, retrieve receipts for REC purchases from the data storage device 324, and the like. The sustainability tracker 808 can identify the level of carbon emissions of the building at various different times in the past and / or present. The sustainability tracker 808 can identify the level of renewable energy consumed by the building at past and / or present times. In addition, the sustainability tracker 808 can identify the level of energy consumed by the building at past and / or present times. The sustainability tracker 808 can provide the user with historical trends of the building's sustainability progress toward one or more sustainability goals.
[0134] The user portal 802 includes a sustainability reporter 810. The sustainability report generator 804 can generate various reports indicating sustainability information for a building. The report can indicate a construction plan, a renovation plan, and / or an operation plan for the building, such as the amount of energy consumed from various different energy sources, an indication of RECs to be purchased, an indication of equipment modifications, an indication of physical building modifications (e.g., energy-efficient windows, energy-efficient insulation, etc.), an indication of new equipment installation (e.g., on-site PV cells, on-site wind turbines, etc.). The report generated by the generator 804 can indicate how the plan meets one or more sustainability, energy efficiency, and / or financial goals of the user. The reporter 810 can include a summary report of the sustainability plan for the building. The reporter 810 can compile reports based on the data generated by the components 804-808.
[0135] The sustainability planning data 814 includes planning data that can be used to run the optimization system 322. The planning data 814 can indicate various goals and / or expectations of the user. The optimization run by the optimization system 322 can use the planning data 814 as a constraint for the optimization, such as running an optimization that results in a plan that meets or exceeds the various goals and / or expectations. In some embodiments, the optimization can find a sustainability plan for a building that meets the various sustainability goals of the user at a minimum financial cost.
[0136] Sustainability planning data 814 may be or may be based on sustainability goals 314. Timeline 816 may indicate the length of time that the user wants the building to meet various goals (e.g., goals 818-824). Renewable power generation goals 818 indicate the level of energy consumption of the building that the user wants to be generated from renewable energy (e.g., solar, wind, etc.). Demand side reduction goals 820 may indicate goals for demand side systems, such as that the demand side systems are energy efficient (e.g., the building's lighting system includes energy-saving light bulbs). Sustainability goals 822 may be goals that the building's operations produce a certain level of carbon emissions, net zero emissions goals, etc. Financial goals 824 may indicate financial goals for the building, such as annual energy costs, monthly energy costs, etc.
[0137] The optimization parameters 826 include demand-side parameters 828 related to the energy demand of the building. The demand-side parameters 828 may indicate different types of building equipment modifications, building equipment maintenance operations, new building equipment installations, building equipment replacements, etc. The demand-side parameters 828 may indicate actions that may be taken to modify, change, and / or update the demand-side equipment of the building. The parameters 828 may further be associated with renewable energy generation, carbon emissions, energy usage, etc.
[0138] Renewable energy generation 830 may indicate parameters for installing renewable energy generation equipment at the building. Parameters 830 may further indicate energy consumption allocation between external power generation systems (e.g., coal power, hydroelectric power, PV battery system, wind power generation system, etc.). Parameters 830 may be associated with various carbon emission levels, financial costs, etc.
[0139] Parameters 826 include renewable energy credits 832. Renewable energy credits 832 can be various different types of RECs that can be purchased for the building. The parameters can indicate the reduction in carbon emissions resulting from the purchase of the RECs and / or the financial return generated by the RECs sold by the building. For example, in some embodiments, if the building includes on-site renewable energy generation, the building can sell RECs. In addition, parameters 826 include a virtual power purchase agreement 834, which can represent an agreed price for renewable energy generation. The parameters can further indicate capital planning 837, such as planning for replacing, purchasing and / or repairing capital for the building (e.g., lighting for the building, conference rooms for the building, audio-visual systems, insulation for the building, chillers for the building, AHUs for the building, etc.).
[0140] The optimization system 322 may include a model service 836. The service 836 may include a marginal cost of carbon 838. The marginal cost of carbon 838 may indicate how much carbon emissions will be generated by the amount of energy consumed next by the building. The marginal cost of carbon may be calculated for external utility services and / or the on-site energy generation system of the building. The marginal cost of carbon may be identified from various energy bills and / or operational decisions of the building. In some embodiments, the marginal cost of carbon may be based on an optimization parameter 826. The carbon optimizer 840 may run an optimization that identifies a decision for the parameter 826 that produces a specific carbon emission level. The optimization may run for one year, five years, ten years into the future, etc. The optimization may be run to slowly reduce carbon emissions by a specific level each year so as to meet a specific carbon emission target in the future. The optimization may be run based on a sustainability target 814 so that the decision for the parameter 826 meets the target 814.
[0141] In some embodiments, the optimization performed by the optimization system 322 may be based on Fig. 9 and Fig.10 The optimization described in . The optimization can take advantage of Fig. 9 and Fig.10 In addition, the optimization of the optimization system 322 can be based on and / or can utilize the techniques described in U.S. Patent Application No. 16 / 518,314 filed on July 22, 2019, the entire contents of which are incorporated herein by reference.
[0142] Reference now Fig. 9, a block diagram of a planning system 900 is shown according to an exemplary embodiment. The planning system 900 can be configured to use an optimizer 930 as part of a planning tool 902 to simulate the operation of a central device over a predetermined time period (e.g., one day, one month, one week, one year, etc.) for planning, budgeting, and / or design considerations. The optimizer 930 can optimize for a planned building, for example, identifying construction decisions, renovation decisions, control planning, etc. The optimizer 930 can run optimizations to minimize carbon emissions, minimize energy consumption, minimize energy costs, maximize renewable energy use, etc. In some embodiments, in addition to sustainability-related features, the optimizer 930 can also consider building loads. For example, the optimizer 930 can use building loads and utility rates to determine the optimal resource allocation to minimize costs within the simulation period. However, in some embodiments, the planning tool 902 may not be responsible for real-time control of the building management system or central devices, while in other embodiments, the planning tool 902 may provide real-time or near real-time control of the building management system or portions thereof to help achieve specific goals. In some implementations, the planning tool 902 can provide actionable insights or recommendations that are automatically implemented or automatically generated by the building management system upon user approval as changes to a building plan (eg, a building plan prior to construction).
[0143] The planning tool 902 may be configured to determine the return on investment in a battery asset and the financial indicators associated with the investment. Such financial indicators may include, for example, an internal rate of return (IRR), a net present value (NPV), and / or a simple payback period (SPP). The planning tool 902 may also assist the user in determining the size of the battery, which produces the best financial indicators such as maximum NPV or minimum SPP. In some embodiments, the planning tool 902 allows the user to specify the battery size and automatically determines the return on the battery asset participating in the selected IBDR project while performing PBDR. In some embodiments, the planning tool 902 is configured to determine the battery size that minimizes the SPP given the selected IBDR project and the requirements for performing PBDR. In some embodiments, the planning tool 902 is configured to determine the battery size that maximizes the NPV given the selected IBDR project and the requirements for performing PBDR.
[0144] In the planning tool 902, the high-level optimizer 932 can receive the planned load and utility rates for the entire simulation period. The planned load and utility rates can be defined by input received from a user via the client device 922 (e.g., user defined, user selected, etc.) and / or input retrieved from the planning information database 926. The high-level optimizer 932 uses the planned load and utility rates in conjunction with the sub-equipment curves from the low-level optimizer 934 to determine the optimal resource allocation (i.e., optimal dispatch schedule) for a portion of the simulation period. In some embodiments, the low-level optimizer 934 can receive the equipment model 920.
[0145] The portion of the simulation cycle over which the high-level optimizer 932 optimizes resource allocations can be defined by a forecast window that ends at a time range. With each iteration of the optimization, the forecast window moves forward, and the portion of the dispatch schedule that is no longer within the forecast window is accepted (e.g., stored or output as a simulation result). The load and rate forecasts can be predefined for the entire simulation and may not be adjusted at each iteration. However, moving the forecast window forward in time may introduce additional planning information (e.g., planned loads and / or utility rates) for the newly added time slices at the end of the forecast window. The new planning information may not have a significant impact on the optimal dispatch schedule because only a small portion of the forecast window changes with each iteration.
[0146] In some embodiments, the high-level optimizer 932 requests all sub-equipment curves used in the simulation from the low-level optimizer 934 at the beginning of the simulation. Since the planned load and environmental conditions for the entire simulation cycle are known, the high-level optimizer 932 can retrieve all relevant sub-equipment curves at the beginning of the simulation. In some embodiments, when the sub-equipment curves are provided to the high-level optimizer 932, the low-level optimizer 934 generates functions that map sub-equipment production to equipment-level production and resource usage. These sub-equipment-to-equipment functions can be used to calculate individual equipment production and resource usage based on the simulation results (e.g., in a post-processing module).
[0147] Still refer to Fig. 9, planning tool 902 is shown to include a communication interface 904 and a processing circuit 906. The communication interface 904 may include a wired or wireless interface (e.g., a jack, an antenna, a transmitter, a receiver, a transceiver, a terminal block, etc.) for communicating data with various systems, devices, or networks. For example, the communication interface 904 may include an Ethernet card and port for sending and receiving data via an Ethernet-based communication network and / or a WiFi transceiver for communicating via a wireless communication network. The communication interface 904 may be configured to communicate via a local area network or a wide area network (e.g., the Internet, a building WAN, etc.) and may use various communication protocols (e.g., BACnet, IP, LON, etc.).
[0148] The communication interface 904 may be a network interface configured to facilitate electronic data communication between the planning tool 902 and various external systems or devices (e.g., client devices 922, results database 928, planning information database 926, etc.). For example, the planning tool 902 may receive planned loads and utility rates from the client device 922 and / or the planning information database 926 via the communication interface 904. The planning tool 902 may use the communication interface 904 to output simulation results to the client device 922 and / or store the results in the results database 928.
[0149] Still refer to Fig. 9 , the processing circuit 906 is shown to include a processor 910 and a memory 912. The processor 910 can be a general or special processor, an application specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGA), a group of processing components, or other suitable processing components. The processor 910 can be configured to execute computer codes or instructions stored in the memory 912 or received from other computer readable media (e.g., CDROM, network storage device, remote server, etc.).
[0150] The memory 912 may include one or more devices (e.g., memory cells, memory devices, storage devices, etc.) for storing data and / or computer code to complete and / or facilitate the various processes described in the present disclosure. The memory 912 may include random access memory (RAM), read-only memory (ROM), hard drive storage, temporary storage, non-volatile memory, flash memory, optical storage, or any other suitable memory for storing software objects and / or computer instructions. The memory 912 may include a database component, an object code component, a script component, or any other type of information structure for supporting the various activities and information structures described in the present disclosure. The memory 912 may be communicatively connected to the processor 910 via the processing circuit 906 and may include computer code for executing (e.g., by the processor 910) one or more processes described herein.
[0151] Still refer to Fig. 9 , the memory 912 is shown to include a GUI engine 916, a web service 914, and a configuration tool 918. In an exemplary embodiment, the GUI engine 916 includes a graphical user interface component configured to provide a graphical user interface to a user for selecting or defining planning information (e.g., planning loads, utility rates, environmental conditions, etc.) for simulation. The web service 914 can allow a user to interact with the planning tool 902 via a web portal and / or from a remote system or device (e.g., an enterprise control application).
[0152] The configuration tool 918 may allow the user to define (e.g., via a graphical user interface, via a prompt-driven "wizard," etc.) various parameters of the simulation, such as the number and type of sub-devices, the devices within each sub-device, sub-device curves, device-specific efficiency curves, simulation duration, duration of the prediction window, duration of each time step, and / or various other types of planning information related to the simulation. The configuration tool 918 may present a user interface for building a simulation. The user interface may allow the user to graphically define simulation parameters. In some embodiments, the user interface allows the user to select pre-stored or pre-built simulation devices and / or planning information (e.g., from the planning information database 926) and adjust it or enable it to be used in the simulation.
[0153] Still refer to Fig. 9 , the memory 912 is shown to include an optimizer 930. The optimizer 930 can use the planned load and utility rates to determine the optimal resource allocation over the forecast window. With each iteration of the optimization process, the optimizer 930 can move the forecast window forward and apply the optimal resource allocation for the portion of the simulation cycle that is no longer in the forecast window. The optimizer 930 can use the new planning information to perform the next iteration of the optimization process at the end of the forecast window. The optimizer 930 can output the applied resource allocation to a reporting application 932 for presentation to the client device 922 (e.g., via the user interface 924) or stored in a results database 928.
[0154] Still refer to Fig. 9, the memory 912 is shown as including a reporting application 932. The reporting application 932 can receive the optimized resource allocation from the optimizer 930, and in some embodiments, receive the cost associated with the optimized resource allocation. The reporting application 932 may include a network-based reporting application having several graphical user interface (GUI) elements (e.g., widgets, dashboard controls, windows, etc.) for displaying key performance indicators (KPIs) or other information to the user of the GUI. In addition, the GUI elements can summarize the relative energy usage and intensity across various devices, sub-devices, etc. Other GUI elements or reports can be generated and displayed based on available data that allows the user to evaluate the simulation results. The user interface or report (or underlying data engine) can be configured to aggregate and classify the resource allocation and the costs associated therewith, and provide the results to the user via the GUI. The GUI elements may include a chart or histogram that allows the user to visually analyze the simulation results.
[0155] Reference now Fig.10 , a block diagram illustrating an asset sizing module 916 is shown in more detail, according to an exemplary embodiment. The asset sizing module 916 can be configured to determine the optimal size of various assets in a building, a group of buildings, or a central facility. As described above, assets can include single pieces of equipment (e.g., boilers, chillers, heat recovery chillers, steam generators, generators, thermal energy storage tanks, batteries, etc.), groups of equipment, or entire sub-equipment of a central facility. The asset size can include the maximum load of the asset (e.g., maximum power, maximum charge / discharge rate) and / or the maximum capacity of the asset (e.g., maximum stored electrical energy, maximum fluid storage, etc.).
[0156] In some embodiments, the asset size determination module 916 includes a user interface generator 1006. The user interface generator 1006 can be configured to generate a user interface for interacting with the asset size determination module 916. The user interface can be provided to a user device 1002 (e.g., a computer workstation, a laptop, a tablet, a smart phone, etc.) and presented via a local display of the user device 1002. In some embodiments, the user interface prompts the user to select one or more assets or asset types to be sized. The selected assets can include assets currently in the building or central equipment (e.g., existing assets that the user is considering upgrading or replacing) or new assets that are not currently in the building or central equipment (e.g., new assets that the user is considering purchasing). For example, if the user is considering adding a thermal energy storage device or an electrical energy storage device to a building or central equipment, the user can select "thermal energy storage device" or "battery" from the list of potential assets for sizing / assessment. The user interface generator 1006 can identify any assets selected via the user interface and provide an indication of the selected assets to the asset cost item generator 1008.
[0157] The asset cost item generator 1008 may be configured to generate one or more cost items representing the purchase cost of the asset being sized. In some embodiments, the asset cost item generator 1008 generates the following two asset cost items:
[0158]
[0159] where c f is a vector of fixed costs for purchasing assets of any size (e.g., one element for each potential asset purchase), v is a vector of binary decision variables indicating whether to purchase the corresponding asset, c s is a vector of marginal costs per unit of asset size (e.g., cost per unit of load, cost per unit of capacity), and s a is a vector of continuous decision variables corresponding to asset size. Advantageously, the binary purchase decisions in vector v and vector s a The asset size decision in can be viewed as a decision to be made with the enhanced cost function J a The decision variables x in (x) are optimized together with the other decision variables x, which will be described in more detail below.
[0160] It should be noted that the binary decision variables in vector v and vector s aThe values of the continuous decision variables in indicate potential asset purchases and asset sizes, which can be evaluated by the asset size determination module 916 to determine whether such a purchase / size optimizes a given financial metric. The values of these decision variables can be adjusted by the asset size determination module 916 as part of the optimization process and do not necessarily reflect the current set of assets actually purchased or installed in a building, group of buildings, or central facility. Throughout this disclosure, the asset size determination module 916 is described as "purchasing" various assets or asset sizes. However, it should be understood that these purchases are merely hypothetical. For example, the asset size determination module 916 may select a binary decision variable v for an asset and determine whether such a purchase / size optimizes a given financial metric. j Set to v j =1 to “purchase” the asset. This indicates that the asset is considered to be purchased within a specific hypothetical scenario, and the cost of the asset is included in the enhanced cost function J a Similarly, the asset size determination module 916 can be configured by transforming the binary decision variable v of the asset into j Set to v j =0 to choose not to purchase the asset. This indicates that the asset is considered not to be purchased within the specific hypothetical scenario, and the cost of the asset is not included in the enhanced cost function J a (x) in.
[0161] Additional cost items and Can be used to calculate the purchase cost of any number of new assets. For example, if only the size of a single asset is determined, then the vector c f A single fixed cost may be included (i.e., the fixed cost of purchasing an asset of any size under consideration), and v may include a single binary decision variable indicating whether the asset was purchased or not purchased (i.e., whether a fixed cost was incurred). The vector c s Can include a single marginal cost element, and s a A single continuous decision variable may be included that indicates the size of the asset to be purchased. If the asset has both a maximum load and a maximum capacity (ie, the asset is a storage device asset), then the vector c s It may include a first marginal cost per unit of load and a second marginal cost per unit of capacity. Similarly, the vector s a A first continuous decision variable indicating a maximum load size to be purchased and a second continuous decision variable indicating a maximum capacity size to be purchased may be included.
[0162] If multiple assets are being sized, then the vector c f 、v、c s and a Elements of each asset can be included. For example, the vector c fThe vector c may include a fixed purchase cost for each asset being sized, and v may include a binary decision variable indicating whether each asset is purchased. s May include marginal cost elements for each asset under consideration, and s a A continuous decision variable indicating the size of each asset to be purchased may be included. For any asset with both a maximum load and a maximum capacity, the vector c s Multiple marginal cost elements may be included (e.g., marginal cost per unit load size and marginal cost per unit capacity size), and the vector s a Multiple continuous decision variables may be included (e.g., the maximum load size to be purchased and the maximum capacity size to be purchased). By considering the purchase cost of the multiple assets in terms of their respective sizes, the cost term and Allows the high-level optimizer 932 to optimize multiple asset sizes simultaneously.
[0163] Still refer to Fig.10 , the asset size determination module 916 is shown to include a constraint generator 1010. The constraint generator 1010 can be configured to generate or update constraints on the optimization problem. As described above, the constraints prevent the high-level optimizer 932 from assigning a load that exceeds the maximum load of the asset to the asset. For example, the constraints can prevent the high-level optimizer 932 from assigning a cooling load that exceeds the maximum cooling load of the chiller to the chiller, or assigning a power set point that exceeds the maximum charge / discharge rate of the battery to the battery. These constraints can also prevent the high-level optimizer 932 from allocating resources in a manner that causes the storage device asset to exceed its maximum capacity or consume to below its minimum capacity. For example, the constraints can prevent the high-level optimizer 932 from charging a battery or thermal energy storage tank to above its maximum capacity or discharging to below its minimum stored electrical energy (e.g., below zero).
[0164] When the asset size is fixed, the load constraint can be written as follows:
[0165]
[0166] where x j,i,负载 is the load of asset j at time step i on the range, is the fixed maximum load of asset j, and N s is the total number of assets. Similarly, the capacity constraint can be written as follows:
[0167]
[0168] where x j,i,容量 is the capacity of asset j at time step i on the range, and is the fixed maximum capacity of asset h. However, these constraints assume that the maximum load of the asset and maximum capacity When the asset size is treated as an optimization variable, the maximum load and capacity of the asset can be a function of the size of the asset purchased in the optimization problem (i.e., represented by the vectors v and s a The size of the assets is defined by the values of the binary decision variables and the continuous decision variables in ).
[0169] The constraint generator 1010 can be configured to update the load constraints to accommodate the variable maximum load of each asset being sized. In some embodiments, the constraint generator 1010 updates the load constraints to limit the maximum load of the asset to be less than or equal to the total size of the assets purchased in the optimization problem. For example, the constraint generator 1010 can transform the load constraints into the following:
[0170]
[0171] in is the load size of asset j (i.e., the continuous variable vector s a The jth load size element of j is a binary decision variable indicating whether asset j is purchased (i.e., the jth element of the binary variable vector v), and M j is a sufficiently large number. In some embodiments, the number M j is set to the maximum size of asset j that has been purchased. The first inequality in this set of constraints ensures that asset x j,i,负载 The load on the asset is not greater than the purchased asset The second inequality forces the optimization to pay the fixed costs of an asset before increasing the size of its load. In other words, asset j (i.e., v j =1), then the load size of asset j can be Increases to a non-zero value.
[0172] Similarly, the constraint generator 1010 can be configured to update the capacity constraint to accommodate the variable maximum capacity of each storage device asset being sized. In some embodiments, the constraint generator 1010 updates the capacity constraint to limit the capacity of the asset to between zero and the total capacity of the assets purchased in the optimization problem. For example, the constraint generator 1010 can transform the capacity constraint into the following:
[0173]
[0174] in is the capacity of asset j (i.e., the continuous variable vector s a The j-th capacity element of jis a binary decision variable indicating whether asset j is purchased (i.e., the jth element of the binary variable vector v), and M j is a sufficiently large number. In some embodiments, the number M j is set to the maximum size of asset j that has been purchased. The first inequality in this set of constraints ensures that asset x j,i,容量 The capacity at any time step i is zero and the amount of assets purchased The second inequality forces the optimization to pay the fixed cost of the asset before increasing its capacity. In other words, asset j (i.e., v j =1), and then the capacity of asset j can be Increases to a non-zero value.
[0175] The constraints generated or updated by the constraint generator 1010 may be applied to the optimization problem along with other constraints generated by the high-level optimizer 932. In some embodiments, the load constraints generated by the constraint generator 1010 replace the power constraints generated by the power constraint module 904. Similarly, the capacity constraints generated by the constraint generator 1010 may replace the capacity constraints generated by the capacity constraint module 906. However, the asset load constraints and capacity constraints generated by the constraint generator 1010 may be applied in conjunction with the switching constraints generated by the switching constraint module 908, the demand cost constraints generated by the demand cost module 910, and any other constraints applied by the high-level optimizer 932.
[0176] Still refer to Fig.10 , the asset size determination module 916 is shown to include a scaling factor generator 1012. The cost of purchasing an asset is typically paid over the duration of a payback period, referred to herein as a simple payback period (SPP). However, the original cost function J(x) may only capture the operating costs and benefits over an optimization period h, which is typically much shorter than the SPP. To convert the asset purchase cost and In combination with the original cost function J(x), it may be necessary to put the costs on the same time scale.
[0177] In some embodiments, the scaling factor generator 1012 generates a and The scaling factor can be used to convert the asset purchase cost into and Scaled to the duration of the optimization period h. For example, the scaling factor generator 1012 may and Multiply by ratio As shown in the following equation:
[0178]
[0179] Among them C 按比例调节的 is the asset purchase cost scaled by the duration of the optimization period, h is the duration of the optimization period in hours, SPP is the duration of the payback period in years, and 8760 is the number of hours in a year.
[0180] In other embodiments, the scaling factor generator 1012 generates a scaling factor for the original cost function J(x). The scaling factor can be used to extrapolate the original cost function J(x) to the duration of the simple payback period SPP. For example, the scaling factor generator 1012 can multiply the original cost function J(x) by the ratio As shown in the following equation:
[0181]
[0182] Where J(x) 按比例调节的 is a scaled cost function extrapolated to the duration of the simple payback period SPP, h is the duration of the optimization period in hours, SPP is the duration of the payback period in years, and 8760 is the number of hours in a year.
[0183] Still refer to Fig.10 , the asset size determination module 916 is shown to include a cost function enhancer 1014. The cost function enhancer 1014 can be configured to use the proportionally adjusted asset C 按比例调节的 The result is the enhanced cost function J a (x), as shown in the following equation:
[0184]
[0185] Where h is the duration of the optimization period in hours, SPP is the duration of the payback period in years, and 8760 is the number of hours in a year.
[0186] The high-level optimizer 932 may perform an optimization process to determine for each binary decision variable in the vector v and the vector s a The optimal value of each continuous decision variable in . In some embodiments, the high-level optimizer 932 uses linear programming (LP) or mixed integer linear programming (MILP) to optimize financial indicators such as net present value (NPV), simple payback period (SPP), or internal rate of return (IRR). The vector c f 、v、c s and aEach element in may correspond to a specific asset and / or a specific asset size. Thus, the high-level optimizer 932 can be configured by identifying the binary decision variables in the vector v and the vector s a The optimal values of the continuous decision variables in determine the best asset to purchase and the optimal size to purchase.
[0187] Still refer to Fig.10 , the asset size determination module 916 is shown to include a yield curve generator 1016. The yield curve generator 1016 can be configured to be based on the enhanced cost function J a (x) to generate a yield curve. In some embodiments, the yield curve indicates the relationship between the initial investment cost C0 of the asset (i.e., the cost of purchasing the asset) and the annual yield C obtained from the asset. For example, the yield curve can represent the initial investment cost C0 as a function of the annual yield C, as shown in the following equation:
[0188] C0=f(C)
[0189] Where both the initial investment cost C0 and the annual return C are functions of the asset size. Several examples of yield curves that can be generated by the yield curve generator 1016 are shown in Figures 12 to 15 (discussed in more detail below).
[0190] In some embodiments, the initial investment cost C0 is an enhancement cost function J a The term in (x) The return of an asset within the optimization range h can be corresponded to the enhanced cost function J a The term J(x) in (x) and can be represented by the variable C h In some embodiments, the variable C h represents the difference between the first value of J(x) when the asset is not included in the optimization and the second value of J(x) when the asset is included in the optimization. The annual return C can be calculated by dividing the range C h The revenue in range C is extrapolated to the full year. h The benefits within a year can be extended to the full year as shown in the following equation:
[0191]
[0192] where h is the duration of the optimization horizon in hours, and 8760 is the number of hours in a year.
[0193] An increase in the size of an asset will increase both its initial cost C0 and the annual return C brought by the asset. However, beyond a certain asset size or initial asset cost C0, the return C of the asset will decrease. In other words, choosing a larger asset does not bring any increased returns. The yield curve indicates the relationship between C0 and C and can be used to find the asset size that optimizes a given financial indicator (e.g., SPP, NPV, IRR, etc.). Several examples of such optimization are described in detail below. In some embodiments, the yield curve generator 1016 provides the yield curve to the financial indicator optimizer 1020 for optimizing the financial indicator.
[0194] Still refer to Fig.10 , the asset size determination module 916 is shown to include a financial indicator optimizer 1020. The financial indicator optimizer 1020 can be configured to find an asset size that optimizes a given financial indicator. The financial indicator can be a net present value (NPV), an internal rate of return (IRR), a simple payback period (SPP) or any other financial indicator that can be optimized according to the asset size. In some embodiments, the financial indicator to be optimized is selected by the user. For example, the user interface generated by the user interface generator 1006 can prompt the user to select the financial indicator to be optimized. In other embodiments, the asset size determination module 916 can automatically determine the financial indicator to be optimized or can optimize multiple financial indicators at the same time (e.g., running a parallel optimization process).
[0195] Energy-saving measures
[0196] The systems and methods described herein may include and / or be implemented by an energy conservation measure (ECM) manager. The ECM manager may be or be included in the BMS described herein. The ECM manager may generate at least one ECM. The ECM may be or be included in at least one energy conservation protocol. The ECM may include at least one action that may be taken or performed by a building served by the ECM manager or that is related to the building served by the ECM manager. The actions included in the ECM may be single actions (e.g., replacing a piece of building equipment) and / or the ECM may be continuous or semi-continuous actions (e.g., control strategies related to building operations).
[0197] A company, enterprise, firm, organization, corporate body, agency, institution or any other possible entity may decide that they want to reduce emissions and / or improve the sustainability of at least one building corresponding to the company. However, since the sustainability of buildings is an ever-changing scenario, it is difficult for companies to actually reduce emissions and / or improve the sustainability of buildings.
[0198] The ECM Manager provides a seamless process that improves a building's ability to reduce a company's emissions and / or increase a company's sustainability. The technology solution enables a company to establish actions that can achieve the sustainability goals that the company has decided to establish (e.g., reduce emissions, increase sustainability, etc.). In addition, the ECM Manager can track progress toward sustainability goals, detect other data that indicates that sustainability factors that did not exist previously are now affecting the sustainability of the building, and generate actions that can correct the newly identified sustainability factors. In addition, the technology solution provides a flexible and dynamic process that can address the ever-changing and evolving nature of a building's sustainability. Simply establishing a goal cannot correctly and effectively achieve the sustainability of a building.
[0199] The ECM manager may obtain at least one sustainability goal. The sustainability goal may be related to the sustainability of the building. For example, the sustainability goal may be related to the sustainability of the building 10. The sustainability goal may be, include and / or be related to at least one of a company goal, a location goal and / or a building goal. The company goal may be or include at least one of a company goal, a company-level goal, a portfolio goal and / or a portfolio-level goal. The sustainability goal may be, include and / or be related to at least one sustainability category. The sustainability category may be or include emissions, energy consumption, water and / or waste. The emission category may be related to at least one of carbon emissions, greenhouse gas emissions, and emissions related to energy (e.g., natural gas, electricity, propane, butane, etc.). The energy consumption category may be related to at least one of total energy consumption, energy use intensity, resource consumption, steam consumption, etc. The water category may be related to the amount of water consumed, used, or otherwise associated with the building. The waste category may be related to garbage generation, waste paper, electronic components, etc. The sustainability categories described herein may be related to at least one of: at least one company comprising at least one location and the locations comprising at least one building; at least one location and the locations comprising at least one building; and / or at least one building that may be related to at least one location and / or company.
[0200] The sustainability goal may be to reduce emissions for the building 10. For example, the sustainability goal may be to reduce carbon emissions for the building 10 by a certain percentage and / or value. Similarly, the sustainability goal may be to reduce energy consumption for the building 10. For example, the sustainability goal may be to reduce energy consumption from the grid and / or increase solar power generation. Examples of goals described herein may be found in U.S. Provisional Patent Application No. 63 / 336,935, filed on April 29, 2022, the entire contents of which are incorporated herein by reference. The ECM manager may determine, detect, or otherwise identify that the goal is related to at least one sustainability category. A sustainability category may be or include at least one emissions.
[0201] The ECM manager may determine a target sustainability level for the building in response to obtaining the sustainability target. The ECM manager may determine the target sustainability level for the building using the baseline sustainability performance and the sustainability target. The baseline sustainability performance may be or include at least one baseline level for at least one sustainability category and / or a baseline value for at least one source that affects at least one of the sustainability categories. For example, the baseline sustainability performance may be a baseline emissions level. The baseline sustainability performance may also be a baseline energy consumption level and / or a baseline electricity consumption level for the building.
[0202] The ECM manager can generate at least one energy conservation agreement. The ECM manager can generate an energy conservation agreement using a baseline sustainability performance and a target sustainability level. The energy conservation agreement can include at least one action that can meet at least a portion of the sustainability goal. For example, the first action included in at least one energy conservation agreement can be to replace the HVAC system with a more energy-efficient HVAC system. The second action can be to transform the building 10 with solar photovoltaic (PV) cells, fuel cells, energy storage devices, etc. The action including the energy conservation agreement can meet at least one of the sustainability goals and / or the target sustainability level. For example, the sustainability goal can be that the building 10 consumes 40% of its total electricity consumption from solar-generated electricity. In this example, the energy conservation agreement can be or include at least one action that involves retrofitting a certain amount of PV cells over a period of time so that the building 10 can consume 40% of its total electricity consumption from solar-generated electricity. Similarly, the energy conservation agreement can include control actions that can be implemented to reduce the amount of electricity consumed by the building 10 from the power grid. In doing so, the building 10 can increase the percentage of its electricity consumption from solar-generated electricity by reducing the amount of electricity consumed from the power grid.
[0203] The ECM manager may receive an indication to accept a subset of the plurality of actions included in at least one energy saving protocol. For example, the ECM manager may provide the energy saving protocol to a user via the user device 318. The user device 318 may provide, present, display, create, or otherwise display a user interface including the energy saving protocol. The user may select at least one energy saving protocol and / or at least one action included in the energy saving protocol via an icon included in the user interface. The ECM manager may receive a subset of the plurality of actions included in the energy saving protocol in response to the user selecting the icon.
[0204] The ECM manager can implement a subset of the multiple actions included in the energy conservation protocol. The ECM manager can implement a subset of the multiple actions included in the energy conservation protocol by generating, providing and or executing the actions included in the energy conservation protocol. For example, the ECM manager can provide control signals to multiple pieces of building equipment included in and / or serving the building 10 to control the multiple pieces of building equipment. Control of multiple pieces of building equipment can enable the building 10 to move towards a target sustainability level. For example, the control action can be to modify and maintain a set point for a piece of equipment. Maintaining the set point can reduce the amount of energy consumed by the piece of equipment, and reducing the amount of energy consumed by the piece of building equipment can reduce the amount of energy consumed for the building 10 (e.g., a sustainability target).
[0205] The ECM manager can detect that the building 10 has progressed toward a target sustainability level in response to controlling a plurality of pieces of building equipment. For example, a sustainability goal can be to reduce the amount of electricity consumed from the grid. The ECM manager can use a utility bill for the building 10 to determine that the building 10's electricity consumption from the grid has decreased. Similarly, the ECM manager can also determine that the amount of energy consumed from solar-generated electricity has increased. Both a decrease in the amount of electricity consumed from the grid and an increase in the amount of electricity consumed from solar-generated electricity can indicate that the building 10 has progressed toward a target sustainability level.
[0206] The sustainability categories described herein can have at least one source. For example, energy consumption can include the amount of electricity consumed, used, or otherwise received by a building. The ECM manager can generate ECMs that can be directed to at least one source that affects at least one of the sustainability categories. For example, the ECM manager can identify ECMs that will affect butane use associated with the building. In addition, the ECM manager can organize the generated ECMs and provide them to the company. For example, the ECM manager can organize the generated ECMs according to the highest reduction (e.g., the ECM that reduces the source by the highest amount is listed first), the shortest payback (e.g., the ECM that provides the fastest return is listed first), and / or the lowest cost (e.g., the ECM with the lowest implementation cost is listed first).
[0207] An ECM manager that organizes generated ECMs enables companies to easily and seamlessly view ECMs to improve the sustainability of buildings, while also allowing companies to have additional priorities (eg, highest reduction, shortest payback, lowest cost).
[0208] Reference now Fig.11 , a block diagram of a system 1100 for energy conservation is shown, according to an exemplary embodiment. The system 1100 may include an energy conservation measure (ECM) manager 1105 (e.g., an ECM manager described herein), at least one data source 1110, at least one network 1115, and a user device 318. The ECM manager 1105 may include at least one communication component 1120, at least one sustainability component 1125, at least one ECM generator 1130, at least one controller 1135, and at least one database 1140. The ECM manager 1105 may perform functionality similar to that of the BAS 200, and / or the ECM manager 1105 may include components similar to those of the BAS 200. The ECM manager 1105 may perform functionality similar to that of the system 300, and / or the ECM manager 1105 may include components similar to those of the system 300. Similarly, the ECM manager 1105 may perform functionality similar to that of the BAS 200, and / or the ECM manager 1105 may include components similar to those of the system 300. Fig. 9 and / or Fig.10 The functionality of at least one component shown has similar functionality.
[0209] The data source 1110 may be or include at least one of the building subsystem 228, the data storage device 324, the utility system 402, the building system 618, the planning information database 926, the asset database 1004, or any other possible data source. In some embodiments, the data source 1110 may be a separate component that receives data from at least one of the building subsystem 228, the data storage device 324, the utility system 402, the building system 618, the planning information database 926, the asset database 1004, or any other possible data source and then provides the data to the ECM manager 1105. The data provided by the data source 1110 to the ECM manager 1105 may be or include at least one of the facility data 312, the sustainability goals 314, the utility access data 316, or any other possible data described herein.
[0210] In some embodiments, the data source 1110 may provide data including data similar to that described in U.S. Provisional Patent Application No. 63 / 336,935 filed on April 29, 2022, the entire contents of which are incorporated herein by reference. For example, the ECM manager 1105 may receive data related to a business goal and / or a business-level goal, a location-level goal, a building-level goal, or a building sub-target goal. Similarly, the data received by the ECM manager 1105 may be or include operational data related to at least one piece of building equipment included in the building 10 and / or serving the building. For example, the data may be operational data related to and / or including a building subsystem 228 and / or multiple pieces of building equipment thereof. The business-level goal, the location-level goal, the building-level goal, and / or the building sub-target goal may be or include at least one sustainability goal. In some embodiments, the ECM manager 1105 may perform functionality similar to that of the sustainability manager, and / or the ECM manager 1105 may include components similar to those of the sustainability manager described in U.S. Provisional Patent Application No. 63 / 336,935 filed on April 29, 2022. The data provided by the data source 1110 may be related to at least one building (e.g., building 10), and the building 10 may be included in at least one location, and the location and the building 10 may be included in at least one company and / or enterprise.
[0211] The communication component 1120 can interact, interface, or otherwise communicate with at least one of the data source 1110 or the user device 318 via the network 1115. For example, the communication component 1120 can communicate with the data source 1110, and the data source 1110 can provide data related to the building (e.g., building 10) (e.g., utility access data 316) to the communication component 1120. Similarly, the user device 318 can provide data related to at least one of user settings, user preferences, user selections, configuration data, sustainability targets and / or sustainability goals (e.g., business-level targets and / or targets, location-level targets and / or targets, building-level targets and / or targets, or building sub-target targets), and / or customizations related to the sustainability targets.
[0212] The sustainability component 1125 can obtain data received from the data source 1110 and / or the user device 318 from the communication component 1120. For example, the sustainability component 1125 can obtain a sustainability target (e.g., a sustainability goal) established for the building. The sustainability target can include parameters related to the sustainability of the building. For example, a sustainability target can be to reduce the emissions (e.g., parameters) of the building by 90%. These parameters can be and / or include the sustainability performance described herein. The parameter can be or include at least one emissions parameter (e.g., carbon emissions, greenhouse gas emissions, or any other possible emissions), at least one energy parameter (e.g., energy consumption, energy usage intensity, or any other possible terms), at least one water parameter (e.g., water use, water consumption, or any other possible water metric) and / or at least one waste parameter (e.g., waste generation, recycling rate).
[0213] In some embodiments, the sustainability component 1125 may use data related to the building to determine a baseline value for a parameter (e.g., a baseline sustainability performance). For example, the baseline value may be the total carbon emissions of the building over the previous year. The sustainability component 1125 may use the baseline value for the parameter and the sustainability target to determine a target value for the parameter (e.g., a target sustainability level). For example, the parameter may be water usage, the baseline value for the building's water usage may be 10,000 gallons, and the sustainability target may be to reduce the building's annual water usage by 80%. The sustainability component 1125 may use the baseline value (10,000 gallons) and the sustainability target (reducing water usage by 80%) to determine that the target value is 2,000 gallons of annual water usage. The sustainability component 1125 may communicate with the ECM generator 1130 in response to determining the target value for the parameter. The sustainability component 1125 may provide the ECM generator 1130 with at least one of the sustainability target, the baseline value for the parameter, the target value for the parameter, or any other possible information related to the sustainability target.
[0214] The sustainability component 1125 can determine a target value (e.g., a target sustainability level) for a parameter by determining a difference between a baseline sustainability performance and a sustainability goal. For example, the building 10 can have a sustainability goal related to carbon emissions, and the baseline sustainability performance for the building 10 can be 8,000 tCO2e / year. The sustainability component 1125 can determine that the sustainability goal is to reduce carbon emissions by 60%, and the sustainability component 1125 can determine the difference using the baseline sustainability performance of 8,000 tCO2e / year and the carbon reduction goal of 60%. For example, the sustainability component 1125 can determine that a reduction in carbon emissions (e.g., a difference) of 4,800 tCO2e / year can result in the achievement of the sustainability goal.
[0215] In some embodiments, the sustainability component 1125 can generate a sustainability value using the difference between the baseline sustainability performance and the sustainability target. The sustainability value can be a value that meets the sustainability target. For example, the sustainability component 1125 can generate a sustainability value of 3,200 tCO2e / year using the baseline sustainability performance of 8,000 tCO2e / year and the difference of 4,800 tCO2e / year. In this non-limiting example, the sustainability component 1125 can determine that the building reaches a carbon emissions value of 3,200 tCO2e / year, which can cause the building 10 to meet the sustainability target (e.g., reducing carbon emissions by 60%). The sustainability component 1125 can then determine the amount of time to reach the sustainability value. For example, the sustainability target can establish the amount of time to reach the sustainability target (e.g., reducing carbon emissions by 60% in the next 15 years). When tracking and / or monitoring progress towards the sustainability target, the sustainability component 1125 can use the amount of time to reach the sustainability value.
[0216] In some embodiments, the ECM generator 1130 can generate at least one energy conservation agreement in response to communication with the sustainability component 1125. The energy conservation agreement can include at least one energy conservation measure (ECM). The ECM can be or include at least one action that can be taken or performed, wherein in response to the action taken or performed, a sustainability target can be achieved, realized, satisfied, completed, or otherwise met. These actions can be building improvements (e.g., FIMs), control strategies (e.g., temperature settings, lighting settings, HVAC settings, circulation settings, ventilation settings, etc.), and / or employee actions (e.g., at least one of a carpool schedule, a work-from-home schedule, an incentive program, or any other possible action that can be used to achieve a sustainability target. The ECM generator 1130 can communicate with the communication component 1120 in response to generating the energy conservation agreement. The ECM generator 1130 can provide the energy conservation agreement to the communication component 1120.
[0217] In some embodiments, the communication component 1120 can provide the energy saving protocol to at least one of the data source 1110 or the user device 318 in response to receiving the energy saving protocol. The communication component 1120 providing the energy saving protocol to the user device 318 can cause the user device 318 to display at least a portion of the energy saving measures via a user interface associated with the user device 318. For example, the user interface displayed by the user device 318 can display, show, present, or otherwise include the energy saving protocol and the actions included in the energy saving protocol.
[0218] The operator of the user device 318 may interact, interface, or otherwise engage with the user interface displayed by the user device 318. For example, the operator of the user device 318 may view the energy saving agreement and the actions included in the energy saving agreement. The operator of the user device 318 may accept, reject, and / or customize at least one of the energy saving agreement, the actions included in the energy saving agreement, and / or the subset of actions included in the energy saving agreement. For example, the actions included in the energy saving agreement may be or include at least one of a control strategy for the HVAC system of the building that can reduce the energy consumption of the building, a FIM related to the HVAC system (e.g., replacing the HVAC system), and / or a building set point (e.g., temperature setting). In addition, the subset of actions included in the energy saving agreement may be at least one of the actions included in the energy saving agreement. For example, the subset of actions included in the energy saving agreement may be a control strategy for the HVAC system. The operator may accept the subset of actions included in the energy saving agreement by hovering the mouse over an icon included in the user interface displayed by the user device 318, selecting the icon, or otherwise interacting with the icon.
[0219] In some embodiments, the communication component 1120 may receive an indication in response to the operator of the user device 318 selecting the icon to accept a subset of actions included in the energy saving protocol. The indication may be an indication of accepting a subset of actions included in the energy saving protocol. For example, the user device 318 may provide a signal to the communication component 1120 in response to the operator selecting the icon to accept a subset of actions included in the energy saving protocol. The signal provided to the communication component 1120 may include an indication of accepting a subset of actions included in the energy saving protocol. The indication may also be an indication that the operator of the user device 318 has accepted the entire energy saving protocol and / or an indication that the energy saving protocol has been customized by the operator. The indication may also be an indication that the operator of the user device 318 has provided a user-defined energy saving protocol. The communication component 1120 may provide the indication to the ECM generator 1130 in response to receiving the indication. For example, an indication of accepting a subset of actions included in the energy saving protocol may be provided to the ECM generator 1130.
[0220] The ECM generator 1130 may use the indication provided by the communication component 1120 to implement, establish, modify, update, change or otherwise continue the energy saving protocol. For example, the indication may be an indication of accepting a subset of actions included in the energy saving protocol, and the ECM generator 1130 may use the indication to update the energy saving protocol. The ECM generator 1130 may update the energy saving protocol to reflect the subset of actions included in the indication. For example, the ECM generator 1130 may update the energy saving protocol to include a subset of actions included in the indication, and remove actions not included in the indication from the energy saving protocol. The ECM generator 1130 may provide, establish an energy saving protocol in response to receiving an indication provided by the communication component 1120 and / or in response to updating the energy saving protocol. The ECM generator 1130 may establish an energy saving protocol by providing the energy saving protocol to the database 1140, and the database 1140 may store, maintain or otherwise save the energy saving protocol. The ECM generator 1130 may provide an indication that the energy saving protocol has been established to the communication component 1120, the sustainability component 1125 and the controller 1135.
[0221] In some embodiments, controller 1135 may implement an energy conservation protocol and / or actions included in the energy conservation protocol in response to receiving an indication that an energy conservation protocol has been established. Controller 1135 may control and / or operate at least one piece of building equipment. For example, controller 1135 may provide a signal to an HVAC system associated with a building (e.g., building 10) such that the ventilation rate of the HVAC system is adjusted. As described herein, an energy conservation protocol may include a control strategy, and controller 1135 may use the control strategy to control multiple pieces of building equipment. For example, the control strategy may be to cause a lighting system to generate a certain amount of light at a specific time of day, and controller 1135 may provide a signal to the lighting system that causes the certain amount of light to be generated.
[0222] In response to receiving the indication that the energy saving protocol has been established, the communication component 1120 can provide an indication that the energy saving protocol has been established to the data source 1110 and / or the user device 318. The communication component 1120 providing the indication that the energy saving protocol has been established to the user device 318 can cause the user device 318 to display a user interface including a notification that the energy saving protocol has been established.
[0223] In some embodiments, the sustainability component 1125 can monitor and / or implement the energy conservation agreement in response to receiving an indication that the energy conservation agreement has been established. For example, the sustainability component 1125 can determine that the energy conservation agreement includes a FIM, and the sustainability component 1125 can use the FIM to determine people, entities, or objects that can implement the FIM and / or be affected by the FIM. For example, the FIM can be replacing a boiler, and the sustainability component 1125 can determine the location of the boiler (e.g., the location of the boiler in the building), the person or company that can replace the boiler, and / or employees that may be affected by the boiler replacement.
[0224] In some embodiments, the sustainability component 1125 can implement an energy conservation agreement in response to determining a person, entity, or object. The sustainability component 1125 can implement an energy conservation agreement by providing a work order request to a company that can perform the FIM, and the sustainability component 1125 can schedule when the FIM will be performed. For example, the sustainability component 1125 can determine a device (e.g., a user device 318) associated with a company that can perform the FIM, and the sustainability component 1125 can provide a signal to the user device 318 that causes the user device 318 to display the work order request. The work order request can include which piece of equipment will be replaced and an identifier (e.g., a serial number) of the piece of equipment that will replace the previous piece of equipment. The sustainability component 1125 can provide a time (e.g., Monday 7:00) in the work order request that the FIM can be performed.
[0225] The ECM may include at least one ECM savings category, and the ECM savings category may include at least one of an item, action, step, and / or measure that may be implemented. The ECM savings categories may include lighting savings, air handler savings, boiler / heat savings, chiller savings, pumping savings, zone savings, and floor zones. The exemplary ECM savings categories are not limiting in any way and there may be several other ECM savings categories. Energy saving protocols, ECM savings categories, and / or ECMs may be stored, located, and / or otherwise maintained in database 1140.
[0226] Lighting savings category actions may include adjusting lighting operating hours, adjusting lighting operating parameters and / or set points, adjusting the amount of lights activated, and / or other possible actions. Air handler savings category actions may include initiating nighttime backoff and shutdown protocols (e.g., air handler operating frequency is backed off at night), developing optimal startup times for air handlers, detecting low leakage dampers (e.g., air is escaping from the ventilation system, causing air handler run time to increase) and correcting low leakage dampers, reducing ventilation volume, installing high efficiency motors, installing high efficiency air handling unit (AHU) motors, installing variable frequency drives (VFDs) on variable air volume (VAV) systems, performing a supply air reset, performing a cold deck reset, performing a hot deck reset, converting multi-zone (MZ) / dual duct (DD) to VAV, and / or installing air-to-air economizers. Boiler / heat savings category actions may include initiating and / or performing a hot water reset, initiating and / or performing a steam reset, initiating and / or performing a boiler replacement, initiating and / or performing a boiler maintenance routine, replacing a burner, updating controls, initiating and / or performing an electric heat pump conversion, and / or other possible boiler / heat actions. Chiller savings category actions may include starting and / or performing a chilled water reset, starting and / or performing a condenser water break, replacing a chiller, and / or other possible chiller actions. Pumping savings category actions may include installing and / or using a VSD chilled water pump, installing and / or using a VSD heating water pump, installing and / or using a high efficiency CHW / CW pump motor, installing and / or using a high efficiency HW pump motor, and / or other possible pumping actions.
[0227] The database 1140 may store, retain, save and / or otherwise maintain different types of data described herein. For example, the database 1140 may store operational data 616 and utility data 608. The database 1140 may also store data related to the building 10. The data related to the building 10 may include at least one of operational metrics, building metrics, occupancy metrics, equipment inventory, maintenance records, building improvement records, building maintenance information, and / or other possible data related to the building 10. The database 1140 may also store weather data, weather forecasts, weather impact information, and / or other possible data related to the weather around the building 10. The database 1140 may also store data related to equipment standards, equipment protocols, equipment efficiency metrics, equipment energy consumption, equipment performance metrics, and / or other possible equipment information. The database 1140 may also store data related to costs associated with equipment modification, equipment maintenance, and / or other possible costs associated with equipment.
[0228] The data stored by database 1140 may be at least one of building-specific data (e.g., the entire building), floor-specific data (e.g., the building is divided into multiple floors in the building, and the data is separated based on the corresponding floors), area-specific data (e.g., the floors are divided into multiple areas, and the data is separated based on the corresponding areas), room-specific data (e.g., the areas are divided into multiple rooms, and the data is separated based on the corresponding rooms), equipment category-specific data (e.g., chiller data is separated from air handler data, lighting data is separated from boiler data, etc.), and / or equipment-specific data (e.g., chiller data is separated from each corresponding unit that contributes to the chiller data, lighting data is separated into each corresponding unit that contributes to the lighting data, etc.).
[0229] The data related to operational metrics may be and / or include at least one of the hours of operation for pieces of equipment, the number of cycles performed by pieces of equipment, equipment set points, the number of heating weeks, the number of cooling weeks, and / or other possible operational data. For example, the data related to operational metrics may include that the HVAC system is running 50 hours per week, the interior lights of the building 10 are on 60 hours per week, and the average heating temperature is 72 degrees Fahrenheit. The data related to building metrics may add and / or include at least one of the total square footage of the building, the number of windows in the building, the number of floors in the building, the height between floors of the building, the energy transfer rate of the building, and / or other possible building metric data. For example, the data related to building metrics may include that the area of the building is 100,000 square feet and the windows have an average shading factor of 0.8.
[0230] The data related to the occupancy metric of the building may be and / or include at least one of the number of hours the building is occupied, the number of days the building is occupied, the number of occupants in the building, and / or other possible occupancy metrics. For example, the data related to the occupancy metric may include that the building is occupied for 65 hours / week and that the building is occupied for six days / week.
[0231] The data related to equipment inventory may include and / or include at least one of the number of chillers, the number of lighting units, the number of heating systems, and / or other possible equipment inventory data. The data related to maintenance records may include and / or include at least one of the date, time, frequency, and / or actions taken to perform maintenance on the building and / or the equipment of the building. For example, the data related to maintenance records may include that the air filter is changed every three months.
[0232] The data related to the building improvement record can be and / or include at least one of equipment replacement, equipment addition, equipment modification, building reconstruction, building maintenance and / or other possible building improvement records. For example, the building improvement record can include that the windows of the building were recently replaced.
[0233] The data related to the weather forecast and / or weather impact information may be and / or include the average temperature for each day of the year, the average amount of sunshine for each day of the year, the average air quality for each day of the year, the predicted temperature for a given date of the year, the predicted amount of sunshine for a given date of the year, the predicted air quality for a given date of the year, and / or other possible weather data. For example, the weather data may include the average outside air temperature during the heating week and the average amount of sunshine during the cooling week.
[0234] Data related to device protocols, device efficiency metrics, device energy consumption, and / or device performance metrics may be and / or include a shading factor for a window, an insulation rating for a window, a wattage rating for a lighting unit, an efficiency rating for a device motor, and / or other possible device metric information. For example, the device efficiency metric may include that a first type of lighting fixture has a rated wattage of 200 watts and a second type of lighting fixture has a rated wattage of 100 watts.
[0235] The ECM generator 1130 may generate an energy conservation agreement by retrieving operational data related to at least one of the plurality of building equipment from the database 1140. For example, the ECM generator 1130 may retrieve operational data related to a boiler. The ECM generator 1130 may then use the operational data related to at least one of the plurality of building equipment to determine the role of at least one of the plurality of building equipment in the baseline sustainability performance. For example, the ECM generator 1130 may determine the amount of carbon emissions contributed to the at least one piece of building equipment. The ECM generator 1130 may then retrieve a predetermined operational metric related to the at least one piece of building equipment from the database 1140. For example, the predetermined operational metric may include an amount of operating time cycles (e.g., the number of times the plurality of equipment performs an operating cycle). The ECM generator 1130 may then use the predetermined operational metric related to the at least one piece of building equipment and the operational data related to the at least one piece of building equipment to detect a difference between the predetermined operational metric and the operational data. For example, the ECM generator 1130 may determine a difference between the number of operating time cycles of the boiler included in the operational data and the number of operating time cycles of the boiler included in the predetermined operational metric. The ECM generator 1130 can then generate a set of actions in response to detecting a difference between the predetermined operational metric and the operational data, the set of actions adjusting the contribution of at least one piece of building equipment in the baseline sustainability performance by reducing the difference between the predetermined operational metric and the operational data. For example, the ECM generator 1130 can generate a maintenance schedule (e.g., a set of actions) for a boiler, and the maintenance schedule can result in a reduction in the number of run time cycles for the boiler. Reducing the number of run time cycles for the boiler can reduce the contribution of the boiler in the baseline sustainability performance (e.g., a reduction in the number of boiler operations can result in a reduction in carbon emissions from the boiler).
[0236] As a non-limiting example, the ECM manager 1105 and / or its components may perform the following functions to generate at least one of the ECMs and / or energy saving protocols described herein. The ECM generator 1130 may retrieve data related to the building 10 from the database 1140. For example, the ECM generator 1130 may retrieve the number of heating weeks for the building 10, data related to the heating system of the building 10, the temperature set point of the building 10, and / or other possible information. The ECM generator 1130 may generate at least one ECM in response to the data retrieved related to the building 10. The ECM generator 1130 may generate the ECM using the number of heating weeks for the building 10 and the data related to the heating system. For example, the number of heating weeks for the building 10 may be 30 weeks, and the data related to the heating system may include an efficiency rating for the heating system. The ECM generator 1130 may generate the ECM using the number of heating weeks and the efficiency rating. For example, the first ECM in the plurality of ECMs may replace the heating system with a more efficient heating system. The first ECM may also include information related to the impact of the ECM. The information may include energy savings, carbon reduction, and / or other possible information. The ECM generator 1130 may determine the impact of the first ECM by comparing the replacement heating system to the current heating system of the building 10. For example, the replacement heating system may be 25% more efficient than the current heating system, and taking into account the 25% difference, the ECM generator 1130 may determine the impact of replacing the current heating system with the replacement heating system.
[0237] As another non-limiting example, the ECM manager 1105 and / or its components may perform the following functions to generate at least one ECM and / or energy saving protocol described herein. The ECM generator 1130 may retrieve data related to the building 10 from the database 1140. For example, the ECM generator 1130 may retrieve information related to windows, building maintenance, and air permeability of the building. The ECM generator 1130 may use the data retrieved from the database 1140 to generate at least one ECM. For example, the ECM generator 1130 may generate a first ECM related to replacing the caulking around the windows of the building and / or a second ECM related to replacing the windows on the side of the building with a given amount of sunlight exposure. The ECM generator 1130 may determine that replacing the caulking around the building 10 may result in a reduction in the operating time of the building equipment (e.g., better maintaining the internal temperature of the building 10 in view of the reduction in air infiltration). The ECM generator 1130 may also determine that replacing the windows on the side of the building with a given amount of sunlight exposure may also result in a reduction in the operating time of the building equipment. The reduction in the operating time of the building equipment may result in a reduction in the energy consumption of the building 10. The reduction in building equipment operating hours may also result in a reduction in the carbon emissions of the building 10 .
[0238] As another non-limiting example, the ECM manager 1105 and / or its components may perform the following functions to generate at least one ECM and / or energy saving protocol described herein. The ECM generator 1130 may retrieve operational data related to a piece of building equipment for the building 10 from the database 1140. For example, the ECM generator 1130 may retrieve operational data related to a lighting device. The ECM generator 1130 may use the operational data to determine the role of the lighting system in the baseline sustainability performance. For example, the baseline sustainability performance for the building 10 may be related to energy consumption, and the ECM generator 1130 may determine the amount of energy consumption attributed to the lighting device (e.g., the role). The ECM generator 1130 may retrieve a predetermined operational metric related to the lighting device from the database 1140. For example, the ECM generator 1130 may retrieve an energy consumption metric (e.g., how many watts a piece of lighting device consumes, how many lumens a piece of lighting device emits, etc.). The ECM generator 1130 may use the predetermined operational metric and the operational data to detect a difference between the predetermined operational metric and the operational data. For example, the predetermined operational metric may include a number of lighting fixtures that consume 60 watts of electricity, and the operational data may indicate that the number of lighting fixtures in the building consumes 100 watts of electricity. The ECM generator 1130 may then generate a set of actions that adjust the role of the number of lighting fixtures in the baseline sustainability performance in response to detecting the difference between the predetermined operational metric and the operational data. For example, the set of actions may include replacing the lighting fixture with a lighting fixture that consumes 60 watts, reducing the brightness setting of the lighting fixture (which may result in the lighting fixture consuming a reduced number of watts), and / or other possible actions. The role of the number of lighting fixtures in the baseline sustainability performance may be adjusted in response to a reduction in the energy consumed by the number of lighting fixtures.
[0239] Reference now Fig.12 , a block diagram of a sustainability component 1125 is shown, according to an exemplary embodiment. The sustainability component 1125 may include at least one monitoring component 1205. The monitoring component 1205 may include at least one fault component 1210, at least one state component 1215, and at least one parameter component 1220. The sustainability component 1125 and / or at least one of its components may perform functionality similar to that of the BAS 200. For example, the fault component 1210 may perform functionality similar to that of the FDD layer 216.
[0240] The communication component 1120 can receive data related to a building (e.g., building 10) from a data source 1110 and / or a user device 318. The communication component 1120 can provide the data related to the building to the sustainability component 1125. The fault component 1210 can use the data related to the building to detect at least one fault condition. The fault condition can be that a piece of building equipment is not functioning properly. For example, the fault component 1210 can detect that a boiler heating valve and a cooling valve are open at the same time. The fault component 1210 can determine that the fault condition affects the sustainability target in response to detecting the fault condition. For example, the fault condition can be that the HVAC system startup run time is above a predetermined threshold (e.g., the HVAC system startup should have been completed) and the fault component 1210 can determine that the additional startup run time has caused additional energy consumption. The fault component 1210 can determine that the additional energy consumption has affected the sustainability target.
[0241] In some embodiments, the fault component 1210 may provide an indication to the ECM generator 1130 in response to determining that the fault condition affects the sustainability target. The indication may include at least one of the fault condition, one or more pieces of building equipment associated with the fault condition, and / or actions that may be taken to correct the fault condition (e.g., replacing multiple pieces of equipment, performing maintenance on multiple pieces of equipment, etc.). The ECM generator 1130 may update the energy conservation protocol in response to receiving the indication from the fault component 1210 to include at least one action that may address the fault condition and / or a portion of the fault condition. For example, the ECM generator 1130 may update the energy conservation protocol by adding a FIM to the energy conservation protocol, which may address the fault condition. The ECM generator 1130 may provide the updated energy conservation protocol to the database 1140 and the sustainability component 1125 in response to updating the energy conservation protocol. The database 1140 may maintain the updated energy conservation protocol. The sustainability component 1125 may execute the updated energy conservation protocol. For example, the sustainability component 1125 may generate a work order including maintenance work related to the equipment included in the fault condition.
[0242] The parameter component 1220 can use data related to the building to determine the current value of the parameter included in the sustainability target. For example, the parameter portion 1220 may include the current value of the energy consumption of the building included in the sustainability target. The parameter component 1220 can determine the current value of the parameter in response to a predetermined amount of time. For example, the parameter component 1220 can determine the current value after the energy conservation agreement has been established for 1 day, 1 month, 1 year, or any other possible amount of time. The parameter component 1220 can determine the difference between the current value of the parameter and the baseline value of the parameter. For example, the parameter can be water consumption, the current value can be 5,000 gallons, and the baseline value can be 6,000 gallons. The parameter component 1220 can determine that the energy conservation agreement has affected the parameter related to the sustainability target in response to the difference between the current value and the baseline value being greater than a predetermined threshold.
[0243] The state component 1215 can use data related to the building to monitor the state of the energy conservation agreement and / or the actions included in the energy conservation agreement. For example, the state component 1215 can monitor the state of a specific action (e.g., FIM) included in the energy conservation agreement. The state component 1215 can determine that the state of the energy conservation agreement and / or the actions included in the energy conservation agreement remain the same in response to monitoring the state of the energy conservation agreement. For example, the state of the FIM can be that a piece of equipment will be replaced before a predetermined date. The state component 1215 can determine that the state of the FIM is the same in response to the passage of the predetermined date (e.g., the piece of equipment was not replaced before the predetermined date).
[0244] In some embodiments, the state component 1215 can provide an indication to the communication component 1120 in response to determining that the state of the energy saving protocol and / or the actions included in the energy saving protocol remain the same. The indication can be an indication that the state has remained the same. For example, the indication can be that the FIM included in the energy saving protocol has not been completed. The indication can also include information about people, objects, or entities related to the energy saving protocol, the actions included in the energy saving protocol, and / or the building equipment associated with the energy saving protocol and / or the actions. For example, the indication can include an individual or company that has been assigned to replace a piece of building equipment. The communication component 1120 can use the indication to identify a device (e.g., user device 318) associated with the energy saving protocol. The communication component 1120 can provide a signal to the device in response to identifying the device, which causes the device to display a notification of performing at least one action included in the energy saving protocol via a user interface. For example, the notification can include an indication that the FIM has not been executed. The state component 1215 can monitor the state of the energy saving protocol in response to the communication component 1120 providing a signal to the device.
[0245] The state component 1215 can use data related to the building to determine that an action included in the notification provided by the communication component 1120 has been performed. The state component 1215 can determine that the action has been performed by identifying at least one of data that has been generated based on a new piece of equipment added to the building by the FIM, an indication by the person or company performing the FIM that the FIM has been completed, data indicating that a previous piece of equipment has been removed (e.g., the piece of equipment is no longer sending data), or any other possible data that can indicate that the operation included in the notification has been performed.
[0246] In some embodiments, state component 1215 can detect that a first piece of building equipment has been replaced by a second piece of building equipment in response to determining that an action has been performed. The second piece of building equipment can perform a function similar to that of the first piece of building equipment. For example, the first piece of building equipment can be a boiler, and the second piece of building equipment can also be a boiler.
[0247] State component 1215 can determine an effect of the second piece of building equipment on at least one of a sustainability goal or a target sustainability level in response to the second piece of building equipment replacing the first piece of building equipment. For example, state component 1215 can determine an effect that the second piece of equipment can have on the amount of energy consumed by building 10. Continuing with this example, state component 1215 can determine the effect by determining a difference between an amount of energy consumed by the first piece of building equipment over an amount of time and an amount of energy consumed by the second piece of building equipment over an amount of time that is predicted to be consumed the same amount of time. The difference between the amount of energy consumed by the first piece of building equipment and the predicted amount of energy for the second piece of building equipment can indicate an effect that the second piece of building equipment can have on the sustainability goal and / or the target sustainability level.
[0248] The state component 1215 can communicate with the communication component 1120. The state component 1215 can provide the impact of the second piece of building equipment on the sustainability goal and / or the target sustainability level to the communication component 1120. The communication component 1120 can provide the impact of the second piece of building equipment on the sustainability goal and / or the target sustainability level to the data source 1110 and / or the user device 318 in response to receiving the impact of the second piece of building equipment on the sustainability goal and / or the target sustainability level. The communication component 1120 providing the impact of the second piece of building equipment on the sustainability goal and / or the target sustainability level to the user device 318 can cause the user device 318 to display a user interface including the impact of the second piece of building equipment on the sustainability goal and / or the target sustainability level.
[0249] Reference now Fig.13, displaying a user interface. The user interface may be shown, displayed, or otherwise provided by a device (e.g., user device 318). The user interface may be displayed by the device in response to the ECM manager 1105 providing a signal to the device. The user interface may include a settings window. The settings window may be related to at least one of a building improvement plan, a sustainability target, an energy conservation agreement, and / or any other possible sustainability tracking related to the building.
[0250] The settings window may be displayed by the device in response to an operator of the device establishing a sustainability target. For example, the settings window may be displayed after the operator has established a business-level target (e.g., a sustainability target) or target sustainability level, a location-level target or target, a building-level target or target, and / or a building sub-target target or target similar to that described in U.S. Provisional Patent Application No. 63 / 336,935 filed on April 29, 2022. The settings window may include at least one icon indicating at least one step that may be taken, performed, or otherwise performed to generate at least one energy conservation protocol. For example, the Step 1 icon may include a display showing Fig.13 The operator of the device of the user interface shown can generate information of the energy saving agreement. The user interface can also include a back icon and a next icon. The operator can select the next icon to start the establishment of the energy saving agreement. The operator can select the back icon to pause the establishment of the energy saving agreement.
[0251] Reference now Fig.14 , according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement action planning dashboard. In response to an operator selecting Fig.13 The next icon shown is used to generate the user interface. The improvement plan dashboard can include a view icon. Display Fig.14 An operator of the device of the user interface shown may hover over a view icon, select the view icon, or otherwise interact with the view icon to adjust the view, appearance, or presentation of the improvement action plan. The view icon may include at least one option. For example, the view icon may include a summary view, a table view, a timeline view, and / or an estimated impact view. Fig.14 Depicts an example of an improvement action planning dashboard in a summary view.
[0252] The improvement planning dashboard may include an emissions window. The emissions window may include information relevant to a specific building. For example, Fig.14 The information is shown to relate to Building 1. The information may include baseline values, previous year values, target values and remaining values all relating to the same parameter. Fig.14 These values are displayed in relation to carbon emissions. The emissions window may also include sub-target windows associated with one or more emission sources. Fig.14The Display sub-target windows may include windows for Natural Gas, Diesel, Electricity, and Butane. The Emissions window and each sub-target window may include an Add ECM icon. Display Fig.14 An operator of the device of the user interface shown may hover over, select, or otherwise interact with at least one of the add ECM icons to add an ECM to that particular window. For example, an operator may add an ECM to a drain window by selecting an add ECM icon associated with the drain window.
[0253] Reference now Fig.15 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard, and the improvement measure planning dashboard may include at least one energy window. The energy window may include at least one energy usage intensity window and at least one energy consumption window. The user interface may be Fig.14 An expansion of, scroll-down, overlay, or otherwise included with or in conjunction with the user interface is shown.
[0254] Reference now Fig.16 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard, and the improvement measure planning dashboard may include at least one water window and at least one waste window. The user interface may be Fig.14 The user interface shown and / or Fig.15 An expansion, scrolling down, overlaying, or otherwise included in or with at least one of the user interfaces shown
[0255] Reference now Fig.17 According to an exemplary embodiment, a user interface is shown. The user interface may include an energy saving measure window. Fig.17 The user interface shown may be responsive to an operator selecting Figures 14 to 16 At least one of the added ECM icons shown in at least one of the added ECM icons is generated. Fig.17 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figures 14 to 16 An overlay on top of at least one of the user interfaces shown. Fig.17 The illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device.
[0256] Fig.17The illustrated user interface may include an ECM impact chart. The ECM impact chart may include a graphical representation of at least one sub-target goal associated with a sustainability goal and / or energy conservation protocol generated and / or obtained by the ECM manager 1105. The ECM impact chart may include a sub-target portion and at least one portion associated with at least one option (e.g., at least one FIM, action, etc.). The ECM impact chart may display the impact that each option may have. Fig.17 The Energy Saving Measures window is displayed in relation to butane emissions associated with Building 1 . Fig.17 At least one window related to options included in the ECM impact graph may also be included.
[0257] Fig.17 Option 1 is shown as being related to replacing a boiler. A window related to the options may be filtered, sorted, or otherwise organized using an optimization icon. The optimization icon may include at least one option. For example, the optimization icon may include a highest emissions reduction option, a shortest payback period option, and / or a lowest cost option. Fig.17 An example of an options window sorted by highest emissions reduction options is depicted. The user interface may also include descriptions and what-if icons that may provide additional information related to a particular options window.
[0258] Reference now Fig.18 , according to an exemplary embodiment, a user interface is shown. The user interface may include an option window related to at least one option included in the ECM impact chart. The user interface may also include a customize icon and an accept and complete icon. Display Fig.18 An operator of the device of the user interface shown may select the customize icon to customize at least one of the options displayed in the user interface. The operator may select the accept and complete icon to establish at least one option that has been selected by the operator. The solid circle next to option 2 indicates that the operator has selected option 2. Option 2 may be established in response to the operator selecting the accept and complete icon and / or may be customized in response to the operator selecting the customize icon. Fig.18 The user interface shown can be Fig.17 An expansion of the user interface shown, scrolled down, overlaid, or otherwise included in or with the user interface. Similarly, Fig.18 The information shown can be found in Fig.17 The user interface shown or shown
[0259] Reference now Fig.19 , according to an exemplary embodiment, a user interface is shown. Fig.19 Depicts after the operator has selected the Description and Hypothesis icons Fig.17 Example of user interface shown. A drop-down window opens with information related to option 1.
[0260] Reference now Fig. 20 , according to an exemplary embodiment, a user interface is shown. Fig. 20 Can include Fig.18 Information similar to that shown. Fig. 20 Can be Fig.19 An expansion of, scroll-down, overlay, or otherwise included with or in conjunction with the user interface is shown.
[0261] Reference now Fig.21 , according to an exemplary embodiment, a user interface is shown. The user interface may include a description window. Fig.21 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figures 17 to 20 An overlay on top of at least one of the user interfaces shown. Fig.21 The illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device. Fig.21 The user interface shown may include Fig.19 The description window may provide information about why a given ECM is recommended, failures associated with building equipment, information about a given ECM, a description of a given ECM, an exemplary payback range, savings associated with implementing the ECM, and / or costs associated with the ECM.
[0262] Reference now Fig. 22 , according to an exemplary embodiment, a user interface is shown. The user interface may include a description window. Fig. 22 The user interface shown can be Fig.21 Same user interface as shown. Fig. 22 It is shown that the boiler change icon has been selected and a window has opened to provide additional information related to boiler changes for a particular ECM.
[0263] Reference now Fig.23 , according to an exemplary embodiment, a user interface is shown. The user interface may include a custom window related to improvement action planning. Fig.23 The user interface shown may be responsive to an operator selecting Fig.18 or Fig. 20 Generated by a customized icon shown in at least one of the following. Fig.23 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figures 17 to 20 An overlay on top of at least one of the user interfaces shown. Fig.23 The illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device. Fig.23The user interface shown may include Figures 17 to 20 In addition, the operator may customize, adjust or otherwise update Figures 17 to 20 At least one of the options included in .
[0264] Reference now Fig.24 , according to an exemplary embodiment, a user interface is shown. The user interface may include a custom window related to improvement action planning. Fig.24 The user interface shown may be responsive to an operator selecting Fig.18 or Fig. 20 Generated by a customized icon shown in at least one of the following. Fig.24 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figures 17 to 20 An overlay on top of at least one of the user interfaces shown. Fig.24 The user interface shown can also be generated as a new user interface, which replaces the user interface previously shown by the device. Fig.23 and Fig.24 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0265] Reference now Fig.25 , according to an exemplary embodiment, a user interface is shown. Fig.25 The user interface shown may include Figures 14 to 16 The improvement measure planning dashboard shown in at least one of the above is the same improvement measure planning dashboard. Fig.25 An exemplary view of an improvement action planning dashboard is depicted in response to an operator interacting with a view icon and selecting a table option. Additionally, in response to the operator selecting the table option, a group by category icon is displayed to switch between grouping ECMs by category and not grouping ECMs by category. These categories can be or include the different sustainability categories described herein (emissions, energy, water, and / or waste). The categories can also include sources associated with each category. For example, the emission categories can include natural gas, diesel, propane, butane, electricity, or any other possible emission source.
[0266] Reference now Fig.26 , according to an exemplary embodiment, a user interface is shown. Fig.26 The user interface shown may include the improvement action planning dashboard described herein. The user interface may also include a window related to the emission source butane. The window may include an ECM that may affect the emissions associated with butane. The user interface may be Fig.25 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.25 and Fig.26The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0267] Reference now Fig. 27 , according to an exemplary embodiment, a user interface is shown. Fig. 27 The user interface shown may include the improvement action planning dashboard described herein. The user interface may also include a window related to energy categories. The window may include ECMs that affect the energy usage intensity and / or energy consumption associated with the building. The user interface may be Figure 25 to Figure 26 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.25 , Fig.26 and Fig. 27 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0268] Reference now Fig.28 , according to an exemplary embodiment, a user interface is shown. Fig.28 The user interface shown may include the improvement action planning dashboard described herein. The user interface may also include windows related to water categories and / or waste categories. The windows may include ECMs that affect the water use intensity and / or waste generation associated with the building. The user interface may be Figure 25 to Figure 27 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.25 , Fig.26 , Fig. 27 and Fig.28 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0269] Reference now Fig.29 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard, and the user interface may include Figures 14 to 16 and / or Figure 25 to Figure 28 Similar information Fig.29 The user interface shown may be responsive to the operator deselecting Fig.25 The grouping icons shown are displayed, illustrated, or otherwise generated. Fig.29 The user interface shown can respond to the operator and Fig.14 The view icon shown is interacted with and a table option is selected to be displayed, shown, or otherwise generated.
[0270] Reference now Fig.30 , according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure dashboard. Fig.30 Depicted is an example of information associated with an improvement action dashboard displayed in a timeline view. Fig.30 The dashboard shown may include at least one ECM associated with the building and a timeline chart for each ECM. The timeline chart may provide a graphical representation of the predicted amount of time required for the ECM to complete or fully execute. The amount of time may be the duration required to execute the FIM (e.g., replace a piece of equipment). The amount of time may also be the amount of time the ECM may be in place before a target value is reached. For example, the ECM is replacing a boiler, and the new boiler will reduce emissions associated with the building by a predetermined amount of time of 3 years. The operator may adjust Fig.30 The graphical representations shown may represent at least one of days, months, years, decades, and or any other possible amount of time.
[0271] Reference now Fig.31 , according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure dashboard. Fig.31 The user interface shown displays an expanded view of ECMs associated with a building and a collapsed view of the predicted amount of time associated with each ECM. Fig.31 The user interface shown can be Fig.30 An expansion of, scrolling down, overlaying, or otherwise included in or with the user interface shown. Fig.31 An operator of the device of the illustrated user interface may hover a mouse over, interact with, or otherwise move at least one of the ECM or the predicted amount of time to expand or collapse the ECM or the predicted amount of time.
[0272] Reference now Fig.32 , according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement action dashboard. The user interface may also include a view of the ECMs sorted by category, similar to Figure 25 to Figure 28 The user interface includes an ECM view associated with an emission category. Fig.32 The user interface shown can be Fig.30 or Fig.31 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.30 , Fig.31 and Fig.32 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0273] Reference now Fig.33, according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The user interface may provide information related to the ECM of the building 1. The user interface may include an ECM impact chart as described herein. The ECM impact chart may include a target value related to a sustainability target and progress toward the target. Progress toward the target may include progress made by incorporating, executing, or otherwise conducting the ECM. The improvement measure planning dashboard may include a list of completed ECMs and a list of planned ECMs. An operator of the device may filter, sort, or otherwise organize the ECMs by selecting an icon below the view icon. Fig.33 Information related to building sustainability targets, building-level targets, sustainability categories, sub-targets related to sustainability categories, and / or any other possible combination may be provided. In addition, Fig.33 The user interface shown can respond to the operator and Fig.14 , Fig.25 , Fig.29 , Fig.30 and / or Fig.32 The estimate impact option is displayed, shown, or otherwise generated by interacting with a view icon shown in at least one of the examples and selecting the estimate impact option.
[0274] Reference now Fig.34A , according to an exemplary embodiment, a user interface is shown. The user interface may include a graphical representation of ECM tracking. The graphical representation depicted by the user interface may be based on ECM projects. The graphical representation depicted by the user interface may also be based on sources that contribute to parameters associated with sustainability targets. The user interface may include baseline values related to parameters associated with sustainability targets. For example, the user interface may include a baseline value for total emissions for a building (e.g., building 10). Similarly, the user interface may include a baseline value related to at least one of the sustainability categories (e.g., emissions, energy, water, waste, etc.). The user interface may include the impact that at least one ECM may have on a parameter value. For example, Fig.34A It shows that ECM 0032 and ECM 0055 can reduce carbon emissions from 20,000tCO2e / year to 18,000tCO2e / year after completion. Fig.34A It shows that after the completion of ECM 0033 and ECM 0056, carbon emissions can be reduced from 18,000tCO2e / year to 15,000tCO2e / year. In addition, Fig.34A ECM 0035 can reduce carbon emissions from 15,000tCO2e / year to 12,000tCO2e / year after completion. Fig.34AAn operator of the illustrated user interface device may adjust, modify or otherwise change the presentation of information by hovering over, interacting with or selecting at least one of the display source icons, completed ECM icons and / or planned ECM icons. Fig.34A The user interface shown can be Fig.32 An expansion of the user interface is shown, scrolled down, overlaid, or otherwise included in or with the user interface.
[0275] Reference now Fig.34B , according to an exemplary embodiment, a user interface is shown. The user interface includes a graphical representation of ECM tracking, including impacts contributing to ECM projects and a view by source. The view by source depicts the impact of the ECM project on each source that contributes to a sustainability parameter and / or sustainability goal. Fig.34B Examples of ECM items that affect natural gas consumption, diesel consumption, propane consumption, and butane consumption are depicted. Fig.34B The user interface shown may be and / or include Fig.34A The information shown is similar to the information shown. Similarly, Fig.34B The user interface shown can be Fig.34A At least one of an expansion, scrolling down, overlaying, or otherwise including the user interface shown Fig.34A In or together with the user interface shown. Fig.34B The user interface shown may be responsive to displaying Fig.34B and / or Fig.34A The user interface shown is generated when an operator of the device selects icons classified by source.
[0276] Reference now Fig.35 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The improvement measure planning dashboard may include information about Fig.14 The same building as the building in question and / or the improvement action plan indicator may include information on buildings that are different from Fig.14 The information of the building can be responsive to the operator's selection Fig.13 The next icon shown is used to generate the user interface. The improvement plan dashboard can include a view icon. Display Fig.35 An operator of the device of the illustrated user interface may hover over, select, or otherwise interact with a view icon to adjust the view, appearance, or presentation of the improvement action plan. Fig.35 Information about the emission categories associated with the building may be included. Fig.35At least one ECM is shown to have been generated, built, customized, or otherwise associated with the emission category of the building. Fig.35 Also included is information on natural gas emission sources that affect the emission categories.
[0277] Reference now Fig.36 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The user interface may include at least one window, the at least one window including information related to Fig.35 Information related to diesel emission sources, electric emission sources, and / or butane emission sources for the emission categories shown. The Butane window may include an ECM impact graph indicating that an ECM has been established, executed, or otherwise implemented that may result in achieving a target value associated with butane. Fig.36 The user interface shown can be Fig.35 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.35 and Fig.36 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0278] Reference now Fig.37 , according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement action planning dashboard. The user interface may include at least one window including information related to an energy sustainability category. The user interface may provide an indication that an ECM has not been established, executed, or otherwise implemented for energy usage intensity parameters and / or energy consumption parameters. Fig.37 The user interface shown can be Fig.35 and / or Fig.36 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.35 , Fig.36 and Fig.37 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0279] Reference now Fig.38 , according to an exemplary embodiment, a user interface is shown. The user interface may include an improvement action planning dashboard. The user interface may include at least one window including information related to a water sustainability category and / or a waste sustainability category. The user interface may provide an indication that an ECM has not been established, implemented, or otherwise implemented for a water use intensity parameter and / or a waste parameter. Fig.38 The user interface shown can be Fig.35 , Fig.36 and / or Fig.37 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.35 , Fig.36 , Fig.37 and / or Fig.38 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0280] Reference now Fig.39 According to an exemplary embodiment, a user interface is shown. The user interface may include a power saving window. Fig.39 The user interface shown may be a pop-up window, superimposed on at least one of the user interfaces described herein, and / or otherwise included therein. The energy saving window may include a start date and an end date icon. The operator of the device may display Fig.39 The user interface shown can be hovered over Fig.39 The operator may select the start date and end date of the ECM shown in the embodiment of the present invention, interact with it, or otherwise select the start date and end date of the ECM. In addition, the operator may also select the status of the ECM. The status may be at least one of established, suspended, rejected, accepted, and / or any other possible status.
[0281] Reference now Fig.40 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The improvement measure planning dashboard may include information about Fig.14 or Fig.35 buildings, and / or the improvement planning dashboard may include information on buildings that are different from Fig.14 or Fig.35 The information of the building of the building. In response to the operator's selection Fig.13 The next icon shown is used to generate the user interface. The improvement plan dashboard can include a view icon. Display Fig.40 An operator of the device of the illustrated user interface may hover over, select, or otherwise interact with a view icon to adjust the view, appearance, or presentation of the improvement action plan. Fig.40 Information related to the emissions sustainability category associated with the building may be included. Fig.40 At least one ECM is shown to have been generated, built, customized, or otherwise associated with the emission category of the building.
[0282] Reference now Fig.41 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The user interface may include at least one window, the at least one window including information related to Fig.40 Information about natural gas emission sources and diesel emission sources for the emission sustainability categories shown. Fig.41 The user interface shown can be Fig.40 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.40 and Fig.41 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0283] Reference now Fig.42 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The user interface may include at least one window, the at least one window including information related to Fig.40 The Butane window may include information related to propane emission sources and butane emission sources for the emission sustainability category shown. The Butane window may include an ECM impact chart indicating that an ECM has been established, executed, or otherwise implemented, which may result in achieving a target value associated with butane. If an ECM has been established for butane, the Butane window is also displayed to include an Add / Remove ECM icon. Additionally, since an ECM has not been established for propane, the Propane window only displays an Add ECM icon. Fig.42 The user interface shown can be Fig.40 and / or Fig.41 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.40 , Fig.41 and Fig.42 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0284] Reference now Fig.43 According to an exemplary embodiment, a user interface is shown. The user interface may include an energy saving measure window. Fig.43 The user interface shown may be responsive to an operator selecting Figures 14 to 16 , Figure 25 to Figure 28 , Figures 35 to 38 and / or Figure 40 to Figure 42 At least one of the added ECM icons shown in at least one of the added ECM icons is generated. Fig.43 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figures 14 to 16 , Figure 25 to Figure 28 , Figures 35 to 38 and / or Figure 40 to Figure 42 An overlay on top of at least one of the user interfaces shown. Fig.43 The illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device.
[0285] Fig.43 The illustrated user interface may include an ECM impact chart. The ECM impact chart may include a graphical representation of at least one sub-target goal associated with a sustainability goal and / or energy conservation protocol generated and / or obtained by the ECM manager 1105. The ECM impact chart may include a sub-target portion and at least one portion associated with at least one option (e.g., at least one FIM, action, etc.). The ECM impact chart may display the impact that each option may have. Fig.43 The Energy Saving Measures window is displayed in relation to butane emissions associated with Building 1 . Fig.43 At least one window related to options included in the ECM impact graph may also be included.
[0286] Fig.43 Option 3 is shown to be related to replacing the boiler. The window related to the options can be filtered, sorted, or otherwise organized using the optimization icon. The optimization icon can include at least one option. For example, the optimization icon can include the highest emission reduction option, the shortest payback period option, and / or the lowest cost option. Fig.43 An example of an option window sorted by the shortest payback period option is depicted.The user interface may also include descriptions and what-if icons that may provide additional information related to a particular option window.
[0287] Reference now Fig.44 , according to an exemplary embodiment, a user interface is shown. The user interface may include an option window related to at least one option included in the ECM impact chart. The user interface may also include a customize icon and an accept and complete icon. Display Fig.43 An operator of the device of the user interface shown may select the customize icon to customize at least one of the options displayed in the user interface. The operator may select the accept and complete icon to establish at least one option that has been selected by the operator. The empty circle next to option 2 indicates that the operator has not yet selected option 2. Once selected, option 2 may be established in response to the operator selecting the accept and complete icon and / or may be customized in response to the operator selecting the customize icon. Fig.44 The user interface shown can be Fig.43 An expansion of the user interface shown, scrolled down, overlaid, or otherwise included in or with the user interface. Similarly, Fig.44 The information shown can be found in Fig.43 In addition, Fig.43 and Fig.44 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0288] Reference now Fig.45 According to an exemplary embodiment, a user interface is shown. The user interface may include an energy saving measure window. Fig.45 The user interface shown may be responsive to an operator selecting Figure 25 to Figure 28 , Figure 35 to Figure 37 , Fig.40 and / or Fig.42 The method is generated by at least one of the add / delete ECM icons shown in at least one of the add / delete ECM icons. Fig.45 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figure 25 to Figure 28 , Figure 35 to Figure 37 , Fig.40 and / or Fig.42 An overlay on top of at least one of the user interfaces shown. Fig.45 The illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device.
[0289] Reference now Fig.46 According to an exemplary embodiment, a user interface is shown. The user interface may include an energy saving measure window. Fig.46 The user interface shown may be responsive to an operator selecting Figures 14 to 16 , Figure 25 to Figure 28 , Figures 35 to 38 and / or Figure 40 to Figure 42 At least one of the added ECM icons shown in at least one of the added ECM icons is generated. Fig.46 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figures 14 to 16 , Figure 25 to Figure 28 , Figures 35 to 38 and / or Figure 40 to Figure 42 An overlay on top of at least one of the user interfaces shown. Fig.46 The illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device.
[0290] Fig.46 The illustrated user interface may include an ECM impact chart. The ECM impact chart may include a graphical representation of at least one sub-target goal associated with a sustainability goal and / or energy conservation protocol generated and / or obtained by the ECM manager 1105. The ECM impact chart may include a sub-target portion and at least one portion associated with at least one option (e.g., at least one FIM, action, etc.). The ECM impact chart may display the impact that each option may have. Fig.46 The Energy Saving Measures window is displayed in relation to butane emissions associated with Building 1 . Fig.46 At least one window related to options included in the ECM impact graph may also be included.
[0291] Fig.46 Option 1 is shown as being related to replacing a boiler. A window related to the options may be filtered, sorted, or otherwise organized using an optimization icon. The optimization icon may include at least one option. For example, the optimization icon may include a highest emissions reduction option, a shortest payback period option, and / or a lowest cost option. Fig.46 An example of an options window sorted by highest emissions reduction options is depicted. The user interface may also include descriptions and what-if icons that may provide additional information related to a particular options window.
[0292] Reference now Fig.47 , according to an exemplary embodiment, a user interface is shown. The user interface may include an option window related to at least one option included in the ECM impact chart. The user interface may also include a customize icon and an accept and complete icon. Display Fig.47 An operator of the device of the user interface shown may select the customize icon to customize at least one of the options displayed in the user interface. The operator may select the accept and complete icon to establish at least one option that has been selected by the operator. The empty circle next to option 2 indicates that the operator has not yet selected option 2. Once selected, option 2 may be established in response to the operator selecting the accept and complete icon and / or may be customized in response to the operator selecting the customize icon. Fig.47 The user interface shown can be Fig.46 An expansion of the user interface shown, scrolled down, overlaid, or otherwise included in or with the user interface. Similarly, Fig.47 The information shown can be found in Fig.46 In addition, Fig.46 and Fig.47 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0293] Reference now Fig.48A , according to an exemplary embodiment, a user interface is shown. The user interface may include a custom window related to improvement action planning. Fig.48A The user interface shown may be responsive to an operator selecting Fig.18 , Fig. 20 , Fig.44 and / or Fig.47 Generated by a custom icon shown in at least one of the . Fig.48A The illustrated user interface may be displayed, provided, shown, or otherwise presented as Fig.18 , Fig. 20 , Fig.44 and / or Fig.47 An overlay on top of at least one of the user interfaces shown. Fig.48AThe illustrated user interface may also be generated as a new user interface that replaces the user interface previously illustrated by the device.
[0294] Fig.48A An operator of a device displaying a user interface is shown having selected an ECM related to space heating replacement and burner replacement. The operator may select the Accept and Finish icon to establish the selected ECM. The operator may select the Return to Recommendations icon to return to Fig.18 , Fig. 20 , Fig.44 and / or Fig.47 A user interface shown in at least one of the following.
[0295] Reference now Fig.48B , according to an exemplary embodiment, a user interface is shown. Fig.48B The user interface shown may be and / or include Fig.48A The information shown is similar to the information shown. Similarly, Fig.48B The user interface shown can be Fig.48A At least one of an expansion, scrolling down, overlaying, or otherwise including the user interface shown Fig.48A In or together with the user interface shown.
[0296] Reference now Fig.49 According to an exemplary embodiment, a user interface is shown. The user interface may include an energy saving measure window. Fig.49 The user interface shown may be responsive to an operator selecting Figure 25 to Figure 28 , Figure 35 to Figure 37 , Fig.40 and / or Fig.42 The user interface displays an ECM associated with a space heating replacement and a burner replacement. The operator may select a yes icon to complete the removal of the selected ECM from the energy conservation protocol. The operator may select a back icon to cancel the removal of the selected ECM. Fig.49 The illustrated user interface may be displayed, provided, shown, or otherwise presented as Figure 25 to Figure 28 , Figure 35 to Figure 37 , Fig.40 and / or Fig.42 An overlay on top of at least one of the illustrated user interfaces. The user interface illustrated in FIG. 459 may also be generated as a new user interface that replaces a previously illustrated user interface.
[0297] Reference now Fig.50 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The improvement measure planning dashboard may include information about Fig.14 , Fig.35 or Fig.40 buildings, and / or the improvement planning dashboard may include information on buildings that are different from Fig.14 , Fig.35 or Fig.40 The information of the building can be responsive to the operator's selection Fig.13 The next icon shown is used to generate the user interface. The improvement plan dashboard can include a view icon. Display Fig.50 An operator of the device of the illustrated user interface may hover over, select, or otherwise interact with a view icon to adjust the view, appearance, or presentation of the improvement action plan. Fig.50 Information related to the emissions sustainability category associated with the building may be included. Fig.40 At least one ECM is shown to have been generated, built, customized, or otherwise associated with the emission category of the building.
[0298] Reference now Fig.51 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The user interface may include at least one window, the at least one window including information related to Fig.50 Information about natural gas emission sources and diesel emission sources for the emission sustainability categories shown. Fig.51 The user interface shown can be Fig.50 An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.50 and Fig.51 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0299] Reference now Fig.52 According to an exemplary embodiment, a user interface is shown. The user interface may include an improvement measure planning dashboard. The user interface may include at least one window, the at least one window including information related to Fig.50 The Butane window may include information related to propane emission sources and butane emission sources for the emission sustainability category shown. The Butane window may include an ECM impact chart indicating that an ECM has been established, executed, or otherwise implemented, which may result in achieving a target value associated with butane. If an ECM has been established for butane, the Butane window is also displayed to include an Add / Remove ECM icon. Additionally, since an ECM has not been established for propane, the Propane window only displays an Add ECM icon. Fig.52 The user interface shown can be Fig.50 and / or Fig.51An expansion of the user interface shown, scrolling down, overlaying or otherwise included in or with the user interface. In addition, Fig.50 , Fig.51 and Fig.52 The illustrated user interfaces may be included within a single user interface (eg, the user interfaces are combined).
[0300] Reference now Fig.53A , according to an exemplary embodiment, a user interface is shown. The user interface may include a graphical representation of ECM tracking. The graphical representation depicted by the user interface may be based on ECM projects. The graphical representation depicted by the user interface may also be based on sources that contribute to parameters associated with sustainability targets. The user interface may include baseline values related to parameters associated with sustainability targets. For example, the user interface may include a baseline value for total emissions for a building (e.g., building 10). Similarly, the user interface may include a baseline value related to at least one of the sustainability categories (e.g., emissions, energy, water, waste, etc.). The user interface may include the impact that at least one ECM may have on a parameter value. For example, Fig.53A It shows that the completion of ECM 0032 and ECM 0055 can reduce carbon emissions from 6,200tCO2e / year to 6,000tCO2e / year. Similarly, Fig.53A It shows that after the completion of ECM 0033 and ECM 0056, carbon emissions can be reduced from 6,000tCO2e / year to 4,000tCO2e / year. In addition, Fig.53A ECM 0035 can reduce carbon emissions from 4,000tCO2e / year to 3,800tCO2e / year after completion. Fig.53A An operator of the illustrated user interface device may adjust, modify or otherwise change the presentation of information by hovering over, interacting with or selecting at least one of the display source icons, completed ECM icons and / or planned ECM icons. Fig.53A The user interface shown can be Fig.32 An expansion of the user interface is shown, scrolled down, overlaid, or otherwise included in or with the user interface.
[0301] Reference now Fig.53B , according to an exemplary embodiment, a user interface is shown. The user interface includes a graphical representation of ECM tracking, including impacts contributing to ECM projects and a view by source. The view by source depicts the impact of the ECM project on each source that contributes to a sustainability parameter and / or sustainability goal. Fig.53B Examples of ECM items that affect natural gas consumption, diesel consumption, propane consumption, and butane consumption are depicted. Fig.53BThe user interface shown may be and / or include Fig.53A The information shown is similar to the information shown. Similarly, Fig.53B The user interface shown can be Fig.53A At least one of an expansion, scrolling down, overlaying, or otherwise including the user interface shown Fig.53A In or together with the user interface shown. Fig.53B The user interface shown may be responsive to displaying Fig.53B and / or Fig.53A The user interface shown is generated when an operator of the device selects icons classified by source.
[0302] Fig.54 A flow chart of a process 5400 for reducing carbon emissions for a building according to an exemplary embodiment is depicted. The building may be and / or include a building 10. The building 10 may be or be included in at least one location of an enterprise. For example, the building 10 may be located in a first campus of an enterprise and the enterprise may include multiple campuses. The building 10 may contribute to its own sustainability and / or the sustainability of the enterprise. The building 10 may include multiple pieces of building equipment. The building equipment may contribute to the sustainability performance of the building 10 (e.g., the sustainability performance described herein). At least one step of the process 5400 may be performed by the ECM manager 1105 and / or its components. For example, the ECM generator 1130 may perform at least one step of the process 5400. The process 5400 may also be performed by any computing device and / or system described herein. The process 5400 may be performed before the construction of the building 10, during the construction of the building 10, after the construction of the building 10 is completed, and / or at other possible time points.
[0303] In step 5405, a carbon reduction target can be obtained. The carbon reduction target can be related to and / or associated with the building 10. The carbon reduction target can be included in the sustainability target for the building 10. Similarly, the carbon reduction target can be a sustainability target for the building 10. The carbon reduction target can be obtained from a data source and / or a user device. For example, the carbon reduction target can be obtained from the user device 318. The communication component 1120 can obtain the carbon reduction target from the user device 318.
[0304] In some embodiments, a carbon reduction goal can be established for building 10. For example, a company and / or entity responsible for building 10 can establish a carbon reduction goal for building 10. The carbon reduction goal can be established by performing steps similar to those described in U.S. Provisional Patent Application No. 63 / 336,935 filed on April 29, 2022 to establish a business-level goal (e.g., a sustainability goal) or a target sustainability level, a location-level goal or target, a building-level goal or target, and / or a building sub-target goal. The establishment of a carbon reduction goal can cause a user device to display a user interface. For example, Fig.13 The illustrated user interface may be displayed on a user device in response to establishing a carbon reduction goal.
[0305] The communication component 1120 can communicate with the sustainability component 1125 in response to obtaining the carbon reduction target. The communication component 1120 can provide the carbon reduction target to the sustainability component 1125. The sustainability component 1125 can determine the baseline carbon emission level for the building 10. The sustainability component 1125 can determine the baseline carbon emission level for the building 10 by retrieving data stored in the database 1140. For example, the sustainability component 1125 can retrieve data related to equipment emissions and then determine the baseline carbon emission level for the building 10. The baseline carbon emission level for the building 10 can be an average value over a period of time (e.g., the average annual emission level for the past 5 years). The baseline carbon emission level for the building 10 can also be a recent value (e.g., the carbon emission level of the building 10 in the previous year). The baseline carbon emission level for the building 10 can also be based on the duration of operation relative to the building 10. For example, the baseline carbon emission level for the building 10 can be the total carbon emissions of the building 10 in the past three months.
[0306] In step 5410, a target carbon emission level can be determined. The target carbon emission level can be associated with the building 10. The target carbon emission level can be determined using the baseline carbon emission level and the carbon reduction target. For example, the sustainability component 1125 can determine the target carbon emission level using the carbon reduction target obtained in step 5405 and the baseline carbon emission level determined in step 5405.
[0307] The target carbon emissions level can be a carbon emissions value, and if the building 10 achieves the carbon emissions value, it can cause the building 10 to achieve the carbon reduction goal of the building 10. For example, the carbon reduction goal can be a goal to reduce the carbon emissions of the building 10 by 90%. Continuing with this example, the baseline carbon emissions for the building 10 can be 10,000 tCO2e / year. The sustainability component 1125 can use the 90% carbon reduction goal and the baseline carbon emissions level of 10,000 tCO2e / year to determine a target carbon emissions level of 1,000 tCO2e / year.
[0308] In step 5415, a plurality of energy conservation agreements may be generated. The ECM generator 1130 may generate energy conservation agreements. The energy conservation agreements may be and / or be included in a plurality of ECMs. The energy conservation agreements may include a plurality of actions. The plurality of actions may be and / or include ECMs, FIMs, and / or other possible actions that may be taken to improve the sustainability of the building 10. The plurality of actions may meet at least a portion of the carbon reduction target and / or at least a portion of the target emission level. For example, a first energy conservation agreement may include actions that, when implemented, result in a reduction in carbon emissions of the building 10.
[0309] The ECM generator 1130 may generate an energy saving agreement using the baseline carbon emission level determined in step 5405 and the target carbon emission level determined in step 5410. For example, the ECM generator 1130 may use the difference between the target emission level and the baseline carbon emission level to determine an ECM that may be included in the energy saving agreement. The ECM generator 1130 may also use data stored in the database 1140 to determine multiple impacts associated with the ECM and / or energy saving agreement. The impact may include expected operating time values, expected efficiency figures, and / or other possible information. The ECM generator 1130 may use the impact to generate an ECM that may meet the target carbon emission level and carbon reduction goals. The ECM generator 1130 may communicate with the communication component 1120 in response to generating the energy saving agreement. The ECM generator 1130 may provide the energy saving agreement to the communication component 1120.
[0310] The communication component 1120 can provide the energy saving agreement in response to receiving the energy saving agreement. For example, the communication component 1120 can provide the energy saving agreement generated in step 5415 to the data source 1110 or the user device 318. The provision of the energy saving agreement by the communication component 1120 can cause the user device 318 to display at least a portion of the energy saving agreement via a user interface associated with the user device 318. For example, the user interface displayed by the user device 318 can display, display, present, or otherwise include the energy saving agreement and the actions included in the energy saving agreement. The user interface can include at least one optional element, and an operator of the device displaying the user interface can interact with the optional element to accept the ECM, the energy saving agreement, and / or the actions included in the ECM and / or the energy saving agreement. For example, the user interface can include Fig.23 Similar information is shown, and the operator can select the Accept and Finish icon to accept the selected ECM.
[0311] In step 5420, an indication may be received. The communication component 1120 may receive the indication. The indication may be received from the user device 318. The indication may be an indication to accept a subset of the plurality of actions included in the energy saving protocol. For example, a first energy saving protocol may include a plurality of actions, and an operator of a device displaying the first energy saving protocol may select an icon to accept a subset of the plurality of actions. The operator selecting the icon may cause the communication component 1120 to receive an indication of acceptance. The communication component 1120 may provide an indication to the ECM generator 1130 to accept the subset of the plurality of actions.
[0312] In step 5425, a subset of actions may be implemented. The subset of actions may be a subset of actions accepted by the operator in step 5420. The ECM generator 1130 may implement the subset of actions in response to the communication component 1120 providing an indication to the ECM generator 1130. The ECM generator 1130 implementing the subset of actions included in the first energy conservation protocol may include establishing, modifying, updating, changing, or otherwise continuing at least one of the subset of actions included in the first energy conservation protocol. Implementation of the subset of actions may include the controller 1135 controlling and / or operating at least one piece of building equipment based on the subset of actions. For example, the subset of actions may include a control strategy and the controller 1135 may use the control strategy to control multiple pieces of building equipment.
[0313] In step 5430, a change in the carbon emissions level of the building can be detected. For example, the monitoring component 1205 can detect that the building 10 has progressed toward the target carbon emissions level obtained in step 5405. For example, the monitoring component 1205 can determine the current carbon emissions level of the building 10, and the monitoring component 1205 can determine that the current carbon emissions level is less than the baseline carbon emissions level. The monitoring component 1205 can detect that the building 10 has progressed toward the target carbon emissions level in response to a subset of the actions implemented in step 5425.
[0314] Although the user interfaces described herein are described as having given numerical values and the user interfaces shown in the accompanying drawings are shown as including given numerical values, the information shown in the user interfaces may include numerical values similar to the values described herein and / or the user interfaces may include numerical values different from the values described herein.
[0315] The user interface described herein may be generated in response to the ECM manager 1105 and / or its components providing a signal to at least one device (e.g., user device 318) that causes the device to display the user interface via the interface. In addition, any information or data received, monitored, generated, or otherwise related to the system described herein may also be included in the user interface described herein.
[0316] Configuration of the Exemplary Embodiment
[0317] The construction and arrangement of the systems and methods as shown in the exemplary embodiments are illustrative only. Although only several embodiments have been described in detail in the present disclosure, multiple modifications are possible (e.g., changes in the size, dimensions, structure, shape and proportion of each element, parameter values, mounting arrangements, material use, color, orientation, etc.). For example, the position of the element may be reversed or otherwise changed, and the nature or number or position of the discrete element may be changed or changed. Therefore, all such modifications are intended to be included within the scope of the present disclosure. The order or sequence of any process or method steps may be changed or reordered according to alternative embodiments. Without departing from the scope of the present disclosure, other substitutions, modifications, changes and omissions may also be made in the design, operating conditions and arrangement of the exemplary embodiments.
[0318] The present disclosure captures methods, systems, and program products on any machine-readable medium for implementing various operations. The embodiments of the present disclosure may be implemented using an existing computer processor, or by a dedicated computer processor for an appropriate system (for the purpose of implementing the embodiments of the present disclosure or another purpose), or by a hardwired system. Embodiments within the scope of the present disclosure include program products, which include machine-readable media for carrying or having machine-executable instructions or data structures stored thereon. This machine-readable medium may be any available medium that can be accessed by a general-purpose or special-purpose computer or other machine with a processor. For example, this machine-readable medium may include RAM, ROM, EPROM, EEPROM, CD-ROM or other optical disk storage devices, magnetic disk storage devices or other magnetic storage devices, or any other medium that can be used to carry or store the desired program code in the form of machine-executable instructions or data structures and can be accessed by a general-purpose or special-purpose computer or other machine with a processor. The above combination is also included in the scope of machine-readable media. Machine-executable instructions include, for example, instructions and data that cause a general-purpose computer, a special-purpose computer, or a special-purpose processing machine to perform a certain function or group of functions.
[0319] Although the drawings show a specific order of method steps, the order of steps may be different from the order depicted. Also, two or more steps may be performed simultaneously or partially simultaneously. Such variations will depend on the selected software and hardware systems and the designer's choice. All such variations are within the scope of the present disclosure. Similarly, software implementations may be implemented using standard programming techniques with rule-based logic and other logic to implement various connection steps, processing steps, comparison steps, and decision steps.
Claims
1. A building management system (BMS), the BMS comprising one or more memory devices having stored thereon instructions which, when executed by one or more processors, cause the one or more processors to: obtaining a sustainability goal established for a building, the building comprising a plurality of pieces of building equipment, and wherein the sustainability goal is related to a sustainability performance of the building; determining a target sustainability level for the building using the baseline value of the sustainability performance for the building and the sustainability target; generating a plurality of energy conservation protocols using the baseline value and the target sustainability level for the sustainability performance of the building, wherein a first energy conservation protocol of the plurality of energy conservation protocols includes a plurality of actions that meet at least a portion of the sustainability goal or at least a portion of the target sustainability level for the building; receiving an indication of acceptance of a subset of the plurality of actions included in the first energy saving protocol; as well as The subset of the plurality of actions included in the first energy conservation protocol is implemented in response to receiving the indication of accepting the subset of the plurality of actions.
2. The BMS of claim 1 , wherein implementing the subset of the plurality of actions included in the first energy saving protocol comprises: controlling at least one piece of building equipment among the plurality of pieces of building equipment using a plurality of control actions associated with the subset of the plurality of actions included in the first energy conservation protocol; as well as It is detected that the building has progressed towards the target sustainability level in response to controlling the at least one piece of building equipment of the plurality of pieces of building equipment.
3. The BMS of claim 1 , wherein the instructions cause the one or more processors to: detecting that a first piece of building equipment among the plurality of pieces of building equipment has been replaced by a second piece of building equipment, wherein the second piece of building equipment performs a function similar to that of the first piece of building equipment; determining an impact of the second piece of building equipment on at least one of the sustainability goal or the target sustainability level in response to the second piece of building equipment replacing the first piece of building equipment; as well as The impact of the second piece of building equipment on at least one of the sustainability goal or the target sustainability level is provided to a user device.
4. The BMS of claim 1 , wherein the instructions cause the one or more processors to: using the operational data of the building to detect an equipment fault condition for at least one piece of building equipment among the plurality of pieces of equipment; determining that the equipment failure condition affects the sustainability goal; updating at least one of the plurality of power conservation protocols to include a first action that addresses at least a portion of the device fault condition; as well as The at least one power saving protocol of the plurality of power saving protocols is executed, wherein the at least one power saving protocol of the plurality of power saving protocols addresses the device fault condition.
5. The BMS of claim 1 , wherein the instructions cause the one or more processors to: causing a device to display an element, wherein the element includes at least one of the sustainability goal, a current value of the sustainability performance for the building, or at least one energy conservation protocol of the plurality of energy conservation protocols; receiving an indication to update at least a portion of the element, wherein the indication includes a user-defined power saving protocol; as well as The element is updated to include the user defined power saving protocol.
6. The BMS of claim 1 , wherein the instructions cause the one or more processors to: executing at least one energy saving protocol among the plurality of energy saving protocols; determining a current value of the sustainability performance for the building using operational data for the building, wherein the current value of the sustainability performance for the building is determined in response to a predetermined amount of time; determining a difference between the current value of the sustainability performance for the building and the baseline value of the sustainability performance for the building; as well as In response to the difference being greater than a predetermined threshold, it is determined that the at least one of the plurality of energy conservation protocols has moved the sustainability performance of the building toward the target sustainability level.
7. The BMS of claim 1 , wherein the instructions cause the one or more processors to: using operational data for the building to monitor a status of a specific action included in at least one of the plurality of energy conservation protocols; determining, in response to monitoring the state of the particular action, that the state of the particular action has remained the same; causing the device to display an element, wherein the element includes a notification to perform the specific action; and Second operational data for the building is used to determine that the particular action has been performed.
8. The BMS of claim 1 , wherein determining the target sustainability level for the building comprises: determining a difference between the baseline value of the sustainability performance for the building and the sustainability target; generating a sustainability value that meets the sustainability target using a difference between the baseline value of the sustainability performance for the building and the sustainability target; as well as An amount of time to reach the sustainability value is determined, wherein the amount of time is established by the sustainability goal.
9. The BMS according to claim 1, wherein generating the plurality of energy saving protocols comprises: retrieving operational data related to at least one piece of building equipment from the plurality of pieces of building equipment from a database; using the operational data relating to the at least one piece of building equipment in the plurality of pieces of building equipment to determine a contribution of the at least one piece of building equipment in the plurality of pieces of building equipment in the baseline value for the sustainability performance of the building; retrieving from the database predetermined operational metrics associated with the at least one piece of building equipment; using the predetermined operational metric associated with the at least one piece of building equipment and the operational data associated with the at least one piece of building equipment to detect a difference between the predetermined operational metric and the operational data; as well as A set of actions is generated in response to detecting the difference between the predetermined operational metric and the operational data, the set of actions adjusting the contribution of the at least one piece of building equipment in the baseline value of the baseline sustainability performance for the building by reducing the difference between the predetermined operational metric and the operational data.
10. A method for reducing carbon emissions from a building, the method comprising: obtaining, by one or more processors, a carbon reduction target established for the building, the building comprising a plurality of pieces of building equipment; determining, by the one or more processors, a target carbon emissions level for the building using a baseline carbon emissions level for the building and the carbon reduction target; generating, by the one or more processors, a plurality of energy conservation protocols using the baseline carbon emissions level and the target carbon emissions level, wherein a first energy conservation protocol of the plurality of energy conservation protocols includes a plurality of actions that meet at least a portion of the carbon reduction goal or at least a portion of the target carbon emissions level for the building; receiving, by the one or more processors, an indication to accept a subset of the plurality of actions included in the first energy conservation protocol; implementing, by the one or more processors in response to receiving the indication to accept the subset of the plurality of actions, the subset of the plurality of actions included in the first energy conservation protocol; as well as The one or more processors detect, in response to implementing the subset of the plurality of actions included in the first energy conservation protocol, that the building has progressed toward the target carbon emissions level.
11. The method according to claim 10, further comprising: detecting, by the one or more processors, that a first piece of building equipment among the plurality of pieces of building equipment has been replaced by a second piece of building equipment, wherein the second piece of building equipment performs a function similar to that of the first piece of building equipment; determining, by the one or more processors, an effect of the second piece of building equipment on at least one of the carbon reduction target or the target carbon emissions level in response to the second piece of building equipment replacing the first piece of building equipment; as well as The impact of the second piece of building equipment on at least one of the carbon reduction goal or the target carbon emissions level is provided, by the one or more processors, to a user device.
12. The method according to claim 10, further comprising: using, by the one or more processors, operational data of the building to detect an equipment fault condition for at least one piece of building equipment among the plurality of pieces of equipment; determining, by the one or more processors, that the equipment fault condition affects the carbon reduction target; updating, by the one or more processors, at least one of the plurality of power conservation protocols to include a first action that addresses at least a portion of the device fault condition; as well as The at least one of the plurality of power conservation protocols is executed by the one or more processors, wherein the at least one of the plurality of power conservation protocols addresses the device fault condition.
13. The method according to claim 10, further comprising: causing, by the one or more processors, a device to display an element, wherein the element includes at least one of the carbon reduction target, a current carbon emissions level, or at least one energy conservation protocol of the plurality of energy conservation protocols; receiving, by the one or more processors, an indication to update at least a portion of the element, wherein the indication includes a user-defined power conservation protocol; as well as The element is updated, by the one or more processors, to include the user-defined power conservation protocol.
14. The method according to claim 10, further comprising: executing, by the one or more processors, at least one energy saving protocol of the plurality of energy saving protocols; determining, by the one or more processors, a current carbon emissions level using operational data for the building, wherein the current carbon emissions level is determined in response to a predetermined amount of time; determining, by the one or more processors, a difference between the current carbon emissions level and the baseline carbon emissions level; as well as The one or more processors determine, in response to the difference being greater than a predetermined threshold, that the at least one of the plurality of energy conservation protocols has moved the sustainability of the building toward the target carbon emissions level.
15. The method according to claim 10, further comprising: monitoring, by the one or more processors, a status of a specific action included in at least one of the plurality of energy conservation protocols using operational data for the building; determining, by the one or more processors in response to monitoring the state of the particular action, that the state of the particular action has remained the same; causing, by the one or more processors, the device to display an element, wherein the element includes a notification to perform the particular action; as well as Second operational data for the building is used by the one or more processors to determine that the particular action has been performed.
16. The method of claim 10, wherein determining the target carbon emissions level for the building comprises: determining, by the one or more processors, a difference between the baseline carbon emissions level and the carbon reduction target; generating, by the one or more processors, a sustainability value that satisfies the carbon reduction target using the difference between the baseline carbon emissions level and the carbon reduction target; as well as An amount of time to reach the sustainability value is determined, by the one or more processors, wherein the amount of time is established by the carbon reduction target.
17. The method of claim 10, wherein generating the plurality of energy saving protocols comprises: retrieving, by the one or more processors, operational data related to at least one piece of building equipment among the plurality of pieces of building equipment from a database; using, by the one or more processors, the operational data associated with the at least one piece of building equipment among the plurality of pieces of building equipment to determine a contribution of the at least one piece of building equipment among the plurality of pieces of building equipment to the baseline sustainability performance; retrieving, by the one or more processors, from the database predetermined operational metrics related to the at least one piece of building equipment; detecting, by the one or more processors, a difference between the predetermined operational metric and the operational data associated with the at least one piece of building equipment; as well as A set of actions is generated by the one or more processors in response to detecting the difference between the predetermined operational metric and the operational data, the set of actions adjusting the role of the at least one piece of building equipment in the baseline sustainability performance by reducing the difference between the predetermined operational metric and the operational data.
18. One or more non-transitory storage media having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations comprising: obtaining a sustainability goal established for a building, the building comprising a plurality of pieces of building equipment, and wherein the sustainability goal is related to a sustainability performance of the building; determining a target sustainability level for the building using the baseline value of the sustainability performance for the building and the sustainability target; generating a plurality of energy conservation protocols using the baseline value and the target sustainability level for the sustainability performance of the building, wherein a first energy conservation protocol of the plurality of energy conservation protocols includes a plurality of actions that meet at least a portion of the sustainability goal or at least a portion of the target sustainability level for the building; receiving an indication of acceptance of a subset of the plurality of actions included in the first energy saving protocol; controlling at least one piece of building equipment among the plurality of pieces of building equipment using a plurality of control actions associated with the subset of the plurality of actions included in the first energy conservation protocol; as well as It is detected that the building has progressed towards the target sustainability level in response to controlling the at least one piece of building equipment of the plurality of pieces of building equipment.
19. The non-transitory storage medium of claim 18, the operations further comprising: detecting that a first piece of building equipment among the plurality of pieces of building equipment has been replaced by a second piece of building equipment, wherein the second piece of building equipment performs a function similar to that of the first piece of building equipment; determining an impact of the second piece of building equipment on at least one of the sustainability goal or the target sustainability level in response to the second piece of building equipment replacing the first piece of building equipment; as well as The impact of the second piece of building equipment on at least one of the sustainability goal or the target sustainability level is provided to a user device.
20. The non-transitory storage medium of claim 18, the operations further comprising: using the operational data of the building to detect an equipment fault condition for at least one piece of building equipment among the plurality of pieces of equipment; determining that the equipment failure condition affects the sustainability goal; updating at least one of the plurality of power conservation protocols to include a first action that addresses at least a portion of the device fault condition; as well as The at least one power saving protocol of the plurality of power saving protocols is executed, wherein the at least one power saving protocol of the plurality of power saving protocols addresses the device fault condition.