Lifting appliance for lifting assembly type high-voltage protective shed and using method of lifting appliance
By integrating a dual-axis inclination sensor, camera and speaker in the hoisting device, combined with electric push rods and connecting iron chains, the safety risks and stability problems when lifting the high-voltage line protection shed is solved, and a safer and more stable lifting process is achieved. .
Patent Information
- Application Number
- CN202411081994.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-12-10
AI Technical Summary
When lifting prefabricated components of high-voltage line protective sheds, the existing lifting device lacks a device to remind the operators of the lifting area to stay away, which increases the safety risk, and the hook lacks support protection when the plate is shaking, which increases the risk of falling. .
A prefabricated high-voltage protective shed sling is designed, using a dual-axis inclination sensor, a rotating camera, a wide-angle camera and speakers to monitor and remind people to stay away from the lifting area in real time, and ensure the stability of the hook through electric push rods and connecting iron chains. Sex and support.
By monitoring the stability of lifting objects and spreaders in real time, safety risks are reduced, and the risk of falling prefabricated components of the board are reduced by connecting iron chains, improving the safety and stability of the lifting process.
Smart Images

Figure CN119100246A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hangers for hoisting prefabricated components, and in particular to a hanger for hoisting an assembled high-voltage protective shed and a use method thereof. Background Art
[0002] At present, there are many intersections between newly built railways and local high-voltage lines. In order to meet safety and use requirements, the construction method of relocating high-voltage lines is usually adopted. This method has some disadvantages: 1. The relocation procedures are cumbersome and the relocation period is long. It is necessary to coordinate with the provincial power supply department and coordinate with many large power users; 2. The power outage time is short and the relocation construction is difficult, especially the 500KVA high-voltage line generally only has a power outage once a year for one day. 3. It restricts the construction period. Due to the long relocation period, the project at the location of the high-voltage line is often the last railway through node control project.
[0003] In order to solve the difficulties in the construction of the intersection of railways and local high-voltage lines, a concrete assembled high-voltage line protection shed is set up above the newly built railway under the high-voltage line, which has no impact on the local high-voltage line, shortens the railway construction period, and ensures the safety of train operation. During the construction of the high-voltage line protection shed, a special lifting device is required to lift the prefabricated parts of the protection shed to the installation site to ensure the safety of the construction process.
[0004] When the existing lifting device is in use, the lifting device lacks a device to remind workers in the lifting area to stay away from the lifting area, so that during the operation of the lifting device, the construction workers below are not warned to stay away, increasing the safety risk of the lifting process. Secondly, when the existing lifting device is lifting prefabricated plate components, the lower sides of the two hooks lack a safety assurance structure, so that when the hooks encounter shaking of the plates and tilting from the hooks, the prefabricated plate components cannot be supported and protected, increasing the risk of the lifted components falling. Therefore, there is an urgent need for a lifting device for lifting assembled high-voltage protective sheds to solve the existing problems. Summary of the invention
[0005] The purpose of the present invention is to provide a hoisting device and a method for using an assembled high-voltage protective shed in order to solve the above-mentioned problem.
[0006] The present invention achieves the above-mentioned purpose through the following technical solutions:
[0007] A lifting device for lifting an assembled high-voltage protective shed, comprising two symmetrically arranged lower cross beams and lifting rings installed at the centers of the upper side surfaces of the two lower cross beams, rotating cameras are installed at both ends of the lower cross beams, a loudspeaker is installed on one side of the lower portion of the lifting ring, dual-axis inclination sensors are installed on the upper side surfaces of the two lower cross beams, an intelligent pan-tilt platform is installed at the center of the lower side surfaces of the lifting rings, a wide-angle camera is installed on the intelligent pan-tilt platform, lower hanging hole plates are symmetrically arranged on the lower side surfaces of the lower cross beams, a cross bar is passed through the lower hanging hole plates, hooks are sleeved at both ends of the cross bar, an electric push rod is installed between the hooks, and connecting iron chains are arranged between the lower horizontal structures of the hooks.
[0008] Furthermore, shoulder pole beams are installed on the upper sides of both ends of the lower cross beam, upper ear plates are welded to the upper side surfaces of the shoulder pole beams, and the shoulder pole beams are welded to the lower cross beam.
[0009] Furthermore, side ear plates are symmetrically arranged on the outer side of the lifting ring, a tensioning steel cable is installed between the side ear plate and the upper ear plate, and a limiting block is welded on the lower side of the shoulder pole beam.
[0010] Furthermore, the limit block is arranged between the two lower cross beams, and the side ear plate is welded to the lifting ring.
[0011] Furthermore, both ends of the electric push rod are connected to the hook via bolts respectively, and the upper end of the hook is connected to the cross bar via a sliding bearing.
[0012] Furthermore, both ends of the cross bar are penetrated with limit pins, the speaker is connected to the hanging ring by bolts, and the rotating camera housing is connected to the lower cross beam by bolts.
[0013] Furthermore, the method comprises the following steps:
[0014] When hoisting the prefabricated components of a general protective shed, fix the upper end of the hoisting rope required for hoisting on the lower hoisting hole plate on the lower side of the lower crossbeam, and then hang the hook at the lower end of the hoisting rope and connect it to the prefabricated component to be hoisted;
[0015] The upper side of the hoist is connected to the hook of the lifting equipment through a lifting ring, and the lifting equipment lifts the prefabricated component;
[0016] The rotating camera and wide-angle camera can clearly capture the situation of the prefabricated components being hoisted, so that the hoisting operator can understand the movement of the hoisted prefabricated components in real time. The dual-axis inclination sensor can monitor the horizontal inclination of the lower beam and the shoulder beam in real time, and transmit the monitored signal to the hoisting equipment end. During the hoisting process, the speaker can broadcast voice in real time to remind the surrounding personnel to stay away from the hoisting area.
[0017] When lifting multi-layer stacked plate prefabricated parts, the crossbar and the hook are passed through the lower lifting hole plate so that the hook on each crossbar is installed on the inner side of the lower lifting hole plate, and the two ends of the electric push rod are connected and fixed to the hook. When the plate prefabricated part needs to be lifted, the electric push rod pushes the two hooks apart so that the hooks can span across the two sides of the plate prefabricated part. Then the electric push rod moves the two hooks toward each other so that the hooks clamp and fix the plate prefabricated part to ensure the stability of the lifting process. At the same time, the two hooks are connected together with a connecting chain so that the connecting chain can provide a guarantee for the stability of the hooks.
[0018] Furthermore, the position of the lower hanging hole plate is selected according to the size of the lifting component, and a reinforcing layer plate is welded at a right angle position on the lower side of the hook.
[0019] Furthermore, the hook angle is 85 degrees, and the dual-axis inclination sensor has a built-in battery module and a wireless transmission module.
[0020] Furthermore, the rotating camera and the wide-angle camera both have built-in battery modules.
[0021] The beneficial effects of the present invention are:
[0022] The present invention provides a dual-axis inclination sensor, a rotating camera, a wide-angle camera and a loudspeaker, so that the lifting operator can use the camera to monitor the situation of the lifting object in real time during the lifting process, and use the dual-axis inclination sensor to monitor the moving stability of the lifting equipment in real time. At the same time, the loudspeaker can give voice reminders to the construction workers below the lifting path, so that the construction workers can avoid it in time and reduce safety risks. The present invention provides a connecting chain, so that the two ends of the connecting chain are connected to the hooks on both sides through tongue-belt sliding hooks. When the prefabricated plate component lifted on the hook tilts from the hook due to shaking, the connecting chain can support the lower side of the prefabricated plate component and reduce the risk of the prefabricated plate component falling. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of the separation of the lifting device, the tensioning steel cable and the hook of the assembled high-voltage protection shed according to the present invention;
[0024] Figure 2 It is a main structural diagram of a hook in a first embodiment of a lifting device for lifting an assembled high-voltage protective shed according to the present invention;
[0025] Figure 3 It is a right side view of a shoulder pole beam in a hoisting device for hoisting an assembled high-voltage protective shed according to the present invention;
[0026] Figure 4 It is a right view of a lifting ring in a lifting device for lifting an assembled high-voltage protective shed according to the present invention;
[0027] Figure 5 It is a structural schematic diagram of a lifting device for lifting an assembled high-voltage protective shed according to the present invention;
[0028] Figure 6 It is a main structural diagram of the hook in the second embodiment of the lifting device for lifting an assembled high-voltage protective shed described in the present invention.
[0029] The following are the descriptions of the reference numerals:
[0030] 1. Lower crossbeam; 2. Shoulder pole beam; 3. Tensioning steel cable; 4. Lifting ring; 5. Lower lifting hole plate; 6. Upper ear plate; 7. Side ear plate; 8. Dual-axis inclination sensor; 9. Crossbar; 10. Hook; 11. Electric push rod; 12. Speaker; 13. Smart pan / tilt; 14. Wide-angle camera; 15. Limit block; 16. Rotating camera; 17. Connecting chain. DETAILED DESCRIPTION
[0031] The present invention will be further described below in conjunction with the accompanying drawings:
[0032] like Figure 1-Figure 6 As shown, a lifting device for lifting an assembled high-voltage protective shed comprises two symmetrically arranged lower beams 1 and lifting rings 4 installed at the centers of the upper side surfaces of the two lower beams 1, rotating cameras 16 are installed at both ends of the lower beams 1, a loudspeaker 12 is installed on one side of the lower portion of the lifting ring 4, dual-axis inclination sensors 8 are installed on the upper side surfaces of the two lower beams 1, an intelligent pan-tilt platform 13 is installed at the center of the lower side surfaces of the lifting rings 4, a wide-angle camera 14 is installed on the intelligent pan-tilt platform 13, lower hanging hole plates 5 are symmetrically arranged on the lower side surfaces of the lower beams 1, a cross bar 9 is passed through the lower hanging hole plates 5, hooks 10 are sleeved at both ends of the cross bar 9, an electric push rod 11 is installed between the hooks 10, a battery module and a signal transmission module are configured on the electric push rod 11, the battery module and the signal transmission module can be arranged on the upper side of the lower beam 1, and a connecting iron chain 17 is arranged between the lower horizontal structures of the hooks 10.
[0033] In this embodiment, shoulder pole beams 2 are installed on the upper sides of both ends of the lower cross beam 1 , upper ear plates 6 are welded to the upper side surfaces of the shoulder pole beams 2 , and the shoulder pole beams 2 are welded to the lower cross beam 1 .
[0034] In this embodiment, side ear plates 7 are symmetrically arranged on the outer side of the lifting ring 4, a tensioning steel cable 3 is installed between the side ear plates 7 and the upper ear plates 6, and a limiting block 15 is welded on the lower side of the shoulder beam 2.
[0035] In this embodiment, the limit block 15 is disposed between the two lower beams 1 , and the side ear plate 7 is welded to the lifting ring 4 .
[0036] In this embodiment, both ends of the electric push rod 11 are connected to the hook 10 via bolts respectively, and the upper end of the hook 10 is connected to the cross bar 9 via a sliding bearing.
[0037] In this embodiment, both ends of the cross bar 9 are provided with limit pins, the speaker 12 is connected to the hanging ring 4 by bolts, and the housing of the rotating camera 16 is connected to the lower cross beam 1 by bolts.
[0038] The method for using the sling is characterized in that the method comprises the following steps:
[0039] When hoisting the prefabricated components of the general protective shed, fix the upper end of the hoisting rope required for hoisting on the lower hoisting hole plate 5 on the lower side of the lower crossbeam 1, and then hang the hook at the lower end of the hoisting rope and connect it to the prefabricated component to be hoisted;
[0040] The upper side of the sling is connected to the hook 10 of the lifting equipment through the lifting ring 4, and the lifting equipment lifts the prefabricated component;
[0041] The rotating camera 16 and the wide-angle camera 14 can clearly capture the situation of the prefabricated components being hoisted, so that the hoisting operator can understand the movement of the hoisted prefabricated components in real time. The dual-axis inclination sensor 8 can monitor the horizontal inclination of the lower beam 1 and the shoulder beam 2 in real time, and transmit the monitored signal to the hoisting equipment end. During the hoisting process, the speaker 12 can broadcast voice in real time to remind the surrounding personnel to stay away from the hoisting area.
[0042] When lifting multi-layer stacked plate prefabricated parts, the cross bar 9 and the hook 10 are passed through the lower lifting hole plate 5, so that the hook 10 on each cross bar 9 is installed on the inner side of the lower lifting hole plate 5, and the two ends of the electric push rod 11 are connected and fixed to the hook 10. When the plate prefabricated part needs to be lifted, the electric push rod 11 pushes the two hooks 10 apart so that the hook 10 can span across the two sides of the plate prefabricated part. Then the electric push rod 11 moves the two hooks 10 toward each other, so that the hook 10 clamps and fixes the plate prefabricated part to ensure the stability of the lifting process. At the same time, the two hooks 10 are connected together with a connecting chain 17, so that the connecting chain 17 can provide a guarantee for the stability of the hook 10.
[0043] In this embodiment, the position of the lower hanging hole plate 5 is selected according to the size of the lifting component, and a reinforcing layer plate is welded at a right angle position on the lower side of the hook 10.
[0044] In this embodiment, the hook 10 has an included angle of 85 degrees, and the dual-axis tilt sensor 8 has a built-in battery module and a wireless transmission module.
[0045] In this embodiment, both the rotating camera 16 and the wide-angle camera 14 have built-in battery modules.
[0046] In the present invention, the method of using the sling is as follows: when hoisting a general protective shed prefabricated component, the upper end of the hoisting rope required for hoisting is fixed to the lower hoisting hole plate 5 on the lower side of the lower crossbeam 1, and then the hook at the lower end of the hoisting rope is hung and connected with the prefabricated component to be hoisted, and the upper side of the sling is connected to the hook 10 of the hoisting device through the hoisting ring 4, and the hoisting device hoists the prefabricated component;
[0047] The rotating camera 16 and the wide-angle camera 14 can clearly capture the situation of the prefabricated components being hoisted, so that the hoisting operator can understand the movement of the hoisted prefabricated components in real time. The dual-axis inclination sensor 8 can monitor the horizontal inclination of the lower beam 1 and the shoulder beam 2 in real time, and transmit the monitored signal to the hoisting equipment end. During the hoisting process, the speaker 12 can broadcast voice in real time to remind the surrounding personnel to stay away from the hoisting area.
[0048] When lifting multi-layer stacked plate prefabricated parts, the cross bar 9 and the hook 10 are passed through the lower lifting hole plate 5, so that the hook 10 on each cross bar 9 is installed on the inner side of the lower lifting hole plate 5, and the two ends of the electric push rod 11 are connected and fixed to the hook 10. When it is necessary to lift the plate prefabricated parts, the electric push rod 11 pushes the two hooks 10 apart so that the hook 10 can span across the two sides of the plate prefabricated parts. Then the electric push rod 11 moves the two hooks 10 toward each other, so that the hook 10 clamps and fixes the plate prefabricated parts to ensure the stability of the lifting process. At the same time, the two hooks 10 are connected together with a connecting chain 17, so that the connecting chain 17 can provide a guarantee for the stability of the hook 10.
[0049] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A lifting device for lifting an assembled high-voltage protective shed, characterized in that: It includes two symmetrically arranged lower cross beams and hanging rings installed at the center of the upper side surfaces of the two lower cross beams, rotating cameras are installed at both ends of the lower cross beams, a speaker is installed on one side of the lower part of the hanging ring, dual-axis inclination sensors are installed on the upper side surfaces of the two lower cross beams, an intelligent pan-tilt platform is installed at the center of the lower side surfaces of the hanging rings, a wide-angle camera is installed on the intelligent pan-tilt platform, lower hanging hole plates are symmetrically arranged on the lower side surfaces of the lower cross beams, a cross bar is passed through the lower hanging hole plates, hooks are sleeved on both ends of the cross bar, an electric push rod is installed between the hooks, and a connecting iron chain is arranged between the lower horizontal structures of the hooks.
2. The lifting device for lifting the assembled high-voltage protection shed according to claim 1 is characterized in that: A shoulder pole beam is installed on the upper sides of both ends of the lower cross beam, an upper ear plate is welded to the upper side surface of the shoulder pole beam, and the shoulder pole beam is welded to the lower cross beam.
3. The lifting device for lifting the assembled high-voltage protection shed according to claim 2 is characterized in that: The outer side surface of the lifting ring is symmetrically provided with side ear plates, a tensioning steel cable is installed between the side ear plates and the upper ear plates, and a limiting block is welded on the lower side surface of the shoulder beam.
4. The lifting device for lifting the assembled high-voltage protection shed according to claim 3 is characterized by: The limit block is arranged between the two lower cross beams, and the side ear plate is welded to the lifting ring.
5. The lifting device for lifting the assembled high-voltage protection shed according to claim 1 is characterized in that: The two ends of the electric push rod are respectively connected to the hook through bolts, and the upper end of the hook is connected to the cross bar through a sliding bearing.
6. The lifting device for lifting an assembled high-voltage protection shed according to claim 1 is characterized in that: Limit pins are provided at both ends of the crossbar, the speaker is connected to the hanging ring through bolts, and the rotating camera housing is connected to the lower crossbeam through bolts.
7. A method for using a lifting device for lifting an assembled high-voltage protective shed, characterized in that: Applied to a lifting device for lifting an assembled high-voltage protective shed as claimed in any one of claims 1 to 6, the method comprises the following steps: S01. When hoisting the prefabricated components of a general protective shed, fix the upper end of the hoisting rope required for hoisting on the lower hoisting hole plate on the lower side of the lower crossbeam, and then hang the hook at the lower end of the hoisting rope on the prefabricated component to be hoisted; S02. The upper side of the lifting device is connected to the hook of the lifting equipment through a lifting ring, and the lifting equipment lifts the prefabricated component; S03. The rotating camera and wide-angle camera can clearly capture the situation of the prefabricated components being hoisted, so that the hoisting operator can understand the movement of the hoisted prefabricated components in real time. The dual-axis inclination sensor can monitor the horizontal inclination of the lower beam and the shoulder beam in real time, and transmit the monitored signal to the hoisting equipment end. During the hoisting process, the speaker can broadcast voice in real time to remind the surrounding personnel to stay away from the hoisting area; S04. When lifting multi-layer stacked plate prefabricated parts, the crossbar and the hook are passed through the lower lifting hole plate, so that the hook on each crossbar is installed on the inner side of the lower lifting hole plate, and the two ends of the electric push rod are connected and fixed to the hook. When the plate prefabricated part needs to be lifted, the electric push rod pushes the two hooks apart so that the hooks can span across the two sides of the plate prefabricated part. Then the electric push rod moves the two hooks toward each other so that the hooks clamp and fix the plate prefabricated part to ensure the stability of the lifting process. At the same time, the two hooks are connected together with a connecting chain so that the connecting chain can provide a guarantee for the stability of the hooks.
8. The method for using the lifting device for lifting the assembled high-voltage protection shed according to claim 7 is characterized by: The position of the lower hanging hole plate is selected according to the size of the lifting component, and a reinforcing layer plate is welded at a right angle position on the lower side of the hook.
9. The method for using the lifting device for lifting an assembled high-voltage protection shed according to claim 7, characterized in that: The hook angle is 85 degrees, and the dual-axis tilt sensor has a built-in battery module and a wireless transmission module.
10. The method for using the lifting device for lifting the assembled high-voltage protection shed according to claim 7, characterized in that: The rotating camera and the wide-angle camera both have built-in battery modules.
