Building slag collecting device for anti-collision guardrail construction

By installing a slag-building collection device with collection plates and baffles on the outside of the anti-collision guardrail, the safety hazards caused by the fall of slag in high altitude construction are solved, and the effective collection and cleaning of slag is achieved, and the safety of the construction site is ensured.

CN119145664AActive Publication Date: 2024-12-17CCCC FOURTH HIGHWAY ENG CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202310938618.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-07-28
Publication Date
2024-12-17
Estimated Expiration
2043-07-28

AI Technical Summary

Technical Problem

When building roads at high altitudes, the slag that pours anti-collision guardrails is likely to fall, causing safety hazards for vehicles passing below.

Method used

A slag collection device for construction of anti-collision guardrails is designed, including a collection plate and a baffle arranged outside the anti-collision guardrail. The baffle and the curved part form a collection groove for collecting falling concrete aggregate or slurry. The collection plate is fixed to the outside of the anti-collision guardrail through a fixing mechanism to ensure that the slag is built into the collection tank.

Benefits of technology

Effectively prevent concrete aggregate or slurry from falling into the road below, protecting vehicle safety, and convenient cleaning, reducing safety hazards at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119145664A_ABST
    Figure CN119145664A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of anti-collision guardrail construction, and particularly discloses a building slag collecting device for anti-collision guardrail construction. The anti-collision guardrail collecting device comprises a collecting device body, and the collecting device body comprises a collecting plate arranged on the outer side of an anti-collision guardrail; one end of the collecting plate extends downwards to the prefabricated box girder, one end of the collecting plate is bent inwards to form a bent part, and baffles are arranged at the two ends of the bent part; and the baffle plate and the bending part jointly form a collecting tank for collecting building slag. The building slag collecting device for anti-collision guardrail construction aims at overcoming the defect that in the prior art, when a highway is constructed at high altitude, building slag generated by pouring of an anti-collision guardrail can cause unpredictable potential safety hazards to passing vehicles below, and the building slag collecting device for anti-collision guardrail construction is provided. The building slag collecting device can achieve the function of collecting building slag, and the effect of preventing the building slag from damaging vehicles below during construction is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of anti-collision guardrail construction, in particular to a construction slag collection device for anti-collision guardrail construction. Background Art

[0002] At present, in order to prevent vehicles from going out of the highway, workers will install anti-collision guardrails on both sides of the highway when building roads; when constructing anti-collision guardrails, workers first weave steel mesh on both sides of the highway, then place casting molds on the steel mesh, and finally pour concrete into the molds, and remove the molds after the concrete solidifies; when workers pour concrete into the molds, concrete aggregates or slurry can easily fall from the molds and contaminate the ground. In order to facilitate cleaning later, workers will set up protective sheds at the construction site.

[0003] However, when workers are building roads at high altitudes, such as viaduct construction, cross-mountain highway construction, etc., most of them are constructed by splicing prefabricated box girders, and thus it is impossible to set up protective sheds. When pouring anti-collision guardrails on both sides of the prefabricated box girders, concrete aggregate or slurry is easy to fall from the outside of the anti-collision guardrails, causing unpredictable safety hazards to vehicles passing below. Summary of the invention

[0004] In view of the defect in the prior art that when constructing a highway at high altitude, the construction slag generated by pouring an anti-collision guardrail will cause unpredictable safety hazards to vehicles passing below, the present invention provides a construction slag collection device for anti-collision guardrail construction. The device can realize the function of collecting construction slag, thereby preventing the construction slag from causing damage to vehicles below during construction.

[0005] In order to solve the above technical problems, the present invention is solved by the following technical solutions:

[0006] A construction debris collection device for use in crash barrier construction comprises a collection device body, the collection device body comprising a collection plate arranged on the outside of the crash barrier; one end of the collection plate extends downward to a prefabricated box beam, one end of the collection plate is bent inward to form a curved portion, baffles are provided at both ends of the curved portion; the baffle and the curved portion together constitute a collection trough for collecting construction debris.

[0007] According to the present invention, after installing the mold, the staff installs the anti-collision guardrail on the outside of the mold; when the staff pours concrete into the mold afterwards, when concrete aggregate or slurry falls into the outside of the mold, it will be blocked by the baffle and fall into the collecting trough at the lower end of the baffle; thereby preventing the concrete aggregate or slurry from falling into the lower road, causing damage to the vehicles passing below and endangering the personal safety of the people in the vehicle; when the concrete aggregate or slurry falls into the inside of the mold, the concrete aggregate or slurry will remain on the prefabricated box girder, which is convenient for the staff to clean up later.

[0008] Preferably, a fixing mechanism is provided at the anti-collision guardrail, and the fixing mechanism is used to fix the collecting plate at the outer side wall of the anti-collision guardrail; the fixing mechanism includes a support frame arranged outside the anti-collision guardrail; the support frame includes a plurality of cross bars and a longitudinal bar used to connect the cross bars; one end of the longitudinal bar is bent inwardly to form a mounting cage for storing the bent portion together with the cross bar; the other end of the longitudinal bar is bent to form a hook, and a channel steel passing through the hook is provided in the hook;

[0009] The end of the anti-collision guardrail away from the channel steel is provided with multiple connecting seats that rest against the side wall of the upper end of the anti-collision guardrail, and the upper end of the anti-collision guardrail is provided with connecting rods connecting the channel steel and the connecting seats; a fixing rod is provided at the side wall of the end of the anti-collision guardrail away from the connecting seat, and a screw connecting the fixing rod and the connecting seat basket is provided on the inner side of the anti-collision guardrail; a support rod is provided between the anti-collision guardrail and the collecting plate.

[0010] According to the present invention, the staff firstly hoists the support frame to the outside of the mold by a crane, then connects the channel steel and the connection seat by a connecting rod, and then connects the fixing rod and the connection seat by a basket screw, so as to fix the support frame; finally, the staff puts the baffle into the support frame, so that it is convenient for the staff to install the baffle; after the baffle is installed, the staff places the support rod between the baffle and the mold, so that there is a gap between the baffle and the mold, so that the concrete aggregate or slurry can fall into the collection tank from the gap;

[0011] When the concrete solidifies in the mold, the staff removes the support rods, lifts the support frame with a crane, and then removes the mold; when the mold is removed, the support frame is lowered, and the staff places the support rods between the baffle and the anti-collision guardrail. Later, when the staff cleans the anti-collision guardrail, the concrete aggregate that falls to the outside of the anti-collision guardrail will fall into the collection trough, making it convenient for the staff to clean the anti-collision guardrail after pouring.

[0012] Preferably, the connecting seat includes two parallel support plates, and the side walls of one end of the two support plates are recessed inward to form a groove for the edge of the anti-collision guardrail to extend into; a connecting plate for connecting the two support plates is provided at the end of the support plate away from the groove; a first nut is provided at the upper end of the connecting plate; the connecting rod is a threaded rod, one end of the threaded rod cooperates with the first nut, and the other end passes through the channel steel; a second nut is provided at the end of the threaded rod passing through the channel steel.

[0013] With the present invention, when connecting the channel steel and the connecting seat, the staff passes the threaded rod through the first nut and the channel steel, and then rotates the second nut to pull the distance between the channel steel and the connecting seat, so that the connecting seat is stuck at the upper side wall of the anti-collision guardrail, and the connecting seat is pulled by the basket screw to prevent the support frame from falling; when the support plate is against the side wall of the anti-collision guardrail, the upper edge of the anti-collision guardrail will be stuck in the groove of the support plate, thereby preventing the connecting seat from sliding when being pulled.

[0014] Preferably, a first through hole is provided on the side wall of the support plate for the hook on the basket screw to pass through; a second through hole and a third through hole are also provided on the side wall of the support plate; and a limiting rod passing through the second through hole is provided at one end of the anti-collision guardrail close to the connecting seat.

[0015] According to the present invention, before pouring concrete into the mold, the staff needs to set a hook on the upper surface of the prefabricated box beam, then hang the hook at one end of the basket screw on the hook on the prefabricated box beam, and then pass the hook at the other end of the basket screw through the first through hole, rotate the second nut, adjust the distance between the channel steel and the connecting seat, so that the connecting seat is pressed against the mold, and then connect the connecting seat to the mold by passing the bolts through the second through hole and the third through hole; thereby increasing the connection strength between the connecting seat and the mold and preventing the connecting seat from falling off;

[0016] When the mold is removed, the limiting rod passes through the second through holes on all the connecting seats, thereby preventing a single connecting seat from shaking when being pulled, thereby improving the overall stability of the fixing mechanism.

[0017] Preferably, an inclined support column is provided between the connecting plate and the upper end surface of the prefabricated box beam.

[0018] Through the present invention, after the mold is removed, the support column pushes into the connecting plate to prevent the connecting seat from shaking, thereby preventing the connecting plate from shaking and improving the structural stability between the connecting seat and the basket screw and the connecting rod.

[0019] Preferably, an end of the connecting plate away from the first nut is provided with an inclined surface; and an end of the supporting column close to the connecting plate is provided with a flange that abuts against the inclined surface.

[0020] With the present invention, the flange at one end of the support column abuts against the inclined surface of the connecting plate, thereby increasing the contact area between the connecting plate and the support column and preventing the support column or the connecting plate from being damaged due to excessive pressure at the supporting point.

[0021] Preferably, a rubber pad is provided at one end of the support rod close to the anti-collision guardrail.

[0022] According to the present invention, after removing the mold, the staff can place a rubber pad on the end surface of the support rod in contact with the anti-collision guardrail to prevent excessive pressure at the contact point between the support rod and the anti-collision guardrail, thereby preventing the anti-collision guardrail from being damaged.

[0023] Preferably, a plurality of sleeves are provided at one end surface of the collecting plate close to the anti-collision guardrail.

[0024] According to the present invention, before the crane lifts the support frame, the staff needs to insert a round rod into the sleeve so that one end of the round rod is supported on the side wall of the prefabricated box beam to prevent the collecting plate from scratching against the side wall of the prefabricated box beam during the upward movement of the support frame.

[0025] Preferably, a discharge hole is provided on the baffle plate, a column is provided at the upper end of the discharge hole, a blocking plate for blocking the discharge hole is provided at the opening of the discharge hole, and a ring is provided on the upper end of the blocking plate to be sleeved on the column.

[0026] Through the present invention, when the staff needs to clean the construction debris in the collection tank, they only need to collect the construction debris at the discharge hole, then push the blocking plate, open the discharge hole, and pour the construction debris out of the discharge hole; thus, it is convenient for the staff to clean the debris in the collection tank.

[0027] Preferably, the support frame includes a first sub-support frame and a second sub-support frame; the channel steel includes a first sub-channel steel and a second sub-channel steel; the collecting plate includes a first sub-collecting plate and a second sub-collecting plate; a protrusion is provided at one end of the first sub-channel steel, and a first limiting hole is provided on the protrusion; a connecting groove for the protrusion to extend into is provided at one end of the second sub-channel steel; a second limiting hole corresponding to the first limiting hole is provided in the connecting groove; a plurality of fourth through holes and fifth through holes for connecting rods to pass through are provided on the side walls of the first sub-channel steel and the second sub-channel steel.

[0028] Through the present invention, the volume of the support frame and the collecting plate is reduced, thereby facilitating the crane to lift the support frame; the first sub-support frame and the second sub-support frame are spliced ​​into the support frame by connecting the first sub-channel steel and the second sub-channel steel; thereby facilitating the installers to install the support frame. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the cooperation between the main body of the collecting device and the anti-collision guardrail in Example 1;

[0030] Figure 2 This is a schematic diagram of the installation position of the connecting socket in Example 1.

[0031] Figure 3 This is a schematic diagram of the back side of the collecting device body in Example 1.

[0032] Figure 4 This is a schematic diagram of the channel steel in Example 1.

[0033] Figure 5 This is a schematic diagram of the main body of the collection device in Example 1.

[0034] Figure 6 Schematic diagram of the support frame in Example 1.

[0035] Figure 7 Schematic diagram of the collecting plate in Example 1.

[0036] Figure 8 Schematic diagram of the baffle in Example 1.

[0037] Fig. 9This is a schematic diagram of the connecting socket in Example 1.

[0038] Fig.10 This is a schematic diagram of the first sub-channel steel in Example 1.

[0039] Fig.11 This is a schematic diagram of the second sub-channel steel in Example 1. DETAILED DESCRIPTION

[0040] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only for explaining the present invention and are not intended to limit it.

[0041] Example 1

[0042] like Figure 1-11 As shown, the present embodiment provides a construction waste collection device for anti-collision guardrail construction, which includes a collection device body 110, and the collection device body 110 includes a collection plate 550 arranged on the outside of the anti-collision guardrail 120; one end of the collection plate 550 extends downward to the prefabricated box beam 130, and one end of the collection plate 550 is bent inward to form a curved portion 740, and baffles 730 are provided at both ends of the curved portion 740; the baffle 730 and the curved portion 740 together constitute a collection trough 750 for collecting construction waste.

[0043] Through this embodiment, after the staff installs the mold, they install the anti-collision guardrail 120 on the outside of the mold; when the staff pours concrete into the mold afterwards, when concrete aggregate or slurry falls into the outside of the mold, it will be blocked by the baffle 730 and fall into the collecting trough 750 at the lower end of the baffle 730; thereby preventing the concrete aggregate or slurry from falling into the lower road, causing damage to the vehicles passing below and endangering the personal safety of the people in the vehicle; when the concrete aggregate or slurry falls into the inside of the mold, the concrete aggregate or slurry will remain on the prefabricated box girder, which is convenient for the staff to clean up later.

[0044] In this embodiment, a fixing mechanism is provided at the anti-collision guardrail 120, and the fixing mechanism is used to fix the collecting plate 550 on the outer side wall of the anti-collision guardrail 120; the fixing mechanism includes a support frame 540 arranged on the outer side of the anti-collision guardrail 120; the support frame 540 includes a plurality of cross bars 630 and a longitudinal bar 640 for connecting the cross bars 630; one end of the longitudinal bar 640 is bent inwardly to form a mounting cage 650 for storing the bent portion 740 together with the cross bar 630; the other end of the longitudinal bar 640 is bent to form a hook 430, and a channel steel 420 passing through the hook 430 is provided in the hook 430;

[0045] A plurality of connecting seats 210 are provided at one end of the anti-collision guardrail 120 away from the channel steel 420, which are against the side wall of the upper end of the anti-collision guardrail 120. A connecting rod 170 connecting the channel steel 420 and the connecting seat 210 is provided at the upper end of the anti-collision guardrail 120. A fixing rod 140 is provided at the side wall of the end of the anti-collision guardrail 120 away from the connecting seat 210. A basket screw 160 connecting the fixing rod 140 and the connecting seat 210 is provided on the inner side of the anti-collision guardrail 120. A support rod 510 is provided between the anti-collision guardrail 120 and the collecting plate 550.

[0046] According to this embodiment, the staff firstly hoists the support frame 540 to the outside of the mold by a crane, then connects the channel steel 420 and the connecting seat 210 by the connecting rod 170, and then connects the fixing rod 140 and the connecting seat 210 by the basket screw 160, so as to fix the support frame 540; the staff finally puts the baffle 730 into the support frame 540, so as to facilitate the staff to install the baffle 730; after the baffle 730 is installed, the staff places the support rod 510 between the baffle 730 and the mold, so that there is a gap between the baffle 730 and the mold, so as to facilitate the concrete aggregate or slurry to fall into the collection tank 750 from the gap;

[0047] When the concrete solidifies in the mold, the staff removes the support rod 510, lifts the support frame 540 by a crane, and then removes the mold; when the mold is removed, the support frame 540 is lowered, and the staff places the support rod 510 between the baffle 730 and the anti-collision guardrail 120. When the staff cleans the anti-collision guardrail 120, the concrete aggregate that falls to the outside of the anti-collision guardrail 120 will fall into the collection trough 750, thereby facilitating the staff to clean the anti-collision guardrail 120 after pouring.

[0048] In this embodiment, the connecting seat 210 includes two parallel support plates 910, and the side walls of one end of the two support plates 910 are recessed inward to form a groove 920 for the edge of the anti-collision guardrail 120 to extend into; the end of the support plate 910 away from the groove 920 is provided with a connecting plate 970 for connecting the two support plates 910; the upper end of the connecting plate 970 is provided with a first nut 220; the connecting rod 170 is a threaded rod, one end of the threaded rod cooperates with the first nut 220, and the other end passes through the channel steel 420; the end of the threaded rod passing through the channel steel 420 is provided with a second nut 410.

[0049] Through this embodiment, when connecting the channel steel 420 and the connecting seat 210, the staff passes the threaded rod through the first nut 220 to cooperate with the channel steel 420, and then rotates the second nut 410 to pull the distance between the channel steel 420 and the connecting seat 210, so that the connecting seat 210 is stuck at the upper side wall of the anti-collision guardrail 120, and the connecting seat 210 is pulled by the basket screw 160 to prevent the support frame 540 from falling; when the support plate 910 is against the side wall of the anti-collision guardrail 120, the upper edge of the anti-collision guardrail 120 will be stuck in the groove 920 of the support plate 910, thereby preventing the connecting seat 210 from sliding when being pulled.

[0050] In this embodiment, a first through hole 950 is provided on the side wall of the support plate 910 for the hook on the basket screw 160 to pass through; a second through hole 930 and a third through hole 960 are also provided on the side wall of the support plate 910; and a limiting rod 230 passing through the second through hole 930 is provided at one end of the anti-collision guardrail 120 close to the connecting seat 210.

[0051] Through this embodiment, before pouring concrete into the mold, the staff needs to set a hook on the upper surface of the prefabricated box beam 130, then hang the hook at one end of the basket screw 160 on the hook on the prefabricated box beam 130, and then pass the hook at the other end of the basket screw 160 through the first through hole 950, rotate the second nut 410, adjust the distance between the channel steel 420 and the connecting seat 210, so that the connecting seat 210 is pressed against the mold, and then connect the connecting seat 210 to the mold by passing the bolts through the second through hole 930 and the third through hole 960; thereby increasing the connection strength between the connecting seat 210 and the mold and preventing the connecting seat 210 from falling off;

[0052] When the mold is removed, the limiting rod 230 passes through the second through holes 930 on all the connecting seats 210, thereby preventing a single connecting seat 210 from shaking when being pulled, thereby improving the overall stability of the fixing mechanism.

[0053] In this embodiment, an inclined support column 150 is provided between the connecting plate 970 and the upper end surface of the prefabricated box beam 130 .

[0054] Through this embodiment, after the mold is removed, the support column 150 is pushed into the connecting plate 970 to prevent the connecting seat 210 from shaking, thereby preventing the connecting plate 970 from shaking and improving the structural stability between the connecting seat 210 and the basket screw 160 and the connecting rod 170.

[0055] In this embodiment, an inclined surface 940 is provided at one end of the connecting plate 970 away from the first nut 220 ; and a flange 240 abutting against the inclined surface 940 is provided at one end of the supporting column 150 close to the connecting plate 970 .

[0056] Through this embodiment, the flange 240 at one end of the support column 150 abuts against the inclined surface 940 of the connecting plate 970, thereby increasing the contact area between the connecting plate 970 and the support column 150, preventing damage to the support column 150 or the connecting plate 970 due to excessive pressure at the supporting point.

[0057] In this embodiment, a rubber pad 520 is provided at one end of the support rod 510 close to the anti-collision guardrail 120 .

[0058] Through this embodiment, after removing the mold, the staff places a rubber pad 520 on the end surface of the support rod 510 that contacts the anti-collision guardrail 120 to prevent excessive pressure at the contact point between the support rod 510 and the anti-collision guardrail 120 and damage to the anti-collision guardrail 120.

[0059] In this embodiment, a plurality of sleeves 530 are provided on one end surface of the collecting plate 550 close to the anti-collision guardrail 120 .

[0060] Through this embodiment, before the crane lifts the support frame 540, the staff needs to insert a round rod into the sleeve 530 so that one end of the round rod is supported on the side wall of the prefabricated box beam 130 to prevent the collection plate 550 from scratching the side wall of the prefabricated box beam 130 during the upward movement of the support frame 540.

[0061] In this embodiment, a discharge hole 820 is provided on the baffle 730, a column 810 is provided at the upper end of the discharge hole 820, a sealing plate 830 for sealing the discharge hole 820 is provided at the mouth of the discharge hole 820, and a ring 840 is provided at the upper end of the sealing plate 830 which is sleeved on the column 810.

[0062] Through this embodiment, when the staff needs to clean the construction debris in the collection tank 750, they only need to concentrate the construction debris at the discharge hole 820, then push the blocking plate 830, open the discharge hole 820, and pour the construction debris out of the discharge hole 820; thus, it is convenient for the staff to clean the debris in the collection tank 750.

[0063] In this embodiment, the support frame 540 includes a first sub-support frame 610 and a second sub-support frame 620; the channel steel 420 includes a first sub-channel steel 1002 and a second sub-channel steel 1101; the collecting plate 550 includes a first sub-collecting plate 710 and a second sub-collecting plate 720; a protrusion 1004 is provided at one end of the first sub-channel steel 1002, and a first limiting hole 1003 is provided on the protrusion 1004; a connecting groove 1103 for the protrusion 1004 to extend into is provided at one end of the second sub-channel steel 1101; a second limiting hole 1104 corresponding to the first limiting hole 1003 is provided in the connecting groove 1103; a plurality of fourth through holes 1001 and fifth through holes 1102 for the connecting rod 170 to pass through are provided on the side walls of the first sub-channel steel 1002 and the second sub-channel steel 1101.

[0064] Through this embodiment, the volume of the support frame 540 and the collecting plate 550 is reduced, thereby facilitating the crane to lift the support frame 540; the first sub-support frame 610 and the second sub-support frame 620 are spliced ​​into the support frame 540 by connecting the first sub-channel steel 1002 and the second sub-channel steel 1101; thereby facilitating the installers to install the support frame 540.

[0065] It is easy to understand that those skilled in the art can combine, split, reorganize, etc. the embodiments of the present application to obtain other embodiments based on one or several embodiments provided in the present application, and these embodiments do not exceed the protection scope of the present application.

[0066] The present invention and its implementation methods are described schematically above, and the description is not restrictive. The embodiments shown in the embodiments are only part of the implementation methods of the present invention, and the actual structure is not limited thereto. Therefore, if a person skilled in the art is inspired by the embodiments and designs a structure and an implementation method similar to the technical solution without creativity without departing from the purpose of the invention, they should all fall within the protection scope of the present invention.

Claims

1. A construction slag collection device for anti-collision guardrail construction, characterized in that: The invention comprises a collecting device body (110), wherein the collecting device body (110) comprises a collecting plate (550) arranged outside a crash barrier (120); one end of the collecting plate (550) extends downward to a prefabricated box beam (130); one end of the collecting plate (550) is bent inward to form a curved portion (740); baffles (730) are provided at both ends of the curved portion (740); the baffles (730) and the curved portion (740) together constitute a collecting trough (750) for collecting construction slag.

2. A construction slag collection device for anti-collision guardrail construction according to claim 1, characterized in that: A fixing mechanism is provided at the anti-collision guardrail (120), and the fixing mechanism is used to fix the collecting plate (550) to the outer wall of the anti-collision guardrail (120); the fixing mechanism comprises a support frame (540) arranged on the outer side of the anti-collision guardrail (120); the support frame (540) comprises a plurality of cross bars (630) and a longitudinal bar (640) for connecting the cross bars (630); one end of the longitudinal bar (640) is bent inwardly to form a mounting cage (650) for storing the bent portion (740) together with the cross bar (630); the other end of the longitudinal bar (640) is bent to form a hook (430), and a channel steel (420) passing through the hook (430) is provided in the hook (430); A plurality of connection seats (210) are provided at one end of the anti-collision guardrail (120) away from the channel steel (420) and are abutted against the side wall of the upper end of the anti-collision guardrail (120); a connection rod (170) connecting the channel steel (420) and the connection seat (210) is provided at the upper end of the anti-collision guardrail (120); a fixing rod (140) is provided at the side wall of one end of the anti-collision guardrail (120) away from the connection seat (210); a basket screw rod (160) connecting the fixing rod (140) and the connection seat (210) is provided inside the anti-collision guardrail (120); and a support rod (510) is provided between the anti-collision guardrail (120) and the collecting plate (550).

3. The construction slag collection device for anti-collision guardrail construction according to claim 2 is characterized in that: The connecting seat (210) comprises two support plates (910) arranged in parallel, wherein the side walls of one end of the two support plates (910) are recessed inward to form a groove (920) for the edge of the anti-collision guardrail (120) to extend into; a connecting plate (970) for connecting the two support plates (910) is provided at one end of the support plate (910) away from the groove (920); a first nut (220) is provided at the upper end of the connecting plate (970); the connecting rod (170) is a threaded rod, one end of the threaded rod cooperates with the first nut (220), and the other end passes through the channel steel (420); a second nut (410) is provided at one end of the threaded rod passing through the channel steel (420).

4. The construction slag collection device for anti-collision guardrail construction according to claim 3 is characterized by: A first through hole (950) is provided on the side wall of the support plate (910) for the draw hook on the flower basket screw (160) to pass through; a second through hole (930) and a third through hole (960) are also provided on the side wall of the support plate (910); and a limit rod (230) passing through the second through hole (930) is provided at one end of the anti-collision guardrail (120) close to the connecting seat (210).

5. The construction slag collection device for anti-collision guardrail construction according to claim 3, characterized in that: An inclined support column (150) is provided between the connection plate (970) and the upper end surface of the prefabricated box beam (130).

6. The construction slag collection device for anti-collision guardrail construction according to claim 5, characterized in that: An inclined surface (940) is provided at one end of the connecting plate (970) away from the first nut (220); and a flange (240) is provided at one end of the supporting column (150) close to the connecting plate (970) to abut against the inclined surface (940).

7. The construction slag collection device for anti-collision guardrail construction according to claim 2, characterized in that: A rubber pad (520) is provided at one end of the support rod (510) close to the anti-collision guardrail (120).

8. The construction slag collection device for anti-collision guardrail construction according to claim 1, characterized in that: A plurality of sleeves (530) are provided on one end surface of the collecting plate (550) close to the anti-collision guardrail (120).

9. The construction slag collection device for anti-collision guardrail construction according to claim 1, characterized in that: The baffle plate (730) is provided with a discharge hole (820), a column (810) is provided at the upper end of the discharge hole (820), a blocking plate (830) for blocking the discharge hole (820) is provided at the opening of the discharge hole (820), and a collar (840) sleeved on the column (810) is provided at the upper end of the blocking plate (830).

10. The construction slag collection device for anti-collision guardrail construction according to claim 2, characterized in that: The support frame (540) includes a first sub-support frame (610) and a second sub-support frame (620); the channel steel (420) includes a first sub-channel steel (1002) and a second sub-channel steel (1101); the collecting plate (550) includes a first sub-collecting plate (710) and a second sub-collecting plate (720); a convex block (1004) is provided at one end of the first sub-channel steel (1002), and a first limiting hole (100 3); a connecting groove (1103) for the protrusion (1004) to extend into is provided at one end of the second sub-channel steel (1101); a second limiting hole (1104) corresponding to the first limiting hole (1003) is provided in the connecting groove (1103); a plurality of fourth through holes (1001) and fifth through holes (1102) for the connecting rod (170) to pass through are provided on the side walls of the first sub-channel steel (1002) and the second sub-channel steel (1101).

Citation Information

Patent Citations

  • Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction

    CN103233424A

  • Double-block type prefabricated assembled anti-collision guardrail and construction method thereof

    CN111074767A

  • Bridge crash barrier device

    CN209211265U

  • Vehicle and personal barrier for construction site

    US20170101751A1