Lifting working platform for high-pile wharf construction and using method of lifting working platform

By designing liftable anti-sink plates and reinforced pulling components in the construction of high pile docks, the instability problem caused by soft sinking of the crane is solved, and stable operation and safe transportation are achieved in soft soil environments.

CN119160795APending Publication Date: 2024-12-20CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411056299.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

During the construction of a high pile wharf, the lifting work platform is sunk due to soft ground, resulting in unstable operation.

Method used

A lifting working platform including liftable ship-type anti-sink plate, reinforced pulling assembly, support assembly and hook assembly is designed. Through the cooperation of servo cylinders, slide rods and limit sleeves, the contact area between the crane and the ground is increased. , and provide additional support through pull ropes and fixing cones to prevent crane tilting and hanger falling off.

Benefits of technology

It improves the stability and safety of the crane in a soft soil environment, ensures the normal operation and material lifting during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119160795A_ABST
    Figure CN119160795A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of lifting working platforms, and discloses a lifting working platform for long-piled wharf construction and a using method thereof.The lifting working platform comprises a crane body, an operation room and a hanging frame, a connecting disc is arranged at the end, away from the crane body, of the hanging frame, and a hook assembly is fixed to the bottom of the connecting disc; according to the lifting type ship-shaped anti-sinking plate, when the lifting type ship-shaped anti-sinking plate is moved to a construction site and reaches designated construction, the anti-sinking plate can be put down to be flush with the ground, the contact area between the crane and the ground can be increased, and the anti-sinking plate can be put down to be flush with the ground; in this way, collapse caused by soft seaside ground during material taking and transporting of a crane is avoided, the problem that an existing lifting working platform for high-pile wharf construction is prone to sinking and unstable in operation due to soft ground during operation is solved, and the stability of the lifting platform during operation is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of lifting work platforms, and specifically to a lifting work platform for high-pile wharf construction and a method of using the same. Background Art

[0002] A high-pile wharf is composed of superstructure, pile foundation, shore connection structure, shore lock and wharf equipment. The superstructure refers to the pile platform or cap. Long piles and large-span structures are widely used, and large prestressed concrete pipe columns or steel pipe columns are gradually used to replace piles with smaller cross-sections to form a pipe column wharf. It is suitable for soft soil conditions in coastal areas and complex geological environments. When carrying out construction operations such as cyclic material collection, transportation, and unloading at a high-pile wharf, cranes are generally used as lifting work platforms for operations.

[0003] Since high-pile piers are often used in soft soil conditions with low foundation strength, especially for construction on soft beach foundations, cranes are important lifting equipment in the construction of high-pile piers. In order to ensure the supporting force of the crane, the upper structure of the lifting bracket on the beach is installed using a crawler crane. However, the contact area between the crawler crane and the ground is still relatively limited, so the crawler base at the bottom of the crane is prone to sinking when the crane is operating, which easily leads to poor stability during crane operation. Summary of the invention

[0004] In order to solve the problem that the existing lifting work platform for high-pile dock construction is prone to sinking and unstable operation due to soft ground during operation, the present invention provides a lifting work platform for high-pile dock construction and a use method thereof to solve the above problem.

[0005] To achieve the above object, the present invention provides the following technical solutions: A lifting work platform for high-pile dock construction and a method of using the same, comprising a crane body, an operating room and a hanging frame, wherein a connecting plate is arranged at one end of the hanging frame away from the crane body, and a hook assembly is fixed at the bottom of the connecting plate, a pulling assembly is connected between the end of the hanging frame and the top of the connecting plate and the operating room, and an anti-sinking assembly is arranged at the bottom of the crane body; The anti-sinking assembly includes an anti-sinking plate, a support plate 1, a servo cylinder, a slide rod 1 and a limiting sleeve block. The anti-sinking plate is slidably arranged between the two crawlers on the bottom surface of the crane main body. A support plate 1 is fixed in the middle of the front and rear sides of the crane main body, and a servo cylinder is arranged on the top surface of the support plate 1. The output ends of the servo cylinders slide through the support plate 1 and are fixed on the top surface of the anti-sinking plate. Support assemblies are arranged on the outer sides of the two crawlers of the crane main body. Limiting sleeve blocks are fixed on the side surfaces of the crane main body on both sides of each support plate 1, and a slide rod 1 is slidably sleeved inside the limiting sleeve block, and the bottom surface of each bottom slide rod 1 is fixed to the top surface of the anti-sinking plate.

[0006] Furthermore, the hook assembly includes a hook body, a positioning groove, an anti-drop rod, a fixed block and a fixed sleeve, the hook body is fixed to the bottom surface of the connecting plate, an anti-drop rod is rotatably arranged in the upper part of the hook body, and fixed blocks are rotatably sleeved at both ends of the anti-drop rod, the two fixed blocks are fixed on the inner wall of the hook body, the top of the anti-drop rod away from the fixed block is abutted against the inner wall of the hook body, a fixed sleeve is fixed inside the hook body on the side of the anti-drop rod, and a spring is fixed between the fixed sleeve and the anti-drop rod.

[0007] Furthermore, a positioning groove cooperating with the lifting rope is provided on the inner bottom surface of the hook body, and the anti-slip rod is arranged in a transversely placed "T" shape, and the end of the anti-slip rod away from the fixed block abuts against the hook-shaped inner wall of the hook body, and the distance between the fixed block and the positioning groove is greater than the height of the anti-slip rod.

[0008] Furthermore, the pulling assembly includes a pulling bracket, a connecting head, a pulling rope, a guide wheel, a winder and a reinforced pulling rope. The pulling bracket is fixed on the top of the operating room, and the connecting head is symmetrically connected to the side of the operating room away from the hanging frame. A pulling rope is fixed on the top of the connecting head, and the end of the pulling rope extending to the outside is fixed on the top surface of the hanging frame. A reinforced pulling rope is fixed on the top of the connecting plate, and the reinforced pulling rope is slidably sleeved on the guide wheel, and the bottom surface of the guide wheel is fixed to the top surface of the hanging frame. The end of the guide wheel extending to the bottom of the pulling bracket is fixed on the input end of the winder, which is used to control the lifting and lowering of the connecting plate and the hook assembly.

[0009] Furthermore, the pulling bracket is arranged to be symmetrically inclined with respect to the hanging bracket, a fixed pulley is symmetrically fixed on the top of the pulling bracket, the pulling rope is overlapped on the outer surface of the fixed pulley, both of the two reinforcement pulling ropes slide through the pulling bracket, and a limiting sliding hole cooperating with the reinforcement pulling rope is opened inside the pulling bracket.

[0010] Furthermore, the anti-sinking plate is configured to be in a boat shape with both ends tilted upward, the height of the anti-sinking plate is greater than the distance between the bottom surface of the middle part of the crane body and the bottom surface of the crawler, the length of the anti-sinking plate is less than the length of the crane body, and the height of each of the sliding rods is greater than the distance between the bottom surface of the anti-sinking plate and the bottom surface of the crawler.

[0011] Furthermore, the support assembly includes a second support plate, a threaded sleeve, an inner screw and a fixed cone. The outer side surfaces of the crane body are symmetrically fixed with the second support plate, and the top surfaces of the second support plate are rotatably connected with the threaded sleeve through bearings. The inside of each threaded sleeve is threadedly sleeved with an inner screw, and one end of the inner screw extending to the outside of the second support plate is fixed with a connecting plate, a fixing cone is fixed to the bottom surface of the connecting plate, and a sliding rod is fixed to the top surface of the connecting plate on the side of the inner screw, and a fixed sleeve block is slidably sleeved on the second slide rod, and each side of the fixed sleeve block is fixed to the side surface of the second support plate.

[0012] Furthermore, the support assembly also includes bevel gear 1, bevel gear 2, a connecting rod, a driven gear, a movable plate and teeth. Bevel gear 1 is fixed to the outer surface of the threaded sleeve, and bevel gear 2 is arranged on the side of bevel gear 1. The diameter of each bevel gear 2 is larger than the diameter of bevel gear 1. A connecting rod is fixed to the center position of the bevel gear 2 away from the threaded sleeve, and a driven gear is fixed to one end of the connecting rod that rotates and passes through the inner side of the crane body. A movable plate is arranged on the side of each driven gear, and the bottom surface of the movable plate is fixed to the top surface of the anti-sinking plate. A plurality of teeth meshing with the driven gear are equidistantly fixed on the side of each movable plate close to the driven gear.

[0013] Furthermore, each of the fixed cone bottom surfaces is located above the track bottom surface, the height of each of the slide bars 2 is greater than the height of the inner screw, the height of each of the threaded sleeves is greater than the height of the inner screw, and a threaded groove cooperating with the inner screw is provided inside the threaded sleeves.

[0014] Furthermore, a method for using a lifting work platform for high-pile wharf construction is provided, wherein the method for using the lifting work platform comprises the following steps: The step A, moving the crane body to the designated construction location and stopping it; The step A1, driving the crane body to a designated location at the construction site through the operating room; In step A2, the servo cylinder is turned on, so that the servo cylinder operates to push the anti-sinking plate downward. When the anti-sinking plate moves downward, the slide bar 1 is driven to slide inside the limiting sleeve until the bottom surface of the anti-sinking plate abuts against the ground, thereby supporting the crane body; In step A3, when the anti-sinking plate moves downward, it drives the moving plate to move downward. When the moving plate moves downward, it drives the driven gear to rotate through the teeth. When the driven gear rotates, it drives the connecting rod to rotate. When the connecting rod rotates, it drives the second bevel gear to rotate. The second bevel gear can drive the meshing bevel gear one to rotate. The first bevel gear can drive the threaded sleeve to rotate again. Under the action of the thread, the inner screw rod can be driven downward, thereby driving the fixed cone to move downward through the connecting plate. When the connecting plate moves downward, it drives the second slide bar to slide inside the fixed sleeve block. The fixed cone moves downward and inserts into the ground, so as to support the crane body. In step B, the lifting rope on the material to be transported is hung on the hook assembly, and the transport operation is controlled through the operation room; In step B1, when hanging, the anti-dropping rod is pressed, so that the anti-dropping rod rotates in the fixed block and compresses the spring, so that the anti-dropping rod rotates to the inside of the hook body and opens, and the sling rope is hung inside the hook body and abutted and engaged inside the positioning groove under the guidance of the positioning groove; In step B2, after the sling is hooked, the anti-drop rod is loosened to release the squeezing of the anti-drop rod. At this time, the anti-drop rod is pushed by the spring to abut against the inner wall of the hook body again, so that the hook body can be sealed; In step B3, during the transport operation, the operating room controls its own rotation and the direction of the hanging frame. During adjustment, the hanging frame is pulled and reinforced by the pulling rope and the connecting head. When the hook assembly needs to be raised or lowered, the winder is turned on to make the winder pay out or reel in, thereby controlling the lifting and lowering of the hook assembly, thereby transporting materials such as pipe piles; After the movement is completed in step C, the anti-sinking plate is driven upward by the servo cylinder, and the moving plate is driven upward at the same time, so that the threaded sleeve is driven to rotate in the opposite direction through the teeth, and the reverse rotation can drive the inner screw to move upward, so that the fixed cone is pulled out of the bottom surface, and the crane body can be moved.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. In the present invention, by using a liftable ship-shaped anti-sinking plate, when it is moved to the construction site and reaches the designated construction site, the anti-sinking plate can be lowered to be flush with the ground, thereby increasing the contact area between the crane and the ground, thereby preventing the collapse caused by the soft ground at the seaside when the crane is picking up materials and moving. This solves the problem that the existing lifting work platform of the high-pile dock construction is prone to sinking and unstable operation due to the soft ground during operation, and greatly improves the stability of the lifting platform during operation.

[0016] 2. In the present invention, the top reinforcement pulling assembly can increase the stability of the hanging frame when the pipe pile is taken and moved. The rear pulling method can avoid the crane from tilting forward, and the anti-sinking plate can further increase the stability of the crane during operation.

[0017] 3. In the present invention, through the support assembly, when the crane is in operation, the crane body can be reinforced by the fixed cone to prevent the crane body from rotating when the material is moved after being lifted. The linkage and synchronous design of the fixed cone and the anti-sinking plate makes the operation easier and also ensures the stability of the crane during operation.

[0018] 4. In the present invention, the anti-drop rod in the hook assembly can prevent the hanging rope from falling off from the hook body during lifting, thereby preventing the lifting rope from falling off due to excessive shaking of the pipe pile material due to strong wind at the seaside, thereby ensuring the safety of the crane during operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0020] Figure 1 It is a front view schematic diagram of a lifting working platform structure according to an embodiment of the present application; Figure 2 yes Figure 1 A bottom view schematic diagram of the lifting working flat structure in the illustrated embodiment; Figure 3 yes Figure 1 A schematic front view of the structure during the lifting operation in the illustrated embodiment; Figure 4 yes Figure 1 A schematic front view of the anti-sinking assembly structure in the illustrated embodiment; Figure 5 yes Figure 1 A schematic front view of the support assembly structure in the illustrated embodiment; Figure 6 yes Figure 1 A bottom view schematic diagram of the support assembly structure in the illustrated embodiment; Figure 7 yes Figure 1 A schematic front view of the hook assembly structure in the illustrated embodiment.

[0021] The meanings of the reference numerals in the figure are as follows: 1. Crane body; 2. Operating room; 3. Hanging frame; 4. Connecting plate; 5. Hook assembly; 51. Hook body; 52. Positioning groove; 53. Anti-slip rod; 54. Fixing block; 55. Fixing sleeve; 56. Spring; 6. Pulling assembly; 61. Pulling bracket; 62. Connecting head; 63. Pulling rope; 64. Guide wheel; 65. Winding machine; 66. Reinforced pulling rope; 7. Anti-sinking assembly; 7 1. Anti-sinking plate; 72. Support plate 1; 73. Servo cylinder; 74. Slide bar 1; 75. Limit sleeve; 8. Support assembly; 81. Support plate 2; 82. Threaded sleeve; 83. Internal screw; 84. Connecting plate; 85. Fixed cone; 86. Slide bar 2; 87. Fixed sleeve; 88. Bevel gear 1; 89. Bevel gear 2; 810. Connecting rod; 811. Driven gear; 812. Moving plate; 813. Tooth. DETAILED DESCRIPTION

[0022] In order to make the purpose, features, and advantages of the present application more obvious and easy to understand, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the embodiments described below are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0023] Reference Figure 1 , Figure 2 , Figure 3 and Figure 4 A lifting work platform for high-pile dock construction and a method of using the same, comprising a crane body 1, an operating room 2 and a hanging frame 3, wherein a connecting plate 4 is arranged at one end of the hanging frame 3 away from the crane body 1, and a hook assembly 5 is fixed at the bottom of the connecting plate 4, a pulling assembly 6 is connected between the end of the hanging frame 3 and the top of the connecting plate 4 and the operating room 2, and an anti-sinking assembly 7 is arranged at the bottom of the crane body 1; The anti-sinking assembly 7 includes an anti-sinking plate 71, a support plate 72, a servo cylinder 73, a slide bar 74 and a limiting sleeve 75. The anti-sinking plate 71 is slidably arranged between the two crawlers on the bottom surface of the crane body 1, a support plate 72 is fixed in the middle of the front and rear sides of the crane body 1, and a servo cylinder 73 is arranged on the top surface of the support plate 72. The output end of the servo cylinder 73 slides through the support plate 72 and is fixed on the top surface of the anti-sinking plate 71. The outer sides of the two crawlers of the crane body 1 are provided with support assemblies 8, and the side surfaces of the crane body 1 on both sides of each support plate 72 are fixed with limiting sleeves 75, and the inside of the limiting sleeve 75 is slidably sleeved with a slide bar 74, and the bottom surface of each bottom slide bar 74 is fixed on the top surface of the anti-sinking plate 71.

[0024] Specifically, the anti-sinking plate 71 is configured to be in a boat shape with both ends tilted upward, so as to increase the supporting force of the anti-sinking plate 71. The height of the anti-sinking plate 71 is greater than the distance from the bottom surface of the middle part of the crane body 1 to the bottom surface of the crawler track, so as to prevent the anti-sinking plate 71 from affecting the normal movement of the crane body 1. The length of the anti-sinking plate 71 is less than the length of the crane body 1, and the height of each sliding rod 74 is greater than the distance from the bottom surface of the anti-sinking plate 71 to the bottom surface of the crawler track.

[0025] As an optimization solution, Figure 7As shown, the hook assembly 5 includes a hook body 51, a positioning groove 52, an anti-slip rod 53, a fixing block 54 and a fixing sleeve 55. The hook body 51 is fixed to the bottom surface of the connecting plate 4, and an anti-slip rod 53 is rotatably arranged in the upper part of the hook body 51, and both ends of the anti-slip rod 53 are rotatably sleeved with fixing blocks 54, and the two fixing blocks 54 are fixed on the inner wall of the hook body 51, and the top of the anti-slip rod 53 away from the fixing block 54 is abutted against the inner wall of the hook body 51, and a fixing sleeve 55 is fixed inside the hook body 51 on the side of the anti-slip rod 53, and a spring 56 is fixed between the fixing sleeve 55 and the anti-slip rod 53.

[0026] Specifically, a positioning groove 52 cooperating with the lifting rope is provided on the inner bottom surface of the hook body 51, and the anti-slip rod 53 is arranged in a horizontally placed "T" shape, so that the anti-slip rod 53 and the fixing block 54 can be conveniently rotated and connected. The end of the anti-slip rod 53 away from the fixing block 54 abuts against the hook-shaped inner wall of the hook body 51, thereby achieving the sealing of the hook body 51. The distance between the fixing block 54 and the positioning groove 52 is greater than the height of the anti-slip rod 53.

[0027] As a further optimization solution, Figure 1 and Figure 3 As shown, the pulling assembly 6 includes a pulling bracket 61, a connecting head 62, a pulling rope 63, a guide wheel 64, a winder 65 and a reinforced pulling rope 66. The pulling bracket 61 is fixed on the top of the operating room 2, and the connecting head 62 is symmetrically connected to the side of the operating room 2 away from the hanging frame 3. The pulling rope 63 is fixed on the top of the connecting head 62, and the end of the pulling rope 63 extending to the outside is fixed on the top surface of the hanging frame 3, the reinforcing pulling rope 66 is fixed on the top of the connecting plate 4, and the reinforcing pulling rope 66 is slidably sleeved on the guide wheel 64, the bottom surface of the guide wheel 64 is fixed on the top surface of the hanging frame 3, and the end of the guide wheel 64 extending to the bottom of the pulling bracket 61 is fixed on the input end of the winder 65, which is used to control the lifting and lowering of the connecting plate 4 and the hook assembly 5.

[0028] Specifically, the pulling bracket 61 is arranged to be symmetrically inclined with the hanging bracket 3, and is arranged opposite to the hanging bracket 3. When pulling, the two opposite forces can interact with each other, and can provide the hanging bracket 3 with a stronger supporting force. A fixed pulley is symmetrically fixed on the top of the pulling bracket 61, and the pulling rope 63 is overlapped on the outer surface of the fixed pulley. Both of the two reinforcement pulling ropes 66 slide through the pulling bracket 61, and a limiting sliding hole cooperating with the reinforcement pulling rope 66 is opened inside the pulling bracket 61.

[0029] As a further optimization solution, Figure 4 and Figure 5As shown, the support assembly 8 includes a support plate 81, a threaded sleeve 82, an inner screw 83 and a fixed cone 85. The outer side surfaces of the crane body 1 are symmetrically fixed with support plates 81, and the top surfaces of the support plates 81 are rotatably connected with threaded sleeves 82 through bearings. The inner surface of each threaded sleeve 82 is threadedly sleeved with an inner screw 83, and one end of the inner screw 83 extending to the outer side of the support plate 81 is fixed with a connecting plate 84, and a fixing cone 85 is fixed to the bottom surface of the connecting plate 84. The bottom surface of each fixing cone 85 is located above the bottom surface of the crawler track. The height of each sliding rod 86 is greater than the height of the inner screw 83, the height of the inside of each threaded sleeve 82 is greater than the height of the inner screw 83, and a threaded groove matching the inner screw 83 is opened inside the threaded sleeve 82. The top surface of the connecting plate 84 on the side of the inner screw 83 is fixed with a sliding rod 86, and a fixing sleeve block 87 is slidably sleeved on the sliding rod 86, and the side of each fixing sleeve block 87 is fixed to the side of the support plate 81.

[0030] Specifically, the support assembly 8 also includes a bevel gear 1 88, a bevel gear 2 89, a connecting rod 810, a driven gear 811, a moving plate 812 and teeth 813. A bevel gear 1 88 is fixed to the outer surface of the threaded sleeve 82, and a bevel gear 2 89 is arranged on the side of the bevel gear 1 88. The diameter of each bevel gear 2 89 is larger than the diameter of the bevel gear 1 88. A connecting rod 810 is fixed to the center position of the bevel gear 2 89 away from the threaded sleeve 82, and the connecting rod A driven gear 811 is fixed to one end of 810 that rotates and penetrates through the inner side of the crane body 1. A movable plate 812 is provided on the side of each driven gear 811, and the bottom surface of the movable plate 812 is fixed to the top surface of the anti-sinking plate 71. A plurality of teeth 813 meshing with the driven gear 811 are equidistantly fixed on one side of each movable plate 812 close to the driven gear 811, so that when the anti-sinking plate 71 moves, it can synchronously drive the fixed cone 85 to move downward, and can reduce the impact on the crane body 1.

[0031] Working principle: Move the crane body 1 to the designated construction position and stop it steadily, drive the crane body 1 to the designated construction position through the operation room 2, open the servo cylinder 73, and make the servo cylinder 73 run to push the anti-sinking plate 71 to move downward. When the anti-sinking plate 71 moves downward, it drives the sliding rod 1 74 to slide inside the limiting sleeve 75 until the bottom surface of the anti-sinking plate 71 abuts against the ground, so as to support the crane body 1. When the anti-sinking plate 71 moves downward, it drives the moving plate 812 to move downward. When the moving plate 812 moves downward, it drives the driven gear 811 to rotate through the teeth 813. When the driven gear 811 rotates, it drives the connecting rod 810 to rotate. When the connecting rod 810 rotates, it drives the bevel gear 2 89 to rotate, and the meshing bevel gear 1 88 can be driven to rotate through the bevel gear 2 89. The bevel gear 1 88 then drives the threaded sleeve 82 to rotate, and the inner screw 83 can be driven downward under the action of the thread, so as to drive the fixed bevel through the connecting plate 84. When the connecting plate 84 moves downward, the sliding rod 86 is driven to slide inside the fixed sleeve block 87, and the fixed cone 85 moves downward and inserts into the ground, so that the crane body 1 can be supported, and the lifting rope on the material to be transported is hung on the hook assembly 5, and the transportation operation is controlled through the operation room 2. When hanging, the anti-drop rod 53 is pressed, so that the anti-drop rod 53 rotates in the fixed block 54 and compresses the spring 56, so that the anti-drop rod 53 rotates to the inside of the hook body 51 to open, and the rope is hung The hook body 51 is connected to the inside of the hook body 51, and under the guidance of the positioning groove 52, it is abutted and engaged in the positioning groove 52. After the hanging rope is hung, the anti-drop rod 53 is released to release the squeezing of the anti-drop rod 53. At this time, the anti-drop rod 53 is pushed by the spring 56 to abut against the inner wall of the hook body 51 again, so that the hook body 51 can be sealed. During the transportation operation, the operating room 2 controls its own rotation and controls the direction of the hanging frame 3 at the same time. When adjusting, the pulling rope 63 and the connecting head 62 are used to pull the rope 63 and the connecting head 62. Cooperate with the pulling and reinforcement of the hanging frame 3. When the hook assembly 5 needs to be raised or lowered, the winder 65 is opened to make the winder 65 pay out or reel in the wire, so as to control the lifting and lowering of the hook assembly 5, thereby transporting materials such as pipe piles. After the transportation is completed, the anti-sinking plate 71 is driven upward by the servo cylinder 73, and the moving plate 812 is driven upward at the same time, so that the threaded sleeve 82 is driven to rotate in the opposite direction through the teeth 813, and the reverse rotation can drive the inner screw 83 to move upward, so as to pull the fixed cone 85 out of the bottom surface, and then the crane body 1 can be moved.

[0032] It will be apparent to those skilled in the art that the present application is not limited to the details of the exemplary embodiments described above, and that the present application can be implemented in other specific forms without departing from the spirit or essential features of the present application. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the present application is defined by the appended claims rather than the above description, and it is intended that all changes within the meaning and scope of the equivalent elements of the claims be included in the present application. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0033] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A lifting work platform for high-pile wharf construction, characterized by: The crane comprises a crane body (1), an operating room (2) and a hanging frame (3); a connecting plate (4) is provided at one end of the hanging frame (3) away from the crane body (1); a hook assembly (5) is fixed at the bottom of the connecting plate (4); a pulling assembly (6) is connected between the end of the hanging frame (3) and the top of the connecting plate (4) and the operating room (2); and an anti-sinking assembly (7) is provided at the bottom of the crane body (1); The anti-sinking assembly (7) comprises an anti-sinking plate (71), a support plate (72), a servo cylinder (73), a slide bar (74) and a limiting sleeve (75). The anti-sinking plate (71) is slidably arranged between the two crawlers on the bottom surface of the crane body (1). The support plate (72) is fixed to the middle of the front and rear sides of the crane body (1), and the top surface of the support plate (72) is provided with a servo cylinder (73). The output end of the servo cylinder (73) slides through the support plate (72) and is fixed to the top surface of the anti-sinking plate (71). The outer sides of the two crawlers of the crane body (1) are provided with a support assembly (8). The side surfaces of the crane body (1) on both sides of each support plate (72) are fixed with a limiting sleeve (75), and the inside of the limiting sleeve (75) is slidably sleeved with a slide bar (74), and the bottom surface of each bottom slide bar (74) is fixed to the top surface of the anti-sinking plate (71).

2. The lifting work platform for high-pile wharf construction according to claim 1 is characterized in that: The hook assembly (5) comprises a hook body (51), a positioning groove (52), an anti-slip rod (53), a fixing block (54) and a fixing sleeve (55). The hook body (51) is fixed to the bottom surface of the connecting plate (4). The anti-slip rod (53) is rotatably arranged in the upper part of the hook body (51), and both ends of the anti-slip rod (53) are rotatably sleeved with fixing blocks (54). The two fixing blocks (54) are fixed to the inner wall of the hook body (51). The top of the end of the anti-slip rod (53) away from the fixing block (54) is abutted against the inner wall of the hook body (51). A fixing sleeve (55) is fixed inside the hook body (51) on the side of the anti-slip rod (53), and a spring (56) is fixed between the fixing sleeve (55) and the anti-slip rod (53).

3. The lifting work platform for high-pile wharf construction according to claim 2 is characterized in that: The bottom surface of the hook body (51) is provided with a positioning groove (52) for cooperating with the hanging rope. The anti-slip rod (53) is arranged in a transverse "T" shape. One end of the anti-slip rod (53) away from the fixing block (54) abuts against the hook-shaped inner wall of the hook body (51). The distance between the fixing block (54) and the positioning groove (52) is greater than the height of the anti-slip rod (53).

4. The lifting work platform for high-pile wharf construction according to claim 1 is characterized by: The pulling assembly (6) comprises a pulling bracket (61), a connecting head (62), a pulling rope (63), a guide wheel (64), a reel (65) and a reinforcement pulling rope (66). The pulling bracket (61) is fixed on the top of the operating room (2). The side of the operating room (2) away from the hanging frame (3) is symmetrically connected to the connecting head (62). The top of the connecting head (62) is fixed with a pulling rope (63), and one end of the pulling rope (63) extending to the outside is fixed to the top surface of the hanging frame (3). The top of the connecting plate (4) is fixed with a reinforcement pulling rope (66), and the reinforcement pulling rope (66) is slidably sleeved on the guide wheel (64). The bottom surface of the guide wheel (64) is fixed to the top surface of the hanging frame (3). The end of the guide wheel (64) extending to below the pulling bracket (61) is fixed to the input end of the reel (65) for controlling the lifting and lowering of the connecting plate (4) and the hook assembly (5).

5. The lifting work platform for high-pile dock construction according to claim 4 is characterized in that: The pulling bracket (61) is arranged to be symmetrically inclined with respect to the hanging bracket (3); a fixed pulley is symmetrically fixed on the top of the pulling bracket (61); the pulling rope (63) is overlapped on the outer surface of the fixed pulley; the two reinforcing pulling ropes (66) both slide through the pulling bracket (61); and a limiting sliding hole cooperating with the reinforcing pulling rope (66) is provided inside the pulling bracket (61).

6. The lifting work platform for high-pile wharf construction according to claim 1 is characterized by: The anti-sinking plate (71) is configured to be in the shape of a boat with both ends tilted upwards, the height of the anti-sinking plate (71) is greater than the distance between the bottom surface of the middle part of the crane body (1) and the bottom surface of the crawler, the length of the anti-sinking plate (71) is less than the length of the crane body (1), and the height of each of the sliding rods (74) is greater than the distance between the bottom surface of the anti-sinking plate (71) and the bottom surface of the crawler.

7. The lifting work platform for high-pile dock construction according to claim 1 is characterized by: The support assembly (8) comprises a second support plate (81), a threaded sleeve (82), an inner screw (83) and a fixed cone (85); the second support plate (81) is symmetrically fixed to the outer side surface of the crane body (1); and the top surface of the second support plate (81) is rotatably connected to the threaded sleeve (82) through a bearing; the inside of each threaded sleeve (82) is threadedly sleeved with an inner screw (83); and one end of the inner screw (83) extending to the outer side of the second support plate (81) is fixed with a connecting plate (84); the bottom surface of the connecting plate (84) is fixed with a fixed cone (85); the top surface of the connecting plate (84) on the side of the inner screw (83) is fixed with a second slide bar (86); and a fixed sleeve block (87) is slidably sleeved on the second slide bar (86); and the side of each fixed sleeve block (87) is fixed to the side surface of the second support plate (81).

8. The lifting work platform for high-pile wharf construction according to claim 7 is characterized in that: The support assembly (8) further comprises a bevel gear 1 (88), a bevel gear 2 (89), a connecting rod (810), a driven gear (811), a movable plate (812) and teeth (813); the bevel gear 1 (88) is fixed to the outer surface of the threaded sleeve (82), and a bevel gear 2 (89) is arranged on the side of the bevel gear 1 (88); the diameter of each bevel gear 2 (89) is larger than the diameter of the bevel gear 1 (88); the bevel gear 2 (89) is away from the threaded sleeve A connecting rod (810) is fixed at the center position of the side (82), and a driven gear (811) is fixed at one end of the connecting rod (810) that rotates and penetrates the inner side of the crane body (1). A moving plate (812) is provided on the side of each driven gear (811), and the bottom surface of the moving plate (812) is fixed to the top surface of the anti-sinking plate (71). A plurality of teeth (813) that mesh with the driven gear (811) are fixed at equal distances on one side of each moving plate (812) close to the driven gear (811).

9. The lifting work platform for high-pile wharf construction according to claim 7 is characterized in that: The bottom surface of each fixed cone (85) is located above the bottom surface of the crawler track, the height of each sliding rod (86) is greater than the height of the inner screw (83), the height of the inside of each threaded sleeve (82) is greater than the height of the inner screw (83), and a thread groove matching the inner screw (83) is provided inside the threaded sleeve (82).

10. A method for using a lifting work platform for high-pile wharf construction derived from the lifting work platform for high-pile wharf construction according to any one of claims 1 to 9, characterized in that: The method for using the lifting work platform comprises the following steps: In the step (A), the crane body (1) is moved to a designated construction location and stopped; The step (A1) is to drive the crane body (1) to a designated location at the construction site through the operating room (2); In the step (A2), the servo cylinder (73) is turned on, so that the servo cylinder (73) operates to push the anti-sinking plate (71) downward, and while the anti-sinking plate (71) moves downward, the slide bar (74) is driven to slide inside the limiting sleeve (75) until the bottom surface of the anti-sinking plate (71) abuts against the ground, thereby supporting the crane body (1); In the step (A2), the anti-sinking plate (71) moves downward, while driving the movable plate (812) downward. When the movable plate (812) moves downward, the driven gear (811) is driven to rotate through the teeth (813). When the driven gear (811) rotates, the connecting rod (810) is driven to rotate. When the connecting rod (810) rotates, the second bevel gear (89) is driven to rotate. The second bevel gear (89) can drive the meshing bevel gear (88) to rotate. The first bevel gear (88) drives the threaded sleeve (82) to rotate. Under the action of the thread, the inner screw (83) is driven downward, thereby driving the fixed cone (85) downward through the connecting plate (84). When the connecting plate (84) moves downward, it drives the second slide rod (86) to slide inside the fixed sleeve (87). The fixed cone (85) moves downward and is inserted into the ground, thereby supporting the crane body (1). In the step (B), the lifting rope on the material to be transported is hung on the hook assembly (5), and the transport operation is controlled through the operating room (2); In the step (B1), when hanging, the anti-dropping rod (53) is pressed, so that the anti-dropping rod (53) rotates in the fixing block (54) and compresses the spring (56), so that the anti-dropping rod (53) rotates to the inside of the hook body (51) and opens, and the hanging rope is hung inside the hook body (51), and under the guidance of the positioning groove (52), it abuts and engages inside the positioning groove (52); In the step (B2), after the sling is hooked, the anti-dropping rod (53) is loosened to release the squeezing of the anti-dropping rod (53). At this time, the anti-dropping rod (53) is pushed by the spring (56) to contact the inner wall of the hook body (51) again, so that the hook body (51) can be sealed; In the step (B3), during the transport operation, the operating room (2) controls its own rotation and controls the direction of the hanging frame (3). During adjustment, the hanging frame (3) is pulled and reinforced by the pulling rope (63) and the connecting head (62). When it is necessary to raise or lower the hook assembly (5), the winding machine (65) is opened to allow the winding machine (65) to release or reel in the wire, thereby controlling the lifting and lowering of the hook assembly (5), thereby transporting materials such as pipe piles; After the step (C) is completed, the anti-sinking plate (71) is driven upward by the servo cylinder (73), and the movable plate (812) is driven upward at the same time, thereby driving the threaded sleeve (82) to rotate in the opposite direction through the teeth (813), and the reverse rotation can drive the inner screw (83) to move upward, thereby pulling the fixed cone (85) out of the bottom surface, and the crane body (1) can be moved.