Construction drawing detection method, device and equipment based on design reply file

Through the initial detection and key matching of the design reply files, automatic comparison and determination of the construction drawing modification content, the error matching problem caused by the many design reply files in the construction project is solved, the efficiency and accuracy of construction drawing review is improved, and the Resource allocation and cross-departmental communication.

CN119182526AActive Publication Date: 2024-12-24WUHAN TIESIYUAN ENG CONSULTING CO LTD

Patent Information

Application Number
CN202411341037.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-12-24
Estimated Expiration
2044-09-25

AI Technical Summary

Technical Problem

In construction projects, when there are many design reply documents and many reviewers, it is difficult to coordinate the dispatch, resulting in the mismatch between the design reply documents and the review opinions, increasing the cost of manpower, material resources and time.

Method used

By initially detecting and parsing the received design reply files, using the key to match the preset key table, automatic comparison and determination of the modification content of the construction drawing, generation of error logs and alarm notifications, reducing human errors, and improving audit accuracy .

Benefits of technology

It improves the efficiency and accuracy of construction drawing review, reduces mismatch situations, optimizes human resource allocation and cross-department communication, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119182526A_ABST
    Figure CN119182526A_ABST
Patent Text Reader

Abstract

The invention discloses a construction drawing detection method, device and equipment based on a design reply file. The method comprises the steps that initial detection is conducted on the received design reply file, and the design reply file passing detection is analyzed to obtain design reply data meeting requirements; matching a first key in the design reply data with a first preset key table, and recording the successfully matched design reply data; analyzing the successfully matched design reply data to obtain a second key and design reply opinion data corresponding to the second key; and matching the second key with a second preset key table, and performing comparison based on a matching result to determine the modification content of the construction drawing. According to the method, the design reply file is matched twice, the auditing opinions corresponding to the design reply data in the design reply file are determined, the distribution precision is improved, and the modification content of the construction drawing can be rapidly determined by comparing the design reply file data with the auditing opinions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of data matching, and more specifically, to a construction drawing detection method, device and equipment based on design response files. Background Art

[0002] During the construction process of a construction project, the review unit needs to review the construction drawings and send the review opinions of the construction drawings to the design unit, which will provide a review response with modifications, improvements, and solutions to the review opinions. There are often multiple review opinions on construction drawings, which will result in multiple design response files. Therefore, the review opinions and the corresponding design response files need to be accurately matched in order to understand whether the design response files have modified the construction drawings.

[0003] In the existing review process, the production mobilization department generally uploads the design response file. After all the reviewers involved in the construction drawing receive the design response confirmation task, the reviewers search for the corresponding review opinions and the corresponding design response files, and determine whether there are any modifications to the construction drawing in the design response through manual comparison.

[0004] However, when there are many reviewers involved in this method in the prior art, the corresponding design response files are also large, and it is difficult to coordinate and dispatch all the reviewers involved. In addition, there are also many distribution tasks. The large distribution workload can easily lead to mismatching between the design response files and the review opinions, which requires reallocation, which incurs high human, material and time costs. Summary of the invention

[0005] In response to at least one defect or improvement need in the prior art, the present invention provides a construction drawing detection method, device and equipment based on design response files, which is used to solve the problem in the prior art that when there are many design response files, it is difficult to coordinate and dispatch all participating reviewers, and the large distribution workload easily leads to mismatch between design response files and review opinions, and it is impossible to determine in time whether the design response files have modified the construction drawings.

[0006] To achieve the above object, according to a first aspect of the present invention, a construction drawing detection method based on a design reply file is provided, comprising:

[0007] Perform initial testing on the received design response files and parse the design response files that pass the test to obtain design response data that meets the requirements;

[0008] Matching the first key in the design reply data with the first preset key table, and recording the successfully matched design reply data;

[0009] Parsing the successfully matched design reply data to obtain the second key and the design reply opinion data corresponding to the second key;

[0010] The second key is matched with the second preset key table, and the modification content of the construction drawing is determined based on the matching result.

[0011] In a possible implementation, matching the first key in the design reply data with the first preset key table further includes:

[0012] If the first key does not match the first preset key table, it indicates that an error occurs in the match, and an error log report is generated and fed back;

[0013] Determine whether to generate an alarm notification based on the error log report and preset alarm indicators.

[0014] In a possible implementation, determining whether to generate an error report based on the error type and the error rate further includes:

[0015] Extracting the error type and error rate of the mismatch between the first key and the first preset key table from the error log report;

[0016] When the error type detected is a preset error type, an error type alarm notification is generated and sent;

[0017] When the detected error rate reaches a preset error rate threshold, an error rate alarm notification is generated and sent.

[0018] In a possible implementation, matching the second key with the second preset key table, and comparing based on the matching result to determine the modified content of the construction drawing, further includes:

[0019] If the second key does not match the second preset key table, the modification content of the construction drawing is determined according to the design response opinion data;

[0020] If the second key matches the second preset key table, the design response opinion data is compared with the corresponding review opinion data to determine the modification content of the construction drawing.

[0021] In a possible implementation, if the second key matches the second preset key table, the design reply opinion data is compared with the corresponding review opinion data to determine the modification content of the construction drawing, further comprising:

[0022] If the design response opinion data is consistent with the corresponding review opinion data, the construction drawing will not be modified;

[0023] If the design response opinion data is inconsistent with the corresponding audit opinion data, then extract the inconsistent data content between the design response opinion data and the corresponding audit opinion data;

[0024] The construction drawings are updated with data content that is inconsistent between the design response opinion data and the corresponding review opinion data.

[0025] In a possible implementation, if the second key does not match the second preset key table, determining the modification content of the construction drawing according to the design reply opinion data further includes:

[0026] Analyzing the cause of the mismatch between the second key and the second preset key table to determine the cause of the mismatch;

[0027] Determine the modification content of the construction drawings based on the reasons for the mismatch and the design response opinion data.

[0028] In a possible implementation, performing an initial test on the received design response file and parsing the design response file that passes the test to obtain design response data that meets the requirements, further comprising:

[0029] Testing the storage capacity of the design response file to obtain a design response file that does not exceed a preset file capacity;

[0030] Parsing the design response file that does not exceed the preset file capacity to obtain the preset type of design response data;

[0031] Perform security checks on the design response data of a preset type to obtain the design response data that passes the security check.

[0032] According to a second aspect of the present invention, there is also provided a construction drawing detection device based on a design reply file, comprising:

[0033] An initial detection module is configured to perform an initial detection on the received design response file and parse the design response file that passes the detection to obtain design response data that meets the requirements;

[0034] A first matching module, configured to match the first key in the design reply data with the first preset key table, and record the design reply data that is successfully matched;

[0035] A data parsing module, configured to parse the successfully matched design reply data to obtain the second key and the design reply opinion data corresponding to the second key;

[0036] The second matching module is configured to match the second key with the second preset key table, and determine the modified content of the construction drawing based on the matching result.

[0037] According to the third aspect of the present invention, there is also provided a construction drawing detection device based on a design response file, which includes at least one processing unit and at least one storage unit, wherein the storage unit stores a computer program, and when the computer program is executed by the processing unit, the processing unit executes any one of the steps of the above-mentioned construction drawing detection method based on a design response file.

[0038] According to the fourth aspect of the present invention, there is also provided a storage medium storing a computer program executable by an access authentication device. When the computer program runs on the access authentication device, the access authentication device executes any step of the construction drawing detection method based on the design response file as described above.

[0039] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0040] The invention provides a construction drawing detection method based on a design reply file, which performs an initial detection on the received design reply file and analyzes the design reply file that passes the detection to obtain the design reply data that meets the requirements. By automatically detecting and analyzing the design reply file, the data that meets the requirements can be quickly screened out, avoiding the cumbersome process of manually checking item by item, thereby significantly improving the efficiency and speed of the construction drawing review. The first key in the design reply data is matched with the first preset key table, the design reply data that successfully matches is recorded, the design reply data that successfully matches is analyzed to obtain the second key and the design reply opinion data corresponding to the second key, the second key is matched with the second preset key table, and the modification content of the construction drawing is determined by comparison based on the matching result. By presetting the key table and automatically comparing, the errors caused by human factors can be reduced, the accuracy and reliability of the review can be improved, and the standardized key matching and data processing process can help different teams better understand and implement the design opinions, promote communication and cooperation between departments, and the automated detection can quickly identify the design reply content that needs to be focused on, and optimize the configuration and utilization efficiency of human resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0042] Figure 1 A schematic flow chart of an embodiment of a construction drawing detection method based on a design reply file provided by the present invention;

[0043] Figure 2 A schematic diagram of a flow chart of an embodiment of determining whether to generate an error report provided by the present invention;

[0044] Figure 3 A schematic diagram of a flow chart of an embodiment of the present invention for comparing data to determine the modified content of a construction drawing;

[0045] Figure 4 The present invention provides Figure 1 A schematic flow chart of an embodiment of step S101;

[0046] Figure 5 A schematic structural diagram of an embodiment of a construction drawing detection device based on a design reply file provided by the present invention;

[0047] Figure 6 A schematic diagram of the structure of a construction drawing detection device based on a design response file provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0049] The terms "first", "second", "third", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.

[0050] The present invention provides a construction drawing detection method, device and equipment based on design response files, which are described below respectively.

[0051] See also Figure 1 , Figure 1 A flowchart of an embodiment of a construction drawing detection method based on a design response file provided by the present invention is provided. In a specific embodiment of the present invention, a construction drawing detection method based on a design response file is disclosed, comprising:

[0052] S101, performing an initial test on the received design response file and parsing the design response file that passes the test to obtain design response data that meets the requirements;

[0053] S102, matching the first key in the design reply data with the first preset key table, and recording the successfully matched design reply data;

[0054] S103, parsing the successfully matched design reply data to obtain the second key and the design reply opinion data corresponding to the second key;

[0055] S104: Match the second key with the second preset key table, and compare based on the matching result to determine the modification content of the construction drawing.

[0056] In the above embodiment, the design response files submitted by the design team or related parties are first received. Subsequently, these files are initially checked to ensure the integrity, correctness of the format and whether they contain necessary metadata. Through preliminary screening, those files that do not meet the basic requirements are excluded, such as files with incorrect format, damaged or missing key information. For the design response files that pass the initial detection, further in-depth analysis is performed. The analysis process aims to extract design response data that meets specific requirements from the files. These data may include detailed descriptions of design changes, drawing numbers involved, specific locations or areas of modifications, etc. Through analysis, this information can be organized into a structured data format to facilitate subsequent processing.

[0057] In the parsed design response data, the first key is identified. The first key usually represents key information such as different design change types, priorities or project stages. The first key can determine the construction drawing corresponding to the current design response file. For a construction drawing, there will generally be multiple review opinions, and the design response file generally contains specific responses to these review opinions. The first key is matched with the pre-established first preset key table. The first preset key table is a database or lookup table containing all valid keys and their corresponding meanings. Through the matching process, those design response data that match the keys in the preset key table can be screened out. These successfully matched data are considered to be valid design change requests that need to be further processed. These successfully matched data are recorded for further analysis and processing in subsequent steps.

[0058] For the successfully matched design response data, a more in-depth analysis is performed to extract more detailed information from the data, especially the second key and its corresponding design response opinion data. The second key may represent specific modification instructions, the marked location on the drawing, or the parts that need to be replaced. Through analysis, these second keys and their corresponding design response opinion data can be organized into a form that is easy to understand and operate. These data provide clear guidance for subsequent construction drawing modifications.

[0059] After obtaining the second key and its corresponding design response opinion data, these second keys are matched with the second preset key table. The second preset key table is a database or lookup table containing information such as construction drawing modification instructions, drawing annotation specifications or component replacement standards. Through the matching process, the construction drawing modification content corresponding to each second key can be determined. These modifications may include information such as the specific modification location on the drawing, modification method, specifications of required materials or replacement parts, etc., which are compared and analyzed based on the matching results to finally determine a complete construction drawing modification plan. The purpose of the entire detection method is to quickly and accurately identify and process construction drawing modification requests in design response files through automated and standardized processes, which can not only improve the efficiency and quality of construction drawing review, but also reduce human errors and communication costs, providing strong support for the smooth progress of the project.

[0060] Compared with the prior art, the present embodiment provides a construction drawing detection method based on a design reply file, which performs an initial detection on the received design reply file and parses the design reply file that passes the detection to obtain the design reply data that meets the requirements. By automatically detecting and parsing the design reply file, the data that meets the requirements can be quickly screened out, avoiding the tedious process of manually checking one by one, thereby significantly improving the efficiency and speed of the construction drawing review. The first key in the design reply data is matched with the first preset key table, the successfully matched design reply data is recorded, the successfully matched design reply data is parsed to obtain the second key and the design reply opinion data corresponding to the second key, the second key is matched with the second preset key table, and the modification content of the construction drawing is determined by comparison based on the matching result. By presetting the key table and automatic comparison, errors caused by human factors can be reduced, the accuracy and reliability of the audit can be improved, and standardized key matching and data processing processes can help different teams better understand and implement design opinions, promote communication and cooperation between departments, and automated detection can quickly identify the design reply content that needs to be focused on, and optimize the configuration and utilization efficiency of human resources.

[0061] In some embodiments of the present invention, matching the first key in the design reply data with the first preset key table further includes:

[0062] If the first key does not match the first preset key table, it indicates that an error occurs in the match, and an error log report is generated and fed back;

[0063] Determine whether to generate an alarm notification based on the error log report and preset alarm indicators.

[0064] In the above embodiment, when it is found that the first key in the design response data does not match any key in the first preset key table, it is immediately identified as a matching error. Subsequently, a detailed error log report is automatically generated, which should include the unmatched first key value, the timestamp of the attempted match, the basic information of the source design response file (such as file name, submitter, submission time, etc.), and possible other relevant context information. The purpose of the error log report is to record and analyze the specific circumstances of the matching failure, and provide a basis for subsequent problem solving and process improvement.

[0065] After the error log report is generated, a feedback mechanism should be initiated to promptly notify the relevant users or teams of the error situation. This can be achieved through email, messages, workflow notifications or other preset communication channels. The feedback content should briefly explain the reason for the matching failure and attach a link or summary of the error log report so that users can quickly understand the problem and take appropriate measures.

[0066] In order to further improve the system's response speed and problem handling capabilities, a series of alarm indicators should be preset, which can be set based on certain characteristics of the error log report (such as error type, frequency of occurrence, impact range, etc.). For example, if a large number of matching errors of the same type occur within a certain period of time, or if the key matching of a key design reply file fails, an alarm may be triggered.

[0067] Based on the content of the error log report and the preset alarm indicators, an automatic judgment is made. If the alarm conditions are met, an alarm notification is immediately generated. The alarm notification should contain sufficient information so that the recipient can quickly understand the severity and urgency of the problem and respond accordingly. The method of generating the alarm notification can also be flexibly selected according to the actual situation, such as quickly notifying relevant personnel through text messages, phone calls, instant messaging tools, etc.

[0068] See also Figure 2 , Figure 2 A flowchart of an embodiment of determining whether to generate an error report provided by the present invention. In some embodiments of the present invention, determining whether to generate an error report based on the error type and the error rate further includes:

[0069] S201, extracting the error type and error rate of the mismatch between the first key and the first preset key table from the error log report;

[0070] S202: when the error type is detected to be a preset error type, generate and send an error type alarm notification;

[0071] S203: When it is detected that the error rate reaches a preset error rate threshold, an error rate alarm notification is generated and sent.

[0072] In the above embodiment, the error log report is first traversed, and each record is analyzed. In particular, it is necessary to pay attention to the entries related to the mismatch between the first key and the first preset key table. From these entries, the specific error type is extracted, such as "unknown key error", "key format error" or "insufficient key authority", etc. At the same time, the frequency of occurrence of each error type, that is, the error rate, is also calculated, which is usually obtained by dividing the number of errors of a specific type by the total number of errors.

[0073] After extracting the error type and error rate, this information will be compared with the preset error type list. If a certain error type is detected and matches a type in the preset list, it means that the error type needs special attention. At this time, a detailed error type alarm notification will be generated according to the preset rules and templates. This notification will clearly indicate the type of error, the time of occurrence, the possible scope of impact, and the recommended solution. Subsequently, the alarm notification will be sent to the relevant users or teams through the preset communication channels (such as email, instant messaging tools, SMS, etc.) so that they can understand and respond to the problem in a timely manner.

[0074] In addition to paying attention to the error type, it is also necessary to monitor the change of the error rate, and compare the calculated error rate of each error type with the preset error rate threshold. If the error rate of a certain error type exceeds the set threshold, it means that the error type occurs frequently in the current stage, which may have a greater impact on the normal operation of the system. At this time, an error rate alarm notification will also be generated according to the preset rules and templates. This notification will emphasize the abnormal situation of the error rate, possible cause analysis, and recommended countermeasures. Subsequently, the alarm notification will be sent to the relevant users or teams through the same communication channel so that they can take quick action to reduce the error rate and restore stable operation.

[0075] It is understandable that the preset error type and the preset error rate threshold may be specifically set according to actual conditions, and the present invention does not impose any further limitation on this.

[0076] In some embodiments of the present invention, matching the second key with the second preset key table, and comparing based on the matching result to determine the modified content of the construction drawing, further includes:

[0077] If the second key does not match the second preset key table, the modification content of the construction drawing is determined according to the design response opinion data;

[0078] If the second key matches the second preset key table, the design response opinion data is compared with the corresponding review opinion data to determine the modification content of the construction drawing.

[0079] In the above embodiment, if the second key does not match a key in the second preset key table, it means that the design unit has added or deleted the review opinions, resulting in the design response opinion data having no corresponding review opinions. Therefore, it is necessary to determine the specific content of the modification to the construction drawing based on the design response opinion data.

[0080] If the second key successfully matches a key in the second preset key table, this means that there is a corresponding relationship between the review opinion of the construction drawing and the design response opinion data, that is, a response has been made to the review opinion. However, in order to ensure the accuracy and completeness of the final construction drawing modification, it is still necessary to further compare the design response opinion data with the corresponding review opinion data. The design response opinion data provides the designer with direct feedback on the construction drawing, while the review opinion data represents the professional auditor's assessment of the compliance, safety, and other aspects of the construction drawing. By comparing and analyzing the two, the system can more comprehensively identify potential problems in the construction drawing and determine more accurate and comprehensive modifications accordingly.

[0081] See also Figure 3 , Figure 3 A flow chart of an embodiment of the present invention for determining the modified content of the construction drawing by comparing data provided by the present invention. In some embodiments of the present invention, if the second key matches the second preset key table, the design reply opinion data is compared with the corresponding review opinion data to determine the modified content of the construction drawing, and further includes:

[0082] S301. If the design response opinion data is consistent with the corresponding review opinion data, the construction drawing is not modified;

[0083] S302, if the design reply opinion data is inconsistent with the corresponding audit opinion data, extract the inconsistent data content between the design reply opinion data and the corresponding audit opinion data;

[0084] S303, updating the construction drawing with data content that is inconsistent between the design response opinion data and the corresponding review opinion data.

[0085] In the above embodiment, the comparison between the design response opinion data and the corresponding audit opinion data includes but is not limited to the adjustment of the design scheme, the change of technical parameters, the change of material selection, etc. If the design response opinion data and the corresponding audit opinion data are consistent in all key points, it means that the designer has responded in full accordance with the audit opinion and has not made any additional modification requirements or omitted the key content in the audit opinion. If the comparison results are consistent, it is recorded that the construction drawing does not need further modification, and a corresponding report or notification may be generated to inform the relevant personnel that the review process has been completed and the construction drawing remains the same.

[0086] If inconsistencies are found in the comparison between the design response data and the corresponding audit opinion data, these inconsistent data contents should be marked immediately. Inconsistencies may be manifested in that the designer has not fully adopted the audit opinions, has a biased understanding of the audit opinions, or has proposed a design plan that is contrary to the audit opinions, etc. These inconsistent data contents need to be recorded in detail, including the terms involved, specific differences, etc., for subsequent analysis and processing.

[0087] Based on the identified inconsistent data content, guide or automatically execute the modification of the construction drawings, which includes but is not limited to adjusting the design plan, modifying technical parameters, changing material selection, etc. During the modification process, it should be ensured that all modifications comply with relevant laws, regulations, technical standards and design requirements. At the same time, key information such as the time, content, and executor of each modification should be recorded for subsequent traceability and auditing. After the modification is completed, the modified construction drawings should be reviewed and verified to ensure that all modifications have been implemented correctly and no new errors or inconsistencies have been introduced.

[0088] In some embodiments of the present invention, if the second key does not match the second preset key table, determining the modification content of the construction drawing according to the design reply opinion data further includes:

[0089] Analyzing the cause of the mismatch between the second key and the second preset key table to determine the cause of the mismatch;

[0090] Determine the modification content of the construction drawings based on the reasons for the mismatch and the design response opinion data.

[0091] In the above embodiment, the cause analysis of the mismatch between the second key and the second preset key table may include confirming whether the second key is complete and correct and has not been damaged due to transmission errors, format problems or human negligence; checking the usage history of the second key to confirm whether the key has been correctly matched in previous use, or whether it has been discarded and replaced with a new key; confirming whether any audit opinions in the second preset key table have been added, deleted or modified, causing the original key to no longer match the current audit opinions; analyzing the design response opinion data to see whether it contains responses to the addition, deletion or modification of the audit opinions, which may indicate that the designer has referred to the updated audit opinion set when preparing the response; checking logs and error reports to see if there are specific error messages or exception records about key matching failures, which may help locate the root cause of the problem.

[0092] If the reason for the mismatch is that the audit opinion has changed (such as addition, deletion or modification), the modification content of the construction drawing shall be determined according to the latest information in the design response data, which may involve the adjustment of the design scheme, the update of technical parameters or the change of material selection, etc. If the design response data contains autonomous modification suggestions for the parts not covered by the audit opinion, and these modifications are reasonable and in compliance with the specifications, these modifications shall also be included in the modification content of the construction drawing. When the reason for the mismatch or the specific meaning of the design response data is uncertain, the communication process with the auditor and the designer can be automatically or manually triggered to obtain more information and clarify questions, which helps to ensure that the modification content of the construction drawing is accurate. Based on the above analysis and confirmation results, detailed construction drawing modification instructions or reports shall be generated. These instructions shall clearly indicate the specific content, location, effect after modification and possible impact, etc. to be modified, so that the construction team can accurately execute them. After the construction drawing modification is completed, the execution of the modification shall be tracked, and necessary verification and review shall be carried out to ensure that the modification content has been correctly implemented and meets the relevant standards and requirements. At the same time, the key information and results of the entire processing process shall be recorded for subsequent traceability and audit.

[0093] See also Figure 4 , Figure 4 The present invention provides Figure 1 In some embodiments of the present invention, the received design response file is initially tested and the design response file that passes the test is parsed to obtain the design response data that meets the requirements, and the process further includes:

[0094] S401, detecting the storage capacity of the design response file, and obtaining a design response file that does not exceed a preset file capacity;

[0095] S402, parsing the design response file that does not exceed the preset file capacity to obtain the preset type of design response data;

[0096] S403: Perform a security check on the preset type of design response data to obtain the design response data that passes the security check.

[0097] In the above embodiment, first, a reasonable preset file capacity upper limit is set according to requirements or industry specifications. This upper limit is intended to prevent excessively large files from causing decreased processing efficiency or excessive resource consumption. When the design reply file is received, its storage capacity (i.e., file size) is detected immediately. This step is usually completed by reading the size information in the file attributes. The detected file size is compared with the preset file capacity. If the file size does not exceed the preset value, the file is considered to meet the storage capacity requirements and subsequent processing can continue; otherwise, an error message is recorded and the file is refused to be processed, and a notification is sent to relevant personnel to remind them that the file is too large.

[0098] After confirming that the file storage capacity is compliant, prepare the necessary environment and tools for file parsing. This may include setting up the correct parser, loading necessary libraries or modules, etc. Before parsing, verify whether the type of the design response file meets the preset requirements (such as PDF, Word, XML, etc.). This step helps ensure the effectiveness of subsequent parsing operations and avoids parsing incompatible file types. Use appropriate parsing methods or tools to parse the file to extract the design response data. The specific implementation of this step will depend on the type and content structure of the file. Convert the parsed data into preset types that can be recognized and processed (such as structured data, object models, etc.). This step helps ensure data consistency and convenience of subsequent processing.

[0099] According to security requirements and industry specifications, set a series of security testing standards. These standards may include detection of malicious code, risk of sensitive information leakage, data integrity and consistency verification, etc. Perform security testing on the design response data that has been parsed and converted into a preset type. This step may involve the use of professional security testing tools or libraries to scan the data for potential security threats. Evaluate the security of the design response data based on the output results of the security test. If all data items pass the security test, the data is considered to be qualified for security testing; otherwise, record the specific security issues and take corresponding handling measures (such as deleting data, notifying relevant personnel, etc.). Record the problems found during the security test and the handling measures taken for subsequent tracking and auditing. At the same time, send notifications to relevant personnel to inform them of the security test results and subsequent operation suggestions.

[0100] In order to better implement the construction drawing detection method based on the design reply file in the embodiment of the present invention, on the basis of the construction drawing detection method based on the design reply file, correspondingly, please refer to Figure 5 , Figure 5 This is a schematic diagram of the structure of an embodiment of a construction drawing detection device based on a design reply file provided by the present invention. The embodiment of the present invention provides a construction drawing detection device 500 based on a design reply file, including:

[0101] An initial detection module 510 is configured to perform an initial detection on the received design response file and parse the design response file that passes the detection to obtain design response data that meets the requirements;

[0102] A first matching module 520, which is configured to match the first key in the design reply data with the first preset key table, and record the design reply data that successfully matches;

[0103] A data parsing module 530 is configured to parse the successfully matched design reply data to obtain the second key and the design reply opinion data corresponding to the second key;

[0104] The second matching module 540 is configured to match the second key with the second preset key table, and determine the modified content of the construction drawing based on the matching result.

[0105] It should be noted here that: the device 500 provided in the above embodiment can implement the technical solutions described in the above method embodiments. The specific implementation principles of the above modules or units can refer to the corresponding contents in the above method embodiments, which will not be repeated here.

[0106] See also Figure 6 , Figure 6 A schematic diagram of the structure of a construction drawing detection device based on a design reply file provided by an embodiment of the present invention. Based on the above-mentioned construction drawing detection method based on a design reply file, the present invention also provides a construction drawing detection device based on a design reply file. The construction drawing detection device based on a design reply file can be a computing device such as a mobile terminal, a desktop computer, a notebook, a palm computer, and a server. The construction drawing detection device based on a design reply file 600 includes a processor 610, a memory 620, and a display 630. Figure 6 Only some components of the synchronous tracking flying welding equipment for real-time measurement of battery height are shown, but it should be understood that it is not required to implement all the components shown, and more or fewer components may be implemented instead.

[0107] In some embodiments, the memory 620 may be an internal storage unit of the construction drawing detection device 600 based on the design reply file, such as a hard disk or memory of the construction drawing detection device 600 based on the design reply file. In other embodiments, the memory 620 may also be an external storage device of the construction drawing detection device 600 based on the design reply file, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the construction drawing detection device 600 based on the design reply file. Further, the memory 620 may also include both the internal storage unit of the construction drawing detection device 600 based on the design reply file and an external storage device. The memory 620 is used to store application software and various types of data installed in the construction drawing detection device 600 based on the design reply file, such as the program code of the construction drawing detection device 600 based on the design reply file. The memory 620 may also be used to temporarily store data that has been output or is to be output. In one embodiment, a construction drawing detection program 640 based on a design response file is stored in the memory 620. The construction drawing detection program 640 based on a design response file can be executed by the processor 610, thereby realizing the construction drawing detection method based on a design response file of each embodiment of the present application.

[0108] In some embodiments, the processor 610 can be a central processing unit (CPU), a microprocessor or other data processing chip, used to run the program code or process data stored in the memory 620, such as executing a construction drawing detection method based on a design response file.

[0109] In some embodiments, the display 630 may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, an OLED (Organic Light-Emitting Diode) touch device, etc. The display 630 is used to display information on the construction drawing detection device 600 based on the design reply file and to display a visual user interface. The components 610-630 of the construction drawing detection device 600 based on the design reply file communicate with each other through a system bus.

[0110] In one embodiment, when the processor 610 executes the construction drawing detection program 640 based on the design recovery file in the memory 620, the steps in the construction drawing detection method based on the design recovery file are implemented.

[0111] This embodiment further provides a computer-readable storage medium on which a construction drawing detection program based on a design reply file is stored. When the construction drawing detection program based on a design reply file is executed by a processor, the following steps are implemented:

[0112] Perform initial testing on the received design response files and parse the design response files that pass the test to obtain design response data that meets the requirements;

[0113] Matching the first key in the design reply data with the first preset key table, and recording the successfully matched design reply data;

[0114] Parsing the successfully matched design reply data to obtain the second key and the design reply opinion data corresponding to the second key;

[0115] The second key is matched with the second preset key table, and the modification content of the construction drawing is determined based on the matching result.

[0116] In summary, the present embodiment provides a construction drawing detection method based on a design reply file, which performs an initial detection on the received design reply file and parses the design reply file that passes the detection to obtain the design reply data that meets the requirements. By automatically detecting and parsing the design reply file, the data that meets the requirements can be quickly screened out, avoiding the tedious process of manually checking one by one, thereby significantly improving the efficiency and speed of the construction drawing review. The first key in the design reply data is matched with the first preset key table, the successfully matched design reply data is recorded, the successfully matched design reply data is parsed to obtain the second key and the design reply opinion data corresponding to the second key, the second key is matched with the second preset key table, and the modification content of the construction drawing is determined by comparison based on the matching result. By presetting the key table and automatic comparison, errors caused by human factors can be reduced, the accuracy and reliability of the audit can be improved, and standardized key matching and data processing processes can help different teams better understand and implement design opinions, promote communication and cooperation between departments, and automated detection can quickly identify the design reply content that needs to be focused on, and optimize the configuration and utilization efficiency of human resources.

[0117] The present application also provides a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, the steps of the above method are implemented. The computer-readable storage medium may include, but is not limited to, any type of disk, including a floppy disk, an optical disk, a DVD, a CD-ROM, a micro drive, and a magneto-optical disk, a ROM, a RAM, an EPROM, an EEPROM, a DRAM, a VRAM, a flash memory device, a magnetic card or an optical card, a nanosystem (including a molecular memory IC), or any type of medium or device suitable for storing instructions and / or data.

[0118] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0119] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0120] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0121] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0122] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0123] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: U disk, read-only memory (ROM), random access memory (RAM), mobile hard disk, disk or optical disk and other media that can store program code.

[0124] A person of ordinary skill in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable memory, which can include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0125] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of the implementation scheme of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.

[0126] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0127] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction drawing detection method based on design response files, characterized in that: include: Perform initial testing on the received design response files and parse the design response files that pass the test to obtain design response data that meets the requirements; Matching the first key in the design reply data with the first preset key table, and recording the successfully matched design reply data; Parsing the successfully matched design reply data to obtain the second key and the design reply opinion data corresponding to the second key; The second key is matched with the second preset key table, and the modification content of the construction drawing is determined by comparison based on the matching result.

2. The construction drawing detection method based on the design reply file according to claim 1, characterized in that: The matching of the first key in the design reply data with the first preset key table further includes: If the first key does not match the first preset key table, it indicates that an error occurs in the match, and an error log report is generated and fed back; Determine whether to generate an alarm notification based on the error log report and preset alarm indicators.

3. The construction drawing detection method based on the design reply file as claimed in claim 2, characterized in that: The determining whether to generate an error report based on the error type and error rate further includes: Extracting the error type and error rate of the mismatch between the first key and the first preset key table from the error log report; When it is detected that the error type is a preset error type, generating and sending an error type alarm notification; When it is detected that the error rate reaches a preset error rate threshold, an error rate alarm notification is generated and sent.

4. The construction drawing detection method based on the design reply file according to claim 1, characterized in that: The matching of the second key with the second preset key table and comparing based on the matching result to determine the modification content of the construction drawing also includes: If the second key does not match the second preset key table, determining the modification content of the construction drawing according to the design reply opinion data; If the second key matches the second preset key table, the design response opinion data is compared with the corresponding review opinion data to determine the modification content of the construction drawing.

5. The construction drawing detection method based on the design reply file according to claim 4 is characterized in that: If the second key matches the second preset key table, the design reply opinion data is compared with the corresponding review opinion data to determine the modification content of the construction drawing, and further includes: If the design response opinion data is consistent with the corresponding review opinion data, the construction drawing is not modified; If the design reply opinion data is inconsistent with the corresponding audit opinion data, extract the inconsistent data content between the design reply opinion data and the corresponding audit opinion data; The construction drawing is updated with data content that is inconsistent between the design response opinion data and the corresponding review opinion data.

6. The construction drawing detection method based on the design reply file according to claim 4 is characterized in that: If the second key does not match the second preset key table, determining the modification content of the construction drawing according to the design reply opinion data, further comprising: Analyzing the mismatch between the second key and the second preset key table to determine the mismatch reason; The modification content of the construction drawing is determined based on the mismatch reason and the design response opinion data.

7. The construction drawing detection method based on design reply file according to claim 1, characterized in that: The initial detection of the received design response file and parsing the design response file that passes the detection to obtain the design response data that meets the requirements also includes: Detecting the storage capacity of the design response file to obtain a design response file that does not exceed a preset file capacity; Parsing the design response file that does not exceed the preset file capacity to obtain the preset type of design response data; A security check is performed on the preset type of design response data to obtain the design response data that passes the security check.

8. A construction drawing detection device based on design reply files, characterized in that: include: An initial detection module is configured to perform an initial detection on the received design response file and parse the design response file that passes the detection to obtain design response data that meets the requirements; A first matching module, configured to match the first key in the design reply data with a first preset key table, and record the design reply data that successfully matches; A data parsing module, configured to parse the successfully matched design reply data to obtain a second key and design reply opinion data corresponding to the second key; The second matching module is configured to match the second key with a second preset key table, and determine the modified content of the construction drawing based on the matching result.

9. A construction drawing detection device based on a design reply file, characterized in that: It includes at least one processing unit and at least one storage unit, wherein the storage unit stores a computer program, and when the computer program is executed by the processing unit, the processing unit executes the steps of the construction drawing detection method based on the design response file as described in any one of claims 1 to 7.

10. A storage medium, characterized in that: It stores a computer program executable by an access authentication device. When the computer program runs on the access authentication device, the access authentication device executes the steps of the construction drawing detection method based on the design response file as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Digitized inspection system for construction drawing

    CN106228340A

  • Unstructured text classification method and computer readable storage medium

    CN112579775A

  • Upstream and downstream intelligent collaborative file processing method and system

    CN118524101A

  • Design book consistency check system

    JP2020149522A

  • KR20240121998A

Cited By

  • Construction drawing content adjustment method, system and equipment and storage medium

    CN120563672A