Water pipe supporting structure passing through existing line

By setting up elastic support structures on both sides of the bridge hole and lifting the water pipes with springs and chains, the damage to the water pipes in the bridge holes is solved by train vibration, improving the stability and safety of the water pipes, and avoiding water leakage accidents.

CN119196404APending Publication Date: 2024-12-27CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411629699.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

When an existing railway crosses a river, the vibration of the train causes damage to the water pipes in the bridge tunnel, causing water leakage accidents. The existing technology is difficult to effectively alleviate the impact of vibration.

Method used

An elastic support structure is set up on both sides of the bridge hole, and the water pipe is supported by springs and chains to reduce longitudinal and lateral displacements and avoid damage to the water pipes by train vibration.

Benefits of technology

Through the suspended water pipe design, vibration damage during train operation is effectively avoided, the stability of the water pipe is improved, and water leakage accidents are avoided. The design is simple and easy to operate, with high practicality and promotional value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119196404A_ABST
    Figure CN119196404A_ABST
Patent Text Reader

Abstract

A water pipe supporting structure passing through an existing line relates to a water pipe supporting frame, the number of elastic supporting frames (1) is two, the two elastic supporting frames (1) are respectively arranged on two opposite river banks of a river channel (12) passing through a bridge opening (5), a sliding block (10) is sleeved on four sliding rods (11) through four sliding holes (16) in a sliding mode, springs (9) are respectively sleeved on the four sliding rods (11) located between the sliding block (10) and a base (7), and the springs (9) are sleeved on the base (7). A chain (2) is arranged between the upper ends of the two supporting columns (6), and the two elastic supporting structures are located on the two opposite sides of the bridge opening (5). The elastic supporting structures are arranged on the two opposite sides of the bridge opening correspondingly, the water pipe located in the bridge opening is supported, the water pipe between the two elastic supporting structures is in a suspended state, longitudinal displacement of the water pipe in the bridge opening is reduced through the springs, and transverse displacement of the water pipe in the bridge opening is reduced through the chains; the vibration damage to the water pipe in the bridge opening when the train runs on the existing line is effectively avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a water pipe supporting structure, in particular to a water pipe supporting structure that passes through an existing line. Background Art

[0002] Existing lines are railway lines that have been opened to traffic and are officially in operation. When an existing line crosses a river, a bridge is usually built above the river, and the river passes through the bridge hole. When carrying out water pipe construction in a river and encountering crossing an existing line, the water pipe is usually fixed in the riverbed and crosses the existing line together with the river. When a train passes on the railway line on top of the bridge, it will generate a large vibration. The vibration of the train is transmitted to the bridge body, and then transmitted to the river under the bridge body through the bridge piers. Since the water pipe in the river is fixed in the river, the section of the water pipe located in the bridge hole is most seriously disturbed by the vibration of the train. Frequent vibrations can easily cause the welding points of the water pipe to become detached, causing water pipe leakage accidents. Summary of the invention

[0003] In order to overcome the deficiencies in the background technology, the present invention discloses a water pipe support structure that crosses an existing line. Elastic support structures are respectively arranged on opposite sides of a bridge hole to lift up the water pipe in the bridge hole, so that the water pipe between the two elastic support structures is in a suspended state. Springs are used to reduce the longitudinal displacement of the water pipe in the bridge hole, and chains are used to reduce the lateral displacement of the water pipe in the bridge hole, thereby effectively avoiding vibration damage to the water pipe in the bridge hole when a train runs on the existing line.

[0004] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme: The support structure of a water pipe crossing an existing line comprises a bridge body and bridge piers, wherein the bridge piers are two bridge piers respectively located at two opposite river banks of a river channel, the bridge body is mounted on the top of the two bridge piers, and the space surrounded by the bridge body and the two bridge piers forms a bridge hole. An existing line is arranged on the top of the bridge body, and also comprises an elastic support structure, wherein the elastic support structure comprises an elastic support frame, which is two elastic support frames and is respectively arranged at two opposite river banks of a river channel crossing the bridge hole. The elastic support frame comprises a base and a sliding block. The base is a square structure, and upwardly extending sliding rods are arranged at positions near four corners of the top of the base, four sliding holes are arranged on the sliding block at positions corresponding to the four sliding rods, and an upwardly extending support column is arranged at the middle position of the top of the sliding block, the sliding block is slidably sleeved on the four sliding rods by using the four sliding holes, and springs are respectively sleeved on the four sliding rods located between the sliding block and the base, the bottoms of the two bases are respectively fixedly connected to the two opposite river banks, a chain is arranged between the upper ends of the two support columns, and there are two elastic support structures and they are located at opposite sides of the bridge hole.

[0005] The water pipe support structure that passes through the existing line, the support column, the spring, the sliding block, the sliding rod, the fixed pile and the chain are all metal structures.

[0006] The water pipe support structure passing through the existing line is coated with anti-rust paint on the support column, spring, sliding block, sliding rod, fixed pile and chain.

[0007] The water pipe support structure that passes through the existing line is provided with fixed piles extending into the soil layer at the bottom of four bases.

[0008] The water pipe support structure that passes through the existing line is provided with plug posts at the bottom of the four bases, and fixing holes are provided at the tops of the four fixing piles. The four bases are placed in the fixing holes provided in the four fixing piles using the plug posts.

[0009] The water pipe support structure passing through the existing line and the fixed piles are reinforced concrete structures.

[0010] The water pipe supporting structure passing through the existing line is provided with an arc-shaped supporting plate in the middle of the chain.

[0011] Due to the adoption of the above technical solution, the present invention has the following beneficial effects: The water pipe support structure crossing the existing line described in the present invention, by respectively arranging elastic support structures on the opposite sides of the bridge hole, lifts up the water pipe in the bridge hole, makes the water pipe between the two elastic support structures in a suspended state, utilizes springs to reduce the longitudinal displacement of the water pipe in the bridge hole, and utilizes chains to reduce the lateral displacement of the water pipe in the bridge hole, thereby effectively avoiding vibration damage to the water pipe in the bridge hole when the train runs on the existing line; the present invention is cleverly designed and highly practical, forms three-dimensional protection for the water pipe in the bridge hole through lateral and longitudinal vibration reduction, is simple and easy to operate, and has research and development and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 This is a schematic diagram of the structure of the support column and the sliding block of the present invention; Figure 3 It is a schematic diagram of the structure of the cooperation between the base and the fixing piles of the present invention.

[0013] In the figure: 1. elastic support frame; 2. chain; 3. bridge pier; 4. bridge body; 5. bridge hole; 6. support column; 7. base; 8. soil layer; 9. spring; 10. sliding block; 11. sliding rod; 12. river channel; 13. arc support plate; 14. water pipe; 15. fixed pile; 16. sliding hole; 17. plug column; 18. fixing hole. DETAILED DESCRIPTION

[0014] The present invention can be explained in more detail by the following examples, the present invention is not limited to the following examples, and the purpose of disclosing the present invention is to protect all changes and improvements within the scope of the present invention; Combined with Figures 1 to 3The water pipe support structure crossing the existing line includes a bridge body 4 and bridge piers 3. The bridge piers 3 are two and are respectively located on two opposite banks of a river channel 12. The bridge body 4 is mounted on the top of the two bridge piers 3. The space surrounded by the bridge body 4 and the two bridge piers 3 forms a bridge hole 5. The existing line is arranged on the top of the bridge body 4. It also includes an elastic support structure. The elastic support structure includes an elastic support frame 1. The elastic support frame 1 is two and is respectively arranged on two opposite banks of a river channel 12 crossing the bridge hole 5. The elastic support frame 1 includes a base 7 and a sliding block 10. The base 7 is a square structure. An upwardly extending sliding rod 11 is arranged at a position near the four corners of the top of the base 7. Four sliding holes 16 are arranged on the sliding block 10 at a position corresponding to the four sliding rods 11. An upwardly extending support column 6 is arranged at the middle position of the top of the sliding block 10. The sliding block 10 is slidably sleeved on the four sliding rods 11 using the four sliding holes 16. Springs 9 are respectively sleeved on the four sliding rods 11 located between the sliding block 10 and the base 7. The bottoms of the two bases 7 are respectively fixed to the two opposite river banks. A chain 2 is provided between the upper ends of the two supporting columns 6. An arc-shaped support plate 13 is provided in the middle of the chain 2. There are two elastic supporting structures located on opposite sides of the bridge hole 5. The supporting columns 6, springs 9, sliding blocks 10, sliding rods 11, fixed piles 15 and chains 2 are all metal structures. The exteriors of the supporting columns 6, springs 9, sliding blocks 10, sliding rods 11, fixed piles 15 and chains 2 are all coated with anti-rust paint. Fixed piles 15 extending into the soil layer 8 are provided at the bottoms of the four bases 7. Insert columns 17 are provided at the bottoms of the four bases 7. Fixing holes 18 are provided at the tops of the four fixing piles 15. The four bases 7 are placed in the fixing holes 18 provided in the four fixing piles 15 by insert columns 17. The fixing piles 15 are reinforced concrete structures.

[0015] The water pipe support structure for crossing the existing line described in the present invention is implemented. The water pipe 14 is normally laid in the river channel 12 far away from the existing line. When the water pipe 14 is laid to both sides of the existing line, elastic support structures are set on both sides of the existing line where the bridge hole 5 is set. When setting the elastic support structure, an elastic support frame 1 is first set on the opposite sides of the river channel 12. When setting the elastic support frame 1, a foundation pit is first dug on the soil layer 8 on the bank, and then a fixed pile 15 is set in the foundation pit with reinforced concrete, and a fixing hole 18 is reserved. The plug column 17 provided on the base 7 is inserted into the fixing hole 18 and fixedly connected. The springs 9 are respectively put on the four sliding rods 11, and the sliding block 10 is slidably connected to the four sliding rods 11 using the four sliding holes 16 provided thereon. After the elastic support frame 1 is set on the opposite sides of the river channel 12, A chain 2 with an arc-shaped support plate 13 in the middle is arranged between the tops of the support columns 6 respectively provided on the two elastic support frames 1, and a water pipe 14 located in the bridge hole 5 provided on the existing line is supported on the two arc-shaped support plates 13, so that the water pipe 14 between the two elastic support structures is in a suspended state, and the two ends of the water pipe 14 located on the two arc-shaped support plates 13 are respectively welded to the normally laid water pipe 14, and the vibration generated by the train located on the top of the existing line when traveling is transmitted to the bridge pier 3, and then transmitted to the river channel 12 under the existing line through the bridge pier 3. The water pipe 14 set in the river channel 12 under the existing line uses the spring 9 to reduce the longitudinal displacement of the water pipe 14 in the bridge hole 5, and uses the chain 2 to reduce the lateral displacement of the water pipe 14 in the bridge hole 5, which effectively avoids the vibration damage to the water pipe 14 in the bridge hole 5 caused by the train when running on the existing line.

[0016] The parts not described in detail in this invention are prior art.

Claims

1. A water pipe support structure crossing an existing line, comprising a bridge body (4) and bridge piers (3), wherein the bridge piers (3) are two bridge piers (3) respectively located on two opposite banks of a river channel (12), the bridge body (4) is built on the top of the two bridge piers (3), and the space enclosed by the bridge body (4) and the two bridge piers (3) forms a bridge hole (5), and an existing line is arranged on the top of the bridge body (4), wherein the structure is characterized in that: The elastic support structure also includes an elastic support frame (1), wherein the elastic support frame (1) is two and is respectively arranged on two opposite banks of a river channel (12) passing through the bridge hole (5), and the elastic support frame (1) includes a base (7) and a sliding block (10), wherein the base (7) is a square structure, and upwardly extending sliding rods (11) are arranged at positions near the four corners of the top of the base (7), and four sliding holes (16) are arranged on the sliding block (10) at positions corresponding to the four sliding rods (11). A support column (6) extending upward is provided at the middle position of the top of the sliding block (10). The sliding block (10) is slidably sleeved on four sliding rods (11) by means of four sliding holes (16). Springs (9) are sleeved on the four sliding rods (11) located between the sliding block (10) and the base (7). The bottoms of the two bases (7) are respectively fixed to two opposite river banks. A chain (2) is provided between the upper ends of the two support columns (6). There are two elastic support structures located on opposite sides of the bridge hole (5).

2. The water pipe support structure for crossing an existing line according to claim 1 is characterized in that: The support column (6), the spring (9), the sliding block (10), the sliding rod (11), the fixing pile (15) and the chain (2) are all metal structures.

3. The water pipe support structure for crossing an existing line according to claim 2 is characterized in that: The support column (6), the spring (9), the sliding block (10), the sliding rod (11), the fixing pile (15) and the chain (2) are all coated with anti-rust paint.

4. The water pipe support structure for crossing an existing line according to claim 1 is characterized in that: Fixed piles (15) extending into the soil layer (8) are provided at the bottoms of the four bases (7).

5. The water pipe support structure for crossing an existing line according to claim 4 is characterized in that: Insertion columns (17) are provided at the bottom of the four bases (7), and fixing holes (18) are provided at the tops of the four fixing piles (15). The four bases (7) are placed in the fixing holes (18) provided on the four fixing piles (15) by means of the insertion columns (17).

6. The water pipe support structure for crossing an existing line according to claim 5 is characterized in that The fixed pile (15) is a reinforced concrete structure:.

7. The water pipe support structure for crossing an existing line according to claim 1 is characterized in that: An arc-shaped supporting plate (13) is provided in the middle of the chain (2).