Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

350results about "Portable bridge" patented technology

Gravity self-balance type emergency rehabilitation rapid self-erection bridge

ActiveCN104499417AReduced counterweight requirementsEasy to installPortable bridgeAerospace engineering
The invention discloses a gravity self-balance type emergency rehabilitation rapid self-erection bridge. The gravity self-balance type emergency rehabilitation rapid self-erection bridge comprises a bridge body mechanism, an erecting mechanism and a vehicle mounting mechanism. The bridge body mechanism comprises at least two folding bridge bodies and a middle connecting device. A rail is arranged on the upper portion of one bridge body, and rollers matched with the rail are arranged at the two ends of the rest of bridges, and the middle connecting device is arranged between two erected bridge bodies and is used for connecting the bridge bodies on the two sides. The erecting mechanism is used for erecting the bridge bodies step by step; the vehicle mounting mechanism is used for transporting and storing the bridge body mechanism and the erecting mechanism and can provide weights for the erecting mechanism in the erecting process; and the erecting mechanism comprises a foldable lifting frame and a winch mechanism. By the adoption of the structure, the bridge bodies can be mounted step by step and one by one, and the mounted bridge bodies can provide supporting for the subsequently-mounted bridge bodies; the requirement for the weights is reduced, and therefore common vehicles can be adopted in the vehicle mounting mechanism. Meanwhile, mounting is rapid and convenient, and the gravity self-balance type emergency rehabilitation rapid self-erection bridge is suitable for the heavy bridge bodies.
Owner:中山市公路钢结构制造有限公司

Synchronous belt telescopic type feeding emergency bridge and use method thereof

The invention belongs to the field of emergency tools applied to mechanical telescopic equipment, and particularly relates to a synchronous belt telescopic type feeding emergency bridge and a use method thereof. The synchronous belt telescopic type feeding emergency bridge comprises two linear synchronous belt telescopic devices arranged side by side; each linear synchronous belt telescopic device comprises a roll, a conveying wheel and a telescopic arm, wherein the roll and the conveying wheel are connected with a drive device and arranged at the bottom end of the telescopic arm, the roll is wound with a synchronous belt, the front end of the synchronous belt is connected with the front end of the telescopic arm, the synchronous belt is arranged along the arm body of the telescopic arm, the conveying wheel is arranged at an outlet of the synchronous belt on the roll and used for driving the synchronous belt to extend out, and then the telescopic arm is driven to extend; and bridge plates are connected between the telescopic arms of the two linear synchronous belt telescopic devices and arranged at the front ends of all sections of the telescopic arms. The synchronous belt telescopic type feeding emergency bridge is good in coordination, low in site requirement and convenient to use.
Owner:SHAANXI UNIV OF SCI & TECH

Folding emergency bridge and using method

The invention discloses a folding emergency bridge and a using method thereof. The folding emergency bridge comprises a bridge main body part, the bridge main body part comprises a base supported on the ground, and a stand column is hinged to the base. A hydraulic cylinder used for driving the stand column and the base to rotate is installed between the stand column and the base. A plurality of sections of foldable bridge plate surfaces are hinged to the other side wall of the stand column through pin shafts; and the bridge plate faces and the side wall of the stand column are connected in a hinged mode through lateral folding frameworks which are symmetrically arranged. Steel wire rope systems used for providing traction force are symmetrically fixed to the top of the stand column. One ofwinding drums of the steel wire rope system is matched with a plurality of guide wheels fixed to the top of the folding framework through a first roller steel wire rope, the tail end of the winding drum is connected to the tail end of the bridge deck, and the other winding drum of the steel wire rope system is connected with the first-section bridge deck of the bridge deck through a second rollersteel wire rope. The bridge is light in self weight and convenient to transport by various operation vehicles; and the connecting rod is flexible in structural design, high in erecting and retractingoperation efficiency, low in requirement for an operation site and high in automation degree.
Owner:CHINA THREE GORGES UNIV

Combined emergency bridge and erection method thereof

The invention puts forward a combined emergency bridge and an erection method thereof which are designed for solving the problems that in the prior art, the quick restoration on the traffics at the gap positions of highway subgrades and the derogative areas of subgrades is realized by way of building shortcuts, therefore, the restoration is restricted by terrain conditions and affected by secondary geological disasters, meanwhile, the restoration is long in time, time-consuming, labor-consuming and the like. The combined emergency bridge comprises cubic steel frames, triangular prism-shaped steel frames, bearing wire cables, fixing wire cables and road slabs. The combined emergency bridge and the erection method thereof have the following beneficial effects: the bearing wire cables and combined steel frames of the bridge constitute a statically indeterminate self-bearing structure system, horizontal pressures produced by the steel frames are transmitted to the ends of the bridge, and the loads of the triangular prism-shaped steel frames are balanced by the tension of the bearing wire cables; the steel frames of the combined emergency bridge provided by the invention can not be fabricated on site, and the fabrication of the steel frames can be standardized and serialized; and the erection method of the combined emergency bridge is simple without carrying out excessive treatments on disaster sites, therefore, the method has the characteristics of emergency, speediness and convenience.
Owner:陈洪凯 +2

Ready-package emergency bridge and construction method for changing same into permanent bridge

InactiveCN101906751AShort cycleTimely recovery or normal transportationPortable bridgeBridge erection/assemblySheet steelEngineering
The invention discloses a ready-package emergency bridge and a construction method for changing the same into a permanent bridge. The ready-package emergency bridge comprises at least two longitudinal beams and bridge road steel plates, wherein the at least two longitudinal beams are parallelly laid; the bridge road steel plates are laid on the longitudinal beams and can limit horizontal and longitudinal freedom degrees; each longitudinal beam comprises longitudinal beam segments which are sequentially fixedly connected along a longitudinal direction; the horizontal longitudinal beams are fixedly connected through horizontal linkage; and the bridge road steel plates are laid on the longitudinal beams in segments along the longitudinal direction. The standard longitudinal beam segments can be combined into the longitudinal beams and the longitudinal beams and the standard bridge road steel plates are combined into a temporary bridge when accidents happen so that the bridge can be fast constructed after the accidents and the traffic of roads are restored within a shorter time to ensure that supplement and supply lifeline can be established in time or normal transportation can be restored after a disaster; in addition, after the emergency temporary bridge is open to traffic, the emergency temporary bridge can be changed into the permanent bridge without maintaining or reconstructing the accident bridge under the condition that the transportation is not obviously influenced, therefore period from the accident to the normal traffic of the road is obviously shortened, and manpower and material resource cost is saved.
Owner:郑志文 +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products