A preparation device and method for high-strength polypropylene imitation steel fiber powder
By designing a high-strength polypropylene imitation steel fiber powder preparation device, the combination of cylinder drive lifting rod and baffle is used to ensure the stable drop of the polypropylene quantity, which solves the problems of polypropylene clogging and unstable discharge quantity in existing equipment, and improves the grinding quality.
Patent Information
- Application Number
- CN202411467903.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2044-10-21
AI Technical Summary
When existing equipment grinding polypropylene, the problems of polypropylene being blocked in the down hopper and unstable amount of discharge are likely to occur, which affects the grinding quality.
A high-strength polypropylene imitation steel fiber powder preparation device is designed, using a cylinder to drive the lifting rod up, and the baffle will no longer block the through groove after the baffle rises. The polypropylene in the cutter enters the lower hopper through the through groove, and the storage barrel is inserted into the interior of the arcuate rod through the plug-in rod. The storage barrel is raised and raised into the lower hopper to ensure the stable drop of the polypropylene into the grinder.
Through this device, the amount of polypropylene entering the lower hopper is ensured to stabilize, the polypropylene is blocked, and the grinding quality is greatly improved.
Smart Images

Figure CN119216025B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel-like fiber powder preparation, in particular to a device and a method for preparing high-strength polypropylene steel-like fiber powder. Background Art
[0002] Imitation steel fiber is a substitute product developed for steel fiber, while taking into account some characteristics of synthetic fiber. Compared with steel fiber, it has the characteristics of corrosion resistance, easy dispersion, easy construction, and no damage to mixing equipment. The product is made of synthetic resin as raw material, processed through special technology and surface treatment, with the advantages of high breaking strength, good dispersion in concrete, and strong bond strength. It can replace steel fiber in cement concrete, overcoming the characteristics of low tensile strength, low ultimate elongation, and brittleness of concrete;
[0003] Patent CN214637041U discloses a fully ground polypropylene grinder, comprising a base, a plurality of support columns are fixedly installed at the middle position of the upper end surface of the base, a grinding box is provided at the upper end of each support column, a box cover is fixedly installed at the upper end surface of the grinding box, a feeding trough is provided on one side of the upper end surface of the box cover, a mounting plate is fixedly installed at one side of the upper end surface of the base, a crushing box is fixedly installed on the upper end surface of the mounting plate, a feeding trough is provided on the upper end surface of the crushing box, a rotating shaft is provided at the middle position inside the crushing box, a plurality of crushing blades are fixedly installed at both ends of the rotating shaft surface, a plurality of tumbling blades are fixedly installed at the middle position of the rotating shaft surface, a rotating motor is provided at one side of the rotating shaft surface, a through groove is provided at the bottom end of one side surface of the crushing box, and a guide plate is installed at the bottom end of the through groove;
[0004] In the prior art, polypropylene needs to be ground into powder when preparing imitation steel fiber, and then the polypropylene powder is used to prepare the imitation steel fiber; however, when the existing equipment grinds the polypropylene, the polypropylene placed in the lower hopper is prone to clogging, and the amount of polypropylene discharged in the lower hopper is unstable, resulting in an unstable amount of polypropylene entering the grinding equipment, affecting the grinding quality of the grinding equipment. Summary of the invention
[0005] The object of the present invention is to provide a device and method for preparing high-strength polypropylene imitation steel fiber powder to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solution: a device for preparing high-strength polypropylene imitation steel fiber powder, comprising:
[0007] A grinder, wherein a base is provided at the bottom of the grinder;
[0008] A lower hopper, a through groove is provided on the surface of the lower hopper, a lifting rod is provided inside the lower hopper, an extension rod is provided on the surface of the lifting rod, a baffle is provided at the end of the extension rod, a material storage barrel is provided at the bottom of the lifting rod, and two groups of material storage barrels are provided; and
[0009] The material discharge chute is arranged on the surface of the material discharge hopper.
[0010] Preferably, a motor is provided on the surface of the grinder, the motor is connected to a grinding roller, the grinding roller is located inside the grinder, a support frame is fixed on the top of the base, a storage hopper is provided on the surface of the support frame, polypropylene is placed inside the storage hopper, a vibration motor is provided at the bottom of the storage hopper, and the surface of the storage hopper is connected to a discharge chute.
[0011] Preferably, the lower hopper is fixed on the surface of the support frame, the lower hopper is located on the top of the grinder, and the bottom of the lower hopper faces the opening at the top of the grinder, a support rod is fixed on the surface of the lower hopper, a cylinder is fixed on the end of the support rod, a lifting rod is arranged at the bottom of the cylinder, the cylinder drives the lifting rod to rise and fall, the extension rod is lifted and lowered along with the lifting rod, the baffle is lifted and lowered along with the extension rod, the baffle is held on the surface of the through groove, and after the baffle rises along with the lifting rod, the through groove is exposed.
[0012] Preferably, an extension ring is fixed to the surface of the lower hopper, a fixed block is fixed to the bottom of the extension ring, an arc-shaped rod is fixed to the surface of the fixed block, a plug-in rod is inserted into the inside of the arc-shaped rod, the plug-in rod can move inside the arc-shaped rod, and the other end of the plug-in rod is hinged to the surface of the storage barrel through a rotating shaft, and the storage barrel is hinged to the end of the lifting rod through the rotating shaft.
[0013] Preferably, an arc-shaped groove is provided on the surface of the plug-in rod, a plurality of groups of protrusions are arranged inside the arc-shaped groove, a fixing rod is fixed on the surface of the arc-shaped rod, a plug-in groove is provided on the surface of the fixing rod, a telescopic rod is plugged in the plug-in groove, the inside of the telescopic rod can move in the plug-in groove, a supporting block is fixed on the end of the telescopic rod, the supporting block is supported in the arc-shaped groove, and after the supporting block moves, it contacts the protrusions on the surface of the arc-shaped groove.
[0014] Preferably, an extension block is fixed on the surface of the fixed rod, a screw is screwed in the extension block, the end of the screw is screwed inside the extension block, a through hole is opened on the surface of the telescopic rod, the end of the screw is inserted into the inside of the through hole, a supporting rod is fixed on the surface of the screw, the supporting rod rotates and moves with the screw, and the supporting rod is supported on the surface of the through hole after movement.
[0015] Preferably, two groups of arc-shaped rods are provided, the two groups of arc-shaped rods are respectively located at the top of the two groups of storage barrels, and the fixing block is fixed to the bottom of the extension ring by a screw rod.
[0016] Preferably, the material storage barrel is raised and lowered along with the lifting rod. When the material storage barrel rises along with the lifting rod, the connecting rod is inserted into the interior of the arc rod, so that the material storage barrel swings along the rotating shaft between the lifting rod and the two groups of material storage barrels are close to each other.
[0017] Preferably, the interior of the material storage barrel is empty, and after the two groups of material storage barrels are attached, the interior of the two groups of material storage barrels is empty, and after the two groups of material storage barrels rise, they are located at the bottom of the lower hopper.
[0018] A preparation method for a high-strength polypropylene imitation steel fiber powder preparation device comprises the following steps:
[0019] Step 1: unloading, the cylinder drives the lifting rod to rise, and the lifting rod drives the baffle to rise through the extension rod. After the baffle rises, it no longer blocks the through slot, and the polypropylene in the unloading slot enters the interior of the unloading hopper through the through slot. During the rising process of the lifting rod, the storage barrel rises with the lifting rod. After the storage barrel rises, the plug-in rod is plugged into the interior of the arc rod. As the storage barrel moves, the end of the storage barrel swings, so that the two groups of storage barrels are merged together and rise to enter the interior of the unloading hopper. The two groups of storage barrels are located at the bottom of the unloading hopper. The polypropylene entering the interior of the unloading hopper falls into the storage barrel. The arc rod descends at the same interval, and the baffle shields the through slot. The storage barrel descends from the interior of the unloading hopper. After the two groups of storage barrels descend, they separate from each other, and the polypropylene inside the storage barrel falls into the interior of the grinder.
[0020] Step 2: Adjustment. When the supporting block is worn and cannot hit the protrusion in the arc groove, turn the knob screw to hold the supporting rod in the through hole, so that the telescopic rod moves inside the fixed rod. The supporting block moves with the through hole, and after moving, the supporting block contacts the protrusion on the surface of the arc groove, and the telescopic rod is placed into the fixed rod through the plug-in slot, so that the telescopic rod can be replaced.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] The cylinder proposed in the present invention drives the lifting rod to rise, and the baffle plate no longer blocks the through slot after rising, and the polypropylene in the lower chute enters the lower hopper through the through slot. After the storage barrel rises, the plug-in rod is plugged into the inside of the arc rod, and the storage barrel moves with the plug-in rod. The two groups of storage barrels are merged together and rise to enter the lower hopper. The two groups of storage barrels are located at the bottom of the lower hopper, and the polypropylene entering the lower hopper falls into the storage barrel, and the storage barrel descends from the inside of the lower hopper. The two groups of storage barrels are separated from each other after descending, and the polypropylene inside the storage barrel falls into the inside of the grinder. The arc rod rises and falls at the same interval, resulting in a stable amount of polypropylene entering the lower hopper, and the separation of the two groups of storage barrels causes the polypropylene to fall, which greatly reduces the blockage of polypropylene. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0024] Figure 2 It is a schematic diagram of the support frame structure of the present invention.
[0025] Figure 3 It is a schematic diagram of the lower hopper structure of the present invention.
[0026] Figure 4 This is a schematic structural diagram of the lower hopper of the present invention from another viewing angle.
[0027] Figure 5 It is a schematic diagram of the structure of the storage barrel of the present invention.
[0028] Figure 6 It is a schematic diagram of the fixing rod structure of the present invention.
[0029] Figure 7 It is a schematic diagram of the telescopic rod structure of the present invention.
[0030] In the figure: grinder 1, motor 2, base 3, storage hopper 4, discharge chute 5, support frame 6, cylinder 8, support rod 9, discharge hopper 10, extension rod 11, lifting rod 12, through groove 13, baffle 14, extension ring 15, storage barrel 16, fixed block 17, arc rod 18, plug-in rod 19, arc groove 20, fixed rod 21, extension block 22, screw 23, plug-in groove 24, telescopic rod 25, top holding block 26, top holding rod 27, through hole 28. DETAILED DESCRIPTION
[0031] In order to make the purpose and technical solution of the present invention clearly and completely described, and the advantages more clearly understood, the embodiments of the present invention are further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are part of the embodiments of the present invention, rather than all of the embodiments, and are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] See also Figures 1 to 7 , the present invention provides a technical solution:
[0033] Embodiment 1: A device for preparing high-strength polypropylene imitation steel fiber powder, comprising:
[0034] A grinder 1, wherein a base 3 is provided at the bottom of the grinder 1; a lower hopper 10, wherein a through groove 13 is provided on the surface of the lower hopper 10, wherein a lifting rod 12 is provided inside the lower hopper 10, wherein an extension rod 11 is provided on the surface of the lifting rod 12, wherein a baffle 14 is provided at the end of the extension rod 11, wherein a material storage barrel 16 is provided at the bottom of the lifting rod 12, wherein two groups of material storage barrels 16 are provided; and a lower chute 5, wherein the cylinder 8 drives the lifting rod 12 to rise, wherein the lifting rod 12 drives the baffle 14 to rise through the extension rod 11, wherein the baffle 14 no longer blocks the through groove 13 after rising, and the polypropylene in the lower chute 5 enters into the lower hopper 10 through the through groove 13.
[0035] Embodiment 2: A motor 2 is provided on the surface of the grinder 1, and the motor 2 is connected to a grinding roller, and the grinding roller is located inside the grinder 1. A support frame 6 is fixed to the top of the base 3, and a storage hopper 4 is provided on the surface of the support frame 6. Polypropylene is placed inside the storage hopper 4, and a vibration motor is provided at the bottom of the storage hopper 4. The surface of the storage hopper 4 is connected to a discharge chute 5.
[0036] The lower hopper 10 is fixed on the surface of the support frame 6. The lower hopper 10 is located at the top of the grinder 1, and the bottom of the lower hopper 10 faces the opening at the top of the grinder 1. A support rod 9 is fixed on the surface of the lower hopper 10. A cylinder 8 is fixed on the end of the support rod 9. A lifting rod 12 is arranged at the bottom of the cylinder 8. The cylinder 8 drives the lifting rod 12 to rise and fall. The extension rod 11 rises and falls with the lifting rod 12. The baffle 14 rises and falls with the extension rod 11. The baffle 14 is held on the surface of the through groove 13, and after the baffle 14 rises with the lifting rod 12, the through groove 13 is exposed.
[0037] An extension ring 15 is fixed on the surface of the lower hopper 10, a fixing block 17 is fixed on the bottom of the extension ring 15, an arc rod 18 is fixed on the surface of the fixing block 17, a plug-in rod 19 is inserted into the interior of the arc rod 18, and the plug-in rod 19 can move inside the arc rod 18. Two groups of arc rods 18 are provided, and the two groups of arc rods 18 are respectively located at the tops of two groups of storage barrels 16. The storage barrels 16 are lifted and lowered with the lifting rod 12. When the storage barrels 16 are lifted with the lifting rod 12, the plug-in rod 19 is inserted into the interior of the arc rod 18, so that the storage barrels 16 can be lifted and lowered. The barrel 16 swings along the rotating shaft between the lifting rod 12, the two groups of storage barrels 16 are close to each other, and the fixed block 17 is fixed to the bottom of the extension ring 15 by a screw, and the other end of the plug-in rod 19 is hinged to the surface of the storage barrel 16 by a rotating shaft, the interior of the storage barrel 16 is empty, and after the two groups of storage barrels 16 are attached, the interior of the two groups of storage barrels 16 is empty, and after the two groups of storage barrels 16 rise, they are located at the bottom of the lower hopper 10, the storage barrel 16 is hinged to the end of the lifting rod 12 by a rotating shaft, and an arc groove 20 is opened on the surface of the plug-in rod 19. The arc groove 20 is provided with a plurality of groups of protrusions inside. A fixing rod 21 is fixed on the surface of the arc rod 18. A plug-in groove 24 is provided on the surface of the fixing rod 21. A telescopic rod 25 is plugged into the plug-in groove 24. The inside of the telescopic rod 25 can move in the plug-in groove 24. A top holding block 26 is fixed to the end of the telescopic rod 25. The top holding block 26 is supported in the arc groove 20. After the top holding block 26 moves, it contacts the protrusions on the surface of the arc groove 20. An extension block 22 is fixed to the surface of the fixing rod 21. A screw 23 is screwed in the extension block 22. The end of the screw 23 The telescopic rod 25 is screwed inside the extension block 22, and a through hole 28 is opened on the surface of the telescopic rod 25. The end of the screw rod 23 is inserted into the inside of the through hole 28. A supporting rod 27 is fixed on the surface of the screw rod 23. The supporting rod 27 rotates and moves with the screw rod 23. After the supporting rod 27 moves, it is supported on the surface of the through hole 28. The screw rod 23 is screwed so that the supporting rod 27 is supported in the through hole 28, so that the telescopic rod 25 moves inside the fixed rod 21. The supporting block 26 moves with the through hole 28. After the supporting block 26 moves, it contacts the protrusion on the surface of the arc groove 20.
[0038] The polypropylene is placed in the storage hopper 4. A vibration motor is provided at the bottom of the storage hopper 4 so that the polypropylene in the storage hopper 4 enters the feed chute 5. The cylinder 8 drives the lifting rod 12 to rise. The lifting rod 12 drives the baffle 14 to rise through the extension rod 11. After the baffle 14 rises, it no longer blocks the through slot 13. The polypropylene in the feed chute 5 enters the interior of the feed hopper 10 through the through slot 13. When the lifting rod 12 is rising, the storage barrel 16 rises with the lifting rod 12. After the storage barrel 16 rises, the plug-in rod 19 Inserted into the interior of the arc rod 18, the storage barrel 16 moves with the movement of the insertion rod 19, and the end of the storage barrel 16 swings, so that the two groups of storage barrels 16 merge together and rise into the interior of the lower hopper 10. The two groups of storage barrels 16 are located at the bottom of the lower hopper 10. The polypropylene entering the lower hopper 10 falls into the storage barrel 16. The arc rod 18 descends at the same time, the baffle 14 shields the through groove 13, and the storage barrel 16 descends from the interior of the lower hopper 10. After the two groups of storage barrels 16 descend, they are separated from each other. The polypropylene in the storage barrel 16 falls into the grinder 1, and during the insertion rod 19 entering the arc rod 18, the supporting block 26 at the end of the telescopic rod 25 is supported in the arc groove 20, and a plurality of groups of protrusions are provided in the arc groove 20. The supporting block 26 is supported on the surface of the protrusions, so that the storage barrel 16 vibrates, so that the polypropylene in the storage barrel 16 can all fall, and the arc rod 18 rises and falls at the same interval, resulting in a stable amount of polypropylene entering the lower hopper 10, and the two groups of storage barrels 16 The separation causes the polypropylene to fall, which greatly reduces the possibility of polypropylene blockage. When the supporting block 26 is worn and cannot hit the protrusion in the arc groove 20, the screw 23 is screwed to hold the supporting rod 27 in the through hole 28, so that the telescopic rod 25 moves inside the fixed rod 21, and the supporting block 26 moves with the through hole 28. After the supporting block 26 moves, it contacts the protrusion on the surface of the arc groove 20, and the telescopic rod 25 is placed into the interior of the fixed rod 21 through the plug-in slot 24, so that the telescopic rod 25 can be replaced.
[0039] Although the above describes the illustrative specific implementation methods of the present application so that technicians in this technical field can understand the present application, the present application is not limited to the scope of the specific implementation methods. For ordinary technicians in this technical field, as long as various changes are within the spirit and scope of the present application defined and determined by the attached claims, all application creations using the concept of the present application are protected.
Claims
1. A device for preparing high-strength polypropylene imitation steel fiber powder, characterized in that: include: A grinder (1), wherein a base (3) is provided at the bottom of the grinder (1); A lower hopper (10), wherein a through groove (13) is provided on the surface of the lower hopper (10), a lifting rod (12) is provided inside the lower hopper (10), an extension rod (11) is provided on the surface of the lifting rod (12), a baffle (14) is provided at the end of the extension rod (11), a material storage barrel (16) is provided at the bottom of the lifting rod (12), and two groups of material storage barrels (16) are provided; and A material discharge chute (5) is arranged on the surface of the material discharge hopper (10); a motor (2) is arranged on the surface of the grinder (1); the motor (2) is connected to a grinding roller; the grinding roller is located inside the grinder (1); a support frame (6) is fixed on the top of the base (3); a storage hopper (4) is arranged on the surface of the support frame (6); polypropylene is placed inside the storage hopper (4); a vibration motor is arranged at the bottom of the storage hopper (4); the surface of the storage hopper (4) is connected to the material discharge chute (5); the material discharge hopper (10) is fixed on the surface of the support frame (6); the material discharge hopper (10) is located The top of the grinder (1) is provided with a lower hopper (10), and the bottom of the lower hopper (10) faces the opening at the top of the grinder (1). A support rod (9) is fixed on the surface of the lower hopper (10). A cylinder (8) is fixed on the end of the support rod (9). A lifting rod (12) is provided at the bottom of the cylinder (8). The cylinder (8) drives the lifting rod (12) to rise and fall. The extension rod (11) rises and falls along with the lifting rod (12). The baffle (14) rises and falls along with the extension rod (11). The baffle (14) is supported on the surface of the through groove (13), and the baffle (14) rises and falls along with the lifting rod (12). ) rises, the through groove (13) is exposed, an extension ring (15) is fixed on the surface of the lower hopper (10), a fixing block (17) is fixed on the bottom of the extension ring (15), an arc rod (18) is fixed on the surface of the fixing block (17), a plug-in rod (19) is inserted into the interior of the arc rod (18), the plug-in rod (19) can move inside the arc rod (18), and the other end of the plug-in rod (19) is hinged to the surface of the storage barrel (16) through a rotating shaft, and the storage barrel (16) is hinged to the end of the lifting rod (12) through the rotating shaft, and the plug-in rod (19) ) is provided with an arc groove (20) on its surface, a plurality of groups of protrusions are arranged inside the arc groove (20), a fixing rod (21) is fixed on the surface of the arc rod (18), a plug-in groove (24) is provided on the surface of the fixing rod (21), a telescopic rod (25) is plugged into the plug-in groove (24), the inside of the telescopic rod (25) can move in the plug-in groove (24), a supporting block (26) is fixed at the end of the telescopic rod (25), the supporting block (26) is supported in the arc groove (20), and after the supporting block (26) moves, it contacts the protrusions on the surface of the arc groove (20).
2. The device for preparing high-strength polypropylene imitation steel fiber powder according to claim 1, characterized in that: An extension block (22) is fixed to the surface of the fixed rod (21), a screw rod (23) is screwed into the extension block (22), an end of the screw rod (23) is screwed into the interior of the extension block (22), a through hole (28) is opened on the surface of the telescopic rod (25), an end of the screw rod (23) is inserted into the interior of the through hole (28), a supporting rod (27) is fixed to the surface of the screw rod (23), the supporting rod (27) rotates and moves with the screw rod (23), and the supporting rod (27) is supported on the surface of the through hole (28) after moving.
3. The device for preparing high-strength polypropylene imitation steel fiber powder according to claim 2, characterized in that: Two groups of arc-shaped rods (18) are provided, and the two groups of arc-shaped rods (18) are respectively located at the tops of the two groups of material storage barrels (16), and the fixing block (17) is fixed to the bottom of the extension ring (15) by means of a screw rod.
4. The device for preparing high-strength polypropylene imitation steel fiber powder according to claim 3, characterized in that: The material storage barrel (16) is raised and lowered along with the lifting rod (12). When the material storage barrel (16) rises along with the lifting rod (12), the plug-in rod (19) is plugged into the interior of the arc-shaped rod (18), so that the material storage barrel (16) swings along the rotating shaft between the material storage barrel (16) and the lifting rod (12), and the two groups of material storage barrels (16) are close to each other.
5. The device for preparing high-strength polypropylene imitation steel fiber powder according to claim 4, characterized in that: The interior of the material storage barrel (16) is empty, and after the two groups of material storage barrels (16) are attached, the interior of the two groups of material storage barrels (16) is empty, and after the two groups of material storage barrels (16) rise, they are located at the bottom of the lower hopper (10).
6. A method for preparing high-strength polypropylene imitation steel fiber powder using the device for preparing the high-strength polypropylene imitation steel fiber powder as claimed in claim 5, characterized in that: The following steps are involved: Step 1: unloading, the cylinder (8) drives the lifting rod (12) to rise, the lifting rod (12) drives the baffle (14) to rise through the extension rod (11), and the baffle (14) no longer blocks the through groove (13) after rising, and the polypropylene in the unloading chute (5) enters the interior of the unloading hopper (10) through the through groove (13). During the rising process of the lifting rod (12), the storage barrel (16) rises along with the lifting rod (12). After the storage barrel (16) rises, since the plug-in rod (19) is plugged into the interior of the arc rod (18), the storage barrel (16) moves along with the movement of the plug-in rod (19), and the storage barrel (16) is filled with material. The ends of the barrels (16) are swung so that the two groups of storage barrels (16) are merged together and rise to enter the interior of the lower hopper (10). The two groups of storage barrels (16) are located at the bottom of the lower hopper (10). The polypropylene entering the interior of the lower hopper (10) falls into the storage barrels (16). The arc rods (18) are lowered at the same interval. The baffles (14) cover the through grooves (13). The storage barrels (16) are lowered from the interior of the lower hopper (10). After the two groups of storage barrels (16) are lowered, they separate from each other. The polypropylene inside the storage barrels (16) falls into the interior of the grinder (1); Step 2: Adjustment. When the supporting block (26) is worn and the supporting block (26) cannot hit the protrusion in the arc groove (20), the knob screw (23) is turned to hold the supporting rod (27) in the through hole (28), so that the telescopic rod (25) moves inside the fixed rod (21). The supporting block (26) moves along with the through hole (28). After the supporting block (26) moves, it contacts the protrusion on the surface of the arc groove (20), and the telescopic rod (25) is placed into the fixed rod (21) through the insertion groove (24), so that the telescopic rod (25) can be replaced.
Citation Information
Patent Citations
Uniform quantitative feeding device
CN113289758A
Polypropylene grinding machine with sufficient grinding function
CN214637041U
Solid waste treatment equipment with quantitative structure
CN219003324U