Drainage optimizing device for medical clinical scientific research sickbed

By designing a drainage optimization device including a water storage funnel, vertical drainage pipe, filter module and steering pipe, the problem of slow and difficult adjustment of the bed is solved in the medical clinical research bed, achieving more efficient drainage and flexible bed angle adjustment.

CN119235572APending Publication Date: 2025-01-03SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411538451.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

The drainage effect of existing medical clinical research beds is poor, resulting in slow drainage and easy accumulation, affecting scientific research efficiency, and fixed drainage points are not conducive to the adjustment of the bed angle.

Method used

A drainage optimization device including a water storage funnel, vertical drainage pipe, filter module, debris storage module and steering pipe was designed. The drainage efficiency is improved by using inverted conical structure and PVC material, and the drainage efficiency is improved through the filter module and debris storage. The module realizes solid-liquid separation and ensures the rotatability of the hospital bed through the steering tube.

Benefits of technology

The drainage rate and efficiency are improved, sewage accumulation is avoided, and the hospital bed is allowed to be adjusted at a certain angle to meet the drainage needs during the scientific research cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119235572A_ABST
    Figure CN119235572A_ABST
Patent Text Reader

Abstract

The invention discloses a drainage optimization device for a medical clinical scientific research sickbed, and relates to the technical field of drainage of medical scientific research sickbeds, the drainage optimization device comprises a water storage funnel, a vertical discharge pipe communicated with the interior of the water storage funnel is arranged at the bottom of the water storage funnel, and a three-way pipe communicated with the interior of the vertical discharge pipe is arranged at the bottom of the vertical discharge pipe; the two sides of the bottom of the three-way pipe are connected with a first bent pipe and a second bent pipe which are communicated with the interior of the three-way pipe respectively. According to the drainage rate and period of an actual clinical scientific research sickbed, it is guaranteed that the drainage amount within a scientific research period range is met, sufficient drainage time is guaranteed for the horizontal drainage process, meanwhile, the bottom of a water storage funnel is connected with a three-way pipe through a vertical drainage pipe, and the three-way pipe is connected with a first bent pipe and a second bent pipe; after sewage enters the three-way pipe, water in the sewage firstly penetrates through the filtering module and enters the second bent pipe, and large-particle impurities enter the impurity continuous storage module through the first bent pipe, so that solid-liquid separation operation is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of drainage of medical and scientific research beds, and in particular to a drainage optimization device for medical clinical and scientific research beds. Background Art

[0002] At present, for many medical clinical research beds, when it comes to anatomical aspects, each bed needs to be designed with independent drainage. The traditional approach is to reserve multiple drainage pipes on the ground. The drainage points are collected through a section of horizontal drainage in the ground building layer to the main drain on the same floor, and then enter the vertical sewage main pipe. The ground research beds are connected to the sewer pipe points through vertical PVC pipes.

[0003] In the prior art, the horizontal drainage pipes on the ground are limited by the thickness of the building layer and the length of the drainage distance, resulting in a low drainage slope and thus slow drainage. There are certain foreign objects in the drainage of scientific research beds. Due to the slow horizontal drainage, accumulation is easily generated, and the drainage rate is slow, affecting the efficiency of subsequent scientific research-related processes. The fixed drainage point is not conducive to the adjustment of the angle of the scientific research beds. Summary of the invention

[0004] Based on this, the purpose of the present invention is to provide a drainage optimization device for a medical clinical research bed to solve the technical problem that the drainage effect of the medical clinical research bed in the prior art is poor, affecting the overall use effect.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solutions: A drainage optimization device for a medical clinical research bed, comprising a water storage funnel, wherein a vertical drainage pipe connected to the interior of the water storage funnel is arranged at the bottom of the water storage funnel;

[0006] A three-way pipe connected to the interior is arranged at the bottom of the vertical drainage pipe, and the two sides of the bottom of the three-way pipe are respectively connected to the first elbow and the second elbow connected to the interior, and a filtering module is arranged inside the three-way pipe near the second elbow position, and a debris storage module is arranged at the end of the first elbow, and a steering pipe connected to the interior is fixed at the end of the second elbow, and a connecting pipe matched with it is movably connected to the outside of the steering pipe, and the bottom of the connecting pipe is interconnected with the horizontal drainage pipe on the ground, and a sealing ring is fixed to the outside of the connecting pipe, and a downpipe connected to the interior is arranged at the middle position of the top of the water storage funnel, and the top of the downpipe is interconnected with the drainage hole of the scientific research bed;

[0007] The water storage funnel adopts an inverted cone structure. At the same time, the water storage funnel is made of PVC lightweight material, which is convenient for overall rotation. The downpipe is customized in size according to the drainage buckle under the specific clinical research bed, ensuring the drainage volume setting within a research cycle. The water storage funnel can ensure a water storage capacity of 50 liters. The lower inverted cone structure is inwardly retracted at an angle of 30 degrees to the horizontal direction, which is convenient for the overall drainage process and avoids the accumulation of sewage.

[0008] The filter module includes a filter screen and a connection sealing frame, wherein the filter screen is connected to the inside of the three-way pipe in an inclined sliding manner, and the inner side of the connection sealing frame is fixedly connected to the filter screen and the inner wall of the connection sealing frame is sealed with the outer wall of the three-way pipe;

[0009] The filter module also includes a buckle handle and a clamping block, wherein the buckle handle and the connecting sealing frame are rotatably connected, and the clamping block is fixed on the outside of the three-way pipe, and the buckle handle and the clamping block are clamped;

[0010] As can be seen from the above, the buckle handle is rotated at the same time to make the buckle handle engage and fix with the two groups of clamping blocks, thereby playing a role in connecting and fixing the three-way pipe and the filter module;

[0011] The debris storage module includes a storage box and a storage cavity, wherein the storage box and the first curved pipe are connected to each other, and the storage cavity is located inside the storage box, wherein impurities that are difficult to filter enter the interior of the debris storage module through the first curved pipe, wherein the storage cavity plays a role in storing impurities;

[0012] A plurality of groups of positioning protrusions matching with the inner side of the connecting tube are evenly fixed on the outer side of the steering tube, and a positioning groove matching with the plurality of groups of positioning protrusions is provided on the inner side of the connecting tube. When the scientific research bed is moved in the scientific research room, the scientific research bed drives the overall movement. At this time, the steering tube is rotated relative to the connecting tube, thereby ensuring the overall rotatability in the horizontal direction, thereby ensuring the adjustment of the bed at a certain angle.

[0013] By adopting the above technical scheme, the water storage funnel and the drainage hole of the scientific research bed are interconnected through the sewer pipe, wherein according to the actual drainage rate and cycle of the clinical scientific research bed, the drainage volume within a scientific research cycle is guaranteed to be met, and sufficient drainage time is guaranteed for the horizontal drainage process. At the same time, the bottom of the water storage funnel is connected with a three-way pipe through a vertical drainage pipe, wherein the three-way pipe is respectively interconnected with the first bend pipe and the second bend pipe. After the sewage enters the interior of the three-way pipe, the water inside the sewage first passes through the filtration module into the interior of the second bend pipe, and the large particles of impurities enter the interior of the debris storage module through the first bend pipe, thereby completing the solid-liquid separation operation.

[0014] Furthermore, the filter module also includes a guide rail and a positioning rod, the guide rail is fixed at both ends of the filter screen and is slidably connected to the three-way pipe, the positioning rod is fixed on one side of the filter screen and extends to the inside of the three-way pipe, and the inside of the three-way pipe is provided with a slide groove and a positioning hole that cooperate with the guide rail and the positioning rod.

[0015] By adopting the above technical solution, the guide rail plays a guiding role for the filter screen during the installation or removal process, and the positioning rod plays a positioning role for the filter screen after installation.

[0016] Furthermore, the debris storage module also includes fastening bolts, the storage box and the first bent pipe are threadedly connected by fastening bolts, and the number of fastening bolts is two groups.

[0017] By adopting the above technical solution, the storage box can be fixed and disassembled by tightening the bolts.

[0018] Furthermore, the lower part of the water storage funnel is an inverted cone structure.

[0019] In summary, the present invention mainly has the following beneficial effects:

[0020] 1. The present invention connects the water storage funnel with the drainage hole of the scientific research bed through a downpipe, wherein the drainage rate and cycle of the actual clinical scientific research bed are used to ensure that the drainage volume within a scientific research cycle is met, and sufficient drainage time is guaranteed for the horizontal drainage process. At the same time, the bottom of the water storage funnel is connected with a three-way pipe through a vertical drainage pipe, wherein the three-way pipe is respectively connected with the first elbow and the second elbow. After the sewage enters the interior of the three-way pipe, the water inside the sewage first passes through the filtering module to enter the interior of the second elbow, and the large particle impurities enter the interior of the debris storage module through the first elbow, thereby completing the solid-liquid separation operation;

[0021] 2. The second curved pipe of the present invention and the internal horizontal pipe on the ground are interconnected through a steering pipe and a connecting pipe, wherein the connecting pipe is fixedly connected to the top of the internal horizontal drainage pipe on the ground, and the steering pipe is fixedly connected to the end of the second curved pipe, wherein the steering pipe and the connecting pipe are engaged with each other through a positioning protrusion and a positioning groove, that is, when the scientific research bed is moved in the scientific research room, the scientific research bed drives the overall movement, and at this time the steering tube is rotated relative to the connecting pipe, thereby ensuring the overall rotatability in the horizontal direction, thereby ensuring the adjustment of the bed at a certain angle. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0023] Figure 2 A cross-sectional view of the present invention as a whole;

[0024] Figure 3 For the present invention Figure 2 A magnified image of point A;

[0025] Figure 4 For the present invention Figure 2 The enlarged view of point B;

[0026] Figure 5 For the present invention Figure 2 Enlarged view of point C;

[0027] Figure 6 It is an enlarged cross-sectional view of the three-way pipe of the present invention from a first viewing angle;

[0028] Figure 7 It is an enlarged cross-sectional view of the three-way pipe of the present invention from a second viewing angle;

[0029] Figure 8 is an enlarged exploded view of the filter module of the present invention;

[0030] Fig. 9 It is an enlarged exploded view of a part of the structure of the present invention;

[0031] Fig.10 It is an enlarged structural schematic diagram of the sundries storage module of the present invention.

[0032] In the figure: 1. water storage funnel; 2. vertical drainage pipe; 3. three-way pipe; 4. first elbow pipe; 5. debris storage module; 501. storage box; 502. storage chamber; 503. fastening bolt; 6. second elbow pipe; 7. connecting pipe; 8. filter module; 801. filter screen; 802. connecting sealing frame; 803. buckle handle; 804. block; 805. guide rail; 806. positioning rod; 9. steering tube; 10. positioning protrusion; 11. positioning groove; 12. sewer pipe. DETAILED DESCRIPTION

[0033] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0034] The following describes an embodiment of the present invention based on its overall structure.

[0035] A drainage optimization device for medical clinical research beds, such as Figure 1-10 As shown, it includes a water storage funnel 1, and a vertical pipe 2 connected to the interior of the water storage funnel is arranged at the bottom of the water storage funnel 1;

[0036] A three-way pipe 3 connected to the interior is arranged at the bottom of the vertical drainage pipe 2, and the first elbow 4 and the second elbow 6 connected to the interior are respectively connected to the two sides of the bottom of the three-way pipe 3, and a filtering module 8 is arranged inside the three-way pipe 3 near the second elbow 6. A debris storage module 5 is arranged at the end of the first elbow 4, and a steering pipe 9 connected to the interior is fixed at the end of the second elbow 6. A connecting pipe 7 matched with the steering pipe 9 is movably connected to the outside of the steering pipe 9. The bottom of the connecting pipe 7 is interconnected with the horizontal drainage pipe on the ground, and a sealing ring is fixed to the outside of the connecting pipe 7. A downpipe 12 connected to the interior is arranged at the middle position of the top of the water storage funnel 1, and the top of the downpipe 12 is interconnected with the drainage hole of the scientific research bed;

[0037] The water storage funnel 1 is set with an inverted cone structure. At the same time, the water storage funnel 1 is made of PVC lightweight material, which is convenient for overall rotation. The downpipe 12 is customized in size according to the drainage buckle under the specific clinical research bed, ensuring the drainage volume setting within a research cycle. The water storage funnel 1 can ensure a water storage volume of 50 liters. The lower inverted cone structure is inwardly retracted at an angle of 30 degrees to the horizontal direction, which is convenient for the overall drainage process and avoids the accumulation of sewage.

[0038] The filter module 8 includes a filter screen 801 and a connection sealing frame 802. The filter screen 801 is connected to the inside of the three-way pipe 3 in an inclined sliding manner. The inner side of the connection sealing frame 802 is fixedly connected to the filter screen 801 and the inner wall of the connection sealing frame 802 is sealed against the outer wall of the three-way pipe 3.

[0039] The filter module 8 further includes a buckle handle 803 and a clamping block 804. The buckle handle 803 and the connecting sealing frame 802 are rotatably connected, and the clamping block 804 is fixed to the outside of the three-way pipe 3. The buckle handle 803 and the clamping block 804 are in a snap-fit ​​connection.

[0040] As can be seen from the above, the buckle handle 803 is rotated at the same time, so that the buckle handle 803 and the two groups of clamping blocks 804 are engaged and fixedly connected, thereby playing a role in connecting and fixing the three-way pipe 3 and the filter module 8;

[0041] The debris storage module 5 includes a storage box 501 and a storage chamber 502. The storage box 501 and the first curved pipe 4 are connected to each other, and the storage chamber 502 is located inside the storage box 501. Impurities that are difficult to filter enter the interior of the debris storage module 5 through the first curved pipe 4, and the storage chamber 502 plays a role in storing impurities.

[0042] A plurality of groups of positioning protrusions 10 matching with the inner side of the connecting tube 7 are evenly fixed on the outer side of the steering tube 9. A positioning groove 11 matching with the plurality of groups of positioning protrusions 10 is provided on the inner side of the connecting tube 7. When the scientific research bed is moved in the scientific research room, the scientific research bed drives the overall movement. At this time, the steering tube 9 is rotated relative to the connecting tube 7, thereby ensuring the overall rotatability in the horizontal direction, thereby ensuring the adjustment of the bed at a certain angle.

[0043] See also Figure 6 , Figure 7 and Figure 8 The filter module 8 also includes a guide rail 805 and a positioning rod 806. The guide rail 805 is fixed at both ends of the filter screen 801 and is slidably connected to the three-way pipe 3. The positioning rod 806 is fixed on one side of the filter screen 801 and extends to the inside of the three-way pipe 3. The three-way pipe 3 is provided with a slide groove and a positioning hole that match the guide rail 805 and the positioning rod 806. The present invention sets the above structure, wherein the guide rail 805 plays a guiding role for the filter screen 801 during the installation or disassembly process, and the positioning rod 806 plays a positioning role for the filter screen 801 after installation.

[0044] See also Figure 5 and Fig.10 The debris storage module 5 also includes a fastening bolt 503, and the storage box 501 and the first bent pipe 4 are threadedly connected by the fastening bolt 503, and the number of the fastening bolts 503 is two groups. The present invention sets the above structure, wherein the fastening bolt 503 plays the role of fixing and disassembling the storage box 501.

[0045] The working principle of the present invention is as follows: when in use, the water storage funnel 1 is connected to the drainage hole of the scientific research bed through the downpipe 12, wherein the drainage rate and cycle of the actual clinical scientific research bed are used to ensure that the drainage volume within a scientific research cycle is met, and sufficient drainage time is guaranteed for the horizontal drainage process;

[0046] Furthermore, the water storage funnel 1 is set with an inverted cone structure. At the same time, the water storage funnel 1 is made of PVC lightweight material, which is convenient for overall rotation. The downpipe 12 is customized in size in combination with the drainage buckle under the specific clinical research bed, ensuring the drainage volume setting within a research cycle. The water storage funnel 1 can ensure a water storage volume of 50 liters. The lower inverted cone structure is inwardly retracted at an angle of 30 degrees to the horizontal direction, which is convenient for the overall drainage process and avoids the accumulation of sewage.

[0047] At the same time, the bottom of the water storage funnel 1 is connected to a three-way pipe 3 through a vertical pipe 2, wherein the three-way pipe 3 is respectively connected to the first elbow pipe 4 and the second elbow pipe 6. After the sewage enters the three-way pipe 3, the water inside the sewage first passes through the filter module 8 to enter the second elbow pipe 6, and the large particles of impurities pass through the first elbow pipe 4 to enter the debris storage module 5, thereby completing the solid-liquid separation operation;

[0048] The filter module 8 and the three-way pipe 3 are detachably connected. Specifically, the filter screen 801 and the three-way pipe 3 are slidably connected via a guide rail 805, so that the filter screen 801 can be disassembled, cleaned or replaced.

[0049] At the same time, after cleaning or replacing the filter screen 801, the filter screen 801 is inserted into the interior of the three-way pipe 3, and the opening of the three-way pipe 3 is sealed by connecting the sealing frame 802, and the buckle handle 803 is rotated at the same time, so that the buckle handle 803 and the two groups of clamping blocks 804 are engaged and fixedly connected, thereby playing a role in connecting and fixing the three-way pipe 3 and the filter module 8;

[0050] Furthermore, the impurities that are difficult to filter enter the interior of the debris storage module 5 through the first curved pipe 4, wherein the storage chamber 502 serves to store the impurities, and the storage box 501 and the first curved pipe 4 are plug-in detachable connections, and the storage box 501 is fixed and disassembled by fastening bolts 503, and the storage box 501 is made of opaque PVC material and is detachable, so that the internal debris can be cleaned regularly;

[0051] Furthermore, the second elbow pipe 6 and the internal horizontal pipe on the ground are connected to each other through the steering pipe 9 and the connecting pipe 7, wherein the connecting pipe 7 is fixedly connected to the top of the internal horizontal drainage pipe on the ground, and the steering pipe 9 is fixedly connected to the end of the second elbow pipe 6;

[0052] The steering tube 9 and the connecting tube 7 are connected to each other by means of the positioning protrusion 10 and the positioning groove 11. That is to say, when the scientific research bed is moved in the scientific research room, the scientific research bed drives the whole to move. At this time, the steering tube 9 is rotated relative to the connecting tube 7, thereby ensuring the overall rotatability in the horizontal direction, thereby ensuring the adjustment of the bed at a certain angle.

[0053] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A drainage optimization device for a medical clinical research bed, comprising a water storage funnel (1), characterized in that: The bottom of the water storage funnel (1) is provided with a vertical row of pipes (2) connected to the interior thereof; A three-way pipe (3) connected to the interior of the vertical pipe (2) is arranged at the bottom of the vertical pipe (2); a first elbow (4) and a second elbow (6) connected to the interior of the three-way pipe (3) are respectively connected to the two sides of the bottom of the three-way pipe (3); a filtering module (8) close to the second elbow (6) is arranged inside the three-way pipe (3); a debris storage module (5) is arranged at the end of the first elbow (4); a steering pipe (9) connected to the interior of the second elbow (6) is fixed at the end of the second elbow (6); and a connecting pipe (7) matched with the steering pipe (9) is movably connected to the outside of the steering pipe (9).

2. The drainage optimization device for medical clinical research beds according to claim 1, characterized in that: The filter module (8) comprises a filter screen (801) and a connecting sealing frame (802); the filter screen (801) is connected to the inside of the three-way pipe (3) in an inclined and sliding manner; the inner side of the connecting sealing frame (802) is fixedly connected to the filter screen (801) and the inner wall of the connecting sealing frame (802) is in close contact with the outer wall of the three-way pipe (3) and is sealed.

3. The drainage optimization device for medical clinical research beds according to claim 2, characterized in that: The filter module (8) further comprises a buckle handle (803) and a clamping block (804); the buckle handle (803) and the connecting sealing frame (802) are rotatably connected, and the clamping block (804) is fixed on the outside of the three-way pipe (3); the buckle handle (803) and the clamping block (804) are snap-fitted.

4. The drainage optimization device for medical clinical research beds according to claim 3 is characterized in that: The filter module (8) further comprises a guide rail (805) and a positioning rod (806); the guide rail (805) is fixed between the two ends of the filter screen (801) and is slidably connected to the three-way pipe (3); the positioning rod (806) is fixed to one side of the filter screen (801) and extends to the inside of the three-way pipe (3); and a slide groove and a positioning hole matching the guide rail (805) and the positioning rod (806) are provided inside the three-way pipe (3).

5. The drainage optimization device for medical clinical research beds according to claim 1, characterized in that: The debris storage module (5) comprises a storage box (501) and a storage chamber (502); the storage box (501) and the first curved pipe (4) are connected to each other, and the storage chamber (502) is located inside the storage box (501).

6. The drainage optimization device for medical clinical research beds according to claim 5, characterized in that: The debris storage module (5) further comprises fastening bolts (503), the storage box (501) and the first curved pipe (4) are threadedly connected via the fastening bolts (503), and the number of the fastening bolts (503) is two groups.

7. The drainage optimization device for medical clinical research beds according to claim 1, characterized in that: The outer side of the steering tube (9) is evenly fixed with a plurality of groups of positioning protrusions (10) that match the inner side of the connecting tube (7), and the inner side of the connecting tube (7) is provided with positioning grooves (11) that match the plurality of groups of positioning protrusions (10).

8. The drainage optimization device for medical clinical research beds according to claim 1, characterized in that: A water pipe (12) connected to the interior of the water storage funnel (1) is arranged at the middle position of the top of the water storage funnel (1), and the top of the water pipe (12) is connected to the drainage hole of the scientific research bed.

9. The drainage optimization device for medical clinical research beds according to claim 1, characterized in that: The bottom of the connecting pipe (7) is communicated with a horizontal drainage pipe on the ground, and a sealing ring is fixed on the outside of the connecting pipe (7).

10. The drainage optimization device for medical clinical research beds according to claim 1, characterized in that: The lower part of the water storage funnel (1) is an inverted cone structure.