Prefabricated water channel hoisting device for large farm construction
By designing a prefabricated canal lifting device for large-scale farm construction, the automatic sliding and alignment of prefabricated canals is achieved using the combination of inclined slides and straight slides, the problem of continuous construction of hoisting and laying in the prior art is solved, and construction efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202411691570.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-25
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-11-25
AI Technical Summary
In the prior art, the lifting and laying of prefabricated water canals cannot achieve continuous construction, resulting in an extension of the construction period.
A prefabricated water canal hoisting device for large farm construction is designed, including a lifting component, a first sliding component, a second sliding component and a guiding component. The device uses a combination of inclined slide and straight slide, using a force-transmitting rope and an electric push rod to realize automatic sliding and alignment of the prefabricated water channel, improving the continuity of construction.
This device can significantly save lifting time, improve construction continuity, shorten construction period, and ensure the accuracy and efficiency of canal laying.
Smart Images

Figure CN119240507B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction hoisting equipment, and in particular relates to a prefabricated water channel hoisting device for large-scale farm construction. Background Art
[0002] Large farms have high requirements for water irrigation. During the construction of large farms, a large number of canals need to be laid. At present, prefabricated canals are mainly used for laying. When laying prefabricated canals, the hoisting equipment lifts the prefabricated canals, and then the adjacent prefabricated canals are manually aligned before the prefabricated canals are lowered. Each prefabricated canal takes a long time to adjust the direction and angle to align with the prefabricated canals that have been laid. The docking of two adjacent prefabricated canals requires a certain degree of precision, so it takes a long time, which is not conducive to the continuity of construction and prolongs the construction period. Summary of the invention
[0003] The purpose of the present invention is to provide a prefabricated water channel hoisting device for large-scale farm construction, so as to solve the technical problem that the hoisting and laying of prefabricated water channels in the prior art cannot be carried out continuously.
[0004] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0005] A prefabricated water channel hoisting device for large-scale farm construction comprises a hoisting component, a first sliding component, a second sliding component and a guide component; the hoisting component is detachably connected to the first sliding component and is used to hoist the prefabricated water channel onto the first sliding component, and the first sliding component, the second sliding component and the guide component are connected in sequence from left to right;
[0006] The first sliding component includes an inclined slide for sliding the prefabricated water channel, a first pulley, a first sling for suspending the prefabricated water channel, and a power component for driving the inclined slide to move, wherein the inclined slide is higher on the left and lower on the right, and wider on the top and narrower on the bottom; the second sliding component includes a straight slide extending in the left and right directions, wherein the width of the straight slide is adapted to the prefabricated water channel, the right end of the inclined slide is connected to the left end of the straight slide, and the right end of the inclined slide is consistent with the left end of the straight slide; the guide component includes a first guide component and a second guide component distributed at the right end of the straight slide, wherein the first guide component includes a support frame, a guide rail, a second sling for suspending the prefabricated water channel, and a second pulley;
[0007] The first pulley is located at the left end of the inclined slideway, the second pulley is located at the right end of the guide track, a force transmission rope is connected between the first sling and the second sling, and the force transmission rope is wound around the first pulley and the second pulley to realize the reversal and force transmission of the force transmission rope;
[0008] The guide rail includes an upper rail and a lower rail for the second sling to slide left and right, and both the upper rail and the lower rail are provided with avoidance grooves for avoiding the second sling to slide back and forth; the left end of the upper rail is provided with an upward channel for the second sling to move from the lower rail to the upper rail, and the right end of the upper rail is provided with a downward channel for the second sling to move from the upper rail to the lower rail. The second sling automatically falls from the upper rail to the lower rail under the action of gravity, and the lower rail is gradually lowered from right to left to allow the second sling to slide from left to right under the action of gravity;
[0009] The left end of the support frame is provided with a lifting assembly for moving the second hanger from the lower track to the upper track, and the lifting assembly includes a wedge-shaped structure that moves up and down along the support frame, and a pushing structure along the left and right directions of the support frame for pushing the wedge-shaped structure to move up and down; the wedge structure includes an upper wedge-shaped block, a connecting plate connected to the upper wedge-shaped block, and a lifting frame for jacking up the second hanger; the pushing structure includes a fixed seat and a pushing frame that moves back and forth on the fixed seat, and the pushing frame is provided with a lower wedge-shaped block that cooperates with the upper wedge-shaped block. The pushing frame moves to the left under the pressure of the second hanger and pushes the wedge-shaped structure to move up and down, so as to drive the lifting frame to jack up the second hanger to the upper track;
[0010] The first lifting device clamps the prefabricated water channel to be lifted from the left side and slides up and down along the inclined slide. The first lifting device is driven to open and close by an electric push rod. The side wall of the lower part of the inclined slide is provided with a protruding part of a control switch for pushing the electric push rod.
[0011] The second sling includes a T-shaped sling seat and a scissor-type lifting claw which cooperate with the upper track and the lower track. A sling rod is arranged at the lower part of the sling seat, and a long hole passing through the sling rod is arranged at the upper part of the scissor-type lifting claw; the sling seat drives the sling rod to move upward, the sling rod moves upward along the long hole, the upper part of the scissor-type lifting claw is tightened inward, and the lower part is also tightened inward to clamp the prefabricated water channel, the sling seat drives the sling rod to move downward, and the scissor-type lifting claw is no longer subjected to tension and is loosened until the sling seat moves upward again.
[0012] Furthermore, an anti-slip member for limiting the slipping of the scissor-type lifting claw is provided on the lifting rod of the second lifting device, and a clamping plate is provided at the lower part of the scissor-type lifting claw, which extends to the inner bottom of the prefabricated water channel. When the lifting device seat moves downward, the clamping plate touches the prefabricated water channel to cause the lifting rod and the scissor-type lifting claw to move relative to each other, and the scissor-type lifting claw is no longer subjected to tension and is loosened.
[0013] Furthermore, the left end of the support frame is provided with a limiting slide rail which is slidably connected with the wedge structure to limit the wedge structure, and the wedge structure is provided with a limiting slide bar which cooperates with the limiting slide rail; the connecting plate passes through the lower part of the support frame and moves up and down, and the upper wedge block passes through the upper part of the support frame and moves up and down; the lifting frame is an L-shaped structure, the lower part of the lifting frame is connected with the connecting plate, and the upper part of the lifting frame passes through the lower track and the upward channel to lift the second hoist to the upper track.
[0014] Furthermore, the pushing frame is an L-shaped frame, the lower part of the pushing frame crosses the fixed seat, the upper part of the pushing frame pushes the wedge-shaped structure to move upward, and the wedge-shaped structure moves downward under the action of gravity to return to its original position. A limiting plate is provided on the support frame to prevent the wedge-shaped structure from moving left and right.
[0015] Furthermore, the first sling comprises a sling frame, two symmetrically distributed sling claws and a sling slide rail for sliding the sling claws forward and backward; a sling groove extending in the front-to-back direction is provided at the lower part of the sling frame, the sling slide rail is located in the sling groove and the sling slide rail limits the sling claws to prevent the sling claws from moving up and down; the upper part of the sling claw is a wedge-shaped driving part, and the lower part of the sling claw is a plate-shaped clamping part to clamp the prefabricated water channel; the electric push rod housing is fixed to the sling frame, the push rod of the electric push rod passes through the upper crossbeam of the sling frame from top to bottom, and the electric The lower end of the push rod of the movable push rod is connected with a trapezoidal block, which is adapted to the two driving parts; an arc groove is arranged on the driving part, and a connecting rod is connected between the lower part of the driving part and the trapezoidal block, the connecting rod slides back and forth in the arc groove, the trapezoidal block is rotatably connected with the connecting rod, the trapezoidal block moves downward to push the two driving parts to open to loosen the prefabricated water channel, the trapezoidal block moves upward, the connecting rod pulls the two driving parts closer, the groove plate at the top of the arc groove and the arc groove limit the connecting rod to achieve clamping, and the control switch of the electric push rod is arranged on the side of the hanger frame close to the inner wall of the inclined slide.
[0016] Furthermore, the left end of the force transmission hoisting rope is connected to the first sling, which is wound in from the bottom of the first pulley and out from the top of the first pulley to extend to the top of the second pulley, and then connected to the second sling after winding out from the bottom of the second pulley. The first sling moves from left to right and pulls the second sling to move from left to right. The first sling holds the prefabricated water channel to slow down, and the second sling holds the prefabricated water channel to assist in sliding the prefabricated water channel down from the straight slide.
[0017] Furthermore, the inclined slide is provided with a plurality of auxiliary rolling members extending in the front-to-rear direction so that the action between the prefabricated water channel and the inclined slide is converted from sliding to rolling. The auxiliary rolling members include a flexible connecting rope fixed on the side panel of the inclined slide, a rolling sleeve and a connecting ring. The connecting ring is fixed on the flexible connecting rope, and the rolling sleeve is rotatably connected to the connecting ring. The flexible connecting ropes arranged at both ends of the auxiliary rolling members buffer the prefabricated water channel, reduce the vibration of the prefabricated water channel when it moves from the inclined slide to the straight slide, and protect the prefabricated water channel.
[0018] Furthermore, a plurality of rolling rods extending in the front-rear direction are arranged on the straight slide, and the rolling rods are rotatably connected to the side plates of the straight slide.
[0019] Furthermore, the first sling and the second sling are both provided with sling holes connected with the force transmission sling rope.
[0020] Beneficial effects of the present invention:
[0021] The prefabricated water channel hoisting device for large-scale farm construction of the present invention is that the prefabricated water channel is hoisted to the inclined slide by the hoisting component, and the power component drives the inclined slide and the straight slide to slide. After the first hoisting device is clamped on the side of the prefabricated water channel, the hoisting component of the prefabricated water channel is loosened, and the prefabricated water channel gradually slides downward to the straight slide, gradually slides to the ground, and is assisted by the guide component to guide it to be aligned with the previous prefabricated water channel.
[0022] The prefabricated water channel hoisting device for large-scale farm construction of the present invention has an inclined slide that is wide at the top and narrow at the bottom, that is, the upper part is wider. The hoisting components do not need to strictly adjust the direction when hoisting the prefabricated water channel to the inclined slide. During the process of the prefabricated water channel moving to the right, it is gradually adjusted to the same direction as the straight slide, which can save hoisting time and facilitate continuous hoisting and laying.
[0023] The prefabricated water channel hoisting device for large-scale farm construction of the present invention cooperates with the first hoist, the second hoist, the first pulley and the second pulley. The first hoist clamps the prefabricated water channel on the inclined slideway, and the second hoist clamps the prefabricated water channel on the straight slideway. The prefabricated water channel on the inclined slideway slides downward under the action of gravity. The pulling force of the first hoist can slow down the descending speed of the prefabricated water channel on the inclined slideway to prevent it from violently hitting the straight slideway. At the same time, the pulling force of the prefabricated water channel on the inclined slideway can assist in pulling the prefabricated water channel on the straight slideway to the ground. The upper track and the lower track are gradually lowered from right to left to allow the second hoist to slide from left to right under the action of gravity. The second hoist returns to its original position while pulling the first hoist back to its original position. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the structure of a prefabricated water channel hoisting device for large farm construction in Example 1;
[0025] Figure 2 This is a schematic diagram of the guide component structure in Example 1;
[0026] Figure 3 for Figure 2 A partial enlarged schematic diagram in the middle;
[0027] Figure 4 This is a schematic structural diagram of the first sliding component in Example 1;
[0028] Figure 5 This is a schematic diagram of the structure of the first sling in Example 1;
[0029] Figure 6 This is a front view of the first spreader in Example 1;
[0030] Figure 7 for Figure 6 Sectional view at AA;
[0031] Figure 8 is a schematic diagram of the structure of the second sling in Example 1;
[0032] Fig. 9 is a schematic diagram of the structure of the auxiliary rolling element in Example 1;
[0033] Fig.10 This is a schematic diagram of the coordination structure between the first hanger, the prefabricated water channel and the first pulley in Example 1.
[0034] In the figure: 100, lifting component; 110, lifting frame; 120, lifting arm; 200, first sliding component; 210, inclined slide; 211, auxiliary rolling element; 2111, flexible connecting rope; 2112, rolling sleeve; 2113, connecting ring; 212, slide bracket; 213, driving wheel; 214, protrusion; 220, first pulley; 230, first hanger; 231, electric push rod; 2311, control switch of electric push rod; 2312, push rod; 2313, trapezoidal block; 232, hanger frame; 233, hanger claw; 2331, driving part; 2332, clamping part; 2333, arc groove; 234, hanger slide rail; 235, connecting rod; 240, power assembly; 300, second sliding component; 310, straight slide; 311, Rolling rod; 400, guiding component; 410, first guiding assembly; 411, supporting frame; 4111, limiting slide rail; 412, guiding rail; 4121, upper rail; 4122, lower rail; 4123, avoiding groove; 4124, upward passage; 4125, downward passage; 413, second sling; 4131, sling seat; 4132, scissor-type lifting claw; 4133, lifting rod; 4134, long hole; 4135, anti-slip nut; 414, second pulley; 500, prefabricated water channel; 600, force transmission rope; 700, lifting assembly; 710, wedge structure; 711, upper wedge block; 712, connecting plate; 713, lifting frame; 714, limiting slide bar; 720, pushing structure; 721, fixing seat; 722, pushing frame; 4112, limiting plate. DETAILED DESCRIPTION
[0035] The present invention will be further described below in conjunction with the embodiments of the present invention and the accompanying drawings.
[0036] The schematic diagram of the structure of the prefabricated water channel hoisting device for large farm construction according to the first embodiment of the present invention is as follows: Figure 1-Figure 10 shown. Example 1
[0037] The prefabricated water channel hoisting device for large-scale farm construction in this embodiment includes a hoisting component 100, a first sliding component 200, a second sliding component 300 and a guiding component 400; the hoisting component 100 is detachably connected to the first sliding component 200, and the hoisting component 100 is used to hoist the prefabricated water channel 500 onto the first sliding component 200, and the first sliding component 200, the second sliding component 300 and the guiding component 400 are connected in sequence from left to right.
[0038] The first sliding component 200 includes an inclined slide 210 for sliding the prefabricated water channel 500, a first pulley 220, a first hanger 230 for suspending the prefabricated water channel 500, and a power component 240 for driving the inclined slide 210 to move. The inclined slide 210 is higher on the left and lower on the right, wider at the top and narrower at the bottom; the second sliding component 300 includes a straight slide 310 extending in the left and right directions, the width of the straight slide 310 is adapted to the prefabricated water channel 500, the right end of the inclined slide 210 is connected to the left end of the straight slide 310, and the right end of the inclined slide 210 is consistent with the left end of the straight slide 310; the guide component 400 includes a first guide component 410 and a second guide component distributed at the right end of the straight slide 310, the first guide component 410 includes a support frame 411, a guide rail 412, a second hanger 413 for suspending the prefabricated water channel 500, and a second pulley 414. The second guide assembly is symmetrical to the first guide assembly 410 .
[0039] The first pulley 220 is located at the left end of the inclined slideway 210. Two first pulleys 220 are provided, which are respectively provided corresponding to the second pulleys 414. The second pulley 414 is located at the right end of the guide track 412. A force transmission rope 600 is connected between the first sling 230 and the second sling 413. The force transmission rope 600 is wound around the first pulley 220 and the second pulley 414 to achieve the reversal and force transmission of the force transmission rope 600. The force transmission rope 600 connects the first sling 230 and the second sling 413 on the same side.
[0040] The guide rail 412 includes an upper rail 4121 and a lower rail 4122 for the second hanger 413 to slide left and right, and the upper rail 4121 and the lower rail 4122 are both provided with an avoidance groove 4123 for preventing the second hanger 413 from sliding back and forth; the left end of the upper rail 4121 is provided with an upward channel 4124 for the second hanger 413 to move from the lower rail 4122 to the upper rail 4121, and the right end of the upper rail 4121 is provided with a downward channel 4125 for the second hanger 413 to move from the upper rail 4121 to the lower rail 4122. The second hanger 413 automatically falls from the upper rail 4121 to the lower rail 4122 under the action of gravity, and the upper rail 4121 and the lower rail 4122 are gradually lowered from right to left to allow the second hanger 413 to slide from right to left under the action of gravity. There are a plurality of support rods on the support frame 411 from left to right, and the height of the support rods gradually decreases from right to left, so that the lower track 4122 gradually decreases from right to left. The upper track 4121 is parallel to the ground.
[0041] The left end of the support frame 411 is provided with a lifting assembly 700 for moving the second sling 413 from the lower track 4122 to the upper track 4121. The lifting assembly 700 includes a wedge-shaped structure 710 that moves up and down along the support frame 411, and a pushing structure 720 that pushes the wedge-shaped structure 710 up and down along the left and right directions of the support frame 411; the wedge-shaped structure 710 includes an upper wedge block 711, a connecting plate 712 connected to the upper wedge block 711, and a lifting frame 713 that lifts up the second sling 413, and the lifting frame 713 is connected to the connecting plate 712. The pushing structure 720 includes a fixed seat 721 and a pushing frame 722 that moves back and forth on the fixed seat 721. The pushing frame 722 moves leftward under the pressure of the second sling 413, and pushes the wedge-shaped structure 710 up and down, so as to drive the lifting frame 713 to lift the second sling 413 to the upper track 4121.
[0042] The lower part of the support frame 411 is provided with a roller. The left end of the support frame 411 is provided with a limiting slide rail 4111 which is slidably connected with the wedge structure 710 to limit the wedge structure 710, and the wedge structure 710 is provided with a limiting slide bar 714 which cooperates with the limiting slide rail 4111; the connecting plate 712 passes through the lower track 4122 at the lower part of the support frame 411 to move up and down, and the upper wedge block 711 passes through the upper track 4121 at the upper part of the support frame 411 to move up and down; the lower track 4122 is provided with a through hole for the connecting plate 712 to pass through, and the upper track 4121 is provided with a through hole for the upper wedge block 711 to pass through. The lifting frame 713 is an L-shaped structure, the lower part of the lifting frame 713 is connected to the connecting plate 712, the upper part of the lifting frame 713 passes through the lower track 4122 and the upward channel 4124 to lift the second hanger 413 to the upper track 4121, and the lower track 4122 is provided with a through hole for the lifting frame 713 to move up and down. The support frame 411 is located outside the straight slideway 310 to avoid the prefabricated water channel 500.
[0043] The push frame 722 is provided with a lower wedge block that cooperates with the upper wedge block 711. The lower part of the push frame 722 crosses the fixed seat 721. The fixed seat 721 is provided with a through hole for the push frame 722 to move left and right, so that the push frame can be guided and moved on the fixed seat. The upper part of the push frame 722 pushes the wedge structure 710 to move upward, and the wedge structure 710 moves downward to return to its original position under the action of gravity. The support frame 411 is provided with a limit plate 4112 to prevent the wedge structure 710 from moving left and right, and the limit plate 4112 also prevents the upper wedge block 711 from slipping off.
[0044] The first lifting device 230 clamps the prefabricated water channel 500 from the left side and slides up and down along the inclined slide 210. The first lifting device 230 is driven to open and close by the electric push rod 231. The lower side wall of the inclined slide 210 is provided with a protrusion 214 for pushing the control switch 2311 of the electric push rod. When the first lifting device 230 moves to the protrusion 214, the protrusion 214 presses the control switch 2311 of the electric push rod, so that the first lifting device 230 releases the prefabricated water channel 500. The first hanger 230 includes a hanger frame 232, two hanger claws 233 symmetrically distributed, and a hanger slide rail 234 for the hanger claws 233 to slide forward and backward; a hanger groove extending in the front-to-back direction is provided at the lower part of the hanger frame 232, the hanger slide rail 234 is located in the hanger groove, and the hanger slide rail 234 limits the hanger claw 233 to prevent the hanger claw 233 from moving up and down; the upper part of the hanger claw 233 is a wedge-shaped driving part 2331, and the lower part of the hanger claw 233 is a plate-shaped clamping part 2332 to clamp the prefabricated water channel 500; the shell of the electric push rod 231 is fixed on the hanger frame 232, and the push rod 2312 of the electric push rod passes through the upper crossbeam of the hanger frame 232 from top to bottom, and The lower end of the push rod 2312 of the electric push rod is connected with a trapezoidal block 2313, which is adapted to the two driving parts 2331; the driving part 2331 is provided with an arc groove 2333, and a connecting rod 235 is connected between the lower part of the driving part 2331 and the trapezoidal block 2313, and the connecting rod 235 slides back and forth in the arc groove 2333. The trapezoidal block 2313 is rotatably connected with the connecting rod 235. The trapezoidal block 2313 moves downward to push the two driving parts 2331 to open to release the prefabricated water channel 500. The trapezoidal block 2313 moves upward, and the connecting rod 235 pulls the two driving parts 2331 closer, and the groove plate at the top of the arc groove 2333 and the arc groove 2333 limit the connecting rod 235 to achieve clamping. The control switch 2311 of the electric push rod is set on the side of the hanger frame 232 close to the inner wall of the inclined slide 210.
[0045] The second sling 413 includes a T-shaped sling seat 4131 and a scissor-type lifting claw 4132 that cooperate with the upper track 4121 and the lower track 4122. The lower part of the sling seat 4131 is provided with a suspension rod 4133 extending in the front-to-back direction, and the upper part of the scissor-type lifting claw 4132 is provided with a long hole 4134 passing through the suspension rod 4133; the sling seat 4131 drives the suspension rod 4133 to move upward, and the suspension rod 4133 moves upward along the long hole 4134, the upper part of the scissor-type lifting claw 4132 is tightened inward, and the lower part is also tightened inward to clamp the prefabricated water channel 500, the sling seat 4131 drives the suspension rod 4133 to move downward, and the scissor-type lifting claw 4132 is no longer subjected to tension and is loosened until the sling seat 4131 moves upward again. The lifting rod 4133 of the second lifting device 413 is provided with an anti-slipping member for limiting the slipping of the scissor-type lifting claw 4132. The anti-slipping member is an anti-slipping nut 4135 arranged on the outside of the scissor-type lifting claw 4132. The lower part of the scissor-type lifting claw 4132 is provided with a clamping plate 4136. The clamping plate 4136 extends to the inner bottom of the prefabricated water channel 500. When the lifting device seat 4131 moves downward, the clamping plate 4136 touches the prefabricated water channel 500 to make the lifting rod and the scissor-type lifting claw 4132 move relative to each other, and the scissor-type lifting claw 4132 is no longer subjected to tension and is loosened.
[0046] The left end of the force transmission rope 600 is connected to the first sling 230, and is wound from the bottom of the first pulley 220 and is wound from the top of the first pulley 220 to the top of the second pulley 414. After being wound from the bottom of the second pulley 414, it is connected to the second sling 413. The first sling 230 moves from left to right to pull the second sling 413 to move from left to right. The first sling 230 pulls the prefabricated water channel 500 to decelerate, and the second sling 413 pulls the prefabricated water channel 500 to assist in sliding the prefabricated water channel 500 down from the straight slide 310. The first sling 230 and the second sling 413 are both provided with rope holes 610 connected to the force transmission rope 600.
[0047] The inclined slide 210 is provided with a plurality of auxiliary rolling members 211 extending in the front-to-back direction so that the action between the prefabricated water channel 500 and the inclined slide 210 is transformed from sliding to rolling. The auxiliary rolling member 211 includes a flexible connecting rope 2111 fixed on the side panel of the inclined slide 210, a rolling sleeve 2112 and a connecting ring 2113. The connecting ring 2113 is fixed on the flexible connecting rope 2111. The rolling sleeve 2112 is rotatably connected to the connecting ring 2113. The flexible connecting ropes 2111 arranged at both ends of the auxiliary rolling member 211 buffer the prefabricated water channel 500, reduce the vibration of the prefabricated water channel 500 when it moves from the inclined slide 210 to the straight slide 310, and protect the prefabricated water channel 500.
[0048] The straight slide 310 is provided with a plurality of rolling rods 311 extending in the front-rear direction, and the rolling rods 311 are rotatably connected to the side plates of the straight slide 310 .
[0049] A slide bracket 212 is provided below the inclined slide 210, a driving wheel 213 is connected to the bottom of the slide bracket 212, a power assembly 240 is fixed below the inclined slide 210, and the driving wheel 213 is connected to the power assembly 240 to drive the inclined slide 210 to move. The power assembly 240 includes a power motor and a power motor box for protecting the power motor. The power motor of the power assembly 240 is connected to the driving wheel 213 through a sprocket. The power assembly 240 and the sprocket are both prior art, so the sprocket part is not shown in the figure.
[0050] The hoisting component 100 includes a hoisting frame 110 and a hoisting arm 120. The hoisting component 100 is detachably connected to the first sliding component 200. When used, other structures can also be used to hoist the prefabricated water channel 500 to the inclined slide 210 to ensure the continuity of the hoisting. When hoisting the first prefabricated water channel 500 and the second prefabricated water channel 500, after the prefabricated water channel 500 is hoisted to the inclined slide 210, the first hoisting device 230 is manually clamped to the prefabricated water channel 500, and the hoisting component 100 is not released first, and the prefabricated water channel 500 is assisted to gradually slide down until the prefabricated water channel 500 slides to the straight slide 310. When hoisting the subsequent prefabricated water channel 500, after the prefabricated water channel 500 is hoisted to the inclined slide 210, the first hoisting device 230 is manually clamped to the prefabricated water channel 500, and after the hoisting component 100 is released, the prefabricated water channel 500 begins to slide down. The control switch 2311 that slides down to the electric push rod is pushed by the protrusion, and the first hanger 230 is released. At this time, the lower part of the prefabricated water channel 500 has already pushed the prefabricated water channel 500 on the straight slide 310 below and slowly slides down without suddenly sliding down. After sliding down to the straight slide 310, the prefabricated water channel 500 on the inclined slide 210 has a certain driving effect on the prefabricated water channel 500 on the straight slide 310, pushing it to move toward the ground. The force of the second hanger 413 pulling the prefabricated water channel 500 will slow down the descending speed of the prefabricated water channel 500 on the inclined slide 210, thereby protecting the prefabricated water channel 500. The position of the protrusion 214 allows the first hanger 230 to reach the protrusion 214 only after the second hanger 413 slides to the descending channel 4125, thereby preventing the second hanger 413 from losing the power to move to the descending channel 4125.
[0051] Specifically, the length of the inclined slide 210 extending in the left-right direction is slightly greater than the length of a single prefabricated water channel 500, the length of the straight slide 310 is slightly shorter than the length of a single prefabricated water channel 500, the length of the upper rail 4121 and the lower rail 4122 is slightly less than the length of a single prefabricated water channel 500, and the second hanger 413 is clamped at a position slightly to the left of the right end of the prefabricated water channel 500. The upper rail 4121 and the lower rail 4122 are both suspended above the straight slide 310 so that the second hanger 413 clamps the side plate of the prefabricated water channel 500 from above.
Claims
1. Prefabricated water channel hoisting device for large farm construction, characterized in that: It comprises a hoisting component, a first sliding component, a second sliding component and a guide component; the hoisting component is detachably connected to the first sliding component and is used to hoist the prefabricated water channel onto the first sliding component, and the first sliding component, the second sliding component and the guide component are connected in sequence from left to right; The first sliding component includes an inclined slide for sliding the prefabricated water channel, a first pulley, a first sling for suspending the prefabricated water channel, and a power component for driving the inclined slide to move, wherein the inclined slide is higher on the left and lower on the right, and wider on the top and narrower on the bottom; the second sliding component includes a straight slide extending in the left and right directions, wherein the width of the straight slide is adapted to the prefabricated water channel, the right end of the inclined slide is connected to the left end of the straight slide, and the right end of the inclined slide is consistent with the left end of the straight slide; the guide component includes a first guide component and a second guide component distributed at the right end of the straight slide, wherein the first guide component includes a support frame, a guide rail, a second sling for suspending the prefabricated water channel, and a second pulley; The first pulley is located at the left end of the inclined slideway, the second pulley is located at the right end of the guide track, a force transmission rope is connected between the first sling and the second sling, and the force transmission rope is wound around the first pulley and the second pulley to realize the reversal and force transmission of the force transmission rope; The guide rail includes an upper rail and a lower rail for the second sling to slide left and right, and both the upper rail and the lower rail are provided with avoidance grooves for avoiding the second sling to slide back and forth; an upward channel for the second sling to move from the lower rail to the upper rail is provided at the left end of the upper rail, and a downward channel for the second sling to move from the upper rail to the lower rail is provided at the right end of the upper rail. The second sling automatically falls from the upper rail to the lower rail under the action of gravity, and the lower rail is gradually lowered from right to left to allow the second sling to slide from right to left under the action of gravity; The left end of the support frame is provided with a lifting assembly for moving the second hanger from the lower track to the upper track, and the lifting assembly includes a wedge-shaped structure that moves up and down along the support frame, and a pushing structure along the left and right directions of the support frame for pushing the wedge-shaped structure to move up and down; the wedge structure includes an upper wedge-shaped block, a connecting plate connected to the upper wedge-shaped block, and a lifting frame for jacking up the second hanger; the pushing structure includes a fixed seat and a pushing frame that moves back and forth on the fixed seat, and the pushing frame is provided with a lower wedge-shaped block that cooperates with the upper wedge-shaped block. The pushing frame moves to the left under the pressure of the second hanger and pushes the wedge-shaped structure to move up and down, so as to drive the lifting frame to jack up the second hanger to the upper track; The first lifting device clamps the prefabricated water channel to be lifted from the left side and slides up and down along the inclined slide. The first lifting device is driven to open and close by an electric push rod. The side wall of the lower part of the inclined slide is provided with a protruding part of a control switch for pushing the electric push rod. The second sling includes a T-shaped sling seat and a scissor-type lifting claw which cooperate with the upper track and the lower track. A sling rod is arranged at the lower part of the sling seat, and a long hole passing through the sling rod is arranged at the upper part of the scissor-type lifting claw; the sling seat drives the sling rod to move upward, the sling rod moves upward along the long hole, the upper part of the scissor-type lifting claw is tightened inward, and the lower part is also tightened inward to clamp the prefabricated water channel, the sling seat drives the sling rod to move downward, and the scissor-type lifting claw is no longer subjected to tension and is loosened until the sling seat moves upward again.
2. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The lifting rod of the second lifting device is provided with an anti-slip part for limiting the slipping of the scissor-type lifting claw, and the lower part of the scissor-type lifting claw is provided with a clamping plate, which extends to the inner bottom of the prefabricated water channel. When the lifting device seat moves downward, the clamping plate touches the prefabricated water channel to make the lifting rod and the scissor-type lifting claw move relative to each other, and the scissor-type lifting claw is no longer subjected to tension and is loosened.
3. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The left end of the support frame is provided with a limiting slide rail which is slidably connected with the wedge structure to limit the wedge structure, and the wedge structure is provided with a limiting slide bar which cooperates with the limiting slide rail; the connecting plate passes through the lower part of the support frame and moves up and down, and the upper wedge block passes through the upper part of the support frame and moves up and down; the lifting frame is an L-shaped structure, the lower part of the lifting frame is connected with the connecting plate, and the upper part of the lifting frame passes through the lower track and the upward channel to lift the second hoist to the upper track.
4. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The pushing frame is an L-shaped frame, the lower part of the pushing frame crosses the fixed seat, the upper part of the pushing frame pushes the wedge-shaped structure to move upward, and the wedge-shaped structure moves downward to return to its original position under the action of gravity. A limiting plate is provided on the support frame to prevent the wedge-shaped structure from moving left and right.
5. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The first sling comprises a sling frame, two symmetrically distributed sling claws and a sling slide rail for the sling claws to slide forward and backward; a sling groove extending in the front-back direction is provided at the lower part of the sling frame, the sling slide rail is located in the sling groove and the sling slide rail limits the sling claws to prevent the sling claws from moving up and down; the upper part of the sling claw is a wedge-shaped driving part, and the lower part of the sling claw is a plate-shaped clamping part to clamp the prefabricated water channel; the electric push rod housing is fixed on the sling frame, the push rod of the electric push rod passes through the upper crossbeam of the sling frame from top to bottom, and the electric push rod A trapezoidal block is connected to the lower end of the push rod of the rod, and the trapezoidal block is adapted to the two driving parts; an arc groove is arranged on the driving part, and a connecting rod is connected between the lower part of the driving part and the trapezoidal block, and the connecting rod slides back and forth in the arc groove, and the trapezoidal block is rotatably connected to the connecting rod. The trapezoidal block moves downward to push the two driving parts to open to loosen the prefabricated water channel, and the trapezoidal block moves upward, and the connecting rod pulls the two driving parts closer, and the groove plate at the top of the arc groove and the arc groove limit the connecting rod to achieve clamping, and the control switch of the electric push rod is arranged on the side of the hanger frame close to the inner wall of the inclined slide.
6. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The left end of the force transmission hoisting rope is connected to the first sling, which is wound in from the bottom of the first pulley and out from the top of the first pulley, extending to the top of the second pulley, and then connected to the second sling after winding out from the bottom of the second pulley. The first sling moves from left to right and pulls the second sling to move from left to right. The first sling holds the prefabricated water channel to slow down, and the second sling holds the prefabricated water channel to assist in sliding the prefabricated water channel down from the straight slide.
7. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The inclined slide is provided with a plurality of auxiliary rolling members extending in the front-to-back direction so that the action between the prefabricated water channel and the inclined slide is transformed from sliding to rolling. The auxiliary rolling members include a flexible connecting rope fixed on the side panel of the inclined slide, a rolling sleeve and a connecting ring. The connecting ring is fixed on the flexible connecting rope, and the rolling sleeve is rotatably connected to the connecting ring. The flexible connecting ropes arranged at both ends of the auxiliary rolling members buffer the prefabricated water channel, reduce the vibration of the prefabricated water channel when it moves from the inclined slide to the straight slide, and protect the prefabricated water channel.
8. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The straight slide is provided with a plurality of rolling rods extending in the front-rear direction, and the rolling rods are rotatably connected with the side plates of the straight slide.
9. The prefabricated water channel hoisting device for large farm construction according to claim 1 is characterized in that: The first sling and the second sling are both provided with a sling hole connected with a force transmission sling rope.
Citation Information
Patent Citations
Multifunctional lifting appliance for construction of prefabricated subway station
CN114955847A
Construction pipeline laying device for municipal construction and using method thereof
CN115126932A