Preparation method, device and equipment of sponge city construction chart and storage medium

Through standardized processing and multi-dimensional review of sponge city construction map preparation methods, the problem of low project identification and review efficiency caused by irregular sponge city construction maps is solved, and the rationality and review efficiency of sponge city projects are improved.

CN119273803APending Publication Date: 2025-01-07WUHAN NEWFIBER OPTOELECTRONICS TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411343551.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

The irregularity of sponge city construction drawings leads to low efficiency in project identification and review, and it is difficult for the existing technology to effectively process and review various types of drawings, resulting in problems such as data sharing and calculation errors.

Method used

Provide a preparation method for sponge city construction drawings. By obtaining the review drawings, standardizing the processing according to preset standards, conducting rationality review of output, environment and economic benefits, generating the overall project review results, and passing them if necessary Particle swarm model and Pareto optimization strategy optimization plan, update the target sponge city construction map.

Benefits of technology

It improves the rationality and review efficiency of sponge city projects, avoids the problem of low identification and review efficiency caused by irregular data, ensures structured data processing and multi-dimensional rationality review, and optimizes the project plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119273803A_ABST
    Figure CN119273803A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of city planning, in particular to a sponge city construction drawing preparation method, device and equipment and a storage medium, and the method comprises the steps: obtaining a plurality of initial city construction drawings and drawing review parameters in advance, and carrying out the standardization processing of the review drawing according to a preset standard drawing strategy; according to the method, the standard city construction drawing is obtained, and the data in the standard drawing is converted into the structured data through drawing analysis, so that the rationality of a sponge city project can be improved, the technical difficulty of a review user is reduced, and the manual review cost is reduced through performing multi-dimensional rationality review on the standard city construction drawing; the examination efficiency is improved, and the project approval time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of urban planning, and in particular to a method, device, equipment and storage medium for preparing a sponge city construction map. Background Art

[0002] In recent years, the frequency of rainstorms and floods and the extent of their impact have shown a significant upward trend. In order to reduce the losses caused by these rainstorms to cities, a sponge city construction plan has been proposed. Sponge city is an urban design concept that aims to effectively manage and utilize urban rainfall through the combination of urban infrastructure and natural systems, thereby enhancing the city's ability to adapt to climate change.

[0003] The construction of sponge cities not only helps reduce urban waterlogging and improve the urban water environment, but also promotes biodiversity and urban ecological balance. Therefore, sponge city construction has become one of the important directions for sustainable urban development.

[0004] However, during the construction of sponge cities, the design unit needs to complete the design plan of the sponge city construction project and submit it to the regulatory unit. The regulatory unit also needs to review the completion of the plan indicators, environmental suitability, investment rationality, etc. The review process has very high professional and technical requirements for the reviewers. In particular, when the design unit submits the construction drawings of the sponge city, it may submit multiple types of drawings, which is not convenient for the system to identify and the user to view, and also brings more workload to the subsequent review.

[0005] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0006] The main purpose of the present invention is to provide a method, device, equipment and storage medium for preparing sponge city construction drawings, aiming to solve the technical problem in the prior art that sponge city construction drawings are not standardized, resulting in low efficiency in project identification and review.

[0007] To achieve the above object, the present invention provides a method for preparing a sponge city construction map, the method comprising the following steps: Obtain the approval drawings for sponge city projects; Standardize the submitted drawings according to a preset standard mapping strategy to obtain a standard urban construction drawing; Conducting a rationality review on the standard urban construction map, including an output benefit review, an environmental benefit review, and an economic benefit review; Generate the overall review results of the project based on the review results of output benefits, environmental benefits and economic benefits; When the overall review result of the project is passed, the target sponge city construction map will be output.

[0008] Optionally, the rationality review of the standard urban construction map includes: Extracting drawing review parameters from the submitted drawings; Based on the drawing review parameters and the sponge city planning information, determine the annual runoff total control rate, annual runoff pollution control rate, hard surface rate, guest water treatment index and vertical rationality index; An output benefit review is conducted based on the annual runoff volume control rate, annual runoff pollution control rate, hard surface rate, guest water treatment index and vertical rationality index to obtain the output benefit review result.

[0009] Optionally, the rationality review of the standard urban construction map further includes: Based on the drawing review parameters and the sponge city planning information, determine the facility selection information, the allocation ratio of various facilities, the evaluation index of the uniform distribution of various facilities, and the index of nearby rainwater treatment; An environmental benefit review is conducted based on facility selection information, allocation ratios of various types of facilities, evaluation indicators for uniform distribution of various types of facilities, and indicators for nearby rainwater treatment, and the results of the environmental benefit review are obtained.

[0010] Optionally, the rationality review of the standard urban construction map further includes: Determine the input-output ratio and cost range based on the drawing review parameters and the set sponge city planning information; An economic benefit review is conducted based on the input-output ratio and cost range to obtain the economic benefit review results.

[0011] Optionally, after generating the project overall review result according to the output benefit review result, the environmental benefit review result and the economic benefit review result, the process further includes: When the overall review result of the project is not passed, a randomly combined sponge city project plan is generated through the preset particle swarm model; Calculate the annual runoff control rate and cost of each sponge city project plan; The target sponge city project plan is determined by the Pareto optimization strategy based on the annual runoff control rate and cost; Update the target sponge city construction map according to the target sponge city project plan.

[0012] Optionally, various plots, zones, underlying surfaces, sponge facilities and marking specifications in the drawings to be reviewed are determined, and parameters to be reviewed in the drawings to be reviewed are extracted; Generate target layers of corresponding categories according to the graphics of various plots, partitions, underlying surfaces and sponge facilities; Annotate each target layer according to the annotation specification and the parameters to be reviewed; Integrate the labeled target layers to obtain a standard urban construction map.

[0013] In addition, to achieve the above-mentioned purpose, the present invention also proposes a device for preparing a sponge city construction map, the device for preparing a sponge city construction map comprising: Acquisition module, used to obtain the approval drawings of sponge city projects; A processing module, used to perform standardization processing on the submitted drawings according to a preset standard mapping strategy to obtain a standard urban construction drawing; A review module, used for conducting a rationality review on the standard urban construction map, wherein the rationality review includes an output benefit review, an environmental benefit review, and an economic benefit review; A generation module is used to generate a project overall review result based on the output benefit review result, the environmental benefit review result and the economic benefit review result; The output module is used to output the target sponge city construction map when the overall review result of the project is passed.

[0014] In addition, to achieve the above-mentioned purpose, the present invention also proposes a device for preparing a sponge city construction map, the device for preparing a sponge city construction map comprising: a memory, a processor, and a program for preparing a sponge city construction map stored in the memory and executable on the processor, the program for preparing a sponge city construction map being configured to implement the steps of the method for preparing a sponge city construction map as described above.

[0015] In addition, to achieve the above-mentioned purpose, the present invention also proposes a storage medium, on which a program for preparing a sponge city construction map is stored. When the program for preparing a sponge city construction map is executed by a processor, the steps of the method for preparing a sponge city construction map as described above are implemented.

[0016] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the method for preparing a sponge city construction map as described above.

[0017] One or more technical solutions proposed in the present invention have at least the following technical effects: The present invention discloses a method for preparing a sponge city construction drawing, the method for preparing a sponge city construction drawing comprising: obtaining a submission drawing of a sponge city project; standardizing the submission drawings according to a preset standard mapping strategy to obtain a standard city construction drawing; conducting a rationality review on the standard city construction drawing, the rationality review including an output benefit review, an environmental benefit review and an economic benefit review, by pre-acquiring a number of initial city construction drawings and drawing review parameters, and then standardizing the submission drawings according to a preset standard mapping strategy, so that the data in the submission drawings are converted into structured data to obtain a standard city construction drawing, and finally, by conducting a rationality review on the standard city construction drawings in multiple dimensions, the rationality of the sponge city project is improved, and the technical problem of low efficiency of project identification and review caused by the non-standardization of sponge city construction drawings in the prior art is avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0020] Figure 1 It is a schematic flow chart of a first embodiment of a method for preparing a sponge city construction map according to the present invention; Figure 2 The present invention is a method for preparing a sponge city construction map - a schematic diagram of an example of a city construction map; Figure 3 This is a schematic diagram of an example of an online drawing operation interface of an embodiment of a method for preparing a sponge city construction map of the present invention; Figure 4 It is a schematic flow chart of a second embodiment of a method for preparing a sponge city construction map according to the present invention; Figure 5 A schematic diagram of an annual runoff volume control rate evaluation process of an embodiment of a method for preparing a sponge city construction map of the present invention; Figure 6 A schematic diagram of an annual runoff pollution control rate evaluation process of an embodiment of a method for preparing a sponge city construction map of the present invention; Figure 7 A schematic diagram of a process for evaluating the treatment of guest water indicators in accordance with an embodiment of a method for preparing a sponge city construction map of the present invention; Figure 8 A schematic diagram of the suitability standard for facility selection in an embodiment of a method for preparing a sponge city construction map of the present invention; Fig. 9 A schematic diagram of the recommended scale standards for facilities in an embodiment of a method for preparing a sponge city construction map of the present invention; Fig.10 A schematic diagram of a cost interval evaluation process of an embodiment of a method for preparing a sponge city construction map of the present invention; Fig.11 A schematic diagram of configuration rules for project overall evaluation rules of an embodiment of a method for preparing a sponge city construction map of the present invention; Fig.12 This is a structural block diagram of the first embodiment of the device for preparing a sponge city construction map according to the present invention.

[0021] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0022] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0023] Based on this, the embodiment of the present invention provides a method for preparing a sponge city construction map, referring to Figure 1 , Figure 1 The present invention is a schematic flow chart of a first embodiment of a method for preparing a sponge city construction map.

[0024] In this embodiment, the method for preparing the sponge city construction map includes: Step S10: Obtain the approval drawings of the sponge city project.

[0025] It should be noted that the execution subject of this embodiment may be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device, a terminal device, etc. capable of realizing the above functions. The following takes the terminal device as an example to illustrate this embodiment and the following embodiments.

[0026] It should be noted that sponge city is an urban design concept that aims to effectively manage and utilize urban rainfall and enhance the city's adaptability to climate change through the combination of urban infrastructure and natural systems. The construction of sponge cities not only helps to reduce urban waterlogging and improve the urban water environment, but also promotes biodiversity and urban ecological balance. Therefore, sponge city construction has become one of the important directions for sustainable urban development.

[0027] The approval drawings of the sponge city project are not simple topographic, zoning and structural diagrams of various facilities, but project drawings with corresponding annotation information for each type of layer, wherein each layer corresponds to a plot, zone, underlying surface and sponge facility. The annotation information includes but is not limited to the runoff coefficient, effective depth, pollution removal rate, elevation of the low point corresponding to the service area, inlet elevation, facility bottom elevation and overflow elevation, etc., depending on the type of layer. This embodiment does not impose specific restrictions on this.

[0028] The drawings submitted for review refer to CAD drawings, Word document tabular drawings and other types of drawings provided by the design unit. Due to the data isolation of drawings in different formats during review, effective data sharing cannot be carried out, and for some complex facilities, the cost cannot be accurately calculated.

[0029] The parameters that need to be reviewed for the drawings submitted for review include but are not limited to the designed annual runoff volume control rate, annual runoff pollution control rate, hard surface rate, guest water treatment index, vertical rationality index, facility selection information, allocation ratio of various facilities, evaluation index of uniform distribution of various facilities, rainwater local treatment index, input-output ratio and cost range. The above index data can be used to evaluate the sponge city project designed by the design unit, and then determine whether it meets the local sponge city planning requirements.

[0030] Step S20: Standardizing the submitted drawings according to a preset standard mapping strategy to obtain standard city construction drawings.

[0031] The preset standard mapping strategy refers to setting the coordinate system, layer name specifications, layer mapping requirements, and annotation requirements, so as to structure the unstructured data, establish a facility ledger, lay the foundation for the information management of the sponge facility life cycle, and allow the data to play its value in the evaluation and operation and maintenance management stages.

[0032] The traditional review is that designers convert the design parameters in the drawings into a standardized calculation book. It is difficult to match the parameters in the drawings with those in the calculation book, and there may be calculation errors or cheating. Standardizing the initial urban construction drawings based on preset standard mapping strategies can eliminate this situation. The parameters are identified from the graphics and annotations of the drawings. The drawings can visually magnify the existing problems, and the chances of errors and cheating will be much smaller. In addition, during on-site verification, the drawings can be used to better verify the existence of facilities, whether the scale is consistent, and whether there are errors in the parameters.

[0033] Furthermore, the drawings submitted for examination shall at least include: graphics and annotation information of the plot, subdivision, underlying surface and sponge facilities; The standardization of the submitted drawings according to the preset standard mapping strategy to obtain standard urban construction drawings includes: Determine the various plots, zones, underlying surfaces, sponge facilities and marking specifications in the drawings submitted for review, and extract the parameters to be reviewed in the drawings submitted for review; Generate target layers of corresponding categories according to the graphics of various plots, partitions, underlying surfaces and sponge facilities; Annotate each target layer according to the annotation specification and the parameters to be reviewed; Integrate the labeled target layers to obtain a standard urban construction map.

[0034] In the specific implementation, refer to Figure 2 The plot contains two layers: graphics and text. The partition contains first-level partition, second-level partition, first-level partition annotation, and second-level partition annotation layer. The partition name is marked. The underlying surface is divided into many categories. Each type is a layer. Each type of underlying surface corresponds to a annotation layer to place annotation information, marking the runoff coefficient and its value. The facilities are also divided into many categories. Each type is a layer. Each type of facility corresponds to a annotation layer to place annotation information, marking the effective depth and its value, the pollution removal rate and its value, the service area corresponding to the low point elevation and its value, the inlet elevation and its value, the facility bottom elevation and its value, and the overflow elevation and its value. The layer can be generated by importing a .las file. All graphics are closed polylines and cannot be hollow polygons to prevent misjudgment.

[0035] Step S30: Conducting a rationality review on the standard urban construction map, wherein the rationality review includes an output benefit review, an environmental benefit review, and an economic benefit review.

[0036] It should be noted that the preparation of sponge city construction maps refers to labeling each layer based on the annotation information of each layer, so that more accurate project data can be provided in the subsequent review stage, and the calculation of annual runoff control rate and cost can be more efficient.

[0037] Furthermore, in this embodiment, the produced target sponge city construction drawings can also be modified to eliminate errors, omissions or areas that need to be modified in the process of producing standard drawings, thereby improving the accuracy of the drawings.

[0038] Specifically, when modifying the target sponge city construction drawings, the modifications can be made online, and the historical versions of the drawings can be managed online to achieve data sharing and avoid data loss. Figure 3 , Figure 3This is a schematic diagram of an example of the online drawing operation interface in this embodiment. Modify the drawings that need to be modified, such as moving, scaling, and rotating drawings that do not have a unified coordinate system, placing graphic objects on the correct layers, modifying graphic and annotation information according to the drawing format, closing unclosed polylines, dividing hollow polylines, adding, deleting, and modifying layers, graphic objects, and annotations, so that the elements that need to be reviewed are correctly displayed in the drawings, thereby improving the efficiency of subsequent reviews.

[0039] Step S40: Generate the overall project review result according to the output benefit review result, the environmental benefit review result and the economic benefit review result.

[0040] Step S50: When the overall review result of the project is passed, the target sponge city construction map is output It should be noted that the rationality review of standard urban construction drawings refers to the review of standard urban construction drawings in four dimensions, namely, output benefit review, environmental benefit review, economic benefit review and project overall review. Referring to Table 1, the review indicators of these four dimensions include but are not limited to annual runoff total control rate, annual runoff pollution control rate, hard ground rate, guest water treatment index, vertical rationality index, facility selection information, allocation ratio of various facilities, evaluation index of uniform distribution of various facilities, rainwater nearby treatment index, input-output ratio, cost range and project overall evaluation results.

[0041] Table 1

[0042] This embodiment obtains several initial urban construction drawings and drawing review parameters in advance, and then standardizes the drawings submitted for review according to a pre-set standard drawing strategy, so that the data in the drawings submitted for review are converted into structured data to obtain standard urban construction drawings. Finally, by conducting a rationality review of the standard urban construction drawings in multiple dimensions, the rationality of the sponge city project is improved, avoiding the technical problem of non-standard sponge city construction drawings in the prior art, which leads to low efficiency in project identification and review.

[0043] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can be referred to the above introduction, and will not be repeated in the following. Figure 4 , step S30, comprising: Step S301: extracting drawing review parameters from the submitted drawings.

[0044] Step S302: Based on the drawing review parameters and the set sponge city planning information, determine the annual runoff volume control rate, annual runoff pollution control rate, hard ground rate, guest water treatment index and vertical rationality index.

[0045] Step S303: conducting an output benefit review based on the annual runoff volume control rate, annual runoff pollution control rate, hard surface rate, guest water treatment index, and vertical rationality index to obtain an output benefit review result.

[0046] It should be noted that the drawing review parameters refer to the basic attributes of various plots, divisions, underlying surfaces and sponge facilities in the submitted drawings, such as area, runoff coefficient, size, length and other information. Since the area, runoff coefficient, size, length and other information in the submitted drawings from different sources may have inconsistencies in unit formats, in order to improve the review accuracy during the subsequent output benefit review, environmental benefit review and economic benefit review, the drawing review parameters in the submitted drawings can be extracted to calculate indicators such as annual runoff total control rate, annual runoff pollution control rate, hard ground rate, guest water disposal index and vertical rationality.

[0047] In specific implementation, output benefits refer to encouraging projects with conditions to complete more rainwater and pollutant control, reduce hard surfaces, effectively handle guest water from sister projects, and vertically ensure that rainwater can be collected and stored, and the benefit indicators of rainwater exceeding the standard can be discharged.

[0048] Among them, the annual runoff total volume control rate refers to encouraging qualified projects to complete more rainwater control. The more completed, the higher the evaluation level. By comparing the designed annual runoff total volume control rate with the target annual runoff total volume control rate, the excellent, medium and poor levels of the annual runoff total volume control rate indicator can be evaluated.

[0049] The target annual runoff control rate is the project target specified during sponge city planning; the design annual runoff control rate is the design rainfall corresponding to the design storage capacity obtained by converting the annual runoff control rate and the design rainfall.

[0050] Specifically, refer to Figure 5 , Figure 5 This is a schematic diagram of the evaluation process of the total annual runoff control rate in this embodiment. The relationship between the total annual runoff control rate and the design rainfall is provided by the sponge city planning of each city; the design rainfall H (mm) corresponding to the design storage capacity is obtained by the comprehensive runoff coefficient φ (dimensionless), the design storage capacity V (m3), and the project area m2 through V=HφF; the comprehensive runoff coefficient is obtained by weighting the runoff coefficients of different underlying surfaces of the project by area; the design storage capacity is obtained by adding up the areas of different facilities × effective depths; the area is obtained by adding up different underlying surfaces; the underlying surface and facility parameters are identified in the construction drawings.

[0051] The annual runoff pollution control rate means that projects with conditions are encouraged to complete more pollutant control. The more completed, the higher the evaluation level. By comparing the designed annual runoff pollution control rate and the target annual runoff pollution control rate, the excellent, medium and poor levels of the annual runoff pollution control rate indicator are evaluated.

[0052] Among them, reference Figure 6 , Figure 6 This is a schematic diagram of the mid-term runoff pollution control rate evaluation process in this embodiment. The target annual runoff pollution control rate is the project target specified in the sponge city planning. The design annual runoff pollution control rate is calculated in the previous step and multiplied by the design comprehensive pollution removal rate. The design comprehensive pollution removal rate is obtained by weighting the pollution removal rates of different facilities by the service area. The facility parameters are identified in the construction drawing.

[0053] The hard ground rate means that projects are encouraged to reduce hard ground. For plots with relatively high hardening rates, green roofs and permeable paving facilities can be used to reduce hard ground. By comparing the hard ground rate of the designed scheme and the target hard ground rate, the excellent, medium and poor grades of the hard ground rate index are evaluated.

[0054] The target hard ground rate is the project target specified in the sponge city planning, and the design hard ground rate is the hard ground in the underlying surface type divided by the total area of ​​the underlying surface; the underlying surface parameters are identified from the construction drawings.

[0055] The guest water treatment index refers to encouraging qualified projects to effectively treat guest water from sister projects. By comparing the designed guest water volume and the target storage volume, the excellent, medium and poor levels of the guest water treatment index are evaluated.

[0056] Among them, reference Figure 7 , Figure 7 Schematic diagram of the evaluation process of guest water treatment indicators in this embodiment. The designed guest water volume is declared by the plan and is generally a fixed value; the target storage volume V (m3) is obtained by V=HφF through the underlying surface runoff coefficient φ (dimensionless), the designed rainfall H (mm), and the underlying surface area F (m2); the underlying surface runoff coefficient is obtained by weighting the runoff coefficients of different underlying surfaces of the project by area; the underlying surface area is obtained by adding different underlying surfaces; the designed rainfall H (mm) is obtained by the target annual runoff control rate from the relationship between the annual runoff control rate and the designed rainfall; the relationship between the annual runoff control rate and the designed rainfall is provided by the sponge city planning of each city; the target annual runoff control rate is the project target specified in the sponge city planning; the underlying surface parameters are identified in the construction drawing.

[0057] The vertical rationality index refers to the vertical direction of the project facilities to ensure that rainwater can be collected and stored, and that excess rainwater can be discharged. The system judgment logic is that the elevation of the lowest point of the service area ≥ the elevation of the inlet ≥ the elevation of the overflow ≥ the elevation of the bottom of the facility + the effective depth. The facility elevation is identified in the drawings. If all the facility elevations are reasonable, the project vertical direction is reasonable, otherwise there is irrationality.

[0058] Furthermore, the rationality review of the standard urban construction map also includes: Based on the drawing review parameters and sponge city planning information, determine the facility selection information, the allocation ratio of various facilities, the evaluation index of the uniform distribution of various facilities, and the index of nearby rainwater treatment; An environmental benefit review is conducted based on facility selection information, allocation ratios of various types of facilities, evaluation indicators for uniform distribution of various types of facilities, and indicators for nearby rainwater treatment, and the results of the environmental benefit review are obtained.

[0059] In specific implementation, environmental benefits are mainly used for the combination of blue, green and gray in sponge city projects to ensure the diversity of facilities, avoid excessive single types, and ensure the suitability of facilities and the environment; use green facilities nearby and dispersedly to treat rainwater and pollutants, maximize land use benefits, reduce construction costs, reduce transmission costs and vertical transmission risks, and disperse overflow rainwater discharge.

[0060] Specifically, refer to Figure 8 , Figure 8 It is a schematic diagram of the suitability standards for facility selection. The facility selection information is used to ensure that the facility selection is suitable for the project type. When there are facilities that are not suitable for selection in the declared project, the facility selection is judged to be unreasonable and the facility parameters are identified in the drawings.

[0061] refer to Fig. 9 , Fig. 9 It is a standard schematic diagram of the recommended proportion of facilities. The proportion of facility allocation is used to ensure the diversity of facilities, avoid too much single type, and ensure the suitability of facilities and the environment. Calculate the proportion of sunken green space rate to green space, the proportion of green roof to green space, and the proportion of permeable pavement to impermeable pavement in the application plan, and compare them with the corresponding index requirements of different types of new construction and reconstruction projects. If they are all greater, the facility allocation ratio is reasonable, otherwise it is unreasonable. The underlying surface and facility parameters are identified in the drawings.

[0062] The evaluation index of uniform distribution of facilities refers to allocating the index to each zone and each facility, making full use of the corner land, maximizing the land use efficiency of the last square meter, calculating whether the facility allocation ratio of each zone is reasonable, and statistically calculating the proportion of reasonable zones in the total number of zones, and judging the excellent, good, medium and poor by percentage.

[0063] The index of nearby rainwater treatment refers to the index of using green facilities to treat rainwater and pollutants nearby and dispersedly, which is used to maximize the land use benefits, reduce construction costs, reduce transmission costs and vertical transmission risks, and disperse the overflow rainwater. Calculate the annual runoff control rate of each sub-district, whether it meets the standard, and calculate the proportion of sub-districts that meet the standard in the total number of sub-districts, and judge the excellent, good, medium and poor by percentage.

[0064] Furthermore, the rationality review of the standard urban construction map also includes: Determine the input-output ratio and cost range based on the drawing review parameters and sponge city planning information; An economic benefit review is conducted based on the input-output ratio and cost range to obtain the economic benefit review results.

[0065] It is understandable that economic benefits are used to evaluate output, assess investment benefits, and optimize the efficiency of capital utilization.

[0066] The input-output ratio is a real completion indicator of the sponge city project. At the same time, the investment should not be too high or too low. The output benefit should be included in the economic benefit evaluation, and the investment in unit volume of rainwater treatment should be evaluated. The investment ratio should be compared with that of similar high-quality projects to evaluate the level.

[0067] The input-output ratio is calculated by dividing the declared sponge investment by the designed storage capacity. The recommended input-output ratio is calculated by the average input-output ratio of the same type of new or expanded projects with high input-output ratio evaluation levels that have been evaluated in the system. The designed storage capacity is the same as the annual runoff pollution control rate evaluation. The more projects evaluated in the system, the more reasonable the input-output ratio evaluation is, and the more investment guidance it has, thereby optimizing the sponge investment benefits at a macro level and improving the efficiency of sponge capital utilization.

[0068] refer to Fig.10 , Fig.10 This is a schematic diagram of the cost range evaluation process. The cost range refers to a certain range in the unit cost of facilities. The total cost range can be calculated according to the scale of the facilities used and compared with the declared sponge funds. When the declared funds are not within the range, it is necessary to focus on the sponge investment.

[0069] The overall evaluation of the project refers to the overall evaluation recommendation conclusion given based on the above 11 evaluation conclusions. The overall evaluation can be dynamically configured, and which evaluation levels of the sub-indicators can be recommended for passing can be configured according to customer requirements. Fig.11 , Fig.11 Configure a rule diagram for the project overall evaluation rules. When all these requirements are met, the sub-indicator evaluation is completed, and the system will automatically give a conclusion on whether the recommended project has passed the review.

[0070] Furthermore, after generating the overall review result of the project according to the review results of the output benefits, the review results of the environmental benefits and the review results of the economic benefits, the following is further included: When the overall review result of the project is not passed, a randomly combined sponge city project plan is generated through the preset particle swarm model; Calculate the annual runoff control rate and cost of each sponge city project plan; The target sponge city project plan is determined by the Pareto optimization strategy based on the annual runoff control rate and cost; Update the target sponge city construction map according to the target sponge city project plan.

[0071] It is worth noting that in the automatic review, when it is found that the annual runoff control rate of a sub-district does not meet the standard, the optimization program will use the facilities in the facility library and randomly combine them at different scales to combine 30 sets of plans. Each set of plans will calculate the annual runoff control rate and cost of the sub-district, and use Pareto optimization to find the best plan. Then, the 30 plans will be combined for the second time. The combination of each of the 30 plans for the second time uses the particle swarm algorithm to make the plan close to the optimization plan found last time, and then the best plan will be selected from the 30 plans. This will be repeated 30 times to find the plan with the annual runoff control rate meeting the standard and the lowest cost, which is the best plan. When combining facilities, the selection of facilities and the recommended proportion of facilities will be considered not less than the recommended proportion.

[0072] In the specific implementation, the optimization plan outputs the type, scale, and storage capacity of the LID facilities. The plan achieves the lowest investment cost while meeting the indicators. The optimized zoning facility scale will be written on the corresponding zoning drawings for intuitive reference by design reviewers, and can be directly exported to CAD files for printing to improve the visualization of the modified plan.

[0073] This embodiment conducts a rationality review on the standard urban construction drawings, and the rationality review includes an output benefit review, an environmental benefit review, and an economic benefit review; generates a project overall review result based on the output benefit review result, the environmental benefit review result, and the economic benefit review result; when the project overall review result is passed, conducts a rationality review on the standard urban construction drawings, and the rationality review includes an output benefit review, an environmental benefit review, and an economic benefit review. Through reviews in multiple different dimensions, the review accuracy of the target sponge city construction drawings is improved, and the feasibility of the sponge city project is improved.

[0074] This application also provides a device for preparing a sponge city construction map, please refer to Fig.12 , the device for preparing the sponge city construction map comprises: Obtain module 10, obtain the approval drawings of the sponge city project.

[0075] The processing module 20 is used to perform standardization processing on the submitted drawings according to a preset standard drawing strategy to obtain a standard urban construction drawing.

[0076] The preparation module 30 is used to conduct a rationality review on the standard urban construction map, wherein the rationality review includes an output benefit review, an environmental benefit review, and an economic benefit review.

[0077] The generation module 40 is used to generate the project overall review result according to the output benefit review result, the environmental benefit review result and the economic benefit review result.

[0078] The output module 50 is used to output the target sponge city construction map when the overall review result of the project is passed.

[0079] This embodiment obtains several initial urban construction drawings and drawing review parameters in advance, and then standardizes the drawings submitted for review according to a pre-set standard drawing strategy, so that the data in the drawings submitted for review are converted into structured data to obtain standard urban construction drawings. Finally, by conducting a rationality review of the standard urban construction drawings in multiple dimensions, the rationality of the sponge city project is improved, avoiding the technical problem of non-standard sponge city construction drawings in the prior art, which leads to low efficiency in project identification and review.

[0080] In one embodiment, the preparation module 30 is also used to extract the drawing review parameters in the submitted drawings; determine the annual runoff control rate, annual runoff pollution control rate, hard ground rate, guest water treatment index and vertical rationality index based on the drawing review parameters and set sponge city planning information; conduct an output benefit review based on the annual runoff control rate, annual runoff pollution control rate, hard ground rate, guest water treatment index and vertical rationality index to obtain the output benefit review result.

[0081] In one embodiment, the preparation module 30 is also used to determine the facility selection information, the allocation ratio of each type of facility, the evaluation index of the uniform distribution of each type of facility, and the rainwater treatment index nearby based on the drawing review parameters and the set sponge city planning information; based on the facility selection information, the allocation ratio of each type of facility, the evaluation index of the uniform distribution of each type of facility, and the rainwater treatment index nearby, an environmental benefit review is conducted to obtain the environmental benefit review results.

[0082] In one embodiment, the preparation module 30 is also used to determine the input-output ratio and cost range based on the drawing review parameters and the set sponge city planning information; perform an economic benefit review based on the input-output ratio and the cost range to obtain an economic benefit review result.

[0083] In one embodiment, the preparation module 30 is also used to generate a randomly combined sponge city project plan through a preset particle swarm model when the overall review result of the project is not passed; calculate the annual total runoff control rate and cost of each sponge city project plan respectively; determine the target sponge city project plan through the Pareto optimization strategy based on the annual total runoff control rate and cost; and update the target sponge city construction map based on the target sponge city project plan.

[0084] In one embodiment, the processing module 20 is also used to determine the various types of plots, zones, underlying surfaces, sponge facilities and marking specifications in the review drawings, and extract the parameters to be reviewed in the review drawings; generate target layers of corresponding categories based on the graphics of the various types of plots, zones, underlying surfaces and sponge facilities; mark each target layer according to the marking specifications and the parameters to be reviewed; and integrate the marked target layers to obtain a standard urban construction drawing.

[0085] The present application provides a device for preparing a sponge city construction map, and the device for preparing a sponge city construction map includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for preparing a sponge city construction map in the above-mentioned embodiment one.

[0086] The equipment for preparing sponge city construction drawings provided by the present application adopts the method for preparing sponge city construction drawings in the above embodiment, which can solve the technical problems of preparing sponge city construction drawings. Compared with the prior art, the beneficial effects of the equipment for preparing sponge city construction drawings provided by the present application are the same as the beneficial effects of the method for preparing sponge city construction drawings provided by the above embodiment, and the other technical features of the equipment for preparing sponge city construction drawings are the same as the features disclosed in the method of the previous embodiment, which will not be described in detail here.

[0087] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0088] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0089] The present application provides a computer-readable storage medium having computer-readable program instructions (i.e., computer programs) stored thereon, and the computer-readable program instructions are used to execute the method for preparing a sponge city construction map in the above-mentioned embodiment.

[0090] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM: Random Access Memory), a read-only memory (ROM: Read Only Memory), an erasable programmable read-only memory (EPROM: Erasable Programmable Read Only Memory or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM: CD-Read Only Memory), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency: Radio Frequency), etc., or any suitable combination of the above.

[0091] The above-mentioned computer-readable storage medium may be included in the device for preparing the sponge city construction drawings; or it may exist independently without being assembled into the device for preparing the sponge city construction drawings.

[0092] The above-mentioned computer-readable storage medium carries one or more programs. When the above-mentioned one or more programs are executed by the device for preparing the sponge city construction drawings, the device for preparing the sponge city construction drawings can prepare the sponge city construction drawings.

[0093] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0094] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0095] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0096] The readable storage medium provided in this application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned method for preparing the sponge city construction map, and can solve the technical problems of preparing the sponge city construction map. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in this application are the same as the beneficial effects of the method for preparing the sponge city construction map provided in the above-mentioned embodiment, and will not be described in detail here.

[0097] The present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the method for preparing a sponge city construction map as described above.

[0098] The computer program product provided in this application can solve the technical problem of preparing sponge city construction drawings. Compared with the prior art, the beneficial effects of the computer program product provided in this application are the same as the beneficial effects of the method for preparing sponge city construction drawings provided in the above embodiment, which will not be repeated here.

[0099] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for preparing a sponge city construction map, characterized in that: The method for preparing the sponge city construction map comprises: Obtain the approval drawings for sponge city projects; Standardize the submitted drawings according to a preset standard mapping strategy to obtain a standard urban construction drawing; Conducting a rationality review on the standard urban construction map, including an output benefit review, an environmental benefit review, and an economic benefit review; Generate the overall review results of the project based on the review results of output benefits, environmental benefits and economic benefits; When the overall review result of the project is passed, the target sponge city construction map will be output.

2. The method according to claim 1, characterized in that The rationality review of the standard urban construction map includes: Extracting drawing review parameters from the submitted drawings; Based on the drawing review parameters and the sponge city planning information, determine the annual runoff total control rate, annual runoff pollution control rate, hard surface rate, guest water treatment index and vertical rationality index; An output benefit review is conducted based on the annual total runoff control rate, annual runoff pollution control rate, hard surface rate, guest water treatment index and vertical rationality index to obtain the output benefit review result.

3. The method according to claim 2, characterized in that The rationality review of the standard urban construction map also includes: Based on the drawing review parameters and sponge city planning information, determine the facility selection information, the allocation ratio of various facilities, the evaluation index of the uniform distribution of various facilities, and the index of nearby rainwater treatment; An environmental benefit review is conducted based on facility selection information, allocation ratios of various types of facilities, evaluation indicators for uniform distribution of various types of facilities, and indicators for nearby rainwater treatment, and the results of the environmental benefit review are obtained.

4. The method according to claim 2, characterized in that The rationality review of the standard urban construction map also includes: Determine the input-output ratio and cost range based on the drawing review parameters and sponge city planning information; An economic benefit review is conducted based on the input-output ratio and cost range to obtain the economic benefit review results.

5. The method according to claim 1, characterized in that After the project overall review results are generated based on the output benefit review results, environmental benefit review results and economic benefit review results, the following also applies: When the overall review result of the project is not passed, a randomly combined sponge city project plan is generated through the preset particle swarm model; Calculate the annual runoff control rate and cost of each sponge city project plan; The target sponge city project plan is determined by the Pareto optimization strategy based on the annual runoff control rate and cost; Update the target sponge city construction map according to the target sponge city project plan.

6. The method according to claim 1, characterized in that The standardization of the submitted drawings according to the preset standard mapping strategy to obtain standard urban construction drawings includes: Determine the various plots, zones, underlying surfaces, sponge facilities and marking specifications in the drawings submitted for review, and extract the parameters to be reviewed in the drawings submitted for review; Generate target layers of corresponding categories according to the graphics of various plots, partitions, underlying surfaces and sponge facilities; Annotate each target layer according to the annotation specification and the parameters to be reviewed; Integrate the labeled target layers to obtain a standard urban construction map.

7. A device for preparing a sponge city construction map, characterized in that: The device for preparing the sponge city construction map comprises: Acquisition module, used to obtain the approval drawings of sponge city projects; A processing module, used to perform standardization processing on the submitted drawings according to a preset standard mapping strategy to obtain a standard urban construction drawing; A review module, used for conducting a rationality review on the standard urban construction map, wherein the rationality review includes an output benefit review, an environmental benefit review, and an economic benefit review; A generation module is used to generate a project overall review result based on the output benefit review result, the environmental benefit review result and the economic benefit review result; The output module is used to output the target sponge city construction map when the overall review result of the project is passed.

8. A device for preparing a sponge city construction map, characterized in that: The device for preparing the sponge city construction map includes: a memory, a processor, and a program for preparing the sponge city construction map stored in the memory and executable on the processor. The program for preparing the sponge city construction map is configured to implement the steps of the method for preparing the sponge city construction map as described in any one of claims 1 to 6.

9. A storage medium, characterized in that: The storage medium stores a program for preparing a sponge city construction map. When the program for preparing a sponge city construction map is executed by a processor, the steps of the method for preparing a sponge city construction map as described in any one of claims 1 to 6 are implemented.

10. A computer program product, comprising a computer program, which, when executed by a processor, implements the steps of the method for preparing a sponge city construction map as described in claims 1-6.