Wing transition beam joint mounting device and method
By using a movable chassis, three-coordinate motion unit and positioning hole bracket during the aircraft modification process, the precise installation of the wing transition beam joint and transition beam is achieved, and the poor hole position accuracy and operability in the whole machine state is solved. The problem has improved the installation quality.
Patent Information
- Application Number
- CN202411358640.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2025-01-10
AI Technical Summary
During the aircraft modification process, it is difficult to ensure the hole position accuracy and hole quality of the wing transition beam joints and transition beams in the entire aircraft state, and the operationality is poor.
Using an installation device including a movable chassis, a three-coordinate motion unit and a positioning hole bracket, the orthogonal motion of the positioning hole bracket is realized through the three-coordinate motion unit, and the intersection point locator, appearance locator and fixed drill template are used. Precisely locate and install the connecting holes for the wing transition beam joints.
The precise connection between the wing transition beam joints and the transition beam during the aircraft modification process is achieved, the hole position accuracy and hole making quality are improved, and the problem of poor operability is solved.
Smart Images

Figure CN119284188A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of aircraft modification, and specifically relates to a wing transition beam joint installation device and method. Background Art
[0002] The development of an aircraft is a huge system engineering, which needs to go through the process of preliminary research, design, manufacturing, flight test verification, etc. The aircraft finally delivered to customers has good safety performance and complete use functions. However, in order to meet the specific use needs of customers, it is often necessary to modify certain parts of the delivered aircraft. For the modification of adding instruments and equipment under the wing, it is usually necessary to install the installation joints of the corresponding instruments and equipment at the determined position of the wing transition beam. In the state of the whole machine, it is difficult to ensure the hole position accuracy and hole making quality by marking and drilling the connection holes between the wing transition beam joint and the transition beam, and the hole making operability is poor. Summary of the invention
[0003] The purpose of the present application is to provide a wing transition beam joint installation device and method, which is used to solve the problem of hole making and installation of the wing transition beam joint and the transition beam in the complete aircraft state during aircraft modification.
[0004] To achieve the above-mentioned purpose, the present application adopts the following technical solutions to achieve the above-mentioned purpose: According to the first aspect of the present invention, a wing transition beam joint installation device is proposed, comprising a movable chassis, a three-coordinate motion unit, and a positioning hole-making bracket; the movable chassis is supported on the ground, the three-coordinate motion unit is slidably connected to the upper surface of the movable chassis, the positioning hole-making bracket is fixed to the top of the Z-axis column in the three-coordinate motion unit, and the three-coordinate motion unit is used to realize the mutually orthogonal three-coordinate X-axis, Y-axis, and Z-axis movements of the positioning hole-making bracket; the positioning hole-making bracket comprises a crossbeam, a fixed drilling template, an intersection locator, and a shape locator, the lower surface of the crossbeam is fixedly connected to the top surface of the Z-axis column in the three-coordinate motion unit, two sets of fixed drilling templates are arranged in a mirror-symmetrical manner along the axial direction of the crossbeam and are fixedly connected to the upper surface of one end of the crossbeam, which are used to locate the processing position of the installation hole of the wing transition beam joint; the intersection locator and the shape locator are fixed near the upper surface of the other end of the crossbeam, which are used to locate the wing.
[0005] In a possible embodiment, the three-coordinate motion unit includes an X-axis slide, a Y-axis slide, and a Z-axis column; the X-axis slide is slidably connected to the movable chassis via an X-axis track fixed to the upper surface of the movable chassis; the Y-axis slide is slidably connected to the X-axis slide via a Y-axis track fixed to the upper surface of the X-axis slide; the setting directions of the X-axis track and the Y-axis track are horizontally orthogonal; the Z-axis column is arranged above the Y-axis slide, and its setting direction is orthogonal to the plane where the X-axis slide and the Y-axis slide are located, and the bottom end of the Z-axis column is connected to the upper surface of the Y-axis slide through a lifting mechanism.
[0006] In a possible embodiment, it further includes an X-axis driving module for sliding drive and positioning of the X-axis slide table, and the X-axis driving module is connected to the X-axis slide table.
[0007] In a possible embodiment, it further includes a Y-axis driving module, which is used for sliding drive and positioning of the Y-axis slide table, and the Y-axis driving module is connected to the Y-axis slide table.
[0008] In a possible embodiment, a Z-direction driving module is further included, which is used for driving the movement and positioning of the Z-direction column, and the Z-direction driving module is connected to the lifting mechanism.
[0009] In a possible embodiment, a Z-direction sleeve is concentrically sleeved outside the Z-direction column, the bottom base of the Z-direction sleeve is connected to the upper surface of the Y-direction slide, a transparent observation window is opened on the Z-direction sleeve, and a scale is arranged on one side of the transparent observation window. The scale is cooperated with the mark set on the Z-direction column to realize the accurate identification of the movement distance of the Z-direction column.
[0010] In a possible embodiment, it also includes universal wheels and parking stabilizers; the universal wheels are fixed at the four corners of the bottom surface of the movable chassis, and the parking stabilizers are fixed to the outside of the four corners of the movable chassis. After the parking stabilizers are extended to the ground, the device can be stably supported on the bottom surface.
[0011] In a possible embodiment, a trailer interface is also fixed to the front end surface of the movable chassis.
[0012] According to a second aspect of the present invention, a method for installing a wing transition beam joint is provided, using the above-mentioned wing transition beam joint installation device, comprising the following steps:
[0013] The Z-axis column drives the positioning hole-making bracket to the lowest position, and the wing transition beam joint is connected to the positioning hole-making bracket through the intersection locator, the shape locator and the fixed drilling template;
[0014] Make the X-axis slide and the Y-axis slide reach the installation position in the horizontal plane;
[0015] The wing transition beam joint is gradually brought closer to the transition beam by the movement of the Z-axis column, and the height difference between the wing transition beam joint and its theoretical installation position is measured at the same time, so that the Z-axis column is accurately raised and lowered until the height difference is eliminated and the wing transition beam joint reaches its theoretical installation position;
[0016] Use a hand-held drill set to make the connection holes between the wing transition beam joint and the transition beam and connect the two together;
[0017] Disconnect the wing transition beam joint from the positioning hole bracket, the Z-axis column, retract the parking stabilizer and then remove the device using a trailer.
[0018] Beneficial technical effects of the present invention: The present invention proposes a wing transition beam joint installation device, comprising a movable chassis, a three-coordinate motion unit, and a positioning hole-making bracket; the movable chassis is supported on the ground, the three-coordinate motion unit is slidably connected to the upper surface of the movable chassis, the positioning hole-making bracket is fixed to the top of the Z-axis column in the three-coordinate motion unit, and the three-coordinate motion unit is used to realize the mutually orthogonal three-coordinate X-axis, Y-axis, and Z-axis movements of the positioning hole-making bracket; the positioning hole-making bracket comprises a crossbeam, a fixed drilling template, an intersection locator, and a shape locator, the lower surface of the crossbeam is fixedly connected to the top surface of the Z-axis column in the three-coordinate motion unit, two sets of fixed drilling templates are arranged in a mirror-symmetrical manner along the axis of the crossbeam and fixedly connected to the upper surface of one end of the crossbeam, and are used to locate the processing position of the wing transition beam joint installation hole; the intersection locator and the shape locator are fixed to the upper surface near the other end of the crossbeam, and are used to locate the wing. The hole-making installation problem of the wing transition beam joint and the transition beam in the whole machine state during the aircraft modification process is solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of a preferred embodiment of the present invention;
[0020] Figure 2 is a schematic diagram of the movable chassis structure of a preferred embodiment of the present invention;
[0021] Figure 3 is a schematic diagram of the structure of a three-coordinate motion unit according to a preferred embodiment of the present invention;
[0022] Figure 4 It is a schematic diagram of the structure of a positioning hole-making bracket according to a preferred embodiment of the present invention;
[0023] Figure 5 It is a schematic diagram of the Z-axis motion mechanism in the three-coordinate motion unit of the preferred embodiment of the present invention.
[0024] Explanation of numbers in the figure: 1- movable chassis, 2- three-coordinate motion unit, 3- positioning hole bracket, 4- trailer interface, 5- parking stabilizer, 6- universal wheel, 7- slide rail, 8- ball screw, 9- toothed handwheel, 10- locking pin, 11- X-axis slide, 12- Y-axis slide, 13- elevator, 14- pointer, 15- scale, 16- sleeve base, 17- Z-axis column, 18- handheld drill sleeve, 19- fixed drill template, 20- crossbeam, 21- intersection locator, 22- shape locator. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0026] The features and illustrative embodiments of various aspects of the present invention will be described in detail below. In the detailed description below, many specific details are proposed to provide a comprehensive understanding of the present invention. However, it is obvious to those skilled in the art that the present invention can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present invention by illustrating examples of the present invention. The present invention is by no means limited to any specific settings and methods proposed below, but covers any improvements, replacements and modifications of structures, methods, devices without departing from the spirit of the present invention. In the accompanying drawings and the following description, known structures and technologies are not shown to avoid unnecessary ambiguity in the present invention.
[0027] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other, and the embodiments can refer to and quote each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0028] See attached Figure 1-5 A wing transition beam joint installation device comprises a movable chassis 1, a three-coordinate motion unit 2 and a positioning hole-making bracket 3, wherein the movable chassis 1 is supported on the ground, the three-coordinate motion unit 2 is installed on the movable chassis 1, the positioning hole-making bracket 3 is installed on the top of the Z-direction column 17 of the three-coordinate motion unit 2, the movable chassis 1 is provided with a parking stabilizer 5, a universal wheel 6 and a trailer interface 4, after the entire device is towed to the working area by a trailer and firmly supported on the ground, the wing transition beam joint is connected to the positioning hole-making bracket 3, and the positioning hole-making bracket 3 is driven by the three-coordinate motion unit 2 to move in the horizontal plane and the plumb plane respectively along the three directions of X, Y and Z until the wing transition beam joint reaches the theoretical position for connection and installation with the transition beam, and the wing transition beam joint and the transition beam are drilled and connected together by the fixed drilling template 19 and the handheld drill sleeve 18 on the positioning hole-making bracket 3.
[0029] The movable chassis 1 is a box-shaped structure, the top surface is used to install the three-coordinate motion unit 2, universal wheels 6 are installed at the four corners of the bottom surface, and a trailer interface 4 and a parking stabilizer 5 are installed on the side. After the parking stabilizer 5 is extended to the ground, the entire device can be stably supported on the bottom surface.
[0030] The three-coordinate motion unit 2 is composed of an X-axis slide 11, a Y-axis slide 12, a Z-axis column 17, a sleeve base 16, a ball screw 8, an elevator 13, a slide rail 7, a toothed handwheel 9, a locking pin 10, a pointer 14 and a scale 15. The toothed handwheel 9 is connected to the ball screw 8 or the elevator 13. The X-axis slide 11 is installed on the upper surface of the movable chassis 1 through the slide rail 7. After the toothed handwheel 9 is rotated, it moves along the X direction under the drive of the ball screw 8. The Y-axis slide 12 is installed on the upper surface of the X-axis slide 11 through the slide rail 7. After the toothed handwheel 9 is rotated, it moves along the Y direction under the drive of the ball screw 8. The sleeve base 16 and the elevator 1 3 is installed on the upper surface of the Y-axis slide 12, the Z-axis column 17 passes through the sleeve base 16 and is connected to the elevator 13. After the toothed handwheel 9 is rotated, it moves along the Z-axis column 17 in the sleeve base 16 under the drive of the elevator 13. A pointer 14 is installed on the Z-axis column 17, and a scale 15 is installed on the sleeve base 16 to indicate the lifting distance of the Z-axis column 17. The toothed handwheels 9 in the X, Y and Z directions are all equipped with locking pins 10. When the head of the locking pin 10 is pushed into the tooth groove of the toothed handwheel 9, the toothed handwheel 9 stops rotating, which is used to lock the moving positions of the X-axis slide 11, the Y-axis slide 12 and the Z-axis column 17.
[0031] like Figure 5 As shown, it is a schematic diagram of the Z-axis motion mechanism in the three-coordinate motion unit. The lifting and lowering motion of the Z-axis column in the sleeve base is powered by the elevator (finished product) and guided by the sleeve base. The horizontal transmission form of the elevator is a worm gear, and the plumb bob transmission form is a screw nut. The worm is connected to the toothed handwheel, the worm wheel is connected to the screw, and the Z-axis column is connected to the nut. After turning the toothed handwheel, the worm drives the worm wheel to rotate, the worm wheel drives the screw to rotate, and the screw drives the nut to move, ultimately realizing the lifting and lowering motion of the Z-axis column in the sleeve base.
[0032] The positioning hole-making bracket 3 is composed of a crossbeam 20, a fixed drilling template 19, a handheld drill sleeve 18, an intersection locator 21 and a shape locator 22. The crossbeam 20 is the base of the entire positioning hole-making bracket 3. Its lower surface is installed on the top of the Z-direction column 17, and the upper surface is used to install the fixed drilling template 19, the intersection locator 21 and the shape locator 22. The positioning surfaces of the fixed drilling template 19 and the shape locator 22 coincide with the shape surface of the wing transition beam joint. The handheld drill sleeve 18 is used in conjunction with the fixed drilling template 19 to make the connecting hole between the wing transition beam joint and the transition beam. The installation positions of the fixed drilling template, intersection locator and shape locator on the crossbeam in the positioning hole-making bracket are coordinated with the geometric positioning elements on the wing transition beam joint. The intersection locator is a double-ear structure, and the wing transition beam joint has a single-ear structure. When the wing transition beam joint is connected on the positioning hole-making bracket, the bottom falls on the fixed drilling template and fits with the profile of the fixed drilling template, and the side rests on the shape locator and fits with the profile of the shape locator. The single ear is inserted into the notch of the double ear of the intersection locator and fixed with a locating pin. The positioning and connection of the wing transition beam joint on the positioning hole-making bracket are realized through the above-mentioned geometric elements.
[0033] The specific operation process of using the device to install the wing transition beam joint is as follows:
[0034] 1. Fold the parking stabilizer 5 on the movable chassis 1 to separate the parking stabilizer 5 from the ground;
[0035] 2. Connect the device to the trailer through the trailer interface 4 on the side of the movable chassis 1. After being towed by the trailer to the bottom of the aircraft wing, extend the parking stabilizer 5 until it contacts the ground to ensure that the entire device is firmly supported on the ground;
[0036] 3. Turn the toothed hand wheel 9 of the Z-direction column 17 so that the Z-direction column 17 drives the positioning hole-making bracket 3 to the lowest position, and connect the wing transition beam joint to the positioning hole-making bracket 3 through the intersection locator 21, the shape locator 22 and the fixed drilling template 19;
[0037] 4. Turn the toothed handwheel 9 of the X-axis slide 11 and the toothed handwheel 9 of the Y-axis slide 12 respectively to adjust the wing transition beam joint into position in the horizontal plane, and use the locking pin 10 to lock the positions of the X-axis slide 11 and the Y-axis slide 12 respectively;
[0038] 5. Turn the toothed hand wheel 9 of the Z-axis column 17 to gradually bring the wing transition beam joint closer to the transition beam, and at the same time measure the height difference between the wing transition beam joint and its theoretical installation position. By observing the scale 15, accurately raise and lower the Z-axis column 17 until the height difference is eliminated and the wing transition beam joint reaches its theoretical installation position, and then use the locking pin 10 to lock the position of the Z-axis column 17;
[0039] 6. Use the handheld drill sleeve 18 to make the connection hole between the wing transition beam joint and the transition beam and connect the two together;
[0040] 7. Disconnect the connection between the wing transition beam joint and the positioning hole bracket 3, release the locking pin 10 from the Z-direction column 17 and lower the Z-direction column 17, retract the parking stabilizer 5 and remove the device with a trailer.
Claims
1. A wing transition beam joint installation device, characterized in that: It includes a movable chassis, a three-coordinate motion unit, and a positioning hole-making bracket; the movable chassis is supported on the ground, the three-coordinate motion unit is slidably connected to the upper surface of the movable chassis, the positioning hole-making bracket is fixed to the top of the Z-axis column in the three-coordinate motion unit, and the three-coordinate motion of the positioning hole-making bracket is mutually orthogonal to the three-coordinate X-axis, Y-axis, and Z-axis. The positioning hole-making bracket includes a crossbeam, a fixed drilling template, an intersection locator, and a shape locator. The lower surface of the crossbeam is fixedly connected to the top surface of the Z-axis column in the three-coordinate motion unit. Two sets of fixed drilling templates are arranged in mirror symmetry along the axial direction of the crossbeam and fixedly connected to the upper surface of one end of the crossbeam, and are used for positioning the processing position of the mounting hole of the wing transition beam joint; the intersection locator and the shape locator are fixed near the upper surface of the other end of the crossbeam, and are used for positioning the wing.
2. A wing transition beam joint installation device according to claim 1, characterized in that: The three-coordinate motion unit includes an X-axis slide, a Y-axis slide, and a Z-axis column; the X-axis slide is slidably connected to the movable chassis via an X-axis track fixed on the upper surface of the movable chassis; the Y-axis slide is slidably connected to the X-axis slide via a Y-axis track fixed on the upper surface of the X-axis slide; the setting directions of the X-axis track and the Y-axis track are horizontally orthogonal; the Z-axis column is arranged above the Y-axis slide, and its setting direction is orthogonal to the plane where the X-axis slide and the Y-axis slide are located, and the bottom end of the Z-axis column is connected to the upper surface of the Y-axis slide through a lifting mechanism.
3. A wing transition beam joint installation device according to claim 2, characterized in that: It also includes an X-direction driving module, which is used for sliding drive and positioning of the X-direction slide table, and the X-direction driving module is connected to the X-direction slide table.
4. A wing transition beam joint installation device according to claim 2, characterized in that: It also includes a Y-axis driving module, which is used for sliding drive and positioning of the Y-axis slide table, and the Y-axis driving module is connected to the Y-axis slide table.
5. A wing transition beam joint installation device according to claim 2, characterized in that: It also includes a Z-direction driving module, which is used for the movement driving and positioning of the Z-direction column. The Z-direction driving module is connected to the lifting mechanism.
6. A wing transition beam joint installation device according to claim 2, characterized in that: A Z-direction sleeve is concentrically sleeved outside the Z-direction column, and the bottom base of the Z-direction sleeve is connected to the upper surface of the Y-direction slide. A transparent observation window is opened on the Z-direction sleeve, and a scale is arranged on one side of the transparent observation window. The scale is coordinated with the mark arranged on the Z-direction column to realize accurate identification of the movement distance of the Z-direction column.
7. A wing transition beam joint installation device according to claim 1, characterized in that: It also includes universal wheels and parking stabilizers; the universal wheels are fixed at the four corners of the bottom surface of the movable chassis, and the parking stabilizers are fixed to the outside of the four corners of the movable chassis. After the parking stabilizers are extended to the ground, the device can be stably supported on the bottom surface.
8. A wing transition beam joint installation device according to claim 1, characterized in that: A trailer interface is also fixed on the front end surface of the movable chassis.
9. A method for installing a wing transition beam joint, using a wing transition beam joint installation device according to any one of claims 1 to 8, characterized in that: The steps include: The Z-axis column drives the positioning hole-making bracket to the lowest position, and the wing transition beam joint is connected to the positioning hole-making bracket through the intersection locator, the shape locator and the fixed drilling template; Make the X-axis slide and the Y-axis slide reach the installation position in the horizontal plane; The wing transition beam joint is gradually brought closer to the transition beam by the movement of the Z-axis column, and the height difference between the wing transition beam joint and its theoretical installation position is measured at the same time, so that the Z-axis column is accurately raised and lowered until the height difference is eliminated and the wing transition beam joint reaches its theoretical installation position; Use a hand-held drill set to make the connection holes between the wing transition beam joint and the transition beam and connect the two together; Disconnect the wing transition beam joint from the positioning hole bracket, the Z-axis column, retract the parking stabilizer and then remove the device using a trailer.
Citation Information
Patent Citations
Modular stanchion system
CN104249814A
Wing butt joint intersection point hole drill jig self-adaptive positioning device
CN112974920A
Automatic control method for aircraft assembly tool platform
CN118239002A
A device for practicing fire extinguisher of fire fight training
KR102884035B1
Self-positioning assembly system for rapid assembly of aircraft and method thereof
US20230391474A1