Installation method of drilling machine for drilling anchor hole
Through the coordination of tracks and drilling posture correction equipment in the drilling rig installation method, the problem of long positioning time of drilling devices in the prior art is solved, and the rapid alignment of the drilling rig and the anchor hole axis is achieved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202411318771.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2044-09-20
AI Technical Summary
In the prior art, the positioning time of the large bridge anchor hole drilling device is long, which affects the construction progress and safety, and it is difficult to ensure the accuracy and shape of the anchor hole position.
A drill rig installation method is adopted, which includes placing the drill rig in the orifice aligning, rotating and moving using tracks and drilling posture correction equipment (including substrates, rotating plates and translation plates), so that the drill rod axis of the drill rig is aligned with the anchor hole axis, And secure the drill rig with tracks.
The drilling rig is quickly and effectively aligned with the anchor hole axis, improving construction efficiency and safety, and ensuring the accuracy of anchor hole position and correct shape.
Smart Images

Figure CN119288566A_ABST
Abstract
Description
Technical Field
[0001] The present specification relates to the field of drilling technology, and in particular to an installation method of a drilling rig for drilling anchor holes. Background Art
[0002] Anchor holes are holes drilled for laying anchor rods or cables when anchoring bridge rocks, dangerous rocks and building components. Anchor hole drilling device is a key equipment for anchor support. It affects the orientation, depth, accuracy of hole diameter and quality of anchor installation, and also involves the personal safety, labor intensity and working conditions of the operator.
[0003] Since the construction angle of the anchor hole is inclined and the construction environment is relatively harsh, it is very difficult to position the drilling device. The drilling device used for the bridge anchor hole in the prior art needs to spend a long time to position before use, which will lead to slow construction progress. In addition, the positioning of the drilling device will affect the position accuracy and shape of the subsequent rock anchor hole drilled, and will have an adverse effect on the overall construction of the anchor cable, which will affect the construction progress at the least and cause safety accidents at the worst. Therefore, the positioning step of the drilling device cannot be ignored. Summary of the invention
[0004] In view of the deficiencies in the prior art, an object of the present specification is to provide a method for installing a drilling rig for drilling anchor holes, which can quickly and effectively adjust the drilling rig body to align with the designed hole axis.
[0005] To achieve the above object, the embodiment of the present specification provides an installation method of a drilling rig for drilling anchor holes, wherein the drilling rig is used to drill anchor holes on a front anchor surface; the installation method comprises the following steps: The drilling rig is placed at a position corresponding to the hole opening for preliminary alignment; the drilling rig has a crawler, and the crawler is used to drive the drilling rig to move forward and backward and support the drilling rig on a working surface; the working surface is parallel to a horizontal plane; the front anchor surface and the working surface have an angle greater than 0; The drilling posture correction device is placed under the drilling rig; the drilling posture correction device comprises a base plate, a rotating plate and a translation plate arranged from bottom to top, and the base plate, the rotating plate and the translation plate are all parallel to the working surface; the rotating plate can rotate relative to the base plate around a vertically extending axis, the translation plate can move left and right relative to the rotating plate, and the crawler is placed on the translation plate; Driving the rotating plate to drive the drilling rig to rotate, so that the axis of the drill rod of the drilling rig is parallel to the axis of the anchor hole; The translation plate is driven to drive the drilling rig to move left and right, so that the axis of the drill rod of the drilling rig and the axis of the anchor hole are located in the same vertical plane; evacuating the drilling posture correction device; Driving the crawler to drive the drilling rig to move forward and backward, so that the axis of the drill rod of the drilling rig coincides with the axis of the anchor hole; The drilling rig is fixed to the working surface.
[0006] As a preferred implementation, in the step of performing preliminary alignment, a crane is used to hoist the drilling rig to a position corresponding to the hole opening.
[0007] As a preferred embodiment, the drilling rig is provided with legs that can be extended up and down, and the step of placing the drilling posture correction device under the drilling rig includes: The legs are extended, the legs support the drilling rig on the working surface, and the crawler is separated from the working surface; the distance between the crawler and the working surface is greater than the height of the drilling posture correction device; Moving the drilling posture correction device to below the drilling rig; The legs are retracted to bring the tracks into contact with the translation plates.
[0008] As a preferred embodiment, the step of evacuating the drilling posture correction device includes: The legs are extended, the legs support the drilling rig on the working surface, and the crawler is separated from the translation plate; Moving the drilling posture correction device out from under the drilling rig; The legs are retracted to bring the tracks into contact with the working surface.
[0009] As a preferred implementation manner, the step of fixing the drilling rig to the working surface includes: welding the drilling rig and the working surface via a limiting steel plate, wherein the limiting steel plate limits the crawler track.
[0010] As a preferred embodiment, the drilling posture correction device also includes at least two parallel channel steels located below the base plate, and the base plate is fixedly connected to the channel steels; the channel steels are used to connect a moving mechanism; in the step of placing the drilling posture correction device below the drilling rig, the moving mechanism is connected to the channel steels, and the moving mechanism is used to move the drilling posture correction device below the drilling rig; in the step of evacuating the drilling posture correction device, the moving mechanism is connected to the channel steels, and the moving mechanism is used to move the drilling posture correction device out from under the drilling rig.
[0011] As a preferred embodiment, the base plate and the rotating plate are connected via a rotating drive mechanism; the step of driving the rotating plate to rotate the drilling rig comprises: operating the rotating drive mechanism to rotate the rotating plate relative to the base plate.
[0012] As a preferred implementation, the rotation angle range of the rotating plate relative to the base plate is ±10°.
[0013] As a preferred embodiment, the rotating plate and the translation plate are connected via a translation drive mechanism; the step of driving the translation plate to drive the drilling rig to move left and right includes: operating the translation drive mechanism to move the translation plate left and right relative to the rotating plate.
[0014] As a preferred implementation, the distance range of the left-right movement of the translation plate relative to the rotation plate is 400 mm. Beneficial Effects
[0015] The installation method of the drilling rig for drilling anchor holes provided in this embodiment is as follows: after preliminary alignment, the drilling posture correction device is placed under the drilling rig, and the rotating plate is driven to drive the drilling rig to rotate so that the axis of the drill rod of the drilling rig is parallel to the axis of the anchor hole; the translation plate is driven to drive the drilling rig to move left and right so that the axis of the drill rod of the drilling rig and the axis of the anchor hole are located in the same vertical plane; after evacuating the drilling posture correction device, the crawler is driven to drive the drilling rig to move forward and backward so that the axis of the drill rod of the drilling rig coincides with the axis of the anchor hole; finally, the drilling rig is fixed to the working surface, and the drilling rig body can be quickly and effectively adjusted to align with the designed hole axis.
[0016] With reference to the following description and the accompanying drawings, the specific embodiments of the present invention are disclosed in detail, indicating the manner in which the principles of the present invention can be adopted. It should be understood that the embodiments of the present invention are not limited in scope thereby.
[0017] Features described and / or illustrated with respect to one embodiment may be used in the same or similar manner in one or more other embodiments, combined with features in other embodiments, or substituted for features in other embodiments.
[0018] It should be emphasized that the term “include / comprises” when used herein refers to the presence of features, integers, steps or components, but does not exclude the presence or addition of one or more other features, integers, steps or components. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without paying creative labor.
[0020] Figure 1 A flowchart of the steps of an installation method of a drilling rig for drilling anchor holes provided in this embodiment; Figure 2 Schematic diagram of the structure of a drilling posture correction device provided in this embodiment, which is a top view; Figure 3 for Figure 2 A schematic diagram of the enlarged structure of part I; Figure 4 for Figure 2 Schematic diagram of the cross-sectional structure of the AA surface.
[0021] Description of reference numerals: 1. Channel steel; 2. Base plate; 3. Rotating plate; 4. Translation plate; 5. Rotating axis; 51. Top cap; 63. Third opening; 64. Fourth opening; 65. Notch; 7. Limit pin; 8. Rotating drive mechanism; 81. Center axis; 82. Rotating angle iron; 83. Bushing; 84. First lead screw; 9. Translation drive mechanism; 91. First connecting piece; 92. Second connecting piece; 93. Second lead screw; X, horizontal direction; Y, vertical direction. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0023] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or there may be another element centered thereon. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be another element centered thereon at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.
[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0025] See also Figure 1The embodiment of the present application provides an installation method of a drilling rig for drilling anchor holes, wherein the drilling rig is used to drill anchor holes on a front anchor surface. The installation method comprises the following steps (step S10, step S20, step S30, step S40, step S50, step S60 and step S70): Step S10: placing the drilling machine at a position corresponding to the hole opening and performing preliminary alignment.
[0026] The drilling rig has a crawler, and the crawler is used to drive the drilling rig to move forward and backward and support the drilling rig on a working surface. The working surface can be a steel panel of a support platform, and the working surface is parallel to a horizontal plane. The front anchor surface and the working surface have an angle greater than 0. In one embodiment, the inclination angle of the anchor hole is 37°, and the angle between the front anchor surface and the working surface is 53°.
[0027] Specifically, a crane may be used to hoist the drilling rig to a position corresponding to the hole opening, or after the crane hoists the drilling rig to a support platform, the drilling rig automatically moves to a position corresponding to the hole opening.
[0028] Step S20: placing the drilling posture correction device under the drilling rig.
[0029] The drilling posture correction device includes a base plate 2, a rotating plate 3 and a translation plate 4 arranged from bottom to top. The base plate 2, the rotating plate 3 and the translation plate 4 are all parallel to the working surface. The rotating plate 3 can rotate relative to the base plate 2 around a vertically extending axis, the translation plate 4 can move left and right (along the horizontal direction X) relative to the rotating plate 3, and the crawler is placed on the translation plate 4.
[0030] Specifically, the drilling rig is provided with legs that can be extended up and down. The step S20 specifically includes: Step S201: Extend the outriggers to support the drilling rig on the working surface, and separate the crawler from the working surface; Step S202: moving the drilling posture correction device to below the drilling rig; Step S203: retract the legs to make the track contact with the translation plate 4.
[0031] In step S201, the distance between the crawler and the working surface is greater than the height of the drilling posture correction device, so that the drilling posture correction device can be moved under the drilling rig.
[0032] like Figure 4As shown, the drilling posture correction device also includes at least two parallel channel steels 1 located below the base plate 2, and the base plate 2 is fixedly connected to the channel steels 1. The channel steels 1 are used to contact the working surface. The lower surface of the base plate 2 is fixedly connected to the upper surface of the channel steels 1. The drilling posture correction device is provided with the channel steels 1 as support, and when the drilling posture correction device needs to be moved, the channel steels 1 can be connected to a moving mechanism (such as a ground pulley, a traction rope, etc.), so as to facilitate the drilling posture correction device to be moved to a desired position quickly and conveniently.
[0033] Specifically, in step S20, the moving mechanism is connected to the channel steel 1, and the drilling posture correction device is moved to the bottom of the drilling rig using the moving mechanism.
[0034] In this embodiment, a plurality of channel steels 1 are arranged horizontally, and their extension direction is parallel to the horizontal direction X. The thickness of the channel steel 1 is 50 mm to 70 mm, preferably 60 mm. The thickness of the base plate 2, the rotating plate 3 and the translation plate 4 can be equal, and can be 15 mm to 25 mm, preferably 20 mm.
[0035] Step S30: driving the rotating plate 3 to drive the drilling rig to rotate, so that the axis of the drill rod of the drilling rig is parallel to the axis of the anchor hole.
[0036] In this embodiment, the upper surface of the substrate 2 is in contact with the lower surface of the rotating plate 3, and the substrate 2 and the rotating plate 3 are connected via a rotation drive mechanism 8, and the rotation drive mechanism 8 is used to drive the rotating plate 3 to rotate relative to the substrate 2 around a vertically extending axis. Accordingly, step S30 includes: operating the rotation drive mechanism 8 to rotate the rotating plate 3 relative to the substrate 2.
[0037] like Figure 2 and Figure 4 As shown, the base plate 2 and the rotating plate 3 are rotatably connected at the center through a rotating shaft 5, the rotating shaft 5 extends along the vertical direction Y, and the bottom of the rotating shaft 5 is fixedly connected to the channel steel 1, so that the rotating plate 3 rotates around the axis of the rotating shaft 5. A first opening (not shown) for accommodating the rotating shaft 5 is provided at the center of the base plate 2, and a second opening (not shown) for accommodating the rotating shaft 5 is provided at the center of the rotating plate 3. The size of the first opening and the size of the second opening are both equal to the size of the rotating shaft 5. The first opening and the second opening are both cylindrical. In a specific embodiment, the diameter of the rotating shaft 5 is 80 mm to 120 mm, preferably 100 mm.
[0038] Specifically, a third opening 63 is provided at the center of the translation plate 4, and a top cap 51 located in the third opening 63 is provided at the top of the rotating shaft 5, and the size of the third opening 63 is larger than the size of the top cap 51. The lower surface of the top cap 51 is in contact with the upper surface of the rotating plate 3, and the diameter of the top cap 51 is 130 mm to 170 mm, preferably 150 mm. The upper surface of the top cap 51 is aligned with the upper surface of the translation plate 4, so as not to interfere with the drilling rig on the translation plate 4. The third opening 63 is cylindrical, and the difference between its diameter and the diameter of the top cap 51 is greater than the distance that the translation plate 4 can move along the horizontal direction X, so that the rotating shaft 5 does not interfere with the movement of the translation plate 4. The diameter of the third opening 63 is 950 mm to 1050 mm, preferably 1000 mm.
[0039] like Figure 3 As shown, the rotary drive mechanism 8 includes: a central axis 81, a rotating angle iron 82 and a first lead screw 84. Four central axes 81 are fixed to the rotating plate 3. The four central axes 81 are located at the four vertices of the first rectangle. The four rotating angle irons 82 are rotatably connected to the base plate 2. The four rotating angle irons 82 are located at the four vertices of the second rectangle, the width of the second rectangle is equal to that of the first rectangle, and the length of the second rectangle is greater than the length of the first rectangle. One end of the first lead screw 84 is connected to the central axis 81 through a sleeve 83. The first lead screw 84 is penetrated and connected to the rotating angle iron 82, and the length of the first lead screw 84 extending from the rotating angle iron 82 is adjustable. By adjusting the lengths of the four first lead screws 84 extending from the four rotating angle irons 82 respectively, the rotating plate 3 can be rotated to the desired angle, and the rotating plate 3 drives the translation plate 4 and the drilling rig on the translation plate 4 to rotate together.
[0040] Preferably, the adjustable length of the first lead screw 84 is configured to allow the rotating plate 3 to rotate ±10° relative to the base plate 2 to achieve fine adjustment of the drilling rig angle.
[0041] Step S40: driving the translation plate 4 to drive the drilling rig to move left and right, so that the axis of the drill rod of the drilling rig and the axis of the anchor hole are located in the same vertical plane.
[0042] In this embodiment, the upper surface of the rotating plate 3 is in contact with the lower surface of the translation plate 4, and the rotating plate 3 and the translation plate 4 are connected via a translation drive mechanism 9, and the translation drive mechanism 9 is used to drive the translation plate 4 to move relative to the rotating plate 3 along the horizontal direction X. Accordingly, step S40 includes: operating the translation drive mechanism 9 to move the translation plate 4 left and right relative to the rotating plate 3.
[0043] like Figure 2As shown, preferably, the substrate 2 and the rotating plate 3 are both rectangular. The widths of the substrate 2, the rotating plate 3 and the translation plate 4 are equal, which are 2300mm~2500mm, preferably 2400mm. The length of the substrate 2 is greater than the length of the rotating plate 3, and the centers of the substrate 2 and the rotating plate 3 are aligned. The length of the substrate 2 is 3900mm~4100mm, preferably 4000mm. The length of the rotating plate 3 is 3200mm~3400mm, preferably 3300mm.
[0044] Specifically, the length of the translation plate 4 is less than that of the rotating plate 3, and the centers of the translation plate 4 and the rotating plate 3 are aligned. The length of the translation plate 4 is 2700 mm to 2900 mm, preferably 2800 mm. Notches 65 are provided at the four vertices of the translation plate 4 to avoid the rotation drive mechanism 8 and avoid interference with the rotation of the rotating plate 3.
[0045] like Figure 1 As shown, the translation plate 4 is provided with two fourth openings 64 located on both sides of the third opening 63, and a limiting pin 7 extending into the fourth opening 64 is fixed on the rotation plate 3. The fourth opening 64 has a predetermined distance in the horizontal direction X, and the limiting pin 7 can move in the fourth opening 64 along the horizontal direction X. The predetermined distance is 550 mm to 650 mm, preferably 600 mm. The diameter of the limiting pin 7 is 110 mm to 130 mm, preferably 120 mm. The width of the fourth opening 64 is equal to the diameter of the limiting pin 7.
[0046] In this embodiment, the translation drive mechanism 9 includes: a first connecting member 91, a second connecting member 92, and a second lead screw 93. The first connecting member 91 is fixed to the side of the translation plate 4. The second connecting member 92 is fixed to the side of the rotating plate 3. One end of the second lead screw 93 is connected to the first connecting member 91, and the second lead screw 93 is connected to the second connecting member 92 through the second connecting member 92. The length of the second lead screw 93 extending from the second connecting member 92 is adjustable. By adjusting the lengths of the four second lead screws 93 extending from the second connecting member 92, the translation plate 4 can be translated to a desired position, and the translation plate 4 drives the drilling rig to translate together.
[0047] Preferably, the adjustable length of the second lead screw 93 is configured to allow the translation plate 4 to move 400 mm relative to the rotation plate 3, thereby achieving fine adjustment of the position of the drilling rig in the horizontal direction X.
[0048] Step S50: Evacuate the drilling posture correction device.
[0049] Specifically, in step S50, the moving mechanism is connected to the channel steel 1, and the drilling posture correction device is moved out from under the drilling rig using the moving mechanism.
[0050] In this embodiment, the step S50 specifically includes: Step S501: Extend the outriggers to support the drilling rig on the working surface, and separate the crawler from the translation plate 4; Step S502: moving the drilling posture correction device out from under the drilling rig; Step S503: retract the legs to make the crawler track contact with the working surface.
[0051] Step S60: driving the crawler to drive the drilling rig to move forward and backward, so that the axis of the drill rod of the drilling rig coincides with the axis of the anchor hole.
[0052] Among them, since the drilling posture correction device is used in step S30 and step S40, the drilling rig is fine-tuned until the axis of the drill rod is parallel to the axis of the anchor hole and the axis of the drill rod and the axis of the anchor hole are located in the same vertical plane, the crawler drives the drilling rig to move forward and backward, that is, the drilling rig can be adjusted until the axis of the drill rod coincides with the axis of the anchor hole. Using the drilling posture correction device can greatly optimize the adjustment process of the drilling rig, improve the adjustment efficiency, and save construction time.
[0053] Step S70: Fix the drilling rig on the working surface.
[0054] Wherein, step S70 specifically includes: welding the drilling rig and the working surface through a limiting steel plate, and the limiting steel plate limits the crawler track.
[0055] The installation method of the drilling rig for drilling anchor holes provided in this embodiment is as follows: after preliminary alignment, the drilling posture correction device is placed under the drilling rig, and the rotating plate 3 is driven to drive the drilling rig to rotate so that the axis of the drill rod of the drilling rig is parallel to the axis of the anchor hole; the translation plate 4 is driven to drive the drilling rig to move left and right so that the axis of the drill rod of the drilling rig and the axis of the anchor hole are located in the same vertical plane; after evacuating the drilling posture correction device, the crawler is driven to drive the drilling rig to move forward and backward so that the axis of the drill rod of the drilling rig coincides with the axis of the anchor hole; finally, the drilling rig is fixed to the working surface, and the drilling rig body can be quickly and effectively adjusted to align with the axis of the designed hole (anchor hole).
[0056] The drilling posture correction device provided in the embodiment of the present application weighs about 3.8 tons. It can quickly and conveniently fine-tune the angle and position of a large drilling rig, so that the drilling rig body is aligned with the axis of the designed anchor hole, so that the deviation between the two does not exceed 2 mm (measured by a total station), and ensure that the drilling inclination angle deviation of the drilling rig does not exceed 0.1° (measured by a hole locator). By setting a rotary drive mechanism 8 between the base plate 2 and the rotating plate 3, the rotating plate 3 can be driven to rotate relative to the base plate 2 around the vertically extending axis, so that the drill rod axis of the drilling rig placed on the drilling posture correction device can be parallel to the axis of the designed hole; by setting a translation drive mechanism 9 between the rotating plate 3 and the translation plate 4, the translation plate 4 can be driven to move in the horizontal direction X relative to the rotating plate 3, so that the drill rod axis of the drilling rig and the axis of the designed hole are located in the same vertical plane. Therefore, the drilling posture correction device can quickly and conveniently adjust the posture of the drilling rig.
[0057] It should be noted that, in the description of this specification, the terms "first", "second", etc. are only used for descriptive purposes and to distinguish similar objects. There is no order of precedence between the two, and they cannot be understood as indicating or implying relative importance. In addition, in the description of this specification, unless otherwise specified, the meaning of "plurality" is two or more.
[0058] Any numerical value cited herein includes all values of lower and upper values that increase by one unit from the lower limit to the upper limit, and there is at least a two-unit interval between any lower value and any higher value. For example, if the value of the quantity of a component or a process variable (such as temperature, pressure, time, etc.) is set forth to be from 1 to 90, preferably from 20 to 80, and more preferably from 30 to 70, the purpose is to illustrate that values such as 15 to 85, 22 to 68, 43 to 51, 30 to 32 are also explicitly listed in the specification. For values less than 1, one unit is appropriately considered to be 0.0001, 0.001, 0.01, 0.1. These are merely examples that are intended to be clearly expressed, and it can be considered that all possible combinations of numerical values listed between the lowest value and the highest value are clearly set forth in the specification in a similar manner.
[0059] Unless otherwise specified, all ranges include the endpoints and all numbers between the endpoints. "About" or "approximately" used with a range applies to both endpoints of the range. Thus, "about 20 to 30" is intended to cover "about 20 to about 30", including at least the specified endpoints.
[0060] All articles and references disclosed, including patent applications and publications, are incorporated herein by reference for all purposes. The term "consisting essentially of..." to describe a combination should include the identified elements, ingredients, parts or steps and other elements, ingredients, parts or steps that do not substantially affect the basic novel characteristics of the combination. The use of the terms "comprising" or "including" to describe a combination of elements, ingredients, parts or steps herein also contemplates embodiments that consist essentially of these elements, ingredients, parts or steps. By using the term "may", it is intended to indicate that any attribute described that "may" include is optional.
[0061] Multiple elements, ingredients, parts or steps can be provided by a single integrated element, ingredient, part or step. Alternatively, a single integrated element, ingredient, part or step can be divided into separate multiple elements, ingredients, parts or steps. The disclosure "one" or "an" used to describe an element, ingredient, part or step is not intended to exclude other elements, ingredients, parts or steps.
[0062] It should be understood that the above description is for illustration and not for limitation. Many embodiments and many applications beyond the examples provided will be apparent to those skilled in the art upon reading the above description. Therefore, the scope of the present teachings should not be determined with reference to the above description, but should be determined with reference to the appended claims and the full scope of equivalents possessed by such claims. For the purpose of comprehensiveness, all articles and references, including disclosures of patent applications and publications, are incorporated herein by reference. The omission of any aspect of the subject matter disclosed herein in the preceding claims is not intended to be a waiver of the subject matter, nor should it be considered that the inventors did not consider the subject matter to be part of the disclosed inventive subject matter.
Claims
1. A method for installing a drilling rig for drilling anchor holes, characterized in that: The drilling rig is used to drill anchor holes on the front anchor surface; the installation method comprises the following steps: The drilling rig is placed at a position corresponding to the hole opening for preliminary alignment; the drilling rig has a crawler, and the crawler is used to drive the drilling rig to move forward and backward and support the drilling rig on a working surface; the working surface is parallel to a horizontal plane; the front anchor surface and the working surface have an angle greater than 0; The drilling posture correction device is placed under the drilling rig; the drilling posture correction device comprises a base plate, a rotating plate and a translation plate arranged from bottom to top, and the base plate, the rotating plate and the translation plate are all parallel to the working surface; the rotating plate can rotate relative to the base plate around a vertically extending axis, the translation plate can move left and right relative to the rotating plate, and the crawler is placed on the translation plate; Driving the rotating plate to drive the drilling rig to rotate, so that the axis of the drill rod of the drilling rig is parallel to the axis of the anchor hole; The translation plate is driven to drive the drilling rig to move left and right, so that the axis of the drill rod of the drilling rig and the axis of the anchor hole are located in the same vertical plane; evacuating the drilling posture correction device; Driving the crawler to drive the drilling rig to move forward and backward, so that the axis of the drill rod of the drilling rig coincides with the axis of the anchor hole; The drilling rig is fixed to the working surface.
2. The method for installing a drilling rig for drilling anchor holes according to claim 1, characterized in that: In the step of performing preliminary alignment, a crane is used to hoist the drilling rig to a position corresponding to the hole opening.
3. The method for installing a drilling rig for drilling anchor holes according to claim 1, characterized in that: The drilling rig is provided with legs that can be extended up and down, and the step of placing the drilling posture correction device under the drilling rig comprises: The legs are extended, the legs support the drilling rig on the working surface, and the crawler is separated from the working surface; the distance between the crawler and the working surface is greater than the height of the drilling posture correction device; Moving the drilling posture correction device to below the drilling rig; The legs are retracted to bring the tracks into contact with the translation plates.
4. The method for installing a drilling rig for drilling anchor holes according to claim 3, characterized in that: The step of evacuating the drilling posture correction device comprises: The legs are extended, the legs support the drilling rig on the working surface, and the crawler is separated from the translation plate; Moving the drilling posture correction device out from under the drilling rig; The legs are retracted to bring the tracks into contact with the working surface.
5. The method for installing a drilling rig for drilling anchor holes according to claim 1, characterized in that: The step of fixing the drilling rig to the working surface includes: welding the drilling rig and the working surface through a limiting steel plate, and the limiting steel plate limits the crawler track.
6. The method for installing a drilling rig for drilling anchor holes according to claim 1, characterized in that: The drilling posture correction device also includes at least two parallel channel steels located below the base plate, and the base plate is fixedly connected to the channel steels; the channel steels are used to connect a moving mechanism; in the step of placing the drilling posture correction device below the drilling rig, the moving mechanism is connected to the channel steels, and the moving mechanism is used to move the drilling posture correction device below the drilling rig; in the step of evacuating the drilling posture correction device, the moving mechanism is connected to the channel steels, and the moving mechanism is used to move the drilling posture correction device out from under the drilling rig.
7. The method for installing a drilling rig for drilling anchor holes according to claim 1, characterized in that: The base plate and the rotating plate are connected via a rotating drive mechanism; the step of driving the rotating plate to drive the drilling rig to rotate comprises: operating the rotating drive mechanism to rotate the rotating plate relative to the base plate.
8. The method for installing a drilling rig for drilling anchor holes according to claim 7, characterized in that: The angular range of the rotation of the rotating plate relative to the base plate is ±10°.
9. The method for installing a drilling rig for drilling anchor holes according to claim 1, characterized in that: The rotating plate and the translation plate are connected via a translation driving mechanism; the step of driving the translation plate to drive the drilling rig to move left and right includes: operating the translation driving mechanism to move the translation plate left and right relative to the rotating plate.
10. The method for installing a drilling rig for drilling anchor holes according to claim 9, characterized in that: The translation plate moves left and right relative to the rotation plate in a distance range of 400 mm.
Citation Information
Patent Citations
Construction method of anchor cable hole
CN117144806A
Hydraulic rock anchor hole drilling device
CN117759305A
All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig
CN202832238U
Fine adjustment mechanism and anchor rod operation vehicle
CN213269802U
Directional angle mechanism
CN213743239U