Intelligent water affair management and control method, device and equipment and storage medium

Through intelligent water management and control methods, the data of the sewage treatment plant is analyzed and the water volume is allocated, which solves the problem of low management efficiency of the sewage treatment plant, and realizes automatic water volume regulation and operation efficiency improvement.

CN119294783AInactive Publication Date: 2025-01-10SHANXI PUYOU TECHNOLOGY CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411832999.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The management efficiency of existing sewage treatment plants is low and difficult to coordinate and regulate, especially in the case of large amount of sewage and uneven staff capabilities, resulting in low operational efficiency.

Method used

Using smart water management and control methods, we can analyze the original data of the sewage treatment plant to determine whether the demand is met. If it is not met, obtain the second sewage treatment plant within the preset range, send the remaining supply signal to achieve water volume regulation and improve the control efficiency. .

Benefits of technology

Unmanned monitoring of water volume has been achieved, the operational efficiency of sewage treatment plants has been improved, the water needs have been met, and human error has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119294783A_ABST
    Figure CN119294783A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water affair management and control, in particular to an intelligent water affair management and control method, device and equipment and a storage medium, and the method comprises the steps: obtaining original data of a sewage treatment plant, and storing the original data to a storage system; analyzing whether the corresponding sewage treatment plant meets requirements or not based on the original data; if the sewage treatment plant cannot meet the requirements, obtaining a second sewage treatment plant in a preset range; sending a remaining supply signal to the second sewage treatment plant; wherein the sewage treatment plant which does not meet the requirements is used as a first sewage treatment plant. The method has the effect of efficient overall management and control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water management and control, and in particular to a smart water management and control method, device, equipment and storage medium. Background Art

[0002] With the development of society, the amount of sewage generated is increasing. For a large amount of sewage, it is necessary to use sewage treatment plants for artificial intensive treatment.

[0003] Due to the large amount of sewage, the number of sewage treatment plants has also increased rapidly, which has brought challenges to the management of sewage treatment plants. It is difficult to achieve overall management for a large number of sewage treatment plants, and due to the uneven capabilities of the staff, the operational efficiency is also low. Summary of the invention

[0004] In order to achieve efficient overall management and control, this application provides a smart water management and control method.

[0005] In the first aspect, the present application provides a smart water management and control method using the following technical solutions: A smart water management and control method, comprising: Acquire raw data of the sewage treatment plant and store the raw data in a storage system; Analyze the corresponding sewage treatment plant based on the original data to see whether it meets the demand; If the sewage treatment plant cannot meet the demand, obtain a second sewage treatment plant within a preset range; sending a surplus supply signal to the second sewage treatment plant; Among them, the sewage treatment plant that does not meet the demand is used as the first sewage treatment plant.

[0006] By adopting the above technical solution, the electronic device obtains the original data of the sewage treatment plant and stores the original data in the storage system, so that the staff can retrieve the original data of each sewage treatment plant, that is, learn the specific situation of the sewage treatment plant. The electronic device analyzes whether the corresponding sewage treatment plant meets the demand based on the original data, that is, determines whether the water output of the sewage treatment plant meets the water demand. If the sewage treatment plant cannot meet the demand, the electronic device obtains the second sewage treatment plant within the preset range, that is, obtains other sewage treatment plants within the preset range with the first sewage treatment plant as the center, and then sends a remaining supply signal to the second sewage treatment plant, so that the second sewage treatment plant can support the remaining water to the first sewage treatment plant, thereby playing a role in regulation and balance, and does not require human monitoring and regulation, thereby improving management and control efficiency.

[0007] Optionally, before sending the surplus supply signal to the second sewage treatment plant, the method further includes: Obtaining the peak water consumption period corresponding to the second sewage treatment plant; Determining whether the second sewage treatment plant meets the first water consumption during the peak water consumption period; If so, executing the step of sending a surplus supply signal to the second sewage treatment plant; If not, the preset ratio value will be sent to the second sewage treatment plant.

[0008] By adopting the above technical solution, before the electronic device sends a surplus supply signal to the second sewage treatment plant, the electronic device obtains the peak water consumption period corresponding to the second sewage treatment plant, and determines whether the second sewage treatment plant meets the first water consumption during the peak water consumption period. If so, the electronic device executes the step of sending a surplus supply signal to the second sewage treatment plant. If not, the electronic device switches to sending a preset proportion value to the second sewage treatment plant.

[0009] Optionally, the determining whether the second sewage treatment plant meets the first water consumption during the peak water consumption period includes: Get the maximum water purification speed and current water storage capacity; Obtain a first time difference between the current time and the peak water consumption period; Calculating a first water production within a first time difference; Calculating a first water storage amount based on the first water production amount and the current water storage amount; Wherein, the first water production is equal to the maximum water purification speed multiplied by the first time difference, and the first water storage is equal to the current water storage plus the first water production; determining whether the first water storage amount is greater than the first water consumption; If the first stored water volume is greater than the first water consumption, it is determined that the second sewage treatment plant meets the first water consumption during the peak water consumption period.

[0010] By adopting the above technical solution, the electronic device obtains the maximum water purification speed and current water storage of the second sewage treatment plant, and then obtains the first difference between the current time and the peak water consumption time. The electronic device calculates the first water production within the first time difference, and the first water production is equal to the first time difference multiplied by the maximum water purification speed, and then calculates the first water storage, and the first water storage is equal to the current water storage plus the first water production. The electronic device determines whether the first water storage is greater than the first water consumption. If the first water storage is greater than the first water consumption, it indicates that the second sewage treatment plant can meet the first water consumption during the peak water consumption period.

[0011] Optionally, the step of sending a preset ratio value to the second sewage treatment plant includes: Calculating a first difference between the first water storage amount and the first water consumption; Calculate and obtain a first ratio value; Wherein, the first ratio value is equal to the first difference divided by the first water storage amount; The preset ratio value is equal to one minus the first ratio value; Controlling the preset water volume to support the first sewage treatment plant; The preset water volume is equal to the preset ratio value multiplied by the first water production volume.

[0012] By adopting the above technical solution, the electronic device calculates the first difference between the first water storage volume and the first water consumption, and then calculates a first proportional value, the first proportional value is equal to the first difference divided by the first water storage volume, the preset proportional value is equal to one minus the first proportional value, and then the value obtained by multiplying the preset proportional value by the first water production is assigned to the preset water volume, and the electronic device controls the preset water volume to support the first sewage treatment plant. The preset proportional value is not a fixed value, and can be adjusted based on the actual situation of the second sewage treatment plant, so as to reasonably support the first sewage treatment plant.

[0013] Optionally, before controlling the preset water volume to support the first sewage treatment plant, the method further includes: Determining whether the first ratio value is greater than a ratio threshold; If the first ratio value is greater than the ratio threshold, the step of providing the preset water volume to the first sewage treatment plant is not performed.

[0014] By adopting the above technical solution, before the electronic device controls the preset water volume to support the first sewage treatment plant, the electronic device determines whether the first proportion value is greater than the proportion threshold. If the first proportion value is greater than the proportion threshold, it indicates that the second sewage treatment plant is also short of water at this time, so the step of controlling the preset water volume to support the first sewage treatment plant is not executed at this time, that is, the second sewage treatment plant is not supported.

[0015] Optionally, before the method switches to sending the preset ratio value to the second sewage treatment plant, the method further includes: Get information from the repository; Filtering the information in the information database based on the first sewage treatment plant; Determining whether the information in the information base includes special request information; If the information in the information base includes the special request information, executing the step of switching to sending the preset ratio value to the second sewage treatment plant; If the information in the information base does not include the special request information, the step of switching to sending the preset ratio value to the second sewage treatment plant is not performed; The special request information is the request information sent by the first sewage treatment plant.

[0016] By adopting the above technical solution, before the electronic device switches to sending the preset ratio value to the second sewage treatment plant, the electronic device obtains the information in the information base and filters the information in the information base based on the first sewage treatment plant to determine whether the information in the information base includes special request information. If the information base information includes special request information, the step of switching to sending the preset ratio value to the second sewage treatment plant is executed. If the information base information does not include the special request information, the step of switching to sending the preset ratio value to the second sewage treatment plant is not executed.

[0017] Optionally, before the switching to sending the preset ratio value to the second sewage treatment plant, the method includes: Calculate a first water shortage of the first sewage treatment plant; Determine whether the first water shortage amount is less than a preset water shortage amount; If the first water shortage amount is less than the preset water shortage amount, the step of sending the preset proportion value support signal is not performed; Switch to obtain sufficient sewage treatment plants outside the preset range; sending a support signal to said sufficient sewage treatment plant; Among them, the sufficient first sewage treatment plant is a sewage treatment plant that can meet the peak water consumption and has surplus.

[0018] By adopting the above technical solution, before the electronic device switches to sending the preset proportion value to the second sewage treatment plant, the electronic device calculates the first water shortage of the first sewage treatment plant, and then determines whether the first water shortage is less than the preset water shortage. If the first water shortage is less than the preset water shortage, it indicates that the water shortage of the first sewage treatment plant is small, so at this time the electronic device does not execute the step of sending the preset proportion value support signal, and switches to obtaining sufficient sewage treatment plants outside the preset range, and then sends a support signal to the sufficient sewage treatment plants.

[0019] In the second aspect, the present application provides a smart water management and control device that adopts the following technical solutions: An acquisition storage module is used to acquire raw data of the first sewage treatment plant and store the raw data in a storage system; An analysis module, used for analyzing whether the first sewage treatment plant corresponding to the raw data meets the demand; if the first sewage treatment plant cannot meet the demand, the acquisition module is entered; The acquisition module is used to acquire a second sewage treatment plant within a preset range; A sending module sends a surplus supply signal to the second sewage treatment plant.

[0020] In a third aspect, the present application provides an electronic device that adopts the following technical solution: An electronic device comprises a processor, wherein the processor is coupled to a memory; the processor is used to execute a computer program stored in the memory, so that the electronic device executes the method described in the first aspect.

[0021] In a fourth aspect, the present application provides a computer-readable storage medium that adopts the following technical solution: A computer-readable storage medium includes a computer program or an instruction. When the computer program or the instruction is executed on a computer, the computer is caused to execute the method according to the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a flow chart of the smart water management and control method of an embodiment of the present application.

[0023] Figure 2 It is a block diagram of the smart water management and control device of an embodiment of the present application.

[0024] Figure 3 It is a block diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0025] The following is combined with Figure 1-3 This application is described in further detail.

[0026] The embodiment of the present application discloses a preset ratio value of a smart water management and control method. The preset ratio value of the smart water management and control method can be executed by an electronic device. The electronic device can be a server or a terminal device, wherein the server can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server providing cloud computing services. The terminal device can be a smart phone, a tablet computer, a desktop computer, etc., but is not limited thereto.

[0027] The present application embodiment discloses a smart water management method for preset ratio values. Figure 1 , a smart water management and control method presets a ratio value, and the main process is described as follows (S100-S400): Step S100, obtaining the original data of the sewage treatment plant and storing the original data in a storage system; Step S200, analyzing whether the corresponding sewage treatment plant meets the demand based on the original data; if the sewage treatment plant cannot meet the demand, proceed to step S300; Step S300, obtaining a second sewage treatment plant within a preset range; Step S400: sending a surplus supply signal to the second sewage treatment plant.

[0028] The electronic device obtains the original data of the first sewage treatment plant and stores the original data in the storage system so that the staff can query the original data and can also uniformly manage and maintain the original data of the first sewage treatment plant. The electronic device analyzes the original data to determine whether the corresponding first sewage treatment plant meets the demand, that is, to determine whether the water output of the first sewage treatment plant can meet the water demand. If the first sewage treatment plant cannot meet the water demand, the electronic device takes the first sewage treatment plant as the center and obtains the second sewage treatment plant within a preset range. The electronic device sends a surplus supply signal to the second sewage treatment plant so that the second sewage treatment plant supports the first sewage treatment plant after receiving the surplus supply signal, so that the water output of the first sewage treatment plant can meet the demand.

[0029] Among them, the sewage treatment plant that does not meet the demand will be used as the first sewage treatment plant.

[0030] As an optional implementation of an embodiment of the present application, before sending a remaining supply signal to the second sewage treatment plant, it also includes: obtaining the peak water consumption period corresponding to the second sewage treatment plant; determining whether the second sewage treatment plant meets the first water consumption during the peak water consumption period; if so, executing the step of sending a remaining supply signal to the second sewage treatment plant; if not, switching to sending a preset proportion value to the second sewage treatment plant.

[0031] Before the electronic device sends a surplus supply signal to the second sewage treatment plant, the electronic device obtains the peak water consumption period corresponding to the second sewage treatment plant, that is, obtains the period when the second sewage treatment plant needs a large amount of water, and then determines whether the second sewage treatment plant can meet the first water consumption during the peak water consumption period. If the second sewage treatment plant can meet it, the electronic device executes the step of sending a surplus supply signal to the second sewage treatment plant. If the second sewage treatment plant cannot meet the first water consumption, the electronic device switches to sending a preset proportion value to the second sewage treatment plant.

[0032] Specifically, determining whether the second sewage treatment plant meets the first water consumption during the peak water consumption period includes: obtaining the maximum water purification speed and the current water storage; obtaining the first time difference between the current time and the peak water consumption period; calculating the first water production within the first time difference; calculating the first water storage based on the first water production and the current water storage; wherein the first water production is equal to the maximum water purification speed multiplied by the first time difference, and the first water storage is equal to the current water storage plus the first water production; determining whether the first water storage is greater than the first water consumption; if the first water storage is greater than the first water consumption, determining that the second sewage treatment plant meets the first water consumption during the peak water consumption period.

[0033] To determine whether the second sewage treatment plant can meet the peak water consumption, specifically, the electronic device obtains the corresponding maximum water purification speed and the current water storage capacity, and then obtains the first time difference between the current time and the peak water consumption time, that is, obtains the time interval from the current time to the peak water consumption time, and then calculates the first water production, and calculates the first water storage capacity based on the first water production and the current water storage capacity.

[0034] The first water production is equal to the maximum net speed multiplied by the first time difference, and the first water storage is equal to the current water storage plus the first water production.

[0035] Afterwards, the electronic device determines whether the first water storage volume is greater than the first water consumption. If the first water storage volume is greater than the first water consumption, it indicates that the second sewage treatment plant meets the first water consumption during the peak water consumption period.

[0036] Specifically, the preset proportion value is sent to the second sewage treatment plant, including: calculating the first difference between the first water storage volume and the first water consumption; calculating the first proportion value; the first proportion value is equal to the first difference divided by the first water storage volume; the preset proportion value is equal to one minus the first proportion value; supporting the preset water volume to the first sewage treatment plant; wherein the preset water volume is equal to the preset proportion value multiplied by the first water production volume.

[0037] The electronic device calculates the first difference between the first water storage and the first water consumption, and then calculates the first ratio value, which is equal to the first difference divided by the first water storage, and the preset ratio value is equal to one minus the first ratio value, and then the preset water volume is supported to the first sewage treatment plant. The preset water volume is equal to the preset ratio value multiplied by the first water output. Although part of the first water output within the first time difference is supported to the first sewage treatment plant, it may cause the second sewage treatment plant to still not meet the peak water consumption, but it can alleviate the situation of the first sewage treatment plant that is short of water to a certain extent, and the more the difference of each second sewage treatment plant relative to the first water consumption, the less support it will receive, and the support is for part of the first water output within the first time difference, so the water shortage of the second sewage treatment plant relative to the first water consumption will be relatively small, and at the same time it can support the first sewage treatment plant to reduce the water shortage at the first sewage treatment plant, playing a certain balancing role.

[0038] As an optional implementation of an embodiment of the present application, before supporting the preset water volume to the first sewage treatment plant, it also includes: determining whether the first proportion value is greater than the proportion threshold; if the first proportion value is greater than the proportion threshold, the step of supporting the preset water volume to the first sewage treatment plant is not executed.

[0039] Before the electronic device controls to support the preset water volume to the first sewage treatment plant, the electronic device also needs to determine whether the first proportion value is greater than the proportion threshold. If the first proportion value is greater than the proportion threshold, it indicates that the water shortage of the second sewage treatment plant is large and the second sewage treatment plant is not suitable for external support, so the electronic device does not execute the step of supporting the preset water volume to the first sewage treatment plant.

[0040] As an optional implementation manner of an embodiment of the present application, before switching to sending the preset ratio value to the second sewage treatment plant, it also includes: obtaining information from the information base; filtering the information from the information base based on the first sewage treatment plant; determining whether the information from the information base includes special request information; if the information base information includes special request information, executing the step of switching to sending the preset ratio value to the second sewage treatment plant; if the information base information does not include special request information, not executing the step of switching to sending the preset ratio value to the second sewage treatment plant; wherein the special request information is the request information sent by the first sewage treatment plant.

[0041] Before the electronic device switches to sending the preset ratio value to the second sewage treatment plant, the electronic device obtains the information in the information library, and then screens the information in the information library based on the first sewage treatment plant, and then determines whether the information in the information library includes special request information, that is, determines whether the first sewage treatment plant has sent a special request to obtain water support. If the information library information does not include special request information, the electronic device does not execute the step of switching to sending the preset ratio value to the second sewage treatment plant. If the information library information includes special request information, the above steps are executed. The first sewage treatment plant sends special request information, which can be severe water shortage or lack of water, but it is necessary to use water.

[0042] As an optional implementation manner of an embodiment of the present application, before switching to sending a preset proportion value to the second sewage treatment plant, it includes: calculating the first water shortage of the first sewage treatment plant; judging whether the first water shortage is less than the preset water shortage; if the first water shortage is less than the preset water shortage, not executing the step of sending a preset proportion value support signal; switching to obtaining a sufficient first sewage treatment plant outside the preset range; wherein, the sufficient first sewage treatment plant is a first sewage treatment plant that meets the peak water use period and has a surplus.

[0043] Before sending the preset ratio value support signal, the electronic device calculates the first water shortage of the first sewage treatment plant, and then determines whether the first water shortage is less than the preset water shortage. If the first water shortage is less than the preset water shortage, the electronic device does not perform the step of sending the preset ratio value support signal, and the electronic device switches to obtaining a sufficient first sewage treatment plant outside the preset range, and then sends a support signal to the sufficient first sewage treatment plant. That is, when the first sewage treatment plant lacks very little water, and the second sewage treatment plant itself cannot meet its own water consumption during the peak period, at this time, it wants to send a support signal to the sufficient first sewage treatment plant outside the preset range to obtain water support from the sufficient sewage treatment plant.

[0044] Among them, the sufficient first sewage treatment plant is a sewage treatment plant that can meet the peak water consumption and has surplus capacity.

[0045] Figure 2 A block diagram of a smart water management and control device 500 provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the smart water management and control device 500 includes: An acquisition storage module 501 is used to acquire the raw data of the first sewage treatment plant and store the raw data in a storage system; The analysis module 502 is used to analyze whether the corresponding first sewage treatment plant meets the demand based on the original data; if the first sewage treatment plant cannot meet the demand, it will be transferred to the acquisition module 503; An acquisition module 503 is used to acquire a second sewage treatment plant within a preset range; The sending module 504 sends a surplus supply signal to the second sewage treatment plant.

[0046] In this optional embodiment, the smart water management and control device 500 further includes: A first acquisition submodule is used to acquire a water consumption peak period corresponding to the second sewage treatment plant before sending a surplus supply signal to the second sewage treatment plant; The first judgment submodule is used to judge whether the second sewage treatment plant meets the first water consumption during the peak water consumption period; if so, execute the step of sending a remaining supply signal to the second sewage treatment plant; if not, switch to sending a preset proportion value to the second sewage treatment plant.

[0047] Specifically, the first judgment submodule includes: The second acquisition submodule is used to obtain the maximum water purification speed and the current water storage volume; The third acquisition submodule is used to obtain a first time difference between the current time and the peak water consumption period; A first calculation submodule, used to calculate a first water production within a first time difference; A second calculation submodule, configured to calculate a first water storage amount based on the first water production amount and the current water storage amount; The first water production is equal to the maximum water purification speed multiplied by the first time difference, and the first water storage is equal to the current water storage plus the first water production; The second judgment submodule is used to judge whether the first water storage volume is greater than the first water consumption; if the first water storage volume is greater than the first water consumption, it is determined that the second sewage treatment plant meets the first water consumption during the peak water consumption period.

[0048] Specifically, the first judgment submodule further includes: A third calculation submodule, used for calculating a first difference between the first water storage amount and the first water consumption; The fourth calculation submodule is used to calculate a first proportional value; wherein the first proportional value is equal to the first difference divided by the first water storage amount; and the preset proportional value is equal to one minus the first proportional value; The control submodule is used to control a preset water volume to support the first sewage treatment plant; wherein the preset water volume is equal to a preset ratio value multiplied by the first water production volume.

[0049] In this optional embodiment, the smart water management and control device 500 further includes: The third judgment submodule is used to, before supporting the preset water volume to the first sewage treatment plant, also include: judging whether the first proportion value is greater than the proportion threshold; if the first proportion value is greater than the proportion threshold, the step of supporting the preset water volume to the first sewage treatment plant is not executed.

[0050] In this optional embodiment, the smart water management and control device 500 further includes: The fourth acquisition submodule is used to acquire information from the information base before switching to sending the preset ratio value to the second sewage treatment plant; A screening submodule, used for screening the information in the information base based on the first sewage treatment plant; The fourth judgment submodule is used to judge whether the information in the information base includes special request information; if the information base information includes special request information, the step of sending a preset ratio value to the second sewage treatment plant is executed; if the information base information does not include special request information, the step of sending a preset ratio value to the second sewage treatment plant is not executed; wherein the special request information is the request information sent by the first sewage treatment plant.

[0051] In this optional embodiment, the smart water management and control device 500 further includes: A fifth calculation submodule, used for calculating the first water shortage of the first sewage treatment plant before switching to sending the preset ratio value to the second sewage treatment plant; A fifth judgment submodule is used to judge whether the first water shortage amount is less than a preset water shortage amount; if the first water shortage amount is less than the preset water shortage amount, the step of sending a preset proportion value support signal is not performed; The fifth acquisition submodule is used to switch to acquiring sufficient sewage treatment plants outside the preset range; The sending support submodule is used to send a support signal to the sufficient sewage treatment plant. The sufficient first sewage treatment plant is a sewage treatment plant that can meet the peak water demand and has surplus water.

[0052] Figure 3 The electronic device 600 is a block diagram of a structure of an electronic device 600 provided in an embodiment of the present application. The electronic device 600 may be a mobile phone, a tablet computer, a PC, a server, etc. Figure 3 As shown, the electronic device 600 includes a memory 601, a processor 602 and a communication bus 603; the memory and the processor 602 are connected via the communication bus 603. The memory 601 stores a computer program that can be loaded by the processor 602 and execute the smart water management method provided in the above embodiment.

[0053] The memory 601 may be used to store instructions, programs, codes, code sets or instruction sets. The memory 601 may include a program storage area and a managed data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function, and instructions for implementing the smart water management and control method provided in the above embodiment, etc.; the managed data storage area may store managed data involved in the smart water management and control method provided in the above embodiment, etc.

[0054] The processor 602 may include one or more processing cores. The processor 602 calls the managed data stored in the memory 601 by running or executing the instructions, programs, code sets or instruction sets stored in the memory 601, executes various functions of the present application and processes the managed data. The processor 602 may be at least one of an application-specific integrated circuit (ASIC), a digital signal processor (DSP), a digital signal processing device (DSPD), a programmable logic device (PLD), a field programmable gate array (FPGA), a central processing unit (CPU), a controller, a microcontroller and a microprocessor. It is understandable that for different devices, the electronic device used to implement the above-mentioned processor 602 function can also be other, and the embodiment of the present application is not specifically limited.

[0055] The communication bus 603 may include a path to transmit information between the above components. The communication bus 603 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus 603 may be divided into an address bus, a managed data bus, a control bus, etc. For ease of representation, Figure 3 Only one double arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0056] An embodiment of the present application provides a computer storage medium storing a computer program that can be loaded by a processor and execute a smart water management and control method as provided in the above embodiment.

[0057] In this embodiment, the computer storage medium may be a tangible device that holds and stores instructions used by the instruction execution device. The computer storage medium may be, but is not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any combination thereof. Specifically, the computer storage medium may be a portable computer disk, a hard disk, a USB flash drive, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a podium random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, an optical disk, a magnetic disk, a mechanical encoding device, and any combination thereof.

[0058] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.

Claims

1. A smart water management and control method, characterized in that: include: Acquire raw data of the sewage treatment plant and store the raw data in a storage system; Analyze the corresponding sewage treatment plant based on the original data to see whether it meets the demand; If the sewage treatment plant cannot meet the demand, obtain a second sewage treatment plant within a preset range; sending a surplus supply signal to the second sewage treatment plant; Among them, the sewage treatment plant that does not meet the demand is used as the first sewage treatment plant.

2. The method according to claim 1, characterized in that Before sending the surplus supply signal to the second sewage treatment plant, the method further includes: Obtaining the peak water consumption period corresponding to the second sewage treatment plant; Determining whether the second sewage treatment plant meets the first water consumption during the peak water consumption period; If so, executing the step of sending a surplus supply signal to the second sewage treatment plant; If not, the preset ratio value will be sent to the second sewage treatment plant.

3. The method according to claim 2, characterized in that The determining whether the second sewage treatment plant meets the first water consumption during the peak water consumption period includes: Get the maximum water purification speed and current water storage capacity; Get the first time difference between the current time and the peak water consumption time; Calculating a first water production within a first time difference; Calculating a first water storage amount based on the first water production amount and the current water storage amount; Wherein, the first water production is equal to the maximum water purification speed multiplied by the first time difference, and the first water storage is equal to the current water storage plus the first water production; determining whether the first water storage amount is greater than the first water consumption; If the first stored water volume is greater than the first water consumption, it is determined that the second sewage treatment plant meets the first water consumption during the peak water consumption period.

4. The method according to claim 3, characterized in that: The step of sending the preset ratio value to the second sewage treatment plant includes: Calculating a first difference between the first water storage amount and the first water consumption; Calculate and obtain a first ratio value; Wherein, the first ratio value is equal to the first difference divided by the first water storage amount; The preset ratio value is equal to one minus the first ratio value; Controlling the preset water volume to support the first sewage treatment plant; The preset water volume is equal to the preset ratio value multiplied by the first water production volume.

5. The method according to claim 4, characterized in that Before the control of the preset water volume to support the first sewage treatment plant, it also includes: Determining whether the first ratio value is greater than a ratio threshold; If the first ratio value is greater than the ratio threshold, the step of controlling the preset water volume to support the first sewage treatment plant is not performed.

6. The method according to claim 4, characterized in that Before the method switches to sending the preset ratio value to the second sewage treatment plant, the method further includes: Get information from the repository; Filtering the information in the information database based on the first sewage treatment plant; Determining whether the information in the information base includes special request information; If the information in the information base includes the special request information, executing the step of switching to sending the preset ratio value to the second sewage treatment plant; If the information in the information base does not include the special request information, the step of switching to sending the preset ratio value to the second sewage treatment plant is not performed; The special request information is the request information sent by the first sewage treatment plant.

7. The method according to claim 2, characterized in that Before the preset ratio value is sent to the second sewage treatment plant, the method includes: Calculate a first water shortage of the first sewage treatment plant; Determine whether the first water shortage amount is less than a preset water shortage amount; If the first water shortage amount is less than the preset water shortage amount, the step of sending the preset proportion value support signal is not performed; Switch to obtain sufficient sewage treatment plants outside the preset range; sending a support signal to said sufficient sewage treatment plant; Among them, the sufficient first sewage treatment plant is a sewage treatment plant that can meet the peak water consumption and has surplus.

8. A smart water management and control device, characterized in that: include: An acquisition storage module is used to acquire raw data of the first sewage treatment plant and store the raw data in a storage system; An analysis module, used for analyzing whether the corresponding first sewage treatment plant meets the demand based on the original data; If the first sewage treatment plant cannot meet the demand, then enter the acquisition module; The acquisition module is used to acquire a second sewage treatment plant within a preset range; A sending module sends a surplus supply signal to the second sewage treatment plant.

9. An electronic device, characterized in that: The electronic device comprises a processor coupled to a memory; the processor is used to execute a computer program stored in the memory so that the electronic device executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The method comprises a computer program or an instruction, which, when executed on a computer, causes the computer to execute the method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Three-dimensional digital twinning operation management system for real-time analog simulation deduction of sewage treatment

    CN116307565A

  • Water quantity prediction-based water treatment system scheduling method and system

    CN116703106A

  • Water resource scheduling method and device, electronic equipment and storage medium

    CN116862174A