Comprehensive evaluation method and system for engineering quality of expressway project
Through the fuzzy comprehensive evaluation method and AHP hierarchical analysis method, a quality engineering evaluation index system for highway projects was constructed, the problem of lack of unified standards in the existing technology was solved, and a systematic evaluation of the quality engineering of highway projects was realized, and a Scientific decision-making support.
Patent Information
- Application Number
- CN202411229711.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2025-01-10
AI Technical Summary
The existing highway project engineering quality evaluation methods lack unified evaluation standards and highly operational quantitative models, making it difficult to fully implement the specific situation of quality projects.
The fuzzy comprehensive evaluation method is adopted, and the initial judgment matrix is obtained by determining the comprehensive evaluation index system, and the weight values of indicators at each level are obtained by using the AHP hierarchical analysis method, and a comprehensive weight matrix and a fuzzy membership matrix are constructed to conduct comprehensive evaluation.
It has achieved systematic and comprehensive evaluation of the quality engineering of highway projects, and provided scientific decision-making and analysis tools to ensure the decomposition, comparison and comprehensiveness of the evaluation.
Smart Images

Figure CN119294881A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering evaluation, and in particular to a method and system for comprehensively evaluating the engineering quality of a highway project. Background Art
[0002] At present, the understanding of the concept of quality engineering in the field of transportation infrastructure construction is relatively mature. The Ministry of Transport has also successively issued guiding opinions and pilot plans for creating quality engineering, providing clear guidance for creating quality engineering for highway projects.
[0003] The implementation of quality engineering is mainly carried out from the aspects of design, construction, innovation, quality, safety, environmental protection, soft power, etc., and its promotion measures are increasing day by day. However, at the project level, the actual implementation of quality engineering is uneven, so there is an urgent need for unified standards to evaluate the specific implementation of quality engineering in highway projects. However, there are relatively few comprehensive evaluation methods for the implementation of quality engineering in highway projects, and there is no unified indicator system and a lack of a quantitative model with strong operability.
[0004] To this end, we comprehensively considered engineering design, engineering management, engineering quality, safety assurance, scientific and technological innovation, green environmental protection and soft power, adopted fuzzy comprehensive evaluation method to build a comprehensive evaluation method for the actual situation of implementing quality engineering in highway projects. Summary of the invention
[0005] The present invention provides a method and system for comprehensively evaluating the engineering quality of a highway project, so as to solve the problem that the existing evaluation methods for the engineering quality of highway projects lack a uniform evaluation standard.
[0006] In order to achieve the above object, the present invention is implemented by the following technical solutions:
[0007] In a first aspect, the present invention provides a method for comprehensive evaluation of engineering quality of a highway project, comprising:
[0008] S1: Determine a comprehensive evaluation index system for the target expressway project, wherein the comprehensive evaluation index system includes at least: a criterion layer, a primary index, and a secondary index;
[0009] S2: Obtain the initial judgment matrix by expert scoring, use AHP to obtain the weight values of indicators at all levels, and construct a comprehensive weight matrix based on the weight values;
[0010] S3: constructing a fuzzy membership matrix based on the initial judgment matrix, and conducting a comprehensive evaluation on the target highway project according to the comprehensive weight matrix and the fuzzy membership matrix.
[0011] Optionally, the evaluation indicators in the criterion layer include at least: engineering design, engineering management, engineering quality, safety assurance, scientific and technological innovation, and green environmental protection.
[0012] Optionally, the engineering design includes at least three first-level indicators consisting of system design, aesthetic design, and humanized design respectively; the engineering management includes at least three first-level indicators consisting of management specialization, management humanization, and management standardization respectively; the engineering quality includes at least three first-level indicators consisting of quality management system, quality risk prevention, and process quality control respectively; the safety assurance includes at least three first-level indicators consisting of construction safety concept, safe production conditions, and construction safety measures respectively; the scientific and technological innovation includes at least three first-level indicators consisting of technological innovation application, innovation team training, and scientific and technological innovation training and publicity respectively; the green environmental protection includes at least three first-level indicators consisting of resource conservation, environmental protection measures, and other management measures respectively.
[0013] Optionally, the system design includes at least five secondary indicators consisting of life cycle cost, construction and maintenance integration, durability design, refined design, and standardized design respectively; the aesthetic design includes at least three secondary indicators consisting of landscape integration design, land landscape improvement, and architectural art respectively; the humanized design includes at least three secondary indicators consisting of human-oriented service functions, service area design, and convenient design respectively; the management specialization includes at least three secondary indicators consisting of management objectives, management concepts, and basic guarantees respectively; the management humanization includes at least three secondary indicators consisting of demand attention, demolition management, and team management respectively; the management standardization includes at least three secondary indicators consisting of management mechanisms, management measures, and smart construction sites respectively; the quality management system includes at least three secondary indicators consisting of the implementation of key personnel duties, the implementation of the lifelong quality responsibility system, and quality objectives and acceptance conditions respectively; the quality risk prevention includes at least three secondary indicators consisting of quality risk management, implementation of construction plans, and quality risk plans respectively; the process quality control includes at least three secondary indicators consisting of quality traceability, product quality management, and implementation of the three-inspection system respectively; the construction safety concept includes at least three secondary indicators consisting of implementation of The three secondary indicators of safety production concept, deepening the construction of safe construction sites, and the construction of a double prevention system, the safety production conditions at least include the three secondary indicators of the establishment of a safety organization, the management of machinery and equipment, and the implementation of safety production responsibilities, the construction safety measures at least include the three secondary indicators of intelligent hidden danger investigation, special safety activities, and emergency plan drills, the technological innovation and application at least include the three secondary indicators of innovative processes and methods, the application of four new technologies, and scientific and technological innovation mechanisms, the innovation team training at least includes the three secondary indicators of building an innovation team platform, innovative talent training models, and innovative talent flow mechanisms, the scientific and technological innovation training and publicity at least include the three secondary indicators of scientific and technological innovation training, scientific and technological innovation publicity, and the promotion of four new technologies, the resource conservation at least includes the three secondary indicators of material recycling, reasonable planning to reduce land use, and other energy-saving and carbon reduction technologies, the environmental protection measures at least include the three secondary indicators of ecological environment monitoring, ecological and environmental protection construction, and the use of energy-saving equipment, and the other management measures at least include the three secondary indicators of green management model innovation, green special funds, and publicity and education.
[0014] Optionally, the AHP hierarchical analysis method is used to obtain weight values of indicators at all levels, and a comprehensive weight matrix is constructed based on the weight values, including:
[0015] The comparative values of the relative importance of the evaluation indicators at the same level are determined through expert scoring, and the weight values of the indicators at each level are obtained by dividing the weight values, and a weight matrix is constructed for the divided weight values;
[0016] Normalize the weight matrix to obtain the normalized weight value;
[0017] The normalized weight values are unit summed, and the summed values are normalized to obtain a normalized sum value;
[0018] All normalized sum values are combined into a weight vector, and a comprehensive weight matrix is constructed based on the weight vector.
[0019] Optionally, constructing a fuzzy membership matrix based on the initial judgment matrix includes:
[0020] Determine the evaluation index set and judgment set for the target highway project;
[0021] Construct a membership function and normalize the expert evaluation results to obtain the index scoring results;
[0022] A fuzzy membership matrix is established based on the comprehensive scoring results of the indicators.
[0023] Optionally, the comprehensive evaluation of the target highway project based on the comprehensive weight matrix and the fuzzy membership matrix includes:
[0024] The comprehensive score of each indicator is obtained based on the comprehensive weight matrix and fuzzy membership matrix;
[0025] The comprehensive scores of various indicators are added up, and the percentage evaluation standard is used to obtain the comprehensive evaluation result score of the evaluation object. Based on the comprehensive evaluation result score, a comprehensive evaluation of the target highway project is carried out.
[0026] In a second aspect, an embodiment of the present application provides a highway project engineering quality comprehensive evaluation system, including a processor and a memory;
[0027] Memory, used to store computer programs;
[0028] The processor is used to implement any method step described in the first aspect when executing a program stored in the memory.
[0029] Beneficial effects:
[0030] The present invention provides a comprehensive evaluation method for the engineering quality of a highway project. The comprehensive evaluation index system of a target highway project is determined, and the comprehensive evaluation index system at least includes: a criterion layer, a primary index and a secondary index; an initial judgment matrix is obtained by an expert scoring method, and the weight values of the indicators at each level are obtained by using the AHP hierarchical analysis method, and a comprehensive weight matrix is constructed based on the weight values; a fuzzy membership matrix is constructed based on the initial judgment matrix, and a comprehensive evaluation is performed on the target highway project based on the comprehensive weight matrix and the fuzzy membership matrix; the method starts from the six dimensions of engineering design, engineering management, engineering quality, safety assurance, scientific and technological innovation and green environmental protection, constructs a three-layer evaluation index system including a criterion layer, a primary index and a secondary index, and constructs the evaluation key content of the secondary index, and can systematically and comprehensively evaluate the actual situation of the highway project in implementing the quality engineering according to the characteristics of the index. At the same time, by constructing a comprehensive evaluation method for the quality engineering of a highway project based on the AHP hierarchical analysis method, the evaluation object can be systematically analyzed and comprehensively evaluated in a decomposition, comparison, judgment and synthesis manner. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 One of the flow charts of the method for comprehensive evaluation of engineering quality of a highway project according to a preferred embodiment of the present invention;
[0032] Figure 2 This is the second flowchart of the method for comprehensive evaluation of engineering quality of highway projects according to the preferred embodiment of the present invention. DETAILED DESCRIPTION
[0033] The technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one" or "one" do not indicate quantity restrictions, but indicate the existence of at least one. Words such as "connect" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship also changes accordingly.
[0035] See also Figure 1 The present application embodiment provides a method for comprehensive evaluation of the engineering quality of a highway project, including:
[0036] S1: Determine a comprehensive evaluation index system for the target expressway project, wherein the comprehensive evaluation index system includes at least: a criterion layer, a primary index, and a secondary index;
[0037] S2: Obtain the initial judgment matrix by expert scoring, use AHP to obtain the weight values of indicators at all levels, and construct a comprehensive weight matrix based on the weight values;
[0038] S3: constructing a fuzzy membership matrix based on the initial judgment matrix, and conducting a comprehensive evaluation on the target highway project according to the comprehensive weight matrix and the fuzzy membership matrix.
[0039] In the above embodiment, by determining the comprehensive evaluation index system of the target highway project, the comprehensive evaluation index system at least includes: a criterion layer, a primary index and a secondary index; an initial judgment matrix is obtained by expert scoring, and the weight values of the indicators at each level are obtained by using the AHP hierarchical analysis method, and a comprehensive weight matrix is constructed based on the weight values; a fuzzy membership matrix is constructed based on the initial judgment matrix, and the target highway project is comprehensively evaluated based on the comprehensive weight matrix and the fuzzy membership matrix; this method starts from the six dimensions of engineering design, engineering management, engineering quality, safety assurance, scientific and technological innovation and green environmental protection, and constructs a three-layer evaluation index system including a criterion layer, a primary index and a secondary index, and at the same time constructs the evaluation key content of the secondary index, which can systematically and comprehensively evaluate the actual situation of the highway project in implementing the quality engineering according to the characteristics of the indicators, and at the same time, by constructing a comprehensive evaluation method for highway project quality engineering based on the AHP hierarchical analysis method, the evaluation object can be systematically analyzed and comprehensively evaluated in the form of decomposition, comparison, judgment and synthesis.
[0040] like Figure 2 As shown, in one embodiment of the present invention, a comprehensive evaluation method for highway project quality engineering includes the following steps:
[0041] Step S1, combining theoretical research related to quality engineering and the characteristics of highway project construction, sorting and screening the key factors of highway project quality engineering, and constructing a three-layer evaluation index system including the criterion layer, the first-level index and the second-level index;
[0042] Step S2, creating key contents of the secondary indicator evaluation according to the secondary indicators and the characteristics of the highway project;
[0043] Step S3, for each indicator, based on the indicator weight value determined by the expert, the normalized weight value of the indicator is determined by AHP and the consistency of the weight matrix is verified;
[0044] Step S4, statistically analyzing the scoring results of experts for each indicator and constructing a fuzzy membership matrix based on the membership function;
[0045] Step S5, performing comprehensive evaluation based on the comprehensive weight matrix and the fuzzy membership matrix.
[0046] The step S1 is specifically as follows: selecting the evaluation indicators of this study from six dimensions, namely, engineering design, engineering management, engineering quality, safety assurance, technological innovation and green environmental protection, and constructing a three-layer indicator system including a criterion layer, a primary indicator and a secondary indicator, as shown in Table 1:
[0047] Table 1: Three-layer indicator system including criteria layer, primary indicators and secondary indicators
[0048]
[0049]
[0050] In step S3, the key evaluation contents of each secondary indicator constructed are shown in Table 2.
[0051] Table 2, key evaluation contents of each secondary indicator
[0052]
[0053]
[0054]
[0055]
[0056]
[0057] The step S3 specifically includes: based on the indicator weight values determined by the experts, determining the normalized weight values of the indicators through the AHP hierarchy analysis method and verifying the consistency of the weight matrix.
[0058]
[0059] The aij in the matrix represents the ratio of the weight of indicator i to the importance of indicator j relative to the previous layer indicator, i, j = 1, 2, 3, ..., n; the aij should satisfy the following three relationships:
[0060] aij is the quantitative result of comparing the importance (fuzzy attributes) of each evaluation index by industry experts according to the 9-level scale method. The definition of the 1 to 9-level scale is shown in Table 2.
[0061] Table 3, Definition of the 1 to 9 scale
[0062]
[0063] We invited several experts to compare the importance of each evaluation index in the index system based on the needs of highway projects and quality engineering requirements, form a weight matrix, calculate the weight vector and perform consistency test. The results are as follows.
[0064] Table 4 Criteria layer indicator weight matrix and calculation results
[0065]
[0066] Table 5. Primary index weight matrix and calculation results
[0067]
[0068]
[0069]
[0070]
[0071]
[0072]
[0073]
[0074] Table 6 Secondary index weight matrix and calculation results
[0075]
[0076]
[0077]
[0078]
[0079]
[0080]
[0081]
[0082]
[0083]
[0084]
[0085]
[0086]
[0087]
[0088]
[0089]
[0090]
[0091]
[0092]
[0093]
[0094] The specific calculation process in the calculation result is as follows:
[0095] Normalize the weight matrix A to get the normalized weight value
[0096]
[0097] right Sum the rows to get At the same time Normalize and calculate the weight value Wi, and then use Wi to form the weight vector W.
[0098] in, W=(W1,W2,...,W n ) T ;
[0099] Calculate the maximum eigenvalue λmax of the weight matrix A, where
[0100] To ensure the consistency of the weight matrix, the eigenvalues other than λmax should be close to 0, and the remaining n-1 eigenvalues and absolute values are taken as the index to check the consistency of the matrix and marked as CI. Generally, the larger the CI value, the greater the degree to which the weight matrix deviates from consistency, and vice versa.
[0101] The order n of the matrix will affect the consistency. Generally, the larger the n, the greater the subjective influence of the judgment. At this time, the consistency of the deviation is greater, and vice versa. In order to eliminate the subjective factor deviation caused by the order n to a certain extent, the average random consistency index is introduced, denoted as RI. The value of RI increases with the order of the weight matrix. The RI value is shown in Table 7.
[0102] Table 7. RI values
[0103]
[0104] The ratio of the consistency index CI to the average random consistency index RI of the same order of the matrix is called the consistency ratio, denoted as The smaller the CR is, the better the consistency of the weight matrix is. It is generally believed that when CR < 0.1, the weight matrix meets the consistency standard, otherwise the weight matrix needs to be corrected.
[0105] According to the weight values of evaluation indicators at different levels, the comprehensive weights of each indicator are obtained (Table 8). The comprehensive weight matrix of evaluation indicators for highway project quality engineering is constructed: A = [0.58%, 1.42%, 0.72%, 2.33%, 3.56%, 0.25%, 0.61%, 1.47%, 2.41%, 0.69%, 0.58%, 1.98%, 0.81%, 4.81%, 1.51%, 0.58%, 0.22%, 1.09%, 2.65%, 0.44%, 3.80%, 2.40%, 14.68%, 6.30%, 1.69%, 4.01 %, 0.56%, 1.06%, 2.99%, 1.45%, 0.77%, 0.28%, 0.87%, 2.64%, 2.64%, 9.76%, 3.75%, 1.43%, 1.50%, 0.40%, 0.95%, 0.31%, 0.74%, 0.12%, 0.10%, 0.10%, 0.29%, 1.56%, 0.60%, 1.37%, 0.27%, 0.87%, 0.48%, 0.09%, 0.42%, 0.04%]
[0106] The comprehensive weight calculation method is: represents the comprehensive weight, a i Indicates the weight of the corresponding criterion layer indicator, a j Indicates the corresponding first-level indicator weight, a k Indicates the corresponding secondary indicator weight.
[0107] Table 8: Comprehensive weights of indicators
[0108]
[0109]
[0110] The step S4 constructs a fuzzy membership matrix, and the specific processing flow is as follows:
[0111] Determine the evaluation index set of the object to be evaluated, B = {b1, b2, ..., b n};
[0112] Determine the evaluation set of the evaluation index, record the possible evaluation of a certain index as vi, and record the set of all possible evaluations as the evaluation set, represented by V, V = {v1, v2, ..., v n}, the possible evaluations are usually divided into five levels, this article adopts the five levels of "good, better, medium, poor, and bad";
[0113] According to the value of each indicator of the object to be evaluated, the fuzzy membership of the indicator is determined. First, m experts (m>10 in this evaluation method) are invited to judge which evaluation level each indicator belongs to based on the given evaluation set [good, better, medium, poor, poor], where the evaluation scores corresponding to the evaluation set are [5, 4, 3, 2, 1] respectively. Secondly, the expert evaluation results are counted, and the indicator evaluation results are converted into values between [0, 1] through the corresponding membership function, where the membership function is expressed as follows:
[0114] Where Xij represents the evaluation level of indicator i made by the jth expert, m is the total number of experts, and Yi represents the normalized evaluation result value of indicator i.
[0115] According to the membership calculation method and expert evaluation results, the quantitative results of the quality engineering evaluation index of a highway project are shown in Table 9:
[0116] Table 9 Quantitative results of quality engineering evaluation indicators for a highway project
[0117]
[0118]
[0119] According to the quantitative results of the evaluation indicators shown in Table 9, the fuzzy membership matrix of the comprehensive evaluation indicators of the quality engineering of a highway project can be constructed as R = [0.80, 0.78, 0.82, 0.76, 0.73, 0.72, 0.69, 0.66, 0.73, 0.68, 0.76, 0.84, 0.86, 0.88, 0.82, 0.83, 0.86, 0.88, 0.89, 0.78, 0.86, 0.78, 0.81, 0. 86, 0.83, 0.84, 0.75, 0.80, 0.78, 0.82, 0.81, 0.78, 0.90, 0.91, 0.92, 0.75, 0.78, 0.73, 0.77, 0.75, 0.68, 0.67, 0.66, 0.75, 0.75, 0.80, 0.68, 0.80, 0.81, 0.73, 0.83, 0.75, 0.86, 0.65, 0.66, 0.64].
[0120] The step S5 is to perform a comprehensive evaluation based on the comprehensive weight matrix and the fuzzy membership matrix;
[0121] The comprehensive score of the quality engineering evaluation of a highway project can be obtained by the formula Q=A×R, where Q is the comprehensive score of the quality engineering evaluation of a highway project, A is the comprehensive weight matrix of the quality engineering evaluation indicators of a highway project, and R is the fuzzy membership matrix of the comprehensive evaluation indicators of the quality engineering of a highway project.
[0122] Table 10 Comprehensive scores of various evaluation indicators and comprehensive evaluation scores of a highway project quality engineering
[0123]
[0124]
[0125]
[0126] According to the comprehensive evaluation scores calculated in Table 10, the comprehensive evaluation result of the quality engineering of the highway project is 80.31 points.
[0127] In summary, the comprehensive evaluation method for highway project quality engineering provided by the present invention can provide technical support for scientific evaluation of the implementation of highway project quality engineering, and provide a decision-making analysis tool for the actual situation of highway project quality engineering implementation.
[0128] The embodiment of the present application also provides a highway project engineering quality comprehensive evaluation system, including a processor and a memory;
[0129] Memory, used to store computer programs;
[0130] The processor is used to implement any method step in the method for comprehensive evaluation of engineering quality of highway projects when executing the program stored in the memory.
[0131] The above-mentioned highway project engineering quality comprehensive evaluation system can implement various embodiments of the above-mentioned highway project engineering quality comprehensive evaluation method and achieve the same beneficial effects, which will not be described in detail here.
[0132] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A comprehensive evaluation method for highway project engineering quality, characterized in that: include: S1: Determine a comprehensive evaluation index system for the target expressway project, wherein the comprehensive evaluation index system includes at least: a criterion layer, a primary index, and a secondary index; S2: Obtain the initial judgment matrix by expert scoring, use AHP to obtain the weight values of indicators at all levels, and construct a comprehensive weight matrix based on the weight values; S3: constructing a fuzzy membership matrix based on the initial judgment matrix, and conducting a comprehensive evaluation on the target highway project according to the comprehensive weight matrix and the fuzzy membership matrix.
2. The method for comprehensive evaluation of highway project quality according to claim 1 is characterized in that: The evaluation indicators in the criterion layer include at least: engineering design, engineering management, engineering quality, safety assurance, scientific and technological innovation and green environmental protection.
3. The comprehensive evaluation method for highway project engineering quality according to claim 2 is characterized in that: The engineering design includes at least three first-level indicators, namely system design, aesthetic design, and humanized design; the engineering management includes at least three first-level indicators, namely management specialization, management humanization, and management standardization; the engineering quality includes at least three first-level indicators, namely quality management system, quality risk prevention, and process quality control; the safety assurance includes at least three first-level indicators, namely construction safety concept, safe production conditions, and construction safety measures; the scientific and technological innovation includes at least three first-level indicators, namely technology innovation application, innovation team training, and scientific and technological innovation training and publicity; the green environmental protection includes at least three first-level indicators, namely resource conservation, environmental protection measures, and other management measures.
4. The method for comprehensive evaluation of highway project quality according to claim 3 is characterized in that: The system design includes at least five secondary indicators, namely, life cycle cost, construction and maintenance integration, durability design, refined design, and standardized design; the aesthetic design includes at least three secondary indicators, namely, landscape integration design, land landscape improvement, and architectural art; the humanized design includes at least three secondary indicators, namely, human-oriented service function, service area design, and convenient design; the management specialization includes at least three secondary indicators, namely, management objectives, management concepts, and basic guarantees; the management humanization includes at least three secondary indicators, namely, demand attention, demolition management, and team management; the management standardization includes at least three secondary indicators, namely, management mechanism, management measures, and smart construction site; the quality management system includes at least three secondary indicators, namely, implementation of key personnel performance responsibilities, implementation of lifelong quality responsibility system, and quality objectives and acceptance status; the quality risk prevention includes at least three secondary indicators, namely, quality risk management, implementation of construction plan, and quality risk plan; the process quality control includes at least three secondary indicators, namely, quality traceability, product quality management, and implementation of the three-inspection system; the construction safety concept includes at least three secondary indicators, namely, implementation of safety The three secondary indicators of production concept, deepening the construction of safe construction sites, and the construction of a double prevention system, the safe production conditions at least include the three secondary indicators of the establishment of a safety organization, the management of machinery and equipment, and the implementation of safe production responsibilities, the construction safety measures at least include the three secondary indicators of intelligent hidden danger investigation, special safety activities, and emergency plan drills, the technological innovation and application at least include the three secondary indicators of innovative processes and methods, the application of four new technologies, and scientific and technological innovation mechanisms, the innovation team training at least includes the three secondary indicators of building an innovation team platform, innovative talent training models, and innovative talent flow mechanisms, the scientific and technological innovation training and publicity at least includes the three secondary indicators of scientific and technological innovation training, scientific and technological innovation publicity, and the promotion of four new technologies, the resource conservation at least includes the three secondary indicators of material recycling, reasonable planning to reduce land use, and other energy-saving and carbon reduction technologies, the environmental protection measures at least include the three secondary indicators of ecological environment monitoring, ecological and environmental protection construction, and the use of energy-saving equipment, and the other management measures at least include the three secondary indicators of green management model innovation, green special funds, and publicity and education.
5. The comprehensive evaluation method for highway project engineering quality according to claim 1 is characterized in that: The AHP hierarchical analysis method is used to obtain the weight values of indicators at all levels, and a comprehensive weight matrix is constructed based on the weight values, including: The comparative values of the relative importance of the evaluation indicators at the same level are determined through expert scoring, and the weight values of the indicators at each level are obtained by dividing the weight values, and a weight matrix is constructed for the divided weight values; Normalize the weight matrix to obtain the normalized weight value; The normalized weight values are unit summed, and the summed values are normalized to obtain a normalized sum value; All normalized sum values are combined into a weight vector, and a comprehensive weight matrix is constructed based on the weight vector.
6. The comprehensive evaluation method for highway project engineering quality according to claim 1 is characterized in that: The step of constructing a fuzzy membership matrix based on the initial judgment matrix includes: Determine the evaluation index set and judgment set for the target highway project; Construct a membership function and normalize the expert evaluation results to obtain the index scoring results; A fuzzy membership matrix is established based on the comprehensive scoring results of the indicators.
7. The comprehensive evaluation method for highway project engineering quality according to claim 1 is characterized in that: The comprehensive evaluation of the target highway project based on the comprehensive weight matrix and the fuzzy membership matrix includes: The comprehensive score of each indicator is obtained based on the comprehensive weight matrix and fuzzy membership matrix; The comprehensive scores of various indicators are added up, and the percentage evaluation standard is used to obtain the comprehensive evaluation result score of the evaluation object. Based on the comprehensive evaluation result score, a comprehensive evaluation of the target highway project is carried out.
8. A highway project engineering quality comprehensive evaluation system, characterized by: Including processor and memory; Memory, used to store computer programs; A processor, for implementing the method steps described in any one of claims 1 to 7 when executing a program stored in a memory.
Citation Information
Cited By
Evaluation method and system for overall design of extra-long highway mountain tunnel
CN121212568A
Labeling data set generation method and system for security training multi-source data
CN122087723A
A method and system for generating a labeled dataset of safety training multi-source data
CN122087723B