Photovoltaic engineering cost statistical method, device and equipment and storage medium
By splitting the design units of the photovoltaic project and counting the costs based on the reference cost standards, the problem of inconsistent budget standards in photovoltaic projects is solved, and the accuracy and efficiency of the project budget is improved.
Patent Information
- Application Number
- CN202411564035.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-01-14
AI Technical Summary
There are problems in photovoltaic projects with inconsistent project budget standards, different depths, and different classification methods, resulting in inaccurate project cost statistics.
By splitting the design units of photovoltaic engineering, the expenses of each design unit are counted separately based on the reference cost standards, and the total design costs of photovoltaic engineering are determined.
It improves the accuracy and efficiency of photovoltaic project estimates and solves the problem of inaccurate project cost statistics.
Smart Images

Figure CN119313415A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the technical field of photovoltaic engineering design, and in particular to a photovoltaic engineering cost statistics method, device, equipment and storage medium. Background Art
[0002] With the development of the photovoltaic power generation industry, the construction cost of photovoltaic power generation projects is also gradually maturing: the construction standards are different, the construction technology routes of photovoltaic power generation are different, and the budget management ideas of investors are very different. The exploration period has entered a period of rapid development with a series of standards, which has enabled the budget management system of photovoltaic power station projects to develop rapidly. The relevant basis is such as "Electric Power Construction Project Budget Quota", "Construction Project Budget Quota", etc. Now, the photovoltaic industry is in a period of rapid development and maturity. Typical representatives such as the State Power Investment Group, China General Nuclear Power Group and Yangtze Three Gorges Group have used relatively advanced management methods in the process of project cost, which has raised the budget management level of the photovoltaic power generation industry to a certain level. However, the existing technology still has problems such as inconsistent standards for the preparation of engineering budgets in the early stages of projects, different depths, and different classification methods. Summary of the invention
[0003] The embodiments of the present invention provide a photovoltaic project cost statistics method, device, equipment and storage medium. The technical solution of the embodiments of the present invention can solve the problems of inconsistent photovoltaic project budget estimates and inaccurate project cost statistics in the prior art. The design units in the photovoltaic project can be split, and the costs corresponding to each design unit can be counted based on the reference cost standard, so as to determine the total design cost of the photovoltaic project, thereby improving the accuracy and efficiency of the photovoltaic project budget estimate.
[0004] In a first aspect, an embodiment of the present invention provides a photovoltaic project cost statistics method, the method comprising:
[0005] Obtain a target design scheme for a target photovoltaic project, and determine at least one unit to be counted according to the target design scheme; for each unit to be counted, determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and a reference unit cost table; determine the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted.
[0006] In a second aspect, an embodiment of the present invention provides a photovoltaic project cost statistics device, the device comprising:
[0007] The module for determining the units to be counted is used to obtain the target design scheme of the target photovoltaic project and determine at least one unit to be counted according to the target design scheme; the module for determining the unit cost is used to determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table; the module for determining the project cost is used to determine the target project cost information of the target photovoltaic project according to the unit design costs of all the units to be counted.
[0008] In a third aspect, an embodiment of the present invention provides a computer device, the computer device comprising:
[0009] one or more processors;
[0010] A memory for storing one or more programs;
[0011] When the one or more programs are executed by the one or more processors, the one or more processors implement the photovoltaic project cost statistics method described in any embodiment.
[0012] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the photovoltaic project cost statistics method described in any embodiment.
[0013] The technical solution provided by the embodiment of the present invention obtains the target design scheme of the target photovoltaic project, determines at least one unit to be counted according to the target design scheme; for each unit to be counted, determines the unit design cost corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table; determines the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted. The technical solution of the embodiment of the present invention solves the problems of inconsistent photovoltaic project budget estimates and inaccurate project cost statistics in the prior art, and can split the design units in the photovoltaic project, and respectively count the costs corresponding to each design unit based on the reference cost standard, and then determine the total design cost of the photovoltaic project, which can improve the accuracy and efficiency of the photovoltaic project budget estimates. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a flow chart of a photovoltaic project cost statistics method provided by an embodiment of the present invention;
[0015] Figure 2 This is a flow chart of another photovoltaic project cost statistics method provided by an embodiment of the present invention;
[0016] Figure 3 is a schematic diagram of a type of preset photovoltaic unit provided by an embodiment of the present invention;
[0017] Figure 4 It is a schematic diagram of the proportion of various expenses in a photovoltaic project provided by an embodiment of the present invention;
[0018] Figure 5 It is a schematic diagram of the structure of a photovoltaic project cost statistics device provided by an embodiment of the present invention;
[0019] Figure 6 It is a structural schematic diagram of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] Figure 1 It is a flow chart of a photovoltaic project cost statistics method provided by an embodiment of the present invention. The embodiment of the present invention can be applied to the scenario of statistics on the construction costs of photovoltaic projects. The method can be executed by a photovoltaic project cost statistics device, which can be implemented by software and / or hardware.
[0022] like Figure 1 As shown in the figure, the statistical method of photovoltaic project costs includes the following steps:
[0023] S110 , obtaining a target design scheme for a target photovoltaic project, and determining at least one unit to be counted according to the target design scheme.
[0024] The target photovoltaic project may be a photovoltaic project for which construction cost statistics are required. The target design scheme may be a construction design scheme corresponding to the target photovoltaic project. Exemplarily, the target design scheme may include instruments and equipment required for the construction of the target photovoltaic project, equipment installation, and other engineering projects requiring expenditures. The unit to be counted may be an engineering unit for which expenditure statistics are required. Specifically, the design units in the target design scheme may be disassembled based on the preset photovoltaic unit type, thereby obtaining a plurality of units to be counted.
[0025] S120 , for each unit to be counted, determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and a reference unit cost table.
[0026] The reference unit cost table may be a reference table for determining the construction cost of the unit to be counted. The unit design cost may be the cost required to build a unit to be counted.
[0027] Specifically, the reference unit cost table may include unit prices corresponding to design units of multiple unit types. For each unit to be counted, the unit price corresponding to the unit to be counted can be matched from the reference unit cost table according to the unit type of the unit to be counted, and then the reference unit price corresponding to the unit to be counted and the number of units can be multiplied to obtain the unit design cost corresponding to the unit to be counted.
[0028] S130: Determine target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted.
[0029] The target project cost information may be information for predicting the project cost corresponding to the target photovoltaic project. Specifically, the unit design costs of all units to be counted may be integrated to obtain the total cost corresponding to all units to be counted, and the total cost information corresponding to all units to be counted may be used as the target project cost information.
[0030] The technical solution provided by the embodiment of the present invention obtains the target design scheme of the target photovoltaic project, determines at least one unit to be counted according to the target design scheme; for each unit to be counted, determines the unit design cost corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table; determines the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted. The technical solution of the embodiment of the present invention solves the problems of inconsistent photovoltaic project budget estimates and inaccurate project cost statistics in the prior art, and can split the design units in the photovoltaic project, and respectively count the costs corresponding to each design unit based on the reference cost standard, and then determine the total design cost of the photovoltaic project, which can improve the accuracy and efficiency of the photovoltaic project budget estimates.
[0031] Figure 2 It is a flow chart of another photovoltaic project cost statistics method provided by an embodiment of the present invention. The embodiment of the present invention can be applied to the scenario of statistics on the construction cost of photovoltaic projects. Based on the above embodiment, this embodiment further explains how to determine at least one unit to be counted according to the target design scheme; how to determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table; and how to determine the target project cost information of the target photovoltaic project based on the unit design costs of all units to be counted. The device can be implemented by software and / or hardware and integrated in a computer device with application development function.
[0032] like Figure 2 As shown in the figure, the statistical method of photovoltaic project costs includes the following steps:
[0033] S210: Obtain a target design scheme for a target photovoltaic project, decompose design units in the target design scheme based on preset photovoltaic unit types, and use the decomposed design units as units to be counted.
[0034] Among them, the target photovoltaic project may be a photovoltaic project that requires construction cost statistics. The target design scheme may be a construction design scheme corresponding to the target photovoltaic project. Exemplarily, the target design scheme may include instruments and equipment required for the construction of the target photovoltaic project, equipment installation, and other engineering projects that require expenditures. Further, the preset photovoltaic unit type may be a preset unit type for photovoltaic engineering division. Exemplarily, the preset photovoltaic type can be divided into four parts: equipment and installation engineering costs, construction engineering costs, other costs, and basic reserve funds. The unit to be counted may be an engineering unit that requires expenditure statistics. Specifically, based on the preset photovoltaic unit type, the design units in the target design scheme can be disassembled to obtain multiple units to be counted.
[0035] For example, Figure 3 is a schematic diagram of a type of preset photovoltaic unit provided by an embodiment of the present invention, such as Figure 3 As shown in the figure, the preset photovoltaic unit type includes four parts: equipment and installation engineering costs, construction engineering costs, other costs, and basic reserve costs. Among them, the equipment and installation engineering costs include power generation equipment and installation engineering, power distribution equipment and installation engineering, control and protection equipment and installation engineering; construction engineering costs include construction engineering, step-up substation engineering, housing construction engineering, transportation engineering, and other construction engineering; other costs include project construction land fees, project construction management fees, production preparation fees, survey and design fees, and other fees; the basic reserve cost only includes the basic reserve cost.
[0036] S220 , respectively determining the unit type and unit quantity corresponding to each unit to be counted.
[0037] Among them, the unit type can be the type corresponding to the unit to be counted. In the process of disassembling the entire target design scheme, the design unit in the scheme can be matched with multiple preset photovoltaic unit types, and the matched preset photovoltaic unit type can be used as the unit type corresponding to the unit to be counted. By determining the unit type corresponding to the unit to be counted, it is convenient to subsequently determine the unit price required to build the unit to be counted. Furthermore, the number of units to be counted of the same unit type can be counted, and then the number of units corresponding to each unit to be counted can be determined. By determining the number of units corresponding to the unit to be counted, it is convenient to subsequently determine the total cost required to build the unit to be counted.
[0038] S230: Based on the unit type, match the reference unit cost corresponding to each unit to be counted from the reference unit cost table.
[0039] The reference unit cost table may be a reference table for determining the construction cost of the unit to be counted. The reference unit price cost may be the construction cost corresponding to a single unit to be counted. Specifically, the reference unit cost table may include unit prices corresponding to design units of multiple unit types. The unit price cost corresponding to the unit to be counted may be obtained by matching the unit type of the unit to be counted from the reference unit cost table, and the matched unit price cost may be used as the reference unit price cost.
[0040] Optionally, a reference unit cost table is generated, including: obtaining photovoltaic project sample information, splitting the design components in the photovoltaic project sample information based on preset photovoltaic unit types to obtain sample units; determining the sample unit cost information corresponding to each sample unit based on the cost information about the sample units in the photovoltaic project sample information and a reference cost standard; and generating a reference unit cost table based on the sample unit cost information corresponding to multiple sample units.
[0041] Among them, the photovoltaic project sample information may be preset photovoltaic project construction information. Exemplarily, the photovoltaic project sample information may include the items of expenditure in the photovoltaic project construction, as well as the expenditure of each item. The sample unit may be the design unit involved in the photovoltaic project sample information. Exemplarily, the photovoltaic unit type may be preset to split the design components in the photovoltaic project sample information, thereby obtaining multiple sample units. Further, the reference cost standard may be a reference standard for determining the cost ratio of multiple types of expenditures. In the construction process of photovoltaic projects, not all expenses are for entities, that is, there are many design units without fixed cost standards in the project construction, so it is necessary to determine the charging range corresponding to the design units without fixed cost standards based on the reference cost standard. Exemplarily, the charging range corresponding to the design units with non-fixed cost standards can be determined based on the proportion of the design unit expenditures with non-fixed cost standards and the actual costs of the design units with fixed cost standards.
[0042] The sample unit cost information may be the construction unit price corresponding to a single sample unit. For example, based on the cost information about the sample unit in the photovoltaic project sample information, the cost corresponding to each type of sample unit may be counted separately, and then the cost range of the sample unit without a fixed cost standard may be adjusted based on the reference cost standard, thereby determining the sample unit cost information corresponding to each sample unit. Finally, the sample unit cost information corresponding to all sample units may be recorded in a corresponding table to generate a reference unit cost table.
[0043] S240: Determine the unit design cost corresponding to each unit to be counted according to the reference unit price and the number of units.
[0044] The unit design fee may be the fee required to construct a unit to be counted. Specifically, for each unit to be counted, the reference unit price corresponding to the unit to be counted and the number of units may be multiplied to obtain the unit design fee corresponding to the unit to be counted.
[0045] S250, counting the unit design costs of all units to be counted, and generating a target engineering budget estimate table based on the unit design costs of all units to be counted, and using the target engineering budget estimate table as the target engineering cost information.
[0046] The target project budget table may be a statistical table of project expenses corresponding to the target photovoltaic project. Specifically, the unit design expenses of all units to be counted may be counted in a corresponding table to obtain the target project budget table.
[0047] Optionally, the unit design costs of all units to be counted are counted, and a target project estimate table is generated based on the unit design costs of all units to be counted, including: constructing multiple initial sub-project estimate tables based on a reference unit cost table; based on the unit type of the units to be counted, the unit design costs of each unit to be counted are counted in the sub-project estimate table to obtain a target sub-project estimate table; and determining the target project estimate table based on multiple initial sub-project estimate tables.
[0048] The initial sub-project budget table may be an original table without data statistics. For example, the initial sub-project budget table may include at least one of: an equipment and installation project budget table, a construction project budget table, other cost budget table, and a basic reserve budget table.
[0049] The target sub-project budget table can be a table obtained by statistically analyzing the initial sub-project budget table. Specifically, based on the unit type of the unit to be statistically analyzed, the initial sub-project budget table corresponding to each unit to be statistically analyzed is analyzed, and the unit design cost is statistically analyzed in the initial sub-project budget table corresponding to the unit to be statistically analyzed, thereby obtaining the target sub-project budget table. Furthermore, all the target sub-project budget tables can be spliced and combined to obtain the target project budget table.
[0050] For example, in order to better understand the technical solution provided by the present invention, a specific embodiment is introduced below:
[0051] Step 1) Extract the preset typical design scheme, summarize and preliminarily screen the engineering budget classification items and the standards used for distributed photovoltaic projects with grid-connected voltage levels ranging from 220V to 35kV. The classification items mainly include equipment costs, construction and installation costs, other costs and basic reserve costs, among which the equipment costs include the equipment costs used in the project, and the construction and installation costs include the construction engineering costs and equipment installation costs used in the project.
[0052] Step 2) Analyze and process the summary information of step 1, and redefine the classification items of the project budget, which can be divided into four parts: equipment and installation project costs, construction project costs, other costs, and basic reserve.
[0053] Step 3) Clarify the charging basis for each item in the four major parts of the second step. If the charging basis cannot be found in the relevant national standards and regulations, the compiler can give an estimated value based on the actual operation results of previous projects and then make corrections based on the results of on-site surveys. Figure 4 It can be seen that the cost of equipment and installation projects accounts for a large proportion of the total project budget, about 75% to 85%, while the equipment costs of photovoltaic modules and inverters and the material costs of cables account for about 57% of the equipment and installation project costs. Therefore, when preparing the project budget table, engineering personnel need to pay attention to the quantity and unit price of photovoltaic modules and cables, which account for a relatively large proportion.
[0054] Step 4) Establish a one-to-one logical relationship between the distributed photovoltaic planning and design unit and the engineering budget unit to form an integrated design and cost process. When establishing a one-to-one logical relationship, the planning and design unit needs to determine the type and quantity of photovoltaic components, the type and quantity of inverters, the type and quantity of cables, the type and quantity of transformers, etc., which are the parts that account for a large proportion of the cost in the engineering budget.
[0055] Step 5) Output the engineering budget form after the integrated design and cost process according to the standard template. The standard template must include the charging basis table, equipment and installation engineering budget table, construction engineering budget table, other cost budget table, basic reserve budget table and engineering total budget table. The charging basis table can list the relevant national standards and regulations used; the equipment and installation engineering budget table can list the various equipment costs, installation costs and device material costs; the construction engineering budget table can list the names of various projects and costs, various unit prices, etc.; the other cost budget table can list the various charging bases, rates, etc.; the basic reserve budget table can list the charging bases, rates, etc., so that the review unit can have an intuitive understanding of the various charging bases and improve work efficiency.
[0056] The technical solution provided by the embodiment of the present invention obtains the power generation information of the target photovoltaic project, disassembles the design units in the target design scheme based on the preset photovoltaic unit type, and uses the disassembled design units as the units to be counted; respectively determines the unit type and unit quantity corresponding to each unit to be counted; based on the unit type, matches the reference unit price cost corresponding to each unit to be counted from the reference unit cost table; according to the reference unit price cost and the unit quantity, respectively determines the unit design cost corresponding to each unit to be counted; counts the unit design costs of all units to be counted, and generates a target project budget table based on the unit design costs of all units to be counted, and uses the target project budget table as the target project cost information. The technical solution of the embodiment of the present invention solves the problems of inconsistent photovoltaic project budget standards and inaccurate project cost statistics in the prior art, can split the design units in the photovoltaic project, count the costs corresponding to each design unit based on the reference cost standard, and then determine the total design cost of the photovoltaic project, which can improve the accuracy and efficiency of the photovoltaic project budget.
[0057] Figure 5 It is a structural schematic diagram of a photovoltaic project cost statistics device provided by an embodiment of the present invention. The embodiment of the present invention can be applied to the scenario of statistics on the construction costs of photovoltaic projects. The device can be implemented by software and / or hardware and integrated into a computer device with application development function.
[0058] like Figure 5 As shown, the photovoltaic project cost statistics device includes: a unit determination module 310 for statistics, a unit cost determination module 320 and a project cost determination module 330.
[0059] Among them, the module 310 for determining the units to be counted is used to obtain the target design scheme of the target photovoltaic project, and determine at least one unit to be counted according to the target design scheme; the module 320 for determining the unit cost is used to determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table; the engineering cost determination module 330 is used to determine the target engineering cost information of the target photovoltaic project according to the unit design costs of all the units to be counted.
[0060] The technical solution provided by the embodiment of the present invention obtains the target design scheme of the target photovoltaic project, determines at least one unit to be counted according to the target design scheme; for each unit to be counted, determines the unit design cost corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table; determines the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted. The technical solution of the embodiment of the present invention solves the problems of inconsistent photovoltaic project budget estimates and inaccurate project cost statistics in the prior art, and can split the design units in the photovoltaic project, and respectively count the costs corresponding to each design unit based on the reference cost standard, and then determine the total design cost of the photovoltaic project, which can improve the accuracy and efficiency of the photovoltaic project budget estimates.
[0061] In an optional implementation, the to-be-counted unit determination module 310 is specifically configured to: disassemble the design units in the target design solution based on preset photovoltaic unit types, and use the disassembled design units as the to-be-counted units.
[0062] In an optional embodiment, the unit cost determination module 320 is specifically used to: respectively determine the unit type and unit quantity corresponding to each unit to be counted; based on the unit type, match the reference unit price cost corresponding to each unit to be counted from the reference unit cost table; and according to the reference unit price cost and the unit quantity, respectively determine the unit design cost corresponding to each unit to be counted.
[0063] In an optional implementation, the engineering cost determination module 330 is specifically used to: count the unit design costs of all units to be counted, and generate a target engineering budget estimate table based on the unit design costs of all units to be counted, and use the target engineering budget estimate table as the target engineering cost information.
[0064] In an optional embodiment, the project cost determination module 330 includes: a budget table determination unit, which is used to: construct multiple initial sub-project budget tables based on the reference unit cost table; based on the unit type of the unit to be counted, count the unit design costs of each unit to be counted in the sub-project budget table to obtain a target sub-project budget table; determine the target project budget table based on multiple initial sub-project budget tables.
[0065] In an optional embodiment, the photovoltaic project cost statistics device also includes: a reference unit cost table determination module, which is used to: obtain photovoltaic project sample information, split the design components in the photovoltaic project sample information based on preset photovoltaic unit types to obtain sample units; based on the cost information about the sample units in the photovoltaic project sample information, and the reference cost standard, respectively determine the sample unit cost information corresponding to each of the sample units; and generate the reference unit cost table based on the sample unit cost information corresponding to multiple sample units.
[0066] In an optional implementation, the initial sub-project estimate table includes at least one of an equipment and installation project estimate table, a construction project estimate table, other cost estimate table, and a basic reserve budget estimate table.
[0067] The photovoltaic project cost statistics device provided in the embodiment of the present invention can execute the photovoltaic project cost statistics method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0068] Figure 6 A schematic diagram of the structure of a computer device provided in an embodiment of the present invention. Figure 6 A block diagram of an exemplary computer device 12 suitable for use in implementing embodiments of the present invention is shown. Figure 6 The computer device 12 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention. The computer device 12 can be any terminal device with computing capability and can be configured in the photovoltaic project cost statistics device.
[0069] like Figure 6 As shown, the computer device 12 is in the form of a general-purpose computing device. The components of the computer device 12 may include, but are not limited to: one or more processors or processing units 16, a system memory 28, and a bus 18 that connects various system components (including the system memory 28 and the processing unit 16).
[0070] The bus 18 may be one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, an accelerated graphics port, a processor or a local bus using any of a variety of bus architectures. For example, these architectures include, but are not limited to, an Industry Standard Architecture (ISA) bus, a Micro Channel Architecture (MAC) bus, an Enhanced ISA bus, a Video Electronics Standards Association (VESA) local bus, and a Peripheral Component Interconnect (PCI) bus.
[0071] The computer device 12 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the computer device 12, including volatile and non-volatile media, removable and non-removable media.
[0072] The system memory 28 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 30 and / or cache 32. The computer device 12 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage system 34 may be used to read and write non-removable, non-volatile magnetic media ( Figure 6 not shown, usually called a "hard drive"). Although Figure 6 Not shown in the figure, a disk drive for reading and writing to a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing to a removable non-volatile optical disk (e.g., a CD-ROM, a DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to the bus 18 via one or more data medium interfaces. The system memory 28 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present invention.
[0073] A program / utility 40 having a set (at least one) of program modules 42 may be stored, for example, in system memory 28, such program modules 42 including, but not limited to, an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. Program modules 42 generally perform the functions and / or methods of the embodiments described herein.
[0074] The computer device 12 may also communicate with one or more external devices 14 (e.g., keyboards, pointing devices, displays 24, etc.), one or more devices that enable a user to interact with the computer device 12, and / or any device that enables the computer device 12 to communicate with one or more other computing devices (e.g., network cards, modems, etc.). Such communication may be performed through an input / output (I / O) interface 22. Furthermore, the computer device 12 may also communicate with one or more networks (e.g., local area networks (LANs), wide area networks (WANs), and / or public networks, such as the Internet) through a network adapter 20. Figure 6 As shown, the network adapter 20 communicates with other modules of the computer device 12 via the bus 18. It should be understood that although Figure 6Not shown, other hardware and / or software modules may be used in conjunction with computer device 12, including but not limited to microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0075] The processing unit 16 executes various functional applications and data processing by running the program stored in the system memory 28, for example, implementing the photovoltaic project cost statistics method provided in the embodiment of the present invention, the method comprising:
[0076] Obtain a target design scheme for a target photovoltaic project, and determine at least one unit to be counted according to the target design scheme; for each unit to be counted, determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and a reference unit cost table; determine the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted.
[0077] This embodiment provides a computer-readable storage medium, on which a computer program is stored. When the program is executed by a processor, the photovoltaic project cost statistics method provided by any embodiment of the present invention is implemented, including:
[0078] Obtain a target design scheme for a target photovoltaic project, and determine at least one unit to be counted according to the target design scheme; for each unit to be counted, determine the unit design cost corresponding to each unit to be counted according to each unit to be counted and a reference unit cost table; determine the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted.
[0079] The computer storage medium of the embodiment of the present invention can adopt any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to: an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it.
[0080] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.
[0081] The program code embodied on the computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.
[0082] Computer program code for performing the operations of the present invention may be written in one or more programming languages or combinations thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0083] It should be understood by those skilled in the art that the modules or steps of the present invention described above can be implemented by a general-purpose computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, optionally, they can be implemented by a program code executable by a computer device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0084] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A photovoltaic project cost statistics method, characterized in that: include: Obtaining a target design scheme for a target photovoltaic project, and determining at least one unit to be counted according to the target design scheme; For each unit to be counted, according to each unit to be counted and a reference unit cost table, the unit design cost corresponding to each unit to be counted is determined respectively; According to the unit design costs of all the units to be counted, target project cost information of the target photovoltaic project is determined.
2. The method according to claim 1, characterized in that The step of determining at least one unit to be counted according to the target design scheme includes: The design units in the target design solution are disassembled based on the preset photovoltaic unit types, and the disassembled design units are used as units to be counted.
3. The method according to claim 1, characterized in that The step of determining the unit design fee corresponding to each unit to be counted according to each unit to be counted and the reference unit cost table includes: Determine the unit type and unit quantity corresponding to each unit to be counted; Based on the unit type, matching the reference unit cost corresponding to each unit to be counted from the reference unit cost table; The unit design cost corresponding to each of the units to be counted is determined respectively according to the reference unit price and the number of units.
4. The method according to claim 1, characterized in that: Determining target project cost information of the target photovoltaic project based on the unit design costs of all units to be counted includes: The unit design costs of all units to be counted are counted, and a target engineering budget estimate table is generated based on the unit design costs of all units to be counted, and the target engineering budget estimate table is used as the target engineering cost information.
5. The method according to claim 4, characterized in that The method of counting the unit design costs of all units to be counted and generating a target engineering budget estimate table based on the unit design costs of all units to be counted includes: Constructing a plurality of initial sub-project budget tables based on the reference unit cost table; Based on the unit type of the unit to be counted, the unit design cost of each unit to be counted is counted into the sub-project budget table to obtain a target sub-project budget table; The target project budget estimate table is determined based on a plurality of initial sub-project budget estimates tables.
6. The method according to claim 1, characterized in that Generating the reference unit cost table includes: Acquire photovoltaic engineering sample information, and split the design components in the photovoltaic engineering sample information based on preset photovoltaic unit types to obtain sample units; Based on the cost information about the sample units in the photovoltaic project sample information and the reference cost standard, respectively determine the sample unit cost information corresponding to each of the sample units; The reference unit cost table is generated according to the sample unit cost information corresponding to the plurality of sample units.
7. The method according to claim 5, characterized in that The initial sub-project budget table includes at least one of an equipment and installation project budget table, a construction project budget table, other cost budget table, and a basic reserve budget table.
8. A photovoltaic project cost statistics device, characterized in that: The device comprises: A unit to be counted determination module is used to obtain a target design scheme of a target photovoltaic project and determine at least one unit to be counted according to the target design scheme; A unit cost determination module, for determining, for each unit to be counted, the unit design cost corresponding to each unit to be counted according to each unit to be counted and a reference unit cost table; The project cost determination module is used to determine the target project cost information of the target photovoltaic project according to the unit design costs of all units to be counted.
9. A computer device, characterized in that: The computer device comprises: one or more processors; A memory for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the photovoltaic project cost statistics method as described in any one of claims 1-7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the photovoltaic project cost statistics method as described in any one of claims 1-7 is implemented.