Water treatment aeration pipe, flow control method, electronic equipment and readable storage medium

By designing a water treatment aeration pipe that includes a gas main pipe, an independent aeration sub-pipe and a flow adjustment mechanism, the problem of aeration pipe blockage caused by impurities in sewage is solved, achieving precise adjustment of gas flow and effective prevention of blockage. .

CN119330519AActive Publication Date: 2025-01-21国能水务环保有限公司
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411542789.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-01-21
Estimated Expiration
2044-10-31

AI Technical Summary

Technical Problem

Due to the wastewater being mixed with more dust and other impurities, the aeration pipeline is blocked and cannot be used normally. The existing methods such as setting up a filter are not effective.

Method used

Design a water treatment aeration pipe, including a main gas transmission pipe, multiple independent aeration sub-pipes and a flow regulating mechanism. Each aeration sub-pipe is connected to the main gas transmission pipe through a transition pipe, and is equipped with a flow regulating mechanism and a pressure detection device. , the controller adjusts the flow based on the gas pressure value to prevent clogging.

Benefits of technology

It achieves precise adjustment of the gas flow in the aeration sub-pipe, increases the gas pressure to blow out the blockage, and effectively prevents the aeration sub-pipe from being blocked. The overall structure is simple and the energy consumption is low.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119330519A_ABST
    Figure CN119330519A_ABST
Patent Text Reader

Abstract

The invention provides a water treatment aeration pipe, a flow control method, electronic equipment and a readable storage medium, and belongs to the technical field of water treatment. Comprising a gas transmission header pipe connected with a gas pressurizing device; the plurality of aeration sub-pipelines are arranged in the wastewater pool, and aeration holes are formed in the aeration sub-pipelines at intervals; each aeration sub-pipeline is connected with the gas transmission header pipe through a transition pipeline; each transition pipeline is provided with a flow adjusting mechanism used for adjusting gas flow. A pressure detection device is arranged on each aeration sub-pipeline and is used for detecting the pressure value of gas in the aeration sub-pipeline; and the controller is connected with the gas pressurizing device, the pressure detection device and the flow adjusting mechanism, and is used for controlling the opening degree of the flow adjusting mechanism based on the pressure value of the corresponding aeration sub-pipeline so as to adjust the gas flow and pressure of the corresponding aeration sub-pipeline and adjust the operation power of the gas pressurizing device. The device is simple in structure, the flow of the pipeline can be accurately adjusted, and the aeration sub-pipeline is effectively prevented from being blocked.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water treatment, and in particular to a water treatment aeration pipe, a flow control method of the water treatment aeration pipe, an electronic device and a readable storage medium. Background Art

[0002] Aeration tube is a new type of aeration facility, also known as compressed air aeration. Aeration tube is usually used for aeration in A / O and A2 / O processes, CASS process, Biolake process and improved oxidation ditch process. It uses a blower to transport air and oxygen through the gas pipeline to the aeration pipeline at the bottom of the pool, where the air and oxygen are dispersed and escaped in the form of bubbles, dissolving oxygen into the water at the gas-liquid interface.

[0003] Since the aeration pipe is in sewage, and the sewage is mixed with a lot of dust and other impurities, the aeration pipe may be blocked, resulting in the aeration pipe being unable to be used normally. Currently, blockage is usually prevented by setting filters, etc., but the effect is not good. Summary of the invention

[0004] The purpose of the embodiments of the present invention is to provide a water treatment aeration pipe, a flow control method, an electronic device and a readable storage medium, so as to solve the above-mentioned problem that the aeration pipe is located in sewage and is mixed with a lot of impurities such as dust, which may cause the aeration pipe to be blocked, thereby causing the aeration pipe to be unable to be used normally. At present, blockage is usually prevented by setting a filter screen, etc., but the effect is not good.

[0005] In order to achieve the above object, an embodiment of the present invention provides a water treatment aeration pipe, the pipe comprising: A gas main pipe, the gas inlet end of the gas main pipe is connected to the gas outlet end of the gas pressurizing device; A plurality of aeration sub-pipes independently arranged from each other are arranged in intervals in the wastewater tank through a fixing mechanism, and aeration holes are arranged at intervals on each aeration sub-pipe; each aeration sub-pipe is connected to the gas outlet end of the gas main pipe through a transition pipe; each transition pipe is provided with a flow regulating mechanism for regulating the gas flow and pressure entering the corresponding aeration sub-pipe; Each aeration sub-pipeline is provided with a pressure detection device for detecting the gas pressure value in the corresponding aeration sub-pipeline. Each aeration sub-pipeline is provided with a pressure detection device; The controller is connected to the gas pressurizing device, the pressure detecting device and the flow regulating mechanism, and is used to control the opening of the corresponding flow regulating mechanism based on the gas pressure value of the aeration sub-pipeline, thereby adjusting the gas flow and gas pressure of the aeration sub-pipeline, and adjusting the operating power of the gas pressurizing device.

[0006] Optionally, the gas pressurizing device is a gas compressor.

[0007] Optionally, a plurality of pipe supports are provided in the wastewater tank; The fixing mechanism includes a plurality of pipe clamps connected to corresponding pipe supports via bolts.

[0008] Optionally, the gas pressurizing device is a gas compressor; The flow regulating mechanism is an electric valve or a pneumatic valve.

[0009] A second aspect of the present invention provides a flow control method for a water treatment aeration pipe, the method comprising: Confirming that the gas supply start instruction has been received, each flow regulating mechanism is adjusted to a first preset opening; Obtain the actual gas pressure value of each aeration sub-pipeline in real time; If the difference between the actual gas pressure value of any aeration sub-pipeline and the first preset pressure value is greater than the set difference threshold and lasts for the first preset time, the flow regulating mechanism corresponding to the aeration sub-pipeline is controlled to adjust to the second preset opening and lasts for the second preset time, and the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted back to the first preset opening; The first preset opening is smaller than the second preset opening.

[0010] Optionally, the method further includes: After a third preset time has passed since the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted back to the first preset opening, the actual pressure value of the gas in the aeration sub-pipeline is reacquired; If the difference between the re-acquired actual gas pressure value of the aeration sub-pipeline and the first preset pressure value is still greater than the set difference threshold, an alarm is generated.

[0011] Optionally, the method further includes: If the difference between the actual gas pressure value and the first preset pressure value of two or more aeration sub-pipes is greater than the set difference threshold and the first preset time duration, the operating power of the gas pressurizing device is adjusted based on the number of the two or more aeration sub-pipes, and the flow regulating mechanisms corresponding to the two or more aeration sub-pipes are adjusted to the second preset opening.

[0012] Optionally, adjust the operating power of the gas pressurization device, including: The operating power of the gas pressurizing device is calculated based on the following formula: ; in, is the operating power of the regulated gas pressurizing device; It is the reference operating power of the gas pressurizing device; The number of aeration sub-pipelines for which the difference between the actual gas pressure value and the first preset pressure value is greater than the set difference threshold and lasts for a certain period of time; is the total number of aeration sub-pipes; is the correction factor.

[0013] A third aspect of the present invention provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned flow control method for a water treatment aeration pipe when executing the computer program.

[0014] On the other hand, the present invention provides a readable storage medium having instructions stored thereon, the instructions being used to enable a machine to execute the above-mentioned flow control method for aeration pipes for water treatment.

[0015] In the technical solution, each aeration sub-pipe is connected to the gas outlet end of the gas main through a transition pipe to achieve independent gas supply, and a flow regulating mechanism is provided on each transition pipe to achieve the regulation of the gas flow entering the aeration sub-pipe. The overall structure is simple, the energy consumption is low, and the pipeline flow can be accurately adjusted. In the early stage of blockage, the gas pressure in the pipeline is increased for blowing and exhaust, thereby effectively preventing blockage of the aeration sub-pipe.

[0016] Other features and advantages of the embodiments of the present invention will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings: Figure 1 It is a schematic diagram of the structure of the water treatment aeration pipe provided by the present invention; Figure 2 is a cross-sectional schematic diagram of the aeration sub-pipe provided by the present invention; Figure 3 It is a flow chart of a first flow control method of a water treatment aeration pipe provided by the present invention; Figure 4 It is a flow chart of a second flow control method for a water treatment aeration pipe provided by the present invention.

[0018] Description of Reference Numerals 1-gas transmission main pipe; 2-gas pressurizing device; 3-aeration sub-pipeline; 4-fixing mechanism; 5-transition pipeline; 6-flow regulating mechanism; 7-pressure detecting device; 8-controller; 11-buffer chamber; 31-aeration hole. DETAILED DESCRIPTION

[0019] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.

[0020] In the embodiments of the present invention, unless otherwise specified, directional words such as "up, down, left, right" generally refer to the directions or positional relationships shown in the accompanying drawings, or the directions or positional relationships in which the inventive product is usually placed when in use.

[0021] The terms “first”, “second”, “third”, etc. are only used for distinguishing descriptions and should not be understood as indicating or implying relative importance.

[0022] The terms "parallel", "vertical", etc. do not mean that the components must be absolutely parallel or vertical, but can be slightly tilted. For example, "parallel" only means that its direction is more parallel than "vertical", and does not mean that the structure must be completely parallel, but can be slightly tilted.

[0023] The terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal, vertical or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0024] In addition, the terms "roughly" and "basically" are intended to explain that the relevant content does not require absolute precision, but can have certain deviations. For example, "roughly equal" does not only mean absolute equality. Since it is difficult to achieve absolute "equality" in actual production and operation, there are generally certain deviations. Therefore, in addition to absolute equality, "roughly equal" also includes the above-mentioned situation with certain deviations. Taking this as an example, in other cases, unless otherwise specified, the terms "roughly" and "basically" have similar meanings to the above.

[0025] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] Figure 1 It is a schematic diagram of the structure of the water treatment aeration pipe provided by the present invention; Figure 2 is a cross-sectional schematic diagram of the aeration sub-pipe provided by the present invention; Figure 3It is a flow chart of a first flow control method of a water treatment aeration pipe provided by the present invention; Figure 4 It is a flow chart of a second flow control method for a water treatment aeration pipe provided by the present invention.

[0027] like Figure 1-2 As shown, this embodiment provides a water treatment aeration pipe, the pipe comprising: A gas main pipe 1, wherein the gas inlet end of the gas main pipe 1 is connected to the gas outlet end of the gas pressurizing device 2; A plurality of aeration sub-pipes 3 independently arranged from each other are arranged at intervals in the wastewater tank through a fixing mechanism 4, aeration holes 31 are arranged at intervals on each aeration sub-pipe 3, each aeration sub-pipe 3 is connected to the gas outlet end of the gas main 1 through a transition pipe 5, and each transition pipe 5 is provided with a flow regulating mechanism 6, and the flow regulating mechanism 6 is used to regulate the gas flow and pressure entering the corresponding aeration sub-pipe 3; A plurality of pressure detection devices 7, used to detect the gas pressure value in the aeration sub-pipeline 3, each aeration sub-pipeline 3 is provided with a pressure detection device 7; The controller 8 is connected to the gas pressurizing device 2, all the pressure detecting devices 7 and all the flow regulating mechanisms 6, and is used to control the opening of the corresponding flow regulating mechanism 6 based on the gas pressure value of the corresponding aeration sub-pipeline 3 to adjust the gas flow and pressure of the corresponding aeration sub-pipeline 3, and adjust the operating power of the gas pressurizing device 2.

[0028] Specifically, in this embodiment, the diameter of the gas main 1 is larger than the diameter of the transition pipe 5 and the aeration sub-pipe 3 to ensure that the gas entering the transition pipe 5 and the aeration sub-pipe 3 has a certain pressure. At the same time, the flow rate in the aeration sub-pipe 3 can be adjusted by the flow regulating mechanism 6, thereby adjusting the gas pressure in the pipe. The pressure detection device 7 can be arranged at the air inlet end of the aeration sub-pipe 3 to ensure the accuracy of pressure data collection, and avoid the problem of inaccurate pressure data collection when the aeration sub-pipe 3 is blocked in the middle section due to the rearward setting position. The number of aeration sub-pipes 3 can be set according to the size of the wastewater tank to ensure that the gas can be uniformly injected into the wastewater tank; the material of the aeration sub-pipe 3 is UPVC, PE, ABS, 304, 316, duplex steel, etc., the opening at the bottom of the aeration sub-pipe 3 (the lower end face of the aeration sub-pipe 3) is Φ5~Φ10mm, the spacing is 200~500, and it is staggered at a 45-degree angle, and the opening is a tapered hole, and the large end of the tapered hole faces the outside of the pipe. The controller 8 is connected to the gas pressurizing device 2, all the pressure detection devices 7 and all the flow regulating mechanisms 6, and can automatically control the corresponding flow regulating mechanism 6 to adjust the gas flow of the corresponding aeration sub-pipe 3 and the operating power of the gas pressurizing device 2 based on the gas pressure value of the corresponding aeration sub-pipe 3 to ensure that the gas pressure meets the usage requirements.

[0029] In the above scheme, each aeration sub-pipe is connected to the gas outlet end of the gas main through a transition pipe to realize independent gas supply, and a flow regulating mechanism is provided on each transition pipe to realize the regulation of the gas flow entering the aeration sub-pipe. The overall structure is simple, the energy consumption is low, and the pipeline flow can be accurately adjusted. In the early stage of blockage, the gas pressure in the pipeline is increased for blowing and exhaust, thereby effectively preventing blockage of the aeration sub-pipe.

[0030] Furthermore, a buffer cavity 11 is provided at the gas outlet end of the gas main pipe 1 , and the gas inlet end of each transition pipe 5 is connected to the buffer cavity 11 .

[0031] Specifically, in this embodiment, a buffer cavity 11 is provided at the outlet end of the gas main 1, and the inlet end of each transition duct 5 is connected to the buffer cavity 11. After compression, the compressed gas enters the gas main 1. If the inlet end of the transition duct 5 is directly connected to the gas main 1, the gas pressure entering the transition duct 5 will be different. Therefore, after the buffer cavity 11 is provided for gas buffering, the stability of the input pressure can be ensured in the input transition duct 5. More specifically, the buffer cavity 11 can be set as a hemispherical structure, the outlet end of the gas main 1 is connected to the convex surface of the hemispherical surface, and the inlet end of the transition duct 5 is evenly connected to the plane of the hemispherical surface.

[0032] Furthermore, a plurality of pipe supports are provided in the wastewater tank; The fixing mechanism 4 includes a plurality of pipe clamps connected to corresponding pipe supports via bolts.

[0033] Specifically, in this embodiment, the aeration sub-pipe 3 is installed and fixed on the pipe support by a pipe clamp, so that the aeration sub-pipe 3 is fixed to the wastewater tank. This method is convenient for installation, fixing and disassembly.

[0034] More specifically, the pipe support is welded to the embedded parts at the bottom of the pool. According to the water quality, the pipe support is uniformly anti-corrosive after welding. The bottom plate anti-corrosion layer covers the bottom of the pool and the embedded parts. The pipe clamp and nut can be made of UPVC, 304, 316, 316L, 317, or duplex steel corrosion-resistant materials according to different water qualities. The length is twice the thickness of the support + the circumference of the round pipe + twice the thickness of the nut. The distance between the two holes of the pipe clamp is the pipe diameter. The pipe support can be a channel steel or a round pipe with a steel plate on top. It can be rotated according to economic efficiency. The holes on it match the pipe clamp. It can be uniformly anti-corrosive before the pipe is installed. The anti-corrosion form is glass fiber reinforced plastic, polyurea anti-corrosion, or UPVC, 304, 316. The material of the embedded parts at the bottom of the pool can be carbon steel, 304, 316, or 316L according to different water qualities. The length or width is greater than 50mm on each side of the pipe support.

[0035] Further, the gas pressurizing device 2 is a gas compressor; The flow regulating mechanism 6 is an electric valve or a pneumatic valve.

[0036] Specifically, the gas pressurizing device 2 is a gas compressor, which can compress the gas, so that the gas introduced into the pipeline has a certain pressure, thereby ensuring the injection effect; in addition, the flow regulating mechanism 6 is an electric valve or a pneumatic valve, which can realize remote on-off control, thereby improving the convenience and flexibility of use.

[0037] The embodiment of the present invention also provides a flow control method for a water treatment aeration pipe, such as Figure 3 As shown, the method includes: Step 1: confirm that the gas supply start instruction has been received, and adjust each flow regulating mechanism to a first preset opening; Step 2: Obtain the actual gas pressure value of each aeration sub-pipeline in real time; Step 3: If the difference between the actual gas pressure value of any aeration sub-pipeline and the first preset pressure value is greater than the set difference threshold and lasts for the first preset time, the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the second preset opening; Step 4: from the moment when the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the second preset opening, after the second preset time has passed, the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the first preset opening; The first preset opening is smaller than the second preset opening.

[0038] Specifically, after the process of introducing gas into the wastewater pool, first, an external signal is input through a keyboard, touch screen, etc. to generate a start gas supply instruction, and the start gas supply instruction is sent to the controller. After receiving the start gas supply instruction, the controller controls the gas pressurizing device to compress the gas according to a preset reference power, and adjusts each flow regulating mechanism to a first preset opening. When operating under the reference power, the gas pressure value in each aeration sub-pipeline is theoretically the same, and even if there is a certain deviation, the deviation value is small; at this time, the actual gas pressure value of each aeration sub-pipeline is obtained in real time; if the difference between the actual gas pressure value of any aeration sub-pipeline and the first preset pressure value is greater than the set difference threshold (when the aeration hole is blocked, the pressure in the aeration sub-pipeline will increase slightly), therefore, the difference between the actual gas pressure value of the aeration sub-pipeline and the first preset pressure value is greater than the set difference threshold (when the aeration hole is blocked, the pressure in the aeration sub-pipeline will increase slightly), therefore, the difference between the actual gas pressure value of the aeration sub-pipeline and the first preset pressure value is greater than the set If the difference threshold value continues for the first preset time, it means that the pressure value change is not accidental but exists for a long time, which means that the aeration hole is indeed blocked at this time and is in the initial stage of blockage. Therefore, the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the second preset opening. After adjusting to the second preset opening, the gas flow entering the aeration sub-pipeline increases, and when the gas discharge volume remains unchanged, the corresponding gas pressure will increase, thereby flushing the blocked aeration control and effectively avoiding the aggravation of the blockage. However, since the flow regulating mechanism is adjusted to the first preset opening, it is the optimal amount of gas injected. Continuing to increase the gas injection amount cannot effectively improve the water treatment effect. Therefore, in order to reduce energy waste, from the moment when the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the second preset opening, after the second preset time, the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the first preset opening.

[0039] In the above scheme, each aeration sub-pipe is connected to the gas outlet end of the gas main through a transition pipe to realize independent gas supply, and a flow regulating mechanism is provided on each transition pipe to realize the regulation of the gas flow entering the aeration sub-pipe. The overall structure is simple, the energy consumption is low, and the pipeline flow can be accurately adjusted. In the early stage of blockage, the gas pressure in the pipeline is increased for blowing and exhaust, thereby effectively preventing blockage of the aeration sub-pipe.

[0040] Furthermore, if Figure 4 As shown, the method also includes: After a third preset time has passed since the moment when the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to the first preset opening for the second time, the actual pressure value of the gas in the aeration sub-pipeline is obtained again; If the difference between the re-acquired actual gas pressure value of the aeration sub-pipeline and the first preset pressure value is still greater than the set difference threshold, an alarm is generated.

[0041] Specifically, after high-pressure gas injection is performed on the clogged aeration sub-pipe, in order to verify whether there is still a blockage in the aeration sub-pipe, after a second preset time, the flow regulating mechanism corresponding to the aeration sub-pipe is adjusted to a first preset opening, and after a third preset time (to avoid misjudgment of the result due to chance), the actual gas pressure value of the aeration sub-pipe is obtained again. If the difference between the re-obtained actual gas pressure value of the aeration sub-pipe and the first preset pressure value is still greater than the set difference threshold, it means that the aeration sub-pipe is still clogged, and the blockage cannot be effectively reduced by injecting gas. In order to avoid further deterioration, an alarm is generated to notify maintenance personnel to perform manual maintenance.

[0042] Furthermore, the method further comprises: If there are two or more aeration sub-pipes at the same time where the difference between the actual gas pressure value and the first preset pressure value is greater than the set difference threshold and lasts for a certain period of time, then based on the number of aeration sub-pipes where the difference between the actual gas pressure value and the first preset pressure value is greater than the set difference threshold and lasts for a certain period of time, the operating power of the gas pressurizing device is adjusted, and the flow regulating mechanisms corresponding to the two or more aeration sub-pipes are adjusted to the second preset opening.

[0043] Specifically, in the present embodiment, in actual use, there may be two or more aeration sub-pipelines at the same time whose actual gas pressure value and the first preset pressure value have a difference greater than the set difference threshold and lasts for a certain period of time. At this time, if the gas injection amount is increased at the same time, the overall gas pressure will be reduced, which will not only fail to effectively prevent blockage, but is more likely to aggravate the blockage. Therefore, based on the number of aeration sub-pipelines whose actual gas pressure value and the first preset pressure value have a difference greater than the set difference threshold and lasts for a certain period of time, the operating power of the gas pressurizing device is adjusted to increase the operating power so that the gas pressure increases. Then, the flow regulating mechanisms corresponding to the two or more aeration sub-pipelines are adjusted to the second preset opening to ensure that the gas pressure meets the usage requirements, thereby ensuring the anti-blockage effect.

[0044] In another implementation, the above solution may also be replaced by: If the difference between the actual gas pressure value and the first preset pressure value of two or more aeration sub-pipes is greater than the set difference threshold and lasts for a long time, the aeration sub-pipes are controlled in sequence according to the preset numbers of the aeration sub-pipes (the control method is the same as above and will not be repeated here).

[0045] Further, adjusting the operating power of the gas pressurizing device includes: The operating power of the gas pressurizing device is calculated based on the following formula: ; in, is the operating power of the regulated gas pressurizing device; It is the reference operating power of the gas pressurizing device; The number of aeration sub-pipelines for which the difference between the actual gas pressure value and the first preset pressure value is greater than the set difference threshold and lasts for a certain period of time; is the total number of aeration sub-pipes; is the correction factor.

[0046] Specifically, the above calculation formula is used to calculate the operating power of the gas pressurizing device. The calculation result is accurate and can match the gas pressure, which can avoid overpressure, protect the pipeline, and ensure that the gas pressure meets the use requirements.

[0047] An embodiment of the present invention further provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned flow control method for a water treatment aeration pipe when executing the computer program.

[0048] The embodiment of the present invention further provides a readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the above-mentioned flow control method for aeration pipes for water treatment.

[0049] The optional implementation modes of the embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the embodiments of the present invention are not limited to the specific details in the above implementation modes. Within the technical concept of the embodiments of the present invention, various simple modifications can be made to the technical scheme of the embodiments of the present invention, and these simple modifications all belong to the protection scope of the embodiments of the present invention.

[0050] Those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including several instructions for making a single-chip microcomputer, a chip or a processor (processor) perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0051] The optional embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the embodiments of the present invention are not limited to the specific details in the above embodiments. Within the technical concept of the embodiments of the present invention, the technical scheme of the embodiments of the present invention can be subjected to a variety of simple modifications, and these simple modifications all belong to the protection scope of the embodiments of the present invention. It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner when there is no contradiction. In order to avoid unnecessary repetition, the embodiments of the present invention will not further describe various possible combinations. In addition, various implementation modes of the embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the embodiments of the present invention, they should also be regarded as the contents disclosed by the embodiments of the present invention.

Claims

1. A water treatment aeration tube, characterized in that: The pipeline includes: A gas main pipe (1), wherein the gas inlet end of the gas main pipe (1) is connected to the gas outlet end of the gas pressurizing device (2); A plurality of aeration sub-pipelines (3) independently arranged from each other are arranged at intervals in the wastewater pool via a fixing mechanism (4), and aeration holes (31) are arranged at intervals on each aeration sub-pipeline (3); each aeration sub-pipeline (3) is connected to the gas outlet end of the gas main pipe (1) via a transition pipe (5); each transition pipe (5) is provided with a flow regulating mechanism (6) for regulating the gas flow and pressure entering the corresponding aeration sub-pipeline (3); Each aeration sub-pipeline (3) is provided with a pressure detection device (7) for detecting the gas pressure value in the corresponding aeration sub-pipeline (3); A controller (8) is connected to the gas pressurizing device (2), the pressure detecting device (7) and the flow regulating mechanism (6), and is used to control the opening of the corresponding flow regulating mechanism (6) based on the gas pressure value of the aeration sub-pipeline (3), thereby adjusting the gas flow and gas pressure of the aeration sub-pipeline (3), and adjusting the operating power of the gas pressurizing device (2).

2. The water treatment aeration tube according to claim 1, characterized in that: A buffer cavity (11) is provided at the gas outlet end of the gas main pipe (1), and the gas inlet end of each transition pipe (5) is connected to the buffer cavity (11).

3. The water treatment aeration tube according to claim 1, characterized in that: A plurality of pipe supports are arranged in the wastewater pool; The fixing mechanism (4) comprises a plurality of pipe clamps which are connected to corresponding pipe support members via bolts.

4. The water treatment aeration tube according to claim 1, characterized in that: The gas pressurizing device (2) is a gas compressor; The flow regulating mechanism (6) is an electric valve or a pneumatic valve.

5. A flow control method for a water treatment aeration pipe, characterized in that: The method comprises: Confirming that the gas supply start instruction has been received, each flow regulating mechanism is adjusted to a first preset opening; Obtain the actual gas pressure value of each aeration sub-pipeline in real time; If the difference between the actual gas pressure value of any aeration sub-pipeline and the first preset pressure value is greater than the set difference threshold and lasts for a first preset time, the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted to a second preset opening and lasts for a second preset time, and the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted back to the first preset opening; The first preset opening is smaller than the second preset opening.

6. The flow control method of the water treatment aeration pipe according to claim 5, characterized in that: The method further comprises: After a third preset time has passed since the flow regulating mechanism corresponding to the aeration sub-pipeline is adjusted back to the first preset opening, the actual pressure value of the gas in the aeration sub-pipeline is reacquired; If the difference between the re-acquired actual gas pressure value of the aeration sub-pipeline and the first preset pressure value is still greater than the set difference threshold, an alarm is generated.

7. The flow control method of the water treatment aeration pipe according to claim 6, characterized in that: The method further comprises: If the difference between the actual gas pressure value and the first preset pressure value of two or more aeration sub-pipes is greater than the set difference threshold and the first preset time duration, the operating power of the gas pressurizing device is adjusted based on the number of the two or more aeration sub-pipes, and the flow regulating mechanisms corresponding to the two or more aeration sub-pipes are adjusted to the second preset opening.

8. The flow control method of the water treatment aeration pipe according to claim 7, characterized in that: Regulate the operating power of gas pressurization devices, including: The operating power of the gas pressurizing device is calculated based on the following formula: ; in, is the operating power of the regulated gas pressurizing device; It is the reference operating power of the gas pressurizing device; The number of aeration sub-pipelines for which the difference between the actual gas pressure value and the first preset pressure value is greater than the set difference threshold and lasts for a certain period of time; is the total number of aeration sub-pipes; is the correction factor.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the flow control method for the water treatment aeration pipe according to any one of claims 5 to 8 is implemented.

10. A readable storage medium having instructions stored thereon, the instructions being used to enable a machine to execute the flow control method for a water treatment aeration pipe according to any one of claims 5 to 8.

Citation Information

Patent Citations

  • Real-time monitoring system for resistance characteristics of aerator in sewage treatment plant and blocking early-warning method

    CN105923742A

  • Optimal energy consumption control device and method for air-blast system of sewage treatment plant

    CN108585173A

  • Aeration device applied to MBR (Membrane Bioreactor) membrane

    CN115893646A

  • Aeration device maintenance system, method and device and storage medium

    CN118270933A

  • Improved AO pool structure for sewage treatment

    CN210915519U