Construction method of ultrahigh integrated stand column and stand column
By installing a steel frame on the outside of the concrete column and integrated air ducts and fire pipes, combined with the use of pendants and screw systems, the problem of difficulty in the high -altitude operation of the decorative panel and the single function of the column is solved, and the efficient decorative panel installation and multi -function column are realized. Construction.
Patent Information
- Application Number
- CN202411641287.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-18
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2044-11-18
AI Technical Summary
During high-altitude operations, the weight and size of the decorative panels make it more difficult to install, and the existing column functions are single, which cannot meet the multifunctional needs.
By installing a steel frame on the outer side of the concrete column, a functional space is formed and the air duct and the fire pipe system are formed. The decorative panel is further installed on the outside of the steel frame, and the decorative panel is used to achieve efficient installation of the decorative panel with the pendant and screw system.
The integration of fire pipelines, ventilation fan pipelines and decorative panels, reducing the difficulty of high -altitude operations, improving the installation efficiency of the decorative panel, and enhancing the functionality of the pillars.
Smart Images

Figure CN119332931A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building decoration, and in particular to a super-high integrated column construction method and a column. Background Art
[0002] In some large exhibition halls, concert halls and other places, due to the large internal area and high internal height of the buildings, the single-story height of some buildings can reach more than 20 meters. Columns are usually installed as structural supports. In the later decoration process, the outside of the columns will also be decorated. Common ones include painting the outside of the columns and installing decorative panels.
[0003] Common decorative panels such as stone, aluminum panels, and composite decorative panels require a lot of work to install due to the high height of the columns. Although the installation workload is reduced by using relatively large decorative panels, the weight of a single decorative panel increases, making it more difficult to position and install at high altitudes.
[0004] When using relatively large-area decorative panels for installation, it is also necessary to use lifting equipment and climbing equipment for assistance. Common lifting equipment includes cranes, and climbing equipment includes articulated boom aerial work platforms. During the installation process, the decorative panel is lifted by the crane to the installation position. The construction personnel use the climbing equipment to adjust the position of the decorative panel to the installation position and fix it. Since the area of a single decorative panel is relatively large and the weight is relatively heavy, the size of some decorative panels can reach 2420×3740mm and the weight can reach 700kg, which makes it difficult to adjust the positioning and install and fix.
[0005] In addition, the existing columns usually have a single function and only have a supporting role, which cannot meet the existing functional requirements. Summary of the invention
[0006] In order to solve the above technical problems, the present invention provides an ultra-high integrated column construction method and column, which integrates fire-fighting pipelines, ventilation fan pipelines and fire alarm wires into the column, fully utilizing the height space of the column. There is no need to set up additional steel frames and other structures for the layout of fire-fighting pipelines and ventilation fan pipelines, and also solves the problem of difficulty in installation and positioning of large-area decorative panels.
[0007] The technical objectives of the present invention are achieved through the following technical solutions:
[0008] A super-high integrated column construction method, the method comprising:
[0009] A steel frame is installed outside the concrete column. The steel frame forms a functional space on one side of the concrete column for laying out the air duct and fire-fighting pipe system. The air duct and fire-fighting pipe system are integrated and installed in the functional space.
[0010] Install decorative panels on the outside of the steel frame. Before installing the decorative panels, install fire doors, air vents and inspection ports on the outside of the functional space;
[0011] The decorative panel includes a decorative surface layer, a metal back plate, and a supporting frame. The decorative surface layer is fixed to the front side of the metal back plate, and the supporting frame is fixed to the rear side of the metal back plate. Hanging parts are symmetrically installed on both sides of the supporting frame. The hanging parts include a plate structure and a downwardly opening mounting groove of the plate structure. The outer side of the steel frame is provided with a transversely arranged screw corresponding to the hanging parts.
[0012] The decorative panel is lifted to a preset installation height by a lifting device, and the decorative panel is moved relative to the screw rod so that the decorative panel is at a set installation position, and the decorative panel is moved so that the installation groove of the hanger is buckled on the screw rod from above; the decorative panel is installed sequentially from bottom to top along the concrete column.
[0013] Furthermore, a mounting plate for screw installation is installed on the outside of the steel frame, two parallel mounting plates are set corresponding to each screw, and mounting holes for screw installation are provided on the mounting plate; the mounting groove of the hanger is buckled on the screw from above between the mounting plates at both ends of the screw.
[0014] Furthermore, the longitudinal depth of the mounting groove is greater than the diameter of the screw; a threaded barrel is arranged above the mounting groove on one side of the plate structure, and a height adjustment bolt matching the thread of the threaded barrel is installed in the threaded barrel. The decorative panel is moved laterally along the screw to a set position in the horizontal direction. After the mounting groove is buckled on the screw, the lower end of the height adjustment bolt presses against the screw from above, and the height adjustment bolt is adjusted to adjust the height of the decorative panel to the set position in the height direction.
[0015] Furthermore, a locking nut is provided on the screw rod, and the locking nut is located on one side of the threaded barrel provided on the plate structure. After the position adjustment of the decorative panel is completed, the locking nut is screwed relative to the screw rod so that the locking nut is against the height adjustment bolt.
[0016] Furthermore, the mounting hole is a waist-shaped hole arranged transversely.
[0017] Furthermore, a clamping block is provided at one end of the height adjustment bolt that presses against the screw rod, and the clamping block has a U-shaped notch. A threaded hole matching the height adjustment bolt is provided in the middle of the clamping block corresponding to the arc-shaped notch, and the end of the height adjustment screw rod passes through the threaded hole and is placed in the U-shaped notch; the height adjustment bolt is pre-installed on the threaded barrel, and when adjusting the installation height of the decorative panel, the height adjustment bolt is screwed so that the U-shaped notch clamps the screw rod and the end of the height adjustment bolt presses against the screw rod from above, and then the clamping block is pressed through the locking nut.
[0018] Furthermore, the steel frame forms a rectangular frame outside the concrete column, the height of the rectangular frame is set along the height direction of the concrete column, the width of the rectangular frame is set along the width direction of the concrete column, and the length of the rectangular frame is set along the direction of the concrete column toward the functional space; a splicing groove is set on the edge of the decorative surface layer at the corner position of the steel frame.
[0019] Furthermore, when installing the decorative panels, a single decorative panel is arranged along the width direction of the rectangular frame and at least two decorative panels are arranged along the length direction of the rectangular frame at the same height of the rectangular frame; and the decorative panels close to the concrete columns are preferentially installed.
[0020] Furthermore, during the process of adjusting the position of the decorative panel, the position of the decorative panel is measured with the aid of a total station, and the position of the decorative panel is adjusted to a set position.
[0021] The present invention also provides an ultra-high integrated column, comprising a concrete column and a steel frame arranged on the outside of the concrete column, the steel frame forming a functional space on one side of the concrete column, air ducts and fire protection pipes are arranged in the functional space, and decorative panels are installed on the outside of the steel frame; fire doors are arranged on the outside of the functional space corresponding to the fire protection pipes, and air outlets are arranged on the outside of the functional space corresponding to the air ducts; an inspection port is arranged on the outside of the functional space; the ultra-high integrated column is constructed according to the above-mentioned ultra-high integrated column construction method.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1. On the one hand, the present invention provides an ultra-high integrated column, forming a functional space on one side of the concrete column, integrating and installing a fire-fighting pipe system and an air duct in the functional space, hiding the fire-fighting pipe system and the air duct in the inner area of the decorative panel, and making full use of the height space of the column and the steel frame.
[0024] 2. Another aspect of the present invention provides an ultra-high integrated column construction method, which realizes the installation of decorative panels through the cooperation of hangers and screws, thereby reducing the problem of greater positioning difficulty caused by the heavy weight of the panels during high-altitude operations.
[0025] 3. The present invention arranges a threaded tube and a height adjustment bolt on the hanger to adjust the height direction of the decorative panel with the help of the height adjustment bolt, thereby solving the problem that the crane cannot achieve fine adjustment in the height direction, facilitating high-altitude operations and reducing the difficulty of positioning the decorative panel. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the transverse section of the super-high integrated column in the present invention.
[0027] Figure 2It is a schematic diagram of the decorative panel structure of the present invention.
[0028] Figure 3 It is an enlarged view of the local structure of the decorative panel in the present invention.
[0029] Figure 4 It is a schematic diagram of the arrangement of the height adjustment bolts in the present invention.
[0030] Figure 5 It is a schematic diagram of the arrangement of the locking bolts in the present invention.
[0031] Figure 6 It is a schematic diagram of the card block arrangement in the present invention.
[0032] Figure 7 It is a schematic diagram of the hanging of the decorative panel of the present invention.
[0033] In the figure, 1. Concrete column; 2. Steel frame; 3. Air duct; 4. Fire pipe system; 5. Functional space; 6. Decorative panel; 7. Fire door; 8. Traction rope; 9. Steel wire rope;
[0034] 2-1, screw; 2-2, mounting plate; 2-3, mounting hole; 2-4, locking nut;
[0035] 6-1, decorative surface layer; 6-2, metal back plate; 6-3, supporting frame; 6-4, hanging parts; 6-5, mounting groove; 6-6, threaded tube; 6-7, height adjustment bolt; 6-8, clamping block; 6-9, U-shaped notch. DETAILED DESCRIPTION
[0036] The technical solution of the present invention is further described below in conjunction with specific embodiments:
[0037] A super-high integrated column construction method, the method comprising:
[0038] like Figure 1 As shown, a steel frame 2 is installed on the outer side of a concrete column 1, and the steel frame 2 forms a functional space 5 for laying out an air duct 3 and a fire-fighting pipe system 4 on one side of the concrete column, and the air duct 3 and the fire-fighting pipe system 4 are integrated and installed in the functional space 5;
[0039] A decorative panel 6 is installed on the outside of the steel frame 2. Before the decorative panel 6 is installed, a fire door 7, an air vent and an inspection port are installed on the outside of the functional space 5 in advance; the air vent is connected to the air duct 3 to facilitate air outlet, and the fire door 7 is set at a position close to the ground to facilitate operation of the fire pipe valve system after opening; the inspection port is convenient for subsequent inspection of the inside of the functional space, and the outside of the fire door and the inspection port can use the same material as the decorative panel or a material with a similar color.
[0040] The steel frame 2 forms a rectangular frame outside the concrete column 1, the height of the rectangular frame is set along the height direction of the concrete column 1, the width of the rectangular frame is set along the width direction of the concrete column, and the length of the rectangular frame is set along the direction of the concrete column 1 toward the functional space 5; a splicing groove is set on the edge of the decorative surface layer 6-1 at the corner position of the steel frame.
[0041] Each decorative panel 6 is pre-layouted and installed at a predetermined position in the early design stage. During the process of adjusting the position of the decorative panel, the position of the decorative panel is measured with the help of a total station, and the position of the decorative panel is adjusted to the set position. Layout can be achieved through BIM means, and common tools include Autodesk Revit software, Rhino software, etc.
[0042] like Figure 2 and Figure 3 As shown, the decorative panel 6 includes a decorative surface layer 6-1, a metal back plate 6-2, and a supporting frame 6-3. The decorative surface layer 6-1 is fixed to the front side of the metal back plate 6-2, and the supporting frame 6-3 is fixed to the rear side of the metal back plate 6-2; hangers 6-4 are symmetrically installed on both sides of the supporting frame 6-3, and a decorative panel is provided with hangers 6-4 on at least the upper two sides and the lower two sides; the hanger 6-4 includes a plate structure and a mounting groove 6-5 which is opened downward in the plate structure; a transversely arranged screw 2-1 is arranged on the outer side of the steel frame 2 corresponding to the hanger 6-4.
[0043] In one embodiment, the decorative surface layer, such as an inorganic artificial stone panel, can be fixed to a metal back plate, such as a honeycomb aluminum plate, by bonding or screw connection. The supporting frame is welded with galvanized steel pipes to form a frame structure, and the supporting frame and the honeycomb aluminum plate are connected by angle brackets.
[0044] The decorative panel 6 is lifted to a preset installation height by a lifting device, and the decorative panel 6 is moved relative to the screw 2-1 so that the decorative panel 6 is at the set installation position. The decorative panel 6 is moved so that the installation groove 6-5 of the hanger 6-4 is buckled on the screw 2-1 from above; the decorative panel 6 is installed in sequence from bottom to top along the concrete column, which requires that the installation height of the screw 2-1 must be precisely controlled.
[0045] A mounting plate 2-2 for mounting the screw rod 2-1 is installed on the outer side of the steel frame 2, two mounting plates 2-2 are arranged parallel to each other for each screw rod 2-1, and mounting holes 2-3 for mounting the screw rod 2-1 are arranged on the mounting plates 2-2; the mounting groove 6-5 of the hanger 6-4 is buckled on the screw rod 2-1 from above between the mounting plates 2-2 at both ends of the screw rod 2-1. Preferably, the longitudinal depth of the mounting groove 6-5 is greater than the diameter of the screw rod 2-1 to ensure the safety of the mounting groove 6-5 buckled on the outside of the screw rod 2-1.
[0046] In another embodiment, if Figure 4 As shown, the longitudinal depth of the mounting groove 6-5 is greater than the diameter of the screw rod 2-1; a threaded barrel 6-6 is provided above the mounting groove 6-5 on one side of the plate structure, and a height adjustment bolt 6-7 which is threadably matched with the threaded barrel 6-6 is installed in the threaded barrel 6-6. The decorative panel 6 is moved laterally along the screw rod 2-1 to a set position in the horizontal direction. After the mounting groove 6-5 is buckled on the screw rod 2-1, the lower end of the height adjustment bolt 6-7 presses against the screw rod 2-1 from above. The height adjustment bolt 6-7 is adjusted to adjust the height of the decorative panel 6 to the set position in the height direction.
[0047] When installing the decorative panel 6, a single decorative panel 6 is set along the width direction of the rectangular frame within the same height of the rectangular frame, and at least two decorative panels 6 are set along the length direction of the rectangular frame; the decorative panel 6 close to the concrete column 1 is installed preferentially to facilitate the adjustment of the height adjustment bolts 6-7 when installing a circle of decorative panels within the same height range. The decorative panels of the same circle in the height direction are located close to the functional space, and personnel can enter the functional space to operate the height adjustment bolts 6-7.
[0048] In one embodiment, Figure 5 As shown, a locking nut 2-4 is also provided on the screw rod 2-1, and the locking nut 2-4 is located on one side of the threaded tube 6-6 provided on the plate structure. After the position adjustment of the decorative panel 6 is completed, the locking nut 2-4 is screwed relative to the screw rod 2-1 so that the locking nut 2-4 is against the height adjustment bolt 6-7.
[0049] In one embodiment, Figure 6 As shown, a clamping block 6-8 is also provided at one end of the height adjustment bolt 6-7 that abuts against the screw rod 2-1, and the clamping block 6-8 has a U-shaped notch 6-9. A threaded hole matching the height adjustment bolt 6-7 is provided in the middle of the block 6-8 corresponding to the arc-shaped notch 6-9, and the end of the height adjustment screw rod 6-7 passes through the threaded hole and is placed in the U-shaped notch 6-9; the height adjustment bolt 6-7 is pre-installed at the threaded barrel 6-6, and the clamping block 6-8 is pre-installed at the end of the height adjustment bolt 6-7. When adjusting the installation height of the decorative panel 6, the height adjustment bolt 6-7 is screwed so that the U-shaped notch 6-9 clamps the screw rod 2-1 and the end of the height adjustment bolt 6-7 abuts against the screw rod 2-1 from above, and then the clamping block 6-8 is abutted through the locking nut 2-4.
[0050] Preferably, the mounting hole 2-3 is a waist-shaped hole arranged transversely, so as to facilitate the adjustment of the horizontal distance between the screw rod 2-1 and the steel frame relative to the steel frame.
[0051] In one embodiment, Figure 7As shown, when hoisting the decorative panel 6, two steel wire ropes 9 are hung on the hook, and a rope loop is set at the end of each steel wire rope 9. The rope loops are put into the installation grooves of the hangers 6-4 on both sides of the upper position of the decorative panel, and the height adjustment screw is adjusted so that the rope loops are buckled on the sides of the height adjustment screw 6-7 to prevent the rope loops from being unable to be removed after hoisting. Before hoisting, the lengths of the two steel wire ropes 9 are adjusted to be consistent; a traction rope 8 is set at the lower end of the decorative panel 6. During the hoisting and rising process, the operator controls the hoisting direction of the decorative panel 6 through the traction rope 8 to prevent the decorative panel 6 from being excessively tilted during the hoisting process; after the installation groove 6-5 is buckled on the screw 2-1, the personnel pushes the decorative panel 6 to adjust the lateral installation position. After the lateral adjustment is completed, the installation groove 6-5 is buckled on the screw 2-1, and then the rope loop and the traction rope are removed, and then the height position of the decorative panel 6 is adjusted by the height adjustment bolt 6-7.
[0052] This embodiment is only a further explanation of the present invention, not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it will be protected by the patent law.
Claims
1. A super-high integrated column construction method, characterized in that: The method includes: A steel frame is installed outside the concrete column, and the steel frame forms a functional space for laying out the air duct and the fire fighting pipe system on one side of the concrete column, and the air duct and the fire fighting pipe system are integrated and installed in the functional space; Install decorative panels on the outside of the steel frame. Before installing the decorative panels, install fire doors, air vents and inspection ports on the outside of the functional space; The decorative panel includes a decorative surface layer, a metal back plate, and a support frame, wherein the decorative surface layer is fixed to the front side of the metal back plate, and the support frame is fixed to the rear side of the metal back plate; hangers are symmetrically installed on both sides of the support frame; the hangers include a plate structure and a downwardly opening mounting groove of the plate structure; and a transversely arranged screw is arranged on the outer side of the steel frame corresponding to the hangers; The decorative panel is lifted to the preset installation height by the lifting equipment, and the decorative panel is moved relative to the screw rod so that the decorative panel is at the set installation position. The decorative panel is moved so that the installation groove of the hanger is buckled on the screw rod from above, and the decorative panel is installed sequentially from bottom to top along the concrete column.
2. The method for constructing an ultra-high integrated column according to claim 1, characterized in that: A mounting plate for screw installation is installed on the outside of the steel frame, two parallel mounting plates are set corresponding to each screw, and mounting holes for screw installation are provided on the mounting plates; the mounting groove of the hanger is buckled on the screw from above between the mounting plates at both ends of the screw.
3. The method for constructing an ultra-high integrated column according to claim 2, characterized in that: The longitudinal depth of the mounting groove is greater than the diameter of the screw rod; a threaded barrel is arranged above the mounting groove on one side of the plate structure, and a height adjustment bolt which matches with the thread of the threaded barrel is installed in the threaded barrel. The decorative panel is moved laterally along the screw rod to a set position in the horizontal direction. After the mounting groove is buckled on the screw rod, the lower end of the height adjustment bolt presses against the screw rod from above, and the height adjustment bolt is adjusted to adjust the height of the decorative panel to the set position in the height direction.
4. The method for constructing an ultra-high integrated column according to claim 3, characterized in that: A locking nut is also provided on the screw rod, and the locking nut is located on one side of the plate structure where the threaded barrel is provided. After the position adjustment of the decorative panel is completed, the locking nut is screwed relative to the screw rod so that the locking nut is against the height adjustment bolt.
5. The method for constructing an ultra-high integrated column according to claim 2, characterized in that: The mounting hole is a waist-shaped hole arranged transversely.
6. The method for constructing an ultra-high integrated column according to claim 4, characterized in that: The height adjustment bolt is also provided with a clamping block at one end that presses against the screw rod, and the clamping block has a U-shaped notch, and a threaded hole matching the height adjustment bolt is provided in the middle of the clamping block corresponding to the arc-shaped notch, and the end of the height adjustment screw rod passes through the threaded hole and is placed in the U-shaped notch; the height adjustment bolt is pre-installed on the threaded barrel, and when adjusting the installation height of the decorative panel, the height adjustment bolt is screwed so that the U-shaped notch clamps the screw rod and the end of the height adjustment bolt presses against the screw rod from above, and then the clamping block is pressed through the locking nut.
7. The method for constructing an ultra-high integrated column according to claim 3, characterized in that: The steel frame forms a rectangular frame outside the concrete column, the height of the rectangular frame is set along the height direction of the concrete column, the width of the rectangular frame is set along the width direction of the concrete column, and the length of the rectangular frame is set along the direction of the concrete column toward the functional space, and a splicing groove is set on the edge of the decorative surface layer at the corner position of the steel frame.
8. The method for constructing an ultra-high integrated column according to claim 7, characterized in that: When installing the decorative panels, a single decorative panel is arranged along the width direction of the rectangular parallelepiped frame, and at least two decorative panels are arranged along the length direction of the rectangular parallelepiped frame at the same height of the rectangular parallelepiped frame; Priority is given to installing decorative panels close to the concrete columns.
9. The method for constructing an ultra-high integrated column according to claim 3, characterized in that: During the process of adjusting the position of the decorative panel, the position of the decorative panel is measured with the help of a total station, and the position of the decorative panel is adjusted to the designed position.
10. An ultra-high integrated column, characterized in that: It comprises a concrete column and a steel frame arranged on the outside of the concrete column, wherein the steel frame forms a functional space on one side of the concrete column, air ducts and fire-fighting pipes are arranged in the functional space, and a decorative panel is installed on the outside of the steel frame; a fire door is arranged on the outside of the functional space corresponding to the fire-fighting pipes, and an air outlet is arranged on the outside of the functional space corresponding to the air duct; an inspection port is arranged on the outside of the functional space; the super-high integrated column is constructed according to the construction method described in any one of claims 1 to 9.
Citation Information
Patent Citations
Kiln brick dry hanging system and construction method thereof
CN107989315A
U-shaped stone decoration column pendant system
CN114382208A
Novel back bolt type decorative column for dry hanging stone
CN210857798U
Fabricated wall surface dry-hanging mounting structure
CN219033884U