A steel bar electromagnetic hot-melt upsetting lengthening device

By designing the electromagnetic hot melt top forging and jointing device of steel bars, and using automated clamping slag scraping components and electromagnetic hot melt welding parts, the problems of low welding efficiency and poor welding slag cleaning are solved, efficient welding and slag scraping are achieved, and construction efficiency is improved.

CN119368899BActive Publication Date: 2025-04-01CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411942884.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-04-01
Estimated Expiration
2044-12-27

AI Technical Summary

Technical Problem

The existing steel bar welding technology has low working efficiency and low welding slag cleaning efficiency, which affects the construction process.

Method used

A steel bar electromagnetic hot melt top forging device is designed, using automated clamping scraping components and electromagnetic hot melt welding parts to realize automatic welding and scraping of steel bars, and improve welding efficiency and scraping effect.

Benefits of technology

It improves the working efficiency of steel bar welding, reduces the residue of welding slag, and improves the consistency and efficiency of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119368899B_ABST
    Figure CN119368899B_ABST
Patent Text Reader

Abstract

The present application relates to a steel bar electromagnetic hot-melt upsetting and extension device, comprising: a base, on which a processing area is provided; two groups of clamping and scraping assemblies for initially scraping off welding slag after steel bar welding; a secondary scraping assemblies for performing secondary scraping of steel bars after the initial scraping; a mobile clamping assembly for pulling the steel bar to move so that it passes through the clamping and scraping assemblies and the secondary scraping assemblies. By adopting an automated clamping and scraping assemblies and electromagnetic hot-melt welding parts, when the steel bars are extended during construction, the steel bar segments to be extended are placed, and then electromagnetic hot-melt welding and upsetting are automatically combined. The purpose of welding and extension can be achieved for steel bars of any length after cutting, avoiding waste of excess materials and improving the efficiency of steel bar welding. At the same time, in the process of clamping and transferring the steel bars, the movement of the steel bars can be used to achieve two scrapings of welding slag at the steel bar welding points, so as to improve the scraping effect of the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel bar welding, and in particular to a steel bar electromagnetic hot-melt upsetting and lengthening device. Background Art

[0002] Rebar extension usually refers to the situation during the construction process where the length of the rebar is not enough to meet the requirements of the structural components, and two or more rebars need to be connected to meet the length requirements.

[0003] There are three main methods of extending steel bars: binding overlap, mechanical connection and welding.

[0004] The main reinforcement used in existing construction reinforcement projects is mostly 9-12m fixed-length bars, and the diameter of the steel bar material is relatively large. A single steel bar needs to be cut to form a length that meets the actual construction needs. A large amount of surplus material will be generated in the cutting process, which is difficult to use. After the surplus material is reused, it will still produce tailings, which is still a loss and waste, increasing the cost of the reinforcement project.

[0005] In addition, the conventional method of steel bar welding is to heat the ends of the steel bars to melt them, and then cool and solidify them to form a connection. The welded connection has high strength, but has high requirements on the construction process and slow work efficiency. The welding slag generated during welding requires additional cleaning, and the cleaning effect is poor, which affects the subsequent construction process. Summary of the invention

[0006] The present application provides a steel bar electromagnetic hot-melt top forging lengthening device, which can solve the problems of slow working efficiency, low cleaning efficiency and poor cleaning effect of existing steel bar welding, thus affecting the entire construction process.

[0007] The technical solution of the present application is as follows: A steel bar electromagnetic hot-melt upsetting and lengthening device, comprising:

[0008] A base, wherein a processing area is provided on the base, a fixed plate and a movable plate are provided on the processing area at intervals along the left-right direction, and a pushing device (2) connected to the movable plate is provided on the right side of the processing area;

[0009] Two groups of clamping and scraping assemblies, the two groups of clamping and scraping assemblies are respectively arranged on the fixed plate and the movable plate in a one-to-one correspondence, and two movable clamping blocks are arranged inside each group of clamping and scraping assemblies, and the two clamping blocks are close to each other to clamp the steel bars and weld the steel bars or scrape the slag for the first time;

[0010] A secondary scraper assembly, which is arranged on the processing area and located on a side of the fixed plate away from the movable plate, and is used for secondary scraping of welding slag after steel bar welding;

[0011] A mobile clamping assembly, which is arranged on the processing area and moves in the left and right direction, and is used to clamp the steel bar and move it left and right on the processing area, and make the welding slag on the steel bar pass through the clamping slag scraping assembly and the secondary slag scraping assembly to perform primary slag scraping and secondary slag scraping in sequence;

[0012] The electromagnetic heat-melting welding part is arranged between the fixed plate and the movable plate, and is used for electromagnetically heating and heat-melting the steel bars.

[0013] By adopting the above scheme, by using an automated clamping and scraping assembly and an electromagnetic hot-melt welding part, when the steel bars are extended during construction, the steel bar segments to be extended are placed, and then electromagnetic hot-melt welding and top forging are automatically performed. The purpose of welding and extending steel bars of any length after cutting can be achieved, thereby avoiding the waste of excess materials and improving the efficiency of steel bar welding. At the same time, in the process of clamping and transferring the steel bars, the movement of the steel bars can be used to achieve two scrapings of the welding slag at the steel bar welding points, thereby improving the scraping effect of the device.

[0014] In one embodiment of the present application, the mobile clamping assembly comprises:

[0015] A movable plate, the movable plate being slidably assembled on the processing area along a left-right direction;

[0016] A clamping and fixing seat, wherein the clamping and fixing seat is fixedly assembled on one side of the surface of the moving plate;

[0017] A clamping oil cylinder, the clamping oil cylinder is mounted on the other side of the surface of the movable plate in the front-rear direction, a clamping block is fixedly connected to the driving rod of the clamping oil cylinder and a side of the clamping fixing seat close to the clamping oil cylinder, and the two clamping blocks are close to each other and clamp the steel bar, or;

[0018] The two clamping blocks move away from each other and release the steel bar;

[0019] A movable oil cylinder is arranged on the processing area along the left-right direction, and a driving shaft of the movable oil cylinder is connected and fixed to the movable plate to drive the steel bar to move along the left-right direction.

[0020] By adopting the above scheme, the clamping cylinder is used to drive the clamping block to clamp the steel bar and drive the steel bar to move. When it moves to the specified position, the steel bar is released, the clamping block returns to its position, and prepares for the next movement. In this way, the device can clamp the steel bar and drive it to move, thereby improving the work efficiency of the steel bar when welding and extending.

[0021] In one embodiment of the present application, each group of the clamping and scraping assemblies further includes:

[0022] A support frame, the support frame is fixedly mounted on the fixed plate or the movable plate;

[0023] A clamping cylinder, the clamping cylinder is vertically mounted on the upper end of the support frame;

[0024] A clamping fixing seat, which is assembled on the supporting frame and is located below the clamping cylinder;

[0025] The clamping block is fixedly mounted on the upper end of the clamping fixing seat and the driving rod of the clamping oil cylinder;

[0026] An arc-shaped depression is provided on one side of the two clamping blocks close to each other, and a reinforcing rib is provided on an edge of one end of each arc-shaped depression close to the electromagnetic hot-melt welding part. The two arc-shaped depressions are close to each other to clamp the steel bars, and the steel bars are initially scraped off through the reinforcing ribs.

[0027] By adopting the above scheme, the steel bars are clamped in the up and down directions by the clamping blocks, so that the stability of the steel bars during welding can be ensured. At the same time, after welding, the steel bars are driven to move in the arc-shaped depression by cooperating with the moving clamping assembly until the welding slag outside the steel bars passes through the two clamping blocks. In this way, the device can not only clamp the steel bars, but also use the side walls of the clamping blocks to perform the initial scraping of the welding slag on the steel bars.

[0028] In one embodiment of the present application, the secondary scraper assembly comprises:

[0029] A scraper movable seat, the scraper movable seat is fixedly assembled on the processing area;

[0030] Two scraper oil cylinders, which are located opposite to each other and are respectively arranged at the front and rear ends of the scraper movable seat;

[0031] Two moving blocks, one end of the two moving blocks is respectively and correspondingly mounted on the driving rods of the two scraper cylinders, and the other end is fixedly mounted with a scraper piece, and the two scraper pieces are close to each other and surround the steel bars to perform secondary scraping on the surface of the steel bars.

[0032] In one embodiment of the present application, the scraper comprises:

[0033] A fixed arc plate, the outer wall of which is fixedly assembled on the other end of the moving block;

[0034] A deflection arc plate, the deflection arc plate is arranged on the fixed arc plate and slides circumferentially along the inner wall of the fixed arc plate;

[0035] The arc-shaped scraping strip is coaxially mounted on one end of the deflection arc plate close to the clamping scraping assembly, and an arc-shaped reinforcing rib is provided on the inner edge of the arc-shaped scraping strip;

[0036] A deflection roller, wherein a plurality of inclined grooves spaced apart along the circumference of the deflection arc plate are provided on the inner wall of the deflection arc plate, the deflection roller is rotatably assembled inside the inclined grooves, and the rotation direction of the deflection roller forms a certain angle with the traveling direction of the steel bar.

[0037] By adopting the above scheme, after the initial scraping of the steel bars is completed, the mobile clamping assembly drives the steel bars to continue to move into the secondary scraping assembly, and the scraping member cooperates with the movement stroke of the steel bars, so that the scraping member can automatically rotate during the movement of the steel bars, and perform a secondary scraping of the unprocessed welding slag on the outside of the steel bars, thereby further improving the scraping effect of the steel bars.

[0038] In one embodiment of the present application, the electromagnetic heat fusion welding part includes:

[0039] A welding seat, the welding seat is assembled on the processing area, and the welding seat is arranged on the base in a manner that it can be lifted up and down;

[0040] An electromagnetic induction hot-melt coil is assembled on the welding seat.

[0041] By adopting the above scheme, after the welding surfaces of the steel bars to be welded are polished and cleaned, the two steel bars to be welded are clamped, and the two steel bars to be welded are heated and melted inside the electromagnetic induction hot-melt coil. The electromagnetic induction heating method is used to avoid the light pollution caused by ordinary light welding, and at the same time reduce smoke pollution, which is more environmentally friendly.

[0042] In one embodiment of the present application, a lifting drive component is further included. The lifting drive component is assembled on one side of the welding seat and is electrically connected through a controller to drive the welding seat to move up and down.

[0043] By adopting the above scheme, by using a lifting drive member, before welding the steel bars, the lifting drive member is controlled by a controller to adjust the height position of the lifting drive member, thereby ensuring that there is no motion interference with the lifting drive member when welding the steel bars.

[0044] In one embodiment of the present application, the pushing device comprises:

[0045] A push cylinder, which is fixedly mounted on the processing area and located on one side of the moving plate;

[0046] A connecting piece is fixedly connected to a driving rod of the push cylinder.

[0047] By adopting the above scheme, after the steel bar welding surface is heated and melted, one of the steel bars to be welded is driven to move toward the other steel bar to be welded by the pushing device, so that the heated and melted welding surfaces are squeezed against each other. After cooling, the welding bonding strength is improved by top forging.

[0048] In one embodiment of the present application, a cooling adsorption device is also included, and the cooling adsorption device includes:

[0049] A fixing rod, one end of which is mounted on the rear side of the fixing plate;

[0050] A transparent cover body, wherein an exhaust hole connected to the negative pressure fan is provided inside the transparent cover body, and the transparent cover body is assembled on the other end of the fixing rod and flipped in the front-to-back direction to the bottom of the fixing rod or the top of the fixing rod;

[0051] A limit block is fixedly assembled on the other end of the fixing rod and is located in front of the transparent cover body. The limit block is used to support the transparent cover body when the transparent cover body is flipped over to the top of the fixing rod.

[0052] By adopting the above scheme, after the steel bars are welded, the transparent cover can be flipped over to cover the heated welding area. At the same time, the negative pressure fan is turned on to drive the airflow through the welding area, which can accelerate the cooling of the welding section and absorb the harmful fumes generated during the hot melting stage of the steel bars. During the work of welding and connecting multiple steel bars, it will not affect the health of the workers.

[0053] In one embodiment of the present application, a control area is further included, which is arranged on a base and located in front of a processing area. A hydraulic station and a main machine are arranged on the control area. The main machine is electrically connected to the electromagnetic hot-melt welding part. The hydraulic station is connected to the pushing device, the clamping and scraping assembly, the movable clamping assembly and the secondary scraping assembly, and is used to provide hydraulic power for the clamping and scraping assembly, the movable clamping assembly and the secondary scraping assembly.

[0054] By adopting the above solution, a control area is set up simultaneously, and a hydraulic station and a main engine are set up in the control area, so as to facilitate the block maintenance work of the device.

[0055] In summary, the present application includes at least one of the following beneficial technical effects:

[0056] 1. By setting up a mobile clamping assembly, a clamping scraping assembly and a secondary scraping assembly, and utilizing the mutual cooperation among the three, the device can complete the primary scraping and secondary scraping of the steel bars during the movement when it is necessary to drive the steel bars to move to the next workstation after the steel bar welding is completed, thereby improving the continuity of steel bar welding, transfer and scraping work, and improving the work efficiency of the device during steel bar welding processing.

[0057] 2. By setting up a scraper, when the scraper scrapes the steel bar, the scraper can cooperate with the moving stroke of the steel bar during transfer, and drive itself to rotate outside the steel bar, so that when the scraper covers the outside of the steel bar, its end can perform secondary scraping on the steel bar. The scraper squeezes and scrapes off the welding slag during the rotation process, thereby improving the effect of secondary scraping and making the device more thorough in scraping the steel bar welding slag.

[0058] 3. By setting up a cooling adsorption device and utilizing a flipping transparent cover, when the device is welding steel bars, the transparent cover can be flipped to the top of the fixed rod, and the transparent cover can be supported by a limit block so that the transparent cover covers the welding area, and the negative pressure fan is turned on to extract the air in the welding area, which can take away the heat and the smoke generated during welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a front view of a steel bar electromagnetic hot-melt upsetting lengthening device provided in an embodiment of the present application;

[0060] Figure 2 It is a plan view of a steel bar electromagnetic hot-melt upsetting and lengthening device provided in an embodiment of the present application;

[0061] Figure 3 It is a front view of a clamping and scraping assembly of a steel bar electromagnetic hot-melt upsetting and lengthening device provided in an embodiment of the present application;

[0062] Figure 4 It is a front view of a cooling adsorption device of a steel bar electromagnetic hot-melt upsetting and lengthening device provided in an embodiment of the present application;

[0063] Figure 5 It is a front view of a clamping member of a steel bar electromagnetic hot-melt upsetting lengthening device provided in an embodiment of the present application;

[0064] Figure 6 It is a front view of a scraper component of a steel bar electromagnetic hot-melt upsetting and lengthening device provided in an embodiment of the present application;

[0065] Figure 7 It is a front view of a pushing device of a steel bar electromagnetic hot-melt upsetting and lengthening device provided in an embodiment of the present application;

[0066] Figure 8 It is a plan view of a welding seat of a steel bar electromagnetic hot-melt upsetting lengthening device provided in an embodiment of the present application;

[0067] Fig. 9 It is a cross-sectional view of a scraper component of a steel bar electromagnetic hot-melt upsetting and lengthening device provided in an embodiment of the present application.

[0068] Description of reference numerals: 1. base; 12. processing area; 13. control area; 131. electric control cabinet; 132. hydraulic station; 133. main machine; 2. jacking device; 21. jacking cylinder; 22. connecting piece; 3. moving plate; 4. fixing plate; 5. clamping scraper assembly; 51. support frame; 52. clamping cylinder; 53. clamping block; 531. arc-shaped depression; 54. clamping fixed seat; 6. moving clamping assembly; 61. moving plate; 62. clamping fixed seat; 63. clamping block; 64. clamping cylinder; 65. Mobile cylinder; 7. Secondary scraper assembly; 71. Scraper moving seat; 72. Scraper cylinder; 73. Moving block; 74. Scraper piece; 741. Fixed arc plate; 742. Deflection arc plate; 7421. Inclined groove; 743. Arc scraper strip; 744. Deflection roller; 8. Electromagnetic hot melt welding piece; 80. Lifting drive piece; 81. Electromagnetic induction hot melt coil; 82. Welding seat; 9. Cooling adsorption device; 91. Fixed rod; 92. Limit block; 93. Transparent cover; 931. Exhaust hole; 10. Steel bar. DETAILED DESCRIPTION

[0069] The following is combined with Figure 1-9 A steel bar electromagnetic hot-melt upsetting and lengthening device provided in the present application is further described in detail.

[0070] See also Figure 1, is a steel bar 10 electromagnetic hot melt upsetting forging and lengthening device provided in an embodiment of the present application, comprising: a base 1, two groups of clamping scraping assemblies 5, a secondary scraping assemblies 7, a movable clamping assembly 6 and an electromagnetic hot melt welding member 8, the base 1 is provided with a processing area 12, the processing area 12 is provided with a fixed plate 4 and a movable plate 3 spaced apart in the left and right directions, a pushing device 2 connected to the movable plate is provided on the right side of the processing area 12, the two groups of the clamping scraping assemblies 5 are respectively provided on the fixed plate 4 and the movable plate 3 in a one-to-one correspondence, each group of the clamping scraping assemblies 5 is provided with two movable clamping blocks 53, the two clamping blocks 53 are close to each other to clamp the steel bar 10 and perform the forging of the steel bar 10 The secondary scraping assembly 7 is arranged on the processing area 12 and is located on the side of the fixed plate 4 away from the movable plate 3, and is used for secondary scraping of the welding slag after the welding of the steel bar 10. The movable clamping assembly 6 is arranged on the processing area 12 and moves in the left and right direction, and is used for clamping the steel bar 10 and moving it left and right on the processing area 12, and making the welding slag on the steel bar 10 pass through the clamping scraping assembly 5 and the secondary scraping assembly 7 to perform the primary scraping and the secondary scraping in sequence. The electromagnetic hot melting welding part 8 is arranged between the fixed plate 4 and the movable plate 3, and is used for electromagnetic heating and hot melting of the steel bar 10. The electromagnetic hot melting welding part 8 is arranged between the fixed plate 4 and the movable plate 3.

[0071] In this embodiment, as shown in the attached specification Figure 1 As shown, an electric control cabinet 131 is also provided on the control area 13, and the electric control cabinet 131 is electrically connected to the pushing device 2, the clamping scraper assembly 5, the movable clamping assembly 6, the secondary scraper assembly 7 and the electromagnetic hot melting welding part 8, and is used to control and distribute the output power of each component. The specific electrical connection method mentioned above is an existing conventional technology, so it will not be repeated here.

[0072] In this embodiment, a temperature sensor (not shown in the figure) is also provided on one side of the processing area 12 corresponding to the electromagnetic hot-melt welding part 8, which is used to sense the temperature of the welding point of the steel bar 10. After the steel bar 10 is welded, it is necessary to wait for the temperature of the welding point to cool to 500° to 600°, and then use the mobile clamping assembly 6 and the secondary slag scraping assembly 7 to scrape off the welding slag at the welding point of the steel bar 10.

[0073] See also Figure 5The movable clamping assembly 6 comprises: a movable plate 61, a clamping fixed seat 62, a clamping cylinder 64 and a movable cylinder 65, wherein the movable plate 61 is slidably mounted on the processing area 12 along the left-right direction, the clamping fixed seat 62 is fixedly mounted on one side of the surface of the movable plate 61, and the clamping cylinder 64 is mounted on the other side of the surface of the movable plate 61 along the front-back direction, and a clamping block 63 is fixedly connected to the driving rod of the clamping cylinder 64 and the side of the clamping fixed seat 62 close to the clamping cylinder 64, and the two clamping blocks 63 are close to each other and clamp the steel bar 10, or; the two clamping blocks 63 are away from each other and release the steel bar 10, wherein the end surfaces of the two clamping blocks 63 opposite to each other are provided with anti-slip patterns, and the anti-slip patterns can be strip-shaped or grid-shaped patterns, and the movable cylinder 65 is arranged on the processing area along the left-right direction, and the driving shaft of the movable cylinder 65 is connected and fixed to the movable plate 61 to drive the steel bar 10 to move along the left-right direction. After the welding of the steel bar 10 is completed, when the welding slag at the weld needs to be scraped off, the clamping cylinder 64 is first used to drive the clamping block 63 to clamp the steel bar 10, thereby pulling the steel bar 10 to move, so that the clamping and scraping assembly 5 and the secondary scraping assembly 7 can cooperate with the steel bar 10, so that when the steel bar 10 is pulled and moved, the external welding slag can be scraped off by the clamping and scraping assembly 5 and the secondary scraping assembly 7 for the initial and secondary scraping work.

[0074] See also Figure 3 Each group of the clamping and scraping slag assembly 5 also includes: a support frame 51, a clamping cylinder 52, a clamping block 53 and a clamping fixed seat 54, the support frame 51 is fixedly mounted on the fixed plate 4 or the movable plate 3, the clamping cylinder 52 is vertically mounted on the upper end of the support frame 51, the clamping fixed seat 54 is mounted on the support frame 51 and is located below the clamping cylinder 52, the clamping block 53 is fixedly mounted on the upper end of the clamping fixed seat 54 and the driving rod of the clamping cylinder 52, and an arc-shaped recess 531 is provided on one side where the two clamping blocks 53 are close to each other, and a reinforcing rib 532 is provided on the edge of one end of each arc-shaped recess 531 close to the electromagnetic hot-melt welding part 8, and the two arc-shaped recesses 531 are close to each other to clamp the steel bar 10, and the steel bar 10 is initially scraped by the reinforcing rib 532. In the process of moving the clamping assembly to clamp and pull the steel bar 10, when the welding slag on the surface of the steel bar 10 passes through the two clamping blocks 53, since the two arc-shaped recesses 531 fit against the outside of the steel bar 10, the clamping blocks can not only ensure the stability of the steel bar 10 during welding, but also enable the device to perform the initial scraping of the welding slag on the outside of the steel bar 10 during the movement after welding.

[0075] See also Figure 6The secondary scraper assembly 7 includes: a scraper movable seat 71, two scraper oil cylinders 72 and two moving blocks 73. The scraper movable seat 71 is fixedly assembled on the processing area 12. The two scraper oil cylinders 72 are positioned opposite to each other and are respectively arranged at the front and rear ends of the scraper movable seat 71. One end of the two moving blocks 73 is respectively and one-to-one mounted on the driving rods of the two scraper cylinders 72, and the other end is fixedly mounted with a scraper 74. The two scraper 74 are close to each other and enclose the steel bar 10 to perform secondary scraping on the surface of the steel bar 10. The scraper 74 includes: a fixed arc plate 741, a deflection arc plate 742, an arc scraper strip 743 and a deflection roller 744. The outer wall of the fixed arc plate 741 is fixedly mounted on the other end of the moving block 73, wherein the two fixed arc plates 741 can enclose each other to form a fixed pipe (not shown in the figure) when they are close to each other. The steel bar 10 can move along and through the rotating pipe (not shown in the figure) during the movement. The deflection arc plate 742 is arranged on the fixed arc plate 741 and slides circumferentially along the inner wall of the fixed arc plate 741. In the figure, when the two deflection arc plates 742 approach each other, they can also enclose to form a rotating pipe (not shown in the figure) that is adapted to the shape of the steel bar 10, so that when the two deflection arc plates 742 approach and enclose, the rotating pipe formed by the two deflection arc plates 742 can rotate in the fixed pipe, and the arc scraper strip 743 is coaxially assembled on one end of the deflection arc plate 742 close to the clamping scraper assembly 5, and the inner edge of the arc scraper strip 743 is provided with an arc reinforcement rib 7431, and the inner wall of the deflection arc plate 742 is provided with a plurality of inclined grooves 7421 distributed at intervals along the circumference of the deflection arc plate 742, and the deflection roller 744 is rotatably assembled inside the inclined groove 7421, and the rotation direction of the deflection roller 744 is at a certain angle to the travel direction of the steel bar 10. When the steel bar 10 is clamped and moved by the movable clamping assembly, after the initial scraping, the steel bar 10 continues to move under the traction, and when the two deflection arc plates 742 rotate and contact the welding slag outside the steel bar 10, the arc reinforcement ribs 7431 at the ends of the deflection arc plates 742 resist the welding slag, thereby improving the structural strength when the deflection arc plates 742 and the welding slag resist each other, making it easier to scrape off the welding slag.

[0076] See also Figure 8The electromagnetic hot-melt welding part 8 includes: a welding seat 82 and an electromagnetic induction hot-melt coil 81. The welding seat 82 is mounted on the processing area 12. The welding seat 82 is arranged on the base 1 in a manner that it can be lifted and lowered in the up-down direction. The electromagnetic induction hot-melt coil 81 is mounted on the welding seat 82. The electromagnetic hot-melt welding part 8 also includes a lifting drive 80. The lifting drive 80 is mounted on one side of the welding seat 82 and is electrically connected through a controller to drive the welding seat 82 to move up and down. The lifting drive 80 can be an electric push rod or an oil cylinder, and the driving rod of the electric push rod or the oil cylinder is connected and fixed to the welding seat 82, so that when the device is welding, by adjusting the height position of the electromagnetic induction hot-melt coil 81, the two steel bars 10 can be inserted into the electromagnetic induction hot-melt coil 81, and electromagnetic induction heating is performed inside the electromagnetic induction hot-melt coil 81.

[0077] In this embodiment, it is necessary to wait until the electromagnetic induction hot melt coil 81 heats the steel bar 10 to 1400° before starting the pushing device 2 to perform top extrusion processing on the steel bar 10.

[0078] See also Figure 7 The pushing device 2 includes: a pushing cylinder 21 and a connecting piece 22. The pushing cylinder 21 is fixedly assembled on the processing area 12 and is located on one side of the moving plate 3. The connecting piece 22 is connected and fixed to the driving rod of the pushing cylinder 21. When the electromagnetic induction hot melt coil 81 heats the steel bar 10 to 1400°, the pushing cylinder 21 is turned on, and the pushing cylinder 21 drives the moving plate 3 to move, thereby performing a top forging and extrusion process on the two steel bars 10.

[0079] See also Figure 1 and Figure 4The electromagnetic hot-melt upsetting and extension device for reinforcing bars further comprises a cooling adsorption device 9, which comprises: a fixing rod 91, a transparent cover 93 and a stopper 92. One end of the fixing rod 91 is mounted on the rear side of the fixing plate 4, and a suction port connected to a negative pressure fan is provided inside the transparent cover 93. The transparent cover 93 is mounted on the other end of the fixing rod 91 and flipped along the front-back direction to the bottom of the fixing rod 91 or the top of the fixing rod 91. The limit block 92 is fixedly assembled on the other end of the fixing rod 91 and is located in front of the transparent cover 93. The limit block 92 is used to support the transparent cover 93 when the transparent cover 93 is flipped over to the top of the fixing rod 91. When the device is used to weld the steel bar 10, the transparent cover 93 is flipped over to the top of the fixing rod 91, and the side of the flipped transparent cover 93 is placed on the limit block 92. At this time, the transparent cover 93 can face the welding position of the steel bar 10, and the negative pressure fan is turned on to drive the negative pressure fan to extract the air at the welding position, thereby driving the smoke generated during hot melt welding. At the same time, when the steel bar 10 is subsequently cooled from 1400° to 500° to 600°, its cooling speed is accelerated, shortening the cooling time.

[0080] See also Figure 1 The electromagnetic hot-melt upsetting and lengthening device for reinforcing bars also includes a control area 13, which is arranged on the base 1 and located in front of the processing area 12. A hydraulic station 132 and a main machine 133 are arranged on the control area 13. The main machine 133 is electrically connected to the electromagnetic hot-melt welding part 8. The hydraulic station 132 is connected to the pushing device 2, the clamping scraping assembly 5, the mobile clamping assembly 6 and the secondary scraping assembly 7, and is used to provide hydraulic power for the clamping scraping assembly 5, the mobile clamping assembly 6 and the secondary scraping assembly 7. By synchronously setting the control area, and using the hydraulic station 132 and the main machine 133 in the control area 13, and placing them in the control area 13 with the electric control cabinet 131, it is convenient to carry out block maintenance work on the device.

[0081] In summary, when it is necessary to weld two steel bars 10, firstly, the two steel bars 10 are placed in the clamping scraper assembly 5, and the two steel bars 10 are clamped and fixed by the clamping scraper assembly 5, and at the same time, the clamping scraper assembly placed on the movable plate 3 is pushed toward the fixed plate 4 by the jacking device 2, so that the welding surfaces of the two steel bars 10 are in contact with each other, and at the same time, the electromagnetic hot-melt welding part 8 is turned on to heat and melt the welding part of the two steel bars 10. After reaching the specified temperature, the movable plate 3 is driven to move by the jacking device 2 again, so that the movable plate 3 is set on the movable plate 3. The steel bar 10 on the upper side moves toward the other steel bar 10, and the two steel bars 10 are squeezed against each other to improve the bonding force. When the top forging welding is completed, the clamping and scraping assembly 5 slightly loosens the steel bar 10, and first uses the clamping cylinder 64 to drive the clamping block 63 to clamp one end of the welded steel bar 10, and then uses the moving cylinder 65 to drive the entire moving plate to move, thereby pulling the steel bar 10 to move. In the process of the mobile clamping assembly 6 clamping and pulling the steel bar 10, when the welding slag on the surface of the steel bar 10 passes through the two clamping blocks 53, due to the two arc-shaped depressions 531, the welding slag on the surface of the steel bar 10 is pressed against the two clamping blocks 53. The welding slag on the outside of the steel bar 10 can be squeezed by the side wall of the arc-shaped depression 531, and finally scraped off by the clamping block, so that the welding slag on the steel bar 10 can be initially scraped off, and the scraped steel bar 10 can continue to move under the traction of the mobile clamping assembly 6, passing through the rotating pipe formed by the deflection arc plates 742 inside the two scraping pieces, because the deflection roller 744 with a rotation direction at a certain angle to the traveling direction of the steel bar 10 is set on the inner wall of the deflection arc plate 742, so that the steel bar 10 During the relative displacement with the deflection roller 744, the deflection roller 744 can move in a spiral manner along the outer surface of the steel bar 10, thereby driving the two deflection arc plates 742 to rotate around the steel bar 10, so that the welding slag remaining on the steel bar 10 after the initial scraping can be completely scraped off during the rotation and movement of the two deflection arc plates 742, and the secondary scraping assembly 7 is used to perform secondary scraping on the moving steel bar 10, thereby improving the scraping efficiency and thoroughness of the steel bar 10 to ensure the smooth progress of subsequent processes.

[0082] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A steel bar electromagnetic hot-melt upsetting and lengthening device, characterized in that: include: A base (1), wherein a processing area (12) is provided on the base (1), a fixed plate (4) and a movable plate (3) are arranged at intervals in the left-right direction on the processing area (12), and a pushing device (2) connected to the movable plate (3) is arranged on the right side of the processing area (12); Two groups of clamping and scraping assemblies (5), the two groups of clamping and scraping assemblies (5) are respectively arranged on the fixed plate (4) and the movable plate (3) in a one-to-one correspondence, and two movable clamping blocks (53) are arranged inside each group of clamping and scraping assemblies (5), and the two clamping blocks (53) are close to each other to clamp the steel bars and weld the steel bars or perform initial scraping on the steel bars during the movement of the steel bars; A secondary scraping assembly (7), the secondary scraping assembly (7) being arranged on the processing area (12) and located on a side of the fixed plate (4) away from the movable plate (3), and being used for performing secondary scraping of the steel bars during their movement; A movable clamping assembly (6), the movable clamping assembly (6) being arranged on the processing area (12) and moving in the left-right direction, and being used for clamping the steel bar and moving it left-right on the processing area (12), and allowing the welding slag on the steel bar to pass through the clamping slag scraping assembly (5) and the secondary slag scraping assembly (7) to perform primary slag scraping and secondary slag scraping in sequence; An electromagnetic hot-melt welding part (8), the electromagnetic hot-melt welding part (8) being arranged between the fixed plate (4) and the movable plate (3) and being used for performing electromagnetic heating hot-melt on the steel bars; The secondary scraper assembly (7) comprises: A scraper movable seat (71), wherein the scraper movable seat (71) is fixedly mounted on the processing area (12); Two scraper oil cylinders (72), the two scraper oil cylinders (72) are located opposite to each other and are respectively arranged at the front and rear ends of the scraper movable seat (71); Two moving blocks (73), one end of each of the two moving blocks (73) is respectively and one-to-one mounted on the driving rods of the two scraper oil cylinders (72), and the other end is fixedly mounted with a scraper member (74), the two scraper members (74) are close to each other and surround the steel bar to perform secondary scraping on the surface of the steel bar; The scraper (74) comprises: A fixed arc plate (741), the outer wall of which is fixedly mounted on the other end of the moving block (73); A deflection arc plate (742), wherein the deflection arc plate (742) is disposed on the fixed arc plate (741) and slides circumferentially along the inner wall of the fixed arc plate (741); An arc-shaped scraping strip (743), the arc-shaped scraping strip (743) being coaxially mounted on one end of the deflection arc plate (742) close to the clamping scraping assembly (5), and an arc-shaped reinforcing rib (7431) being provided on the inner edge of the arc-shaped scraping strip (743); A deflection roller (744), wherein a plurality of inclined grooves (7421) are arranged on the inner wall of the deflection arc plate (742) and are distributed at intervals along the circumference of the deflection arc plate (742); the deflection roller (744) is rotatably assembled inside the inclined grooves (7421), and the rotation direction of the deflection roller (744) forms a certain angle with the travel direction of the steel bar.

2. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 1 is characterized in that: The movable clamping assembly (6) comprises: A movable plate (61), the movable plate (61) being slidably mounted on the processing area (12) in a left-right direction; A clamping and fixing seat (62), wherein the clamping and fixing seat (62) is fixedly mounted on one side of the surface of the moving plate (61); A clamping cylinder (64), the clamping cylinder (64) is mounted on the other side of the surface of the movable plate (61) along the front-rear direction, a clamping block (63) is fixedly connected to the driving rod of the clamping cylinder (64) and the side of the clamping fixing seat (62) close to the clamping cylinder (64), and the two clamping blocks (63) are close to each other and clamp the steel bar, or; The two clamping blocks (63) move away from each other and release the steel bar; A movable oil cylinder (65) is arranged on the processing area along the left-right direction, and a driving shaft of the movable oil cylinder (65) is connected and fixed to the movable plate (61) to drive the steel bar to move along the left-right direction.

3. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 2 is characterized in that: Each group of the scraper and scraper assembly (5) further comprises: A support frame (51), wherein the support frame (51) is fixedly mounted on the fixed plate (4) or the movable plate (3); A clamping cylinder (52), wherein the clamping cylinder (52) is vertically mounted on the upper end of the support frame (51); A clamping fixing seat (54), the clamping fixing seat (54) is assembled on the support frame (51) and is located below the clamping oil cylinder (52); The clamping block (53) is fixedly mounted on the upper end of the clamping fixing seat (54) and the driving rod of the clamping oil cylinder (52); An arc-shaped depression (531) is provided on one side of the two clamping blocks (53) close to each other, and a reinforcing rib (532) is provided on the edge of one end of each arc-shaped depression (531) close to the electromagnetic hot-melt welding part (8). The two arc-shaped depressions (531) are close to each other to clamp the steel bars, and the steel bars are initially scraped by the reinforcing rib (532).

4. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 1, characterized in that: The electromagnetic heat fusion welding part (8) comprises: A welding seat (82), the welding seat (82) being assembled on the processing area (12), and the welding seat (82) being arranged on the base (1) so as to be liftable in an up-down direction; An electromagnetic induction hot-melt coil (81), wherein the electromagnetic induction hot-melt coil (81) is assembled on the welding seat (82).

5. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 4 is characterized in that: The electromagnetic hot-melt welding component (8) further comprises a lifting driving component (80), wherein the lifting driving component (80) is mounted on one side of the welding seat (82) and is electrically connected via a controller to drive the welding seat (82) to move up and down.

6. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 5, characterized in that: The pushing device (2) comprises: A push cylinder (21), the push cylinder (21) is fixedly mounted on the processing area (12) and is located on one side of the moving plate (3); A connecting piece (22), wherein the connecting piece (22) is connected and fixed to a driving rod of the push oil cylinder (21).

7. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 1, characterized in that: It also includes a cooling adsorption device (9), wherein the cooling adsorption device (9) includes: A fixing rod (91), one end of which is mounted on the rear side of the fixing plate (4); A transparent cover (93), wherein an air exhaust hole (931) connected to a negative pressure fan is provided inside the transparent cover (93), and the transparent cover (93) is assembled on the other end of the fixing rod (91) and flipped in the front-to-back direction to the bottom of the fixing rod (91) or to the top of the fixing rod (91); A limit block (92), the limit block (92) is fixedly assembled on the other end of the fixing rod (91) and is located in front of the transparent cover (93), and the limit block (92) is used to support the transparent cover (93) when the transparent cover (93) is turned over to the top of the fixing rod (91).

8. The electromagnetic hot-melt upsetting and lengthening device for steel bars according to claim 1, characterized in that: The invention also comprises a control area (13), wherein the control area (13) is arranged on the base (1) and is located in front of the processing area (12); a hydraulic station (132) and a main machine (133) are arranged on the control area (13); the main machine (133) is electrically connected to the electromagnetic hot-melt welding part (8); the hydraulic station (132) is connected to the pushing device (2), the clamping scraping assembly (5), the movable clamping assembly (6) and the secondary scraping assembly (7), and is used to provide hydraulic power for the clamping scraping assembly (5), the movable clamping assembly (6) and the secondary scraping assembly (7).

Citation Information

Patent Citations

  • Deburring mechanism and butt welding machine

    CN114799442A

  • Butt-joining method

    JP2004001054A

  • Machine for contact butt welding of round parts with trimming

    RU2465109C1