Multi-section steel beam hoisting, loading and unloading system and using method thereof

By designing multi -section of steel beam hanging unloading systems, using Y -type main suspension, safety hooks, and ring rings to realize the stringing transportation and stable positioning of multiple groups of steel beams, solving the problem of low traditional hanging efficiency and hidden safety hazards. , Improve construction efficiency and security.

CN119370721AInactive Publication Date: 2025-01-28YANCHENG INST OF IND TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411752593.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-01-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The lifting efficiency of traditional steel beams is low during the lifting process, which affects the construction efficiency. Moreover, when the high-rise steel structure is constructed on site, there are safety hazards in the lifting and positioning of steel beams.

Method used

A multi -segment steel beam hanging unloading system is designed, including the main body of the beam, the main suspension, the main suspension belt, and the main body of the steel beam. Maggers such as the lifting belt realize the string transportation and stable positioning of multiple groups of steel beams.

Benefits of technology

The efficiency of the lifting and unloading of the steel beam is improved, the number of steel beams can be lifted at the same time, reducing the construction time, and ensuring the stable load and positioning of the steel beam during the lifting process by positioning the component, which improves the construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119370721A_ABST
    Figure CN119370721A_ABST
Patent Text Reader

Abstract

The invention relates to a multi-section steel beam hoisting and unloading system and a using method thereof, and belongs to the technical field of building construction.The multi-section steel beam hoisting and unloading system comprises a hoisting beam body, a main hoisting rope, a main hoisting belt and a steel beam body, the main hoisting rope is of a Y-shaped structure and is fixedly connected with a first safety hook, and the hoisting beam body is fixedly connected with a first hanging ring; the main lifting rope is connected with the first hanging ring through the first safety hook, the lifting beam body is fixedly connected with a connecting frame, the connecting frame is connected with the five main lifting belts, the five main lifting belts are evenly distributed and installed on the connecting frame, and the main lifting belts are fixedly connected with the first auxiliary lifting belt, the second auxiliary lifting belt and the second hanging ring. The first auxiliary lifting belt is fixedly connected with a second safety hook. According to the hoisting device, multiple groups of steel beams can be synchronously hoisted in series and discharged one by one, so that the hoisting and discharging efficiency of the steel beams can be effectively improved, the positioning assembly is arranged, the hoisted steel beams can be stably borne and positioned in the hoisting process, and the safety in the positioning and conveying process can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a multi-section steel beam hoisting and unloading system and a use method thereof. Background Art

[0002] Steel beams are commonly used structural members in construction. The weight of the steel beams themselves is relatively large, and they need to be hoisted during the construction process. When hoisting traditional steel beams, hoisting holes must be opened on the steel beams or lifting ears must be welded on the steel beams. They must be connected to the steel wire ropes using clamps, and then hoisted using vertical transportation machinery such as tower cranes.

[0003] During the on-site construction of high-rise steel structures, it is necessary to lift steel beams and other components. The length of such steel beam components is generally between 3 meters and 10 meters, and the weight is not large, but there are many types and quantities. Traditional lifting components can only lift one steel beam component at a time, and the lifting efficiency is low, which affects the construction efficiency. For this reason, a multi-section steel beam lifting and unloading system and a use method thereof are proposed, which can synchronously lift multiple groups of steel beams and unload them one by one, thereby effectively improving the lifting and unloading efficiency of the steel beams, and a positioning component is provided, which can stably bear the load and position the lifted steel beams during the lifting process, thereby ensuring the safety during the positioning and transportation process. Summary of the invention

[0004] The present invention provides a multi-section steel beam lifting and unloading system and a use method thereof, which solves the problems raised by the above-mentioned existing background technology, can effectively improve the conveying efficiency of steel beams, is suitable for lifting steel beams of different lengths, has good applicability, and is provided with a safety component, which can stably bear the load and position the lifted steel beams during the lifting process, and has good safety.

[0005] The solution of the present invention to solve the above technical problems is as follows: a multi-section steel beam lifting and unloading system comprises a lifting beam body, a main lifting rope, a main lifting belt, and a steel beam body, the main lifting rope is a Y-shaped structure, the main lifting rope is fixedly connected to a No. 1 safety hook, the lifting beam body is fixedly connected to a No. 1 hanging ring, the main lifting rope is connected to the No. 1 hanging ring through the No. 1 safety hook, the lifting beam body is fixedly connected to a connecting frame, the connecting frame is connected to the main lifting belt, the main lifting belt is provided with five, and the five main lifting belts are evenly arranged and installed at the connecting frame, the main lifting belt is fixedly connected to a No. 1 auxiliary lifting belt, a No. 2 auxiliary lifting belt, and a No. 2 lifting ring, the No. 1 auxiliary lifting belt is fixedly connected to a No. 2 safety hook, the No. 2 auxiliary lifting belt is fixedly connected to a No. 3 safety hook, the steel beam body is evenly installed with a No. 3 lifting ring, the lifting beam body is fixedly connected to a storage box, the storage box is fixedly connected to a brake stepping motor, the brake stepping motor is fixedly connected to a winding roller, and the outer wall of the winding roller is fixedly connected to a winding disk;

[0006] The method of use includes the following steps:

[0007] S1: Place the main beam on the ground, lay multiple sets of main lifting belts flat on the ground, evenly place multiple steel beams on the main lifting belts, first connect the No. 3 safety hook of the No. 2 auxiliary lifting belt with the No. 3 lifting ring of the steel beam, so that the steel beam can be initially positioned on the main lifting belt, then connect the No. 2 safety hook of the No. 1 auxiliary lifting belt with the No. 2 lifting ring of the main lifting belt to complete the loading, and evenly place multiple sets of steel beams one by one on the main lifting belt for positioning;

[0008] S2: Connect the hook of the crane equipment with the No. 1 hanging ring of the main lifting rope, and connect the No. 1 safety hook of the main lifting rope with the connecting frame of the lifting beam body to start the crane equipment for lifting operation. During lifting, multiple steel beam bodies can be transported in series. When the steel beam body at the bottom reaches the unloading position, it can be stopped. After releasing the No. 2 safety hook and the No. 2 lifting ring, release the No. 3 lifting ring and the No. 3 safety hook to release the positioning. After the steel beam body is out, connect the No. 2 safety hook with the No. 2 lifting ring again. After one steel beam body is transported to the unloading position, the crane equipment can lift it again to transport and unload the next steel beam body without moving to the bottom to load again;

[0009] S3: After the unloading of a steel beam body is completed, the brake stepper motor can be started to rotate the winding roller, and the winding roller can drive the winding disk to rotate in the storage box to reel in the excess lifting belt, so that the main lifting belt at the bottom of the feeding steel beam body can be stored, thereby preventing the excess main lifting belt from affecting the unloading and conveying operation;

[0010] S4: After the transportation is completed, the main body of the lifting beam can be lifted to the ground. By starting the brake stepper motor, the main lifting belt can be released from the storage box to carry out the loading operation of the steel beam main body again.

[0011] Based on the above technical solution, the present invention can also be improved as follows.

[0012] Furthermore, a plurality of the No. 3 lifting rings are installed on the steel beam body, and the spacing of the steel beam body is consistent with the spacing of the connecting frame, so that the steel beam body can be stably positioned at the main lifting belt.

[0013] Furthermore, each of the main lifting belts is evenly provided with a plurality of No. 1 auxiliary lifting belts, No. 2 auxiliary lifting belts and No. 2 lifting rings, and the plurality of No. 1 auxiliary lifting belts and No. 2 auxiliary lifting belts can respectively carry out load-bearing and positioning processing on the steel beam body.

[0014] Furthermore, five reel drums are provided corresponding to the main lifting belts, so that the five main lifting belts can be evenly stored in the storage box.

[0015] Furthermore, a collecting hole is provided at the bottom of the storage box corresponding to the main lifting belt, and a guide roller is rotatably connected to the inner wall of the collecting hole, so that the reeling and unreeling of the main lifting belt can be more stable.

[0016] Furthermore, one end of the winding roller is rotatably connected to the inner wall of the storage box.

[0017] The beneficial effects of the present invention are as follows: the present invention provides a multi-section steel beam lifting and unloading system and a method for using the same, which has the following advantages:

[0018] 1. The main body of the steel beam can be initially positioned at the main lifting belt, and then the No. 2 safety hook of the No. 1 auxiliary lifting belt is connected to the No. 2 lifting ring of the main lifting belt to complete the loading. Multiple groups of steel beam bodies are evenly placed one by one at the main lifting belt for positioning, so that the main lifting belt can bear and position multiple groups of steel beam bodies respectively;

[0019] 2. During hoisting, multiple steel beam bodies can be hoisted in series for transportation. When the bottom steel beam body reaches the unloading position, it can be stopped. After releasing the No. 2 safety hook and the No. 2 lifting ring, the No. 3 lifting ring and the No. 3 safety hook can be released to release the positioning. After the steel beam body is pulled out, the No. 2 safety hook is connected to the No. 2 lifting ring again. After one steel beam body is transported to the unloading position, the crane equipment can be lifted again to transport and unload the next steel beam body. There is no need to move to the bottom to load again, so that the steel beam body can be quickly hoisted and unloaded;

[0020] 3. The winding roller can drive the winding disk to rotate in the storage box to reel in the excess lifting belt, so that the main lifting belt at the bottom of the steel beam body being fed can be stored, thereby preventing the excess main lifting belt from affecting the unloading and conveying operation;

[0021] 4. Such a multi-section steel beam lifting and unloading system and its use method can synchronously lift multiple groups of steel beams and unload them one by one, thereby effectively improving the lifting and unloading efficiency of the steel beams. In addition, a positioning component is provided to stably bear the load and position the lifted steel beams during the lifting process, thereby ensuring safety during the positioning and transportation process.

[0022] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. The specific implementation of the present invention is given in detail by the following embodiments and their accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0024] Figure 1 A schematic structural diagram of a multi-section steel beam lifting and unloading system and a method of using the system provided by an embodiment of the present invention;

[0025] Figure 2A schematic diagram of the structure from a side view of a multi-section steel beam lifting and unloading system and a method of using the system provided by an embodiment of the present invention;

[0026] Figure 3 A schematic diagram of the structure of a main lifting belt in a multi-section steel beam lifting and unloading system and a method for using the system provided by an embodiment of the present invention;

[0027] Figure 4 A schematic diagram of the structure of a storage box from a side view in a multi-section steel beam lifting and unloading system and a method for using the same provided by an embodiment of the present invention;

[0028] Figure 5 A schematic diagram of the structure of a storage box in a multi-section steel beam lifting and unloading system and a method for using the same provided by an embodiment of the present invention;

[0029] Figure 6 A schematic structural diagram of a steel beam main body in a multi-section steel beam lifting and unloading system and a method for using the same provided in one embodiment of the present invention.

[0030] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0031] 1. The main body of the lifting beam; 2. The main lifting rope; 3. Safety hook No. 1; 4. Hanging ring No. 1; 5. Connecting frame; 6. Main lifting belt; 7. Auxiliary lifting belt No. 1; 8. Auxiliary lifting belt No. 2; 9. Lifting ring No. 2; 10. Safety hook No. 2; 11. Safety hook No. 3; 12. The main body of the steel beam; 13. Lifting ring No. 3; 14. Storage box; 15. Brake stepping motor; 16. Winding roller; 17. Winding reel; 18. Collecting hole; 19. Guide roller. DETAILED DESCRIPTION

[0032] The following is combined with Figure 1-5 The principles and features of the present invention are described, and the examples are only used to explain the present invention and are not used to limit the scope of the present invention. In the following paragraphs, the present invention is described in more detail by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the drawings are all in a very simplified form and are not in precise proportions, and are only used to facilitate and clearly assist in explaining the purpose of the embodiments of the present invention.

[0033] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0034] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0035] like Figure 1-5 As shown, the present invention provides a multi-section steel beam lifting and unloading system, including a beam body 1, a main lifting rope 2, a main lifting belt 6, and a steel beam body 12. The main lifting rope 2 is a Y-shaped structure. The main lifting rope 2 is fixedly connected to a No. 1 safety hook 3. The beam body 1 is fixedly connected to a No. 1 hanging ring 4. The main lifting rope 2 is connected to the No. 1 hanging ring 4 through the No. 1 safety hook 3. The beam body 1 is fixedly connected to a connecting frame 5. The connecting frame 5 is connected to the main lifting belt 6. Five main lifting belts 6 are arranged, and the five main lifting belts 6 are evenly arranged and installed on the connecting frame 5. At the frame 5, the main lifting belt 6 is fixedly connected with the No. 1 auxiliary lifting belt 7, the No. 2 auxiliary lifting belt 8, and the No. 2 lifting ring 9, the No. 1 auxiliary lifting belt 7 is fixedly connected with the No. 2 safety hook 10, the No. 2 auxiliary lifting belt 8 is fixedly connected with the No. 3 safety hook 11, the steel beam body 12 is evenly installed with the No. 3 lifting ring 13, the lifting beam body 1 is fixedly connected with a storage box 14, the storage box 14 is fixedly connected with a brake stepping motor 15, the brake stepping motor 15 is fixedly connected with a winding roller 16, and the outer wall of the winding roller 16 is fixedly connected with a winding disk 17.

[0036] Preferably, a plurality of No. 3 lifting rings 13 are installed on the steel beam body 12 , and the spacing between the steel beam body 12 is consistent with the spacing between the connecting frames 5 , so that the steel beam body 12 can be stably positioned at the main lifting belt 6 .

[0037] Preferably, each main lifting belt 6 is evenly provided with multiple No. 1 auxiliary lifting belt 7, No. 2 auxiliary lifting belt 8 and No. 2 lifting ring 9, and multiple No. 1 auxiliary lifting belts 7 and No. 2 auxiliary lifting belts 8 can respectively bear the weight and position the steel beam body 12.

[0038] Preferably, five reel drums 17 are provided corresponding to the main lifting belts 6 , so that the five main lifting belts 6 can be evenly stored in the storage box 14 .

[0039] Preferably, a collecting hole 18 is provided at the bottom of the storage box 14 corresponding to the main lifting belt 6, and a guide roller 19 is rotatably connected to the inner wall of the collecting hole 18, so that the winding and unwinding of the main lifting belt 6 can be more stable.

[0040] Preferably, one end of the winding roller 16 is rotatably connected to the inner wall of the storage box 14 .

[0041] The specific working principle and use method of the present invention are as follows: S1: Place the main beam 1 on the ground, lay multiple sets of main lifting belts 6 flat on the ground, and evenly place multiple steel beam main bodies 12 on the main lifting belts 6. First, connect the No. 3 safety hook 11 of the No. 2 auxiliary lifting belt 8 with the No. 3 lifting ring 13 of the steel beam main body 12, so that the steel beam main body 12 can be initially positioned on the main lifting belt 6, and then connect the No. 2 safety hook 10 of the No. 1 auxiliary lifting belt 7 with the No. 2 lifting ring 9 of the main lifting belt 6 to complete the loading. Multiple sets of steel beam main bodies 12 are evenly placed one by one on the main lifting belt 6 for positioning;

[0042] S2: Connect the hook of the crane equipment with the No. 1 hanging ring 4 of the main lifting rope 2, and connect the No. 1 safety hook 3 of the main lifting rope 2 with the connecting frame 5 of the lifting beam body 1 to start the crane equipment for lifting operation. During lifting, multiple steel beam bodies 12 can be transported in series. When the bottom steel beam body 12 reaches the unloading position, it can be stopped. After releasing the No. 2 safety hook 10 and the No. 2 lifting ring 9, the No. 3 lifting ring 13 and the No. 3 safety hook 11 can be released to release the positioning. After the steel beam body 12 is removed, the No. 2 safety hook 10 is connected to the No. 2 lifting ring 9 again. After one steel beam body 12 is transported to the unloading position, the crane equipment can lift it again to transport and unload the next steel beam body 12 without moving to the bottom to load again;

[0043] S3: After the unloading of a steel beam body 12 is completed, the brake stepping motor 15 can be started to rotate the winding roller 16, and the winding roller 16 can drive the winding disk 17 to rotate in the storage box 14 to reel in the excess lifting belt 6, so that the main lifting belt 6 at the bottom of the feeding steel beam body 12 can be stored, thereby preventing the excess main lifting belt 6 from affecting the unloading and conveying operation;

[0044] S4: After the transportation is completed, the beam body 1 can be hoisted to the ground, and the brake stepper motor 15 can be started to release the main hoisting belt 6 from the storage box 14 to perform the loading operation of the steel beam body 12 again.

[0045] It should be noted that, in this document, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Contents not described in detail in this specification belong to the prior art known to professionals in the field.

[0046] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.

Claims

1. A multi-section steel beam lifting and unloading system, comprising a beam lifting body (1), a main lifting rope (2), a main lifting belt (6), and a steel beam body (12), characterized in that: The main lifting rope (2) is a Y-shaped structure. The main lifting rope (2) is fixedly connected to a No. 1 safety hook (3). The main beam body (1) is fixedly connected to a No. 1 hanging ring (4). The main lifting rope (2) is connected to the No. 1 hanging ring (4) via the No. 1 safety hook (3). The main beam body (1) is fixedly connected to a connecting frame (5). The connecting frame (5) is connected to a main lifting belt (6). Five main lifting belts (6) are provided. The five main lifting belts (6) are evenly arranged and installed at the connecting frame (5). The main lifting belt (6) is fixedly connected to a No. 1 auxiliary lifting belt (7). , a No. 2 auxiliary lifting belt (8), a No. 2 lifting ring (9), the No. 1 auxiliary lifting belt (7) is fixedly connected with a No. 2 safety hook (10), the No. 2 auxiliary lifting belt (8) is fixedly connected with a No. 3 safety hook (11), the steel beam body (12) is evenly installed with a No. 3 lifting ring (13), the beam body (1) is fixedly connected with a storage box (14), the storage box (14) is fixedly connected with a brake stepping motor (15), the brake stepping motor (15) is fixedly connected with a winding roller (16), and the outer wall of the winding roller (16) is fixedly connected with a winding disk (17); The method of use includes the following steps: S1: placing the main beam body (1) on the ground, laying multiple sets of main lifting belts (6) flat on the ground, and evenly placing multiple steel beam bodies (12) on the main lifting belts (6). First, connecting the No. 3 safety hook (11) of the No. 2 auxiliary lifting belt (8) with the No. 3 lifting ring (13) of the steel beam body (12) so that the steel beam body (12) can be initially positioned on the main lifting belt (6). Then, connecting the No. 2 safety hook (10) of the No. 1 auxiliary lifting belt (7) with the No. 2 lifting ring (9) of the main lifting belt (6) to complete the loading. Multiple sets of steel beam bodies (12) are evenly placed one by one on the main lifting belt (6) for positioning. S2: The hook of the crane equipment is connected to the No. 1 hanging ring (4) of the main lifting rope (2), and the No. 1 safety hook (3) of the main lifting rope (2) is connected to the connecting frame (5) of the lifting beam body (1), and the crane equipment can be started to perform the lifting operation. During the lifting operation, multiple steel beam bodies (12) can be transported in series, and the lifting can be stopped when the bottom steel beam body (12) reaches the unloading position. After the No. 2 safety hook (10) and the No. 2 lifting ring (9) are released, the No. 3 lifting ring (13) and the No. 3 safety hook (11) are released to release the positioning. After the steel beam body (12) is released, the No. 2 safety hook (10) is connected to the No. 2 lifting ring (9) again. After one steel beam body (12) is transported to the unloading position, the crane equipment can lift again to transport and unload the next steel beam body (12), without moving to the bottom to load again; S3: After the unloading of a steel beam body (12) is completed, the brake stepping motor (15) can be started to rotate the winding roller (16), and the winding roller (16) can drive the winding disk (17) to rotate in the storage box (14) to reel in the excess lifting belt (6), so that the main lifting belt (6) at the bottom of the steel beam body (12) being fed can be stored, thereby preventing the excess main lifting belt (6) from affecting the unloading and conveying operation; S4: After the transportation is completed, the main body of the lifting beam (1) can be lifted to the ground, and the brake stepping motor (15) can be started to release the main lifting belt (6) from the storage box (14) to perform the loading operation of the main body of the steel beam (12) again.

2. A multi-section steel beam lifting and unloading system according to claim 1, characterized in that: A plurality of the third lifting rings (13) are installed on the steel beam body (12), and the spacing of the steel beam body (12) is consistent with the spacing of the connecting frame (5).

3. According to claim 1, a multi-section steel beam lifting and unloading system is characterized in that: Each of the main lifting belts (6) is evenly provided with a plurality of No. 1 auxiliary lifting belts (7), No. 2 auxiliary lifting belts (8) and No. 2 lifting rings (9).

4. The multi-section steel beam lifting and unloading system according to claim 1 is characterized in that: The winding reels (17) are provided with five corresponding to the main lifting belts (6).

5. The multi-section steel beam lifting and unloading system according to claim 1 is characterized in that: A collecting hole (18) is provided at the bottom of the storage box (14) corresponding to the main lifting belt (6), and a guide roller (19) is rotatably connected to the inner wall of the collecting hole (18).

6. The multi-section steel beam lifting and unloading system according to claim 1, characterized in that: One end of the winding roller (16) is rotatably connected to the inner wall of the storage box (14).