Fabricated pseudo-classic building roof construction structure and construction method

Through prefabricated antique building roof construction structure, the prefabrication and panel are used to set up a supporting system and use template to solve the problem of low construction efficiency, difficulty and poor quality quality of traditional roof cantiles. Construction effect and optimized molding quality.

CN119373276AInactive Publication Date: 2025-01-28CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411668092.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-21
Publication Date
2025-01-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional roof cantilever decoration modeling has low construction efficiency, high difficulty and poor molding quality.

Method used

The construction structure of an antique building roof is adopted, including prefabricated and prefabricated panels. By supporting the system setting up and template use, the stable and peaceful rectification of the pouring enclosure is achieved.

Benefits of technology

Improve construction efficiency, reduce the difficulty of process, ensure the optimization of the final molding quality, and form a structural action surface in advance in prefabricated 椽 and panels, ensuring the reliability of the bottom surface gear during pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119373276A_ABST
    Figure CN119373276A_ABST
Patent Text Reader

Abstract

The invention discloses a fabricated pseudo-classic building roof construction structure and method. The construction structure comprises a supporting system, a plurality of prefabricated rafters distributed at intervals are arranged on the supporting system, each prefabricated rafter comprises a rafter body, top anchor bars extending to a roof pouring area are arranged on the rafter bodies, shoulder steps are arranged on the rafter bodies, and a prefabricated panel is arranged between the shoulder steps of every two adjacent rafter bodies. The prefabricated panel is flush with the lower end face of the roof pouring area. The construction method comprises the following steps that manufacturing of the prefabricated rafters and the prefabricated panels is completed; erecting a supporting system; positioning the mounting position of the prefabricated rafter; the prefabricated rafters are installed on the supporting system; mounting the prefabricated panel; and steel bars are bound in the roof pouring area, and concrete is poured. The method has the advantages that the bottom formwork serves as a unified supporting face of the prefabricated rafters, the overall flatness of the prefabricated rafters can be guaranteed, the overall flat prefabricated rafters provide a good foundation for arrangement of prefabricated panels, and the final forming quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of assembled antique-style buildings, and specifically relates to an assembled antique-style building roof construction structure and a construction method. Background Art

[0002] Antique buildings refer to buildings that are specially used to imitate and replace ancient buildings, traditional religious temples, traditional landscapes, historical buildings, cultural relics buildings, and ancient villages, and to restore the historical style and features. For the cantilevered decorative shapes of roofs, the templates of traditional construction methods need to be manufactured in advance according to the decorative shapes, and then assembled and connected to cast enclosures, in order to finally form the corresponding molding effect. However, this form of template is difficult to manufacture, and there are many inconveniences in on-site use. It is easy to deform and bend, which affects the final molding quality. Summary of the invention

[0003] The purpose of this application is to provide a prefabricated antique building roof construction structure and construction method, which solves the problems of poor construction efficiency, difficulty and poor quality of traditional roof cantilever decoration modeling.

[0004] The purpose of this application is achieved through the following technical solutions:

[0005] A prefabricated antique building roof construction structure comprises a support system, on which a plurality of prefabricated rafters are arranged at intervals, the prefabricated rafters comprise a rafter body, on which a top anchor bar extending to a roof casting area is provided, and on which a shoulder step is provided. A prefabricated panel is provided between the shoulder steps of two adjacent rafter bodies, and the prefabricated panel is flush with the lower end surface of the roof casting area.

[0006] Furthermore, it also includes a baffle, which is arranged at the end between two adjacent rafter bodies.

[0007] Furthermore, it also includes a structural beam, and the rafter body is provided with end anchor bars extending to the casting area of ​​the structural beam.

[0008] Furthermore, a built-in cavity is provided on the rafter body, and a plug is provided at the end of the built-in cavity.

[0009] Furthermore, the support system includes a support frame and a template, the template includes a bottom template, the bottom template is supported on the support frame on the ground, and the prefabricated rafters are supported on the bottom template.

[0010] Furthermore, the template also includes a side template, the bottom template is connected to the side template, and the side template is blocked at the end between two adjacent rafter bodies.

[0011] A method for constructing an assembled antique building roof comprises the following steps:

[0012] The first step is to complete the production of prefabricated rafters and prefabricated panels. The prefabricated rafters include a rafter body, and the rafter body is provided with a top anchor bar and a shoulder step;

[0013] The second step is to set up the support system;

[0014] The third step is to locate the installation position of the prefabricated rafters on the support system;

[0015] The fourth step is to install the prefabricated rafters on the support system according to the positioning, and extend the top anchor bars to the roof pouring area;

[0016] The fifth step is to install the prefabricated panel, and cover the prefabricated panel between the shoulder steps of the two adjacent rafter bodies to ensure that the prefabricated panel is flush with the lower end surface of the roof pouring area;

[0017] Step 6: Tie the steel bars and pour concrete in the roof pouring area.

[0018] Furthermore, in the second step, the support system includes a support frame and a formwork, the formwork includes a bottom formwork and a side formwork, the bottom formwork is supported on the support frame on the ground, the bottom formwork is used to support prefabricated rafters, and the bottom formwork is connected to the side formwork; in the fourth step, the side formwork is blocked at the end between two adjacent rafter bodies.

[0019] Furthermore, in the fourth step, the end anchor bars on the rafter body extend to the casting area of ​​the structural beam.

[0020] Furthermore, the fifth step also includes installing a baffle, which is located at the end between two adjacent rafter bodies.

[0021] Beneficial effects of this application:

[0022] (1) Prefabricated rafters and prefabricated panels are used as the working surface for pouring enclosures, eliminating the need for complex bottom formwork, reducing the overall process difficulty and optimizing work efficiency.

[0023] (2) The bottom formwork serves as a unified supporting surface for the precast rafters, which can ensure the overall flatness of the precast rafters. The overall flat precast rafters provide a good foundation for the placement of the precast panels, ensuring the final molding quality.

[0024] (3) Prefabricated rafters and prefabricated panels can form the structural action surface in advance, ensuring the reliability and stability of the bottom enclosure during pouring. After the subsequent pouring is completed, it can form an integral part with the roof and have reliable strength.

[0025] The aforementioned main scheme of the present application and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection in the present application; and in the present application, (non-conflicting options) can also be freely combined with each other and with other options. After understanding the scheme of the present application, those skilled in the art can understand that there are many combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present application, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the three-dimensional structure of this application.

[0027] Figure 2 It is a schematic diagram of the main structure of this application.

[0028] Figure 3 It is a schematic diagram of a local three-dimensional structure of this application.

[0029] Figure 4 It is a three-dimensional structural schematic diagram of the prefabricated rafters of this application.

[0030] In the figure: 1-precast rafter, 2-precast panel, 3-baffle, 4-structural beam, 5-formwork; 101-rafter body, 102-top anchor bar, 103-end anchor bar, 104-shoulder step, 105-built-in cavity, 106-plug; 401-beam body, 402-beam reinforcement; 501-bottom formwork, 502-side formwork, 503-slope formwork. DETAILED DESCRIPTION

[0031] The following non-limiting examples are provided to illustrate the present application.

[0032] Example 1

[0033] refer to Figure 1 to Figure 4 As shown, an assembled antique building roof construction structure includes a prefabricated rafter 1, a prefabricated panel 2, a baffle 3, a structural beam 4 and a support system.

[0034] The support system is used to support the precast rafters 1. A number of precast rafters 1 are arranged at intervals on the support system. The precast rafters 1 are arranged in parallel at equal intervals. The precast rafters 1 serve as the foundation and support for casting enclosures in the early stage and form a decorative structure of the roof in the later stage. The precast rafter 1 includes a rafter body 101. The rafter body 101 is provided with a top anchor bar 102 extending to the roof casting area. After the subsequent casting of the roof concrete, the rafter body 101 is connected to the roof casting as a whole through the top anchor bar 102.

[0035] The rafter body 101 is provided with a shoulder step 104, and a prefabricated panel 2 is provided between the shoulder steps 104 of two adjacent rafter bodies 101, that is, the two adjacent rafter bodies 101 on the left and right are used to support the middle prefabricated panel 2, and the horizontal gap between the two rafter bodies 101 is covered. The prefabricated panel 2 is flush with the lower end surface of the roof casting area, and the prefabricated panel 2 serves as the foundation for casting enclosures in the early stage and as part of the roof in the later stage.

[0036] The prefabricated rafter 1 is a reinforced concrete structure, including a rafter body 101, a top anchor bar 102, an end anchor bar 103, a shoulder step 104, a built-in cavity 105 and a plug 106. The rafter body 101 is a rectangular solid concrete material, and a steel skeleton is arranged inside. A top anchor bar 102 extends from the top of the rafter body 101, and the top anchor bar 102 is preferably an L-shaped bending structure. A plurality of top anchor bars 102 are arranged at intervals along the length direction, and are subsequently connected to the roof concrete pouring to ensure good anchoring strength.

[0037] An end anchor 103 extends from the end of the rafter body 101. The end anchor 103 is preferably a small-angle (0-20°) bending structure. Several end anchors 103 are arranged at intervals along the peripheral direction and are subsequently cast and connected with other building bodies. For example, the structural beam casting area of ​​the structural beam 4 is also cast and connected to other building bodies to ensure good connection strength of the rafter body 101.

[0038] The shoulder of the rafter body 101 is provided with a shoulder step 104, which is the left and right corners of the upper cross section of the rafter body 101. The shoulder step 104 is preferably an L-shaped concave corner to facilitate the placement of the prefabricated panel 2 therein. The step height is preferably the same as the thickness of the prefabricated panel 2.

[0039] The rafter body 101 is provided with an internal cavity 105, which is preferably a cylindrical structure with two ends connected, so as to reduce the overall amount of prefabricated rafters 1, optimize costs, and also reduce the overall quality, facilitating construction operations. The end of the internal cavity 105 is provided with a plug 106, which can be a rubber or plastic plug to block the port when the roof is poured to prevent concrete from leaking into the cavity.

[0040] Since the prefabricated rafters 1 are arranged at intervals, there is a horizontal gap between two adjacent prefabricated rafters 1, and the horizontal gap is blocked and closed by the prefabricated panel 2, and the prefabricated panel 2 is preferably a cement board. At the same time, there is a vertical gap between the two prefabricated rafters 1 at both ends, and the vertical gap is blocked and closed by the baffle 3, which is preferably a cement board and is set at the end between the two adjacent rafter bodies 101.

[0041] The support system includes a support frame and a template 5. The support frame can be in the form of a scaffold or the like. The template 5 includes a bottom template 501, a side template 502, and a slope template 503. A flat bottom template 501 is supported on the support frame on the ground, and prefabricated rafters 1 are supported on the bottom template 501. The plane of the bottom template 501 is used to position and lift all prefabricated rafters 1 to ensure that all prefabricated rafters 1 are located on the same plane.

[0042] The bottom formwork 501 is fixedly connected to the side formwork 502, and the side formwork 502 is set at the end between two adjacent rafter bodies 101, that is, the side formwork 502 is not only used for enclosure during the subsequent roof pouring, but also used to block and close the vertical gap between two adjacent prefabricated rafters 1.

[0043] The structural beam 4 includes a beam body 401 made of concrete and a beam reinforcement 402, and the end anchor bar 103 extends to the structural beam casting area of ​​the structural beam 4. The structural beam casting area is cast for the second time while the roof is cast, so as to realize the casting connection between the prefabricated rafter 1 and the structural beam 4. The slope template 503 is extended on the other side of the structural beam 4, and extends from the wall surface of the structural beam 4 upward and then to the outer side of the upper part, forming a casting slope with a slope.

[0044] Example 2

[0045] refer to Figure 1 to Figure 4 As shown, a method for constructing an assembled antique building roof comprises the following steps: First, the size of the antique prefabricated rafter 1 and the prefabricated panel 2 is determined according to the drawing, and the prefabricated rafter 1 and the prefabricated panel 2 are manufactured. The structure of the prefabricated rafter 1 and the prefabricated panel 2 is the same as that of the first embodiment.

[0046] The second step is to set up a support system. The support system includes a support frame and a template 5. The template 5 includes a bottom template 501 and a side template 502. The support frame is first set up, and then the bottom template 501 is laid on the support frame. The bottom template 501 is supported on the support frame on the ground. The bottom template 501 is used to support the prefabricated rafter 1. The bottom template 501 is connected to the side template 502.

[0047] The third step is to draw lines on the bottom template 501 according to the drawing and locate the installation position of the prefabricated rafter 1 on the support system.

[0048] Step 4: According to the positioning line, the prefabricated rafter 1 is installed on the bottom template 501 of the support system, the top anchor bar 102 extends to the roof casting area, and the end anchor bar 103 extends to the structural beam casting area. The two sides of the prefabricated rafter 1 are fixed to the bottom template 501 with steel nails to prevent lateral movement. At the same time, ensure that the side template 502 is located at the end between the two adjacent rafter bodies 101.

[0049] The fifth step is to install the prefabricated panel 2, and cover the shoulder steps 104 of two adjacent rafter bodies 101 to ensure that the prefabricated panel 2 is flush with the lower end surface of the roof casting area. The baffle 3 and the plug 106 are also installed, and the baffle 3 is set at the end between the two adjacent rafter bodies 101, and the plug 106 is plugged at the port of the rafter body 101.

[0050] Finally, the gaps formed by the adjacent structures of the prefabricated rafters 1, the prefabricated panels 2, the baffles 3, the side formwork 502 and the plugs 106 are sealed with cement mortar to prevent leakage.

[0051] Step 6: Tie the steel bars and pour concrete in the roof pouring area.

[0052] The rest is the same as in Example 1.

[0053] The aforementioned basic examples and their further selected examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection in this application. In the scheme of this application, each selected example can be arbitrarily combined with any other basic examples and selected examples.

[0054] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. An assembled antique building roof construction structure, including a support system, characterized in that: The support system is provided with a plurality of prefabricated rafters (1) distributed at intervals. The prefabricated rafters (1) include a rafter body (101). The rafter body (101) is provided with a top anchor bar (102) extending to the roof casting area. The rafter body (101) is provided with a shoulder step (104). A prefabricated panel (2) is provided between the shoulder steps (104) of two adjacent rafter bodies (101). The prefabricated panel (2) is flush with the lower end surface of the roof casting area.

2. The assembled antique building roof construction structure according to claim 1 is characterized by: It also comprises a baffle (3), which is arranged at the end between two adjacent rafter bodies (101).

3. The assembled antique building roof construction structure according to claim 1 is characterized by: It also includes a structural beam (4), and the rafter body (101) is provided with end anchor bars (103) extending to the casting area of ​​the structural beam.

4. The assembled antique building roof construction structure according to claim 1 is characterized by: The rafter body (101) is provided with a built-in cavity (105), and a plug (106) is provided at the end of the built-in cavity (105).

5. The assembled antique building roof construction structure according to claim 1 is characterized by: The support system comprises a support frame and a template (5), the template (5) comprises a bottom template (501), the bottom template (501) is supported on the support frame on the ground, and the prefabricated rafters (1) are supported on the bottom template (501).

6. The assembled antique building roof construction structure according to claim 5 is characterized by: The template (5) further comprises a side template (502), the bottom template (501) is connected to the side template (502), and the side template (502) is arranged at the end between two adjacent rafter bodies (101).

7. A method for constructing an assembled antique building roof, characterized in that: The steps include: The first step is to complete the production of a prefabricated rafter (1) and a prefabricated panel (2), wherein the prefabricated rafter (1) comprises a rafter body (101), and the rafter body (101) is provided with a top anchor bar (102) and a shoulder step (104); The second step is to set up the support system; The third step is to locate the installation position of the prefabricated rafter (1) on the support system; Step 4: Install the prefabricated rafters (1) onto the support system according to the positioning, and extend the top anchor bars (102) to the roof casting area; The fifth step is to install the prefabricated panel (2), and cover the prefabricated panel (2) between the shoulder steps (104) of two adjacent rafter bodies (101), and ensure that the prefabricated panel (2) is flush with the lower end surface of the roof casting area; Step 6: Tie the steel bars and pour concrete in the roof pouring area.

8. The method for constructing an assembled antique building roof according to claim 7, characterized in that: In the second step, the support system includes a support frame and a template (5), the template (5) includes a bottom template (501) and a side template (502), the bottom template (501) is supported on the support frame on the ground, the bottom template (501) is used to support the prefabricated rafter (1), and the bottom template (501) is connected to the side template (502); in the fourth step, the side template (502) is blocked at the end between two adjacent rafter bodies (101).

9. The method for constructing an assembled antique building roof according to claim 7, characterized in that: In the fourth step, the end anchor bars (103) on the rafter body (101) extend to the structural beam casting area.

10. The method for constructing an assembled antique building roof according to claim 7 or 8, characterized in that: The fifth step also includes installing a baffle (3), and placing the baffle (3) at the end between two adjacent rafter bodies (101).