Subway station beam plate column construction plate buckle support erecting system and erecting method

By setting up a board to support the vertical rod on the frame beam of the subway station, and using the technique of dual -patch groove steel, the setting of the settings of the subway station is solved. Efficient and safe construction effect.

CN119373306APending Publication Date: 2025-01-28CHINA RAILWAY 23RD BUREAU GRP RAILTRANSIT ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411820256.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-01-28

AI Technical Summary

Technical Problem

During the construction of subway stations, the existing buckle bracket support structure has problems such as weak load capacity, poor stability and high cost.

Method used

It is used to set up the structure of the vertical rod on the main beam of the existing frame beams, and to form a subway station beam pillar construction discharge support system through the method of staggered the setting of the supporting rods through the double -patch groove steel.

Benefits of technology

It effectively solves the problem of supporting difficulties and stability of the traditional discharge bracket system when the height difference and the height difference between the beam board and the large height difference, and improve the construction efficiency and cost benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119373306A_ABST
    Figure CN119373306A_ABST
Patent Text Reader

Abstract

The invention discloses a subway station beam-slab-column construction plate buckle support erecting system and method, and the system comprises two groups of main beam supporting units which are respectively arranged at the two sides of a column; the two sets of transfer layer supporting units are oppositely arranged on the two sides of the main beam in the arrangement direction of the secondary beams respectively and comprise transfer layer double-spliced channel steel close to the secondary beams and arranged on the two sides of the secondary beams respectively, and the two ends of the transfer layer double-spliced channel steel are erected on the brackets of the basic supporting units and the brackets of the transfer layer supporting vertical rods respectively; the transfer layer supporting vertical rods are erected on the main beam double-splicing steel channels located on the two sides of the secondary beams correspondingly and staggered from the brackets at the corresponding positions of the basic supporting units. The two groups of secondary beam supporting units are respectively arranged on the two sides of the column; the plate supports the unit. The plate buckle support supporting system can be suitable for erecting a plate buckle support under the conditions that the height difference of a primary beam and a secondary beam is larger than 0.3 m and beam-slab columns are crossed, and the problems of a traditional plate buckle support system in beam-slab construction with the large supporting height and the large beam-slab height difference are well solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a screw-lock bracket erection system and an erection method for subway station beam, slab and column construction. Background Art

[0002] According to the relevant requirements of the highway engineering construction specifications, in the construction of elevated subway stations, the use of fastener-type steel pipe full-height support frames and ordinary bowl-hook type steel pipe full-height support frames are generally restricted. Disc-hook type support frames are widely used in the construction of elevated subway stations.

[0003] The design of the subway station frame structure takes into account the passage of rail trains, and the cross-sectional dimensions of beams, plates, and columns are large, and the design floor height is high, which makes the design and construction of the support frame scheme very difficult. In addition, the subway station frame structure is mostly of special-shaped pitch, which is difficult to match the modulus of the buckle bracket. The existing buckle bracket support structure often has problems such as weak bearing capacity, poor stability, and high cost. Summary of the invention

[0004] The purpose of the present invention is to provide a system and method for erecting a turnbuckle bracket for beam, slab and column construction of a subway station, so as to solve the problems of weak bearing capacity, poor stability and high cost of the existing turnbuckle bracket support structure in the construction of subway stations.

[0005] The present invention is achieved through the following technical solutions: The bracket erection system for the construction of beams, slabs and columns in subway stations is used for the construction of beams, slabs and columns at the intersection of the main beams, secondary beams and columns, including: The basic support unit is a formed disc bracket structure; Set up the unit again, including: The main beam support unit is provided in two groups, which are respectively provided on both sides of the column, and include a main beam support upright and a plurality of main beam double-jointed channel steels sequentially arranged on the brackets of the main beam support upright along the main beam setting direction; The transfer layer support unit is provided in two groups, which are respectively arranged on both sides of the main beam along the secondary beam setting direction, and include transfer layer double-jointed channel steels respectively arranged on both sides of the secondary beam close to the secondary beam, and the two ends of the transfer layer double-jointed channel steels are respectively laid on the brackets of the main beam support poles and the brackets of the transfer layer support poles, and the transfer layer support poles are respectively laid on the main beam double-jointed channel steels located on both sides of the secondary beam, and are staggered with the brackets of the main beam support poles; Secondary beam support units, the secondary beam support units are arranged in two groups, respectively arranged on both sides of the column, including secondary beam double-jointed channel steels sequentially erected on the brackets of the secondary beam support uprights along the secondary beam setting direction and multiple node secondary beam double-jointed channel steels erected on the transfer layer support units and the brackets of the secondary beam support uprights located between the transfer layer double-jointed channel steels; The plate support unit includes plate support uprights erected on the foundation support unit, main beam-plate support uprights located on both sides of the main beam and respectively erected on the main beam double-jointed channel steel, secondary beam-plate support uprights located on both sides of the secondary beam and respectively erected on the secondary beam double-jointed channel steel, and node-plate support uprights located on both sides of the secondary beam and respectively erected on the node secondary beam double-jointed channel steel; the main beam-plate support uprights and secondary beam-plate support uprights are staggered with the support seats of the main beam support uprights and the secondary beam support uprights.

[0006] In some embodiments, the double-jointed channel steels of the transfer layer are respectively arranged at positions corresponding to the brackets of the main beam support columns and the brackets of the transfer layer support columns.

[0007] In some embodiments, the transfer layer support posts are staggered toward the side close to the main beam and are arranged to be aligned with the brackets at the corresponding positions of the main beam support posts.

[0008] In some embodiments, the spacing between the support seats at corresponding positions of the transfer layer support posts and the main beam support posts is 0.1-0.3 m.

[0009] In some embodiments, the node-plate supporting upright is arranged near the overlap position of the double-jointed channel steel of the transition layer, and is staggered with the double-jointed channel steel of the transition layer toward the side close to the secondary beam.

[0010] In some embodiments, the node-plate supporting uprights and the double-jointed channel steels of the transfer layer are staggered at a spacing of 0.1-0.3 m.

[0011] In some embodiments, the main beam double channel steel, the secondary beam double channel steel, the transfer layer double channel steel, and the node secondary beam double channel steel include two channel steels arranged side by side and spaced apart, and the two channel steels of the main beam double channel steel, the secondary beam double channel steel, and the transfer layer double channel steel are respectively arranged side by side and spaced apart on the brackets of the main beam support pole, the secondary beam support pole, and the transfer layer support pole; The main beam-slab supporting uprights, the secondary beam-slab supporting uprights, the transfer layer supporting uprights, and the node-slab supporting uprights are respectively arranged between two corresponding channel steels, and are supported on the two channel steels through the discs arranged thereon.

[0012] In some embodiments, a main beam secondary rib is provided on the main beam double-jointed channel steel; Secondary beam secondary ribs are set on the secondary beam double-jointed channel steel and the node secondary beam double-jointed channel steel; Main plate ribs are arranged on the supporting seats of the plate supporting uprights, the secondary beam-plate supporting uprights, the main beam-plate supporting uprights and the node-plate supporting uprights, and secondary plate ribs are arranged on the main plate ribs.

[0013] On the other hand, the present invention also provides a method for erecting a disc bracket erection system for subway station beam, slab and column construction, which is re-erected on a basic support unit to form a re-erecting unit for beam, slab and column construction at a node position where a main beam, a secondary beam and a column intersect, comprising the following steps: Along the setting direction of the main beam, the main beam double-jointed channel steels are respectively installed on the main beam support seats; On the main beam double-jointed channel steel near both sides of the secondary beam, set up transfer layer support poles around the columns, set up transfer layer double-jointed channel steels on the brackets of the transfer layer support poles and the brackets of the adjacent main beam support poles along the secondary beam setting direction, set up two transfer layer support units on both sides of the main beam, and stagger the main beam brackets at the corresponding positions of the transfer layer support poles and the main beam support poles; On the transfer layer support unit, a plurality of node secondary beam double-jointed channel steels are set up along the secondary beam setting direction, and the node secondary beam double-jointed channel steels are supported and set in the middle on the support seat of the secondary beam support upright pole located between two transfer layer double-jointed channel steels, and the secondary beam double-jointed channel steels are set up on the support seat of the secondary beam support upright pole outside the node secondary beam double-jointed channel steels; Plate supporting poles are set on the poles of the foundation support unit, node-plate supporting poles are respectively set on the node-secondary beam double-jointed channel steels, main beam-plate supporting poles are set on the main beam double-jointed channel steels located outside the transfer layer support unit, and secondary beam-plate supporting poles are set on the secondary beam double-jointed channel steels; the node-plate supporting poles are staggered with the transfer layer double-jointed channel steels toward the side close to the secondary beam, and the main beam-plate supporting poles and secondary beam-plate supporting poles are staggered with the brackets at the corresponding positions of the main beam supporting poles and the secondary beam supporting poles.

[0014] In some embodiments, the main plate ribs are set on the plate supporting posts, the secondary beam-plate supporting posts, the main beam-plate supporting posts and the node-plate supporting posts, and the secondary plate ribs are set on the main plate ribs; the main plate ribs are arranged along the secondary beam direction, and the secondary plate ribs are arranged along the main beam direction; Lay the secondary beam ribs on the main beam double-jointed channel steel; Lay the secondary beam secondary ribs on the secondary beam double-jointed channel steel and the node secondary beam double-jointed channel steel; The plate forming formwork, main beam forming formwork and secondary beam forming formwork are laid on the plate secondary ribs, main beam secondary ribs and secondary beam secondary ribs respectively.

[0015] Compared with the prior art, the present invention has the following advantages and beneficial effects: The present invention adopts a structure of setting up plate support uprights again on the main cross beam of the existing frame beam body, which effectively solves the problems existing in the traditional disc-hook bracket system in the beam-slab construction with large support height and large height difference between the beam and the slab, and by adopting the method of staggered arrangement of double-jointed channel steels and support uprights, it effectively solves the problems of large beam hanging length at the intersection of the beam and the slab and the beam and the column, conflict between the position of the plate support uprights and the beam top support seat, difficulty in arranging the secondary beam support structure at the intersection node of the main and secondary beams and the columns, and difficulty in ensuring the stability of the double-jointed channel steel structure.

[0016] The disc-shaped bracket support system of the present invention can be applied to the erection of disc-shaped brackets when the height difference between the primary and secondary beams is greater than 0.3m and when beams, slabs and columns intersect. No additional processed components are required and the bearing capacity of the bracket and the supporting pole disc can be fully utilized. The stability of the re-erected structure is well guaranteed by the mutual engagement of the channel steel, the supporting pole and the bracket.

[0017] The present invention forms a conversion layer support unit by erecting a layer on the double-jointed channel steel of the main beam at the intersection of the primary and secondary beams and the columns. The erection system has a simple structure and high safety, and increases the height difference between the secondary beam and the main beam. It can be well applied to construction conditions where the height difference between the primary and secondary beams is greater than 0.3m. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0019] Figure 1 This is a schematic diagram of the disc-shaped bracket structure that uses a common frame for beams and slabs.

[0020] Figure 2 It is a schematic diagram of the disc-hook bracket structure using the beam-slab independent frame method.

[0021] Figure 3 This is a schematic diagram of the disc-shaped bracket structure that is erected at the minimum spacing.

[0022] Figure 4 It is a schematic diagram of the structure of the re-erection unit in the buckle bracket erection system according to an embodiment of the present invention.

[0023] Figure 5 It is a structural schematic diagram from another perspective of the re-erecting unit in the buckle bracket erection system according to an embodiment of the present invention.

[0024] Figure 6 This is a front view of a unit structure being re-erected in a buckle bracket erection system according to an embodiment of the present invention.

[0025] Figure 7 It is a side view of the re-erecting unit structure in the buckle bracket erection system according to an embodiment of the present invention.

[0026] Figure 8 It is a schematic diagram of the structure at the junction of the unit beams and slabs erected again in the buckle bracket erection system according to an embodiment of the present invention.

[0027] Fig. 9 It is a schematic diagram of the double-jointed channel steel support structure for re-erecting the unit node secondary beam in the disc-hook bracket erection system according to an embodiment of the present invention.

[0028] Fig.10 It is a schematic diagram of the installation of the conversion base in the method for erecting a disc-lock bracket system according to an embodiment of the present invention.

[0029] Fig.11 It is a schematic diagram of the installation structure of the upright pole in the method for erecting a disc-lock bracket system according to an embodiment of the present invention.

[0030] Fig.12 It is a schematic diagram of the standard step frame erection structure in the erection method of the buckle bracket system according to an embodiment of the present invention.

[0031] Fig.13 It is a schematic diagram of the installation structure of the top vertical pole of the top step frame in the erection method of the buckle bracket system according to an embodiment of the present invention.

[0032] Fig.14 It is a schematic diagram of the installation structure of the top horizontal rod of the top step frame in the erection method of the disc-lock bracket system according to an embodiment of the present invention.

[0033] Fig.15 It is a schematic diagram of the installation structure of the diagonal rods of the top step frame in the erection method of the buckle bracket system according to an embodiment of the present invention.

[0034] Fig.16 It is a schematic diagram of the installation structure of the bottom upright pole of the top step frame beam in the erection method of the disc-hook bracket system according to an embodiment of the present invention.

[0035] Fig.17 It is a schematic diagram of the installation structure of the adjustable bracket of the top step frame in the method for erecting the disc-hook bracket system according to an embodiment of the present invention.

[0036] Fig.18 It is a schematic diagram of the structure of the disc-lock support erection system in the method for erecting the disc-lock support system in an embodiment of the present invention.

[0037] Fig.19 It is a finite element model and analysis diagram of the buckle bracket erection system of the embodiment of the present invention.

[0038] in: 101. Main beam double channel steel, 102. Secondary beam double channel steel, 103. Transfer layer double channel steel, 104. Node secondary beam double channel steel, 105. Transfer layer support pole, 106. Plate support pole, 107. Secondary beam-plate support pole, 108. Main beam-plate support pole, 109. Node-plate support pole; 201, main beam secondary rib, 202, secondary beam secondary rib, 203, plate main rib, 204, plate secondary rib; 301, main beam forming template, 302, secondary beam forming template, 303, plate forming template; 40. Bracket; 501, main beam supporting pole, 502, secondary beam supporting pole. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.

[0040] A certain project includes the construction of two subway stations, one of which is a two-story double-island four-line branch line connection station. The total length of the station is 95m, the total width is 35.3m, the effective standard section width is 8.5m+10m, and the right platform at the short-distance end is partially retracted by 50mm, with a design width of 9.95m. The main structure of the station adopts a bridge-building structure type in which the track beam and the main structure of the station are rigidly connected. Precast concrete components are used and arranged according to the axis. The maximum horizontal axis span is 10.85m, the maximum longitudinal axis span is 13m, and the track area uses a 500mm thick concrete slab. The maximum main frame beam size is 800×2000mm 2 .

[0041] The other subway station is the depot connection station, which is a three-story side elevated station. The first floor is the equipment room floor, the second floor is the station hall floor, and the third floor is the platform floor. The total length of the station is 95m, the total width is 19m, the effective platform width is 5.6m+5.6m, and the main structure adopts a horizontal four-column three-span frame structure. The track beam and the main structure of the station adopt a rigidly connected bridge-building structure. The main frame beam of the station adopts a cast-in-place ordinary concrete structure, arranged according to the axis, with a maximum horizontal axis span of 8.6m and a maximum longitudinal axis span of 12m; the concrete slab thickness is 500mm, and the maximum main beam size is 600×1700mm 2 .

[0042] Compared with other brackets, the disc-shaped bracket has the characteristics of high single-pole bearing capacity, fast erection and disassembly, good rod quality and good overall benefits. However, there are problems such as the frame size is limited by the modulus and the difficulty in arranging the vertical poles of the frame structure, which restricts its application in station beam and slab forming.

[0043] In actual engineering construction, only 600mm cross bars can be rented on the market. Therefore, in actual functional construction, only cross bars with a minimum spacing of 600mm can be used. This also causes great difficulties in the erection of support poles at the junction of beams and slabs in the subway station's buckle support system.

[0044] There are three main structural forms of the commonly used disc bracket support system: 1) beam and slab shared frame, such as Figure 1 2) beam-slab independent frame, such as Figure 2 3) Erect according to the minimum spacing, such as Figure 3 As shown; the advantages and disadvantages of the above three structural forms are shown in Table 1.

[0045] Table 1 Comparison of the advantages and disadvantages of different structural support systems During the design of the project construction, it was found that the above two stations used cast-in-place frame beams, the support erection height reached 6m, the maximum beam size reached 0.8m×1.975m, and the line load reached 76.616kN / m.

[0046] If a shared frame structure for beams and slabs is adopted, there is a situation where the beam line load is too large and the bearing capacity of the disc of the hook bracket is insufficient, and the bearing capacity of the bracket support system cannot meet the requirements; if an independent frame structure for beams and slabs is adopted, due to the high height of the bracket erection, there is a situation where the width-to-height ratio of the support frame is greater than 3, and the width-to-height ratio of the hook bracket cannot meet the requirements and the stability of the hook bracket cannot be guaranteed; if the structure is erected at the minimum spacing, the amount of steel used in the support system of the two stations will be greatly increased to 2,621t, and the erection cost of the hook bracket will be greatly increased.

[0047] The present invention adopts a method of re-erecting a plate support upright on the main cross beam of the existing frame beam body, which can well solve the problems existing in the traditional disc buckle bracket support system and can well ensure the stability of the re-erecting.

[0048] In view of the construction structure characteristics of this project, the following difficulties were found in the re-erection structure of the disc-shaped bracket support system of this project: 1) There is a conflict between the position of the plate support upright and the beam top support seat; 2) The layout of the secondary beam support structure is difficult at the intersection of the main beam, secondary beam and column; 3) The stability of the double-jointed channel steel in the disc-shaped bracket support system is difficult to guarantee.

[0049] In some embodiments, in the re-erection of the disc bracket for the beam-slab node, a Z-shaped disc bracket structure and double-splice channel steel are used. Based on the double-splice channel steel crossbeam, the setting position of the plate support uprights on the double-splice channel steel crossbeam is moved a certain distance in the direction of the main beam, so that the plate support uprights and the main beam top supports are staggered.

[0050] This structural setting can effectively solve the problem that the bearing capacity of the support beam in the existing disc-hook bracket is weak and an additional anti-falling device needs to be installed; it can also effectively solve the problem that the hanging length of the main rib of the slab is too long at the junction of the beam and slab, and fully utilizes the shear resistance of the supporting vertical rod disc, making the disc-hook bracket support system simple to erect and highly safe.

[0051] Reference Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 and Fig. 9 In some embodiments of the present invention, a subway station beam, slab and column construction buckle bracket erection system is used for the construction of beams, slabs and columns at the intersection of the main beam, secondary beam and column, and includes: The basic support unit is a formed disc bracket structure; Set up the unit again, including: The main beam support unit is provided in two groups, which are respectively provided on both sides of the column to be formed, and include a main beam support vertical rod 501 and a plurality of main beam double-jointed channel steels 101 on the bracket 40 on which the main beam support vertical rod 501 is sequentially erected along the main beam setting direction; The transfer layer support unit is provided in two groups, which are respectively arranged on both sides of the main beam along the secondary beam setting direction, and include transfer layer double-jointed channel steels 105 respectively arranged on both sides of the secondary beam close to the secondary beam, and the two ends of the transfer layer double-jointed channel steels 105 are respectively laid on the brackets 40 of the main beam support uprights 501 and the brackets 40 of the transfer layer support uprights 105, and the transfer layer support uprights 105 are respectively laid on the main beam double-jointed channel steels 101 located on both sides of the secondary beam, and are staggered with the brackets 40 of the main beam support uprights 501; Secondary beam support unit, the secondary beam support unit is set in two groups, respectively set on both sides of the column, including secondary beam support uprights 502 and secondary beam double-jointed channel steels 102 sequentially erected on the brackets 40 of the secondary beam support uprights 502 along the secondary beam setting direction, and multiple node secondary beam double-jointed channel steels 104 erected on the brackets 40 of the secondary beam support uprights 502 between the transfer layer support unit and the transfer layer double-jointed channel steels 103; The plate support unit includes a plate support upright 106 erected on the foundation support unit, a main beam-plate support upright 108 located on both sides of the main beam and respectively erected on the main beam double-jointed channel steel 101, a secondary beam-plate support upright 107 located on both sides of the secondary beam and respectively erected on the secondary beam double-jointed channel steel 102, and a node-plate support upright 109 located on both sides of the secondary beam and respectively erected on the node secondary beam double-jointed channel steel 104; the main beam-plate support upright 108 and the secondary beam-plate support upright 107 are staggered with the brackets of the main beam support upright 501 and the secondary beam support upright 502, respectively.

[0052] At the intersection of the main beam, secondary beam and column, by setting up a transfer layer support unit, the problems of interference and excessive hanging length caused by the re-erection of the buckle bracket at the intersection of the main beam, secondary beam and column are well solved.

[0053] In some embodiments, the transfer layer double-jointed channel steels 103 are respectively erected at positions corresponding to the brackets of the main beam support columns and the brackets of the transfer layer support columns.

[0054] In some embodiments, the transfer layer support posts 105 are staggered with the brackets of the main beam support posts toward the side close to the main beam.

[0055] In some embodiments, the spacing between the transfer layer support poles 105 and the brackets of the main beam support poles is 0.1-0.3 m. For example, the spacing is set to 0.2 m, which optimizes the distribution of load while ensuring the stability of the support structure.

[0056] In some embodiments, the node-plate supporting uprights 109 are arranged near the overlap position of the double-jointed channel steels of the transition layer, and are staggered with the double-jointed channel steels of the transition layer toward the side close to the secondary beam.

[0057] In some embodiments, the node-plate support uprights 109 are staggered with respect to the double-jointed channel steels of the transfer layer by a spacing of 0.1-0.3 m, such as a staggered distance of 0.2 m, to optimize the distribution of the load.

[0058] In some embodiments, the staggered spacing between the main beam-plate support uprights 108, the secondary beam-plate support uprights 107 and the brackets of the basic support unit is 0.1-0.3m, for example, the staggered distance is set to 0.2m, which optimizes the load distribution while ensuring the stability of the supporting structure.

[0059] In some embodiments, the main beam double channel steel 101, the secondary beam double channel steel 102, the transfer layer double channel steel 103, and the node secondary beam double channel steel 104 include two channel steels arranged side by side and spaced apart, and the two channel steels of the main beam double channel steel, the secondary beam double channel steel, and the transfer layer double channel steel are respectively arranged side by side and spaced apart on the brackets of the main beam support pole, the secondary beam support pole, and the transfer layer support pole; The main beam-slab support uprights 108, the secondary beam-slab support uprights 107, the transfer layer support uprights 105, and the node-slab support uprights 109 are respectively arranged between two corresponding channel steels, and are supported on the two channel steels through the discs arranged thereon.

[0060] In some embodiments, a main beam secondary rib 201 is provided on the main beam double channel steel 101; A secondary beam secondary rib 202 is arranged on the secondary beam double channel steel 102 and the node secondary beam double channel steel 104; The main plate ribs 203 are arranged on the supports of the plate supporting uprights 106 , the secondary beam-plate supporting uprights 107 , the main beam-plate supporting uprights 108 and the node-plate supporting uprights 109 , and the secondary plate ribs 204 are arranged on the main plate ribs 203 .

[0061] The following takes the construction steps of the disc bracket system of a subway station as an example to explain in detail the structure and erection method of the beam, slab and column disc bracket erection system of the present invention. Figures 10 to 18 , the specific construction steps are as follows: 1. Elastic line positioning Before erection, mark the position lines of the supports on the base according to the support system plan.

[0062] 2. First step: erection of the frame According to the order of the intersection points of the laying out lines, the installation bases are arranged on the intersection points of the laying out lines respectively, and the bases adopt adjustable bases.

[0063] The maximum distance between the base and the center rod of the sweeping rod is 550mm, the exposed screw of the base does not exceed 300mm, and the length of the screw of the base inserted into the column is not less than 150mm.

[0064] The foundation structure adopts reinforced concrete foundation, and the base is directly set on the foundation structure without laying a pad in the middle.

[0065] Insert the short end of the conversion base into the adjustable base and install the conversion base on the adjustable base respectively.

[0066] Vertical poles are inserted at the other end of the conversion base. There is a certain height difference between adjacent vertical poles to form a high and low staggered arrangement. The height difference between the vertical poles should not be less than 500mm.

[0067] Horizontal bars are set up between the vertical poles for connection. Both ends of the horizontal bars are fixedly connected to the vertical pole discs by pins. The standard pitch of the horizontal bars is 1500mm, and the pitch of the horizontal bars on the top layer does not exceed 1000mm.

[0068] 3. Standard step frame erection Vertical poles and horizontal poles are set up in sequence on the first step frame to form a standard step frame.

[0069] 4. Top step frame erection Vertical poles, horizontal poles and diagonal poles are set up on the standard step frame to form a top step frame.

[0070] A bottom beam support rod is respectively set up near the four corners of the top step frame. The bottom beam support rod is located between two adjacent vertical rods, and the height of the bottom beam support rod is lower than the height of the two adjacent vertical rods.

[0071] Adjustable brackets are installed on the top of the vertical pole and the bottom support rod of the beam respectively.

[0072] At this point, the complete foundation support unit is erected.

[0073] 5. Set up the buckle bracket again Along the main beam setting direction, main beam double-jointed channel steels 101 are respectively installed on the brackets 40 of the main beam support uprights 501; The main beam double-jointed channel steel is composed of two channel steels, for example, [8 channel steel can be used; the two channel steels are arranged on a bracket, and the setting distance between the two channel steels is limited by the bracket.

[0074] Two main beam support units are respectively set up on both sides of the column to be formed.

[0075] On the main beam double-jointed channel steel 101 near both sides of the secondary beam, transfer layer support uprights 105 are set around the columns, and on the supports of the transfer layer support uprights 105 and the supports of the adjacent main beam support uprights 501, transfer layer double-jointed channel steels 103 are respectively set along the secondary beam setting direction, and two transfer layer support units are respectively set on both sides of the main beam, and the supports of the transfer layer support uprights 105 and the main beam support uprights 501 are staggered.

[0076] For example, the spacing between the transfer layer support poles 105 and the brackets at corresponding positions of the basic support units is 0.2 m.

[0077] Two node secondary beam double-jointed channel steels 104 are set up along the secondary beam setting direction on the transfer layer support unit, and the node secondary beam double-jointed channel steel 104 is supported in the middle on the support seat of the secondary beam support upright 502 located between the two transfer layer double-jointed channel steels 103, referring to Fig. 9 As shown, at this time, the node secondary beam double-jointed channel steel is limitedly supported by the bracket on the secondary beam support column; the secondary beam double-jointed channel steel 102 is set on the bracket of the secondary beam support column outside the node secondary beam double-jointed channel steel 104.

[0078] The node secondary beam double-jointed channel steel 104 and the secondary beam double-jointed channel steel 102 form two secondary beam support platforms on both sides of the column.

[0079] Plate supporting uprights 106 are set on the uprights of the foundation supporting unit, node-plate supporting uprights 107 are respectively set on the node secondary beam double-jointed channel steels 104, main beam-plate supporting uprights 108 are set on the main beam double-jointed channel steels located outside the transfer layer supporting unit, and secondary beam-plate supporting uprights 107 are set on the secondary beam double-jointed channel steels 102.

[0080] The node-plate supporting uprights 109 are staggered with the transfer layer double-jointed channel steel 103 toward the side close to the secondary beam, and the main beam-plate supporting uprights 108 and the secondary beam-plate supporting uprights 107 are staggered with the brackets of the main beam supporting uprights and the secondary beam supporting uprights respectively, and the staggered spacing can be set to 0.2m.

[0081] Complete the installation of the unit by setting up the disc bracket again.

[0082] 6. Wooden formwork erection The main plate ribs 203 are set on the brackets 40 of the plate supporting uprights 106, the secondary beam-plate supporting uprights 107, the main beam-plate supporting uprights 108 and the node-plate supporting uprights 109, and the secondary plate ribs 204 are set on the main plate ribs 203; the main plate ribs 203 are arranged along the secondary beam direction, and the secondary plate ribs 204 are arranged along the main beam direction.

[0083] Lay the main beam secondary rib 201 on the main beam double channel steel 101; Lay the secondary beam secondary ribs 202 on the secondary beam double-jointed channel steel 102 and the node secondary beam double-jointed channel steel 104; The plate forming template 303, the main beam forming template 301 and the secondary beam forming template 302 are laid on the plate secondary rib 204, the main beam secondary rib 201 and the secondary beam secondary rib 202 respectively.

[0084] The secondary ribs of the main beam, the secondary ribs of the secondary beam, the main ribs of the board, and the secondary ribs of the board can be made of 10×10cm square timber; the board forming formwork, the main beam forming formwork, and the secondary beam forming formwork can be made of 1.5cm thick formwork.

[0085] The force analysis of the disc bracket support system of the present invention was carried out, and the disc bracket and finite element model were established. The components were simulated by bar system units, and the overlap was simulated by elastic connection. The horizontal bars and diagonal bars of the disc bracket were all rotationally constrained by 20kN*m / [rad]. The boundary conditions were set at the bottom of the vertical pole to constrain the translational freedom in three directions. Through the above parameter settings, a finite element model of the optimal solution for the disc bracket re-erection structure with 2376 nodes, 2912 beam units, and 984 plate units was established, as shown in the figure. Fig.19 .

[0086] The stress conditions are as follows: The concrete pouring speed is relatively slow during the construction of the buckle bracket, and it can be analyzed according to the static load condition. The load is transferred from the 1.5cm thick formwork to the 10×10cm square wood, double-jointed channel steel, support pole disc, support pole, buckle base and finally to the concrete foundation.

[0087] The self-weight of each component is automatically calculated in the analysis software. The manually added loads include concrete load, steel load, and construction load. The standard value of concrete load is 24kN / m 2 The standard value of plate reinforcement load is 1.1kN / m 2 The standard value of the main and secondary beam reinforcement load is 1.5kN / m 2 The construction load is 3kN / m 2 To obtain the value, apply the above load as a surface load on a 1.5 cm thick formwork, and perform verification according to the following two working conditions: (1) Safety verification of the disc support system under the ultimate load-bearing capacity state; (2) Verification of the deformation of the disc bracket under the limit state of normal use.

[0088] The finite element analysis results are as follows: Through finite element analysis and calculation, the stress, load and deformation results of the buckle bracket under two working conditions can be obtained, as shown in Table 2.

[0089] Table 2 Finite element analysis results It can be seen from Table 2 that during the casting process of the disc buckle bracket, the stress values ​​of each component and node did not exceed the allowable stress value of the material. The maximum stress of the disc buckle bracket supporting the vertical pole was 188.93Mpa, which was less than the allowable value of 300Mpa; the stress value of the double-jointed channel steel beam was 64.52Mpa, which was less than the allowable value of 215Mpa; the maximum load of the bracket was 61.54kN, which was less than the allowable bearing capacity of the bracket of 140kN; the maximum shear force on the supporting vertical pole disc was 16.16kN, which was less than the allowable value of 40kN; the deformation of each component was within the allowable range of the specification, and the disc buckle bracket was re-erected. The structural strength, stiffness and stability all met the requirements of the specification.

[0090] The spacing between the vertical poles of the disc bracket support system of the present invention can be optimized from 0.6m×0.6m to 0.6m×0.9m, 0.9m×0.9m, and 1.2m×0.9m; under the condition that the volume of the bracket remains unchanged, the steel consumption per cubic meter is reduced from 47.6kg / m 3 Reduced to 23.54kg / m after optimization 3 ; and the labor cost per cubic meter required for erection is also reduced accordingly.

[0091] By adopting the disc-shaped bracket support system and erection method of the present invention, the construction efficiency is improved while ensuring construction safety. The cost of erecting the support system is reduced from 3.666 million yuan to 2.26 million yuan, the cost of erecting the disc-shaped bracket is reduced by about 30%, and the amount of steel used is reduced by about 50% compared with before optimization.

[0092] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. used to indicate the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship commonly placed when the product of the invention is used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0093] In addition, if the terms "horizontal" or "vertical" appear in the description of the present invention, it does not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0094] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in combination with specific circumstances.

[0095] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. The bracket erection system for the construction of beams, slabs and columns in subway stations is used for the construction of beams, slabs and columns at the intersection of the main beams, secondary beams and columns. It is characterized by: include: The basic support unit is a formed disc bracket structure; Set up the unit again, including: The main beam support unit is provided in two groups, which are respectively provided on both sides of the column, and include a main beam support column and a plurality of main beam double-jointed channel steels on the brackets on which the main beam support columns are sequentially erected along the main beam setting direction; The transfer layer support unit is provided in two groups, which are respectively arranged on both sides of the main beam along the secondary beam setting direction, and include transfer layer double-jointed channel steels respectively arranged on both sides of the secondary beam close to the secondary beam, and the two ends of the transfer layer double-jointed channel steels are respectively laid on the brackets of the main beam support poles and the brackets of the transfer layer support poles, and the transfer layer support poles are respectively laid on the main beam double-jointed channel steels located on both sides of the secondary beam, and are staggered with the brackets of the main beam support poles; A secondary beam support unit, wherein the secondary beam support unit is provided in two groups, which are respectively provided on both sides of the column, and include secondary beam support posts and secondary beam double-jointed channel steels sequentially erected on the supporting seats of the secondary beam support posts along the secondary beam setting direction, and a plurality of node secondary beam double-jointed channel steels erected on the supporting seats of the secondary beam support posts of the transfer layer support unit and the transfer layer double-jointed channel steels; The plate support unit includes plate support uprights erected on the foundation support unit, main beam-plate support uprights located on both sides of the main beam and respectively erected on the main beam double-jointed channel steel, secondary beam-plate support uprights located on both sides of the secondary beam and respectively erected on the secondary beam double-jointed channel steel, and node-plate support uprights located on both sides of the secondary beam and respectively erected on the node secondary beam double-jointed channel steel; the main beam-plate support uprights and secondary beam-plate support uprights are staggered with the support seats of the main beam support uprights and the secondary beam support uprights.

2. The subway station beam, slab and column construction buckle bracket erection system according to claim 1 is characterized in that: The double-jointed channel steels of the transfer layer are respectively arranged at positions corresponding to the brackets of the main beam supporting uprights and the brackets of the transfer layer supporting uprights.

3. The subway station beam, slab and column construction buckle bracket erection system according to claim 1 or 2, characterized in that: The transfer layer support posts are staggered with the support seats of the main beam support posts toward the side close to the main beam.

4. The subway station beam, slab and column construction buckle bracket erection system according to claim 3 is characterized in that: The staggered spacing between the support bases of the transfer layer support posts and the main beam support posts is 0.1-0.3m.

5. The subway station beam, slab and column construction buckle bracket erection system according to claim 1 is characterized in that: The node-plate supporting upright is arranged near the overlapping position of the double-jointed channel steel of the transfer layer, and is staggered with the double-jointed channel steel of the transfer layer toward the side close to the secondary beam.

6. The subway station beam, slab and column construction buckle bracket erection system according to claim 5 is characterized in that: The node-plate supporting uprights and the double-jointed channel steels of the transfer layer are staggered at a spacing of 0.1-0.3m.

7. The subway station beam, slab and column construction buckle bracket erection system according to claim 1 is characterized in that: The main beam double channel steel, the secondary beam double channel steel, the transfer layer double channel steel, and the node secondary beam double channel steel include two channel steels arranged side by side and at intervals, and the two channel steels of the main beam double channel steel, the secondary beam double channel steel, and the transfer layer double channel steel are respectively arranged side by side and at intervals on the support seats of the main beam support pole, the secondary beam support pole, and the transfer layer support pole; The main beam-slab supporting uprights, the secondary beam-slab supporting uprights, the transfer layer supporting uprights, and the node-slab supporting uprights are respectively arranged between two corresponding channel steels, and are supported on the two channel steels through the discs arranged thereon.

8. The subway station beam, slab and column construction buckle bracket erection system according to claim 1 is characterized in that: The secondary ribs of the main beam are set on the double-jointed channel steel of the main beam; Secondary beam secondary ribs are set on the secondary beam double-jointed channel steel and the node secondary beam double-jointed channel steel; Main plate ribs are arranged on the supporting seats of the plate supporting uprights, the secondary beam-plate supporting uprights, the main beam-plate supporting uprights and the node-plate supporting uprights, and secondary plate ribs are arranged on the main plate ribs.

9. A method for erecting a disc bracket system for beam, slab and column construction of a subway station, characterized in that: Re-erecting on the foundation support unit to form a re-erecting unit for the construction of beams, slabs and columns at the intersection nodes of the main beams, secondary beams and columns, includes the following steps: Along the setting direction of the main beam, the main beam double-jointed channel steels are respectively installed on the brackets of the main beam supporting uprights; On the main beam double-jointed channel steels near both sides of the secondary beam, transfer layer support poles are set around the columns, and on the brackets of the transfer layer support poles and the brackets of the adjacent main beam support poles, transfer layer double-jointed channel steels are respectively set along the secondary beam setting direction, and two transfer layer support units are respectively set on both sides of the main beam, and the brackets of the transfer layer support poles and the main beam support poles are staggered; On the transfer layer support unit, a plurality of node secondary beam double-jointed channel steels are set up along the secondary beam setting direction, and the node secondary beam double-jointed channel steels are supported and set in the middle on the support seat of the secondary beam support upright pole located between two transfer layer double-jointed channel steels, and the secondary beam double-jointed channel steels are set up on the support seat of the secondary beam support upright pole outside the node secondary beam double-jointed channel steels; Plate supporting poles are set on the poles of the foundation support unit, node-plate supporting poles are respectively set on the node-secondary beam double-jointed channel steels, main beam-plate supporting poles are set on the main beam double-jointed channel steels located outside the transfer layer support unit, and secondary beam-plate supporting poles are set on the secondary beam double-jointed channel steels; the node-plate supporting poles are staggered with the transfer layer double-jointed channel steels toward the side close to the secondary beam, and the main beam-plate supporting poles and secondary beam-plate supporting poles are staggered with the brackets at the corresponding positions of the main beam supporting poles and the secondary beam supporting poles.

10. The method for erecting a disc bracket system for subway station beam, slab and column construction according to claim 9, characterized in that: Main slab ribs are set up on slab support posts, secondary beam-slab support posts, main beam-slab support posts and node-slab support posts, and secondary slab ribs are set up on the main slab ribs; The main ribs of the plate are arranged along the direction of the secondary beam, and the secondary ribs of the plate are arranged along the direction of the main beam; Lay the secondary beam ribs on the main beam double-jointed channel steel; Lay the secondary beam secondary ribs on the secondary beam double-jointed channel steel and the node secondary beam double-jointed channel steel; The plate forming formwork, main beam forming formwork and secondary beam forming formwork are laid on the plate secondary ribs, main beam secondary ribs and secondary beam secondary ribs respectively.