Portable underground roadway surrounding rock core while-drilling monitoring sampling device and using method thereof
By designing a portable underground lane surrounding rock core with drilling the sampling device, the integrated sensor and wastewater recycling components are used to solve the lack of the existing technology. Accurate sampling and environmental effects.
Patent Information
- Application Number
- CN202411576107.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2044-11-06
AI Technical Summary
Existing drilling and sampling equipment is difficult to accurately reveal the crack structural surface inside the surrounding rock under complex geological conditions. The equipment is large in size and heavy in weight, which is inconvenient to operate, and it is easy to cause core damage during the sampling process, affecting the integrity of the sample.
A portable underground lanes surrounding rock core monitoring the sampling device with diamonds, using integrated sensors and data collection sensors to monitor the drill speed, torque and displacement during the drilling process. True samples. At the same time, the device has built -in wastewater recycling components, which can effectively collect and filter wastewater in the drilling holes and improve environmental protection effects.
The accurate sampling of the internal fissure structure surface of the fence under complex geological conditions is achieved, which improves the originality and integrity of the sample, simplifies the operation process, improves the environmental effect, and reduces the volume and weight of the equipment.
Smart Images

Figure CN119373439A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of drilling sampling, in particular to a portable underground tunnel surrounding rock core drilling monitoring sampling device and a use method thereof. Background Art
[0002] Rock mass quality is a prerequisite for evaluating geological conditions. Therefore, it is crucial to accurately obtain the rock mass mechanical parameters and internal geological structure characteristics of the surrounding rock (especially the fracture structure surface and other stability and permeability-controlling geological structures in the rock mass). On-site in-situ drilling sampling is an important means to understand the internal rock mass structural characteristics of the surrounding rock.
[0003] The geological conditions of underground space are complex, the spatial distribution is limited, and the exposed surrounding rock surface has a complex geometric structure, which brings challenges to the efficient and safe sampling of surrounding rocks in narrow spaces. At present, the existing rock field in-situ sampling equipment can only drill holes in one direction (vertically inward), and the distribution of fracture structure surfaces in the surrounding rock is complex. Drilling machines that can only drill in a single direction cannot accurately reveal the geological structure information of the stability and permeability control structure surface inside the surrounding rock; in addition, the existing drilling sampling equipment often has a large size and weight, which increases the difficulty of using it in unfavorable geological conditions in narrow spaces.
[0004] During the drilling process, the drilling rig will inevitably generate torque and vibration due to the shaking of the drilling rig, the rotation of the drill rod, and the friction between the drill bit and the rock contact surface, which can easily cause damage to the core and affect the integrity of the drilled surrounding rock core. In addition, during the drilling process of the drilling rig, the location of the fracture structure surface inside the rock mass is unknown. The use of drilling parameters suitable for the intact surrounding rock will lead to fracture and damage of the fracture structure surface in the sampled core, and the original location and integrity of the core containing the fracture structure surface cannot be guaranteed, which seriously affects the objective and accurate understanding of the physical mechanics and hydraulics of the fracture structure surface that controls stability and seepage. How to perceive the changes in the lithology of the surrounding rock during the drilling process of a drilling rig in a complex engineering geological field, to provide real-time feedback and adjust the drilling parameters, and to ensure the in-situ and complete sampling of the surrounding rock core (especially the rock mass with fractured structural surfaces) is still a key challenge in the evaluation of the suitability of the development and utilization of underground space repositories. At the same time, the traditional drilling sampling process cannot properly handle the wastewater discharged from the borehole. After the sampling is completed, the sample cannot be quickly removed from the sampling rod, and the operation is cumbersome and inconvenient to use. Summary of the invention
[0005] The present invention provides a portable underground tunnel surrounding rock core drilling monitoring sampling device and a use method thereof, which solves the problems in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] The portable underground tunnel surrounding rock core drilling monitoring sampling device comprises a mounting plate, and also comprises: a mounting seat arranged on one side of the mounting plate, a displacement adjustment component is arranged between the mounting seat and the mounting plate, the mounting seat is fixedly connected to the mounting plate on the side away from the mounting plate, the mounting plate is rotatably connected to the gear turntable, the side wall of the mounting seat on the side of the gear turntable is fixedly connected to the transmission rack, a limit assembly is arranged on the gear turntable, one side of the gear turntable is fixedly connected to the mounting rod, one side of the mounting rod is slidably sleeved with a mounting sleeve, a driving assembly is arranged in the mounting sleeve, a drilling machine is fixedly sleeved on the mounting sleeve on the side of the mounting rod, an output shaft end of the drilling machine is connected to a drill rod, an integrated sensor is arranged between the drill rod and the output shaft end of the drilling machine, a data acquisition sensor is arranged on the side of the mounting sleeve away from the mounting rod, a signal input end of the data acquisition sensor is connected to a signal output end of the integrated sensor, the inside of the drill rod is a hollow structure, a drill bit is arranged at one end of the drill rod away from the drilling machine, the drill bit is a hollow structure, and is arranged in communication with the drill rod, a discharge assembly is arranged in the drill rod, the discharge assembly is connected to the drill bit, and a wastewater recovery assembly is arranged below the drilling machine.
[0008] As a preferred technical solution of the present invention, the displacement adjustment assembly includes a positioning block fixedly arranged on one side of the mounting seat, a position adjustment rod is rotatably arranged on the mounting plate on one side of the positioning block, the end of the position adjustment rod is a threaded structure, and the threaded structure at the end of the position adjustment rod extends into the positioning block and is threadedly connected to the positioning block.
[0009] As a preferred technical solution of the present invention, a slide groove is provided on the mounting plate, a limit rod is slidably arranged in the slide groove, the limit rod is fixedly connected to the mounting seat, and positioning holes are provided on both sides of the mounting plate.
[0010] As a preferred technical solution of the present invention, the limit assembly includes a positioning column that slides through the gear turntable, an elastic member is sleeved on the positioning column, and a positioning groove is provided on the mounting plate.
[0011] As a preferred technical solution of the present invention, the driving assembly includes a torsion column rotatably arranged on the mounting sleeve, a socket is provided on the torsion column, the torsion column extends into the mounting sleeve, and the bottom is fixedly connected to the adjusting gear, the side wall of the mounting rod on one side of the adjusting gear is fixedly connected to the transmission gear rod, the transmission gear rod is meshed with the adjusting gear, and a first torque sensor is arranged at the rotating connection between the torsion column and the mounting sleeve.
[0012] As a preferred technical solution of the present invention, the integrated sensor includes a pressure sensor, a drilling speed sensor, a second torque sensor and a laser displacement sensor, and the laser displacement sensor is located at the center of the drill rod cross section.
[0013] As a preferred technical solution of the present invention, the unloading assembly includes a fixed sleeve, both ends of which are respectively installed and connected to the drill pipe and the drill bit, the fixed sleeve is fixedly connected to a linkage rod on the side close to the drill pipe, the linkage rod is located inside the drill pipe, and the linkage rod is fixedly connected to a unloading ring on the end away from the fixed sleeve, and the unloading ring is slidably connected to the inner wall of the drill pipe.
[0014] As a preferred technical solution of the present invention, the wastewater recovery component includes a mounting block, a threaded rod is threaded through the mounting block, the end of the threaded rod is fixedly connected to a transmission column, the end of the transmission column is slidably sleeved on a mounting tube, one side of the inner wall of the mounting tube is fixedly connected to a telescopic part, the end of the telescopic part is fixedly connected to a clamping block, the clamping block is slidably arranged in the mounting tube, and the end of the transmission column is rotatably connected to the clamping block.
[0015] As a preferred technical solution of the present invention, the end of the installation cylinder is fixedly connected to the wastewater recovery frame, the filter screen is fixedly connected inside the wastewater recovery frame, and a water guide pipe is arranged at the bottom of the wastewater recovery frame.
[0016] The method for using the portable underground tunnel surrounding rock core drilling monitoring sampling device comprises the following steps:
[0017] S1. First, select the construction location, then place the mounting plate on one side of the construction surface and use expansion bolts to fix the mounting plate on one side of the construction surface, leaving an operating space between the mounting plate and the construction surface. After the installation is completed, the operator drives the mounting seat to move horizontally through the displacement adjustment component to achieve horizontal adjustment of the drilling position, and at the same time drives the mounting rod to rotate by rotating the gear turntable to achieve adjustment of the drilling direction;
[0018] S2, then use the driving assembly to drive the drilling machine on one side of the installation sleeve to move close to the rock layer, and start the drilling machine to drive the drill rod and the drill bit to rotate, so as to achieve drilling and sampling of the rock layer, and at the same time, one side of the wastewater recovery assembly is in contact with the drilling position;
[0019] S3. During the drilling sampling process, the operator uses an external computer to analyze the specific parameter information about the rock formation transmitted by the integrated sensor, and then adjusts the drilling parameters in real time during the drilling process based on the feedback parameter information, thereby achieving fidelity sampling. After the sampling is completed, the drive assembly is adjusted in reverse to remove the drill bit and drill rod. The drill bit is removed and the removed core is taken out by the unloading assembly, and then the rock formation analysis is carried out.
[0020] The invention has the following advantages: when in use, the operator first fixes the mounting plate on the surrounding rock with expansion screws according to the target target area of the surrounding rock to be studied, and then, according to the (occurrence) distribution of the potential fracture structure surface inside the surrounding rock, first rotates the position adjustment rod to drive the mounting seat to move, thereby realizing the lateral adjustment of the drilling position, then pulls out the positioning column, adjusts the gear turntable to adjust the drilling angle of the drill bit on one side of the mounting rod, and then starts the drilling machine to drive the drill bit at one end of the drill rod to rotate, and at the same time, the operator inserts the tool rod into the jack of the torsion column to drive the torsion column to rotate, and drives the mounting sleeve to move laterally along the mounting rod under the action of the adjusting gear and the transmission gear rod to perform drilling, and at the same time, the operator makes the wastewater recovery frame contact with the rock surface and then rotates the threaded rod to drive the transmission column to rotate, and the transmission column squeezes the pressing block to fix the wastewater recovery frame under the action of the telescopic member, and when the water valve is opened to cool the drill bit during the drilling process, the wastewater recovery frame can effectively collect wastewater and filter it under the action of the filter screen, so as to achieve better environmental protection effect;
[0021] At the same time, during the drilling process, the sample will enter the drill pipe through the hollow position of the drill bit to achieve sampling. At the same time, during the drilling sampling process, the integrated sensor can measure the drilling speed, torque, and thrust applied to the drill pipe by the drilling rig. At the same time, under the action of the laser displacement sensor, the laser displacement sensor can measure the precise displacement of the contact between the drill bit and the rock surface before each drilling and each drilling rig starts drilling through the hollow borehole. The integrated sensor transmits information to the computer through the data acquisition sensor to conduct real-time monitoring of the drilling machine parameters (drilling speed, torque, thrust) and drilling position during the drilling process. The operator uses an external computer to analyze the specific parameter information about the rock formation transmitted by the integrated sensor, and then adjusts the drilling parameters in real time during the drilling process based on the feedback parameter information, thereby achieving fidelity sampling. After the sampling is completed, the drill rod is taken out and the drill bit is disassembled. The drill bit drives the unloading ring to move through the linkage rod on one side of the fixed sleeve to achieve rapid unloading. Compared with the traditional material extraction method, this method of the device is more convenient to operate and use, has better environmental protection effect, and can unload more conveniently. The condition of the rock formation can be judged in time according to the drilling information transmitted by the integrated sensor, and then the drilling parameters can be adjusted to achieve fidelity sampling. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The structure diagram of the portable underground tunnel surrounding rock core sampling device while drilling Figure 1 .
[0023] Figure 2 The structure diagram of the portable underground tunnel surrounding rock core sampling device while drilling Figure 2 .
[0024] Figure 3 The structure diagram of the portable underground tunnel surrounding rock core sampling device while drilling Figure 3.
[0025] Figure 4 This is a schematic diagram of the cross-sectional structure of a portable underground tunnel surrounding rock core drilling monitoring sampling device from a top view.
[0026] Figure 5 It is a schematic diagram of the cross-sectional structure of a portable underground tunnel surrounding rock core drilling monitoring sampling device from the side.
[0027] Figure 6 for Figure 5 Schematic diagram of the enlarged structure of A.
[0028] In the figure: 1. mounting plate; 2. mounting seat; 3. mounting sleeve; 4. drilling machine; 5. data acquisition sensor; 6. integrated sensor; 7. torsion column; 8. transmission gear rod; 9. drill rod; 10. threaded rod; 11. mounting block; 12. transmission column; 13. mounting cylinder; 14. wastewater recovery frame; 15. mounting rod; 16. slide groove; 17. position adjustment rod; 18. positioning block; 19. limit rod; 20. positioning hole; 21. transmission rack; 22. gear turntable; 23. elastic member; 24. positioning column; 25. mounting plate; 26. positioning groove; 27. drill bit; 28. jack; 29. unloading ring; 30. linkage rod; 31. fixing sleeve; 32. filter screen; 33. adjusting gear; 34. laser displacement sensor; 35. first torque sensor; 36. pressing block; 37. telescopic member. DETAILED DESCRIPTION
[0029] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0030] Example 1, please refer to Figure 1-Figure 6A portable underground tunnel surrounding rock core drilling monitoring sampling device includes a mounting plate 1, and also includes: a mounting seat 2 arranged on one side of the mounting plate 1, a displacement adjustment component is arranged between the mounting seat 2 and the mounting plate 1, the mounting seat 2 is fixedly connected to a mounting disk 25 away from the mounting plate 1, the mounting disk 25 is rotatably connected to a gear turntable 22, a side wall of the mounting seat 2 on one side of the gear turntable 22 is fixedly connected to a transmission rack 21, the transmission rack 21 is meshed with the gear turntable 22, a limit assembly is arranged on the gear turntable 22, one side of the gear turntable 22 is fixedly connected to a mounting rod 15, one side of the mounting rod 15 is slidably sleeved with a mounting sleeve 3, a driving assembly is arranged in the mounting sleeve 3, the A drilling machine 4 is arranged on a fixed sleeve 31 on the mounting sleeve 3 on one side of the mounting rod 15, and the output shaft end of the drilling machine 4 is connected to a drill rod 9, and an integrated sensor 6 is arranged between the drill rod 9 and the output shaft end of the drilling machine 4, and a data acquisition sensor 5 is arranged on the side of the mounting sleeve 3 away from the mounting rod 15, and the signal input end of the data acquisition sensor 5 is connected to the signal output end of the integrated sensor 6, the inside of the drill rod 9 is a hollow structure, and a drill bit 27 is arranged at the end of the drill rod 9 away from the drilling machine 4, the drill bit 27 is a hollow structure, and is connected to the drill rod 9, a unloading assembly is arranged in the drill rod 9, and the unloading assembly is connected to the drill bit 27, and a wastewater recovery assembly is arranged below the drilling machine 4.
[0031] Example 2, please refer to Figure 1-Figure 6 The displacement adjustment component includes a positioning block 18 fixedly arranged on one side of the mounting seat 2, and a position adjustment rod 17 is rotatably arranged on the mounting plate 1 on one side of the positioning block 18, and the end of the position adjustment rod 17 is a threaded structure. The threaded structure at the end of the position adjustment rod 17 extends into the positioning block 18 and is threadedly connected to the positioning block 18.
[0032] The mounting plate 1 is provided with a slide groove 16, and a limit rod 19 is slidably penetrated in the slide groove 16, and the limit rod 19 is fixedly connected to the mounting seat 2, and positioning holes 20 are provided on both sides of the mounting plate 1; the limit assembly includes a positioning column 24 slidably penetrated on the gear turntable 22, and an elastic member 23 is sleeved on the positioning column 24, and a positioning groove 26 is provided on the mounting plate 25, and a plurality of positioning grooves 26 are provided, and are arranged on the mounting plate 25 with equal arc spacing.
[0033] The driving assembly includes a torsion column 7 rotatably arranged on the mounting sleeve 3, and a socket 28 is provided on the torsion column 7. The torsion column 7 extends into the mounting sleeve 3, and the bottom is fixedly connected to the adjusting gear 33. The side wall of the mounting rod 15 on one side of the adjusting gear 33 is fixedly connected to the transmission gear rod 8, and the transmission gear rod 8 is meshed with the adjusting gear 33. A first torque sensor 35 is provided at the rotation connection between the torsion column 7 and the mounting sleeve 3.
[0034] The integrated sensor 6 includes a pressure sensor, a drilling speed sensor, a second torque sensor and a laser displacement sensor 34. The laser displacement sensor 34 is located at the center of the cross section of the drill pipe 9. The laser displacement sensor 34 can measure the precise displacement of the drill bit 27 and the rock surface each time the drilling machine 4 drills and before the drilling machine 4 starts drilling through a hollow hole.
[0035] The unloading assembly includes a fixed sleeve 31, both ends of which are respectively installed and connected to the drill rod 9 and the drill bit 27. The fixed sleeve 31 is fixedly connected to a linkage rod 30 on one side close to the drill rod 9. The linkage rod 30 is located inside the drill rod 9. The linkage rod 30 is fixedly connected to a unloading ring 29 on one end away from the fixed sleeve 31. The unloading ring 29 is slidably connected to the inner wall of the drill rod 9.
[0036] The wastewater recovery component includes a mounting block 11, a threaded rod 10 is threadedly provided on the mounting block 11, the end of the threaded rod 10 is fixedly connected to a transmission column 12, the end of the transmission column 12 is slidably sleeved on a mounting tube 13, one side of the inner wall of the mounting tube 13 is fixedly connected to a telescopic member 37, the end of the telescopic member 37 is fixedly connected to a clamping block 36, the clamping block 36 is slidably provided in the mounting tube 13, and the end of the transmission column 12 is rotatably connected to the clamping block 36.
[0037] The end of the mounting tube 13 is fixedly connected to the wastewater recovery frame 14, and the filter screen 32 is fixedly connected inside the wastewater recovery frame 14. A water pipe is arranged at the bottom of the wastewater recovery frame 14. The water pipe is externally connected to a water pump. When in actual use, the wastewater in the wastewater recovery frame 14 is pumped away by the water pump, thereby making the construction site more environmentally friendly.
[0038] During the actual drilling process, the drilling parameters and the drilling displacement of the drill rod 9 are monitored in real time through the integrated sensor 6; when drilling to a certain depth, the drilling machine 4 is pulled back in the opposite direction, the drill rod 9 is pulled out, and the core is taken out; then the drill rod 9 is lengthened and drilling continues to proceed inward, and the rock formation conditions inside the rock body are judged by using the monitoring parameters of drilling; when the drilling parameters have a tendency to begin to change suddenly, such as when the drilling speed becomes faster while the drilling speed remains unchanged, the thrust applied to the drilling machine 4 should be reduced at this time, and the drilling speed of the drilling machine 4 should be reduced to ensure complete sampling of the contact position of the lithology mutation, and the laser displacement sensor 34 can be used to capture the contact position of the lithology mutation; finally, the support vector machine SVM method can be used to establish a nonlinear relationship between the parameters of the drilling machine 4 and the rock mechanical strength parameters when drilling cores in situ, and then a mechanical property prediction model for surrounding rock quality characteristics and integrity is constructed based on multi-source sensing technology.
[0039] Example 3, please refer to Figure 1-Figure 6The method for using the portable underground tunnel surrounding rock core drilling monitoring sampling device includes the following steps: S1, first select the construction position, then place the mounting plate 1 on one side of the construction surface and use expansion bolts to fix the mounting plate 1 on one side of the construction surface, and leave an operating space between the mounting plate 1 and the construction surface. After the installation is completed, the operator drives the mounting seat 2 to move horizontally through the displacement adjustment component to achieve the horizontal adjustment of the drilling position, and at the same time drives the mounting rod 15 to rotate by rotating the gear turntable 22 to achieve the adjustment of the drilling direction;
[0040] S2, then use the driving assembly to drive the drilling machine 4 on one side of the installation sleeve 3 to move close to the rock layer, and start the drilling machine 4 to drive the drill rod 9 and the drill bit 27 to rotate, so as to achieve drilling and sampling of the rock layer, and at the same time, one side of the wastewater recovery assembly is in contact with the drilling position;
[0041] S3. During the drilling sampling process, the operator uses an external computer to analyze the specific parameter information about the rock formation transmitted by the integrated sensor 6, and then adjusts the drilling parameters in real time during the drilling process according to the feedback parameter information, thereby achieving fidelity sampling. After the sampling is completed, the drive assembly is adjusted in reverse to remove the drill bit 27 and the drill rod 9. The drill bit 27 is disassembled and the removed core is taken out by the action of the unloading assembly, and then the rock formation analysis is carried out.
[0042] Example 4, please refer to Figure 1-Figure 6 When using it, the operator first fixes the mounting plate 1 on the surrounding rock with expansion screws according to the target area of the surrounding rock to be studied, and then according to the occurrence and distribution of the potential fracture structure surface inside the surrounding rock, first rotate the position adjustment rod 17 to drive the mounting seat 2 to move, thereby realizing the lateral adjustment of the drilling position, and then pull out the positioning column 24, adjust the gear turntable 22 to adjust the drilling angle of the drill bit 27 on one side of the mounting rod 15, and then start the drilling machine 4 to drive the drill bit 27 at one end of the drill rod 9 to rotate, and at the same time the operator uses the tool rod to insert the socket 2 of the torsion column 7 8 drives the torsion column 7 to rotate, and under the action of the adjusting gear 33 and the transmission gear rod 8, the installation sleeve 3 is driven to move horizontally along the installation rod 15 to perform drilling. At the same time, the operator makes the wastewater recovery frame 14 contact the rock surface and then rotates the threaded rod 10 to drive the transmission column 12 to rotate. The transmission column 12 squeezes the pressing block 36 to fix the wastewater recovery frame 14 under the action of the telescopic member 37. When the water valve is opened to cool the drill bit 27 during the drilling process, the wastewater recovery frame 14 can effectively collect wastewater and filter it under the action of the filter screen 32, so that the environmental protection effect is better.
[0043] At the same time, during the drilling process, the sample will enter the drill rod 9 through the hollow position of the drill bit 27 to achieve sampling. At the same time, during the drilling sampling process, the integrated sensor 6 can measure the drilling speed, torque, and thrust applied to the drill rod 9 by the drilling machine 4. At the same time, under the action of the laser displacement sensor 34, the laser displacement sensor 34 can measure the precise displacement of the contact between the drill bit 27 and the rock surface each time drilling and each time before the drilling machine 4 starts drilling through the hollow borehole. The integrated sensor 6 transmits information to the computer through the data acquisition sensor 5, and performs real-time monitoring of the drilling machine 4 parameters such as drilling speed, torque, thrust and drilling position during drilling. The operator uses an external computer to analyze the specific parameter information about the rock formation transmitted by the integrated sensor 6, and then adjusts the drilling parameters in real time during the drilling process according to the feedback parameter information, thereby realizing fidelity sampling. After the sampling is completed, the drill rod 9 is taken out and the drill bit 27 is disassembled. The drill bit 27 drives the unloading ring 29 to move through the linkage rod 30 on one side of the fixed sleeve 31 to realize rapid unloading. Compared with the traditional material collection method, this method of the device is more convenient to operate and use, has better environmental protection effect, and can unload more conveniently. According to the drilling information transmitted by the integrated sensor 6, the condition of the rock formation can be judged in time, and then the drilling parameters can be adjusted to realize fidelity sampling.
[0044] The standard parts used in the present invention can all be purchased from the market, and the special-shaped parts can be customized according to the description and the drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0045] In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. "Multiple" means two or more, unless otherwise clearly and specifically defined.
[0046] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0047] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0048] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0049] In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other.
[0050] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A portable underground tunnel surrounding rock core drilling monitoring sampling device, comprising a mounting plate (1), characterized in that: Also includes: A mounting seat (2) is arranged on one side of the mounting plate (1), a displacement adjustment component is arranged between the mounting seat (2) and the mounting plate (1), the mounting seat (2) is fixedly connected to a mounting plate (25) on a side away from the mounting plate (1), the mounting plate (25) is rotatably connected to a gear turntable (22), a side wall of the mounting seat (2) on one side of the gear turntable (22) is fixedly connected to a transmission rack (21), a limiting component is arranged on the gear turntable (22), one side of the gear turntable (22) is fixedly connected to a mounting rod (15), one side of the mounting rod (15) is slidably sleeved with a mounting sleeve (3), a driving component is arranged in the mounting sleeve (3), and a drilling machine (4) is fixedly sleeved on the mounting sleeve (3) on one side of the mounting rod (15) The output shaft end of the drilling machine (4) is connected to a drill rod (9), an integrated sensor (6) is arranged between the drill rod (9) and the output shaft end of the drilling machine (4), a data acquisition sensor (5) is arranged on the side of the mounting sleeve (3) away from the mounting rod (15), a signal input end of the data acquisition sensor (5) is connected to the signal output end of the integrated sensor (6), the interior of the drilling rod (9) is a hollow structure, a drill bit (27) is arranged at the end of the drilling rod (9) away from the drilling machine (4), the drill bit (27) is a hollow structure, and is connected to the drilling rod (9), a discharge assembly is arranged in the drilling rod (9), and the discharge assembly is connected to the drill bit (27), and a wastewater recovery assembly is arranged below the drilling machine (4).
2. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1 is characterized in that: The displacement adjustment component comprises a positioning block (18) fixedly arranged on one side of the mounting seat (2); a position adjustment rod (17) is rotatably arranged on the mounting plate (1) on one side of the positioning block (18) and penetrates therethrough; the end of the position adjustment rod (17) is a threaded structure; the threaded structure at the end of the position adjustment rod (17) extends into the positioning block (18) and is threadedly connected to the positioning block (18).
3. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 2 is characterized in that: The mounting plate (1) is provided with a slide groove (16), a limit rod (19) is slidably arranged in the slide groove (16), the limit rod (19) is fixedly connected to the mounting seat (2), and positioning holes (20) are provided on both sides of the mounting plate (1).
4. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1 is characterized in that: The position limiting assembly comprises a positioning column (24) which is slidably penetrated on the gear rotating disk (22), an elastic member (23) is sleeved on the positioning column (24), and a positioning groove (26) is provided on the mounting disk (25).
5. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1 is characterized in that: The driving assembly comprises a torsion column (7) rotatably arranged on the mounting sleeve (3), a plug hole (28) being provided on the torsion column (7), the torsion column (7) extending into the mounting sleeve (3), and the bottom of the torsion column (7) being fixedly connected to an adjusting gear (33), a side wall of a mounting rod (15) on one side of the adjusting gear (33) being fixedly connected to a transmission gear rod (8), the transmission gear rod (8) being meshed with the adjusting gear (33), and a first torque sensor (35) being provided at a rotational connection between the torsion column (7) and the mounting sleeve (3).
6. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1 is characterized in that: The integrated sensor (6) comprises a pressure sensor, a drilling speed sensor, a second torque sensor and a laser displacement sensor (34), and the laser displacement sensor (34) is located at the center of the cross section of the drill rod (9).
7. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1 is characterized in that: The unloading assembly comprises a fixed sleeve (31), two ends of the fixed sleeve (31) are respectively mounted and connected to the drill rod (9) and the drill bit (27), the fixed sleeve (31) is fixedly connected to a linkage rod (30) on one side close to the drill rod (9), the linkage rod (30) is located inside the drill rod (9), and the linkage rod (30) is fixedly connected to a unloading ring (29) on one end away from the fixed sleeve (31), and the unloading ring (29) is slidably connected to the inner wall of the drill rod (9).
8. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1 is characterized in that: The wastewater recovery component comprises a mounting block (11), a threaded rod (10) is threadedly provided on the mounting block (11), the end of the threaded rod (10) is fixedly connected to a transmission column (12), the end of the transmission column (12) is slidably sleeved on a mounting tube (13), one side of the inner wall of the mounting tube (13) is fixedly connected to a telescopic member (37), the end of the telescopic member (37) is fixedly connected to a clamping block (36), the clamping block (36) is slidably provided in the mounting tube (13), and the end of the transmission column (12) is rotatably connected to the clamping block (36).
9. The portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 8, characterized in that: The end of the installation cylinder (13) is fixedly connected to the wastewater recovery frame (14), the filter screen (32) is fixedly connected inside the wastewater recovery frame (14), and a water guide pipe is arranged at the bottom of the wastewater recovery frame (14).
10. A method for using the portable underground tunnel surrounding rock core drilling monitoring sampling device according to claim 1, characterized in that: The following steps are involved: S1. First, a construction position is selected, and then the mounting plate (1) is placed on one side of the construction surface and fixed to the one side of the construction surface using expansion bolts, and an operating space is left between the mounting plate (1) and the construction surface. After the installation is completed, the operator drives the mounting seat (2) to move horizontally through the displacement adjustment component to achieve horizontal adjustment of the drilling position, and at the same time drives the mounting rod (15) to rotate by rotating the gear turntable (22) to achieve adjustment of the drilling direction; S2, then use the driving assembly to drive the drilling machine (4) on one side of the installation sleeve (3) to move closer to the rock layer, and at the same time start the drilling machine (4) to drive the drill rod (9) and the drill bit (27) to rotate, so as to achieve drilling and sampling of the rock layer, and at the same time, one side of the wastewater recovery assembly is in contact with the drilling position; S3. During the drilling sampling process, the operator uses an external computer to analyze the specific parameter information about the rock formation transmitted by the integrated sensor (6), and then adjusts the drilling parameters in real time during the drilling process based on the feedback parameter information, thereby achieving true sampling. After the sampling is completed, the drive assembly is reversely adjusted to remove the drill bit (27) and the drill rod (9), and the drill bit (27) is disassembled and the removed core is taken out by the action of the unloading assembly, and then the rock formation analysis is carried out.
Citation Information
Patent Citations
Rock core drilling device and method with rock core scanning function
CN118346177A
Directional coring machine and method for coring using it
KR101596278B1
Drilling machine
RU2194142C2
Portable earth core sampling machine
US4161988A
Method of monitoring core sampling during borehole drilling
US5010765A