A synchronous two-liner construction system and a construction method thereof

By positioning the slurry pipeline on the box culvert or cast-in-place ground during the tunneling process of the slurry balance shield machine, and combining it with the secondary lining trolley of the independent traveling unit, the synchronous secondary lining construction can be achieved, which solves the problem of slurry pipeline suspension and improves construction efficiency and flexibility.

CN119373532BActive Publication Date: 2025-11-28CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411920509.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-25
Publication Date
2025-11-28
Estimated Expiration
2044-12-25

AI Technical Summary

Technical Problem

During the tunneling process of a slurry balance shield machine, how can we achieve simultaneous secondary lining construction, avoid the slurry pipeline being suspended on the tunnel segment wall and affecting subsequent secondary lining construction, and improve construction efficiency?

Method used

Design a synchronous secondary lining construction system, including a pipeline extension device and a secondary lining trolley. By positioning the slurry pipeline on the box culvert or cast-in-place ground, and combining the independent traveling units of the traveling platform pouring trolley and the secondary lining trolley, the synchronous extension of the slurry pipeline and the secondary lining construction can be achieved, avoiding interference.

Benefits of technology

This allows for the simultaneous excavation of the slurry balance shield tunnel, segment assembly, and secondary lining construction, reducing downtime, saving construction costs, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119373532B_ABST
    Figure CN119373532B_ABST
Patent Text Reader

Abstract

The application discloses a synchronous secondary lining construction system, which comprises a pipeline extension device connected to a trailer, a walking table pouring trolley and a secondary lining trolley are sequentially arranged behind the trailer, the walking table pouring trolley comprises a walking table pouring trolley walking unit used for walking on both sides of a box culvert and a walking table pouring unit used for supporting a walking structure of the secondary lining trolley for pouring on the outside of the box culvert, and a pipeline tool is arranged behind the pipeline extension device and used for positioning a slurry pipeline on the box culvert or cast-in-place ground; the application further discloses a synchronous secondary lining construction method, and the synchronous secondary lining construction system is adopted. After the technical scheme provided by the application is adopted, the secondary lining construction can be carried out at the tail of a slurry balance shield tunneling machine, the slurry balance shield tunneling machine excavation, segment assembly and secondary lining construction can be synchronously carried out, and the problem that the secondary lining trolley and the pipeline working area are overlapped during the secondary lining construction of the traditional slurry balance shield tunneling machine is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of tunnel secondary lining construction, in particular to a synchronous secondary lining construction system and a construction method thereof. BACKGROUND

[0002] Pipeline extension is an important step in slurry balance shield machine construction. In the operation process of the slurry balance shield machine, the slurry pipe cannot be disconnected, and the slurry pipe needs to be continuously extended with the advancement of the main machine. However, the slurry pipeline in various forms of pipeline extension devices needs to be suspended on the tunnel segment wall through a tool, which will affect the subsequent secondary lining construction of the tunnel, such as the construction of the walkway on both sides of the railway tunnel, the construction of the side wall of the highway tunnel, and the secondary lining of the river-crossing tunnel. Therefore, before the tunnel secondary lining construction, the pipeline needs to be operated for secondary arrangement on the tunnel wall. This process needs to disconnect the pipeline, causing the slurry balance shield machine to stop, and affecting the overall construction efficiency of the tunnel.

[0003] In summary, how to realize synchronous secondary lining in tunnel excavation construction, especially how to perform synchronous secondary lining in the process of slurry balance shield machine excavation construction, is a technical problem to be solved.

[0004] It should be particularly noted that the above technical information is only intended to deepen the understanding of the overall background of the present application, and should not be regarded as acknowledging or implying in any form that the above technical information constitutes prior art known to those skilled in the art. SUMMARY

[0005] In view of the deficiencies in the above background art, the present application proposes a synchronous secondary lining construction system and a construction method thereof, and the technical problem to be solved is how to perform synchronous secondary lining in the process of slurry balance shield machine excavation construction.

[0006] The technical solution of the present application is:

[0007] The synchronous secondary lining construction system comprises a pipeline extension device connected to a trailer, a walking table pouring trolley and a secondary lining trolley arranged in sequence behind the trailer, the walking table pouring trolley comprises a walking table pouring trolley walking unit for walking on both sides of a box culvert and a walking table pouring unit for pouring a walking support structure of the secondary lining trolley on the outside of the box culvert, and a pipeline tool is arranged behind the pipeline extension device for positioning a slurry pipeline on the box culvert or cast-in-place ground. The synchronous secondary lining construction system can pour secondary structure lining while the slurry balance shield tunneling machine is excavating, specifically, the pipeline extension device can be synchronized with the slurry balance shield tunneling machine to add pipes and extend the slurry pipeline, the slurry pipeline behind the pipeline extension device can be directly fixed on the box culvert through the pipeline tool, avoiding the influence of the slurry pipeline suspended on the pipe segment on the secondary structure construction behind. The slurry pipeline is fixed on the box culvert, which needs to avoid interference with the secondary lining trolley and material transfer equipment, therefore, the walking support structure of the walking table pouring trolley is used to pour the secondary lining trolley, and the secondary lining trolley walks on the walking support structure to pour the secondary lining structure without interference with the slurry pipeline and the material transfer equipment. Further, the walking table pouring trolley and the secondary lining trolley are both equipped with independent walking units, which can greatly improve the flexibility of construction without always following the trailer to move synchronously.

[0008] On the basis of the above technical scheme, as a preferred technical scheme of the synchronous secondary lining construction system, a relay pump is arranged behind the pipeline extension device for positioning on the box culvert, and the relay pump is used to pump the slurry in the slurry pipeline. The more optimal arrangement scheme is provided, as the tunnel excavation advances, the slurry pipeline becomes longer, and the relay pump needs to be used to relay pump the slurry, and the relay pump is arranged on the box culvert, which can improve the space utilization and avoid interference with the walking table pouring trolley and the secondary lining pouring trolley.

[0009] On the basis of the above technical scheme, as a preferred technical scheme of the synchronous secondary lining construction system, the secondary lining trolley is a secondary lining pouring trolley or a secondary lining assembling trolley, when the secondary lining trolley is the secondary lining pouring trolley, the transport vehicle for conveying pouring materials for the walking table pouring trolley and the secondary lining pouring trolley is further included. The two preferred structures of the secondary lining trolley are provided, one is the secondary lining pouring trolley for cast-in-place secondary lining structure, and the other is the secondary lining assembling trolley for assembling prefabricated secondary lining pieces. Meanwhile, the transport vehicle and the more optimal arrangement scheme are provided, preferably, the slurry pipeline and the relay pump are arranged on the same side of the box culvert, and the transport vehicle passes on the other side of the box culvert. Preferably, the transport vehicle is a rubber-tyred transport vehicle.

[0010] On the basis of the above technical scheme, as the preferred technical scheme of the synchronous secondary lining construction system, the pipeline extension device comprises a structure assembly connected with the pipeline assembly, a mud pipe crane connected with the trailer through a crane frame capable of moving forward, backward, left and right, and the structure assembly is driven to move forward and backward along the track on the trailer through a movement unit. The pipeline extension device in the technical scheme can not only drive the pipeline assembly to move forward and backward relative to the trailer through the structure assembly, but also drive the mud pipe crane to move forward, backward, left and right through the crane frame, and the movement of the pipeline assembly and the movement of the mud pipe crane are independent of each other, so that the pipe adding operation during pipeline extension is more convenient and accurate.

[0011] On the basis of the above technical scheme, as the preferred technical scheme of the synchronous secondary lining construction system, the pipeline extension device comprises an elastic supporting wheel for supporting the mud pipe at the interface of the pipeline assembly above the box culvert and a hoisting support for hoisting the mud pipe at the interface of the pipeline assembly. The technical scheme provides a more reliable positioning structure at the pipeline extension position, specifically, the inlet pipe and the outlet pipe in the pipeline assembly are reliably positioned, because the inlet pipe and the outlet pipe in the pipeline assembly are used to connect the mud pipeline in front of the trailer with the mud pipeline behind the trailer, and the mud pipeline in front of the trailer is higher in horizontal height than the mud pipeline behind the trailer, so the inlet pipe and the outlet pipe in the pipeline assembly are both transition elbows, and the elastic supporting wheel and the hoisting support can more reliably position and support the inlet pipe and the outlet pipe.

[0012] On the basis of the above technical scheme, as the preferred technical scheme of the synchronous secondary lining construction system, the walking table pouring trolley comprises a walking table pouring trolley frame supported on the walking unit of the walking table pouring trolley, the walking table pouring trolley frame is connected with a walking table pouring unit and an adjusting tool for supporting the walking support structure, and the walking table pouring unit is used to pour the pouring cavity between the adjusting tool, the box culvert and the segment.

[0013] On the basis of the above technical scheme, as the preferred technical scheme of the synchronous secondary lining construction system, the secondary lining pouring trolley comprises a secondary lining pouring trolley frame connected with the walking unit of the secondary lining pouring trolley, the secondary lining pouring trolley frame is connected with a secondary lining forming template, an external shape adjusting tool for adjusting the secondary lining forming template and a secondary lining pouring unit for pouring the pouring cavity between the secondary lining forming template and the segment and the walking support structure.

[0014] On the basis of the above technical scheme, as the preferred technical scheme of the synchronous secondary lining construction system, the secondary lining pouring trolley comprises a grouting detection unit for detecting the grouting effect, the grouting detection unit is provided with a radar detection device for detecting whether there is a cavity behind the grouting wall, and secondary grouting is performed at the place where the grouting is insufficient.

[0015] On the basis of the above technical solutions, as the preferred technical solution of the synchronous secondary lining construction system, the walking platform pouring unit and the secondary lining pouring unit both comprise a pressure sensor for detecting the pressure in the grouting pipe, so that whether the grouting is sufficient can be detected.

[0016] A synchronous secondary lining construction method, which adopts the synchronous secondary lining construction system of any one of the above technical solutions, in the process of slurry balance shield tunneling construction, the slurry pipe is extended synchronously through the pipe extension device, the slurry pipe is positioned on the box culvert synchronously through the pipe line tool, the walking support structure of the secondary lining pouring platform trolley is poured synchronously through the walking platform pouring platform trolley, and the secondary lining pouring platform trolley walks on the walking support structure while pouring the secondary lining structure.

[0017] The synchronous secondary lining construction system and the synchronous secondary lining construction method are proposed, compared with the prior art, for the first time, the slurry pipe is placed on the box culvert or cast-in-place ground at the tail of the trailer, while the slurry balance shield tunneling machine is excavated, the secondary lining construction can be carried out at the tail of the slurry balance shield tunneling machine, the slurry balance shield tunneling, segment assembly and secondary lining construction can be carried out synchronously, effectively solving the problem that the secondary lining platform trolley and the pipe line working area overlap during the secondary lining construction of the traditional slurry balance shield tunneling machine. The technical solution provided by the present application does not need additional construction cost, on the contrary, it can save the cost of manpower and material resources during pipe turning, and does not need to stop operation during secondary lining construction, greatly improving the construction efficiency. With the development of underground space, the demand for tunnels is also increasing, and the projects of slurry balance shield tunneling construction are also increasing, and the demand for secondary lining of tunnels is also increasing, the application range and use value of the present application are also increasingly broad. BRIEF DESCRIPTION OF DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present application, the drawings needed in the following embodiment description will be briefly introduced, obviously, the drawings in the following description are only some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creating labor.

[0019] Figure 1 It is a layout schematic diagram of the synchronous secondary lining construction system;

[0020] Figure 2 It is a tunnel section pipe line and equipment layout diagram;

[0021] Figure 3 It is a tunnel section diagram at the pipe extension device;

[0022] Figure 4 It is a tunnel section diagram at the walking platform pouring platform trolley;

[0023] Figure 5Tunnel section view for pouring the second lining pouring trolley position;

[0024] Figure 6 Enlarged view of the pipeline tool.

[0025] Brief description of the drawings:

[0026] Trailer 1;

[0027] Pipeline extension device 2, structural assembly 201, pipeline assembly 202, mud pipe hoist 203, elastic support wheel 204, hoisting support 205, hoist frame 206;

[0028] Traveling table pouring trolley 3, traveling table pouring trolley frame 301, adjustment tool 302, traveling table pouring unit 303, traveling table pouring trolley traveling unit 304;

[0029] Second lining pouring trolley 4, second lining pouring trolley frame 401, second lining forming template 402, shape adjustment tool 403, second lining pouring unit 404, grouting detection unit 405, second lining pouring trolley traveling unit 406;

[0030] Box culvert 6;

[0031] Mud pipeline 7, grout inlet pipeline 701, grout discharge pipeline 702;

[0032] Pipeline tool 8, pipeline arrangement tool 801, high-voltage cable 803, water pipe 804;

[0033] Relay pump 9;

[0034] Transport vehicle 10;

[0035] Air pipe 11;

[0036] Traveling support structure 12;

[0037] Second lining structure 13. DETAILED DESCRIPTION

[0038] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the core idea of the present application and the following embodiments, all other embodiments obtained by those skilled in the art without creative labor are within the scope of protection of the present application.

[0039] The present application provides these examples is to make the present application and complete, and to the person skilled in the art fully express the scope of the present application. It should be noted that: unless otherwise specified, the relative arrangement of components and steps, the composition of materials, numerical expressions and numerical values set forth in these examples should be interpreted as merely exemplary, and not as limiting.

[0040] It should be noted that, in the description of the present application, unless otherwise specified, the meaning of "several" is greater than or equal to two; The orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "axial", "radial" and the like is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, therefore it cannot be understood as a limitation on the present application. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0041] In addition, "first", "second" and similar words used in the present application do not represent any order, number or importance, but are only used to distinguish different parts. "Vertical" is not strictly vertical, but within the allowable error range. "Parallel" is not strictly parallel, but within the allowable error range. "Include" or "contain" and similar words mean that the elements before the word cover the elements listed after the word, and do not exclude the possibility of also covering other elements.

[0042] It should also be noted that, in the description of the present application, unless otherwise specifically provided and limited, the terms "mounting", "connecting", "connecting" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected; It can be mechanical connection, or electrical connection; It can be directly connected, or indirectly connected through intermediate medium; It can be the communication inside two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances. When it is described that a specific device is located between the first device and the second device, there can be or can not be an intermediate device between the specific device and the first device or the second device.

[0043] All terms used in the present application have the same meaning as understood by those skilled in the art to which the present application belongs, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries should be interpreted to have meanings consistent with their meanings in the context of the relevant technology, and should not be interpreted in an idealized or excessively formalized sense, unless otherwise defined herein.

[0044] Techniques, methods, and apparatus known to those of ordinary skill in the relevant art can not be discussed in detail herein, but should be considered part of the specification.

[0045] An object of the present application is to provide a synchronous secondary lining construction system that can meet the synchronous secondary lining construction during the construction of a slurry balance shield machine, avoid the secondary pipeline arrangement operation during the subsequent secondary lining construction, realize the synchronous assembly of the secondary lining under the non-stop state, improve the construction efficiency, and reduce the construction process.

[0046] To achieve the above object, the present application has a trailer, a pipeline extension device, a pipeline arrangement tool, a secondary lining trolley, etc. The trailer provides support for the pipeline extension device. The pipeline extension device is composed of a structure assembly, a pipeline assembly, and a slurry pipe crane. The structure assembly is the pipeline support of the entire pipe replacement device and the walking unit on the trailer. The pipeline assembly is the slurry pipeline that meets the slurry inlet and slurry outlet. The slurry pipe crane is used for hoisting and transporting the slurry pipe during pipeline extension. The pipeline arrangement tool is a device designed to support the pipeline to meet the pipeline extension and synchronous secondary lining. The secondary lining trolley is a walking frame unit that can perform synchronous secondary lining construction at the tail of the slurry balance shield machine while tunneling. It has the functions of walking, planting, pouring, and troweling, and can realize the tunnel shield construction segment assembly, secondary lining walking platform, and synchronous forming of the secondary lining segment.

[0047] In the present application, by changing the way of fixing the inlet and outlet slurry pipes in the inner wall of the segment in the past, a new pipeline extension device and tool are designed. The inlet and outlet slurry pipes are placed on the box culvert or cast-in-place ground, and the remaining pipelines (such as water pipes and high-voltage cables) that assist the slurry balance shield machine in tunneling are also placed on the box culvert or cast-in-place ground through the tool. At this time, there are no other pipelines on the inner wall of the segment. The trolley for secondary lining construction is carried at the tail of the shield machine, which is divided into a walking platform construction trolley and an arc segment construction trolley. Since there are no other obstacles on the inner wall of the segment, there is no need for secondary pipeline operation during the secondary lining construction. The secondary lining construction can be carried out simultaneously at the tail of the slurry balance shield machine while tunneling. The two can be carried out simultaneously. The secondary lining construction trolley has the functions of walking, planting, pouring, and troweling, and can realize integrated forming without the need for secondary construction. The pipeline extension device and the secondary lining trolley in the construction method simultaneously consider material transportation, ventilation pipe arrangement, pipeline arrangement, etc., and are a relatively comprehensive solution for slurry balance shield machine secondary lining construction.

[0048] According to the present application, the secondary lining construction of the shield machine can be more efficiently realized, the problem of secondary pipeline arrangement during subsequent tunnel construction is solved, the secondary lining construction while tunneling is met, repeated construction is avoided, the construction process is reduced, the construction efficiency is improved, the construction method is simple and feasible, the device is simple and easy to manufacture, and it can be widely applied to tunnel construction.

[0049] Specific embodiments are described below:

[0050] A synchronous secondary lining construction system, such as Figure 1 and Figure 5 As shown, the system includes a pipeline extension device 2 connected to a trailer 1. Behind the trailer 1, a traveling platform pouring trolley 3 and a secondary lining trolley 4 are arranged in sequence. The traveling platform pouring trolley 3 includes a traveling platform pouring trolley traveling unit 304 for traveling on both sides of the box culvert 6 and a traveling platform pouring unit 303 for traveling support structure 12 for pouring the secondary lining trolley 4 on the outside of the box culvert 6. Behind the pipeline extension device 2, a pipeline tooling 8 is arranged for positioning the mud pipeline 7 on the box culvert 6 or the cast-in-place ground.

[0051] The synchronous secondary lining construction system provided in this embodiment can perform secondary structure lining pouring while the slurry balance shield tunneling machine is tunneling. Specifically, during the tunneling process of the slurry balance shield tunneling machine, the pipeline extension device 2 can simultaneously add pipes, thereby extending the slurry pipe synchronously. The slurry pipe 7 behind the pipeline extension device 2 can be directly fixed to the box culvert 6 through the pipeline fixture 8, avoiding the slurry pipe 7 being suspended on the tunnel segment 5 and affecting the subsequent secondary structure construction. However, fixing the slurry pipe 7 to the box culvert 6 requires avoiding interference with the secondary lining trolley and material transfer equipment. Therefore, the secondary lining trolley's traveling support structure 12 is constructed through the traveling platform pouring trolley 3. This ensures that the secondary lining trolley will not interfere with the slurry pipe 7 and material transfer equipment while traveling and pouring the secondary lining structure 13 on the traveling support structure 12.

[0052] Furthermore, both the traveling platform pouring trolley 3 and the secondary lining trolley are equipped with independent traveling units, which can greatly improve the flexibility of construction, and they do not have to follow the trailer 1 in sync.

[0053] Based on the above embodiments, as a preferred embodiment of the synchronous secondary lining construction system, such as... Figure 2 As shown, a relay pump 9 is installed behind the pipeline extension device 2 for positioning on the box culvert 6. The relay pump 9 is used to pump mud from the mud pipeline 7. This embodiment provides a better layout scheme. As the tunnel excavation progresses, the mud pipeline 7 becomes longer and longer, requiring the relay pump 9 to relay the mud. Placing the relay pump 9 on the box culvert 6 can improve space utilization and avoid interference with the construction of the traveling platform pouring trolley 3 and the secondary lining pouring trolley 4.

[0054] Based on the above embodiments, as a preferred embodiment of the synchronous secondary lining construction system, such as... Figure 4As shown, the secondary lining trolley is a secondary lining pouring trolley or a secondary lining assembling trolley, when the secondary lining trolley is a secondary lining pouring trolley, a transport vehicle 10 for conveying pouring material to the walking pouring trolley 3 and the secondary lining pouring trolley 4 is further included. The embodiment provides two preferred structural modes of the secondary lining trolley, one of which is the secondary lining pouring trolley 4 for the cast-in-place secondary lining structure 13, and the other of which is the secondary lining assembling trolley for assembling the prefabricated secondary lining piece. Meanwhile, the embodiment provides the transport vehicle 10 and a more optimal arrangement scheme, preferably, the slurry pipeline 7 and the relay pump 9 are arranged on the same side of the box culvert 6, and the transport vehicle 10 passes on the other side of the box culvert 6. Preferably, the transport vehicle 10 is a rubber-tyred transport vehicle.

[0055] On the basis of the above-mentioned embodiment, as a preferred embodiment of the synchronous secondary lining construction system, as shown in Figure 3 As shown, the pipeline extension device 2 includes a structural assembly 201 connected with the pipeline assembly 202, a slurry pipe crane 203 connected with the trailer 1 through a crane frame 206 capable of moving forward, backward and left and right, and the structural assembly 201 is actively moved forward and backward along the track on the trailer 1 through a movement unit. The pipeline extension device 2 in the embodiment not only can drive the pipeline assembly 202 to move forward and backward relative to the trailer 1 through the structural assembly 201, but also can drive the slurry pipe crane 203 to move forward, backward, left and right through the crane frame 206, and the movement of the pipeline assembly 202 and the movement of the slurry pipe crane 203 are independent of each other, so that the pipe adding operation during pipeline extension is more convenient and accurate.

[0056] On the basis of the above-mentioned embodiment, as a preferred embodiment of the synchronous secondary lining construction system, the pipeline extension device 2 includes an elastic supporting wheel 204 for supporting the slurry pipe at the interface of the pipeline assembly 202 above the box culvert 6, and a hoisting support 205 for hoisting the slurry pipe at the interface of the pipeline assembly 202. The embodiment provides a more reliable positioning structure at the pipeline extension, specifically, the inlet pipe and the outlet pipe in the pipeline assembly 202 are reliably positioned, because the inlet pipe and the outlet pipe in the pipeline assembly 202 are used to connect the slurry pipeline in front of the trailer 1 with the slurry pipeline 7 behind the trailer 1, and the slurry pipeline in front of the trailer 1 is higher in horizontal height, while the slurry pipeline 7 behind the trailer 1 is lower in horizontal height, so the inlet pipe and the outlet pipe in the pipeline assembly 202 are both transition elbows, and the elastic supporting wheel 204 and the hoisting support 205 can more reliably position and support them.

[0057] On the basis of the above-mentioned embodiment, as a preferred embodiment of the synchronous secondary lining construction system, as shown in Figure 4As shown, the walking bench pouring trolley 3 comprises a walking bench pouring trolley frame 301 supported on the walking bench pouring trolley walking unit 304, the walking bench pouring trolley frame 301 is connected with a walking bench pouring unit 303, an adjusting tool 302 for supporting the walking support structure 12, the walking bench pouring unit 303 is used for pouring the pouring cavity between the adjusting tool 302, the box culvert 6 and the segment 5.

[0058] On the basis of the above-mentioned embodiment, as a preferred embodiment of the synchronous secondary lining construction system, as shown in Figure 5 As shown, the secondary lining pouring trolley 4 comprises a secondary lining pouring trolley frame 401 connected to the secondary lining pouring trolley walking unit 406, the secondary lining pouring trolley frame 401 is connected with a secondary lining forming formwork 402, an external shape adjusting tool 403 for adjusting the secondary lining forming formwork 402, and a secondary lining pouring unit 404 for pouring the pouring cavity between the secondary lining forming formwork 402 and the segment 5 and the walking support structure 12.

[0059] On the basis of the above-mentioned embodiment, as a preferred embodiment of the synchronous secondary lining construction system, the secondary lining pouring trolley 4 comprises a grouting detection unit 405 for detecting the grouting effect, the grouting detection unit 405 is provided with a radar detection device, which is used for detecting whether there is a cavity behind the grouting wall, and performing secondary grouting in the place where the grouting is insufficient.

[0060] On the basis of the above-mentioned embodiment, as a preferred embodiment of the synchronous secondary lining construction system, the walking bench pouring unit 303 and the secondary lining pouring unit 404 both comprise a pressure sensor for detecting the pressure in the grouting pipe, which can detect whether the grouting is sufficient.

[0061] As a preferred embodiment of the synchronous secondary lining construction system, as shown in Figure 1 As shown, it comprises a trailer 1, a pipeline extension device 2, a walking bench pouring trolley 3, a secondary lining pouring trolley 4 which is an arc-shaped secondary lining pouring trolley, a segment 5, a box culvert 6, a mud pipeline 7; Figure 2 The tunnel cross-section pipeline and equipment arrangement is shown, which comprises a pipeline tool 8, a relay pump 9, a rubber-tyred transport vehicle 10, and an air pipe 11. The trailer 1 is a load-bearing unit of the pipeline extension device 2, which is generally a steel structure, used for equipment arrangement and bearing moving parts, and moves with the shield machine.

[0062] The pipeline extension device 2 is used for the extension of the mud pipeline when the mud balance shield machine is tunneling, Figure 3The display pipeline extension device 2 is provided with a structure assembly 201 with a movement unit, which can be actively moved forward and backward along the track on the trailer 1, and can provide support for the pipeline assembly 202; the pipeline assembly 202 is divided into a slurry inlet pipe and a slurry outlet pipe, which is used for slurry inlet and outlet during tunneling of the slurry balance shield tunneling machine; the slurry pipe crane 203 is arranged on the crane frame 206 which can move forward, backward and left and right, and is provided with a lifting mechanism which can lift, and is used for lifting the standby slurry pipe to the pipeline extension area; the supporting wheel 204 is a flexible supporting wheel, which is used to compensate for the height difference caused by the unevenness of the box culvert 6 or the pouring ground, to support the slurry inlet pipe to avoid transmitting force to the trailer to cause trailer unbalanced loading, and to provide support after the pipe is disconnected from the pipeline; the hoisting support 205 is used to hoist the slurry outlet pipe to avoid its free swing, and to provide support in the vertical direction.

[0063] The walking platform pouring platform car 3 is a walking platform forming platform car, which is used for shaping, pouring, detecting and the like of the walking platform, as shown in Figure 4 The walking platform pouring platform car 3 is provided with a walking platform pouring platform car frame 301 for providing force support for movement of the whole mechanism; an adjustment tool 302 adjusts the appearance, height, surface flatness and other elements of the walking platform through power actuators such as oil cylinders to ensure that the appearance size of the walking platform meets the design requirements; a pouring unit 303 aims to pour the mortar in the transport vehicle 10 into the model set in the walking platform pouring platform car 3 through a grouting device, and the grouting pipe is provided with a pressure sensor to detect whether the grouting is sufficient; a walking platform pouring platform car walking unit 304 provides support and stability for the car walking, and is provided with a driving device which can actively advance and retreat along the tunnel.

[0064] As shown in Figure 5 The arc-shaped secondary lining pouring platform car 4 is used for shaping, pouring, detecting and the like of the arc-shaped secondary lining. The arc-shaped secondary lining pouring platform car 4 is provided with a frame 401 for the arc-shaped secondary lining forming platform car, which provides force support for movement of the whole mechanism; a secondary lining forming template 402 aims to ensure the appearance size; an appearance adjustment tool 403 adjusts the appearance, thickness, surface flatness, curvature and other elements of the arc-shaped secondary lining through power actuators such as oil cylinders to ensure that the appearance size of the arc-shaped secondary lining meets the design requirements; a secondary lining pouring unit 404 aims to pour the mortar in the transport vehicle 10 into the model set in the secondary lining pouring platform car 4 through a grouting device, and the grouting pipe is provided with a pressure sensor to detect whether the grouting is sufficient; a grouting detection unit 405 is used to detect the grouting effect, which is generally provided with a radar detection device to detect whether there is a cavity behind the wall after grouting, and to perform secondary grouting in the place where the grouting is insufficient; a secondary lining pouring platform car walking unit 406 provides support and stability for the car walking, and is provided with a driving device which can actively advance and retreat along the tunnel;

[0065] As shown in Figure 6As shown, the pipeline arrangement in the tunnel under the action of the pipeline tool 8, specifically includes the pipeline arrangement tool 801 for supporting and hanging various pipelines; the mud pipeline 7 is divided into the mud inlet pipeline 701 and the mud outlet pipeline 702, and the mud pipeline 7 in the tunnel is placed on the box culvert or the cast-in-place ground through the pipeline arrangement tool 801, so as to provide space for the secondary lining construction; the high-voltage cable 803 is hung on the side of the pipeline arrangement tool 801 to provide power for the slurry balance shield tunneling machine; and the water pipe 804. The pipeline originally placed on the inner wall of the pipe segment is placed on the box culvert or the cast-in-place ground through the tool, and the secondary lining trolley is avoided during the secondary lining construction.

[0066] It should be particularly pointed out that in the above embodiment, the pipeline extension device 2 is not limited to this structure form, and any method for placing the mud pipeline 7 on the box culvert or the cast-in-place ground belongs to the derivative scheme of the present scheme; the secondary lining trolley is not limited to the hole planting, hole pouring and hole smoothing, and the hole assembly of the prefabricated secondary lining also belongs to the derivative scheme of the present scheme; the pipeline arrangement of the present scheme is not limited to placing the pipeline on the box culvert or the cast-in-place ground through the tool, and placing the pipeline on the box culvert or the cast-in-place ground through any method belongs to the derivative scheme of the present scheme.

[0067] A synchronous secondary lining construction method, using the synchronous secondary lining construction system of any one of the above technical schemes, in the process of the slurry balance shield tunneling construction, the mud pipeline is extended synchronously through the pipeline extension device 2, the mud pipeline 7 is positioned on the box culvert 6 synchronously through the pipeline tool 8, the walking support structure 12 of the secondary lining pouring trolley 4 is poured synchronously through the walking pouring trolley 3, and the secondary lining pouring trolley 4 walks on the walking support structure 12 while pouring the secondary lining structure 13.

[0068] The details of the present application are well known to those skilled in the art.

[0069] The above shows and describes the basic principles, main features and beneficial effects of the present application. The above is only a preferred embodiment of the present application and does not limit the present application. Any modification, equivalent replacement, improvement, etc. within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A synchronous two-liner construction system comprising a pipe extension device (2) connected to a trailer (1), characterized in that: The trailer (1) is sequentially provided with a walking table pouring trolley (3) and a secondary lining trolley behind. The walking table pouring trolley (3) comprises a walking table pouring trolley walking unit (304) for walking on both sides of the box culvert (6), a walking table pouring unit (303) for pouring the walking support structure (12) of the secondary lining trolley outside the box culvert (6), a pipeline extension device (2) is provided behind the pipeline extension device (2) for positioning the mud pipeline (7) on the box culvert (6) or the cast-in-place ground. The pipeline extension device (2) is provided behind the pipeline extension device (2) for positioning the relay pump (9) on the box culvert (6), and the relay pump (9) is used for pumping the mud in the mud pipeline (7). The mud pipeline (7) and the relay pump (9) are arranged on the same side of the box culvert (6), and the transport vehicle (10) passes on the other side of the box culvert (6); the pipeline extension device (2) comprises a structure assembly (201) connected with a pipeline assembly (202), a mud pipe crane (203) connected with the trailer (1) through a crane frame (206) which can move forward and backward and left and right, the structure assembly (201) is actively moved forward and backward along the track on the trailer (1) through a movement unit; the pipeline extension device (2) comprises elastic support wheels (204) for supporting the mud pipe at the interface of the pipeline assembly (202) above the box culvert (6), and hoisting supports (205) for hoisting the mud pipe at the interface of the pipeline assembly (202); the walking table pouring trolley (3) comprises a walking table pouring trolley frame (301) supported on the walking table pouring trolley walking unit (304), the walking table pouring trolley frame (301) is connected with the walking table pouring unit (303), an adjustment tool (302) for formwork supporting the walking support structure (12), and the walking table pouring unit (303) is used for pouring the pouring cavity between the adjustment tool (302), the box culvert (6) and the segment (5); the secondary lining trolley is a secondary lining pouring trolley (4), the secondary lining pouring trolley (4) comprises a secondary lining pouring trolley frame (401) connected with a secondary lining pouring trolley walking unit (406), the secondary lining pouring trolley frame (401) is connected with a secondary lining forming template (402), an external shape adjustment tool (403) for adjusting the secondary lining forming template (402), and a secondary lining pouring unit (404) for pouring the pouring cavity between the secondary lining forming template (402) and the segment (5) and the walking support structure (12); the secondary lining pouring trolley (4) comprises a grouting detection unit (405) for detecting the grouting effect; the walking table pouring unit (303) and the secondary lining pouring unit (404) both comprise a pressure sensor for detecting the pressure in the grouting pipe.

2. The synchronized liner construction system of claim 1, wherein: When the double lining trolley is a double lining pouring trolley (4), the system further comprises a transport vehicle (10) for conveying pouring material to the walking pouring trolley (3) and the double lining pouring trolley (4).

3. A method of synchronizing the construction of two linings, characterized in that: The synchronous double lining construction system of claim 1 or 2, in the process of the slurry balance shield tunneling construction, the slurry pipe is extended synchronously through the pipe extension device (2), the slurry pipe (7) is positioned on the box culvert (6) synchronously through the pipe tooling (8), the walking support structure (12) of the double lining pouring trolley (4) is poured synchronously through the walking pouring trolley (3), and the double lining pouring trolley (4) walks on the walking support structure (12) while pouring the double lining structure (13).

Citation Information

Patent Citations

  • Open-type TBM synchronous lining method and device

    CN108316946A

  • Mud-water shield mud pipeline extension device and extension method

    CN110985036A

  • Tunnel segment secondary lining structure for synchronous construction in slurry shield

    CN220267715U