Performance assessment system and method for power enterprise

By constructing a hierarchical structure model and judging matrix calculation index weights, the performance appraisal and evaluation system of the power enterprise has achieved multi-dimensional comprehensive performance evaluation, solving the problem of single evaluation dimensions of the existing system and improving management efficiency.

CN119417304APending Publication Date: 2025-02-11STATE GRID SHANXI ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411543373.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

The evaluation dimensions of the existing performance appraisal and evaluation system of power enterprises are single, lacking field systems and evaluation methods, which cannot meet the rapid growth performance evaluation needs.

Method used

The hierarchical structure model is used to build an index evaluation system, including the target layer, the criterion layer and the index layer. The weights of each index are calculated through the judgment matrix, the scores are calculated based on the actual value and the target value, and finally the performance evaluation results are obtained through the weight calculation model.

Benefits of technology

A comprehensive performance evaluation of power enterprises has been achieved from multiple dimensions (social responsibility, finance, customers, internal processes, learning and growth), reducing the work costs of financial personnel and improving corporate management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119417304A_ABST
    Figure CN119417304A_ABST
Patent Text Reader

Abstract

The invention provides a power enterprise performance assessment and evaluation system and method, and the method comprises the following steps: constructing an index evaluation system according to a hierarchical structure model, the index evaluation system comprises a target layer, criterion layers and index layers, obtaining the calculation mode and influence direction of each index in the index layer corresponding to each criterion layer, constructing a judgment matrix, the two factors are i and j, A = (aij) n * n, aij represents the importance degree of the ith element compared with the jth element, a fuzzy judgment matrix aij of any two elements about a criterion layer can represent the meaning of an importance scale, and the weight of each index is calculated; based on each index weight, calculating an index layer score by combining the index layer actual value and the index layer target value, and calculating a criterion layer score according to the index layer score and the criterion layer weight; and calculating the score of the final target layer for the criterion layer according to the weight to obtain an evaluation result, thereby improving the financial data analysis efficiency of the power enterprise, and being applicable to the technical field of performance assessment and evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of digital financial performance assessment, and in particular relates to a power enterprise performance assessment evaluation system and method. Background Art

[0002] With the rapid development of information technology, traditional power companies have begun to gradually introduce emerging technologies such as big data and artificial intelligence to help develop their various business lines. Power companies in the process of digital transformation have accumulated business data resources for many years and created application scenarios for emerging information technology.

[0003] Power companies involve huge amounts of personnel and capital, and the traditional manual performance evaluation method can no longer meet the rapidly growing performance evaluation needs. By introducing digital performance evaluation methods and combining the characteristics of power companies, the work costs of financial personnel can be greatly reduced and the management efficiency of the company can be improved.

[0004] The existing performance appraisal and evaluation system of electric power enterprises has a single evaluation dimension, involving only a limited number of dimensions, and lacks a domain system and evaluation method at the evaluation department level. Therefore, a performance appraisal and evaluation system and method for electric power enterprises is proposed. Summary of the invention

[0005] In order to solve the problems existing in the prior art, the present invention provides a power enterprise performance assessment and evaluation system and method to solve the problems raised in the above background.

[0006] In order to achieve the above object, the present invention provides a method for evaluating the performance of an electric power enterprise, comprising the following steps:

[0007] According to the hierarchical model, an indicator evaluation system is constructed. The indicator evaluation system includes the target layer, the criterion layer and the indicator layer. The calculation method and influence direction of each indicator in the indicator layer corresponding to each criterion layer are obtained, and a judgment matrix is ​​constructed. Two factors i and j, A=(a ij )n×n, where a ij Indicates the importance of the i-th factor compared to the j-th factor. The fuzzy judgment matrix a of any two elements on the criterion layer ij It can be expressed as the meaning of the importance scale and the weight of each indicator can be calculated;

[0008] Based on the weight of each indicator, the indicator layer score is calculated by combining the actual value of the indicator layer and the target value of the indicator layer, and the criterion layer score is calculated according to the indicator layer score and the criterion layer weight;

[0009] The final target layer score is calculated according to the weight of the criterion layer to obtain the evaluation result.

[0010] Furthermore, the goal level is performance evaluation, and the criteria levels are social responsibility, finance, customers, internal processes, and learning and growth;

[0011] The social responsibility level includes the actual values ​​and target values ​​of five indicators: clean energy grid-connected capacity, clean energy utilization rate, number of local jobs supported, rural revitalization support, and safety accident reduction rate; the indicator layer corresponding to social responsibility includes clean energy grid-connected capacity, clean energy utilization rate, number of local jobs supported, rural revitalization support, and number of safety accidents; the indicator layer corresponding to finance includes profit growth rate, return on net assets, operating cash ratio, and debt-to-asset ratio; the indicator layer corresponding to customer satisfaction includes customer satisfaction, customer complaint rate, and market share; the indicator layer corresponding to internal processes includes comprehensive line loss rate, comprehensive voltage qualification rate, power supply reliability rate, and emergency response time; the indicator layer corresponding to learning and growth includes employee training rate, employee retention rate, R&D investment level, and digital development level.

[0012] Furthermore, the clean energy grid-connected capacity refers to the actual grid-connected capacity of clean energy, which is a positive indicator; the clean energy utilization rate is (effectively utilized energy / supplied energy)*100%, which is a positive indicator; the number of local employment supported = the annual number of recruits, which is a positive indicator; the support for rural revitalization is the amount of investment in rural revitalization, which is a positive indicator; the number of safety accidents is calculated by the reduction rate of major and serious power grid equipment accidents, which is a positive indicator; the profit growth rate = (current year profit - previous year profit) / current year profit * 100%, which is a positive indicator; return on net assets = net profit / average net assets, which is a positive indicator; operating cash ratio = net operating cash inflow / operating income * 100%, which is a positive indicator; debt-to-asset ratio = assets and liabilities / total assets * 100%, which is a positive indicator; customer satisfaction = net number of satisfied customers / total number of surveyed people × 100%, which is a positive indicator; customer complaint rate = number of complaining customers Number of households / total number of customers × 100%, which is a positive indicator; market share = sales revenue / sales revenue of all power supply companies in the business area × 100%, which is a positive indicator; comprehensive line loss rate = (power supply - power sales) / power supply × 100%, which is a negative indicator; comprehensive voltage qualification rate is the cumulative time of actual operating voltage / total operating time, which is a positive indicator; power supply reliability rate = [1-average annual power outage time for users / number of hours throughout the year (8760)] × 100%, which is a positive indicator; emergency response time is a negative indicator; employee training rate = number of trained personnel / total number of employees × 100%, which is a positive indicator; employee retention rate = 1-(number of resignations / total number of employees) × 100%, which is a positive indicator; R&D investment level = total research expenditure / operating income × 100%, which is a positive indicator; digital development level = digital investment amount / total assets * 100%, which is a positive indicator.

[0013] Furthermore, based on the weights of each indicator, the indicator layer scores are calculated by combining the actual values ​​of the indicator layer and the target values ​​of the indicator layer. When the criterion layer scores are calculated according to the indicator layer scores and the criterion layer weights, A is set as the target layer score, and B is set as the target layer score. i is the criterion layer score, C ij is the index layer score, W i is the criterion layer weight, W ij is the index layer weight, V j is the actual value of the indicator layer, T j is the target value of the indicator layer,

[0014] The positive indicator score of the calculation indicator layer is:

[0015] C ij =V j / T j *W ij

[0016] The negative indicator score of the calculation indicator layer is:

[0017] C ij =T j / V j *W ij

[0018] The calculation criteria layer score is:

[0019]

[0020] The target layer score is calculated as:

[0021]

[0022] Furthermore, the value scale of the membership value of the importance of the two elements and the comparison results and interpretation of the i-th index and the j-th index are as follows: when the scale is 1, the importance of i and j is equal, and the two indicators have the same importance to the target; when the scale is 3, i is slightly prioritized over j, and the difference between the two indicators is slightly small; when the scale is 5, i is prioritized over j, and the difference between the two indicators is obvious; when the scale is 7, i is even prioritized over j, and the difference between the two indicators is strong; when the scale is 9, i is extremely prioritized over j, and the difference between the two indicators is extreme; when the scale is 2, 4, 6, and 8, the importance is between the importance corresponding to its adjacent scales, and it is adopted when it is a compromise.

[0023] Furthermore, it also includes: performance evaluation of the transmission center, distribution center, substation center, operation and maintenance integrated center, dispatching center and marketing center based on the indicator layer; performance evaluation of the communication center, material center, safety supervision center and logistics center based on the indicator layer.

[0024] On the other hand, the present invention provides a power enterprise performance assessment and evaluation system, including a weight vector acquisition module, a calculation module and an evaluation module;

[0025] The weight vector acquisition module is used to construct an indicator evaluation system according to the hierarchical model. The indicator evaluation system includes the target layer, the criterion layer and the indicator layer. The calculation method and influence direction of each indicator in the indicator layer corresponding to each criterion layer are obtained, and the judgment matrix is ​​constructed. Two factors i and j, A = (a ij )n×n, where a ij Indicates the importance of the i-th factor compared to the j-th factor. The fuzzy judgment matrix a of any two elements on the criterion layer ij It can be expressed as the meaning of the importance scale and the weight vector of each indicator is calculated;

[0026] The calculation module is used to calculate the indicator layer score based on the weight of each indicator, combined with the actual value of the indicator layer and the target value of the indicator layer, and calculate the criterion layer score according to the indicator layer score and the criterion layer weight;

[0027] The evaluation module is used to calculate the final target layer score according to the weight of the criterion layer to obtain the evaluation result.

[0028] Furthermore, the calculation module includes a criterion layer calculation unit and an indicator layer calculation unit; the indicator layer calculation unit is used to calculate the indicator layer score based on each indicator weight, combined with the indicator layer actual value and the indicator layer target value, and the criterion layer calculation unit calculates the criterion layer score according to the indicator layer score and the criterion layer weight.

[0029] Furthermore, it also includes evaluation modules for each center under the enterprise. The evaluation modules for each center under the enterprise conduct performance evaluation on the transmission center, distribution center, substation center, operation and maintenance integrated center, dispatching center and marketing center based on the indicator layer; and conduct performance evaluation on the communication center, material center, safety supervision center and logistics center based on the indicator layer.

[0030] In addition, the present invention can also provide a computer device, including a processor and a memory, the memory is used to store a computer executable program, the processor reads the computer executable program from the memory and executes it, and when the processor executes the computer executable program, it can implement the power enterprise performance appraisal and evaluation method described in the present invention.

[0031] A computer-readable storage medium is also provided, in which a computer program is stored. When the computer program is executed by a processor, the power enterprise performance assessment method of the present invention can be implemented.

[0032] Compared with the prior art, the present invention has at least the following beneficial effects: The present invention proposes a performance evaluation system and method for electric power enterprises. The system imports enterprise financial data from multiple sources, evaluates from five dimensions: social responsibility, finance, customers, internal processes, and learning and growth, and calculates from the indicator layer, criterion layer, and target layer links through a weight calculation model to obtain a performance evaluation value. The performance results are displayed through an indicator visualization panel, which is convenient for relevant personnel to view and reduces communication costs. The performance evaluation system and method for electric power enterprises provided by the present invention are novel in creativity, perfect in overall process, and have promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 This is a system architecture diagram of a power enterprise performance assessment and evaluation system of the present invention;

[0034] Figure 2 A method flow chart of a method for evaluating performance of an electric power enterprise according to the present invention; DETAILED DESCRIPTION

[0035] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, a specific implementation method is summarized below to further illustrate the present invention.

[0036] Embodiment 1:

[0037] Please refer to Figure 1 As shown: a power enterprise performance assessment and evaluation system, the power enterprise performance assessment and evaluation system includes a company assessment module, a basic operation center assessment module and an auxiliary operation center assessment module;

[0038] The company assessment module is used to evaluate the overall performance of the power company from five aspects: social responsibility, finance, customers, internal processes, and learning and growth;

[0039] The basic operation center assessment module is used to evaluate the performance of the transmission center, distribution center, substation center, operation and inspection center, dispatching center and marketing center from five aspects: social responsibility, finance, customers, internal processes, and learning and growth;

[0040] The auxiliary operation center assessment module is used to evaluate the performance of the communication center, material center, safety supervision center and logistics center from five aspects: social responsibility, finance, customers, internal processes, and learning and growth.

[0041] In the example of the present invention, the power enterprise flow performance appraisal and evaluation system can be applied to the PC side and can also be applied to the mobile terminal; the mobile terminal refers to a smart device that can be used on the move, including a mobile phone, a notebook, and a tablet computer. The power enterprise performance appraisal and evaluation system of the example of the present invention includes a company appraisal module, a basic operation center appraisal module, and an auxiliary operation center appraisal module. In the company appraisal module, financial accountants can evaluate performance through indicators in five parts: social responsibility, finance, customers, internal processes, and learning and growth, and calculate a total score based on the weights, and perform performance appraisal based on the evaluation criteria. In the basic operation center appraisal module, financial accountants can perform performance appraisal on the six operation centers of the transmission center, distribution center, substation center, operation and inspection integrated center, dispatching center, and marketing center from five dimensions: social responsibility, finance, customers, internal processes, and learning and growth. Users can view the appraisal results through radar charts. In the auxiliary operation center appraisal module, users can use social responsibility, finance, customers, internal processes, and learning and growth to evaluate the performance of the transmission center, distribution center, substation center, operation and inspection integrated center, dispatching center, and marketing center, and also support the visual performance evaluation method of radar charts.

[0042] Embodiment 2:

[0043] Please refer to Figure 2 As shown: A method for evaluating the performance of an electric power enterprise comprises the following steps:

[0044] Step 1: First, use the balanced scorecard to calculate the weights of different indicators.

[0045] A hierarchical model is established and an indicator evaluation system is constructed as shown in the following table.

[0046]

[0047]

[0048] Construct a judgment matrix with two factors i and j, A = (a ij )n×n, where a ij Indicates the importance of the i-th factor compared to the j-th factor. The fuzzy judgment matrix a of any two elements on the criterion layer ij It can be expressed as the meaning of the importance scale, where the values ​​of the membership values ​​of the importance of the two elements can be referred to the table below to check whether the established fuzzy matrix is ​​consistent.

[0049]

[0050] Normalize the judgment matrix by column, that is, normalize each column of the judgment matrix A:

[0051]

[0052] Add row by row to get the sum vector:

[0053]

[0054] Normalizing the obtained sum vector, we can get the indicator weight vector:

[0055]

[0056] Calculate the largest eigenvalue λ max :

[0057]

[0058] Perform consistency check and introduce random consistency index RI:

[0059]

[0060] When CR<0.1, the consistency of the judgment matrix is ​​considered acceptable, otherwise the judgment matrix should be appropriately modified.

[0061] The application of the balanced scorecard fully embodies strategic and forward-looking nature. First of all, from the perspective of the four dimensions, the financial dimension measures the company's past achievements and is an indicator dimension that focuses on results; the customer, internal process, and learning and growth dimensions focus on the dynamic process of the company's operations and are process indicators. By combining result indicators and process indicators, the balanced scorecard can evaluate the company's performance from multiple angles, comprehensively and objectively. Secondly, the advantage of the balanced scorecard is not only that it integrates financial and non-financial indicators, but more importantly, it can analyze the company's own strategic implementation path and clearly show whether the company is correctly executing its plan by generating a series of performance measurement indicators;

[0062] Step 2, obtain the actual values ​​and target values ​​of five indicators at the social responsibility level, including clean energy grid-connected capacity, clean energy utilization rate, number of local jobs supported, support for rural revitalization, and safety accident reduction rate.

[0063] Obtain the actual and target values ​​of four financial indicators including profit growth rate, return on equity, operating cash ratio and economic added value.

[0064] Obtaining customer levels includes the actual and target values ​​of two indicators: customer satisfaction, customer complaint rate and market share.

[0065] The actual and target values ​​of four indicators at the internal process level are obtained, including line loss rate, comprehensive voltage qualification rate, power supply reliability rate, and emergency response time.

[0066] Obtaining the learning and growth level includes the actual and target values ​​of four indicators: employee training rate, employee retention rate, R&D investment level, and digital development level.

[0067] Step 3, define A as the target layer score, B i is the criterion layer score, C ij is the index layer score, W i is the criterion layer weight, W ij is the index layer weight, V j is the actual value of the indicator layer, T j is the target value of the indicator layer;

[0068] The positive indicator score of the calculation indicator layer is:

[0069] C ij =V j / T j *W ij

[0070] The negative indicator score of the calculation indicator layer is:

[0071] C ij =T j / V j *W ij

[0072] The calculation criteria layer score is:

[0073]

[0074] The target layer score is calculated as:

[0075]

[0076] According to the values ​​of the above five criteria layers, the total score of the target layer is calculated to obtain the evaluation result.

[0077] In the example of the present invention, firstly, based on the balanced scorecard, the weights of different indicators are calculated, and the dimensions are eliminated. At the same time, negative indicators are recorded. The value of the social responsibility level is calculated by the actual values ​​and target values ​​of the clean energy grid-connected capacity, clean energy utilization rate, number of local employment supported, rural revitalization support, and safety accident reduction rate, as well as the corresponding weights. The value of the financial level is calculated by the actual values ​​and target values ​​of the profit growth rate, return on net assets, operating cash ratio, and economic added value, as well as the corresponding weights. The value of the customer level is calculated by the actual values ​​and target values ​​of customer satisfaction, customer complaint rate, and market share, as well as the corresponding weights. The value of the internal process level is calculated by the actual values ​​and target values ​​of the line loss rate, comprehensive voltage qualification rate, power supply reliability rate, and emergency response time, as well as the corresponding weights. The value of the learning and growth level is calculated by the actual values ​​and target values ​​of the line loss rate, comprehensive voltage qualification rate, power supply reliability rate, and emergency response time, as well as the corresponding weights. Finally, the total score of the target level is calculated based on the values ​​of the above five criterion levels to obtain the evaluation result.

[0078] In summary, the present invention introduces an automated performance appraisal model through data indicator technology. The indicators cover all aspects and support the visual display of performance appraisal results. It is convenient and fast, and can greatly reduce the cost of financial accounting communication, improve work efficiency, realize company value creation, and meet the requirements of company value management and early warning.

[0079] The present invention can also provide a computer device, including a processor and a memory, the memory is used to store a computer executable program, the processor reads the computer executable program from the memory and executes it, and when the processor executes the computer executable program, it can implement the power enterprise performance appraisal and evaluation method described in the present invention.

[0080] On the other hand, the present invention provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the power enterprise performance assessment and evaluation method described in the present invention can be implemented.

[0081] The computer device may be a laptop computer, a desktop computer or a workstation.

[0082] The processor may be a central processing unit (CPU), a digital signal processor (DSP), an application specific integrated circuit (ASIC), or an off-the-shelf field programmable gate array (FPGA).

[0083] The memory of the present invention may be an internal storage unit of a laptop computer, a desktop computer or a workstation, such as a memory or a hard disk; or an external storage unit, such as a mobile hard disk or a flash memory card.

[0084] Computer-readable storage media may include computer storage media and communication media. Computer storage media include volatile and non-volatile, removable and non-removable media implemented by any method or technology for storing information such as computer-readable instructions, data structures, program modules or other data. Computer-readable storage media may include: read-only memory (ROM), random access memory (RAM), solid-state drive (SSD) or optical disk, etc. Among them, random access memory may include resistance random access memory (ReRAM) and dynamic random access memory (DRAM).

[0085] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for evaluating the performance of an electric power enterprise, characterized in that: The following steps are involved: According to the hierarchical model, an indicator evaluation system is constructed. The indicator evaluation system includes the target layer, the criterion layer and the indicator layer. The calculation method and influence direction of each indicator in the indicator layer corresponding to each criterion layer are obtained, and a judgment matrix is ​​constructed. Two factors i and j, A=(a ij )n×n, where a ij Indicates the importance of the i-th factor compared to the j-th factor. The fuzzy judgment matrix a of any two elements on the criterion layer ij It can be expressed as the meaning of the importance scale and the weight of each indicator can be calculated; Based on the weight of each indicator, the indicator layer score is calculated by combining the actual value of the indicator layer and the target value of the indicator layer, and the criterion layer score is calculated according to the indicator layer score and the criterion layer weight; The final target layer score is calculated according to the weight of the criterion layer to obtain the evaluation result.

2. The power enterprise performance evaluation method according to claim 1 is characterized in that: The target level is performance evaluation, and the criteria level is social responsibility, finance, customers, internal processes, and learning and growth; The social responsibility level includes the actual values ​​and target values ​​of five indicators: clean energy grid-connected capacity, clean energy utilization rate, number of local jobs supported, rural revitalization support, and safety accident reduction rate; the indicator layer corresponding to social responsibility includes clean energy grid-connected capacity, clean energy utilization rate, number of local jobs supported, rural revitalization support, and number of safety accidents; the indicator layer corresponding to finance includes profit growth rate, return on net assets, operating cash ratio, and debt-to-asset ratio; the indicator layer corresponding to customer satisfaction includes customer satisfaction, customer complaint rate, and market share; the indicator layer corresponding to internal processes includes comprehensive line loss rate, comprehensive voltage qualification rate, power supply reliability rate, and emergency response time; the indicator layer corresponding to learning and growth includes employee training rate, employee retention rate, R&D investment level, and digital development level.

3. The power enterprise performance evaluation method according to claim 2 is characterized in that: The grid-connected capacity of clean energy refers to the actual grid-connected capacity of clean energy, which is a positive indicator; the utilization rate of clean energy is (effectively utilized energy / supplied energy)*100%, which is a positive indicator; the number of local employment supported = the number of annual recruits, which is a positive indicator; the support for rural revitalization is the amount of investment in rural revitalization, which is a positive indicator; the number of safety accidents is calculated by the reduction rate of major and serious power grid equipment accidents, which is a positive indicator; the profit growth rate = (current year profit - previous year profit) / current year profit * 100%, which is a positive indicator; return on net assets = net profit / average net assets, which is a positive indicator; operating cash ratio = net operating cash inflow / operating income * 100%, which is a positive indicator; debt-to-asset ratio = assets and liabilities / total assets * 100%, which is a positive indicator; customer satisfaction = net number of satisfied customers / total number of surveyed people × 100%, which is a positive indicator; customer complaint rate = number of complaining customers / Total number of customers × 100%, which is a positive indicator; market share = sales revenue / sales revenue of all power supply companies in the business area × 100%, which is a positive indicator; comprehensive line loss rate = (power supply - power sales) / power supply × 100%, which is a negative indicator; comprehensive voltage qualification rate is the cumulative time of actual operating voltage / total operating time, which is a positive indicator; power supply reliability rate = [1-average annual power outage time for users / number of hours throughout the year (8760)] × 100%, which is a positive indicator; emergency response time is a negative indicator; employee training rate = number of trained personnel / total number of employees × 100%, which is a positive indicator; employee retention rate = 1-(number of resignations / total number of employees) × 100%, which is a positive indicator; R&D investment level = total research expenditure / operating income × 100%, which is a positive indicator; digital development level = digital investment amount / total assets * 100%, which is a positive indicator.

4. The power enterprise performance evaluation method according to claim 1 is characterized in that: Based on the weights of each indicator, the indicator layer scores are calculated by combining the actual values ​​of the indicator layer and the target values ​​of the indicator layer. When the criterion layer scores are calculated based on the indicator layer scores and the criterion layer weights, let A be the target layer score, and B be i is the criterion layer score, C ij is the index layer score, W i is the criterion layer weight, W ij is the index layer weight, V j is the actual value of the indicator layer, T j is the target value of the indicator layer, The positive indicator score of the calculation indicator layer is: C ij =V j / T j *W ij The negative indicator score of the calculation indicator layer is: C ij =T j / V j *W ij The calculation criteria layer score is: The target layer score is calculated as:

5. The power enterprise performance evaluation method according to claim 1 is characterized in that: The value scale of the membership value of the importance of two elements and the comparison results and interpretation of the i-th index and the j-th index are as follows: when the scale is 1, the importance of i and j is equal, and the two indicators have the same importance to the target; when the scale is 3, i is slightly prioritized over j, and the difference between the two indicators is slightly small; when the scale is 5, i is prioritized over j, and the difference between the two indicators is obvious; when the scale is 7, i is even prioritized over j, and the difference between the two indicators is strong; when the scale is 9, i is extremely prioritized over j, and the difference between the two indicators is extreme; when the scale is 2, 4, 6, and 8, the importance is between the importance corresponding to the adjacent scales, and it is adopted when compromise is used.

6. The power enterprise performance evaluation method according to claim 1 is characterized in that: Also includes: Based on the indicator layer, the performance of the transmission center, distribution center, substation center, operation and inspection center, dispatching center and marketing center is evaluated; Conduct performance evaluation on the communication center, material center, safety supervision center, and logistics center based on the indicator level.

7. A power enterprise performance evaluation system, characterized in that: It includes a weight vector acquisition module, a calculation module and an evaluation module; The weight vector acquisition module is used to construct an indicator evaluation system according to the hierarchical model. The indicator evaluation system includes the target layer, the criterion layer and the indicator layer. The calculation method and influence direction of each indicator in the indicator layer corresponding to each criterion layer are obtained, and the judgment matrix is ​​constructed. Two factors i and j, A = (a ij )n×n, where a ij Indicates the importance of the i-th factor compared to the j-th factor. The fuzzy judgment matrix a of any two elements on the criterion layer ij It can be expressed as the meaning of the importance scale and the weight vector of each indicator is calculated; The calculation module is used to calculate the indicator layer score based on the weight of each indicator, combined with the actual value of the indicator layer and the target value of the indicator layer, and calculate the criterion layer score according to the indicator layer score and the criterion layer weight; The evaluation module is used to calculate the final target layer score according to the weight of the criterion layer to obtain the evaluation result.

8. The power enterprise performance evaluation system according to claim 7 is characterized in that: The calculation module includes a criterion layer calculation unit and an indicator layer calculation unit; The indicator layer calculation unit is used to calculate the indicator layer score based on the weight of each indicator, combined with the indicator layer actual value and the indicator layer target value, and the criterion layer calculation unit calculates the criterion layer score according to the indicator layer score and the criterion layer weight; It also includes evaluation modules for each center under the enterprise. The evaluation modules for each center under the enterprise conduct performance evaluation on the transmission center, distribution center, substation center, integrated operation and maintenance center, dispatching center and marketing center based on the indicator layer; and conduct performance evaluation on the communication center, material center, safety supervision center and logistics center based on the indicator layer.

9. A computer device, characterized in that: The invention comprises a processor and a memory, wherein the memory is used to store a computer executable program, the processor reads the computer executable program from the memory and executes it, and when the processor executes the computer executable program, the power enterprise performance assessment and evaluation method described in any one of claims 1 to 6 can be implemented.

10. A computer-readable storage medium, characterized in that: A computer program is stored in the computer-readable storage medium. When the computer program is executed by a processor, the power enterprise performance assessment and evaluation method according to any one of claims 1 to 6 can be implemented.