A metal rod casting device for building climbing chain
By designing a casting device including conveying, casting, shock, auxiliary and agitating mechanism, the problem of bubbles and short service life of the casting mechanism during the casting process of building climbing frame chain metal rods is solved, and the effect of efficient casting and extended service life is achieved.
Patent Information
- Application Number
- CN202510053402.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-14
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2045-01-14
AI Technical Summary
The existing casting devices for building climbing frame chains are prone to bubbles during the casting process, resulting in a decrease in the strength of the metal rod and the inability to preheat the casting mechanism, resulting in a short service life.
A casting device including a conveying mechanism, a casting mechanism, a shock mechanism, an auxiliary mechanism and an agitating mechanism are designed. By the combination of the casting mechanism and the shock mechanism, bubbles in the molten metal liquid can be discharged; the auxiliary mechanism is used for rapid cooling and preheating the casting mechanism; the agitating mechanism ensures uniform cooling and forming of the metal liquid.
Effectively discharge bubbles in the metal liquid, improve the casting effect of the metal rods on the building frame chain, and avoid the problem of reducing strength due to the existence of bubbles; at the same time, the service life of the casting mechanism is extended through preheating and rapid cooling.
Smart Images

Figure CN119457018B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building climbing frames, in particular to a metal rod casting device for a building climbing frame chain. Background Art
[0002] The climbing frame is also called the lifting frame. According to its power source, it can be divided into several main categories such as hydraulic, electric, and manual. The metal bars of the construction climbing frame chain need to be cast using a casting device during manufacturing.
[0003] However, the metal rods cast by the existing casting device for the metal rods of the building climbing frame chain are prone to bubbles, thereby reducing the strength of the building climbing frame chain. In addition, the existing casting device for the building climbing frame chain cannot preheat the casting mechanism during use, which leads to the problem of rapid changes in temperature, further reducing the service life of the casting mechanism.
[0004] In view of the above problems, the inventor proposes a metal rod casting device for building climbing chain to solve the above problems. Summary of the invention
[0005] In order to solve the problems that the metal rods cast by the existing casting device for building climbing chains are prone to bubbles and the casting mechanism cannot be preheated during use; the purpose of the present invention is to provide a metal rod casting device for building climbing chains.
[0006] In order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme: a metal rod casting device for building climbing frame chains, comprising a mounting bracket, the top of the mounting bracket is provided with a conveying mechanism and a casting mechanism for use together, and the casting mechanism is provided with a vibrating mechanism for use together, the lower end of the mounting bracket is provided with an auxiliary mechanism for use together with the casting mechanism, and the auxiliary mechanism and the mounting bracket are provided with a stirring mechanism for use together with the conveying mechanism, the coordinated use of the casting mechanism and the vibrating mechanism can ensure the convenient casting of metal rods for making building climbing frame chains, and can effectively discharge bubbles mixed in the cast molten metal liquid, the setting and use of the auxiliary mechanism can make the cast molten metal liquid quickly cool and form, and can preheat the casting mechanism, and the setting and use of the stirring mechanism ensures the uniform cooling and forming of the metal liquid.
[0007] Preferably, the conveying mechanism includes a conveying motor, which is fixedly mounted on the upper end of the mounting bracket, and the output end of the conveying motor rotates and passes through the mounting bracket and is fixedly sleeved with a conveying swivel at its end, and an array-distributed Z-shaped conveying rod is fixedly connected to the conveying swivel, and the end of the Z-shaped conveying rod is fixedly connected to a conveying sleeve, a multi-stage electric push rod is fixedly inserted in the conveying sleeve, and the end of the output end of the multi-stage electric push rod is fixedly sleeved with a conveying cross plate, the casting mechanism includes a first mold, the first mold is fixedly connected to the end of the conveying cross plate, and the top end of the first mold is connected to a vertical material pipe, and the end of the vertical material pipe close to the first mold is connected to a casting conduit for use, a symmetrically distributed first side block is fixedly mounted on the outer wall of the first mold, and a first waterproof electric push rod is fixedly inserted on the first side block, the end of the output end of the first waterproof electric push rod is fixedly sleeved with a second side block, and a second mold is fixedly mounted between adjacent second side blocks, and the second mold can be tightly engaged with the first mold, the material vibration mechanism includes a third side block and a fourth side block, and the third side block and the fourth side block are both fixedly mounted on the second mold, and A second waterproof electric push rod is fixedly connected to the third side block, and a lifting horizontal plate is fixedly sleeved on the end of the output end of the second waterproof electric push rod, and a first side rod and a second side rod are fixedly installed on the top and bottom of one side of the lifting horizontal plate respectively, a sliding sleeve is fixedly connected to the end of the first side rod, and a sliding inner rod is slidably inserted in the sliding sleeve, a blocking sliding column is fixedly installed on the bottom end of the sliding inner rod, and the blocking sliding column is slidably inserted in the vertical material pipe, and the outer diameter of the blocking sliding column is the same as the inner diameter of the vertical material pipe, and a mounting vertical plate is fixedly installed on the bottom end of the second side rod, and A symmetrically arranged elastic paddle is fixedly installed on the mounting vertical plate, a sliding vertical rod is slidably inserted on the fourth side block, and an L-shaped paddle is fixedly installed on the top of the sliding vertical rod, the L-shaped paddle can be movably contacted with the elastic paddle, a receiving chassis is fixedly installed on the bottom end of the sliding vertical rod, and a return spring is fixedly installed on the top of the receiving chassis, the return spring is movably sleeved on the sliding vertical rod, and the top of the return spring is fixedly connected to the fourth side block, a knocking rod is fixedly installed on the middle part of the bottom end of the receiving chassis, and the end of the knocking rod can contact with the bottom end of the second mold.
[0008] Preferably, the auxiliary mechanism comprises a double-layer cylinder, an infusion pump body and a preheating cylinder, the double-layer cylinder, the infusion pump body and the preheating cylinder are all fixedly mounted on a mounting bracket, an arc-shaped through groove for cooperation is provided in the double-layer cylinder, and the arc-shaped through grooves are distributed in an array, a liquid guide tube body is connected at the bottom end of the double-layer cylinder, and a control valve for cooperation is fixedly mounted on the liquid guide tube body, and a side connecting pipe and a delivery conduit for cooperation are provided at the lower end of the infusion pump body, and the end of the side connecting pipe is connected to the lower end of the double-layer cylinder, a serpentine heat dissipation pipe is fixedly connected to the end of the delivery conduit, and the serpentine heat dissipation pipe is fixedly inserted at the lower end of the preheating cylinder, a return conduit is fixedly installed at the end of the serpentine heat dissipation pipe, and the end of the return conduit is connected to the upper end of the double-layer cylinder, a mesh partition plate and a mounting plug plate for cooperation with the serpentine heat dissipation pipe are provided at the lower end of the preheating cylinder, and a driving fan is fixedly plugged on the mounting plug plate, an air inlet slot for cooperation with the driving fan is provided at the bottom end of the preheating cylinder, and the air inlet slots are distributed in an array.
[0009] Preferably, the stirring mechanism includes a driven gear ring and a driven rotating rod, the driven gear ring is rotatably installed on the top of the double-layer cylinder, and a driven rotating ring is fixedly installed on the inner side of the driven gear ring, the bottom end of the driven rotating ring is integrally formed with stirring blades distributed in an array, and the stirring blades are rotatably installed in the double-layer cylinder, the driven rotating rod is rotatably inserted on the mounting bracket, and the bottom end of the driven rotating rod is fixedly sleeved with a driving gear, the driving gear is meshed with the driven gear ring, the top end of the driven rotating rod is fixedly sleeved with a second wheel disc, the outer side of the output end of the conveying motor is fixedly sleeved with a first wheel disc, and the outer transmission sleeves of the first wheel disc and the second wheel disc are connected with a transmission belt.
[0010] Compared with the prior art, the present invention has the following beneficial effects:
[0011] 1. Through the coordinated use of the casting mechanism and the vibration mechanism, the mold opening and closing can be conveniently realized, thereby ensuring the convenient casting of the metal rod for the construction climbing frame chain. After the molten metal is cast, the elastic paddle and the return spring can be used to drive the striking rod to reciprocate up and down, thereby hitting the corresponding second mold, thereby causing the corresponding second mold and the first mold to vibrate, thereby effectively discharging the bubbles mixed in the molten metal in the corresponding second mold and the first mold, thereby effectively improving the casting effect of the metal rod for the construction climbing frame chain, thereby avoiding the phenomenon that the strength of the construction climbing frame chain is reduced due to the presence of bubbles;
[0012] 2. Through the setting and use of the auxiliary mechanism, the molten metal liquid in the corresponding first mold and the second mold can be quickly cooled and formed through the cooling water source in the double-layer cylinder, and the water source after absorbing heat can be introduced into the serpentine heat dissipation pipe, and the heat in the water source can be dissipated by the serpentine heat dissipation pipe, and the outside air can be guided to the serpentine heat dissipation pipe, so that the dissipated heat can be absorbed and the air after absorbing heat can be guided to the corresponding first mold and the second mold, and then the corresponding first mold and the second mold can be preheated, so as to avoid the phenomenon of rapid changes in temperature in the casting mechanism, thereby effectively extending the service life of the casting mechanism;
[0013] 3. Through the setting and use of the stirring mechanism, the second wheel can be driven to rotate through the transmission belt, thereby driving the driven rotating rod to rotate, and then driving the driving gear to rotate, thereby driving the driven gear ring to rotate, and then driving the driven rotating ring to rotate, and further driving the stirring blades to rotate, thereby stirring the water source in the double-layer cylinder, and then the water source in the double-layer cylinder can be evenly mixed, further ensuring the uniform cooling and forming of the molten metal. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 It is a schematic diagram of the structure of the present invention.
[0016] Figure 2 It is a schematic diagram of the installation of the auxiliary mechanism in the present invention.
[0017] Figure 3 For the present invention Figure 2 A schematic diagram of the enlarged structure in the middle.
[0018] Figure 4 For the present invention Figure 2 Enlarged schematic diagram of the structure at point B in the middle.
[0019] Figure 5 For the present invention Figure 2 Enlarged schematic diagram of the structure at point C in the middle.
[0020] Figure 6 For the present invention Figure 2 Enlarged schematic diagram of the structure at point D in the middle.
[0021] Figure 7 It is a schematic diagram of the connection of the casting mechanism in the present invention.
[0022] Figure 8 For the present invention Figure 7 Enlarged schematic diagram of the structure at point E in the middle.
[0023] In the figure: 1. mounting bracket; 2. conveying mechanism; 21. conveying motor; 22. conveying swivel; 23. Z-shaped conveying rod; 24. conveying sleeve; 25. multi-stage electric push rod; 26. conveying horizontal plate; 3. casting mechanism; 31. first mold; 32. vertical material pipe; 33. casting conduit; 34. first side block; 35. first waterproof electric push rod; 36. second side block; 37. second mold; 4. material shock mechanism; 41. third side block; 42. fourth side block; 43. second waterproof electric push rod; 44. lifting horizontal plate; 45. first side rod; 46. second side rod; 47. sliding sleeve; 48. sliding inner rod; 49. blocking sliding column; 410. mounting vertical plate; 411. elastic paddle; 41 2. Sliding vertical rod; 413. L-shaped lever; 414. Supporting chassis; 415. Return spring; 416. Knocking rod; 5. Auxiliary mechanism; 51. Double-layer cylinder; 52. Infusion pump body; 53. Preheating cylinder; 54. Side connecting pipe; 55. Delivery duct; 56. Serpentine heat pipe; 57. Return duct; 58. Mesh partition; 59. Mounting plug plate; 510. Driving fan; 511. Arc-shaped groove; 512. Liquid guide tube body; 513. Control valve; 514. Air inlet groove; 6. Agitation mechanism; 61. Driven gear ring; 62. Driven rotating rod; 63. Driven rotating ring; 64. Agitation blades; 65. Driving gear; 66. Second wheel disc; 67. First wheel disc; 68. Transmission belt. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] Example: Figure 1-Figure 8As shown, the present invention provides a metal rod casting device for a building climbing frame chain, comprising a mounting bracket 1, a conveying mechanism 2 and a casting mechanism 3 for use together are provided at the top of the mounting bracket 1, and a material vibration mechanism 4 for use together is provided on the casting mechanism 3, an auxiliary mechanism 5 for use together with the casting mechanism 3 is provided at the lower end of the mounting bracket 1, and a stirring mechanism 6 for use together with the conveying mechanism 2 is provided on the auxiliary mechanism 5 and the mounting bracket 1, the casting mechanism 3 and the material vibration mechanism 4 are used together to ensure the convenient casting of the metal rod for making the building climbing frame chain, and can effectively discharge the bubbles mixed in the cast molten metal liquid, the setting and use of the auxiliary mechanism 5 can make the cast molten metal liquid quickly cool and form, and can preheat the casting mechanism 3, and the setting and use of the stirring mechanism 6 ensures the uniform cooling and forming of the metal liquid.
[0026] The conveying mechanism 2 includes a conveying motor 21, which is fixedly mounted on the upper end of the mounting bracket 1, and the output end of the conveying motor 21 rotates through the mounting bracket 1 and is fixedly sleeved with a conveying swivel 22 at its end, and an array of Z-shaped conveying rods 23 are fixedly connected to the conveying swivel 22, and the ends of the Z-shaped conveying rods 23 are fixedly connected with a conveying sleeve 24, and a multi-stage electric push rod 25 is fixedly inserted in the conveying sleeve 24, and the end of the output end of the multi-stage electric push rod 25 is fixedly sleeved with a conveying cross plate 26, and the casting mechanism 3 includes a first mold 31, the first mold 31 is fixedly connected to the end of the conveying cross plate 26, and the top of the first mold 31 is connected to a vertical material pipe 32, and the vertical material pipe 32 is connected to the top of the first mold 31. The end of the material pipe 32 close to the first mold 31 is connected to a casting conduit 33 for use with it. A symmetrically distributed first side block 34 is fixedly installed on the outer wall of the first mold 31, and a first waterproof electric push rod 35 is fixedly plugged into the first side block 34. The end of the output end of the first waterproof electric push rod 35 is fixedly sleeved with a second side block 36, and a second mold 37 is fixedly installed between adjacent second side blocks 36. The second mold 37 can be tightly engaged with the first mold 31 to achieve mold closing. The material vibration mechanism 4 includes a third side block 41 and a fourth side block 42. The third side block 41 and the fourth side block 42 are both fixedly installed on the second mold 37, and the third side block 41 is fixedly plugged into the second waterproof electric push rod 35. The end of the output end of the second waterproof electric push rod 43 is fixedly sleeved with a lifting horizontal plate 44, and the top and bottom of one side of the lifting horizontal plate 44 are respectively fixedly installed with a first side rod 45 and a second side rod 46, the end of the first side rod 45 is fixedly connected with a sliding sleeve 47, and a sliding inner rod 48 is slidably inserted in the sliding sleeve 47, and a blocking slide column 49 is fixedly installed at the bottom end of the sliding inner rod 48, and the blocking slide column 49 is slidably inserted in the vertical material pipe 32, and the outer diameter of the blocking slide column 49 is the same as the inner diameter of the vertical material pipe 32, so that the vertical material pipe 32 can be blocked, and the bottom end of the second side rod 46 is fixedly installed with a mounting vertical plate 410, and the mounting vertical plate 410 is fixedly installed. A symmetrically arranged elastic paddle 411 is fixedly installed, a sliding vertical rod 412 is slidably inserted on the fourth side block 42, and an L-shaped paddle 413 is fixedly installed on the top of the sliding vertical rod 412, and the L-shaped paddle 413 can movably contact with the elastic paddle 411, a receiving chassis 414 is fixedly installed on the bottom end of the sliding vertical rod 412, and a return spring 415 is fixedly installed on the top of the receiving chassis 414, the return spring 415 is movably sleeved on the sliding vertical rod 412, and the top of the return spring 415 is fixedly connected to the fourth side block 42, a knocking rod 416 is fixedly installed in the middle of the bottom end of the receiving chassis 414, and the end of the knocking rod 416 can contact with the bottom end of the second mold 37.
[0027] By adopting the above technical solution, when in use, the molten metal liquid will be introduced into the cavity formed by the corresponding first mold 31 and the second mold 37 through the corresponding vertical material pipe 32, and the molten metal liquid introduction operation will be stopped after an appropriate amount of molten metal liquid is introduced, and then the corresponding second waterproof electric push rod 43 will be started, thereby driving the corresponding lifting horizontal plate 44 to move downward, and then driving the corresponding first side rod 45 and the second side rod 46 to move downward, and further driving the corresponding sliding sleeve 47 and the installation vertical plate 410 to move downward, so as to drive the corresponding sliding The inner rod 48 and the blocking slide column 49 move downward to block the corresponding vertical material pipe 32. During this period, the installation vertical plate 410 will synchronously drive the corresponding two elastic paddles 411 to move downward. When the elastic paddle 411 contacts the corresponding L-shaped lever 413, it will deform and push it downward, thereby driving the corresponding sliding vertical rod 412 and the receiving chassis 414 to move downward, and then driving the corresponding knocking rod 416 to move downward and stretch the corresponding return spring 415. When the elastic paddle 411 is separated from the corresponding L-shaped lever 413, it will move downward. The corresponding second mold 37 and the first mold 31 are automatically restored, and the reset spring 415 drives the corresponding knocking rod 416 to move up and reset quickly, so that the corresponding second mold 37 can be hit, and then the corresponding second mold 37 and the first mold 31 can vibrate, and further the bubbles mixed in the molten metal liquid cast in the corresponding second mold 37 and the first mold 31 can be effectively discharged, and then the corresponding second waterproof electric push rod 43 is closed and the corresponding multi-stage electric push rod 25 is started, so that the corresponding first mold 31 and the second mold 37 can be driven to move down through the corresponding conveying cross plate 26 and gradually extend into the auxiliary mechanism 5, and then the molten metal liquid in the corresponding first mold 31 and the second mold 37 can be quickly cooled and formed through the cooling water source in the auxiliary mechanism 5, and the corresponding first mold 31 and the second mold 37 are reset after cooling and forming, and then the conveying motor 21 will drive the conveying swivel 22 to rotate one hundred and twenty degrees, so that the Z-shaped conveying rod 23 can be driven to rotate one hundred and twenty degrees, and then the conveying cross plate 26 can be driven to rotate one hundred and twenty degrees through the conveying sleeve ring 24 and the multi-stage electric push rod 25.
[0028] The auxiliary mechanism 5 includes a double-layer barrel 51, an infusion pump body 52 and a preheating barrel 53. The double-layer barrel 51, the infusion pump body 52 and the preheating barrel 53 are all fixedly mounted on the mounting bracket 1. The double-layer barrel 51 is provided with an arc-shaped through groove 511 for use in conjunction with each other, and the arc-shaped through groove 511 is distributed in an array. The bottom end of the double-layer barrel 51 is connected with a liquid guide tube 512, and a control valve 513 for use in conjunction with each other is fixedly mounted on the liquid guide tube 512. The coordinated use of the liquid guide tube 512 and the control valve 513 provides convenience for the extraction of liquid in the double-layer barrel 51. The lower end of the infusion pump body 52 is provided with a side connecting tube 54 and a delivery conduit 55 for use in conjunction with each other. The end of the side connecting tube 54 is connected to the double-layer barrel 51. The lower end of the preheating cylinder 53 is connected, the end of the conveying duct 55 is fixedly connected with a serpentine heat dissipation pipe 56, and the serpentine heat dissipation pipe 56 is fixedly inserted in the lower end of the preheating cylinder 53, the end of the serpentine heat dissipation pipe 56 is fixedly installed with a return duct 57, and the end of the return duct 57 is connected with the upper end of the double-layer cylinder 51, the lower end of the preheating cylinder 53 is provided with a mesh partition plate 58 and a mounting plug plate 59 used in conjunction with the serpentine heat dissipation pipe 56, and the mounting plug plate 59 is fixedly plugged with a driving fan 510, the bottom end of the preheating cylinder 53 is provided with an air inlet slot 514 used in conjunction with the driving fan 510, and the air inlet slots 514 are distributed in an array, and the setting and use of the air inlet slots 514 ensure the normal operation of the driving fan 510.
[0029] By adopting the above technical solution, when in use, the cooling water source in the double-layer cylinder 51 can be used to quickly cool and shape the molten metal liquid in the corresponding first mold 31 and the second mold 37. During this period, the first mold 31 and the second mold 37 at the upper end of the preheating cylinder 53 will be synchronously moved into the preheating cylinder 53, and the driving fan 510 and the infusion pump body 52 will be started synchronously, so that the water source after absorbing heat can be introduced into the delivery conduit 55 through the side connecting pipe 54, and then the water source after absorbing heat will be introduced into the serpentine heat dissipation pipe 56 and the serpentine heat dissipation pipe 56 will dissipate the heat in the water source, and then the water source after dissipation will flow back to the double-layer cylinder 51 through the return conduit 57. At the same time, the driving fan 510 can guide the outside air to the serpentine heat dissipation pipe 56, so that the dissipated heat can be absorbed, and then the air after absorbing heat will be guided to the corresponding first mold 31 and the second mold 37, so that the corresponding first mold 31 and the second mold 37 can be preheated, and will be moved up and reset after preheating.
[0030] The stirring mechanism 6 includes a driven ring gear 61 and a driven rotating rod 62. The driven ring gear 61 is rotatably installed on the top of the double-layer cylinder 51, and a driven rotating ring 63 is fixedly installed on the inner side of the driven ring gear 61. The bottom end of the driven rotating ring 63 is integrally formed with an array of stirring blades 64, and the stirring blades 64 are rotatably installed in the double-layer cylinder 51. The driven rotating rod 62 is rotatably inserted on the mounting bracket 1, and the bottom end of the driven rotating rod 62 is fixedly sleeved with a driving gear 65, and the driving gear 65 is meshed with the driven ring gear 61. The top end of the driven rotating rod 62 is fixedly sleeved with a second wheel disc 66, and the outer side of the output end of the conveying motor 21 is fixedly sleeved with a first wheel disc 67, and the outer side transmission sleeves of the first wheel disc 67 and the second wheel disc 66 are connected with a transmission belt 68.
[0031] By adopting the above technical solution, when in use, when the conveying motor 21 is started, the first wheel 67 will be driven to rotate, so that the second wheel 66 can be driven to rotate through the transmission belt 68, and then the driven rotating rod 62 can be driven to rotate, and further the driving gear 65 can be driven to rotate, so that the driven ring gear 61 can be driven to rotate, and then the driven rotating ring 63 can be driven to rotate, and further the stirring blade 64 can be driven to rotate, so that the water source in the double-layer cylinder 51 can be stirred, and then the water source in the double-layer cylinder 51 can be evenly mixed, which further ensures the uniform cooling and forming of the molten metal.
[0032] Working principle: When in use, the casting machine can introduce the molten metal into the casting conduit 33 at the upper end of the double-layer cylinder 51, and then the molten metal will be introduced into the cavity formed by the corresponding first mold 31 and the second mold 37 through the corresponding vertical material pipe 32, and the molten metal introduction operation will be stopped after an appropriate amount of molten metal is introduced, and then the corresponding second waterproof electric push rod 43 will be started, so as to drive the corresponding lifting horizontal plate 44 to move downward, and then drive the corresponding first side rod 45 and the second side rod 46 to move downward, and further drive the corresponding sliding sleeve 47 and the installation vertical plate 410 to move downward, so as to drive the corresponding sliding inner rod 48 and the blocking sliding column 49 to move downward and block the corresponding vertical material pipe 32. During this period, the installation vertical plate 410 will be The two corresponding elastic paddles 411 are driven to move downward. When the elastic paddles 411 contact the corresponding L-shaped levers 413, they are deformed and pushed downward, thereby driving the corresponding sliding vertical rods 412 and the receiving chassis 414 to move downward, and then driving the corresponding knocking rods 416 to move downward and stretch the corresponding return springs 415. When the elastic paddles 411 are separated from the corresponding L-shaped levers 413, they are automatically restored, and the return springs 415 drive the corresponding knocking rods 416 to move upward and reset quickly, thereby hitting the corresponding second mold 37, thereby causing the corresponding second mold 37 and the first mold 31 to vibrate, and further enabling the bubbles mixed in the molten metal cast in the corresponding second mold 37 and the first mold 31 to be effectively discharged.
[0033] Then, the corresponding second waterproof electric push rod 43 is closed and the corresponding multi-stage electric push rod 25 is started, so that the corresponding first mold 31 and the second mold 37 can be driven to move downward through the corresponding conveying horizontal plate 26 and gradually extend into the double-layer cylinder 51, and then the molten metal liquid in the corresponding first mold 31 and the second mold 37 can be quickly cooled and formed through the cooling water source in the double-layer cylinder 51, and the corresponding first mold 31 and the second mold 37 are reset after cooling and forming. During this period, the first mold 31 and the second mold 37 at the upper end of the preheating cylinder 53 will be synchronously moved into the preheating cylinder 53, and the fan 510 and the infusion pump body 52 are driven. The two parts are started synchronously, so that the water source after absorbing heat can be introduced into the conveying conduit 55 through the side connecting pipe 54, and then the water source after absorbing heat will be introduced into the serpentine heat dissipation pipe 56 and the serpentine heat dissipation pipe 56 will dissipate the heat in the water source, and then the water source after dissipation will flow back to the double-layer cylinder 51 through the return conduit 57. At the same time, the driving fan 510 can guide the outside air to the serpentine heat dissipation pipe 56, so that the dissipated heat can be absorbed, and then the air after absorbing heat will be guided to the corresponding first mold 31 and the second mold 37, so that the corresponding first mold 31 and the second mold 37 can be preheated, and after preheating, it will move up and reset;
[0034] Then the conveying motor 21 will drive the conveying rotating ring 22 to rotate 120 degrees, thereby driving the Z-shaped conveying rod 23 to rotate 120 degrees, and then driving the conveying cross plate 26 to rotate 120 degrees through the conveying sleeve ring 24 and the multi-stage electric push rod 25. At this time, the preheated first mold 31 and the second mold 37 will be moved to the upper end of the double-layer cylinder 51 for casting, and the two first waterproof electric push rods 35 corresponding to the metal rod after casting will be started, so that the corresponding second mold 37 can be driven to move through the corresponding second side block 36, so that the mold can be opened, and the metal rod formed after the mold opening will fall into the storage mechanism below, and then the mold will be closed again and the preheating, casting, cooling and unloading operations will be carried out according to the above steps;
[0035] When the conveying motor 21 is started, it will drive the first wheel 67 to rotate, thereby driving the second wheel 66 to rotate through the transmission belt 68, and then driving the driven rotating rod 62 to rotate, and further driving the driving gear 65 to rotate, thereby driving the driven ring gear 61 to rotate, and then driving the driven rotating ring 63 to rotate, and further driving the stirring blade 64 to rotate, thereby stirring the water source in the double-layer cylinder 51, and then the water source in the double-layer cylinder 51 can be evenly mixed, further ensuring the uniform cooling and forming of the molten metal.
[0036] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A metal rod casting device for a building climbing chain, comprising a mounting bracket (1), characterized in that: The top of the mounting bracket (1) is provided with a conveying mechanism (2) and a casting mechanism (3) for use together, and the casting mechanism (3) is provided with a material vibration mechanism (4) for use together, and the lower end of the mounting bracket (1) is provided with an auxiliary mechanism (5) for use together with the casting mechanism (3), and the auxiliary mechanism (5) and the mounting bracket (1) are provided with a stirring mechanism (6) for use together with the conveying mechanism (2). The coordinated use of the casting mechanism (3) and the material vibration mechanism (4) can ensure the convenient casting of metal rods for making building climbing frame chains, and can effectively discharge bubbles mixed in the cast molten metal liquid. The use of the auxiliary mechanism (5) can enable the cast molten metal liquid to be quickly cooled and formed, and can preheat the casting mechanism (3). The use of the stirring mechanism (6) ensures the uniform cooling and forming of the metal liquid. The conveying mechanism (2) comprises a conveying motor (21), the conveying motor (21) is fixedly mounted on the upper end of the mounting bracket (1), and the output end of the conveying motor (21) rotates through the mounting bracket (1) and a conveying swivel (22) is fixedly sleeved at its end, the conveying swivel (22) is fixedly connected to an array of Z-shaped conveying rods (23), and the ends of the Z-shaped conveying rods (23) are fixedly connected to a conveying sleeve (24), a multi-stage electric push rod (25) is fixedly inserted in the conveying sleeve (24), and the end of the output end of the multi-stage electric push rod (25) is fixedly sleeved with a conveying cross plate (26); The casting mechanism (3) comprises a first mold (31), the first mold (31) is fixedly connected to the end of the conveying cross plate (26), and the top end of the first mold (31) is connected to a vertical material pipe (32), and the end of the vertical material pipe (32) close to the first mold (31) is connected to a casting conduit (33) for use with it, and the outer wall of the first mold (31) is fixedly installed with symmetrically distributed first side blocks (34), and the first side blocks (34) are fixedly plugged with a first waterproof electric push rod (35), the end of the output end of the first waterproof electric push rod (35) is fixedly sleeved with a second side block (36), and a second mold (37) is fixedly installed between adjacent second side blocks (36), and the second mold (37) can be tightly engaged with the first mold (31); The material vibration mechanism (4) comprises a third side block (41) and a fourth side block (42), the third side block (41) and the fourth side block (42) are both fixedly mounted on the second mold (37), and a second waterproof electric push rod (43) is fixedly plugged into the third side block (41), the end of the output end of the second waterproof electric push rod (43) is fixedly sleeved with a lifting horizontal plate (44), and the top and bottom ends of one side of the lifting horizontal plate (44) are respectively fixedly mounted with a first side rod (45) and a second side rod (46), the end of the first side rod (45) is fixedly connected with a sliding sleeve (47), and a sliding inner rod (48) is slidably plugged into the sliding sleeve (47), the bottom end of the sliding inner rod (48) is fixedly mounted with a blocking sliding column (49), and the blocking sliding column (49) is slidably plugged into the vertical material pipe (32), the bottom end of the second side rod (46) is fixedly mounted with a vertical mounting screw The fourth side block (42) is provided with a sliding vertical rod (412) which is slidably inserted thereon, and an L-shaped lever (413) is fixedly installed on the top of the sliding vertical rod (412), and the L-shaped lever (413) can be movably contacted with the elastic lever (411), and a receiving chassis (41) is fixedly installed on the bottom of the sliding vertical rod (412). 4), and a return spring (415) is fixedly installed on the top of the receiving chassis (414), and the return spring (415) is movably sleeved on the sliding vertical rod (412), and the top of the return spring (415) is fixedly connected to the fourth side block (42), and a knocking rod (416) is fixedly installed in the middle of the bottom end of the receiving chassis (414), and the end of the knocking rod (416) can contact the bottom end of the second mold (37); The auxiliary mechanism (5) comprises a double-layer cylinder (51), an infusion pump body (52) and a preheating cylinder (53); the double-layer cylinder (51), the infusion pump body (52) and the preheating cylinder (53) are all fixedly mounted on the mounting bracket (1); and the lower end of the infusion pump body (52) is provided with a side connecting tube (54) and a delivery conduit (55) for use in conjunction with each other; the end of the side connecting tube (54) is connected to the lower end of the double-layer cylinder (51); and the end of the delivery conduit (55) is fixedly connected to a A serpentine heat dissipation pipe (56) is fixedly inserted at the lower end of the preheating cylinder (53); a return conduit (57) is fixedly installed at the end of the serpentine heat dissipation pipe (56); and the end of the return conduit (57) is connected to the upper end of the double-layer cylinder (51); a mesh partition plate (58) and a mounting plug plate (59) used in conjunction with the serpentine heat dissipation pipe (56) are provided at the lower end of the preheating cylinder (53); and a driving fan (510) is fixedly plugged on the mounting plug plate (59); The stirring mechanism (6) comprises a driven gear ring (61) and a driven rotating rod (62), wherein the driven gear ring (61) is rotatably mounted on the top of the double-layer cylinder (51), and a driven rotating ring (63) is fixedly mounted on the inner side of the driven gear ring (61), and the bottom end of the driven rotating ring (63) is integrally formed with stirring blades (64) distributed in an array, and the stirring blades (64) are rotatably mounted in the double-layer cylinder (51), and the driven rotating rod (62) is rotatably inserted into the driven rotating ring (63). The driven rotating rod (62) is arranged on a mounting bracket (1), and a driving gear (65) is fixedly sleeved at the bottom end thereof, the driving gear (65) is meshed with a driven gear ring (61), a second wheel disc (66) is fixedly sleeved at the top end thereof, a first wheel disc (67) is fixedly sleeved at the outer side of the output end of the conveying motor (21), and a transmission belt (68) is connected to the outer transmission sleeves of the first wheel disc (67) and the second wheel disc (66).
2. A metal rod casting device for a building climbing chain as claimed in claim 1, characterized in that: The outer diameter of the blocking slide column (49) is the same as the inner diameter of the vertical material pipe (32).
3. A metal rod casting device for a building climbing chain as claimed in claim 1, characterized in that: The double-layer cylinder (51) is provided with arc-shaped through grooves (511) for use with the double-layer cylinder (51), and the arc-shaped through grooves (511) are distributed in an array.
4. A metal rod casting device for a building climbing chain as claimed in claim 1, characterized in that: The bottom end of the double-layer cylinder (51) is connected to a liquid guiding tube (512), and a control valve (513) for use with the liquid guiding tube (512) is fixedly mounted on the liquid guiding tube (512).
5. A metal rod casting device for a building climbing chain as claimed in claim 1, characterized in that: The bottom end of the preheating cylinder (53) is provided with air inlet slots (514) for use with the driving fan (510), and the air inlet slots (514) are distributed in an array.
Citation Information
Patent Citations
Hardware pressure-casting forming mold convenient to stably mount and fix
CN112916825A
Brake drum heating device and process
CN113059139A
Low-temperature-impact-resistant ductile iron casting device
CN116329499A
Cooling device of injection molding machine
CN213830211U
Energy-saving injection molding machine with heat recovery function
CN215434877U