A kind of assembled vertical prefabricated component sleeve visual grouting assembly and method
By introducing L-shaped tubes and airbag structures into the sleeve grouting system, visualization of the slurry filling process and air exhaust are achieved, which solves the problem of difficult to observe the grouting state in the traditional grouting method, and improves the grouting quality and structural stability.
Patent Information
- Application Number
- CN202510059637.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2045-01-15
AI Technical Summary
Traditional grouting methods do not easily observe the grouting state when grouting the sleeve, resulting in void leakage in the sleeve, which affects the integrity and seismic resistance of the structure.
A prefabricated vertical prefabricated member sleeve visual grouting assembly is designed. By setting an L-shaped tube at one end of the overflow outlet, using the sealing member and air bag structure, the slurry filling process is visualized and the air exhaust gas is exhausted, and the grouting quality is improved.
Real-time monitoring of the grouting process is realized, which avoids the occurrence of hollows and slurry leakage, improves the compactness and earthquake resistance of the structure, and enhances the reliability and safety of prefabricated buildings.
Smart Images

Figure CN119466233B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction tools, and in particular to an assembled vertical prefabricated component sleeve visualized grouting assembly and method. Background Art
[0002] During the construction of prefabricated buildings, especially for the node connections of vertical prefabricated components, the control of grouting quality is a key link to ensure the stability and safety of the overall structure.
[0003] The traditional grouting method has some limitations. Although the sleeve is set in the component, the steel bar is inserted into the sleeve, the slurry is injected through the grouting port, and the grouting can be stopped when the slurry overflows through the overflow port, there are still the following problems, such as local voids and leakage that is difficult to detect, which may affect the integrity and seismic resistance of the structure. In order to solve these problems, a visual grouting component and method for prefabricated vertical prefabricated component sleeve are proposed, aiming to improve the grouting quality by real-time monitoring of the grouting process, thereby improving the reliability and safety of prefabricated buildings. Summary of the invention
[0004] The purpose of the present invention is to solve the problem in the prior art that it is difficult to observe the grouting state during sleeve grouting, which leads to the easy occurrence of voids and grout leakage inside the sleeve, and to propose a visualized grouting assembly and method for the sleeve of an assembled vertical prefabricated component.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A prefabricated vertical prefabricated component sleeve visual grouting assembly comprises a sleeve preset in the component, one side of the sleeve is provided with an overflow port, a side of the overflow port is provided with a grouting port below the overflow port, steel bars are provided inside the sleeve, a connecting sleeve is sleeved on the surface of the overflow port, an L-shaped tube sleeved on one end of the connecting sleeve, a sealing ring is fixed to the outer wall of one end of the L-shaped tube, and the surface of the sealing ring is provided with raised patterns distributed at equal intervals; a disc is arranged above the L-shaped tube, one end of the disc is provided with a plugging piece, when the overflowed slurry squeezes the plugging piece to move, the air in the L-shaped tube is discharged; a second airbag and a third airbag are arranged on the outer wall surface of one end of the L-shaped tube, when the plugging piece moves, the pre-stored air is transported to the second airbag and the third airbag to expand to seal and limit the joint between the L-shaped tube and the connecting sleeve.
[0007] Preferably, the sealing member includes a piston slidably connected to the inner wall of the L-shaped tube, the top of the piston is fixedly connected to a lifting rod, the lifting rod is slidably connected in the L-shaped tube, the piston and the inner wall of the L-shaped tube are fixedly connected to an extrusion spring, the extrusion spring is sleeved on the surface of the lifting rod, and the other end of the lifting rod is fixedly connected to a disc.
[0008] Preferably, an exhaust passage is provided inside the lifting rod, the disc and the piston, a first chamber is provided inside the piston, a second chamber is provided on the surface of the piston, and the first chamber, the second chamber and the exhaust passage are connected.
[0009] Preferably, a moving block is slidably connected inside the first chamber, a return spring is fixedly connected to one side of the moving block, the end of the return spring is fixedly connected to the piston, and a downward pressure block is fixedly connected to the top of the L-shaped tube, and the downward pressure block is adapted to the second chamber.
[0010] Preferably, a retaining ring is fixed on the top surface of the disc, and a sealing cover is provided at the axis of the retaining ring at the outlet end of the exhaust channel.
[0011] Preferably, the bottom of the disc is located on one side of the lifting rod and is fixedly connected to a connecting rod, the end of the connecting rod is fixedly connected to a trapezoidal block, a first airbag is arranged obliquely above the trapezoidal block, the first airbag is fixed on the outer wall of the L-shaped tube, and a reset piece is arranged inside the first airbag.
[0012] Preferably, the reset member includes a limit plate fixed to the inner wall of the first airbag, a telescopic spring is fixedly connected between the two limit plates, the outer wall of the first airbag is rounded, an air inlet is provided on the surface of the first airbag, and a sealing cap is provided at the air inlet.
[0013] Preferably, an air pipe is fixedly connected to the top of the first airbag, one end of the air pipe passes through the inner wall of the L-shaped tube and is fixedly connected to the second airbag, one end of the air pipe is fixedly connected to a shunt pipe, the end of the shunt pipe is fixedly connected to the third airbag, and the third airbag is arranged in a sealing ring.
[0014] Preferably, the bottom of the trapezoidal block is fixedly connected to a fixing rod, the bottom of the fixing rod is fixedly connected to an arc-shaped plate, a limiting ring is provided on one side of the arc-shaped plate, the bottom of the limiting ring is fixedly connected to a sliding seat, the sliding seat is slidably connected to a sliding rail, the sliding rail is fixed on the outer wall of the L-shaped tube, one end of the sliding rail is fixed with a fixing ring, the fixing ring is fixed on the outer wall of the L-shaped tube, and a limiting spring is fixedly connected between the fixing ring and the limiting ring.
[0015] A method for using an assembled vertical prefabricated component sleeve visual grouting assembly mainly comprises the following steps:
[0016] Step A: When in use, a sleeve is pre-set in the component, and a steel bar is inserted through the sleeve to improve the strength of the structure, so that the two components are connected as a whole, wherein the overflow port and the grouting port penetrate the component and extend to the side surface of the prefabricated component, which is convenient for the subsequent grouting operation, and then an L-shaped pipe is inserted at one end of the overflow port and limited by a connecting sleeve. When the grouting operation is performed, the grouting pipe is inserted into the grouting port, and the injected slurry fills the sleeve and then overflows through the overflow port. The overflowed slurry enters the interior of the L-shaped pipe. When the slurry enters the L-shaped pipe, the staff can know the grouting amount state of the slurry by observing the slurry in the L-shaped pipe;
[0017] Step B: After the slurry enters the L-shaped tube, the slurry squeezes the sealing piece set in the L-shaped tube to move and displace the sealing piece. In this process, the air that enters the L-shaped tube during the grouting process can be exhausted. During the rising process of the sealing piece, the disc is driven to move synchronously, thereby facilitating the squeezing of the pre-stored air, causing the second airbag and the third airbag to expand. When the slurry squeezing piston is displaced to the inner wall at the top of the L-shaped tube, the grouting tube at the grouting port is pulled out, and the grouting port is blocked with a sealing plug to complete the grouting operation.
[0018] Compared with the prior art, the present invention provides a prefabricated vertical prefabricated component sleeve visual grouting assembly, which has the following beneficial effects:
[0019] 1. This kind of assembled vertical prefabricated component sleeve visual grouting assembly can be plugged into one end of the overflow port through the provided L-shaped tube. When the slurry injected into the sleeve enters the L-shaped tube, it is convenient for the staff to observe the state of the injected slurry in real time through the L-shaped tube. At the same time, the air entering the L-shaped tube can be discharged through the sealing piece provided on the L-shaped tube to prevent bubbles from being trapped inside the sleeve to form bubbles, which will affect the density and strength of the grouting.
[0020] 2. This kind of assembled vertical prefabricated component sleeve visualized grouting assembly drives the disc to move upward during the rising process of the sealing part, thereby facilitating the squeezing of the pre-placed first air bag, so that the internal air is transported to the second air bag and the diverter pipe, thereby effectively improving the sealing performance of one end of the L-shaped pipe and preventing the slurry from escaping from the joint between the L-shaped pipe and the connecting sleeve.
[0021] 3. This kind of assembled vertical prefabricated component sleeve visualized grouting assembly, when the trapezoidal block moves upward, can also drive the arc plate to move upward synchronously, thereby squeezing the limit ring to shift horizontally, and horizontally supporting the side of the second airbag, thereby further improving the sealing effect of the L-shaped tube, and at the same time playing a good role in correcting deformation.
[0022] The parts not involved in the device are the same as the prior art or can be implemented by the prior art. The L-shaped tube provided in the present invention can be used to observe the amount of slurry injected into the sleeve, thereby realizing the visual operation of the grouting process and improving the accuracy of slurry pouring. During the grouting process, the air entering the L-shaped tube during the grouting process can be exhausted by the setting of the plugging piece to avoid bubbles being trapped inside the sleeve and forming bubbles, which affect the density and strength of the grouting. At the same time, the power of the plugging piece moving upward is used to inflate the joint between the L-shaped tube and the connecting sleeve, thereby improving the sealing performance of the structure and preventing the slurry from leaking out. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the overall structure of an assembled vertical prefabricated component sleeve visual grouting assembly proposed by the present invention when it is not installed in a component;
[0024] Figure 2 This is a schematic diagram of the front view structure of an assembled vertical prefabricated component sleeve visualized grouting assembly proposed by the present invention;
[0025] Figure 3 A schematic diagram of the front cross-sectional structure of an assembled vertical prefabricated component sleeve visualized grouting assembly proposed by the present invention;
[0026] Figure 4 The present invention proposes Figure 3 A schematic diagram of the enlarged structure of the middle A area;
[0027] Figure 5 The present invention proposes Figure 3 Schematic diagram of the enlarged structure of the middle B area;
[0028] Figure 6 A schematic diagram of a top-view cross-sectional structure of an assembled vertical prefabricated component sleeve visualized grouting assembly proposed by the present invention;
[0029] Figure 7 It is a schematic diagram of the partial cross-section three-dimensional structure of the L-shaped tube proposed by the present invention;
[0030] Figure 8 A schematic diagram of the three-dimensional structure of the limit ring and the arc-shaped plate in the extrusion state of the assembled vertical prefabricated component sleeve visualization grouting assembly proposed by the present invention;
[0031] Fig. 9 A schematic diagram of the partial cross-sectional structure of the extrusion state of a limit ring and an arc-shaped plate in a visualized grouting assembly of an assembled vertical prefabricated component sleeve proposed by the present invention.
[0032] In the figure: 1. sleeve; 11. overflow port; 12. grouting port; 13. steel bar; 14. connecting sleeve; 2. L-shaped tube; 21. sealing ring; 22. convex pattern; 31. lifting rod; 32. disc; 33. piston; 34. extrusion spring; 41. exhaust channel; 42. retaining ring; 43. sealing cover; 44. first chamber; 45. second chamber; 46. moving block; 47. return spring; 48. pressing block; 51. connecting rod; 52. trapezoidal block; 53. first air bag; 54. limiting plate; 55. telescopic spring; 56. air pipe; 57. second air bag; 58. shunt pipe; 59. third air bag; 61. fixing rod; 62. arc plate; 63. limiting ring; 64. slide seat; 65. slide rail; 66. limiting spring; 67. fixing ring. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0034] In the description of the present invention, the term "multiple" refers to two or more. Unless otherwise clearly defined, the orientation or positional relationship indicated by the terms "upper", "lower", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation of the present invention. The terms "connection", "installation", "fixation", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. can explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, the meaning of "multiple" is two or more.
[0035] In the description of this specification, the description of the terms "one embodiment", "some implementations", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0036] Reference Figure 1-Figure 9 , an assembled vertical prefabricated component sleeve visual grouting assembly, comprising a sleeve 1 preset in the component, an overflow port 11 is arranged on one side of the sleeve 1, a grouting port 12 is arranged on the side of the overflow port 11 below the overflow port 11, a steel bar 13 is arranged inside the sleeve 1, a connecting sleeve 14 is sleeved on the surface of the overflow port 11, an L-shaped tube 2 is sleeved on one end of the connecting sleeve 14, a sealing ring 21 is fixed on the outer wall of one end of the L-shaped tube 2, and convex patterns 22 distributed at equal intervals are arranged on the surface of the sealing ring 21; a disc 32 is arranged above the L-shaped tube 2, and a plugging piece is arranged at one end of the disc 32, which is used to discharge the air in the L-shaped tube 2 when the overflowed slurry squeezes the plugging piece to move; a second airbag 57 and a third airbag 59 are arranged on the outer wall surface of one end of the L-shaped tube 2, and when the plugging piece moves, the pre-stored air is transported to the second airbag 57 and the third airbag 59 to expand to seal and limit the joint between the L-shaped tube 2 and the connecting sleeve 14.
[0037] When in use, the sleeve 1 is pre-set in the component, and the steel bar 13 is inserted through the sleeve 1 to improve the strength of the structure, so that the two components are connected as a whole, wherein the overflow port 11 and the grouting port 12 extend through the component to the outer surface of the prefabricated component, which is convenient for the subsequent grouting operation, and then the L-shaped tube 2 is inserted at one end of the overflow port 11 and a limit is set through the connecting sleeve 14. When the grouting operation is performed, the grouting tube is inserted into the grouting port 12, and the injected slurry fills the sleeve 1 and then overflows through the overflow port 11. The overflowed slurry enters the interior of the L-shaped tube 2, wherein the L-shaped tube 2 is made of transparent plastic tube material. When the slurry enters the L-shaped tube 2, the staff can know the slurry by observing the slurry in the L-shaped tube 2. The filling amount state can be visualized for improved accuracy of slurry filling. When the slurry enters the L-shaped tube 2, the sealing member arranged in the L-shaped tube 2 is squeezed by the slurry to move the sealing member. In this process, the air entering the L-shaped tube 2 during the grouting process can be exhausted to prevent air from entering the slurry in the sleeve 1 and causing voids and leakage. During the rising process of the sealing member, the disc 32 is driven to move synchronously, thereby facilitating the squeezing of the pre-stored air, causing the second airbag 57 and the third airbag 59 to expand, thereby improving the sealing performance of the joint between the L-shaped tube 2 and the connecting sleeve 14, preventing the injected slurry from leaking out of the joint, and at the same time correcting the sealing components to extend their service life.
[0038] In a preferred embodiment, referring to Figure 2 , Figure 3 , Figure 4 and Figure 7The blocking member includes a piston 33 slidably connected to the inner wall of the L-shaped tube 2, a lifting rod 31 is fixedly connected to the top of the piston 33, the lifting rod 31 is slidably connected in the L-shaped tube 2, an extrusion spring 34 is fixedly connected to the inner wall of the L-shaped tube 2, the extrusion spring 34 is sleeved on the surface of the lifting rod 31, and the other end of the lifting rod 31 is fixedly connected to the disc 32, an exhaust channel 41 is opened inside the lifting rod 31, the disc 32 and the piston 33, a first chamber 44 is opened inside the piston 33, and the surface of the piston 33 is opened. A second chamber 45 is provided, and the first chamber 44, the second chamber 45 and the exhaust channel 41 are connected. A moving block 46 is slidably connected inside the first chamber 44, and a return spring 47 is fixedly connected to one side of the moving block 46. The end of the return spring 47 is fixedly connected to the piston 33. A pressing block 48 is fixedly connected to the top of the L-shaped tube 2, and the pressing block 48 is adapted to the second chamber 45. A retaining ring 42 is fixed to the top surface of the disc 32, and a sealing cover 43 is provided at the axis of the retaining ring 42 located at the outlet end of the exhaust channel 41.
[0039] When the poured slurry overflows from the overflow port 11 into the L-shaped tube 2, the overflowing slurry contacts the bottom surface of the piston 33 to squeeze the piston 33 to move inside the L-shaped tube 2. When the piston 33 moves to the top of the L-shaped tube 2, it stops moving at a limited position to prevent the poured slurry from running out. At the same time, since the L-shaped tube 2 is made of transparent plastic, it is convenient to visualize the fullness of the poured slurry. During the pouring process, since one end of the lifting rod 31 is fixedly connected to the disc 32, when the piston 33 moves, the disc 32 moves synchronously. The shape of the disc 32 is larger than that of the piston 33, and the disc 32 moves upward during the pouring process, which makes it more convenient for the staff to observe the state of the poured slurry, and the slurry delivery can be stopped in time to prevent leakage from the grouting port 12, thereby optimizing the visualization state of the L-shaped tube 2 and making it more eye-catching.
[0040] When the slurry poured in the sleeve 1 overflows from the overflow port 11, the internal air enters the interior of the L-shaped tube 2 in advance. Since an exhaust channel 41 is provided at the piston 33, the air entering the L-shaped tube 2 can be discharged through the exhaust channel 41 and then transported to the top of the disc 32. This prevents air from flowing back into the slurry or into the interior of the sleeve 1, causing local voids and unfilled honeycombs, which affects the construction quality. The L-shaped tube 2 has an exhaust effect when performing visual operations on the poured slurry.
[0041] It should be noted that, although the exhaust channel 41 can exhaust the air in the sleeve 1, during the pouring process, when the slurry contacts the bottom of the piston 33, a small part of the slurry will be discharged through the exhaust channel 41. However, since the diameter of the exhaust channel 41 is small, the part of the slurry that escapes flows through the exhaust port to the retaining ring 42 for storage and collection, so that no waste of slurry is caused.
[0042] When the piston 33 moves upward and approaches the top inner wall of the L-shaped tube 2, the pressing block 48 is inserted into the interior of the second chamber 45 and contacts the moving block 46. The pressing block 48 is adapted to the moving block 46, squeezing the moving block 46 to move horizontally. The moving block 46 is used to block the exhaust channel 41 to prevent the slurry in the L-shaped tube 2 from continuously running out, thereby achieving a good limiting effect.
[0043] In a preferred embodiment, reference is made to Figure 2 , Figure 4 , Figure 5 and Figure 6 The bottom of the disc 32 is located on one side of the lifting rod 31 and is fixedly connected to a connecting rod 51. The end of the connecting rod 51 is fixedly connected to a trapezoidal block 52. A first airbag 53 is arranged obliquely above the trapezoidal block 52. The first airbag 53 is fixed on the outer wall of the L-shaped tube 2. A reset member is arranged in the first airbag 53. The reset member includes a limit plate 54 fixed on the inner wall of the first airbag 53. A telescopic spring 55 is fixedly connected between the two limit plates 54. The outer wall of the first airbag 53 is rounded. An air inlet is arranged on the surface of the first airbag 53. A sealing cap is arranged at the air inlet. An air supply pipe 56 is fixedly connected to the top of the first airbag 53. One end of the air supply pipe 56 passes through the inner wall of the L-shaped tube 2 and is fixedly connected to the second airbag 57. A shunt pipe 58 is fixedly connected to one end of the air supply pipe 56. The end of the shunt pipe 58 is fixedly connected to the third airbag 59. The third airbag 59 is arranged in the sealing ring 21.
[0044] When the disc 32 moves, it can drive the connecting rod 51 to move synchronously, and then drive the trapezoidal block 52 at one end of the connecting rod 51 to move, wherein the trapezoidal block 52 is a trapezoidal shape, and when moving upward, one side of the inclined surface contacts the surface of the first airbag 53 to squeeze the first airbag 53, so that the air in the first airbag 53 is transported to the second airbag 57 through the air delivery pipe 56, and the second airbag 57 expands, thereby supporting and squeezing the concave inclined surface of one side of the sealing ring 21. On the other hand, part of the air is transported to the third airbag 59 through the shunt pipe 58 to make it expand, and the third airbag 59 is arranged on the sealing ring 21. The inside of the ring 21 makes the sealing ring 21 fit more closely with the inner wall of the connecting sleeve 14 to prevent loosening and falling off, thereby ensuring that the slurry in the sleeve 1 runs out from the joint, improving the sealing effect of the device, and making the device have visual operation while having good sealing performance. Compared with the traditional sealing structure, it avoids the connected parts from being squeezed and deformed during transportation, which causes the sealing to be unreliable. In addition, the sealing design of this scheme is evenly extruded to improve the stability of the device sealing. It should be understood that the second airbag 57 expands upward when it expands.
[0045] In a preferred embodiment, referring to Figure 1 , Figure 8 and Fig. 9 A fixing rod 61 is fixedly connected to the bottom of the trapezoidal block 52, and an arc-shaped plate 62 is fixedly connected to the bottom of the fixing rod 61. A limiting ring 63 is arranged on one side of the arc-shaped plate 62. A sliding seat 64 is fixedly connected to the bottom of the limiting ring 63. The sliding seat 64 is slidably connected to a sliding rail 65. The sliding rail 65 is fixed on the outer wall of the L-shaped tube 2. A fixing ring 67 is fixed at one end of the sliding rail 65. The fixing ring 67 is fixed on the outer wall of the L-shaped tube 2. A limiting spring 66 is fixedly connected between the fixing ring 67 and the limiting ring 63.
[0046] By adopting the above scheme, when the trapezoidal block 52 moves upward, it drives the arc plate 62 to move upward synchronously, wherein one end of the arc plate 62 is provided with an inclined surface, which is adapted to one side surface of the limit ring 63. As the arc plate 62 moves, the limit ring 63 is squeezed and horizontally displaced, so that one side surface of the limit ring 63 is displaced toward the second airbag 57, thereby providing side support and positioning for the second airbag 57 and the sealing ring 21. The diameter of the limit ring 63 is the same as the diameter of the connecting sleeve 14, and a secondary seal is performed on the joint between the connecting sleeve 14 and the L-shaped tube 2, which has a good limiting support effect, and has a good corrective effect on the sealing ring 21 and the second airbag 57, preventing large deformation during inflation. The setting of the slide seat 64 and the slide rail 65 improves the smoothness and stability of the movement of the limit ring 63, and plays a role in movement limitation.
[0047] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An assembled vertical prefabricated component sleeve visual grouting assembly, comprising a sleeve (1) preset in the component, an overflow port (11) being arranged on one side of the sleeve (1), a grouting port (12) being arranged on the side of the overflow port (11) below the overflow port (11), a steel bar (13) being arranged inside the sleeve (1), and a connecting sleeve (14) being arranged on the surface of the overflow port (11), characterized in that: An L-shaped tube (2) sleeved on one end of the connecting sleeve (14), a sealing ring (21) being fixed to the outer wall of one end of the L-shaped tube (2), and a surface of the sealing ring (21) being provided with raised patterns (22) distributed at equal intervals; A disc (32) is arranged above the L-shaped tube (2), and a plugging piece is arranged at one end of the disc (32). When the overflowing slurry squeezes the plugging piece to move, the air in the L-shaped tube (2) is discharged; The second airbag (57) and the third airbag (59) are arranged on the outer wall surface of one end of the L-shaped tube (2), and when the blocking member moves, the pre-stored air is delivered to the second airbag (57) and the third airbag (59) to expand and block the joint between the L-shaped tube (2) and the connecting sleeve (14). The blocking member comprises a piston (33) slidably connected to the inner wall of the L-shaped tube (2); the top of the piston (33) is fixedly connected to a lifting rod (31); the lifting rod (31) is slidably connected in the L-shaped tube (2); a pressing spring (34) is fixedly connected between the piston (33) and the inner wall of the L-shaped tube (2); the pressing spring (34) is sleeved on the surface of the lifting rod (31); and the other end of the lifting rod (31) is fixedly connected to the disc (32); The bottom of the disc (32) is located on one side of the lifting rod (31) and is fixedly connected to a connecting rod (51); the end of the connecting rod (51) is fixedly connected to a trapezoidal block (52); a first airbag (53) is arranged obliquely above the trapezoidal block (52); the first airbag (53) is fixed on the outer wall of the L-shaped tube (2); and a reset member is arranged inside the first airbag (53); The top of the first airbag (53) is fixedly connected to an air delivery pipe (56), one end of the air delivery pipe (56) passes through the inner wall of the L-shaped tube (2) and is fixedly connected to the second airbag (57), one end of the air delivery pipe (56) is fixedly connected to a shunt pipe (58), the end of the shunt pipe (58) is fixedly connected to a third airbag (59), and the third airbag (59) is arranged in the sealing ring (21).
2. The assembled vertical prefabricated component sleeve visual grouting assembly according to claim 1, characterized in that: An exhaust passage (41) is provided inside the lifting rod (31), the disc (32) and the piston (33); a first chamber (44) is provided inside the piston (33); a second chamber (45) is provided on the surface of the piston (33); and the first chamber (44), the second chamber (45) and the exhaust passage (41) are connected.
3. The assembled vertical prefabricated component sleeve visual grouting assembly according to claim 2, characterized in that: A moving block (46) is slidably connected inside the first chamber (44), a return spring (47) is fixedly connected to one side of the moving block (46), an end of the return spring (47) is fixedly connected to the piston (33), and a pressing block (48) is fixedly connected to the top of the L-shaped tube (2), and the pressing block (48) is adapted to the second chamber (45).
4. The assembled vertical prefabricated component sleeve visual grouting assembly according to claim 2, characterized in that: A retaining ring (42) is fixed on the top surface of the disc (32), and a sealing cover (43) is provided at the axis of the retaining ring (42) at the gas outlet end of the gas exhaust channel (41).
5. The assembled vertical prefabricated component sleeve visual grouting assembly according to claim 1, characterized in that: The reset member comprises a limit plate (54) fixed to the inner wall of the first airbag (53), a telescopic spring (55) being fixedly connected between the two limit plates (54), the outer wall of the first airbag (53) being rounded, an air inlet being arranged on the surface of the first airbag (53), and a sealing cap being arranged at the air inlet.
6. The assembled vertical prefabricated component sleeve visual grouting assembly according to claim 1, characterized in that: The bottom of the trapezoidal block (52) is fixedly connected to a fixing rod (61), the bottom of the fixing rod (61) is fixedly connected to an arc-shaped plate (62), a limiting ring (63) is provided on one side of the arc-shaped plate (62), the bottom of the limiting ring (63) is fixedly connected to a sliding seat (64), the sliding seat (64) is slidably connected to a sliding rail (65), the sliding rail (65) is fixed to the outer wall of the L-shaped tube (2), one end of the sliding rail (65) is fixed to a fixing ring (67), the fixing ring (67) is fixed to the outer wall of the L-shaped tube (2), and a limiting spring (66) is fixedly connected between the fixing ring (67) and the limiting ring (63).
7. A method for using a prefabricated vertical prefabricated component sleeve visual grouting assembly, according to claim 4, characterized in that: The main steps include: Step A: When in use, the sleeve (1) is pre-arranged in the component, and the steel bar (13) is inserted through the sleeve (1) to improve the strength of the structure so that the two components are connected as a whole, wherein the overflow port (11) and the grouting port (12) penetrate the component and extend to the side surface of the prefabricated component to facilitate the subsequent grouting operation, and then the L-shaped pipe (2) is inserted into one end of the overflow port (11) and limited by the connecting sleeve (14). When the grouting operation is performed, the grouting pipe is inserted into the grouting port (12), and the injected slurry fills the sleeve (1) and then overflows through the overflow port (11). The overflowed slurry enters the interior of the L-shaped pipe (2). When the slurry enters the L-shaped pipe (2), the staff can know the injection amount state of the slurry by observing the slurry in the L-shaped pipe (2); Step B: After the slurry enters the L-shaped tube (2), the slurry squeezes the sealing member provided in the L-shaped tube (2), causing the sealing member to move and displace. During this process, the air that enters the L-shaped tube (2) during the grouting process can be exhausted. During the rising process of the sealing member, the disc (32) is driven to move synchronously, thereby facilitating the squeezing of the pre-stored air, causing the second airbag (57) and the third airbag (59) to expand. When the slurry squeezing piston (33) moves to the inner wall at the top of the L-shaped tube (2), the grouting tube at the grouting port (12) is pulled out, and the grouting port (12) is blocked with a sealing plug, thereby completing the grouting operation.
Citation Information
Patent Citations
Fabricated building construction grouting sleeve
CN116044094A
Filling type karst grouting plugging device
CN116378082A