Heat supply network automatic configuration and data binding method and system

By automatically dividing similar site groups and using the configuration pages of template sites, the efficiency and accuracy of manual binding of configuration modules in large heating pipelines is solved, and efficient configuration binding of target thermal sites in the thermal network is achieved. Certainly.

CN119476763APending Publication Date: 2025-02-18HANGZHOU YINGJI POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411347693.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

In large heating pipelines, the way of manually binding configuration modules makes it difficult for data binding to meet the requirements.

Method used

By leveraging the equipment settings of the target thermal site and the binding requirements for monitoring data, similar site groups are divided, and the configuration page construction and data binding are automated based on the configuration page of the template site.

Benefits of technology

It realizes efficient configuration binding of target thermal sites in the thermal network, reduces unnecessary component page deletion and modification, and improves the efficiency and accuracy of binding processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119476763A_ABST
    Figure CN119476763A_ABST
Patent Text Reader

Abstract

The invention provides a heat supply network automatic configuration and data binding method and system, and belongs to the technical field of heat supply, and the method specifically comprises the steps: determining a construction processing sequence of different similar station groups based on the number of target heating stations in the different similar station groups and similarity coefficients of construction demands of template stations corresponding to the target heating stations, on the basis of the construction processing sequence, the construction sequence of configuration pages of different similar site groups is determined, and data binding and generation processing of the configuration pages of the template sites are carried out by utilizing reading results of gateway data of the template sites corresponding to the similar site groups and matching results of a preset configuration library. And the configuration binding processing of other target thermal sites in the similar site group is carried out by taking the configuration page of the template site as the template, so that the efficiency of the configuration binding processing is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of data analysis, and in particular relates to a method and system for automatic configuration and data binding of a heating network. Background Art

[0002] In order to realize real-time monitoring of the operation status of the heating network, the operation data of different devices in the heating network can be conveniently and intuitively monitored through the setting of a visualized configuration module. In the existing technical solutions, targeted binding processing is often performed through the association relationship between different IoT devices and configuration modules. However, it is not difficult to find the following technical problems through analysis:

[0003] When performing data binding of configuration modules, especially for large-scale heating pipe networks, the number of configuration modules that need to be data bound is very large, so the manual binding method makes it difficult to meet the requirements in terms of efficiency and accuracy of the binding process.

[0004] In view of the above technical problems, the present invention provides a method and system for automatic configuration and data binding of a heating network. Summary of the invention

[0005] A method for automatic configuration and data binding of a heating network, specifically comprising:

[0006] S1 determines the basic data of the target thermal power site by using the equipment settings of the target thermal power site and the binding requirements of the monitoring data of different equipment, and divides different target thermal power sites in the thermal network into different similar site groups by using the basic data;

[0007] S2: determining the similarity coefficient of the construction requirements between the configuration pages of the target thermal power sites in different similar site groups, and determining the template sites of different similar site groups in combination with the basic data of the different target thermal power sites;

[0008] S3 determines the construction processing order of different similar site groups based on the number of target thermal sites in different similar site groups and the similarity coefficients of the construction requirements of the corresponding template sites;

[0009] S4 determines the construction order of the configuration pages of different similar site groups based on the construction processing order, uses the reading result of the gateway data of the template site corresponding to the similar site group and the matching result with the preset configuration library to perform data binding and generate the configuration page of the template site, and uses the configuration page of the template site as a template to perform configuration binding processing on other target thermal sites in the similar site group.

[0010] A further technical solution is that the equipment setting of the target thermal power site includes the setting quantity of different types of equipment of the target thermal power site and the connection status between different types of equipment.

[0011] A further technical solution is that the binding requirement of the monitoring data of the device includes the type of the monitoring data of the device.

[0012] A further technical solution is to perform data binding and generation processing of the configuration page of the template site, specifically including:

[0013] Use the configuration page of the template site as a template to perform configuration binding processing on other target thermal sites in similar site groups

[0014] Based on the setting data of the equipment of other target thermal power sites in the similar site group and the deviation of the monitoring data of different equipment from the template site, the configuration page of the template site is optimized to build the configuration page of the other target thermal power sites;

[0015] The monitoring data of the equipment on the configuration page of other target thermal power sites is used to automatically perform configuration binding processing of the monitoring data.

[0016] On the other hand, an embodiment of the present application provides a heating network automatic configuration and data binding system, which adopts the above-mentioned heating network automatic configuration and data binding method, and is characterized in that it specifically includes:

[0017] Site grouping module, template site screening module, build order determination module, configuration binding module:

[0018] The site grouping module is responsible for determining the basic data of the target thermal site by using the equipment settings of the target thermal site and the binding requirements of the monitoring data of different equipment, and using the basic data to divide different target thermal sites in the heating network into different similar site groups;

[0019] The template site screening module is responsible for determining the similarity coefficients of the construction requirements between the configuration pages of the target thermal sites in different similar site groups, and determining the template sites of different similar site groups in combination with the basic data of different target thermal sites;

[0020] The construction order determination module is responsible for determining the construction processing order of different similar site groups based on the number of target thermal sites in different similar site groups and the similarity coefficients of the construction requirements of the corresponding template sites;

[0021] The configuration binding module is responsible for determining the construction order of the configuration pages of different similar site groups based on the construction processing order, performing data binding and generation processing of the configuration page of the template site by using the reading results of the gateway data of the template site corresponding to the similar site group and the matching results with the preset configuration library, and performing configuration binding processing of other target thermal sites in the similar site group using the configuration page of the template site as a template.

[0022] The beneficial effects of the present invention are:

[0023] 1. Different target thermal power sites in the heating network are divided into different similar site groups using basic data, thereby realizing the division of target thermal power sites into different groups from two perspectives: the similarity of the settings of the equipment at the target thermal power sites and the similarity of the monitoring data in the equipment. This reduces unnecessary deletion and modification of component pages and improves the processing efficiency of component binding.

[0024] 2. Use the configuration page of the template site as a template to perform configuration binding processing on other target thermal sites in similar site groups, reducing the modification processing of the configuration pages of other target thermal sites during configuration binding, improving the processing efficiency of configuration binding of the target thermal sites, and realizing adaptive binding processing for different target thermal sites. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.

[0026] Figure 1 It is a flow chart of a method for automatic configuration and data binding of a heating network according to Example 1.

[0027] Figure 2 It is a flow chart of a method for determining a template site for a group of similar sites.

[0028] Figure 3 It is a framework diagram of a heating network automation configuration and data binding system. DETAILED DESCRIPTION

[0029] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of ways and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that the present invention will be comprehensive and complete and fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar structures, and thus their detailed description will be omitted.

[0030] The terms "a", "an", "the", and "said" are used to indicate the presence of one or more elements / components / etc.; the terms "comprising" and "having" are used to express an open-ended inclusive meaning and mean that additional elements / components / etc. may be present in addition to the listed elements / components / etc.

[0031] Example 1

[0032] To solve the above problems, according to one aspect of the present invention, Figure 1 As shown, a method for automatic configuration and data binding of a heating network is provided, which specifically includes:

[0033] S1 determines the basic data of the target thermal power site by using the equipment settings of the target thermal power site and the binding requirements of the monitoring data of different equipment, and divides different target thermal power sites in the thermal network into different similar site groups by using the basic data;

[0034] S2: determining the similarity coefficient of the construction requirements between the configuration pages of the target thermal power sites in different similar site groups, and determining the template sites of different similar site groups in combination with the basic data of the different target thermal power sites;

[0035] S3 determines the construction processing order of different similar site groups based on the number of target thermal sites in different similar site groups and the similarity coefficients of the construction requirements of the corresponding template sites;

[0036] S4 determines the construction order of the configuration pages of different similar site groups based on the construction processing order, uses the reading result of the gateway data of the template site corresponding to the similar site group and the matching result with the preset configuration library to perform data binding and generate the configuration page of the template site, and uses the configuration page of the template site as a template to perform configuration binding processing on other target thermal sites in the similar site group.

[0037] Furthermore, the equipment setting of the target thermal power site includes the setting quantity of different types of equipment of the target thermal power site and the connection status between different types of equipment.

[0038] Specifically, the binding requirement of the monitoring data of the device includes the type of the monitoring data of the device.

[0039] It is understandable that different target thermal power sites in the thermal network are divided into different similar site groups, specifically including:

[0040] Determine the number of different types of equipment in the target thermal power site based on the equipment setting conditions of the target thermal power site, and determine the equipment similarity coefficient between the target thermal power sites in combination with the connection conditions between the different types of equipment;

[0041] Based on the types of monitoring data of different equipment, determine the similarity coefficient of monitoring data between target thermal power stations;

[0042] The similarity coefficients of the construction requirements between the configuration pages of different target thermal power sites are determined according to the equipment similarity coefficients and the monitoring data similarity coefficients between the target thermal power sites, and the target thermal power sites are divided into different similar site groups based on the similarity coefficients.

[0043] It can be understood that the target thermal power site is divided into different similar site groups based on the similarity coefficient, specifically including:

[0044] Target thermal power sites whose similarity coefficients are greater than a preset similarity coefficient are divided into the same similar site group.

[0045] Furthermore, different target thermal power sites in the thermal network are divided into different similar site groups, specifically including:

[0046] Determine the number of different types of equipment in the target thermal power site based on the equipment setting of the target thermal power site, and when the deviation of the number of equipment between the target thermal power sites does not meet the requirement, determine that the target thermal power sites do not belong to the same similar site group;

[0047] When the deviation of the set quantity of equipment between the target thermal power sites meets the requirements:

[0048] Based on the types of monitoring data of different devices, the number of bindings of different types of monitoring data of the target thermal power site is determined. When the deviation of the number of bindings of different types of monitoring data between the target thermal power sites does not meet the requirements:

[0049] It is determined that the target thermal power sites do not belong to the same similar site group;

[0050] When the deviation of the binding quantity of different types of monitoring data between target thermal power sites meets the requirements:

[0051] Based on the types of monitoring data of different devices, the similarity coefficient of monitoring data between different devices of the target thermal power site is determined. When the number of devices whose monitoring data similarity coefficient does not meet the requirements is greater than the preset number of devices, it is determined that the target thermal power sites do not belong to the same similar site group;

[0052] When the number of devices whose monitoring data similarity coefficient does not meet the requirements is not greater than the preset number of devices:

[0053] The equipment similarity coefficients between the target thermal power sites are determined by using the number of different types of equipment set in the target thermal power sites and the connection conditions between the different types of equipment. When the equipment similarity coefficients between the target thermal power sites do not meet the requirements, it is determined that the target thermal power sites do not belong to the same similar site group.

[0054] When the equipment similarity coefficients between the target thermal power sites meet the requirements:

[0055] Based on the types of monitoring data of different equipment, the monitoring data similarity coefficients between the target thermal sites are determined, and the similarity coefficients of the construction requirements between the configuration pages of different target thermal sites are determined according to the equipment similarity coefficients and the monitoring data similarity coefficients between the target thermal sites. The target thermal sites are divided into different similar site groups based on the similarity coefficients.

[0056] Specifically, Figure 2 As shown, the method for determining the template site of the similar site group is:

[0057] Acquire basic data of a specific target thermal power site in the similar site group, and determine the difficulty of building a configuration page of the specific target thermal power site based on the basic data;

[0058] Determining a comprehensive construction similarity coefficient of the specific target thermal power site in the similar site group based on a similarity coefficient of construction requirements between configuration pages of the specific target thermal power site and the target thermal power site in the similar site group;

[0059] Based on the construction difficulty of the configuration page and the comprehensive construction similarity coefficient, the template matching coefficient of the specific target thermal site is determined, and the template matching coefficient is used to determine whether the specific target thermal site is a template site of the similar site group.

[0060] Furthermore, the specific target thermal power site with the largest template matching coefficient is used as the template site of the similar site group.

[0061] It should also be noted that the method for determining the template site of the similar site group is:

[0062] Obtaining basic data of a specific target thermal power site in the similar site group, and determining a construction difficulty of a configuration page of the specific target thermal power site based on the basic data, and when the construction difficulty of the configuration page of the specific target thermal power site does not meet the requirements, determining that the specific target thermal power site does not belong to a template site;

[0063] When the difficulty of constructing the configuration page of the specific target thermal power site meets the requirements:

[0064] The similarity coefficient of the construction requirements between the configuration page of the specific target thermal power site and the target thermal power site in the similar site group is used as the construction requirement similarity coefficient. When the average value of the construction requirement similarity coefficient between the specific target thermal power site and the target thermal power site in the similar site group does not meet the requirement, it is determined that the specific target thermal power site does not belong to the template site;

[0065] When the average value of the construction demand similarity coefficient between the specific target thermal power site and the target thermal power site in the similar site group meets the requirement:

[0066] Determine the deviation thermal site in the target thermal site in the similar site group by using the construction demand similarity coefficient, and when the number of deviation thermal sites does not meet the requirement, determine that the specific target thermal site does not belong to the template site;

[0067] When the number of deviation thermal stations does not meet the requirements,

[0068] Determine the comprehensive construction similarity coefficient of the specific target thermal power site in the similar site group by using the construction demand similarity coefficient between the specific target thermal power site and the target thermal power site in the similar site group; when the comprehensive construction similarity coefficient does not meet the requirement, determine that the specific target thermal power site does not belong to the template site;

[0069] When the comprehensive construction similarity coefficient meets the requirements, the template matching coefficient of the specific target thermal site is determined based on the construction difficulty of the configuration page and the comprehensive construction similarity coefficient, and the template matching coefficient is used to determine whether the specific target thermal site is the template site of the similar site group.

[0070] It should be noted that the method for determining the construction processing order of the similar site groups is:

[0071] Determining the difficulty of group construction of the similar site group based on the number of target thermal sites in the similar site group and basic data of different target thermal sites;

[0072] Obtaining a similarity coefficient between the construction requirements of the target thermal power site in the similar site group and its corresponding template site, and determining the component construction difficulty of the similar site group according to the similarity coefficient between the construction requirements of the corresponding template site;

[0073] The construction difficulty coefficient of the similar site group is determined based on the group construction difficulty and the component construction difficulty, and the construction processing order of different similar site groups is determined by the construction difficulty coefficient.

[0074] Furthermore, the construction processing order of different similar site groups is determined by using the construction difficulty coefficient, specifically including:

[0075] The construction processing order of different similar site groups is determined according to the construction difficulty coefficient from large to small.

[0076] It can be understood that the data binding and the generation of the configuration page of the template site specifically include:

[0077] Use the configuration page of the template site as a template to perform configuration binding processing on other target thermal sites in similar site groups

[0078] Based on the setting data of the equipment of other target thermal power sites in the similar site group and the deviation of the monitoring data of different equipment from the template site, the configuration page of the template site is optimized to build the configuration page of the other target thermal power sites;

[0079] The monitoring data of the equipment on the configuration page of other target thermal power sites is used to automatically perform configuration binding processing of the monitoring data.

[0080] Example 2

[0081] On the other hand, Figure 3 As shown, the embodiment of the present application provides a heating network automatic configuration and data binding system, which adopts the above-mentioned heating network automatic configuration and data binding method, and is characterized in that it specifically includes:

[0082] Site grouping module, template site screening module, build order determination module, configuration binding module:

[0083] The site grouping module is responsible for determining the basic data of the target thermal site by using the equipment settings of the target thermal site and the binding requirements of the monitoring data of different equipment, and using the basic data to divide different target thermal sites in the heating network into different similar site groups;

[0084] The template site screening module is responsible for determining the similarity coefficients of the construction requirements between the configuration pages of the target thermal sites in different similar site groups, and determining the template sites of different similar site groups in combination with the basic data of different target thermal sites;

[0085] The construction order determination module is responsible for determining the construction processing order of different similar site groups based on the number of target thermal sites in different similar site groups and the similarity coefficients of the construction requirements of the corresponding template sites;

[0086] The configuration binding module is responsible for determining the construction order of the configuration pages of different similar site groups based on the construction processing order, performing data binding and generation processing of the configuration page of the template site by using the reading results of the gateway data of the template site corresponding to the similar site group and the matching results with the preset configuration library, and performing configuration binding processing of other target thermal sites in the similar site group using the configuration page of the template site as a template.

[0087] Example 3

[0088] On the other hand, an embodiment of the present application provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed in a computer, the computer is caused to execute the above-mentioned method for automatic configuration and data binding of a heating network.

[0089] Example 4

[0090] On the other hand, a computer program product is provided in an embodiment of the present application, characterized in that the computer program product stores instructions, and when the instructions are executed by a computer, the computer implements the above-mentioned method of automatic configuration and data binding of a heating network.

[0091] In the embodiments of the present invention, the term "plurality" refers to two or more than two, unless otherwise clearly defined. The terms "installation", "connection", "fixation" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection. For those skilled in the art, the specific meanings of the above terms in the embodiments of the present invention can be understood according to the specific circumstances.

[0092] In the description of the embodiments of the present invention, it needs to be understood that the directions or positional relationships indicated by the terms "upper" and "lower" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the embodiments of the present invention.

[0093] In the description of this specification, the description of the terms "one embodiment", "a preferred embodiment", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiment of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0094] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for automatic configuration and data binding of a heating network, characterized in that: Specifically include: The basic data of the target thermal power site is determined by using the equipment settings of the target thermal power site and the binding requirements of the monitoring data of different equipment, and the different target thermal power sites in the heating network are divided into different similar site groups by using the basic data; Determine the similarity coefficient of the construction requirements between the configuration pages of the target thermal power sites in different similar site groups, and determine the template sites of different similar site groups in combination with the basic data of the different target thermal power sites; Determine the construction processing order of different similar site groups based on the number of target thermal sites in different similar site groups and the similarity coefficients of the construction requirements of the corresponding template sites; Based on the construction processing sequence, the construction sequence of the configuration pages of different similar site groups is determined, and the data binding and configuration page generation processing of the template site are performed by utilizing the reading result of the gateway data of the template site corresponding to the similar site group and the matching result with the preset configuration library. The configuration binding processing of other target thermal sites in the similar site group is performed using the configuration page of the template site as a template.

2. The method for automatic configuration and data binding of a heating network according to claim 1, characterized in that: The equipment setting of the target thermal power site includes the setting quantity of different types of equipment of the target thermal power site and the connection conditions between different types of equipment.

3. The method for automatic configuration and data binding of a heating network according to claim 1, characterized in that: The binding requirement of the monitoring data of the device includes the type of the monitoring data of the device.

4. The method for automatic configuration and data binding of a heating network according to claim 1, characterized in that: Different target thermal power sites in the thermal network are divided into different similar site groups, including: Determine the number of different types of equipment in the target thermal power site based on the equipment setting conditions of the target thermal power site, and determine the equipment similarity coefficient between the target thermal power sites in combination with the connection conditions between the different types of equipment; Based on the types of monitoring data of different equipment, determine the similarity coefficient of monitoring data between target thermal power stations; The similarity coefficients of the construction requirements between the configuration pages of different target thermal power sites are determined according to the equipment similarity coefficients and the monitoring data similarity coefficients between the target thermal power sites, and the target thermal power sites are divided into different similar site groups based on the similarity coefficients.

5. The method for automatic configuration and data binding of a heating network as claimed in claim 4, characterized in that: Dividing the target thermal power site into different similar site groups based on the similarity coefficient specifically includes: Target thermal power sites whose similarity coefficients are greater than a preset similarity coefficient are divided into the same similar site group.

6. The method for automatic configuration and data binding of a heating network according to claim 1, characterized in that: The method for determining the template site of the similar site group is: Acquire basic data of a specific target thermal power site in the similar site group, and determine the difficulty of building a configuration page of the specific target thermal power site based on the basic data; Determining a comprehensive construction similarity coefficient of the specific target thermal power site in the similar site group based on a similarity coefficient of construction requirements between configuration pages of the specific target thermal power site and the target thermal power site in the similar site group; Based on the construction difficulty of the configuration page and the comprehensive construction similarity coefficient, the template matching coefficient of the specific target thermal site is determined, and the template matching coefficient is used to determine whether the specific target thermal site is a template site of the similar site group.

7. The method for automatic configuration and data binding of a heating network as claimed in claim 6, characterized in that: The specific target thermal site with the largest template matching coefficient is used as the template site of the similar site group.

8. The method for automatic configuration and data binding of a heating network according to claim 1, characterized in that: The method for determining the construction processing order of the similar site group is: Determining the difficulty of group construction of the similar site group based on the number of target thermal sites in the similar site group and basic data of different target thermal sites; Obtaining a similarity coefficient between the construction requirements of the target thermal power site in the similar site group and its corresponding template site, and determining the component construction difficulty of the similar site group according to the similarity coefficient between the construction requirements of the corresponding template site; The construction difficulty coefficient of the similar site group is determined based on the group construction difficulty and the component construction difficulty, and the construction processing order of different similar site groups is determined by the construction difficulty coefficient.

9. The method for automatic configuration and data binding of a heating network as claimed in claim 8, characterized in that: Determining the construction processing order of different similar site groups according to the construction difficulty coefficient specifically includes: The construction processing order of different similar site groups is determined according to the construction difficulty coefficient from large to small.

10. A heating network automatic configuration and data binding system, using a heating network automatic configuration and data binding method according to any one of claims 1 to 9, characterized in that: Specifically include: Site grouping module, template site screening module, build order determination module, configuration binding module: The site grouping module is responsible for determining the basic data of the target thermal site by using the equipment settings of the target thermal site and the binding requirements of the monitoring data of different equipment, and using the basic data to divide different target thermal sites in the heating network into different similar site groups; The template site screening module is responsible for determining the similarity coefficients of the construction requirements between the configuration pages of the target thermal sites in different similar site groups, and determining the template sites of different similar site groups in combination with the basic data of different target thermal sites; The construction order determination module is responsible for determining the construction processing order of different similar site groups based on the number of target thermal sites in different similar site groups and the similarity coefficients of the construction requirements of the corresponding template sites; The configuration binding module is responsible for determining the construction order of the configuration pages of different similar site groups based on the construction processing order, performing data binding and generation processing of the configuration page of the template site by using the reading results of the gateway data of the template site corresponding to the similar site group and the matching results with the preset configuration library, and performing configuration binding processing of other target thermal sites in the similar site group using the configuration page of the template site as a template.