A transport mechanism for producing air conditioner outdoor units

By designing the handling mechanism for the production of air conditioning external units and using automation technology to conduct refrigerant leak detection, the problem of incomplete manual inspection is solved, product quality and production efficiency are improved, and cost is reduced.

CN119490061BActive Publication Date: 2025-04-08JIANGXI XINGXUN TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510074402.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-04-08
Estimated Expiration
2045-01-17

AI Technical Summary

Technical Problem

During the production process of air conditioners, manual assembly operations lead to incomplete leakage detection of refrigerant, which is prone to leakage detection, affecting product quality.

Method used

A handling mechanism for the production of air conditioning external units is designed, including a leak detection room, double-speed chain conveyor line, leak detection component, storage belt line group and box sealing cache component. Through the automated handling and leak detection process, the accuracy and efficiency of refrigerant detection are ensured.

Benefits of technology

It realizes efficient handling of air conditioning external units and refrigerant leak detection, improves product quality, reduces labor costs, improves production efficiency, and reduces the factory probability of unqualified products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119490061B_ABST
    Figure CN119490061B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of air-conditioning outdoor unit production, and in particular, is a conveying mechanism for the production of air-conditioning outdoor units. The following scheme is proposed, which specifically includes a leak detection room, wherein a double-speed chain conveyor line is provided inside the leak detection room, and leak detection feeding conveyor lines and repair conveyor lines vertically distributed with the double-speed chain conveyor line are provided on both sides of the leak detection room, respectively. A double-speed chain conveyor line discharge end is provided at one end of the double-speed chain conveyor line close to the repair conveyor line, and a plurality of conveying pallets carrying air-conditioning outdoor units are provided on the double-speed chain conveyor line. The conveying mechanism in the present invention is arranged next to the production line of the air-conditioning outdoor unit, with two layers, the lower layer seals and caches the air-conditioning outdoor unit through a box sealing buffer assembly, and the upper layer refluxes the detection box through a box storage belt line group, which greatly saves site space, has high work efficiency, is stable and reliable, and can also ensure product quality, reduce labor costs, and improve production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of production of air conditioner outdoor units, and in particular to a conveying mechanism for producing air conditioner outdoor units. Background Art

[0002] With the development of science and technology, the improvement of people's living standards, the gradual popularization of home appliances such as air conditioners have become necessities in life, which in turn promotes the mass production of air conditioners. In the past, production operations were all manually assembled and tested, but manual assembly operations are prone to human defects such as missed assembly and missed testing. More importantly, the low production efficiency is far from meeting the needs of mass production. With the development of automation technology, it has become a necessary requirement for enterprises to replace manpower with machinery and equipment to adapt to the development of the times and improve production efficiency.

[0003] Refrigerant is the medium of refrigeration equipment, which is used for heat exchange of fluid (air) medium to produce cooling effect. After being compressed by the compressor, the temperature of the refrigerant rises. When passing through the pipeline system, the heat is blown away by the cooling fan and enters the outside air. When it continues to circulate, the refrigerant expands and absorbs heat, and the indoor air is cooled. The refrigerant circulates continuously along the closed-loop pipeline, absorbing heat from the room and releasing it to the outdoor air, and the indoor temperature continues to decrease. When the set temperature is reached, the compressor stops working in standby mode. Since the refrigerant must circulate in a closed pipeline, no leakage is allowed in the pipeline system.

[0004] During the production process of air conditioners, they need to be leak-checked to avoid refrigerant leakage. Currently, the refrigerant leak detection of air conditioners is performed manually during the manual assembly process without sealing, which is prone to quality anomalies such as missed detection and incomplete detection.

[0005] In view of this, the present invention provides a transport mechanism for producing an air conditioner outdoor unit to solve the technical problems existing in the above-mentioned prior art. Summary of the invention

[0006] Based on the technical problems existing in the background technology, the present invention proposes a transport mechanism for producing an air conditioner outdoor unit.

[0007] The present invention proposes a transport mechanism for producing air-conditioning outdoor units, comprising a leak detection room, wherein a double-speed chain conveyor line is provided inside the leak detection room, and a leak detection feeding conveyor line and a rework conveyor line which are perpendicularly distributed to the double-speed chain conveyor line are provided on both sides of the leak detection room, a double-speed chain conveyor line discharge end is provided at one end of the double-speed chain conveyor line close to the rework conveyor line, a plurality of transport pallets carrying air-conditioning outdoor units are provided on the double-speed chain conveyor line, a leak detection assembly is provided on the outer side of a section of the double-speed chain conveyor line located inside the leak detection room, a box collecting robot arm assembly is installed between the rework conveyor line and the leak detection room, and two layers of equipment brackets are provided on the side of the feeding end of the double-speed chain conveyor line. A box storage belt line group is arranged on the upper layer of the equipment support, and a box body sealing cache assembly is arranged on the lower layer of the equipment support. A hollow replacement conveyor belt is arranged between the box collection robot arm assembly and the box storage belt line group, and multiple detection boxes are placed on the hollow replacement conveyor belt and the box collection robot arm assembly, and four self-sealing leak detection holes are arranged on the outer side of the detection box. A cache transplanter, a leak detection transplanter and a box collection blocker are arranged in sequence at the bottom of the double-speed chain conveyor line, and the leak detection transplanter is arranged at the exit of the box body sealing cache assembly, and a box covering robot arm assembly spanning the box storage belt line group is arranged above the cache transplanter, and the box collection blocker is located below the box collection robot arm assembly.

[0008] Preferably in the present invention, the box storage belt line group includes a box cover positioning belt and a box cover translation belt arranged below the box cover mechanical arm assembly, the box cover translation belt is arranged at the exit position of the hollow replacement conveyor belt, the box cover positioning belt is located between the box cover translation belt and the cache transplanter, and a positioning enclosure is arranged on the side of the box cover positioning belt.

[0009] Preferably in the present invention, two rows of box storage areas are arranged on the sides of the box cover translation belt and the box cover positioning belt, and the two rows of box storage areas are composed of a front box outgoing belt, a box storage transition belt, a rear box outgoing belt, a rear box storage belt, and a box ingoing belt arranged in parallel.

[0010] Preferably in the present invention, the box sealed buffer assembly includes a feed transplanter, a front buffer detour conveyor line, a transfer transplanter unit, a rear buffer detour conveyor line and a discharge transplanter, the front buffer detour conveyor line and the rear buffer detour conveyor line are arranged in parallel, and the feed transplanter is arranged at the side of the buffer transplanter, and the discharge transplanter is arranged at the side of the leak detection feed conveyor line.

[0011] Preferably in the present invention, the box cover robotic arm assembly includes a main steel structure support frame spanning the cache transplanter, the box cover positioning belt and the box cover translation belt, and a main servo translation guide rail is provided in the main steel structure support frame, a box cover pulley moving between the cache transplanter and the box cover positioning belt is installed in the main servo translation guide rail, a box cover lifting arm is installed on the box cover pulley, and a box cover clamping robotic arm is installed at the bottom of the box cover lifting arm.

[0012] Preferably in the present invention, a box cover translation pulley that moves between the box cover positioning belt and the box cover translation belt is also installed in the main servo translation guide rail, and an anti-collision bar that cooperates with the box cover pulley is arranged on the side of the box cover translation pulley, and a transplanting clamping mechanical arm is installed on the box cover translation pulley.

[0013] Preferably in the present invention, the box collecting robot arm assembly includes a secondary steel structure support frame spanning the double-speed chain conveyor line and the hollow replacement conveyor belt, the secondary steel structure support frame is equipped with a secondary servo translation guide rail, and the secondary servo translation guide rail is equipped with a box collecting pulley, the box collecting pulley is equipped with a box collecting lifting arm, and the bottom of the box collecting lifting arm is equipped with a box collecting clamping robot arm.

[0014] Preferably in the present invention, a transfer table is provided in the middle of the secondary steel structure support frame, and a box collecting and translating pulley moving between the transfer table and the hollow replacement conveyor belt is also installed on the secondary servo translation guide rail, and a transfer and clamping mechanical arm is installed at the bottom of the box collecting and translating pulley.

[0015] Preferably in the present invention, the hollow displacement conveyor belt is composed of two rows of conveyor belts arranged in parallel, and a displacement air source with a nozzle facing upward is provided between the two conveyor belts.

[0016] Preferably in the present invention, the leak detection assembly includes a leak detection bracket spanning both sides of the double-speed chain conveyor line, and a leak detection blocker installed at the bottom of the double-speed chain conveyor line, and leak detection swing arms and detection equipment are installed at the four corners of the leak detection bracket, and a leak detection gun head connected to the detection equipment is installed at the end of the leak detection swing arm.

[0017] Compared with the prior art, the present invention provides a transport mechanism for producing an air conditioner outdoor unit, which has the following beneficial effects:

[0018] In the present invention, the transport mechanism is arranged beside the production line of the air-conditioning outdoor unit, and an upper and lower layer are arranged in the transport mechanism. The lower layer seals and caches the air-conditioning outdoor unit through the box sealing cache component, and the upper layer returns the detection box through the box storage belt line group, which greatly saves site space, has high work efficiency, is stable and reliable, and can also ensure product quality during the transportation of the air-conditioning outdoor unit, reduce labor costs, and improve production efficiency. The total number of detection boxes is 37, and the box storage belt line group stores two rows of 14 detection boxes. The other detection boxes are stored in the box collection mechanical arm assembly, the hollow replacement conveyor belt and the box covering mechanical arm assembly. The arm assembly is used for cyclic replenishment. The air-conditioning outdoor unit products are sent to the area where the buffer transplanter is located on the transport pallet through the double-speed chain conveyor line. The box covering mechanical arm assembly picks up the empty test box and transports the test box to the air-conditioning outdoor unit product transport pallet to cooperate with the sealing operation. After the product is sealed, the buffer transplanter lifts and transports the sealed product to leave the double-speed chain conveyor line and enter the box body sealing buffer assembly for cyclic caching movement until 25 air conditioners are cached (sealed for 5 minutes). Then, it is transferred to the double-speed chain conveyor line again through the leak detection feeding conveyor line and the leak detection transplanter, and enters the leak detection room. The product enters the leak detection The leak detection component is inserted into the detection box for automatic leak detection (the detection time can be adjusted according to different product models). After the detection result is completed, data is uploaded for analysis to determine whether the product is leaking refrigerant. At the same time, the gun head automatically shrinks and returns to its position, releasing the air-conditioning outdoor unit to flow into the next process. After the air-conditioning outdoor unit product leaves the leak detection room, it flows under the box collecting mechanical arm component. The box collecting blocker rises to stop the air-conditioning outdoor unit product and locate it. The box collecting mechanical arm component takes the detection box on the product and carries it to the hollow replacement conveyor belt. The air is replaced by the hollow replacement conveyor belt and transported to the box covering mechanical arm component area for cache and circulation. Products with OK test results continue to flow to the next process; products with NG test results are transferred to the repair conveyor line for manual processing. The motion control program of the entire equipment completes the leak detection of the refrigerant during the transportation of the air-conditioning outdoor unit. 37 empty boxes are placed and cached in the top-level box storage belt line group to ensure that there is no waiting in the cycle. 25 boxes are cached in the lower-level box sealing cache assembly. Each box has a 5-minute sealing time. The leak detection is carried out on the 26th box. The detection time of each air-conditioning outdoor unit is shortened to 12 seconds, thereby improving the overall efficiency of the production line and reducing labor costs, and minimizing the probability of unqualified products leaving the factory. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the structure of a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0020] Figure 2 This is a schematic diagram of the distribution structure of the hollow replacement conveyor belt of the transport mechanism for producing the air conditioner outdoor unit proposed by the present invention;

[0021] Figure 3This is a schematic diagram of the structure of a box storage belt line group of a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0022] Figure 4 A schematic diagram of the distribution structure of a box storage belt line group and a box sealing buffer component of a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0023] Figure 5 This is a schematic diagram of the structure of a box sealing buffer assembly of a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0024] Figure 6 A schematic diagram of the distribution structure of the leak detection components of a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0025] Figure 7 This is a schematic diagram of the structure of a leak detection component of a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0026] Figure 8 This is a schematic diagram of the structure of a box cover mechanical arm assembly of a handling mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0027] Fig. 9 This is a schematic diagram of the structure of a detection box for a transport mechanism for producing an air conditioner outdoor unit proposed by the present invention;

[0028] Fig.10 This is a schematic structural diagram of a box collecting robot arm assembly of a handling mechanism for producing an air conditioner outdoor unit proposed by the present invention.

[0029] In the figure: 1 leak detection room, 2 box cover mechanical arm assembly, 21 main steel structure support frame, 22 main servo translation guide rail, 23 box cover pulley, 24 box cover lifting arm, 25 box cover clamping mechanical arm, 26 box cover translation pulley, 27 transplanting clamping mechanical arm, 3 detection box, 4 box storage belt line group, 41 rear box storage belt, 42 rear box outgoing belt, 43 box storage transition belt, 44 front box outgoing belt, 45 box inlet belt, 46 box cover translation belt, 47 box cover positioning belt, 5 box body sealing buffer assembly, 51 discharge transplanter, 52 front buffer detour conveyor line, 53 rear buffer detour conveyor line, 54 transfer transplanter unit, 55 feeding transplanter, 6 times speed chain conveyor line feeding end , 7 handling pallet, 8 self-sealing leak detection hole, 9 leak detection feeding conveyor line, 10 control box, 11 leak detection assembly, 111 leak detection bracket, 112 leak detection blocker, 113 leak detection swing arm, 114 leak detection gun head, 115 testing equipment, 12 times speed chain conveyor line discharge end, 13 box receiving robot arm assembly, 131 pair of steel structure support frame, 132 pair of servo translation guide rails, 133 box receiving pulley, 134 box receiving lifting arm, 135 box receiving clamping robot arm, 136 box receiving translation pulley, 137 transfer clamping robot arm, 138 transfer table, 14 rework conveyor line, 15 hollow replacement conveyor belt, 16 leak detection transplanter, 17 cache transplanter, 18 box receiving blocker. DETAILED DESCRIPTION

[0030] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0031] Reference Figures 1 to 10A transport mechanism for producing an air-conditioning outdoor unit comprises a leak detection room 1, wherein a double-speed chain conveyor line 6 is provided inside the leak detection room 1, and leak detection feeding conveyor lines 9 and repair conveyor lines 14 which are vertically distributed with the double-speed chain conveyor line 6 are respectively provided on both sides of the leak detection room 1, a double-speed chain conveyor line discharge end 12 is provided at one end of the double-speed chain conveyor line 6 close to the repair conveyor line 14, a plurality of transport pallets 7 carrying air-conditioning outdoor units are provided on the double-speed chain conveyor line 6, a leak detection assembly 11 is provided on the outer side of a section of the double-speed chain conveyor line 6 located inside the leak detection room 1, a box collecting robot arm assembly 13 is installed between the repair conveyor line 14 and the leak detection room 1, two layers of equipment brackets are provided on the side of the feeding end of the double-speed chain conveyor line 6, and the upper layer of the equipment bracket A box storage belt line group 4 is provided, a box body sealing cache assembly 5 is provided on the lower layer of the equipment support, a hollow replacement conveyor belt 15 is provided between the box collection robot arm assembly 13 and the box storage belt line group 4, and a plurality of detection boxes 3 are placed on the hollow replacement conveyor belt 15 and the box collection robot arm assembly 13, and four self-sealing leak detection holes 8 are provided on the outer side of the detection box 3, a cache transplanter 17, a leak detection transplanter 16 and a box collection blocker 18 are provided in sequence at the bottom of the double-speed chain conveyor line 6, and the leak detection transplanter 16 is provided at the exit of the box body sealing cache assembly 5, a box covering robot arm assembly 2 spanning the box storage belt line group 4 is provided above the cache transplanter 17, and the box collection blocker 18 is located below the box collection robot arm assembly 13.

[0032] In the present invention, the transport mechanism is arranged beside the production line of the air-conditioning outdoor unit, with two layers, the lower layer seals and caches the air-conditioning outdoor unit through the box sealing cache component 5, and the upper layer returns the detection box 3 through the box storage belt line group 4, which greatly saves site space, has high work efficiency, is stable and reliable, and can also ensure product quality, reduce labor costs, and improve production efficiency. The total number of detection boxes 3 is 37, and the box storage belt line group 4 stores two rows of 14 detection boxes 3, and the other detection boxes 3 are circulated and supplemented in the box collection mechanical arm component 13, the hollow replacement conveyor belt 15 and the box covering mechanical arm component 2. The machine products are transported on the transport pallet 7 through the double-speed chain conveyor line 6 to the area where the buffer transplanter 17 is located. The box covering robot arm assembly 2 picks up the empty test box 3 and transports the test box 3 to the air conditioner outdoor unit product transport pallet 7 to cooperate with the sealing operation. After the product is sealed, the buffer transplanter 17 lifts and transports the sealed product to leave the double-speed chain conveyor line 6 and enter the box body sealing buffer assembly 5 for a circular buffering movement until 25 air conditioners are cached and sealed for 5 minutes. Then, it is transferred through the leak detection feeding conveyor line 9 and the leak detection transplanter 16 and moved to the double-speed chain conveyor line 6 again, and enters the leak detection room 1. The product enters the leak detection room 1 and is positioned. The leak detection component 11 extends into the detection box 3 for automatic leak detection (the detection time can be adjusted according to different product models). After the detection result is completed, data analysis is uploaded to determine whether the product is leaking refrigerant. At the same time, the gun head automatically shrinks and returns to its original position, allowing the air conditioner outdoor unit to flow into the next process. After the air conditioner outdoor unit product leaves the leak detection room 1, it flows under the box collecting mechanical arm component 13. The box collecting blocker 18 rises to stop the air conditioner outdoor unit product and position it. The box collecting mechanical arm component 13 takes the detection box 3 on the product and transports it to the hollow replacement conveyor belt 15. Through the air replacement of the hollow replacement conveyor belt 15, it is transported to the box covering mechanical arm component 2 area for cache and circulation. Products with OK test results continue to flow to the next process; products with NG test results are transferred to the repair conveyor line 14 for manual processing. The motion control program of the entire equipment completes the leak detection of the refrigerant during the transportation of the air-conditioning outdoor unit. 37 empty boxes are placed and cached in the top-level box storage belt line group 4 to ensure that the cycle does not wait. 25 boxes are cached in the lower-level box sealing cache component 5. Each box has a 5-minute sealing time. The leak detection is carried out on the 26th box. The detection time of each air-conditioning outdoor unit is shortened to 12 seconds, thereby improving the overall efficiency of the production line and reducing labor costs, and minimizing the probability of unqualified products leaving the factory.

[0033] As a further solution in the present invention, the box storage belt line group 4 includes a box cover positioning belt 47 and a box cover translation belt 46 arranged below the box cover mechanical arm assembly 2, the box cover translation belt 46 is arranged at the exit position of the hollow replacement conveyor belt 15, the box cover positioning belt 47 is located between the box cover translation belt 46 and the cache transplanter 17, and a positioning fence is arranged on the side of the box cover positioning belt 47. In the present invention, part of the inspection box 3 is located between the box collection mechanical arm assembly 13, the hollow replacement conveyor belt 15 and the box cover mechanical arm assembly Component 2 is used for cyclic replenishment, wherein there are always two inspection boxes 3 on the box cover positioning belt 47 and the box cover translation belt 46, and the box cover robot arm assembly 2 moves the inspection box 3 on the box cover translation belt 46 to the box cover positioning belt 47 for standby use, and grabs the inspection box 3 on the box cover positioning belt 47 for conveying the cover to the air-conditioning outdoor unit product, cooperates with the conveying tray 7 at the bottom of the air-conditioning outdoor unit product to seal the product, and then moves the sealed air-conditioning outdoor unit product to the box body sealing cache assembly 5 for cyclic caching through the cache transplanter 17.

[0034] As a further solution in the present invention, two rows of box storage areas are arranged on the sides of the box cover translation belt 46 and the box cover positioning belt 47, and the two rows of box storage areas are composed of a front box outflow belt 44, a box storage transition belt 43, a rear box outflow belt 42, a rear box storage belt 41, and an inflow belt 45 arranged in parallel. In the present invention, when the conveying line is shut down, 14 inspection boxes 3 are stored in the two rows of box storage areas composed of the front box outflow belt 44, the box storage transition belt 43, the rear box outflow belt 42, the rear box storage belt 41, and the inflow belt 45 arranged in parallel. When entering the conveying process, the stored inspection boxes 3 are transported to the box cover positioning belt 47 and the box cover translation belt 46 in turn through the front box outflow belt 44, the box storage transition belt 43, the rear box outflow belt 42, the rear box storage belt 41, and the inflow belt 45, and the stored inspection boxes 3 enter the sealing cache process, and reserve the inspection boxes 3 for replacing damaged parts to ensure that there is no waiting in the cycle.

[0035] As a further solution in the present invention, the box sealing buffer assembly 5 includes a feed transplanter 55, a front buffer detour conveyor line 52, a transfer transplanter unit 54, a rear buffer detour conveyor line 53 and a discharge transplanter 51. The front buffer detour conveyor line 52 and the rear buffer detour conveyor line 53 are arranged in parallel, and the feed transplanter 55 is arranged at the side position of the buffer transplanter 17, and the discharge transplanter 51 is arranged at the side position of the leak detection feed conveyor line 9. In the present invention, the transport tray 7 for sealing and sealing the air-conditioning outdoor unit product moves to the top of the feed transplanter 55 under the action of the buffer transplanter 17, and the feed transplanter 55 moves with the It moves downward and connects the transport pallet 7 to the front buffer detour conveyor line 52, and enters the U-shaped detour buffer area composed of the front buffer detour conveyor line 52, the transfer transplanter unit 54 and the rear buffer detour conveyor line 53, until 25 air conditioners are cached and sealed for 5 minutes, and then it is transferred to the leak detection feeding conveyor line 9 by the discharge transplanter 51, and transferred by the leak detection transplanter 16 and moved again to the double-speed chain conveyor line 6, and enters the leak detection room 1 for leak detection operation, to ensure the sealing time of the air-conditioning outdoor unit product in the detection box 3, and when the refrigerant of the air-conditioning outdoor unit product leaks, the refrigerant is fully diffused in the detection box 3.

[0036] As a further solution in the present invention, the box cover robotic arm assembly 2 includes a main steel structure support frame 21 spanning the cache transplanter 17, the box cover positioning belt 47 and the box cover translation belt 46, and a main servo translation guide rail 22 is provided in the main steel structure support frame 21, and a box cover pulley 23 that moves between the cache transplanter 17 and the box cover positioning belt 47 is installed in the main servo translation guide rail 22, a box cover lift arm 24 is installed on the box cover pulley 23, and a box cover clamping robotic arm 25 is installed at the bottom of the box cover lift arm 24. In the present invention, the box cover clamping robotic arm 25 clamps the inspection box 3 above the box cover positioning belt 47, the box cover pulley 23 moves the clamped inspection box 3 to the area above the cache transplanter 17, and the box cover lifting arm 24 drives the clamped inspection box 3 to descend and cover the outside of the air-conditioning outdoor unit product, thereby completing the sealing operation of the air-conditioning outdoor unit product.

[0037] As a further solution in the present invention, a box cover translation pulley 26 that moves between the box cover positioning belt 47 and the box cover translation belt 46 is also installed in the main servo translation guide rail 22. The side of the box cover translation pulley 26 is provided with an anti-collision bar that cooperates with the box cover pulley 23. A transplanting and clamping mechanical arm 27 is installed on the box cover translation pulley 26. In the present invention, the box cover translation pulley 26 clamps the inspection box 3 on the box cover translation belt 46 through the transplanting and clamping mechanical arm 27, and translates to replenish the inspection box 3 above the box cover positioning belt 47, forming a conveying channel for the inspection box 3 between the hollow replacement conveyor belt 15 and the box cover positioning belt 47, so that the inspection box 3 is circulated and replenished in the box collection mechanical arm assembly 13, the hollow replacement conveyor belt 15 and the box cover mechanical arm assembly 2.

[0038] As a further solution in the present invention, the box collecting robot arm assembly 13 includes a secondary steel structure support frame 131 spanning the double-speed chain conveyor line 6 and the hollow replacement conveyor belt 15, and a secondary servo translation guide rail 132 is installed on the secondary steel structure support frame 131, and a box collecting pulley 133 is installed on the secondary servo translation guide rail 132, and a box collecting pulley 133 is installed on the box collecting pulley 133. A box collecting lifting arm 134 is installed on the box collecting lifting arm 134, and a box collecting clamping robot arm 135 is installed at the bottom of the box collecting lifting arm 134. In the present invention, after the leak detection of the air-conditioning outdoor unit product is completed, the box collecting blocker 18 is raised to stop the air-conditioning outdoor unit product and position it, and the box collecting clamping robot arm 135 takes away the inspection box 3 on the product and transports it to the hollow replacement conveyor belt 15, completing the recycling cycle of the inspection box 3.

[0039] As a further solution in the present invention, a transfer table 138 is set in the middle of the secondary steel structure support frame 131, and a box collection and translation pulley 136 that moves between the transfer table 138 and the hollow replacement conveyor belt 15 is also installed on the secondary servo translation guide rail 132, and a transfer clamping robot arm 137 is installed at the bottom of the box collection and translation pulley 136. In the present invention, the box collection and clamping robot arm 135 takes the inspection box 3 and transports it to the transfer table 138, and transports the inspection box 3 to the hollow replacement conveyor belt 15 through the box collection and translation pulley 136 and the transfer clamping robot arm 137 on the other side. The alternating transportation shortens the moving time of a single translation pulley and improves the transfer efficiency and stability of the inspection box 3.

[0040] As a further solution in the present invention, the hollow replacement conveyor belt 15 is composed of two rows of parallel conveyor belts, and a replacement air source with a nozzle facing upward is provided between the two conveyor belts. In the present invention, the detection box 3 spans between the two conveyor belts of the hollow replacement conveyor belt 15, and the opening of the detection box 3 is exposed above the replacement air source. When the detection box 3 moves, the internal air is replaced by jets from the bottom to avoid refrigerant residue inside the detection box 3.

[0041] As a further solution in the present invention, the leak detection component 11 includes a leak detection bracket 111 spanning both sides of the double-speed chain conveyor line 6, and a leak detection blocker 112 installed at the bottom of the double-speed chain conveyor line 6. The four corners of the leak detection bracket 111 are equipped with leak detection swing arms 113 and detection equipment 115. The end of the leak detection swing arm 113 is equipped with a leak detection gun head 114 connected to the detection equipment 115. In the present invention, when the cached and sealed detection box 3 enters the leak detection room 1, the product enters the leak detection room 1 and is positioned under the action of the leak detection blocker 112, and the leak detection swing arm 113 drives the leak detection gun head 114 to rotate and swing. The end of the leak detection gun head 114 is directly inserted into the self-sealed leak detection hole 8 at the four corners of the detection box 3 to detect whether there is leaking refrigerant around the air-conditioning outdoor unit product. After the detection result is completed, data analysis is uploaded to determine whether the product is leaking refrigerant. At the same time, the leak detection swing arm 113 drives the leak detection gun head 114 to automatically shrink and return to its position. The detection time is short, and the synchronous detection of the four corners improves the leak detection accuracy.

[0042] When in use, the total number of test boxes 3 is 37. Two rows of 14 test boxes 3 are stored on the box storage belt line group 4. The other test boxes 3 are circulated and replenished in the box receiving mechanical arm assembly 13, the hollow replacement conveyor belt 15 and the box covering mechanical arm assembly 2. The air-conditioning outdoor unit products are sent to the area where the cache transplanter 17 is located on the conveying pallet 7 through the double-speed chain conveyor line 6. The box covering mechanical arm assembly 2 picks up the empty test box 3 and transports the test box 3 to the air-conditioning outdoor unit product conveying pallet 7 to cooperate with the sealing operation. After the product is sealed, the cache transplanter 17 lifts and transports the sealed product away from the double-speed chain conveyor line 6 and enters the box body sealed cache component 5 for cyclic cache movement until 25 air conditioners are cached and sealed for 5 minutes. Then, it is transferred to the double-speed chain conveyor line 6 again through the leak detection feeding conveyor line 9 and the leak detection transplanter 16, and enters the leak detection room 1. The product enters the leak detection room 1 and is positioned. The leak detection component 11 extends into the detection box 3 for automatic leak detection. After the detection is completed, the data is uploaded for analysis to determine whether the product is leaking refrigerant. At the same time, the gun head is automatically retracted. The air conditioner outdoor unit is retracted and returned to its original position, and the air conditioner outdoor unit is released to flow into the next process. After the air conditioner outdoor unit product leaves the leak detection room 1, it flows under the box collecting mechanical arm assembly 13. The box collecting blocker 18 rises to stop the air conditioner outdoor unit product and positions it. The box collecting mechanical arm assembly 13 takes the detection box 3 on the product and transports it to the hollow replacement conveyor belt 15. The air is replaced by the hollow replacement conveyor belt 15 and transported to the box covering mechanical arm assembly 2 area for buffering and circulation. The products with OK test results continue to flow to the next process; the products with NG test results are transferred to the repair conveyor line 14 for manual processing. The motion control program of the entire equipment completes the refrigerant leak detection material during the transportation of the air conditioner outdoor unit. 37 empty boxes are placed and cached in the top box storage belt line group 4 to ensure that the cycle does not wait. 25 boxes are cached in the lower box body sealing cache assembly 5. Each box body has a sealing time of 5 minutes. Leakage detection is performed on the 26th box. The detection time of each air conditioner outdoor unit is shortened to 12 seconds, thereby improving the overall efficiency of the production line and reducing labor costs, and minimizing the probability of unqualified products leaving the factory.

[0043] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A transport mechanism for producing air conditioner outdoor units, comprising a leak detection room (1), wherein a double-speed chain conveyor line (6) is provided inside the leak detection room (1), and a leak detection feed conveyor line (9) and a repair conveyor line (14) are respectively provided on both sides of the leak detection room (1) and are vertically distributed with the double-speed chain conveyor line (6), and a double-speed chain conveyor line discharge end (12) is provided at one end of the double-speed chain conveyor line (6) close to the repair conveyor line (14), and a plurality of transport pallets (7) carrying air conditioner outdoor units are provided on the double-speed chain conveyor line (6), characterized in that: The double-speed chain conveyor line (6) is provided with a leak detection assembly (11) on the outer side of a section located inside the leak detection room (1), a box collection robot arm assembly (13) is installed between the repair conveyor line (14) and the leak detection room (1), two layers of equipment brackets are provided on the side of the feeding end of the double-speed chain conveyor line (6), and the upper layer of the equipment bracket is provided with a box storage belt line group (4), and the lower layer of the equipment bracket is provided with a box body sealing buffer assembly (5), a hollow replacement conveyor belt (15) is provided between the box collection robot arm assembly (13) and the box storage belt line group (4), and the hollow replacement conveyor belt (15) ), a plurality of detection boxes (3) are placed on a box collection mechanical arm assembly (13), and four self-sealing leak detection holes (8) are arranged on the outer side of the detection box (3); a buffer transplanter (17), a leak detection transplanter (16) and a box collection blocker (18) are arranged in sequence at the bottom of the double-speed chain conveyor line (6), and the leak detection transplanter (16) is arranged at the exit of the box body sealing buffer assembly (5); a box covering mechanical arm assembly (2) spanning the box storage belt line group (4) is arranged above the buffer transplanter (17), and the box collection blocker (18) is located below the box collection mechanical arm assembly (13); The box storage belt line group (4) comprises a box cover positioning belt (47) and a box cover translation belt (46) arranged below the box cover mechanical arm assembly (2); the box cover translation belt (46) is arranged at the exit position of the hollow replacement conveyor belt (15); the box cover positioning belt (47) is located between the box cover translation belt (46) and the buffer transplanter (17); and a positioning enclosure is arranged on the side of the box cover positioning belt (47); two rows of box storage areas are arranged on the side of the box cover translation belt (46) and the box cover positioning belt (47); the two rows of box storage areas are composed of a front box outgoing belt (44), a box storage transition belt (43), a rear box outgoing belt (42), a rear box storage belt (41), and a box ingoing belt (45) arranged in parallel.

2. The conveying mechanism for producing an air conditioner outdoor unit according to claim 1, characterized in that: The box sealed buffer assembly (5) comprises a feed transplanter (55), a front buffer detour conveyor line (52), a transfer transplanter unit (54), a rear buffer detour conveyor line (53) and a discharge transplanter (51), wherein the front buffer detour conveyor line (52) and the rear buffer detour conveyor line (53) are arranged in parallel, and the feed transplanter (55) is arranged at a side position of the buffer transplanter (17), and the discharge transplanter (51) is arranged at a side position of the leak detection feed conveyor line (9).

3. The conveying mechanism for producing an air conditioner outdoor unit according to claim 1, characterized in that: The box cover mechanical arm assembly (2) comprises a main steel structure support frame (21) spanning a buffer transplanter (17), a box cover positioning belt (47) and a box cover translation belt (46), and a main servo translation guide rail (22) is provided in the main steel structure support frame (21), a box cover pulley (23) moving between the buffer transplanter (17) and the box cover positioning belt (47) is installed in the main servo translation guide rail (22), a box cover lifting arm (24) is installed on the box cover pulley (23), and a box cover clamping mechanical arm (25) is installed at the bottom of the box cover lifting arm (24).

4. The conveying mechanism for producing an air conditioner outdoor unit according to claim 3, characterized in that: A box cover translation pulley (26) is also installed in the main servo translation guide rail (22) and moves between the box cover positioning belt (47) and the box cover translation belt (46). An anti-collision bar that cooperates with the box cover pulley (23) is arranged on the side of the box cover translation pulley (26). A transplanting clamping mechanical arm (27) is installed on the box cover translation pulley (26).

5. The conveying mechanism for producing an air conditioner outdoor unit according to claim 1, characterized in that: The box collecting robot arm assembly (13) comprises a secondary steel structure support frame (131) spanning a double-speed chain conveyor line (6) and a hollow replacement conveyor belt (15); a secondary servo translation guide rail (132) is installed on the secondary steel structure support frame (131); a box collecting trolley (133) is installed on the secondary servo translation guide rail (132); a box collecting lifting arm (134) is installed on the box collecting lifting arm (134); and a box collecting clamping robot arm (135) is installed at the bottom of the box collecting lifting arm (134).

6. The conveying mechanism for producing an air conditioner outdoor unit according to claim 5, characterized in that: A transfer platform (138) is provided in the middle of the secondary steel structure support frame (131), and a box collection translation pulley (136) is installed on the secondary servo translation guide rail (132) and moves between the transfer platform (138) and the hollow replacement conveyor belt (15), and a transfer clamping mechanical arm (137) is installed at the bottom of the box collection translation pulley (136).

7. The conveying mechanism for producing an air conditioner outdoor unit according to claim 6, characterized in that: The hollow displacement conveyor belt (15) is composed of two rows of conveyor belts arranged in parallel, and a displacement air source with a nozzle facing upward is arranged between the two conveyor belts.

8. The conveying mechanism for producing an air conditioner outdoor unit according to claim 1, characterized in that: The leak detection assembly (11) comprises a leak detection bracket (111) spanning both sides of the double-speed chain conveyor line (6), and a leak detection blocker (112) installed at the bottom of the double-speed chain conveyor line (6), and leak detection swing arms (113) and detection equipment (115) are installed at the four corners of the leak detection bracket (111), and a leak detection gun head (114) connected to the detection equipment (115) is installed at the end of the leak detection swing arm (113).

Citation Information

Patent Citations

  • Air conditioner leakage detection system

    CN204154450U

  • Automatic electronic leak detection system

    CN219122722U