Hydraulic self-climbing elevator shaft shaping operation platform and construction method
Through the adoption of the hydraulic self-climbing elevator shaft fixed operation platform, the problems of low construction efficiency and major safety hazards in the existing technology have been solved, and the accuracy and rapid formation of the hydraulic self-climbing elevator shaft have been achieved.
Patent Information
- Application Number
- CN202411719810.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-03-11
AI Technical Summary
In the existing integrated self-climbing cylinder molds, the mold release and tight fixed position construction operations of the formwork mostly rely on manual labor, resulting in low construction efficiency and major safety hazards.
A hydraulic self-climbing elevator shaft fixed operation platform is adopted, which includes first and second climbing components that can be abutted from the inner wall of the cast-in-place shear wall, a power device, a steel frame support, a formwork assembly and a pull-up adjustment support unit. The staggered climb of the first and second climbing components is achieved through the hydraulic system and the power device to stabilize the support of the formwork assembly.
It improves construction efficiency, reduces manual participation, reduces construction difficulty and safety hazards, and realizes the accuracy and rapid formation of cast-in-place shear walls.
Smart Images

Figure CN119593578A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to a hydraulic self-climbing elevator shaft standardized operating platform and a construction method. Background Art
[0002] In construction, we often encounter cylinder-type cast-in-place shear walls of various shapes and different cross-sectional sizes, such as elevator shaft-type cast-in-place shear walls. When constructing such cast-in-place shear walls, we usually overlap the formwork platform inside the cylinder and then install the formwork. The more common method is to use steel pipes, fasteners, wooden squares, plywood and other materials to assemble and cast the cast-in-place shear wall forming formwork.
[0003] Traditional splicing construction methods like the one above consume a lot of materials, are labor-intensive and time-consuming, and cast-in-place shear walls of different shapes and cross-sectional sizes require splicing parts of different specifications and quantities. Not only is the construction cost high and the workload heavy, but the simple platforms constructed also pose great safety hazards.
[0004] Therefore, some construction units have adopted the integral self-climbing drum formwork. However, the conventional integral self-climbing drum formwork generally only uses a transmission device on the climbing part. The demoulding and fixing operations of the formwork are still done manually, the construction efficiency is still low, and the construction of large-scale formwork still has great safety hazards. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a hydraulic self-climbing elevator shaft standardization operation platform and construction method to solve the problem that in the existing integral self-climbing cylinder mold, the demoulding and fixing and positioning operations of the template are mostly done manually, and the construction efficiency is still low.
[0006] In order to achieve the above-mentioned object, the basic scheme of the present invention is as follows: a hydraulic self-climbing elevator shaft standardized operating platform, comprising:
[0007] A first climbing component capable of abutting against the inner wall of a cylindrical cast-in-place shear wall;
[0008] A second climbing component can be abutted against the inner wall of the cylindrical cast-in-place shear wall, the lower end of the second climbing component is located on the upper side of the lower end of the first climbing component, and a mounting hole for a part of the first climbing component to pass through is provided in the middle of the second climbing component;
[0009] A power device for controlling the staggered climbing of the first climbing assembly and the second climbing assembly, the power device being fixedly connected to the first climbing assembly or the second climbing assembly;
[0010] Steel frame support, the steel frame support is adjustably mounted on the second climbing assembly;
[0011] Formwork assembly, the formwork assembly can be detachably installed on the steel frame support;
[0012] A plurality of pull-up adjustment support units are provided, one end of the pull-up adjustment support unit is hinged to the template assembly, and the other end of the pull-up adjustment support unit is hinged to one end of the first climbing assembly passing through the second climbing assembly.
[0013] The technical principle of the present invention is: when the hydraulic self-climbing elevator shaft standardized operating platform is in use, the first climbing component and the second climbing component can both be against the inner wall of the cast-in-place shear wall, so that after being fixed, they can cooperate with the formwork component to cast the upper cast-in-place shear wall; after the casting is completed, the power device can cooperate with the first climbing component and the second climbing component, so that the first climbing component and the second climbing component can climb alternately. When the first climbing component and the second climbing component climb alternately, the installation hole can cooperate with the local part of the first climbing component, so that the first climbing component or the second climbing component can be stably guided and limited by each other when climbing, so that the climbing of the first climbing component and the second climbing component is stable and the climbing efficiency is high.
[0014] When the supporting formwork assembly is used to cast the upper cast-in-place shear wall, the steel skeleton support and the upward-adjustable support unit can provide stable support for the supporting formwork assembly, so that the upper cast-in-place shear wall remains stable during casting and the upper cast-in-place shear wall is precisely formed; because the steel skeleton support is adjustably installed on the second climbing assembly and cooperates with the upward-adjustable support unit, the disassembly and assembly of the formwork assembly is more convenient and efficient when the formwork assembly is folded or unfolded.
[0015] Further, the first climbing assembly comprises:
[0016] Beam frame, the beam frame is set horizontally;
[0017] A first adjusting slide group, the first adjusting slide group is horizontally installed on the end of the beam frame;
[0018] A first latch foot, the first latch foot is hinged and horizontally adjustable and installed on an end of the first adjustment slide away from the beam frame;
[0019] A first tension spring, one end of the first tension spring is connected to the first latch foot, the other end of the first tension spring is connected to the first latch foot and connected to an end of the first adjustment slide group away from the beam frame, and the hinge between the first latch foot and the first adjustment slide group is located between the first tension springs;
[0020] The column is vertically installed on the upper side of the beam frame, the column can pass through the installation hole and is hinged with the upward pull adjustment support unit, and the power device is installed on the column or the second climbing component.
[0021] With the above settings, the beam frame can stably support the first latch leg and the column. When installing the first climbing component into the elevator shaft, first adjust the position of the first adjustment slide group on the end of the beam frame according to the size of the elevator shaft, so that the first latch leg can be clamped and supported at the lower cast-in-place shear wall. When the first climbing component needs to climb, control the first tension spring to fold the first latch leg, so that the first latch leg can be disengaged from the lower cast-in-place shear wall and climb upward under the control of the power device and the guidance of the column. When the first climbing component climbs, the cooperation between the various structures is precise and stable, and it is convenient to adapt to elevator shafts of different sizes.
[0022] Furthermore, the second climbing component includes:
[0023] A cross beam, the cross beam is in a "well" shape, the power device is installed on the cross beam, and the installation hole is located in the middle of the cross beam;
[0024] A guide rail group, the guide rail group is horizontally and fixedly installed on the end of the cross beam;
[0025] A slider that can slide along the guide rail group;
[0026] A support plate, the support plate is horizontally and fixedly installed on the slider;
[0027] A second adjustment slide group, the second adjustment slide group is horizontally installed on the end of the cross beam, and the second adjustment slide group and the support plate are located on different ends of the cross beam;
[0028] A second latch leg, the second latch leg is hinged and horizontally adjustable and installed on the end of the second adjustment slide group away from the cross beam;
[0029] A second tension spring, one end of the second tension spring is connected to the second latch leg, the other end of the second tension spring is connected to the end of the second adjustment slide group away from the cross beam where the second latch leg is connected, and the hinge point between the second latch leg and the second adjustment slide group is located between the second tension springs;
[0030] A number of connecting beam units, one end of the connecting beam unit is fixedly connected to the slider on one of the guide rail groups, the other end of the connecting beam is fixedly connected to the slider on the other guide rail group, and the steel skeleton support is installed on the connecting beam unit and the support plate;
[0031] A hydraulic cylinder, the hydraulic cylinder is horizontally installed between the support plate and the cross beam or between the connecting beam unit and the cross beam, and the axis of the hydraulic cylinder is parallel to the axis of the guide rail group.
[0032] Through the above arrangement, the crossbeam can stably support structures such as the second latch foot, the connecting beam unit, the second adjustment slide group and the support plate; when the second climbing component is installed in the elevator shaft, the position of the second adjustment slide group on the end of the beam frame is first adjusted according to the size of the elevator shaft, so that the second latch foot can be embedded and supported to the lower cast-in-place shear wall. When the second climbing component needs to climb, the second tension spring is controlled to fold the second latch foot, so that the second latch foot can be separated from the lower cast-in-place shear wall and climb upward under the control of the power device and the guidance of the column. When the second climbing component climbs, the various structures still cooperate accurately and stably, and it is easy to adapt to elevator shafts of different sizes; when pouring the cast-in-place shear wall, the connecting beam unit and the support plate can cooperate with the guide rail group and the slider, so that the installation position of the steel skeleton support is easy to control and stably supported, and the formwork component can be stably supported, and the position of the formwork component is also easy to control, making the disassembly and assembly of the formwork component more convenient.
[0033] Furthermore, the second climbing assembly also includes a plurality of limit slider groups, which are installed on the middle inner wall of the beam, and the limit slider groups are in sliding contact with the outer wall of the column.
[0034] Through the above arrangement, the limit slider group can limit the column, so that when the column slides relative to the mounting hole, the lifting and lowering of the column is more stable, and the climbing of the first climbing component or the second climbing component is also smoother and more stable.
[0035] Furthermore, the power unit comprises:
[0036] A rack, the rack is fixedly mounted on the outer wall of the column, and the axis of the rack is parallel to the vertical axis of the column;
[0037] a gear meshing with a rack;
[0038] The first motor controls the rotation of the gear, and the first motor is fixedly installed at the middle part of the crossbeam.
[0039] Through the above arrangement, when the first climbing assembly and the second climbing assembly are allowed to climb alternately, it is only necessary to control the first latch foot or the second latch foot to be in a state of abutting against the cast-in-place shear wall, and then start the first motor to control the rack to move upward or control the gear to move upward relative to the rack, thereby controlling the first climbing assembly or the second climbing assembly to climb. The switching of the climbing states of the first climbing assembly and the second climbing assembly is convenient and efficient, and the power transmission for climbing is also very efficient.
[0040] Furthermore, the number of the support plates is two, and the two support plates are symmetrically arranged along the crossbeam; the number of the connecting beam units is two, and the two connecting beam units are symmetrically arranged along the crossbeam.
[0041] Through the above arrangement, the support plate and the connecting beam unit can stably support the steel frame, and make the force at the end of the beam more balanced. When controlling the position of the support plate and the connecting beam unit, the control of the hydraulic cylinder is also more balanced.
[0042] Furthermore, the number of steel frame supports is four, and the steel frame supports are vertically and detachably mounted on the support plate or the connecting beam unit.
[0043] Through the above arrangement, the steel skeleton supports correspond one-to-one with the two support plates and the two connecting beam units, so that the four steel skeleton supports can be supported evenly and stably, and the four steel skeleton supports can be driven to fold or extend, thereby facilitating the disassembly and assembly of the formwork assembly.
[0044] Further, the template components include:
[0045] Four straight templates, the four straight templates correspond to the four steel frame supports one by one and are detachably connected, wherein two of the straight templates are fixedly provided with a latching mold located on the same vertical plane as the first latching foot or the first latching foot on one side away from the column;
[0046] A first oblique mold, the first oblique mold is assembled and installed on one side of the vertical edge of the straight template;
[0047] Corner mould, which is installed on the other side of the vertical edge of the straight template;
[0048] The second oblique mold is assembled and installed on one side of the vertical edge of another straight mold plate, and the first oblique mold and the second oblique mold are both assembled and detachably connected with one side of the angle mold away from the straight mold plate;
[0049] An adjusting bolt group is installed between the first oblique die, the angle die and the second oblique die.
[0050] Through the above-mentioned arrangement, when the straight formwork, the first oblique formwork, the angle formwork, the second oblique formwork and the adjusting bolt group in the formwork assembly are disassembled and assembled, the angle formwork can be installed in cooperation with the first oblique formwork or the second oblique formwork at the edge of the straight formwork; when the formwork assembly is installed at the casting cavity, the angle formwork only needs to be disassembled and assembled with the adjusting bolt group at the first oblique formwork or the second oblique formwork, thereby realizing the rapid disassembly and assembly of the formwork assembly; when the straight formwork, the first oblique formwork, the angle formwork and the second oblique formwork in the formwork assembly are folded or unfolded under the drive of the steel skeleton support and the upward pull-up adjustment support unit, the first oblique formwork, the angle formwork and the second oblique formwork are not easy to interfere with each other, so that the folding or unfolding of the formwork assembly is more stable and reliable.
[0051] Furthermore, a power assembly is also included, and the power assembly includes:
[0052] A capstan, wherein an arc-shaped slot is vertically provided on the capstan, one end of the slot extends toward the axis of the capstan, and the other end of the slot extends toward the edge of the capstan;
[0053] A driving source shaft that drives the capstan to rotate coaxially forward and reversely;
[0054] A second motor drives the drive source shaft to rotate forward and reversely, the second motor is fixedly mounted on the upper end of the column, and the drive source shaft is coaxially arranged with the column;
[0055] A fixing plate, the fixing plate is fixedly mounted on the upper end of the column, and the fixing plate is located between the second motor and the winch;
[0056] A pull rod, one end of which is fixedly provided with a limiting protrusion slidably mounted on the card slot;
[0057] The pull-up adjustment support unit comprises:
[0058] Screw;
[0059] A pin is hinged on one end of the screw rod, and the number of the screw rod and the number of the pins are both two. The end of the pull rod away from the limiting protrusion is detachably connected to one of the pins, and the other pin is detachably connected to the upper side of the flat template;
[0060] A sleeve, with bolts threadedly connected to the screw rod at both ends of the sleeve, the two bolts have different rotation directions, and the bolts are threadedly connected to the end of the screw rod away from the pin;
[0061] The handle is fixedly mounted on the outer wall of the sleeve.
[0062] Through the above arrangement, when the formwork assembly is separated from the cast-in-place shear wall, the second motor is started, the second motor drives the driving source shaft and the winch to rotate, and the winch drives the end of the pull rod to slide along the winch's slot toward the center of the winch, so that the pull rod shrinks into the winch, and the formwork assembly can be folded along the arc of the slot, so that the first oblique mold, the angle mold, and the second oblique mold are not easy to interfere with each other when folded or unfolded.
[0063] The present invention is also intended to provide a hydraulic self-climbing elevator shaft shaping construction method, including a hydraulic self-climbing elevator shaft shaping operation platform, and further comprising the following steps:
[0064] Step 1: In the initial state, the bottom layer of cast-in-place shear wall is pre-constructed manually at the bottom of the elevator shaft;
[0065] Step 2: Install the hydraulic self-climbing elevator shaft standardized operating platform to the bottom of the elevator shaft, fit the upper side of the beam frame with the lower side of the crossbeam, and insert the first latch foot and the second latch foot into the latch groove formed by the latch mold;
[0066] Step 3: Select four corresponding straight formworks according to the length and width of the elevator shaft cross-section profile. After the straight formworks are assembled with the first oblique formwork, the angle formwork and the second oblique formwork, a casting cavity for the cast-in-place shear wall is formed between the outer wall of the formwork assembly and the inner wall of the elevator shaft; install the formwork assembly on the pull-up adjustment support unit and the steel skeleton support;
[0067] Step 4: According to the length and width of the elevator shaft cross-sectional profile, adjust the length of the pull-up adjustment support unit and the hydraulic cylinder so that the outer wall of the formwork assembly can be located at the inner wall of the casting cavity, the lower side of the formwork assembly fits with the outer wall of the lowest cast-in-place shear wall, the upper outer wall of the formwork assembly and the inner wall of the elevator shaft form a casting cavity, and concrete is poured into the casting cavity to form a middle-layer cast-in-place shear wall;
[0068] Step 6: After the middle-layer cast-in-place shear wall is cured and formed, the connection between the formwork components is disassembled, and the power component and the hydraulic cylinder are started. The power component drives the upward pull-adjustable support unit to rotate and retract toward the column. The hydraulic cylinder retracts, and the upward pull-adjustable support unit and the steel skeleton support drive the formwork component to detach from the middle-layer cast-in-place shear wall.
[0069] Step 7: The first motor controls the gear to rotate in the opposite direction, the second tension spring pulls the second latch foot to retract, and the second latch foot is disengaged from the latch groove; the gear moves upward relative to the rack under the support of the rack, the second climbing assembly moves upward along the column as a whole, and the upward adjustment support unit rotates relative to the power assembly and the formwork assembly to an inclined state; after the second climbing assembly climbs to the desired position, the second tension spring is relaxed, the second latch foot is embedded in the side wall of the middle-layer cast-in-place shear wall to form a latch groove again, and the second climbing assembly completes the climbing positioning;
[0070] Step 8: The first motor controls the gear to rotate forward, the first tension spring pulls the first latch foot to retract, and the first latch foot is disengaged from the latch groove; the gear drives the rack to move upward, the first climbing assembly moves upward along the column as a whole, and the upward adjustment support unit rotates relative to the power assembly and the formwork assembly to restore to a horizontal state; after the first climbing assembly climbs to the desired position, the first tension spring is relaxed, the first latch foot is embedded in the side wall of the middle-level cast-in-place shear wall to form a latch groove again, and the first climbing assembly completes the climbing positioning;
[0071] Repeat steps 4-8 to cast and cure the upper middle layer of cast-in-place shear wall until the cast-in-place shear wall inside the cylinder is completely formed.
[0072] The technical principle of the present invention is as follows: during operation, this construction method adopts a hydraulic self-climbing elevator shaft standardized operating platform to allow the middle-level cast-in-place shear wall to be formed in sections during the staggered climbing of the first climbing component and the second climbing component; during the formation process, the formwork component can be stably stretched and supported or stably supported and stretched, which is convenient for the precise forming of the middle-level cast-in-place shear wall; at the same time, the latch mold can form a latch groove on the cast-in-place shear wall, and the latch groove can cooperate with the first latch foot and the second latch foot, thereby providing a stable and precise support position for the staggered climbing of the first climbing component and the second climbing component and the segmented forming of the cast-in-place shear wall, so that the cast-in-place shear wall can be accurately and quickly formed; during the entire construction process, there is less manual participation, which can improve construction efficiency and reduce construction difficulty. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] Figure 1 It is a structural schematic diagram of the main viewing direction of a hydraulic self-climbing elevator shaft standardized operating platform in an embodiment of the present invention.
[0074] Figure 2 It is a schematic diagram of the structure of a hydraulic self-climbing elevator shaft standardized operating platform in a top-down view in an embodiment of the present invention.
[0075] Figure 3 for Figure 1 Schematic diagram of the structure of the first climbing component in the axial direction.
[0076] Figure 4 for Figure 1 Schematic diagram of the structure of the second climbing component in the axial direction.
[0077] Figure 5 This is an exploded view of the axial direction of a standardized operating platform for a hydraulic self-climbing elevator shaft.
[0078] Figure 6 for Figure 5 A partial enlarged view of the joint of the middle template components.
[0079] Figure 7 A magnified view of a single pull-up adjustment support unit.
[0080] Figure 8 This is an enlarged view of the axial direction of the power component.
[0081] In the above drawings: first climbing assembly 1, beam frame 12, second adjustment hole 112, first adjustment slide group 13, first adjustment hole 113, first bolt group 14, first latch foot 15, first tension spring 16, column 17, second climbing assembly 2, cross beam 21, second adjustment slide group 22, third adjustment hole 212, second bolt group 23, second latch foot 24, second tension spring 214, guide rail group 25, slider 26, limit slider group 27, hydraulic cylinder 28, support plate 29, connecting beam unit 3 , connecting plate 31, gear 41, rack 42, first motor 43, steel skeleton support 5, formwork assembly 6, straight formwork 61, first oblique formwork 62, angle formwork 63, second oblique formwork 64, adjusting bolt group 65, latch formwork 66, power assembly 7, winch 71, slot 711, drive source shaft 72, second motor 73, fixing plate 74, pull rod 75, limiting protrusion 715, pull-up adjustment support unit 8, screw 81, pin 82, sleeve 83, handle 84, cast-in-place shear wall 9. DETAILED DESCRIPTION
[0082] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0083] This embodiment is basically Figure 1-8 As shown, an embodiment of the present invention proposes a hydraulic self-climbing elevator shaft standardized operating platform, including a first climbing component 1 that can be abutted against the inner wall of a cylinder-shaped cast-in-place shear wall 9, a second climbing component 2 that can be abutted against the inner wall of a cylinder-shaped cast-in-place shear wall 9, a power device for controlling the staggered climbing of the first climbing component 1 and the second climbing component 2, a steel skeleton support 5, a formwork component 6, eight pull-up adjustment support units 8 and a power component 7, the formwork component 6 is an aluminum formwork component 6, the lower end of the second climbing component 2 is located on the upper side of the lower end of the first climbing component 1, and a mounting hole for a part of the first climbing component 1 to pass through is provided in the middle of the second climbing component 2.
[0084] like Figure 1 and 3As shown, the first climbing assembly 1 includes a beam frame 12, four first adjustment slide groups 13, four first latch feet 15, four first tension springs 16 and a column 17. The beam frame 12 is in an I-shape and is horizontally arranged. The column 17 is vertically fixed and installed at the center of the upper side of the beam frame 12 by bolts; the first adjustment slide group 13, the first latch foot 15 and the first tension spring 16 constitute a group one by one and are located at the four ends of the beam frame 12. The first adjustment slide group 13 is horizontally installed on the end of the beam frame 12. The first adjustment slide group 13 can be fitted on the end of the beam frame 12. A plurality of first adjustment holes 113 are axially arranged on the side wall of the first adjustment slide group 13. A plurality of first adjustment holes 113 are arranged on the end of the beam frame 12 The adjustment hole 113 overlaps with the second adjustment hole 112, and the first bolt group 14 is detachably installed at the overlapping first adjustment hole 113 and the second adjustment hole 112, so that the position of the first adjustment slide group 13 and the end of the beam frame 12 can be adjusted; at the same time, the first latch foot 15 is hinged to the end of the first adjustment slide group 13 away from the beam frame 12, one end of the first tension spring 16 is connected to the first latch foot 15, and the other end of the first tension spring 16 is connected to the first latch foot 15 and the end of the first adjustment slide group 13 away from the beam frame 12, and the hinge between the first latch foot 15 and the first adjustment slide group 13 is located between the first tension spring 16; the top of the column 17 can pass through the installation hole and be hinged to the pull-up adjustment support unit 8.
[0085] like Figure 1 and 4As shown, the second climbing assembly 2 includes a crossbeam 21, eight guide rail groups 25, eight sliders 26 that can slide along the guide rail groups 25, two support plates 29, four second adjustment sliders 22, four second latch feet 24, four second tension springs 214, two connecting beam units 3, four limit sliders 26 groups and four hydraulic cylinders 28. The crossbeam 21 is in a "well" shape, and the mounting hole is formed at the center of the crossbeam 21; the eight guide rail groups 25 are respectively fixedly installed horizontally on the eight ends of the crossbeam 21, a single support plate 29 is horizontally mounted on the two sliders 26 of the two guide rail groups 25, and the two support plates 29 The second adjusting slide group 22 is symmetrically arranged along the horizontal midline of the cross beam 21; the second adjusting slide group 22 is horizontally installed on the two ends of the cross beam 21, and the second adjusting slide group 22 and the support plate 29 are located at different ends of the cross beam 21; at the same time, the second adjusting slide group 22 can be sleeved on the end of the cross beam 21, and a plurality of third adjusting holes 212 are axially arranged on the side wall of the second adjusting slide group 22, and a plurality of fourth adjusting holes that can overlap with the first adjusting holes 113 are arranged on the end of the cross beam 21, and the second bolt group 23 can be detachably installed at the overlapping third adjusting holes 212 and the fourth adjusting holes, so as to realize the second adjusting slide group 22 and the cross beam 21. The position of the end of the beam 21 is adjustable, and the second latch foot 24 is hinged and horizontally adjustable and installed on the end of the second adjustment slide group 22 away from the beam 21; one end of the second tension spring 214 is connected to the second latch foot 24, and the other end of the second tension spring 214 is connected to the second latch foot 24 and the end of the second adjustment slide group 22 away from the beam 21, and the hinge between the second latch foot 24 and the second adjustment slide group 22 is located between the second tension spring 214; the connecting beam unit 3 includes two connecting plates 31, one end of the two connecting plates 31 is fixedly connected to the slider 26 on one of the guide rail groups 25 by bolts, and the two The other end of a connecting plate 31 is fixedly connected to a slider 26 on another guide rail group 25 by bolts. The two connecting beam units 3 are symmetrically arranged along the horizontal center line of the beam 21, and the connecting beam unit 3 is located between the two second adjustment slide groups 22; the hydraulic cylinder 28 is horizontally installed between the support plate 29 and the beam 21 or between the connecting beam unit 3 and the beam 21, and the axis of the hydraulic cylinder 28 is parallel to the axis of the guide rail group 25; the limit slider 26 group is installed on the middle inner wall of the beam 21, and the limit slider 26 group is in sliding contact with the outer wall of the column 17, and the limit slider 26 group is a pulley.
[0086] like Figure 1 , 3 As shown in 4, the power device includes a rack 42, a gear 41 meshing with the rack 42, and a first motor 43 for controlling the rotation of the gear 41. The rack 42 is fixedly mounted on the outer wall of the column 17 by bolts, and the axis of the rack 42 is parallel to the vertical axis of the column 17; the first motor 43 is fixedly mounted at the middle part of the beam 21 by bolts and a bracket, and the gear 41 is located at the mounting hole and is convenient for meshing with the rack 42.
[0087] like Figure 2 and 5 As shown, the number of steel frame supports 5 is four, of which two steel frame supports 5 are vertically and detachably mounted on two support plates 29 by bolts, and the other two steel frame supports 5 are vertically and detachably mounted on the connecting beam unit 3 by bolts.
[0088] like Figure 2 , 5 As shown in FIG. 6 , the template assembly 6 includes four straight templates 61, a first oblique template 62, an angle template 63, a second oblique template 64, and an adjustment bolt group 65 installed between the first oblique template 62, the angle template 63, and the second oblique template 64. The four straight templates 61 correspond to the four steel frame supports 5 one by one and are detachably connected by bolts, as shown in FIG. Figure 1 As shown, a latch mold 66 located on the same vertical plane as the first latch foot 15 or the first latch foot 15 is fixedly arranged on one side of the left and right flat templates 61 away from the column 17; Figure 6 As shown, the first oblique mold 62 is assembled and installed on the left side of the vertical edge of the right straight mold 61, the angle mold 63 is assembled and installed in the middle of the vertical edges of the two straight molds 61, and the second oblique mold 64 is assembled and installed on the right side of the vertical edge of the left straight mold 61, and the sides of the first oblique mold 62 and the second oblique mold 64 away from the straight mold 61 can be assembled and detachably connected with one side of the angle mold 63, and the adjusting bolt group 65 is installed on the inclined side of the first oblique mold 62 and the inclined side of the angle mold 63, and the inclined side of the second oblique mold 64 and the inclined side of the angle mold 63.
[0089] like Figure 2 , 5 As shown in FIGS. 7 and 8, the power assembly 7 includes a winch 71, a driving source shaft 72 that drives the winch 71 to coaxially rotate in a forward and reverse direction, a second motor 73 that drives the driving source shaft 72 to rotate in a forward and reverse direction, a fixing plate 74, and four pull rods 75; the pull-up adjustment support unit 8 includes a screw 81, a pin 82, a sleeve 83, and a handle 84, as shown in FIGS. Figure 7As shown, an arc-shaped slot 711 is vertically provided on the capstan 71, one end of the slot 711 extends toward the axis of the capstan 71, and the other end of the slot 711 extends toward the edge of the capstan 71; the second motor 73 is fixedly installed on the upper end of the column 17 through the fixing plate 74, and the driving source shaft 72 is coaxially arranged with the column 17; the fixing plate 74 is fixedly installed at the upper end of the column 17, and the fixing plate 74 is located between the second motor 73 and the capstan 71; a limiting protrusion 715 slidably installed on the slot 711 is fixedly provided on one end of the pull rod 75; at the same time, in the pull-up adjustment support unit 8, the pin 82 is hinged on one end of the screw 81, and the number of the screw 81 and the pin 82 are both two. The end of the pull rod 75 away from the limiting protrusion 715 is detachably connected to one of the pins 82 through a pin shaft, and the other pin 82 is detachably connected to the upper side of the straight template 61 through a pin shaft; bolts threadedly connected to the screw 81 are provided on both ends of the sleeve 83, and the two bolts have different rotation directions, and the bolts are threadedly connected to one end of the screw 81 away from the pin 82; the handle 84 is welded and installed on the outer wall of the sleeve 83, and the end of the single pull rod 75 is connected to the pins 82 in the two pull-up adjustment support units 8.
[0090] When the cast-in-place shear wall 9 is constructed on the inner wall of the elevator shaft, a hydraulic self-climbing elevator shaft standardized construction method is adopted, including a hydraulic self-climbing elevator shaft standardized operation platform in this embodiment, and specifically also includes the following steps:
[0091] Step 1: In the initial state, the bottom cast-in-place shear wall 9 is manually pre-constructed at the bottom of the elevator shaft;
[0092] Step 2: Install the hydraulic self-climbing elevator shaft standardization operating platform to the bottom of the elevator shaft, fit the upper side of the beam frame 12 with the lower side of the crossbeam 21, adjust the position of the first adjustment slide 13 on the beam frame 12, so that the first latch foot 15 on the end of the first adjustment slide 13 abuts against the outer wall of the bottom cast-in-place shear wall 9 and can be located at the latch groove formed by the outer latch mold 66 of the template assembly 6 after abutting against each other. After reaching the required position, the first adjustment hole 113 on the first adjustment slide 13 coincides with the second adjustment hole 112 on the beam frame 12 and is locked with the first bolt group 14; at the same time, adjust the crossbeam The second adjusting slide 22 on the part 21 is positioned so that the second latch foot 24 on the end of the second adjusting slide 22 abuts against the outer wall of the bottom cast-in-place shear wall 9 and can be located at the latch groove formed by the latch mold 66 of the template assembly 6 after the abutment. After reaching the required position, the third adjusting hole 212 on the second adjusting slide 22 coincides with the fourth adjusting hole on the beam frame 12 and is locked with the second bolt group 23, so as to adapt to the construction of elevator shafts of different specifications; after the hydraulic self-climbing elevator shaft standardized operating platform is installed, the first latch foot 15 and the second latch foot 24 are embedded in the latch groove formed by the latch mold 66;
[0093] Step 3: According to the length and width of the elevator shaft cross-sectional profile, four straight templates 61 of corresponding width are selected, and the straight template 61 is assembled with the first oblique mold 62, the angle mold 63 and the second oblique mold 64 as shown in FIG. Figure 5 As shown, the formwork assembly 6 is installed on the pull-up adjustment support unit 8 and the steel skeleton support 5, the gripping handle 84 is rotated around the axis of the sleeve 83, and the bolts on both ends of the sleeve 83 are rotated relative to the screw rod 81, thereby adjusting the length of the single pull-up adjustment support unit 8, and then adjusting the horizontal position of the single straight formwork 61, so that the outer wall of the entire formwork assembly 6 can form a casting cavity for the cast-in-place shear wall 9 between the inner wall of the elevator shaft, so as to adapt to the inner wall position of different elevator shafts;
[0094] Step 4: According to the length and width of the elevator shaft cross-sectional profile, adjust the length of the pull-up adjustment support unit 8, the power assembly 7 and the hydraulic cylinder 28 so that the outer wall of the template assembly 6 can be located at the inner wall of the casting cavity. At this time, adjust the bolt group 65 to fix the angle mold 63 and the first oblique mold 62 or the angle mold 63 and the second oblique mold 64 to realize the splicing of the template assembly 6; the lower side of the template assembly 6 is fitted with the outer wall of the bottom layer of the cast-in-place shear wall 9, and the upper outer wall of the template assembly 6 forms a casting cavity with the inner wall of the elevator shaft, and concrete is poured into the casting cavity to form the middle layer of the cast-in-place shear wall 9;
[0095] Step 6: After the middle-layer cast-in-place shear wall 9 is cured and formed, the adjusting bolt group 65 on one side of the angle mold 63 is removed to realize the disassembly of the formwork assembly 6, so as to prepare for the separation of the formwork assembly 6 from the middle-layer cast-in-place shear wall 9; the second motor 73 and the hydraulic cylinder 28 are started, and the second motor 73 drives the driving source shaft 72 and the winch 71 to rotate, and the winch 71 drives the end of the pull rod 75 to slide along the slot 711 of the winch 71 toward the center of the winch 71, so that the pull rod 75 is retracted into the winch 71, and at the same time, the hydraulic cylinder 28 is retracted, and the steel skeleton support 5 is controlled to be retracted toward the column 17 under the support of the connecting beam unit 3 or the support plate 29 through the guide rail group 25 and the slider 26, and then the upward pull adjustment support unit 8 and the steel skeleton support 5 synchronously drive the formwork assembly 6 as a whole to quickly separate from the middle-layer cast-in-place shear wall 9;
[0096] Step 7: The first motor 43 controls the gear 41 to rotate in the opposite direction, and the second tension spring 214 pulls the second latch foot 24 to retract, and the second latch foot 24 is disengaged from the latch groove; the gear 41 moves upward relative to the rack 42 under the support of the rack 42, and the second climbing component 2 moves upward along the column 17 as a whole, and the upward adjustment support unit 8 rotates to an inclined state relative to the power component 7 and the formwork component 6; after the second climbing component 2 climbs to the desired position, the second tension spring 214 is relaxed, and the second latch foot 24 is embedded in the side wall of the middle-layer cast-in-place shear wall 9 to form a latch groove again, and the second climbing component 2 completes the climbing positioning;
[0097] Step 8: The first motor 43 controls the gear 41 to rotate forward, the first tension spring 16 pulls the first latch foot 15 to retract, and the first latch foot 15 is out of the latch groove; the gear 41 drives the rack 42 to move upward, the first climbing assembly 1 moves upward along the column 17 as a whole, and the upward adjustment support unit 8 rotates relative to the power assembly 7 and the formwork assembly 6 to restore to a horizontal state; after the first climbing assembly 1 climbs to the desired position, the first tension spring 16 is relaxed, the first latch foot 15 is embedded in the side wall of the middle-layer cast-in-place shear wall 9 to form a latch groove again, and the first climbing assembly 1 completes the climbing positioning;
[0098] Repeat steps 4-8 to cast and cure the upper middle layer of cast-in-place shear wall 9 until the cast-in-place shear wall 9 inside the cylinder is completely formed.
[0099] The hydraulic self-climbing elevator shaft standardized operating platform in this embodiment can drive the first climbing component 1 and the second climbing component 2 to climb alternately when constructing the cast-in-place shear wall 9 under the cooperation of the rack 42 and the gear 41; when climbing, the column 17 of the first climbing component 1 can cooperate with the mounting hole and the limit slider 26 group on the second climbing component 2, so that the first climbing component 1 or the second climbing component 2 is stably guided and limited to each other when climbing, so that the climbing of the first climbing component 1 and the second climbing component 2 is stable and efficient; the first latch foot 15 cooperates with the first tension spring 16 and the second latch foot 24 can cooperate with the second tension spring 214, so as to facilitate the extension and contraction of the first latch foot 15 and the second latch foot 24, and then cooperate with the latch groove formed by the latch mold 66, so as to facilitate the first latch foot 15 and the second latch foot 24 to be stably supported on the formed cast-in-place shear wall 9, and provide stability for the climbing of the first climbing component 1 or the second climbing component 2 and the support of the template component 6.
[0100] When the straight formwork 61, the first bevel formwork 62, the angle formwork 63, the second bevel formwork 64 and the adjusting bolt group 65 in the formwork assembly 6 are disassembled and assembled, the angle formwork 63 can cooperate with the first bevel formwork 62 or the second bevel formwork 64 at the edge of the straight formwork 61 for installation. When the formwork assembly 6 is installed in the casting cavity, the angle formwork 63 only needs to be disassembled and assembled with the adjusting bolt group 65 at the first bevel formwork 62 or the second bevel formwork 64, thereby realizing rapid disassembly and assembly of the formwork assembly 6. It is also convenient to select and install the formwork assembly 6 according to the structure of the elevator shaft, and is convenient to stably install and cooperate with the pull-up adjustment support unit 8, thereby improving the adaptability of the entire hydraulic self-climbing elevator shaft standardized operating platform.
[0101] When the formwork assembly 6 is pushed and installed to the casting cavity and the formwork assembly 6 is separated from the cast-in-place shear wall 9, the hydraulic cylinder 28 can stably push the support plate 29 and the connecting beam unit 3 to move horizontally along the guide rail group 25, so that the lower end of the steel skeleton support 5 moves horizontally and stably; at the same time, the upper side of the straight formwork 61 moves synchronously under the control of the power assembly 7 and the upward pull-adjusting support unit 8, so that when the formwork assembly 6 is close to the casting cavity or separated from the cast-in-place shear wall 9, the formwork assembly 6 can be folded or unfolded along the arc of the slot 711, so that the first inclined mold 62, the angle mold 63, and the second inclined mold 64 are not easy to interfere with each other, and the movement of the upper and lower sides of the formwork assembly 6 is stable.
[0102] During the construction process, the first motor 43, the second motor 73 and the hydraulic cylinder 28 can be electrically controlled, so that the construction process of the cast-in-place shear wall 9 can be more automatically controlled and the construction efficiency can be improved.
[0103] The standardized operating platform and construction method of the hydraulic self-climbing elevator shaft in this embodiment can be more widely applied to elevator shaft structures of different sizes, and has strong versatility and professionalism.
[0104] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A hydraulic self-climbing elevator shaft standardized operating platform, characterized in that: Comprising: A first climbing component that can abut against the inner wall of the tube-shaped cast-in-place shear wall; A second climbing component that can abut against the inner wall of the tube-shaped cast-in-place shear wall. The lower end of the second climbing component is located above the lower end of the first climbing component, and an installation hole is provided at the middle part of the second climbing component for a partial part of the first climbing component to pass through; A power device for controlling the staggered climbing of the first climbing component and the second climbing component, and the power device is fixedly connected to the first climbing component or the second climbing component; A steel skeleton support, and the steel skeleton support is adjustably installed on the second climbing component; A formwork component, and the formwork component is detachably installed on the steel skeleton support; A number of upward pulling and adjusting support units. One end of the upward pulling and adjusting support unit is hinged to the formwork component, and the other end of the upward pulling and adjusting support unit is hinged to the end of the first climbing component passing through the second climbing component.
2. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 1, characterized in that: The first climbing component includes: A beam frame, and the beam frame is horizontally arranged; A first adjusting sliding group, and the first adjusting sliding group is horizontally installed on the end of the beam frame; A first latch foot, and the first latch foot is hinged and horizontally adjustably installed on the end of the first adjusting sliding group away from the beam frame; A first tension spring. One end of the first tension spring is connected to the first latch foot, and the other end of the first tension spring is connected to the end of the first adjusting sliding group away from the beam frame where the first latch foot is connected to the first adjusting sliding group, and the hinge joint between the first latch foot and the first adjusting sliding group is located between the first tension springs; A column, and the column is vertically installed on the upper side of the beam frame. The column can pass through the installation hole and is hinged to the upward pulling and adjusting support unit, and the power device is installed on the column or the second climbing component.
3. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 2, characterized in that: The second climbing component includes: A cross beam, and the cross beam is in a "well" shape. The power device is installed on the cross beam, and the installation hole is located at the middle part of the cross beam; A guide rail group, and the guide rail group is horizontally and fixedly installed on the end of the cross beam; A slider that can slide along the guide rail group; A support plate, and the support plate is horizontally and fixedly installed on the slider; A second adjusting sliding group, and the second adjusting sliding group is horizontally installed on the end of the cross beam. The second adjusting sliding group and the support plate are located at different ends of the cross beam; A second latch foot, and the second latch foot is hinged and horizontally adjustably installed on the end of the second adjusting sliding group away from the cross beam; A second tension spring. One end of the second tension spring is connected to the second latch foot, and the other end of the second tension spring is connected to the end of the second adjusting sliding group away from the cross beam where the second latch foot is connected to the second adjusting sliding group, and the hinge joint between the second latch foot and the second adjusting sliding group is located between the second tension springs; A number of connecting beam units. One end of the connecting beam unit is fixedly connected to the slider on one of the guide rail groups, and the other end of the connecting beam is fixedly connected to the slider on the other guide rail group. The steel skeleton support is installed on the connecting beam unit and the support plate; A hydraulic cylinder, and the hydraulic cylinder is horizontally installed between the support plate and the cross beam or between the connecting beam unit and the cross beam. The axis of the hydraulic cylinder is parallel to the axis of the guide rail group.
4. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 3, characterized in that: The second climbing component further includes a number of limit slider groups, and the limit slider groups are installed on the inner wall of the middle part of the cross beam, and the limit slider groups are in sliding contact with the outer wall of the column.
5. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 4, characterized in that: The power device includes: A rack, and the rack is fixedly installed on the outer wall of the column, and the axis of the rack is parallel to the vertical axis of the column; A gear meshing with the rack; A first motor for controlling the rotation of the gear is fixedly installed at the middle part of the crossbeam.
6. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 5, characterized in that: The number of the support plates is two, and the two support plates are symmetrically arranged along the crossbeam; the number of the connection beam units is two, and the two connection beam units are symmetrically arranged along the crossbeam.
7. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 6, characterized in that: The number of the steel frame supports is four, and the steel frame supports are vertically and detachably mounted on the support plate or the connecting beam unit.
8. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 7, characterized in that: The template components include: Four straight templates, the four straight templates are corresponding to the four steel frame supports one by one and are detachably connected, wherein two of the straight templates are fixedly provided with a latching mold located on the same vertical plane as the first latching foot or the first latching foot on one side away from the column; A first oblique mold, which is assembled and installed on one side of the vertical edge of the straight template; Angle mold, the corner mold is assembled and installed on the other side of the vertical edge of the straight template; A second oblique mold, the second oblique mold is assembled and installed on one side of the vertical edge of another straight template, and the first oblique mold and the second oblique mold, both of which are away from the straight template, can be assembled and detachably connected with one side of the angle mold; An adjusting bolt group is installed between the first oblique die, the angle die and the second oblique die.
9. A hydraulic self-climbing elevator shaft standardized operating platform as claimed in claim 8, characterized in that: Also included is a power assembly, the power assembly comprising: A capstan, wherein the capstan is vertically provided with an arc-shaped slot, one end of the slot extends toward the axis of the capstan, and the other end of the slot extends toward the edge of the capstan; A driving source shaft that drives the capstan to rotate coaxially forward and reverse; A second motor driving the drive source shaft to rotate forward and reversely, wherein the second motor is fixedly mounted on the upper end of the column, and the drive source shaft is coaxially arranged with the column; A fixing plate, the fixing plate is fixedly mounted at the upper end of the column, and the fixing plate is located between the second motor and the winch; A pull rod, one end of which is fixedly provided with a limiting protrusion slidably mounted on the card slot; The pull-up adjustment support unit comprises: Screw; A pin, wherein the pin is hinged to one end of the screw rod, the screw rod and the pin are both in number of two, one end of the pull rod away from the limiting protrusion is detachably connected to one of the pins, and the other pin is detachably connected to the upper side of the flat template; A sleeve, wherein bolts threadedly connected to the screw rod are provided at both ends of the sleeve, the two bolts have different rotation directions, and the bolts are threadedly connected to the end of the screw rod away from the pin; A handle is fixedly mounted on the outer wall of the sleeve.
10. A method for standardizing the construction of a hydraulic self-climbing elevator shaft, characterized in that: The method comprises a hydraulic self-climbing elevator shaft standardization operating platform as described in any one of claims 7 to 9, and further comprises the following steps: Step 1: In the initial state, the bottom layer of cast-in-place shear wall is pre-constructed manually at the bottom of the elevator shaft; Step 2: Install the hydraulic self-climbing elevator shaft standardized operating platform to the bottom of the elevator shaft, fit the upper side of the beam frame with the lower side of the crossbeam, and insert the first latch foot and the second latch foot into the latch groove formed by the latch mold; Step 3: Select four corresponding straight formworks according to the length and width of the elevator shaft cross-section profile. After the straight formworks are assembled with the first oblique formwork, the angle formwork and the second oblique formwork, a casting cavity for the cast-in-place shear wall is formed between the outer wall of the formwork assembly and the inner wall of the elevator shaft; install the formwork assembly on the pull-up adjustment support unit and the steel skeleton support; Step 4: According to the length and width of the elevator shaft cross-sectional profile, adjust the length of the pull-up adjustment support unit and the hydraulic cylinder so that the outer wall of the formwork assembly can be located at the inner wall of the casting cavity, the lower side of the formwork assembly fits with the outer wall of the lowest cast-in-place shear wall, the upper outer wall of the formwork assembly and the inner wall of the elevator shaft form a casting cavity, and concrete is poured into the casting cavity to form a middle-layer cast-in-place shear wall; Step 6: After the middle-layer cast-in-place shear wall is cured and formed, the connection between the formwork components is disassembled, and the power component and the hydraulic cylinder are started. The power component drives the upward pull-adjustable support unit to rotate and retract toward the column. The hydraulic cylinder retracts, and the upward pull-adjustable support unit and the steel skeleton support drive the formwork component to detach from the middle-layer cast-in-place shear wall. Step 7: The first motor controls the gear to rotate in the opposite direction, the second tension spring pulls the second latch foot to retract, and the second latch foot is disengaged from the latch groove; the gear moves upward relative to the rack under the support of the rack, the second climbing assembly moves upward along the column as a whole, and the upward adjustment support unit rotates relative to the power assembly and the formwork assembly to an inclined state; after the second climbing assembly climbs to the desired position, the second tension spring is relaxed, the second latch foot is embedded in the side wall of the middle-layer cast-in-place shear wall to form a latch groove again, and the second climbing assembly completes the climbing positioning; Step 8: The first motor controls the gear to rotate forward, the first tension spring pulls the first latch foot to retract, and the first latch foot is disengaged from the latch groove; the gear drives the rack to move upward, the first climbing assembly moves upward along the column as a whole, and the upward adjustment support unit rotates relative to the power assembly and the formwork assembly to restore to a horizontal state; after the first climbing assembly climbs to the desired position, the first tension spring is relaxed, the first latch foot is embedded in the side wall of the middle-level cast-in-place shear wall to form a latch groove again, and the first climbing assembly completes the climbing positioning; Repeat steps 4-8 to cast and cure the upper middle layer of cast-in-place shear wall until the cast-in-place shear wall inside the cylinder is completely formed.