Method for equipment entering cabin in gas equipment room
By selecting suitable lifting ship specifications and using the lifting ship to gradually lift the equipment and the total section, the problem of the equipment in the gas equipment between the 110,000 tons of dual-fuel crude oil/product oil tanker cannot be lifted in the blue sky, reducing the impact of nodes and workload, and improving construction efficiency.
Patent Information
- Application Number
- CN202411548277.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2044-11-01
AI Technical Summary
The equipment in the gas equipment room of the 110,000 tons of dual-fuel crude oil/finished oil tanker cannot be lifted in the blue sky, resulting in late arrival of the equipment affecting the upper-level segmented lifting nodes, and it is easy to cause deformation of the wall panels and huge workload when opening temporary process holes.
By selecting suitable lifting ship specifications, using the lifting ship lifting equipment and main sections, gradually hoisting to different levels of the ship, and the equipment is installed in the cabin by welding and fixing the main sections and code plates.
It reduces the node impact caused by the incoming time of equipment, reduces the intensity impact and workload caused by opening temporary process holes, and improves construction efficiency and reliability of ship docking.
Smart Images

Figure CN119611689A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of ship equipment installation, and in particular relates to a method for equipment to enter a gas equipment room. Background Art
[0002] In the prior art, there are a large number of equipment in the gas equipment room of a 110,000-ton dual-fuel crude oil / finished oil tanker. Due to the large size of the equipment, it is usually required to be hoisted in the dock stage. If hoisting in the air is not possible, a temporary process hole is usually opened to hoist the equipment into the cabin.
[0003] Since there are many equipments and different equipment suppliers, and aerial lifting is required, it is easy for the late arrival of equipment to affect the upper-level section lifting node, thereby affecting the ship's undocking node.
[0004] When the equipment cannot be hoisted in the air, a temporary process hole needs to be opened to enter the cabin. Since the equipment is large, many profiles need to be disconnected when opening the temporary process hole, which can easily cause the wall panel to deform. At the same time, the workload of opening and sealing the temporary process hole is huge. At the same time, it is difficult to enter the equipment through the temporary process hole because the size of the temporary process hole needs to be controlled. Summary of the invention
[0005] The present invention provides a method for entering a gas equipment room into a gas equipment room, comprising the following steps:
[0006] S1: Select the crane ship specifications based on the weight of the second-layer section, the weight of the equipment and the height of the ship;
[0007] S2: crane vessel auxiliary hook lifting equipment;
[0008] S3: The crane's main hook lifts the second-layer section;
[0009] S4: Lift the equipment to the equipment installation position on the first-floor main section;
[0010] S5: Lift the second-layer segment onto the first-layer segment;
[0011] S6: Weld the second layer section and the first layer section.
[0012] Further: In S1, the crane vessel is fixed to one side of the ship, and the crane vessel is a floating crane vessel.
[0013] Further: In S1, the floating crane is fixed by four anchors at four corners.
[0014] Further: In S2, the elevation angle of the steel frame of the crane vessel is adjusted.
[0015] Further: In S3, the main hook of the crane vessel lifts the second-layer section and lifts it vertically to a safe distance from the deck of the ship.
[0016] Further: In S3, the lower corner of the second-layer total section is made higher than the top of the LNG tank.
[0017] Further: in S4, the equipment is installed after being hoisted to the equipment installation position on the first-floor main section.
[0018] Further: in said S5, the second-layer total section is hoisted to the top of the first-layer total section, and the main hook is vertically moved until the second-layer total section is hoisted onto the first-layer total section.
[0019] Further: In S5, a plurality of code plates are welded and fixed.
[0020] Further: In S5, a single side surface in the transverse direction of the connection between the second layer section and the first layer section is welded and fixed by at least two code plates, and a single side surface in the longitudinal direction of the connection between the second layer section and the first layer section is welded and fixed by at least two code plates.
[0021] The beneficial effects brought by the present invention are as follows:
[0022] It can be seen from the above scheme that the present invention provides a method for equipment entry into a gas equipment room. Through the method for equipment entry into a gas equipment room, the node impact caused by the equipment delivery time problem is reduced, and the strength impact and workload caused by opening a temporary process hole are reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 A flow chart showing a method for entering a gas equipment room into a gas equipment room according to an embodiment of the present invention;
[0024] Figure 2 A schematic diagram showing the state of step S2 of a method for bringing equipment into a gas equipment room according to an embodiment of the present invention;
[0025] Figure 3 A schematic diagram showing the state of step S3 of a method for bringing equipment into a gas equipment room according to an embodiment of the present invention;
[0026] Figure 4 A schematic diagram showing the state of step S4 of a method for bringing equipment into a gas equipment room according to an embodiment of the present invention;
[0027] Figure 5 A schematic diagram showing the state of step S5 of a method for bringing equipment into a gas equipment room according to an embodiment of the present invention;
[0028] Figure 6 A schematic diagram showing a floating crane vessel with four anchors at four corners fixed according to an embodiment of the present invention;
[0029] Figure 7 A schematic diagram showing the structure of the welded second layer overall section and the first layer overall section according to an embodiment of the present invention;
[0030] Figure 8 A schematic structural diagram of a welding code plate, a second layer overall section and a first layer overall section according to an embodiment of the present invention is shown.
[0031] In the figure, 1 is the second-layer section; 2 is the first-layer section; 3 is the yard plate; 4 is the ship; 5 is the crane ship; 6 is the anchor; 7 is the auxiliary hook; 8 is the main hook; and 9 is the equipment. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] like Figures 1 to 8 As shown, the present invention provides a method for entering a gas equipment room into a cabin, and the method for entering a gas equipment room into a cabin comprises the following steps:
[0034] S1: Select the specifications of the crane vessel 5 according to the weight of the second-layer section 1, the weight of the equipment 9 and the height of the vessel 4;
[0035] S2: crane vessel 5 auxiliary hook 7 hoists equipment 9;
[0036] S3: The main hook 8 of the crane vessel 5 lifts the second-layer section 1;
[0037] S4: hoisting the device 9 to the device 9 installation position on the first-layer main section 2;
[0038] S5: hoist the second-layer segment 1 onto the first-layer segment 2;
[0039] S6: Welding the second layer segment 1 and the first layer segment 2.
[0040] It can be seen from the above scheme that the embodiment of the present invention provides a method for equipment entry into a gas equipment room. Through the method for equipment entry into a gas equipment room, the node impact caused by the time of equipment 9 arrival is reduced, and the strength impact and workload caused by opening a temporary process hole are reduced.
[0041] Furthermore, in S1, the crane vessel 5 is fixed to one side of the ship 4, and the crane vessel 5 is a floating crane vessel.
[0042] like Figure 6 As shown, the floating crane is fixed by four anchors 6 at four corners.
[0043] Further: in said S2, the elevation angle of the steel frame of the crane vessel 5 is adjusted.
[0044] Further: In S3, the main hook 8 of the crane vessel 5 lifts the second-layer segment 1 and lifts it vertically to a safe distance from the deck surface of the ship 4.
[0045] Further: In S3, the lower corner of the second-layer total section 1 is made higher than the top of the LNG tank.
[0046] Further: in S4, the equipment 9 is installed after being hoisted to the equipment 9 installation position on the first-layer main section 2.
[0047] Further: in S5, the second-layer total section 1 is hoisted to the top of the first-layer total section 2, and the vertical main hook 8 is raised until the second-layer total section 1 is hoisted onto the first-layer total section 2.
[0048] Further: In S5, a plurality of code plates 3 are welded and fixed.
[0049] Further: in S5, a single side surface in the transverse direction of the connection between the second layer section 1 and the first layer section 2 is welded and fixed by at least two code plates 3, and a single side surface in the longitudinal direction of the connection between the second layer section 1 and the first layer section 2 is welded and fixed by at least two code plates 3.
[0050] like Figures 1 to 8 As shown, the present invention provides a method for entering a gas equipment room, which is explained below with a specific embodiment:
[0051] The specifications of the crane vessel 5 are selected by calculating the weight of the second-layer section 1, the weight of the equipment 9 that needs to be put into the cabin, and the height of the vessel 4.
[0052] Use a suitable crane ship 5, and before the operation, adjust the crane ship 5 as follows: Figure 6 As shown, it is fixed to one side of the ship 4. The crane ship 5 is fixed to one side of the ship 4, and the crane ship 5 is a floating crane ship. The floating crane ship is fixed by four anchors 6 at four corners.
[0053] By adjusting the steel frame elevation angle of the crane ship 5, first use the auxiliary hook 7 of the crane ship 5 to lift the equipment 9, then use the main hook 8 of the crane ship 5 to lift the second-layer block 1, and vertically lift it to a safe distance from the deck surface of the ship 4. Make the lower corner of the second-layer block 1 higher than the top of the LNG tank. Use the anchor winch of the crane ship 5 to adjust the position of the crane ship 5, and install the equipment 9 after lifting it to the equipment 9 installation position on the first-layer block 2.
[0054] After the equipment 9 in the gas equipment room is installed, the second-layer total section 1 is hoisted to the top of the first-layer total section 2 , and the vertical main hook 8 is used until the second-layer total section 1 is hoisted onto the first-layer total section 2 .
[0055] Welding the welds of the second-floor section 1 and the first-floor section 2 of the gas equipment room.
[0056] Before the ship 4 is undocking, the second layer section 1 and the first layer section 2 of the gas equipment room are welded and fixed by welding through a plurality of yard plates 3 .
[0057] The present invention provides a method for bringing equipment into a gas equipment room, which fully utilizes the period of the dock stage to carry out the equipment 9 bringing operation into the gas equipment room, thereby improving the construction efficiency and achieving the purpose of reducing costs and increasing efficiency.
[0058] The present invention provides a method for loading equipment into a gas equipment room, which mainly solves the problem that the equipment 9 of the gas equipment room of a 110,000-ton dual-fuel crude oil / product oil ship cannot be hoisted in the dock stage due to late delivery, and needs to be loaded into the cabin at the dock stage. By hoisting the equipment 9 into the cabin by using a crane ship 5 at the dock stage, the node impact caused by the time problem of the equipment 9 delivery is reduced, and the strength impact and workload caused by opening a temporary process hole are reduced.
[0059] Reduce the node impact caused by the arrival time of equipment 9, reduce the workload of opening temporary process holes for equipment 9 to enter the cabin, reduce the construction difficulty, improve construction efficiency, and shorten the dock cycle.
[0060] The workload of opening temporary process holes is avoided, and the difficulty of entering equipment 9 through the temporary process holes is reduced, while the work quality and efficiency of employees are improved, which provides a basis for the entry of equipment 9 into the gas equipment room during the dock stage of subsequent new ships.
[0061] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A method for entering a gas equipment room into a cabin, characterized in that: The following steps are involved: S1: Select the crane ship specifications based on the weight of the second-layer section, the weight of the equipment and the height of the ship; S2: crane vessel auxiliary hook lifting equipment; S3: The crane's main hook lifts the second-layer section; S4: Lift the equipment to the equipment installation position on the first-floor main section; S5: Lift the second-layer segment onto the first-layer segment; S6: Weld the second layer section and the first layer section.
2. The method for entering a gas equipment room according to claim 1, characterized in that: In S1, the crane vessel is fixed to one side of the ship, and the crane vessel is a floating crane vessel.
3. The method for entering a gas equipment room according to claim 2, characterized in that: In S1, the floating crane is fixed by four anchors at four corners.
4. The method for entering a gas equipment room according to claim 1, characterized in that: In S2, the elevation angle of the steel frame of the crane vessel is adjusted.
5. The method for entering a gas equipment room according to claim 1, characterized in that: In S3, the main hook of the crane vessel lifts the second-layer segment and lifts it vertically to a safe distance from the deck of the ship.
6. The method for entering a gas equipment room according to claim 1, characterized in that: In S3, the lower corner of the second-layer total section is made higher than the top of the LNG tank.
7. The method for entering a gas equipment room according to claim 1, characterized in that: In S4, the equipment is hoisted to the equipment installation position on the first-floor main section and then installed.
8. The method for entering a gas equipment room according to claim 1, characterized in that: In S5, the second-layer total section is hoisted to the top of the first-layer total section, and the main hook is vertically moved until the second-layer total section is hoisted onto the first-layer total section.
9. The method for entering a gas equipment room according to claim 1, characterized in that: In the above S5, a plurality of code plates are welded and fixed.
10. The method for entering a gas equipment room according to claim 1, characterized in that: In S5, a single side surface in the transverse direction of the connection between the second layer section and the first layer section is welded and fixed by at least two code plates, and a single side surface in the longitudinal direction of the connection between the second layer section and the first layer section is welded and fixed by at least two code plates.
Citation Information
Patent Citations
Process for sectionally putting up ship berths or docks
CN102582784A
Method for righting jacket by using single cantilever gin pole and double hooks
CN102852147A
Large-scale ultrahigh lift height floating crane
CN104925677A
Hoisting process for large flare stack of FPSO ship
CN105819351A
Door frame hoisting device and hoisting method thereof
CN115028089A