By designing a digital geological system for physical and chemical probe networks, the problems of data processing lag and data loss in the existing technology are solved, efficient and accurate data acquisition and processing are achieved, and work efficiency and accuracy are improved.

CN119667810APending Publication Date: 2025-03-21CHINA NONFERROUS METALS (GUILIN) GEOLOGY AND MINING CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202411705628.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-03-21

AI Technical Summary

Technical Problem

The existing physical and chemical exploration data processing lag is prone to data loss, low work efficiency, and the inability to view survey progress and data in real time.

Method used

Design a digital geological system for physical and chemical exploration networks, including instrument data acquisition unit, positioning system, network design unit, physical and chemical exploration management unit, data processing unit and 3-dimensional model generation unit, to realize real-time data collection, management and processing.

Benefits of technology

It realizes higher and more accurate data acquisition, reduces manual participation, avoids data loss, improves work efficiency and accuracy, and allows real-time viewing of survey progress and data.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention provides a geophysical exploration network distribution digital geological system, which belongs to the technical field of exploration and comprises an instrument data acquisition unit, a positioning system, a network distribution design unit, a geophysical exploration management unit, a geophysical exploration management unit, a data processing unit and a three-dimensional model generation unit. The geophysical and geochemical exploration is subjected to network arrangement, then data of measuring points are automatically transmitted, higher and more accurate data collection is achieved, meanwhile, the designed and collected data are rapidly transmitted to corresponding management modules of geophysical and geochemical exploration, a corresponding standard table is automatically generated, then the data are sent to a data processing unit, and the data processing unit processes the data. The data processing unit carries out rapid filtering and other processing on the data, so that the later obtained data is more effective and accurate, finally, a three-dimensional model is automatically generated, automatic generation of geophysical prospecting and geochemical prospecting from design and detection to later data processing and automatic formation of the model are achieved, manual participation is reduced, data loss is avoided, and working efficiency and accuracy are improved.