Drainage and sewerage system and fabricated building using same

Through the modularly designed drainage and sewage discharge system, the problems of complex structure and incomplete sewage treatment in the existing technology are solved, the effects of simplified production and convenient maintenance are achieved, and the sewage treatment capacity of prefabricated buildings are improved.

CN119683795AActive Publication Date: 2025-03-25SHANGHAI CONSTR ENG DESIGN & RSCH INST CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411833468.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-03-25
Estimated Expiration
2044-12-13

AI Technical Summary

Technical Problem

The drainage and sewage system in existing prefabricated buildings has a complex structure, high degree of refinement, and cannot effectively treat small particles or viscous substances, resulting in incomplete sewage treatment and inconvenient maintenance.

Method used

A modularly designed drainage and sewage discharge system is adopted, including building prefabricated parts and drainage treatment series. The series includes adsorption section, magnetization section, treatment section and sewage discharge section in turn according to the direction of sewage flow. Each section is equipped with sealing covers for easy cleaning and module replacement.

Benefits of technology

The production process of building prefabricated parts is simplified, which facilitates subsequent treatment and maintenance, can effectively pretreat sewage generated by the building, and improves the sewage treatment capacity of prefabricated buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119683795A_ABST
    Figure CN119683795A_ABST
Patent Text Reader

Abstract

The invention discloses a drainage and sewerage system and a fabricated building using the system.The drainage and sewerage system comprises a building prefabricated part and further comprises a drainage treatment string part, the building prefabricated part is provided with an insertion part matched with the drainage treatment string part in advance, and during assembly, the drainage treatment string part is inserted into the insertion part to treat building drainage; the drainage treatment string piece is in a box type, the drainage treatment string piece sequentially comprises an adsorption section, a magnetization section, a treatment section and a pollution discharge section in the sewage flowing direction, the whole structure is relatively simple, the building prefabricated piece can be conveniently manufactured, meanwhile, the whole structure does not need to be complexly controlled, and in the practical application process, the construction cost is reduced. The drainage treatment string piece can be conveniently taken out for operation; in the fabricated building, sewage generated by the building can be effectively pretreated, and the sewage treatment capacity during drainage of the fabricated building is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building drainage, and in particular to a drainage and sewage system and an assembled building using the system. Background Art

[0002] In prefabricated buildings, drainage and sewage pipes and some small accessories are directly embedded in prefabricated parts in the prefabricated factory, that is, pre-embedded installation. In order to ensure good drainage and removal effects, the patent application with application number CN202210271913.1 records a prefabricated building and its sewage system, which includes a water supply connecting pipe, a filter device, a cleaning device and a spoiler device. It is essentially a solid-liquid separation device. The working principle is to use the filter device to block impurities in the sewage and separate the solids from the liquid in the sewage. Then, as the sewage continues to flow, the solid impurities in the wastewater gradually block the filter device. Under the impact of the sewage flow, the filter device gradually moves down to the bottom of the sewage outlet opened on the guide rod. At this time, the cleaning device begins to clean the impurities that block the filter device, and concentrate the solid impurities in the guide pipe. Finally, the solid impurities are Centralized treatment improves the efficiency of sewage treatment; however, the defect of this solution is that its structure is quite complicated, and the degree of refinement is high. It is not convenient and flexible in actual application adjustment and prefabrication. Moreover, the holes set on the main filter plate can only filter some larger solid substances, but for some smaller particles or some sticky substances (such as oil, etc.), the impurities in the wastewater cannot block the filtering device, so the subsequent cleaning device cannot play an effective role. At this time, the structure cannot effectively treat the discharged sewage, especially in scenarios with high environmental protection requirements. The above solution is no longer applicable, and it is not convenient for subsequent cleaning and maintenance. Therefore, we need a prefabricated building with better sewage treatment function. Summary of the invention

[0003] In order to overcome the defects of the prior art, the technical problem to be solved by the present invention is to propose a drainage and sewage system and an assembled building using the system, which reduces the difficulty of prefabrication by adopting a modular design and facilitates subsequent processing and maintenance.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] The present invention provides a drainage and sewage system, including building prefabricated parts and also including drainage treatment strings. The building prefabricated parts are pre-set with plug-in parts that cooperate with the drainage treatment strings. During assembly, the drainage treatment strings are plugged into the plug-in parts to treat building drainage. The drainage treatment strings are box-shaped, and the drainage treatment strings include an adsorption section, a magnetization section, a treatment section and a sewage discharge section in sequence according to the sewage flow direction.

[0006] The adsorption section includes an adsorption chamber, in the middle of which an adsorption platform is fixedly provided, the adsorption platform divides the adsorption chamber into a water inlet chamber and a water outlet chamber, and a detachably connected adsorption box is also provided on the adsorption platform, the adsorption box is filled with adsorption particles, after the sewage enters the water inlet chamber, it passes through the adsorption box and enters the water outlet chamber, and then flows to the magnetization section; the adsorption particles in the adsorption box are filled with several layers along the flow direction of the sewage, and the material of the adsorption particles includes one or more of activated carbon, oil-absorbing resin, sodium alginate and its derivatives, chitosan adsorption materials, diatomaceous earth adsorption materials, etc.

[0007] The magnetization section includes a magnetization cavity, which is trumpet-shaped. The cross-sectional area of ​​the magnetization cavity decreases along the flow direction of the sewage. The magnetization section is also provided with a magnetic cavity along the circumference of the magnetization cavity. A magnet is provided in the magnetic cavity to form a magnetic field in the magnetization cavity. After the sewage enters the magnetization cavity and is magnetized, it flows to the treatment section.

[0008] The treatment section is provided with a water flow channel, and a plurality of treatment tanks cooperating with the water flow channel are opened in the treatment section along the flow direction of sewage. A treatment cake is inserted in the treatment tank, and a sewage treatment agent is arranged in the treatment cake to treat and filter the sewage. After the sewage flows through the treatment section, it flows to the sewage discharge section; the sewage discharge section is provided with an outlet pipe and a collection box, so that the treated wastewater can be introduced into the collection box by using the outlet pipe.

[0009] It also includes a spiral section, which is arranged between the adsorption section and the magnetization section. The spiral section includes a spiral water passage chamber and a spiral part arranged in the spiral water passage chamber. The spiral part includes a spiral rod and a fixed plate. The spiral rod is coaxially arranged with the spiral water passage chamber. Both ends of the spiral rod are provided with an integrally formed conical head. A threaded groove is provided on the spiral rod. Both ends of the spiral rod are rotatably connected with the fixed plate. The fixed plate is provided with a water passage hole. Both ends of the spiral water passage chamber are provided with plug-in grooves that cooperate with the fixed plate. When sewage is treated, the fixed plate is inserted into the plug-in groove so that the spiral rod is located in the spiral water passage chamber.

[0010] The adsorption section, the spiral section, the magnetization section, the processing section and the sewage discharge section are all provided with sealing covers.

[0011] The beneficial effects of the present invention are:

[0012] The present invention adopts a serial modular design with a simple structure, which makes it easy to manufacture prefabricated building parts. At the same time, the entire structure does not need to be complicatedly controlled. In actual application, the required parts can be actively modified according to different usage scenarios. During subsequent cleaning and module adjustment, the drainage treatment series parts can be conveniently taken out for operation. In prefabricated buildings, the sewage generated by the building can be effectively pretreated, thereby improving the sewage treatment capacity of the prefabricated building during drainage. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the sequence of sewage flow in a drainage and sewage system provided in a specific embodiment 1 of the present invention;

[0014] Figure 2 It is a schematic diagram of the structure of the drainage treatment string provided in the specific embodiment 1 of the present invention when it is inserted into the plug-in part;

[0015] Figure 3 It is a schematic diagram of the structure of the drainage treatment string provided in the specific embodiment 1 of the present invention;

[0016] Figure 4 yes Figure 3 The schematic diagram of the cross section of aa in the figure;

[0017] Figure 5 is a schematic structural diagram of another viewing angle of the drainage treatment string provided in the specific embodiment 1 of the present invention;

[0018] Figure 6 yes Figure 5 Schematic diagram of the cross section principle of the middle bb;

[0019] Figure 7 yes Figure 5 Schematic diagram of the cross section principle of CC;

[0020] Figure 8 It is an exploded schematic diagram of the sewage inlet end perspective of the adsorption section provided in the specific embodiment 1 of the present invention;

[0021] Fig. 9 It is an exploded schematic diagram of the sewage outlet end perspective of the adsorption section provided in the specific embodiment 1 of the present invention;

[0022] Fig.10 It is a schematic structural diagram of the sewage inlet end perspective of the magnetization section provided in the specific embodiment 1 of the present invention;

[0023] Fig.11 It is a schematic structural diagram of the sewage outlet end perspective of the magnetization section provided in the specific embodiment 1 of the present invention;

[0024] Fig.12It is a schematic structural diagram of the sealing cover of the spiral segment provided in the specific embodiment 1 of the present invention when it is opened;

[0025] Fig.13 is a structural schematic diagram of another viewing angle when the sealing cover of the spiral segment provided in the specific embodiment 1 of the present invention is opened;

[0026] Fig.14 It is a schematic diagram of the structure when the spiral part provided in the specific embodiment 1 of the present invention is inserted into the spiral water passage cavity;

[0027] Fig.15 is a schematic diagram of the structure of the processing section provided in the specific embodiment 1 of the present invention;

[0028] In the figure:

[0029] 1. Prefabricated building parts; 11. Connecting parts;

[0030] 2. Drainage treatment string; 21. Adsorption section; 22. Spiral section; 23. Magnetization section; 24. Treatment section; 25. Sealing cover;

[0031] 211, adsorption chamber; 212, adsorption platform; 213, water inlet chamber; 214, water outlet chamber; 215, adsorption box;

[0032] 221, spiral water chamber; 222, spiral part; 223, spiral rod; 224, fixing plate; 2231, conical head; 225, thread groove; 2241, water hole; 2211, plug-in groove;

[0033] 231, magnetizing cavity; 232, magnetic loading cavity; 233, magnet;

[0034] 241. Water flow channel; 242. Processing tank; 243. Processing cake. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0036] Embodiment 1: As shown in the figure, the present invention provides a drainage and sewage system, including a building prefabricated component 1, and also including a drainage treatment string component 2. The building prefabricated component 1 is pre-set with a plug-in portion 11 that cooperates with the drainage treatment string component 2. During assembly, the drainage treatment string component 2 is plugged into the plug-in portion 11 to treat the building drainage; the drainage treatment string component 2 is box-shaped, and the present case is intended to use the drainage treatment string component 2 in advance to effectively treat the sewage when the sewage is discharged from the building. When the building prefabricated component 1 (such as prefabricated wall panels or prefabricated floors) is manufactured, the plug-in portion 11 that cooperates with the drainage treatment string component 2 is pre-set. In this way, when in use, the drainage treatment string component 2 is inserted into the plug-in portion 11, and then when the drainage treatment string component 2 needs to be cleaned or the corresponding module needs to be replaced later, the drainage treatment string component 2 can be conveniently taken out for operation. Furthermore, the drainage The water treatment string 2 includes an adsorption section 21, a magnetization section 23, a treatment section 24 and a sewage discharge section in sequence according to the flow direction of the sewage; specifically, the adsorption section 21 includes an adsorption chamber 211, and an adsorption platform 212 is fixedly provided in the middle of the adsorption chamber 211. The adsorption platform 212 divides the adsorption chamber 211 into a water inlet chamber 213 and a water outlet chamber 214. A detachably connected adsorption box 215 is also provided on the adsorption platform 212. The adsorption box 215 is filled with adsorption particles, and the adsorption particles in the adsorption box 215 are filled with several layers along the flow direction of the sewage. The material of the adsorption particles includes one or more of activated carbon, oil-absorbing resin, sodium alginate and its derivative materials, chitosan adsorption materials, diatomaceous earth adsorption materials, etc.; to ensure the adsorption of various impurities in the sewage, the sewage enters the water inlet chamber 213 and enters the water outlet chamber 214 through the adsorption box 215, and then flows to the magnetization section 23;In this way, the adsorption particle layer in the adsorption box 215 can be set according to the main type of sewage generated in the building. Then, when the adsorption particles in the adsorption box 215 need to be processed and replaced regularly, the drainage treatment string 2 can be taken out from the plug-in part 11, and then the adsorption box 215 is taken out to adjust the adsorption particle layer in each replacement adsorption box 215, and the entire adsorption chamber 211 is cleaned at the same time, so that it is more flexible and targeted when treating sewage in different scenarios, ensuring environmental friendliness and environmental protection. After passing through the adsorption section 21, it must pass through the magnetization section 23. The magnetization section 23 includes a magnetization cavity 231. The magnetization cavity 231 is trumpet-shaped. The cross-sectional area of ​​the magnetization cavity 231 decreases along the direction of sewage flow. A magnetic chamber 232 is also provided along the circumference of the magnetizing chamber 231. A magnet 233 is provided in the magnetic chamber 232 to form a magnetic field in the magnetizing chamber 231. After the sewage enters the magnetizing chamber 231 and is magnetized, it flows to the treatment section 24. The magnetizing section 23 is mainly used to magnetize the sewage. After the sewage is magnetized, it is beneficial to improve the flocculation effect and the oxidation treatment effect, so as to reduce the use of chemical agents and facilitate the subsequent further treatment in the treatment section 24. Since the magnetizing chamber 231 is trumpet-shaped, the cross-sectional area of ​​the magnetizing chamber 231 can be more linearly decreased to enhance the magnetization effect of the sewage when it passes through the magnetizing chamber 231. The water flow velocity will increase with the reduction of the cross-sectional area, which may be beneficial to improve the magnetization efficiency; thus, the sewage flows from After the magnetized section 23 flows out, it continues to flow into the treatment section 24; the treatment section 24 is provided with a water flow channel 241, and the treatment section 24 is provided with a plurality of treatment tanks 242 that cooperate with the water flow channel 241 along the flow direction of the sewage, and a treatment cake 243 is inserted in the treatment tank 242, and a sewage treatment agent is arranged in the treatment cake 243 to treat and filter the sewage. After the sewage flows through the treatment section 24, it flows to the sewage discharge section, so that the magnetized sewage can be further absorbed and treated by the treatment cake 243 in the treatment section 24; finally, the sewage discharge section is provided with an outlet pipe and a collection box, so that the treated wastewater is introduced into the collection box by the outlet pipe; preferably, it also includes a spiral section 22, which is arranged between the adsorption section 21 and the magnetized section 24. The spiral section 22 includes a spiral water chamber 221 and a spiral portion 222 disposed in the spiral water chamber 221. The spiral portion 222 includes a spiral rod 223 and a fixed plate 224. The spiral rod 223 is coaxially disposed with the spiral water chamber 221. Both ends of the spiral rod 223 are provided with an integrally formed conical head 2231. The spiral rod 223 is provided with a threaded groove 225. Both ends of the spiral rod 223 are rotatably connected with the fixed plate 224. The fixed plate 224 is provided with a water hole 2241. Both ends of the spiral water chamber 221 are provided with a plug-in groove 2211 that cooperates with the fixed plate 224. When sewage is treated, the fixed plate 224 is inserted into the plug-in groove 2211 so that the spiral rod 223 is located in the spiral water chamber 221.In this way, the sewage from the adsorption section 21 will first enter the spiral section 22, and then during the flow process, the spiral rod 223 can guide the water flow to form a vortex, which can accelerate the flow rate of the water. If necessary, a micro motor can also be added to drive the spiral rod 223 to actively rotate, so as to actively improve the sewage discharge efficiency. ;

[0037] Preferably, the adsorption section 21, the spiral section 22, the magnetization section 23, the processing section 24 and the sewage discharge section are all provided with a sealing cover 25; while ensuring the drainage sealing, it can be opened during subsequent cleaning and module replacement for easy adjustment.

[0038] In summary, this case generally adopts a serial modular design. The entire structure is simple and does not require complex control. In actual application, the required parts can be actively modified according to different usage scenarios. During subsequent cleaning and module adjustments, the drainage treatment string 2 can also be conveniently taken out for adjustment.

[0039] An assembled building adopts the above drainage and sewage system, which can effectively pre-treat the sewage generated by the building and improve the sewage treatment capacity of the assembled building during drainage.

[0040] Embodiment 2: The difference from Embodiment 1 is that during sewage treatment, there may be some larger impurities. In this case, the spiral section 22 needs to be arranged before the adsorption section 21. During the flow of sewage, the cooperation between the spiral rod 223 and the thread groove 225 uses the flow and water pressure of the sewage during drainage as the power source to accelerate the rotation of the entire spiral rod 223, thereby forming eddy currents and involution forces to break up and mix the impurities in the sewage. While preventing blockage, it also facilitates the efficient absorption of the adsorption section 21 and improves the sewage discharge efficiency.

[0041] Embodiment 3: Different from Embodiments 1 and 2, the spiral section 22 is arranged between the magnetization section 23 and the treatment section 24; this allows the magnetized sewage to enter the treatment section 24 at a higher speed, and then be absorbed and treated by the treatment cake 243, so that the efficiency is further improved.

[0042] The present invention is described by preferred embodiments, and the above three embodiments are further described in different scenarios. Those skilled in the art know that various changes or equivalent substitutions can be made to these features and embodiments without departing from the spirit and scope of the present invention. The present invention is not limited to the specific embodiments disclosed herein, and other embodiments falling within the claims of this application belong to the scope of protection of the present invention.

Claims

1. A drainage and sewage system, comprising a prefabricated building component (1), characterized in that: It also comprises a drainage treatment string (2), wherein the building prefabricated component (1) is pre-equipped with a plug-in portion (11) that cooperates with the drainage treatment string (2), and during assembly, the drainage treatment string (2) is plugged into the plug-in portion (11) to treat building drainage; the drainage treatment string (2) is box-shaped, and the drainage treatment string (2) comprises an adsorption section (21), a magnetization section (23), a treatment section (24) and a sewage discharge section in sequence according to the flow direction of sewage.

2. A drainage and sewage system according to claim 1, characterized in that: The adsorption section (21) comprises an adsorption chamber (211), an adsorption platform (212) is fixedly arranged in the middle of the adsorption chamber (211), the adsorption platform (212) divides the adsorption chamber (211) into a water inlet chamber (213) and a water outlet chamber (214), and a detachably connected adsorption box (215) is also arranged on the adsorption platform (212), the adsorption box (215) is filled with adsorption particles, and after the sewage enters the water inlet chamber (213), it passes through the adsorption box (215) and enters the water outlet chamber (214), and then flows to the magnetization section (23).

3. A drainage and sewage system according to claim 2, characterized in that: The adsorption box (215) is filled with several layers of adsorption particles along the flow direction of the sewage, and the material of the adsorption particles includes one or more of activated carbon, oil-absorbing resin, sodium alginate and its derivative materials, chitosan adsorption materials, diatomaceous earth adsorption materials, etc.

4. A drainage and sewage system according to claim 2, characterized in that: The magnetizing section (23) comprises a magnetizing cavity (231), the magnetizing cavity (231) is trumpet-shaped, and the cross-sectional area of ​​the magnetizing cavity (231) decreases along the flow direction of the sewage. The magnetizing section (23) is also provided with a magnetic cavity (232) along the circumference of the magnetizing cavity (231), and a magnet (233) is provided in the magnetic cavity (232) to form a magnetic field in the magnetizing cavity (231). After the sewage enters the magnetizing cavity (231) and is magnetized, it flows to the treatment section (24).

5. A drainage and sewage system according to claim 4, characterized in that: The treatment section (24) is provided with a water flow channel (241). The treatment section (24) is provided with a plurality of treatment troughs (242) cooperating with the water flow channel (241) along the flow direction of the sewage. A treatment cake (243) is inserted into the treatment trough (242). A sewage treatment agent is provided in the treatment cake (243) to treat and filter the sewage. After the sewage flows through the treatment section (24), it flows to the sewage discharge section.

6. A drainage and sewage system according to claim 5, characterized in that: The sewage discharge section is provided with an outlet pipe and a collection box, so that the treated wastewater can be introduced into the collection box by using the outlet pipe.

7. A drainage and sewage system according to claim 6, characterized in that: The device further comprises a spiral section (22), wherein the spiral section (22) is arranged between the adsorption section (21) and the magnetization section (23), wherein the spiral section (22) comprises a spiral water passage cavity (221) and a spiral portion (222) arranged in the spiral water passage cavity (221), wherein the spiral portion (222) comprises a spiral rod (223) and a fixing plate (224), wherein the spiral rod (223) is arranged coaxially with the spiral water passage cavity (221), wherein both ends of the spiral rod (223) are provided with integrally formed conical heads (2231), wherein the spiral rod (223) is provided with a thread groove (225), wherein both ends of the spiral rod (223) are rotatably connected to the fixing plate (224), and wherein the fixing plate (224) is provided with a water passage hole (2241); Both ends of the spiral water passage chamber (221) are provided with plug-in grooves (2211) that cooperate with the fixing plate (224); during sewage treatment, the fixing plate (224) is inserted into the plug-in grooves (2211) so that the spiral rod (223) is located in the spiral water passage chamber (221).

8. A drainage and sewage system according to claim 7, characterized in that: The adsorption section (21), the spiral section (22), the magnetization section (23), the processing section (24) and the sewage discharge section are all provided with sealing covers (25).

9. An assembled building, characterized in that: A drainage and sewage system as described in any one of claims 1 to 8 is adopted.

Citation Information

Patent Citations

  • A prefabricated building and its sewage system

    CN114534355B

  • Sewage treatment device

    CN107619147A

  • Water quality treatment and purification device with magnetic auxiliary impurity separation function for waterworks

    CN111646628A

  • filter device for water purification

    DE102016122516A1

  • Cleaning method and device for waste water

    JP2000202482A